DS4-T5. Zaandam Meeting 24-25 February. Andrew Faulkner - UMAN. Beam Forming: at patch/tile level for phased arrays. DS4-T3. DS4-T4. 1. 2. 3. n (100?). Antennas. LNA. DS4-T1. Tile. Magic beamforming system. DS4-T6. Obs data. DS4-T5. Control. Power supplies, monitoring etc. - PowerPoint PPT Presentation
Citation preview
DS4-T5
Zaandam Meeting
24-25 February
Andrew Faulkner - UMAN
DS4-T5
Beam Forming: at patch/tile level for phased arrays
Obs data
Control
Power
Magic beamformingsystem
Power supplies, monitoring etc.
1 2 3 n (100?)
LNA
Antennas
Tile
DS4-T4
DS4-T1
DS4-T6
DS4-T5
DS4-T3
DS4-T5
Beam forming:Considerations
Number of fields of view (FOVs)
Acts as SKA ‘multiplier’
RFI mitigation – info DS4-T3/2 vital early Power budget – heat!
106 tiles, maybe 108 elements so:
COST AND MASS PRODUCTION
DS4-T5
Approaches - Analogue
LNA
RF Based Beam forming
ADC
ADC
Control
FOV
AnotherFOV
DS4-T5
Approaches - Digital
LNA
ADC
Control
ADC ADC ADC
DSP DSP DSP DSP
Digital Beam forming
DS4-T1
DS4-T5
Projects in DS4-T5
ASTRON MMIC based analogue beamforming
€558k
UMAN/OXF All digital system to each antenna element
€1,551k
INAF Develop digital beamforming for Northern Cross
€185k
OPAR/CNRS Develop analogue beam forming components
€807k
ASTRON Photonics investigation (wild card??)
GaAs based beamformers development for EMBRACE
WP8: Element level DSP design - key cost driver
WP11: Tile level digital beam former.Design and build FPGA based DSP coupled with
digital beamforming system using FPGA and Alpha
system. DS6??
Silicon based beamformers development
PICS low cost analogue interconnect technology
DS4-T5
Trade Offs
Analogue DigitalProven? Yes Not yet….
Flexibility Features Designed in Programmable
FOVs A few (2) Potentially many
RFI resilience Fixed Can be changed
Calibration for 106 tiles Tricky! Good
Cost ‘low’ ‘high’
Single Beam performance Excellent Excellent
DS4-T5
Some Numbers...Participants: 1. Astron 2. UMAN 4. OPAR 5. INAF 8. OXF 26. CNRS Qinetiq
Man months Nat 43.2 47.0 10.0 43.2 18.0Man months EC 28.8 18.0 8.0 28.8 36.0Man months TOTAL 60.0 72.0 65.0 18.0 72.0 54.0
Monthly rate (k€/mth) 4.1 4.9 7.0 4.1 ????Manpower cost (k€) Nat 177.1 230.3 70.1 177.1 135.0Manpower cost (k€) EC 118.1 88.2 56.1 118.1 72.0Manpower cost (k€) TOTAL 295.2 318.5 126.2 295.2 207.0
Equipment Cost Nat 13.8 45.0 11.0 13.8 0.0Equipment Cost EC 9.2 95.0 9.0 9.2 10.0Equipment Cost TOTAL 90.0 23.1 140.0 20.0 23.1 10.0
Travel (k€) Nat 14.2 6.0 14.2Travel (k€) EC 9.4 4.0 9.4Travel (k€) TOTAL 18.0 23.6 25.0 10.0 23.6 10.0
Other (k€) Nat 25.7 25.7Other (k€) EC 17.1 17.1Other (k€) TOTAL 42.8 42.8
Cost model FC AC AC FC AC FC
Sub costs (k€) Nat 556.8Sub costs (k€) ECSub costs (k€) TOTAL 556.8
Overhead Nat funded 81.5 16.2 81.5Overhead EC funded 30.8 13.0 30.8
Participant Totals (k€) Nat 312.3 103.3 312.3Participant Totals (k€) EC 184.7 82.1 184.7Participant Totals (k€) inc. 497.0 185.4 497.0
DS4-T5
Reality
MUST pursue all options
Major/dominant cost driver for SKA
2-PAD ALL Digital testbed
Final SKA system possibly an analogue/digital mix