Dry HCl Gas Generation Plant DETAILS TO BE PROVIDED BY THE CLIENT 1. Capacity of HCl gas required : __________ (kg/hr) 2. Dryness desired : __________ (% w/w of moisture tolerated) 3. Dry HCl Gas Generation Plant to be selected (please tick) :- Boiling of 30% Hydrochloric acid system Sulphuric acid system Calcium chloride system 4. If Sulphuric acid system is selected; 1. Desired concentration of spent H2SO4 : _________ (w/w) 2. HCl content in spent H2SO4 : <1.0% (w/w) OR <0.5% (please tick choice) (w/w) 5. Whether Vent Scrubber required : ___________ (Yes/No) 6. Control Instrument (auto control) required : _________ (Yes/No) 7. Available utilities: Cooling water (inlet temp.) : ____________ (deg. C) Chilled water (inlet temp.) : ____________ (deg. C) Brine (inlet temp.) : ____________ (deg. C) 8. Temp. of gas desired : ____________(deg. C) 9. Desired pressure of gas at outlet : ____________(inches of water col.) 10. Scope of supply (Please tick) a. Complete Plant b. Only gas components/equipment including interconnecting glass pipeline and valves.

Dry HCl Gas Generation Plant

  • Upload
    srshah

  • View
    212

  • Download
    0

Embed Size (px)

DESCRIPTION

Questionnare for dry HCl Generation plant

Citation preview

Page 1: Dry HCl Gas Generation Plant

Dry HCl Gas Generation Plant

DETAILS TO BE PROVIDED BY THE CLIENT1. Capacity of HCl gas required : __________ (kg/hr)2. Dryness desired : __________ (% w/w of moisture tolerated)3. Dry HCl Gas Generation Plant to be selected (please tick) :- Boiling of

30% Hydrochloric acid system Sulphuric acid system Calcium chloride system

4. If Sulphuric acid system is selected;1. Desired concentration of spent H2SO4 : _________ (w/w)2. HCl content in spent H2SO4 : <1.0% (w/w) OR <0.5% (please tick

choice) (w/w)5. Whether Vent Scrubber required : ___________ (Yes/No)6. Control Instrument (auto control) required : _________ (Yes/No)7. Available utilities:

Cooling water (inlet temp.) : ____________ (deg. C)Chilled water (inlet temp.) : ____________ (deg. C)Brine (inlet temp.) : ____________ (deg. C)

8. Temp. of gas desired : ____________(deg. C)9. Desired pressure of gas at outlet : ____________(inches of water col.)10. Scope of supply (Please tick)

a. Complete Plantb. Only gas components/equipment including interconnecting glass

pipeline and valves.