HIPPOBAGs are so easy to use. They come flat packed so we can store them on site, and can be moved easily once full.

Tony Davis Tony Davis Contracts Manager Dryplast

“”

What was the problem?All of the sites are new build projects, All of the sites are new build projects, which is particularly difficult as each plot required a skip outside for ease of use. The contractors were carrying plasterboard from each plot to a central compound where the skips were situated, which was very difficult and time consuming time consuming

What has HIPPO done?Using HIPPOBAGs we are able to dedicate three bags per plot and situate them directly outside. Once full, we use a forklift to move the bags to a central location where they are collected in bulk

What were the results?We have seen a significant saving in We have seen a significant saving in time from the contractors moving the waste to a central location to being able to just fill the bags at each plot