Dry Creek Adaptive Management Plan (AMP)

Final

Prepared for

Sonoma County Water Agency

Prepared by

Marc Porter, David Marmorek, Darcy Pickard and Katherine Wieckowski ESSA Technologies Ltd.

Suite 300, 1765 West 8th Avenue Vancouver, BC V6J 5C6

May 9, 2014

Page 2: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Citation: Porter, M., D. Marmorek, D. Pickard, and K. Wieckowski. 2014. Dry Creek Adaptive Management Plan (AMP). Prepared by ESSA Technologies Ltd., Vancouver, BC for Sonoma County Water Agency, Santa Rosa CA. 32 pp. + appendices. © 2013 ESSA Technologies Ltd. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from Gregg Horton or David Manning, Sonoma County Water Agency, Santa Rosa, California.

ii

Page 3: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Executive Summary The Russian River Biological Opinion (RRBIOP, NMFS 2008) identifies the operation of Warm Springs Dam as adversely modifying critical habitat in Dry Creek and jeopardizing coho salmon (endangered) and steelhead (threatened). To alleviate these impacts, the RRBIOP compels the Sonoma County Water Agency (Water Agency) and the United States Army Corps of Engineers (USACE) to implement projects along up to six miles of mainstem Dry Creek. Projects will be designed and implemented with the objective of addressing the lack of low water velocity areas with adequate cover and appropriate water depth that limit habitat suitability for juvenile salmonids in general and juvenile coho salmon in particular. Multiple habitat enhancement projects over the 14 mile length will occur in phases during the 15 year time-period covered by the RRBIOP. A question raised by the RRBIOP is whether Dry Creek habitat enhancements will have the desired benefits. This question is important both for receiving credit toward the total amount of habitat enhancements set forth in the RRBIOP (six miles) and for assessing the relative effectiveness of various habitat enhancements options. For the latter reason, the RRBIOP states that “an adaptive management, monitoring and evaluation plan” will be developed that identifies “project goals, objectives and success criteria”. ESSA Technologies Ltd. (an independent consulting firm from Vancouver Canada) facilitated the collaborative development of an adaptive management plan (AMP) for Dry Creek in an iterative process of meetings, discussions and document revision. This document captures the outcomes of that process. The goal of the Dry Creek AMP is to serve as a guide for monitoring juvenile coho and steelhead populations and the habitats they live in over multiple years to detect change resulting from habitat enhancement. A series of multi-agency workshops were convened to address the following objectives:

1. Identify performance measures; 2. Develop success criteria for each performance measure; 3. Select approaches for evaluating performance measures relative to success criteria; 4. Agree on a set of decision rules for determining credit toward the total amount of habitat

enhancement. Evaluation of performance measures will be based on the results of implementation monitoring to determine if the habitat enhancement was done according to the approved design, effectiveness (habitat) monitoring to determine if the enhancement is having the intended effect on physical habitat quality and validation (fish) monitoring to assess whether the habitat enhancement is achieving the intended biological objective. For each type of monitoring, quantitative data for performance measures will be gathered using specific data collection protocols. These quantitative data will then be used to qualitatively rate whether the habitat enhancement was implemented correctly, whether it is having the desired effect on physical habitat conditions and whether juvenile coho and steelhead are benefiting from the work. Ratings at smaller spatial scales will be combined within or “rolled-up” to larger spatial scales as new habitat enhancement projects are implemented. Results from habitat monitoring will play a central role in determining project success, but results from fish monitoring will influence interpretation of project success, and potentially modify future project design. Information

iii

Page 4: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

gained in earlier phases of the project regarding habitat enhancement measures that provide the most benefit will be fed in to the design adaptively to inform the design of future project phases. In order to arrive at an overall qualitative rating for all habitat enhancements in Dry Creek, qualitative ratings from specific types of monitoring and scales will lead to decisions ranging from no action required (good and excellent ratings) to some remedial action (fair and poor ratings). Finally, qualitative ratings from all types of monitoring will be combined to arrive at an overall decision on how much credit to assign to the entire set of habitat enhancement projects in Dry Creek (Figure 1).

NO

Positive response

Nodetectableresponse

Positive response

Nodetectableresponse

Positiveresponse

Nodetectableresponse

Positiveresponse

Nodetectableresponse

EXCELLENT/GOODContinue to monitor per AMP and proceed with similar enhancements

for miles 4-6.

GOOD/FAIRProceed with enhancing

mile 4 with successful performing elements while continuing to

monitor/adjust negative performing features.

FAIR/POORContinue monitoring and correct site deficiencies, add features, or accept

reduced credit in existing 3 miles. Revisit site

potential and conceptual design priorities for miles

4-6.

FAILBuild pipeline.

>80% of projects effective 70-80% of projects effective

60-70% of projects effective <60% of projects effective

Adjust or monitor

Were habitat enhancements implemented according to approved designs?

Are habitat enhancements across the three enhanced miles working as they should?

Adjust or reduce credit

YES

PARTIAL

1. M

PLEM

ENTA

TIO

N2a

. EF

FECT

IVEN

ESS

2b.

VALI

DATI

ON

3. R

ATIN

G

Figure 1. Process for determining course of action in 2018 after the first three miles of Dry

Creek have been enhanced.

iv

Page 5: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Acknowledgements We are very grateful to the participants who have attended multiple workshops (Appendix 5) in support of the development of the Dry Creek AMP. This includes representatives from the Sonoma County Water Agency, the National Marine Fisheries Service, California Department of Fish and Wildlife, United States Army Corps of Engineers, Inter-Fluve, and ESSA Technologies Ltd. Their ideas form the core content of this document.

v

Page 6: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Table of Contents Executive Summary ..................................................................................................................... iii Acknowledgements ....................................................................................................................... v Table of Contents ......................................................................................................................... vi List of Figures .............................................................................................................................. vii List of Tables .............................................................................................................................. viii Glossary of Terms ........................................................................................................................ ix 1.0 Introduction ........................................................................................................................ 1

1.1 Background ...................................................................................................................... 1 1.2 Adaptive management – the concept ............................................................................... 2 1.3 Purpose of the Dry Creek AMP ....................................................................................... 2

2.0 Project Description ............................................................................................................ 3 2.1 RPA for coho, steelhead and Chinook in Dry Creek ....................................................... 3 2.2 Spatial extent and temporal horizon of the project .......................................................... 3 2.3 Key Decision Points ......................................................................................................... 4 2.4 Actions under consideration for enhancing fish habitat ................................................... 6 2.5 Conceptual model for Dry Creek ..................................................................................... 6 2.6 Objectives ......................................................................................................................... 7

3.0 Key questions, information and decisions ....................................................................... 9 3.1 Types of monitoring ....................................................................................................... 12 3.2 Spatial scale and data rollup ........................................................................................... 13 3.3 Performance measures and monitoring protocols .......................................................... 16

3.3.1. Implementation monitoring design and ratings ...................................................... 16 3.3.2. Effectiveness monitoring design and ratings .......................................................... 17 3.3.3. Validation monitoring design and ratings ............................................................... 23

3.4 Monitoring timeline........................................................................................................ 26 3.5 Reporting schedule ......................................................................................................... 26

4.0 Implementing an adaptive management strategy ......................................................... 28 5.0 References Cited............................................................................................................... 29 Appendices ................................................................................................................................... 33

vi

Page 7: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

List of Figures Figure 1. Process for determining course of action in 2018 after the first three miles of Dry Creek

have been enhanced. ....................................................................................................... iv Figure 2 The adaptive management cycle (Murray and Marmorek 2003; Williams et al. 2007). . 2 Figure 3 Straw decision process for Dry Creek habitat enhancement. The results of effectiveness

and validation monitoring undertaken throughout the 5 years of project implementation from 2013-2017 will be evaluated in 2018 in order to further inform the decision of whether to design and implement future habitat enhancements. ..................................... 5

Figure 4 Conceptual model for the Dry Creek habitat enhancement activities. Color coding indicates the different types of monitoring that will be required to determine whether particular objectives are being met. The brown row at the bottom reflects important factors outside of the control of the Water Agency/USACE but that can nevertheless significantly affect each of the other rows. ...................................................................... 7

Figure 5 Objectives hierarchy for Dry Creek enhancements (organized by the causal relationships depicted in the Dry Creek conceptual model – Figure 4) with associated performance measures (PMs) to be monitored at each level of the hierarchy. ................ 8

Figure 6 Process for determining course of action in 2018 after the first three miles of Dry Creek have been enhanced. Ratings will be based on an objective evaluation by the Joint Monitoring Team in a step-wise phased monitoring approach which includes phyiscal and biological quantitative measurements which lead to qualitative ratings. ................ 11

Figure 7 Hypothetical example of an enhancement reach illustrating the relationship between features, sites, enhancement reaches and project reaches. The collection of all project reaches treated represent the length of stream in Dry Creek ultimately treated and evaluated. ....................................................................................................................... 14

Figure 8 Illustration of the rollup concept for (a) implentation and (b) effectiveness and validation monitoring. .................................................................................................... 15

Figure 9 The adaptive management cycle (Murray and Marmorek 2003; Williams et al. 2007) including the releveant sources of information necessary to implement the AMP on Dry Creek. ............................................................................................................................. 28

vii

Page 8: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

List of Tables Table 1 Timeline of Dry Creek habitat project design, construction, implementation,

monitoring, and evaluation over the next 15 years. Source: Table 33 in NMFS (2008), pg. 264. ............................................................................................................................ 4

Table 2 Qualitative rating for site-level implementation. The qualitative rating is based on a combination of qualitative and quantitative data collected using protocols as modified from Harris (2004) for each feature within the site. ...................................................... 17

Table 3 Primary and secondary habitat performance measures and their associated “near-optimal” quantitative ranges (targets) for coho salmon at feature/habitat unit, site, enhancement reach, and project reach scales that will be directly evaluated at three different flows (spring, summer, winter) during Dry Creek effectiveness monitoring. Reference sources used to inform targeted ranges are provided in Apppendix 6. ......... 19

Table 4 Post treatment site-level effectiveness rating. Standard CDFW habitat ratings based on Harris (2004) have been modified to incorporate Dry Creek RPA-specific quantitative enhancement objectives. ................................................................................................ 21

Table 5 Post treatment enhancement reach- and project reach-level effectiveness rating. ........ 22 Table 6 Primary and secondary biological response performance measures and their associated

target ranges at feature, site, and enhancement reach scales that will be evaluated during Dry Creek validation monitoring. ...................................................................... 25

Table 7 Initial design and timeline for implementation, effectiveness and validation monitoring in Dry Creek. The proposed BACI component of the design will be dependent on establishing concurrently monitored reference sites for comparison. ........................... 27

viii

Page 9: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Glossary of Terms Effectiveness monitoring: Monitoring to determine if the enhancement/restoration is having the intended effect on physical habitat quality.

Estimate: A value (i.e., a point estimate) or range of values (i.e., an interval estimate) applied to a parameter of a population on the basis of sampling statistics.

Features: Individually engineered elements (e.g., large woody debris accumulation, riffle, pool, side channel, alcove, boulder cluster, etc.) that will individually or in composite make up a habitat enhancement site (see definition for Site below). Features can in some cases represent complete habitat units (see definition for Habitat Unit below), while in other cases they represent only structural components within a habitat unit (e.g., large wood placement). Goals1: Desired outcomes from Dry Creek enhancement actions as articulated in applicable documents and agency missions / mandates. Goals are distinguished from objectives as follows:

• Goals are broad; objectives are narrow. • Goals are general intentions; objectives are precise. • Goals are intangible; objectives are tangible (i.e., measurable). • Goals are abstract; objectives are concrete.

There are usually tradeoffs among the goals suggested by different stakeholders. Examples: ‘supply water to Santa Rosa’, ‘significantly improve juvenile coho production out of Dry Creek’.

Habitat Unit: A designation within a habitat classification system that allows stratification (based on natural patterns of variation) when attempting to quantify biological or physical attributes of a stream. For the purpose of habitat condition assessments (Inter-Fluve 2010) habitat units within Dry Creek have been identified as pools, scour pools, riffles, flatwaters, cascades, alcoves, or side channels. Individual habitat unit definitions are as follows:

Main Channel Pool: Pools are areas with very low velocities and multiple flow vectors, spanning at least 60% of the channel width, with minimum residual depths of 2.0 feet. Water surfaces are flat.

Scour Pool: Pools that consist of less than 60% of the channel width and are often associated with large wood, sharp meander bends, or boulders and have residual pool depths of at least 2.0 feet.

Riffle: Riffles have obvious surface turbulence and are typically shallow water with low to moderate slopes (<4%). Water velocities are greater than 1 ft/s.

Flatwater: Flatwaters have little surface turbulence and lack significant residual depth (less than 2 feet), with water velocities greater than pools. Flatwaters are deeper and velocity is less than in riffles; water surfaces are gently sloping.

Cascade: Cascades are steep gradient (>4%) riffles with short falls, plunges or chutes typically dominated by boulders or bedrock.

1 goal = fundamental objective = what you want; objective and sub-objectives = means objectives = how to get what you want

ix

Page 10: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Alcove/Backwater Pool: Alcove/backwater pools are pools located off the main channel in alcove or backwater areas. These units do not have a downstream flow component at the time of the survey.

Side Channel Pool/Riffle/Flatwater: Side channels split from the main channel and reconnect downstream. Side channels can be categorized as side channel pools, riffles, or flatwaters based on the dominant habitat type in the side channel.

Implementation monitoring: Monitoring to determine if the habitat enhancement/restoration was done according to the approved design.

Large woody debris: A large piece of relatively stable woody material having a diameter greater than 30 cm (12 inches) and a length greater than 2 m (6 feet) that intrudes into the stream channel.

Objectives: The proposed means of achieving goals. Objectives are a disaggregation of goals into a logical hierarchy of desired attributes of the system. Higher level objectives in the objectives hierarchy may reflect a combination of conditions that are not directly measurable with a single metric, but sub-objectives lower in the hierarchy should correspond to performance measures that are directly measurable. (Example: ‘create and maintain 6 miles of coho habitat’).

Performance measure: A method of assessing the attainment of an objective in either quantitative or descriptive terms. More technically, the variable measured during monitoring (or calculated during analysis) and reported as an estimate of the performance of one or more management actions against one or more objectives. Performance measures can also be proxy measures or indicators for something that cannot be measured directly. Reach: a) Any specified length of stream; b) A relatively homogeneous section of a stream having a repetitious sequence of physical characteristics and habitat types; or c) a regime of hydraulic units whose overall profile is different from another reach. It is often the principal sampling unit for collecting physical, chemical, and biological data.

Enhancement reach: A specified collection of enhancement sites (see definition for site below) that are implemented in close proximity to one another.

Project reach: A specified collection of enhancement reaches (see definition for Enhancement Reach above)

Site: One or more engineered habitat features (see definition for Features above) that have been designed to work in combination to enhance a stream reach.

Suitable habitat: Environments used by a particular species or particular life stages which provide all requirements for survival (e.g., food, shelter) at a level deemed acceptable based on project goals.

Temporal scale: The length of time over which a certain kind of response from management actions can be expected to take, and the logical duration of monitoring to detect that response.

Trend monitoring: Monitoring to detect trends in a particular performance measure (or set of performance measures) over time. Validation monitoring: Monitoring to assess whether the habitat enhancement/restoration work is achieving the intended objective (i.e., creating habitat that is inhabited by listed salmonids and

x

Page 11: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

appreciably improves the production and survival of rearing steelhead and coho salmon in Dry Creek).

xi

Page 12: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

1.0 Introduction

1.1 Background In September 2008, the National Marine Fisheries Service (NMFS) through Section 7 consultation under the federal Endangered Species Act (ESA) issued a Russian River Biological Opinion (RRBIOP) on the water supply, flood control, and channel maintenance operations in the Russian River watershed (NMFS 2008). The California Department of Fish and Wildlife (CDFW) issued a consistency determination on November 9, 2009, finding that the RRBIOP was consistent with the California Endangered Species Act (CESA). The RRBIOP identifies the operation of Warm Springs Dam (WSD) as adversely modifying critical habitat in Dry Creek and jeopardizing coho (endangered) and steelhead (threatened). The RRBIOP includes a Reasonable and Prudent Alternative (RPA) with a 15 year timeline for implementation that minimizes these adverse impacts. More specifically, the RPA compels the Sonoma County Water Agency (Water Agency) and the United States Army Corps of Engineers (USACE) to conduct projects along six miles of Dry Creek to enhance habitat and reduce stream velocities during critical fish-rearing months. Guidance for the types of habitat enhancement projects and target habitat conditions are outlined in the RPA. Many of the site specific details (e.g., location, form, connectivity) are identified in Inter-Fluve’s Conceptual Design Report (Inter-Fluve 2012) and depend on the opportunities available in the system, which in turn are affected by both geomorphic characteristics and the cooperation of landowners. The RPA also states that the Water Agency will develop and implement an adaptive management plan to assess the effectiveness of the habitat enhancement projects:

“Prior to construction of Phase III, IV and V enhancement projects, SCWA [the Water Agency] will develop and submit to NMFS and CDFG [CDFW] for review and approval, a post-construction adaptive management, monitoring and evaluation plan that will identify project goals, objectives and success criteria.” (pg. 265; NMFS 2008)

To meet this, the Water Agency asked ESSA Technologies Ltd. (an independent consulting firm from Vancouver Canada) to facilitate the collaborative development of an adaptive management plan (AMP) for Dry Creek, involving all parties to that portion of the RPA, together with other experts, in an iterative process of meetings, discussions and document revision. The current AMP incorporates our best understanding of agreements reached during multi-agency workshops and meetings convened between 2010 and 2012 to define approaches for monitoring Dry Creek habitat enhancements so as to inform RRBIOP crediting toward the total amount of habitat enhancement area outlined in the RRBIOP. The key entities involved in implementing the RPA for Dry Creek (NMFS, CDFW, Water Agency, USACE, and Inter-Fluve) were encouraged to participate in the AMP process so that the final document accurately captures the knowledge, goals and objectives of all parties. Throughout this document we will refer to the entities that participated in this process as the “Dry Creek AMP Working Group”. The initial one mile targeted for habitat enhancement of Dry Creek has been selected. This “Demonstration Mile” represents a pilot project that will serve as a guide for habitat enhancement work in later phases. It is a pilot both in regards to the design of the habitat projects themselves as well as to the associated implementation, effectiveness and validation monitoring approaches that will be used to gauge overall project success. It is expected that aspects of the AMP will be adjusted based on results from pilot implementation and analyses in the Demonstration Mile. The initial monitoring and evaluation methods described herein will be evaluated relative to their cost, feasibility and

1

Page 13: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

overall utility and may be revised as necessary. The general schedule for developing the Dry Creek AMP is summarized in Appendix 1.

1.2 Adaptive management – the concept Adaptive management (AM) is a formal process for continually improving management policies and practices by learning from their outcomes (Taylor et al. 1997). The fundamental principles of AM include:

• learning to reduce critical management uncertainties; • using what is learned to change management policy and practice (i.e., “closing the loop”;

ensuring what is learned informs decisions); and • following a formal, structured, and systematic process (i.e., not ad-hoc, trail-and-error, or

simply reactionary adaptation). AM involves synthesizing existing knowledge, exploring alternative actions, making explicit predictions of their outcomes, selecting one or more actions to implement, monitoring to see if the actual outcomes match those predicted, and then using these results to learn and adjust future management plans and policy (Walters 1986, Taylor et. al 1997, Murray and Marmorek 2003, Williams et al. 2007). This sequence can be summarized by the following 6-step process (Figure 2).

Figure 2 The adaptive management cycle (Murray and Marmorek 2003; Williams et al. 2007).

The AM process for the Dry Creek Project is intended to be iterative. After management treatments are completed and assessed, the knowledge gained will be applied to improve the next round of management, recognizing that pressures from external ecosystem drivers should be expected to change over time and these changes may influence the effectiveness of management strategies.

1.3 Purpose of the Dry Creek AMP The goal of this Dry Creek AMP is to serve as a guide for monitoring juvenile coho and steelhead populations and the habitats they live in over multiple years (pre- and post-enhancement) to detect change resulting from the treatment conditions and distinguish between background noise or non-treatment variables (NMFS 2008). Describing rigorous methods to be

Assess

Design

Implement

Adjust

Evaluate

Monitor

Adaptive Management

Cycle

2

Page 14: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

employed for implementation, effectiveness and validation monitoring are the objectives of the AMP, as outlined below:

1) Defining the spatial extent and temporal horizon of the project and the alternative management actions under consideration;

2) Describing the context for Dry Creek monitoring so as to highlight the linkages between management actions and habitat attributes and fish response;

3) Describing the performance measures / indicators associated with each objective as outlined by the RRBIOP; and

4) Identifying decision rules for assessing the success of current and/or future management actions.

The key performance measures (PMs) that will be used to evaluate the implementation and effectiveness of Dry Creek enhancement projects are outlined in the RPA. Monitoring of project effectiveness will rely principally on an adaptation of procedures outlined in Harris (2004), with use of associated pre- and post-treatment checklists developed by CDFW. Standard CDFW checklists described by Harris (2004) for evaluating performance of constructed features (i.e., instream habitat, off-channel habitat and bank stabilization), have been expanded and modified by NMFS, ESSA, and the Water Agency in order to incorporate the additional quantitative metrics in the Dry Creek RPA while allowing rollup of project performance evaluations to larger spatial scales of interest (i.e., site and reach).

2.0 Project Description

2.1 RPA for coho, steelhead and Chinook in Dry Creek Within the Russian River BiOp, the RPA can be broadly described as (NMFS 2008, pg. xvii):

1) Avoid the likelihood of jeopardizing the continued existence of endangered Central California (CCC) coho, threatened CCC steelhead and threatened California Coast (CC) Chinook;

2) Avoid the destruction or adverse modification of these species’ critical habitats; 3) Implement actions that are consistent with the legal authority and jurisdictions of the

Water Agency and USACE; and 4) Implement actions that are economically and technologically feasible.

2.2 Spatial extent and temporal horizon of the project The spatial extent of management actions covered by the AMP includes the 14 mile length of Dry Creek, from WSD to the confluence with the Russian River (see Figure 1 in Inter-Fluve 2012). While the tributaries are of interest and the RPA specifies certain actions be taken by the Water Agency in tributaries (NMFS 2008, pg. xvii), they are explicitly not part of the study area and are therefore beyond the scope of the Dry Creek AMP. The temporal horizon for undertaking and evaluating current actions is described in the RPA (Table 33, pg. 264, NMFS 2008, reproduced in Table 1 below). The timeline indicates when various habitats should be enhanced, and identifies key decision points that would occur within 15 years of project initiation (i.e., 2009 – 2023). These mandated decision points are incorporated into the AMP; however, a longer time horizon may ultimately be required to

3

Page 15: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

determine whether statistically and biologically significant changes occur in freshwater production. There is likely to be an inherent time lag between creation of enhanced freshwater habitat and the ramping up of coho populations, and detection of a response is made more difficult by the high variability in estuarine and marine survival rates (Bradford et al. 2005).

Table 1 Timeline of Dry Creek habitat project design, construction, implementation, monitoring, and evaluation over the next 15 years. Source: Table 33 in NMFS (2008), pg. 264.

Years 2009-10 2011-12 2013-15 2016-18 2019-20 2021-23+ Phase I II III IV V VI

Engineering Design

Conceptual Design

Permitting & final design: mile 1

Permitting and final design: miles 2 & 3

Permitting and final design: miles 4-6

Engineering Construction Construct

mile 1 Construct miles 2 & 3

Construct miles 4, 5 and 6

Design evaluation & AM

Evaluate mile 1 & boulder clusters

Evaluate miles 2, 3 & boulder clusters

Evaluate miles 4, 5 and 6

Monitoring

Pre-monitoring Pre and post-monitoring

2.3 Key Decision Points Several decision points over the next ten years will be important for directing the development of habitat enhancement projects in Dry Creek (Figure 3). An inventory of current conditions in Dry Creek and associated feasibility assessment (Inter-Fluve 2010a) has informed the conceptual design for the demonstration project in Mile 1 (Phases I & II in Table 1; see Inter-Fluve 2010b, 2011a, 2011c). Inter-Fluve’s design documents (and reviews by NMFS and CDFW) have moved the project considerably closer to actual construction of habitat enhancement projects (Phase III in Table 1 and Figure 3). Decision points following the completion of habitat enhancement within the first mile and the second and third miles (Phases III and IV, respectively; blue arrows in Figure 3) represent logical places to pause, evaluate the physical habitat response to habitat enhancement projects, and adapt/modify subsequent habitat enhancement projects based on the learning that has taken place through rigorous effectiveness monitoring. Validation (biological response) monitoring will also take place for all phases of the project. However, because of population drivers that are external to habitat conditions in Dry Creek, data from validation monitoring will be supportive to the main data gained through implementation and effectiveness monitoring as described in section 3.3.3 Validation monitoring.

4

Page 16: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Figure 3 Straw decision process for Dry Creek habitat enhancement. The results of

effectiveness and validation monitoring undertaken throughout the 5 years of project implementation from 2013-2017 will be evaluated in 2018 in order to further inform the decision of whether to design and implement future habitat enhancements.

5

Page 17: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

At a higher level is a decision regarding the Water Agency’s and USACE’s level of compliance with the RPA for Dry Creek. This will involve examination of data from implementation, effectiveness and, to a lesser extent, validation monitoring, as well as comparisons against timelines and targets stipulated in the RPA.

2.4 Actions under consideration for enhancing fish habitat According to the RPA (NMFS 2008, Section 3.1.1), habitat enhancement activities will focus on converting sections of stream containing marginal or poor quality habitat to near optimal quality habitats that can accommodate a range of flow releases from WSD. Habitat enhancement will create both winter and summer rearing habitat for juvenile steelhead and coho; with an emphasis on improving habitats for the survival of juvenile coho (NMFS 2008). The RPA outlines specific criteria for desired rearing habitat characteristics (see Table 13 in Inter-Fluve 2010a for summary). In considering alternative actions for enhancing fish habitat it will be important to bear in mind that Dry Creek is a fluvial system with particular physical and biological processes operating longitudinally, vertically, laterally, and temporally (Inter-Fluve 2010a). Consequently, all actions will need to be assessed individually and within the context of the system as a whole (WSD to confluence) in order to affirm the feasibility and sustainability of the enhancement work that is implemented at a project scale. Planned fish habitat enhancements (Inter-Fluve 2012) are intended to emphasize natural stream characteristics, or those which evolve through the geomorphology of a given stream reach. By using enhancement practices that emulate outcomes from natural geomorphic effects, the benefits provided to juvenile coho and steelhead will be optimized by increasing the amount of high quality rearing habitat. Because these approaches occur within a dynamic system, they should not be expected to be static through time. However, they should provide approximately similar quantities of habitat through time within an enhancement reach (Inter-Fluve 2012); the planned adaptive management approach outlined in the current document will guide the process of assessing whether this is indeed the case.

2.5 Conceptual model for Dry Creek A conceptual model for the Dry Creek habitat enhancement is shown in Figure 5. The conceptual model indicates the expected salmonid habitat and population response as a result of management actions (yellow row, second from bottom) implemented in Dry Creek. Implementation of listed management actions will result in various fluvial geomorphologic processes (darker blue row, third from bottom) taking place which will in turn result in fish habitat creation (light blue row, third from top) and an eventual fish response (juveniles – grey row, second from top, and adults – top tan row). Habitat creation and fish response relate most clearly to the objectives outlined in the RPA. Therefore, progress towards these objectives will need to be monitored and evaluated to determine if the implemented management actions are working as intended. The brown bottom row of Figure 5 shows factors currently outside the control of Dry Creek management actions, but which could have significant effects on the rate of recovery of habitat, fish populations and other ecosystem components. These factors operate concurrently with management actions, potentially generating cumulative effects that could make it difficult to tease out their relative importance. The AM monitoring design will attempt to account for and/or control for these factors by

6

Page 18: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

creating contrasts (to the extent possible) in time and space (e.g., reference sites subjected to the same external factors but not enhanced).

Figure 4 Conceptual model for the Dry Creek habitat enhancement activities. Color coding indicates the different types of monitoring that will be required to determine whether particular objectives are being met. The brown row at the bottom reflects important factors outside of the control of the Water Agency/USACE but that can nevertheless significantly affect each of the other rows.

2.6 Objectives The objectives hierarchy for Dry Creek (Figure 5) provides a structured way of displaying multiple levels of objectives within the project and the relationships between these objectives. All objectives (at some level of the hierarchy) are measurable by one or more performance measures (PMs).

7

Page 19: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Figure 5 Objectives hierarchy for Dry Creek enhancements (organized by the causal relationships depicted in the Dry Creek conceptual model – Figure 4) with associated performance measures (PMs) to be monitored at each level of the hierarchy.

The RPA has directed the Water Agency and USACE to implement enhancements that will improve the quality of rearing habitat and appreciably increase the survival of juvenile salmonids in Dry Creek in both summer and winter months (NMFS 2008, pg. xvii). At the next level of objective specificity, the RPA lists the expected quantified habitat benefits of the RPA on Dry Creek:

• 96,500 m2 of habitat created for steelhead (pg. 281 in RRBIOP), assuming that the 6 miles of enhanced pool-riffle habitat averages 10 m in width (i.e., 6 mi * 5280 ft/mi * 0.3048 ft/m * 10 m width) distributed over 8+ sites of Dry Creek (upper, middle, lower),

• 96,500 m2 of high quality habitat created for coho (pg. 289 in RRBIOP, same assumptions as for steelhead) distributed over 8+ sites of Dry Creek (upper, middle, lower),

• An additional 3,000 to 6,000 m2 of coho rearing habitat from boulder clusters (pg. 289 in RRBIOP), plus 5,000 to 10,000 m2 of steelhead habitat from boulder clusters (pg. 282 in RRBIOP) located between enhanced reaches,

Effectiveness Monitoring PMs Primary: velocity, depth, shelter value pool/riffle ratio Secondary: water temperature, dissolved oxygen, canopy, quiet water in winter, backwater access, habitat connectivity, spawning riffle depth & substrate size

EFFECTIVENESS OBJECTIVES • Increase stream complexity • Increase quantity & quality of suitable coho and steelhead

summer rearing habitat • Increase quantity & quality of suitable coho and steelhead winter

refugia habitat

VALIDATION OBJECTIVES • Increase wild coho and steelhead densities, abundance and life

history diversity

GOAL Significantly improve coho and steelhead production

IMPLEMENTATION OBJECTIVES • Construct backwaters, alcoves, pools and riffles, stabilize banks • Install boulder clusters and LWD • Manage riparian vegetation for purposes of improving plant

species diversity, structural complexity and overall habitat values

Validation Monitoring PMs Primary: habitat use, abundance/density (juveniles), relative abundance (smolts) Secondary: growth/size, survival, fidelity, community indices

Implementation Monitoring PMs See modified Harris (2004) habitat enhancement checklists (Appendix 2)

8

Page 20: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

• No negative impact on Chinook.

The RPA also translates these expected habitat improvements into specific expected biological responses, while recognizing that the timing of those responses will be delayed (i.e., will not occur immediately after the habitat enhancement activities). RPA estimates of benefits to the population from fish habitat enhancements are based on assumptions outlined for juvenile steelhead and coho (pp. 281 and 289). A broader suite of detailed, measurable objectives and associated PMs have been defined that relate to successful achievement of Dry Creek RPA enhancements across different spatial (e.g. features, sites, reaches) and temporal scales.

3.0 Key questions, information and decisions The decision that will be made in 2018 to answer the key question of whether to enhance the remaining three miles of Dry Creek will depend on the information collected and associated decisions made relative to the performance of the first three miles of habitat construction until then. For example, if the three miles enhanced by 2018 were functioning well then the decision could be made to similarly enhance additional miles. However, alternative decisions might be made (e.g., undertake additional work, re-evaluate or eliminate poorly performing enhancement techniques/reaches, build pipeline, etc.) if considerably less than a desirable amount of habitat enhancement projects were considered to be effective or a much smaller amount of enhanced coho habitat was considered near-optimal than is listed in the RPA. This AMP incorporates the performance measures (PMs), target criteria for those PMs and the broad decision rules that will govern future actions and decisions over the 15 years encompassed by the RRBIOP (2009-2023). Decision rules adopted by the agencies will drive the design of pre- and post-construction habitat monitoring. It is expected that feedback from monitoring with regards to how the Dry Creek ecosystem actually responds to habitat enhancements, which techniques are ultimately effective, and which factors (illustrated in the conceptual model – Figure 4) are outside of management control (e.g., extreme climatic events) will allow for continued learning and innovation as well as adaptations of monitoring protocols as appropriate. In short, the results of the monitoring will answer the key questions which inform the decision process. A Joint Monitoring Team consisting of representatives from NMFS, CDFW, USACE and the Water Agency will be responsible for collecting and evaluating monitoring data. This Adaptive Management Plan is intended to inform the subsequent phases of monitoring by incorporating feedback about the design, implementation and performance of the various techniques and features through decision rules that incorporate information collected from monitoring. Some decision rules are binary and fairly straightforward (e.g., yes or no response). For example, under implementation monitoring, the Joint Monitoring Team will evaluate whether habitat enhancement projects (e.g., pool-riffle sequencing) have been built according to their respective design plans. If the answer is yes, no action is required. If the answer is partially, the Joint Monitoring Team documents deviations from the approved designs (i.e., modifications, additions or omissions) and a course of remediating actions and/or additional monitoring is determined.

9

Page 21: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Decision rules for effectiveness monitoring are more nuanced, and require a mix of quantitative and qualitative information that involve decision rules at multiple scales to determine a suitable course of action. For example, there are decision rules which involve several possible action alternatives on a response continuum ranging from perfectly functioning habitat enhancements to habitat enhancements that do not function at all. Such a continuum necessitates management actions ranging from no action to no or reduced credit (Figure 6). Although Figure 6 pertains specifically to the first three miles enhanced between now and 2018, it could be extended (with or without modification) for additional miles of habitat enhancement after the 2018 decision point. No feature or site can receive a failed rating – in this case, some action is required to either repair, replace or accept reduced credit. The feedback portion of the AMP comes into play through the phased approach of tracking project performance from the conceptual design and approved construction design to the overall implementation rating and effectiveness rating through time. For example, if techniques, features or sites do not perform as expected, this could be explained by a poor design, or a good design but poor implementation. The latter instance would be addressed at the implementation monitoring phase. Alternatively, if the design plans were jointly approved by NMFS and CDFW and the overall implementation rating was favorable yet the overall effectiveness rating was poor, the Joint Monitoring Team may decide to eliminate poorly performing techniques in future phases of construction. The Joint Management Team would then determine how much credit would be applied depending upon the relevant information contained in the design feasibility analysis, and the outcome of previous monitoring phases and/or future monitoring phases (eg. validation).

10

Page 22: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

NO

Positive response

Nodetectableresponse

Positive response

Nodetectableresponse

Positiveresponse

Nodetectableresponse

Positiveresponse

Nodetectableresponse

EXCELLENT/GOODContinue to monitor per AMP and proceed with similar enhancements

for miles 4-6.

GOOD/FAIRProceed with enhancing

mile 4 with successful performing elements while continuing to

monitor/adjust negative performing features.

FAIR/POORContinue monitoring and correct site deficiencies, add features, or accept

reduced credit in existing 3 miles. Revisit site

potential and conceptual design priorities for miles

4-6.

FAILBuild pipeline.

>80% of projects effective 70-80% of projects effective

60-70% of projects effective <60% of projects effective

Adjust or monitor

Were habitat enhancements implemented according to approved designs?

Are habitat enhancements across the three enhanced miles working as they should?

Adjust or reduce credit

YES

PARTIAL

1. M

PLEM

ENTA

TIO

N2a

. EF

FECT

IVEN

ESS

2b.

VALI

DATI

ON

3. R

ATIN

G

Figure 6 Process for determining course of action in 2018 after the first three miles of Dry Creek have been enhanced. Ratings will

be based on an objective evaluation by the Joint Monitoring Team in a step-wise phased monitoring approach which includes phyiscal and biological quantitative measurements which lead to qualitative ratings.

11

Page 23: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

3.1 Types of monitoring Three types of monitoring (implementation, effectiveness and validation) as defined in the RPA (NMFS 2008, pg. 266) will be conducted in order to inform the decisions in Figure 6. Physical habitat responses (e.g., changes in depth, velocity, shelter) can be more directly linked to habitat enhancement actions than can biological responses which may be subject to complex factors outside of human control (e.g., seasonal rainfall patterns, ocean conditions, etc.) that will affect salmon and steelhead survival and abundance on an annual basis. Additionally, it may take a considerable length of time and a considerable amount of habitat enhancement to produce and detect a measurable biological response (Bradford et al. 2005; Roni et al 2010). For these reasons once project conditions have been documented and approved via implementation monitoring, effectiveness monitoring of improvements in physical habitat will be the primary means whereby the results of fish habitat enhancements in mainstem Dry Creek will be credited. Implementation monitoring is “monitoring to determine if the habitat enhancement was done according to the approved design” (NMFS 2008, pg. 266). In other words, did the contractor/builder do what they said they were going to do? Implementation monitoring will occur immediately post-construction and will serve as a check-in point to determine if all the essential elements were placed according to the design as approved by NMFS/CDFW. Based on the results of post-construction implementation monitoring, The Water Agency’s, USACE’s or other engineering techniques and approaches will be re-visited as deemed necessary. Effectiveness monitoring is “monitoring to determine whether habitat enhancement is having the intended effect on physical habitat quality” (NMFS 2008, pg. 266). This definition implies that protocols should facilitate a detailed comparison between baseline habitat quantity and quality data collected prior to any enhancement actions (pre-enhancement monitoring) and the habitat amounts/condition as measured over time after each implementation phase (post-enhancement monitoring). For example, pre-enhancement monitoring will occur prior to each enhancement phase, and post-enhancement monitoring will occur after the first geomorphically-effective flow (i.e., flow that deposits substantial sediment on the flood plain), or within 3 years following each enhancement phase, and then at minimum every 3 years until 2023, to assess the long term sustainability of all implemented habitat enhancement actions. Proposed timing and location of effectiveness monitoring across the 6 enhanced miles is described in Table 7. Validation monitoring is “monitoring to determine whether habitat enhancement work is achieving the intended objective (i.e., creating habitat that is inhabited by listed salmonids and appreciably improves the production and survival of rearing steelhead and coho salmon in Dry Creek”; NMFS 2008, pg. 266). As discussed elsewhere in this document, establishing the temporal component for validation monitoring (i.e., when should validation monitoring start and for how long) will be challenging because of the inherent time lag between the physical habitat response and the expected biological response. Statistical power to detect changes in freshwater fish production depends strongly on the number of years of pre-enhancement baseline monitoring (Bradford et al. 2005; Parnell et al. 2003) and may require an extensive amount of habitat to be enhanced in order for there to be a measurable response (Roni et al. 2010). Due to serious sampling challenges given the current channel form in Dry Creek (i.e., water depths, velocities and water clarity common in Dry Creek limit efficacy of juvenile sampling techniques)

12

Page 24: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

there is the added complexity of how much baseline population monitoring can be effectively conducted in the time frame prior to scheduled habitat enhancements (Water Agency 2009). Proposed timing and location of validation monitoring across the 6 enhanced miles is described in Table 7.

3.2 Spatial scale and data rollup In addition to the temporal scale (discussed above) the spatial scale at which data to evaluate PMs are collected will include four progressively broader scales: feature, site, enhancement reach, project reach (see Glossary of Terms section for definitions). Assessments at a smaller spatial scale can be viewed as the fundamental elements of habitat enhancement at a broader scale. For example, a collection of individual features can be considered the building blocks for habitat enhancement within a given site if they work together to achieve desired target conditions (Figure 7). Depending on the type of monitoring (implementation, effectiveness or validation) and the monitoring objective, data will be used to assess the degree of success in meeting stated objectives as follows. With a few exceptions (see 3.3 Performance measures and monitoring protocols below), quantitative data collected at the feature scale will be used to inform qualitative assessments of individual features for all types of monitoring. The set of qualitative assessments for all features in a given site will then be combined in a data “rollup” to arrive at a qualitative rating (ranging from excellent to fail) for the site. For effectiveness and validation monitoring, this data rollup concept will be similarly extended to the enhancement reach and project reach scales (Figure 8).

13

Page 25: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Figure 7 Hypothetical example of an enhancement reach illustrating the relationship between features, sites, enhancement reaches

and project reaches. The collection of all project reaches treated represent the length of stream in Dry Creek ultimately treated and evaluated.

14

Page 26: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

(a) Implementation monitoring:

(b) Effectiveness and validation monitoring:

Figure 8 Illustration of the rollup concept for (a) implentation and (b) effectiveness and

validation monitoring.

Because of the spatial rollup approach to monitoring described here, an important initial step prior to the commencement of post-construction effectiveness monitoring within a given enhancement reach will be an agreed-on definition of what constitutes a feature and a site within that reach. For features that will be enhanced (e.g., existing pools, placement of boulder clusters) this step could occur prior to the commencement of construction so that the degree of improvement in meeting target habitat conditions can be assessed for a given site. However, in cases where no habitat currently exists (e.g., construction of new off-channel habitat) features and sites will be defined immediately following construction (i.e., during implementation monitoring). For purposes of the Dry Creek AMP, a site is defined as one or more engineered habitat features that have been designed to work in combination within a stream reach. The degree of hydrologic connectivity between features over a range of flows will be used as the primary criterion for determining which features comprise a given site. While hydrologic connectivity is an important consideration during the design phase, it will be necessary to confirm that all features were implemented according to the approved design (see 3.3.1 Implementation monitoring below) so that, if necessary, adjustments to which features constitute a given site can be documented. An enhancement reach is defined as a specified collection of enhancement sites that are implemented in close proximity to one another. Most often, an enhancement reach will represent a well-defined area from which to stage construction for a particular group of features/sites. The project reach is a collection of enhancement reaches. In 2018, sufficiency of progress toward habitat enhancement in Dry Creek will be made based on how well the project reach is functioning from both a physical habitat perspective (via effectiveness monitoring) as well as a biological perspective (via validation monitoring).

15

Page 27: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

3.3 Performance measures and monitoring protocols The basis for monitoring will be performance measures (PMs) and associated protocols to assess habitat enhancement measures relative to these measures. PMs are quantitative and qualitative criteria for measuring or assessing the success of project activities that are intended to support agency management objectives. PMs will provide information on how well the Dry Creek habitat enhancements have achieved their intended benefits (in aggregate, and where appropriate and feasible, their independent benefits or unintended impacts). Consequently, PMs include explicit, pertinent and objectively verifiable results achieved at lower levels of the objectives hierarchy, leading towards the achievement of higher level project objectives and goals. PMs are based on the expected physical and biological responses under each objective (e.g., improved rearing habitat is an example objective in the RRBIOP). Associated elements include post-project treatment mitigations which would be initiated if the expected target criteria are not met. The summary of PMs and their associated monitoring protocols in the sections that follow describe the habitat and fish response indicators, and the types of decisions they will inform. Given the nature of the AMP, the list of PMs and associated targets (i.e., success criteria) may be revised depending upon data feedback from the initial monitoring of implemented enhancement projects.

3.3.1. Implementation monitoring design and ratings The focus of implementation monitoring is simply to determine whether actions have/have not been undertaken as intended/planned. As a matter of course, NMFS/CDFW will approve the construction plans for each phase of project construction (phases of overall project construction for habitat enhancement on mainstem Dry Creek are listed in Table 1). This approval is based on several factors including whether habitat enhancement in selected reaches is being designed in such a way to maximize the benefit to juvenile salmonids given the geomorphic opportunities and other constraints in the immediate vicinity of the enhancement reach. The implementation monitoring design can be envisioned as a way to ensure that each feature has been constructed when, where and how intended and without any structural changes or omissions that would compromise integrity. Monitoring protocols outlined in Harris (2004) and associated implementation monitoring checklists (customized as necessary for RPA assessment) provide a useful, consistent template that will be used within the AMP for describing/documenting the implementation status of engineered enhancements in Dry Creek reaches. There is a separate checklist with respect to the three relative locations within the stream channel where habitat enhancement is being contemplated: 1) instream, 2) off-channel, 3) channel reconstruction and bank stabilization. Enhanced features will be assessed using modified Harris (2004) implementation checklists (Appendix 2). Suites of feature-level assessments will then be rolled-up into a final composite site rating (Table 2) that will be used to determine whether enhancements at a particular site are considered successful or whether further remediation will be necessary. The final overall qualitative site-scale rollup assessments of habitat enhancement implementation (i.e., excellent, good, fair, poor, fail) will be undertaken by a Joint Monitoring Team consisting of representatives from NMFS, CDFW and either the Water Agency or USACE (as appropriate). In the event that implementation was insufficient, remedial action may be recommended by the Joint Monitoring Team (Table 2).

16

Page 28: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Table 2 Qualitative rating for site-level implementation. The qualitative rating is based on a combination of qualitative and quantitative data collected using protocols as modified from Harris (2004) for each feature within the site.

Rating Implementation Status Action

Excellent Exceeds all specifications and all expectations. No action required.

Good Meets all specifications and expectations. No action required.

Fair Does not meet some specifications and expectations due to site capacity or conditions beyond control, but implemented adequately.

If non-compliance is significant enough to jeopardize performance, require remedial action.

Poor Does not meet most specifications and expectations, implemented inadequately.

Serious enough to require remedial action.

Fail Fails to meet specifications, implemented incorrectly. Or, not implemented.

Reduce total project habitat benefit unless remedial actions are implemented.

Summary of implementation monitoring steps

• Every attempt will be made to implement habitat enhancement measures in a manner that is consistent with designs approved by NMFS and CDFW.

• Upon completion of implementation, a Joint Monitoring Team consisting of representatives from NMFS, CDFW and either the Water Agency or USACE (as appropriate) will conduct a walk-through of newly-implemented enhancement reaches in order to evaluate whether the features were implemented according to the approved designs. The outcome of this step will be a site-scale rollup (see Figure 8a and Table 2).

• Modifications to the approved designs will be documented and determination made as to whether modifications were beneficial to performance or otherwise

• If implementation did not sufficiently follow the approved design, the Joint Monitoring Team will recommend what adjustments (if any) should be made.

3.3.2. Effectiveness monitoring design and ratings The RPA highlights high stream current velocities, inappropriate water depths, minimal instream cover, and lack of habitat complexity as serious juvenile salmonid habitat deficiencies in mainstem Dry Creek. Because of this, habitat enhancement designs are focused on improving these specific conditions. Likewise, efforts will be focused on developing performance measures that capture how those habitat conditions change as a result of habitat enhancements. Pre-treatment monitoring will occur prior to habitat enhancement implementation while post-treatment monitoring will occur after the first geomorphically-effective flow (i.e., flow that deposits substantial sediment on the flood plain), or within 3 years of completion. For some features, pre-construction monitoring may not be possible or necessary (e.g., for surfaces that are

17

Page 29: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

not wet prior to implementation) though as built designs/documentation is necessary for further monitoring phases. Primary and secondary PM’s have been identified and agreed to by the Joint Monitoring Team. Primary PMs (Table 3) are those metrics which: 1) will be utilized to inform enhancement effectiveness across feature/habitat unit, site and reach scales; and 2) will determine whether reach and project criteria are being met which will, in turn, influence the amount of RRBIOP habitat credit assigned as well as the future decision on whether or not to continue with an additional three miles of habitat enhancement in 2018. Secondary PMs (Table 3) will assist in determining the effectiveness of various enhancement techniques in changing non-target conditions. Secondary PMs, will not directly relate to RRBIOP crediting. Reference sources for PM targets are provided in Appendix 3. Accounting for variation in seasonal utilization of habitat via PM’s An issue that was not explicit in the RPA but one that was recognized by the Dry Creek AMP Working Group is that juvenile coho during the spring, when they are small, tend to prefer shallower water and slower water velocities than their larger counter-parts in late summer. Coupled with the importance the RPA places on creating “near-optimal” conditions with respect to the four primary PMs listed in Table 3, the Dry Creek AMP Working Group tailored the primary PM thresholds and the associated effectiveness monitoring approach in the following ways. First, there was agreement to adjust the target velocity from a range of 0-0.2 ft/s (listed in the RPA) to a range of 0-0.5 ft/s in order to encompass the range of velocity preferences of juvenile coho when the entire size range of juveniles in freshwater is considered (see discussion in Appendix 4 and associated references in Appendix 3). Second, to the extent safe and practical we will repeat quantitative data collection for velocity, depth and shelter value at stream discharges that represent the seasonal variation critical to each life stage. Because flows in mainstem Dry Creek during the non-winter season are largely controlled by releases from Warm Springs Dam, there was agreement that stream discharge would be a good proxy for season. Therefore, Table 3 lists three PMs for each of three approximate stream discharges to reflect these differences by season: 105 cfs (currently the typical summer discharge), 200 cfs (typical spring discharge), and 1,000 cfs (typical winter discharge).

18

Page 30: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Table 3 Primary and secondary habitat performance measures and their associated “near-optimal” quantitative ranges (targets) for coho salmon at feature/habitat unit, site, enhancement reach, and project reach scales that will be directly evaluated at three different flows (spring, summer, winter) during Dry Creek effectiveness monitoring. Reference sources used to inform targeted ranges are provided in Apppendix 6.

Type of Performance Measure

Per- formance Measure

Life Stage

Biologic Function Spatial Scale Habitat Type

Evaluation Method

Near-Optimal Ranges (Targets)

Spring Flow1

Summer Flow2

Winter Flow3

PRIMARY

Velocity fry Rearing Feature/HU/Site Margins Quant. & Qual. 0-0.5 ft/s n/a n/a Depth fry Rearing Feature/HU/Site Margins Quant. & Qual. 0.5-2.0 ft n/a n/a

Velocity Summer/ winter parr Rearing Feature/HU/Site Pools, off-channel Quant. & Qual. 0-0.5 ft/s 0-0.5 ft/s 0-0.5ft/s

Depth Summer/ winter parr Rearing Feature/HU/Site Pools, off-channel Quant. & Qual. 2-4 ft 2-4 ft 2-4 ft

Shelter value4 Juvenile Rearing Feature/HU Pools, margins, off-channel Quant. & Qual. >80 >80 >80

Pool:Riffle ratio Juvenile Rearing Project reach Pools, riffles Quant. & Qual. 1:2 to 2:1

SECONDARY

Temperature Juvenile Rearing Site Off-channel Quantitative n/a 8-16o C n/a

Diss. oxygen Juvenile Rearing Site Off-channel Quantitative n/a 6-10 mg/l n/a

Canopy Juvenile Rearing Site Off-channel Quantitative 80 %

Quiet water (< 0.5 ft/s) Juvenile Rearing Enhancement

reach

Pools off-channel/ backwaters (in winter)

Quant. & Qual. n/a n/a > 25%

Off-channel access Juvenile Rearing Project reach Off-channel/

backwaters Quant. & Qual. Approx. 0.05 – 0.06 ft/s (ucrit); Approx. 3.3 ft/s (burst speed)

Connectivity of habitats Juvenile Rearing Project reach Pools, riffles,

margins, off-channel Qual. & GIS & Inter-Fluve modeling Undefined

Substrate particle size Adult Spawning Feature/Site Riffles Quant. & Qual. n/a n/a 0.25-2.5 in

Depth Adult Spawning Feature/Site Riffles Quant. & Qual. n/a n/a 0.5-1.6 ft

1 Target coho life stage during spring is newly-emerged feeding fry which use shallower depths than would be preferred later in the summer and winter when fish would be larger. Target spring flow (discharge within the enhancement reach) is 200 cfs (approximately double the summer “base” flow). 2 Target summer flow is 105 cfs 3 Target winter flow is 1000 cfs 4 See Flosi et al. (2003) for a description of how data for shelter value is collected and how shelter values are calculated.

19

Page 31: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Harris (2004) provides effectiveness monitoring protocols and associated monitoring checklists which will provide the foundation for many of the effectiveness evaluations to be utilized in Dry Creek. The standard Harris (2004) effectiveness monitoring checklists have been modified and supplemented with the addition of more quantitative PMs specific to the RPA as it pertains to Dry Creek, as well as to allow rollup of habitat feature effectiveness ratings to the site and reach scale. These include a pre-treatment and a post-treatment checklist for each of the three relative locations within the stream channel where habitat enhancement is being contemplated: 1) instream, 2) off-channel, 3) channel reconstruction and bank stabilization for a total of six checklists, see Appendix 2). Quantitative data As previously discussed (section 3.2 Spatial scale and data rollup), the collection of quantitative data for PMs will form the basis for evaluating overall effectiveness of habitat enhancement measures in Dry Creek (Figure 8b). Collection of quantitative data on velocity, depth and shelter (the three primary PMs that can be measured at the feature/habitat unit scale; Table 3) will take place in locations where habitat enhancement will occur (pre-treatment) or has occurred (post-treatment). Water velocity and depth data will be collected in either of two ways depending on the type of habitat enhancement being evaluated:

• In constructed backwaters and in main channel portions of Dry Creek where constructed riffles will be placed, water depth and average water column velocity will be measured along evenly-spaced cross-sectional transects. The sampling intensity (i.e., measurement interval along each transect as well as the distance between individual transects) will be decided by the Joint Monitoring Team. To help inform that decision, various levels of sampling intensity will be evaluated in an effort to optimize the trade-off between effort and accuracy so as to inform planning for future effectiveness monitoring.

• In main channel (instream) portions of Dry Creek near selected large woody debris structures (log jams, etc.) and boulder placements, water depth and velocity gradients will be measured and mapped in relation to installed features. This “habitat feature mapping” will result in spatial (two-dimensional) depictions of various habitat features showing the area of newly created habitat meeting depth and velocity criteria (Table 3). Specific approaches and instruments for habitat feature mapping will be evaluated and decided on by the Joint Monitoring Team.

Shelter value (Flosi et al. 2003) is a primary PM that will be measured at the habitat unit-scale for both enhanced existing habitat units as well as newly-created habitat units (e.g. constructed backwaters, pools). Pool:riffle ratio is the fourth and final primary PM. Pool:riffle ratio will be measured at the project reach scale. In all cases, the quantitative data will be used to develop qualitative ratings for evaluation at the appropriate scale (feature, habitat unit, project reach). Qualitative ratings for features / habitat units within a site will then be rolled-up to arrive at a composite site rating (Table 4). Qualitative ratings for sites within an enhancement reach will be further rolled-up into a composite enhancement reach rating and, finally, enhancement reach ratings within a project reach will be rolled-up into a final project reach rating. For both the enhancement reach and project reach rollups, the same criteria listed in Table 5 will be used. Monitoring of secondary PMs at the

20

Page 32: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

appropriate scale will also occur as a way to document changes that may arise as unintended benefits or detriments due to habitat enhancements which are largely targeted at the primary PMs; however, secondary PMs will only be used as a way to guide future enhancement efforts. The final overall qualitative rollup assessments of habitat enhancement effectiveness (i.e., excellent-good, fair-poor, fail) will be undertaken by a Joint Monitoring Team consisting of representatives from NMFS, CDFW and either the Water Agency or USACE (as appropriate). In the event that effectiveness monitoring reveals less than a “good” rating for a feature, site or an enhancement reach, remedial action may be recommended by the Joint Monitoring Team (Table 4 and Table 5) depending on the circumstances. The Joint Monitoring Team will use the adaptive management feedback loop (Figure 2) as a mechanism to incorporate information regarding primary and secondary PMs when developing/reviewing plans for future habitat enhancements.

Table 4 Post treatment site-level effectiveness rating. Standard CDFW habitat ratings based on Harris (2004) have been modified to incorporate Dry Creek RPA-specific quantitative enhancement objectives.

Rating Objectives Criteria Unintended Effects

Structural Condition Future Outcome

Excellent- Good

Achieved all or most stated site design objectives.

All to most features/ habitat units achieve desired habitat response and meet targeted values for primary PMs (where relevant) (>80% of features rated Good or Excellent)

None or minimal negative unintended effects. Unintended positive effects may outweigh failure to achieve a targeted value.

Excellent to Good. Has the intended functional value.

Continue to monitor according to adaptive management plan.

Fair-poor

Some to many site design objectives not achieved, or objectives not achieved were beyond site capacity

Some to many features/ habitat units do not achieve desired habitat response and do not meet targeted values for primary PMs (where relevant) (60-80% of features rated Good or Excellent)

May have minor or major unintended negative effects that partially offset objectives or negates a targeted gain.

Poor to fair. Has some functional value

Step up monitoring on features exhibiting negative performance. Correct site or feature deficiencies as appropriate, including the option of adding sites/features or reducing total project habitat credit.

Fail

No site design objectives achieved at site due to the fault of the features; sites/feature may be completely gone.

Many features/ habitat units did not achieve desired habitat response and did not meet targeted values for primary PMs (where relevant) (<60% of features rated Good or Excellent).

Few positive effects and/or unintended negative effects may be degrading the habitat and outweigh achieved objectives.

Fail. Has no functional value.

Reduce site contribution from total project habitat credit. Revisit site potential and feature level design priorities. Redesign or add more sites/features. Alternatively reduce total project habitat credit.

21

Page 33: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Table 5 Post treatment enhancement reach- and project reach-level effectiveness rating.

Rating Objectives Criteria Unintended Effects Future Outcome

Excellent- Good

Achieved all or most stated reach design objectives.

All or most sites/ enhancement reaches meet or exceed targeted values.(>80% of sites rated Good or Excellent)

None or minimal negative unintended effects. Unintended positive effects may outweigh failure to achieve a targeted value.

Continue to monitor according to adaptive management plan.

Fair-Poor

Partially achieved most reach design objectives, or objectives not achieved were beyond reach capacity

Some sites / enhancement reaches did not meet targeted values (60-80% of sites/ enhancement reaches rated Good or Excellent)

May have minor or major unintended negative effects that partially offset objectives or negates a targeted gain.

Develop and implement plans to correct site or metric deficiencies, add sites/features or reduce total project habitat credit. Step up monitoring on sites and features exhibiting negative performance.

Fail

Many sites achieved no goals; objectives not achieved were the fault of the feature; sites/feature may be completely gone.

Many sites/ enhancement reaches did not meet targeted values (<60% of sites/ enhancement reaches rated Good or Excellent).

Few positive effects and/or unintended negative effects may be degrading the habitat and outweigh achieved objectives.

Reduce total project habitat credit, and abandon use of failed features. Revisit site potential and conceptual design priorities.

Potential use of reference sites to supplement effectiveness monitoring As recommended in the RPA, a clearer interpretation of the benefits from habitat enhancement in Dry Creek could be gained through the use of reference/control sites (NMFS 2008). The goal of control-impact survey approaches is to assess the impact of some change, in this case the suite of Dry Creek habitat enhancement projects. A variety of impact designs with degrees of inference that increase with the level of effort (summaries in Underwood 1994 and Schwarz 2006). Mellina and Hinch (1995) provide a summary of different impact designs and describe how each might be used to assess watershed restoration. The simplest impact studies look at a single location before and after some event. Obtaining multiple observations before and after an event improves the ability to determine if an observed change is ‘real’ by taking into account the natural year to year variability. Because obtaining ‘before’ samples is often difficult, some have suggested that randomly sampling from similar but undisturbed habitats may be a suitable way to estimate variance (Underwood 1994). This approach can be considerably improved by adding a control site, where the control site is similar to the treatment site with respect to general characteristics (e.g., region, annual precipitation, size, etc.). These Before-After-Control-Impact (BACI) designs are intended to address the question of whether a particular action has resulted in a change at the treatment/impact site relative to the control site, while simultaneously adjusting for extraneous co-variables that might be similarly affecting both impact and control areas. Our

22

Page 34: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

ability to incorporate any of these comparative approaches in our effectiveness monitoring design will depend in large part on whether or not areas of Dry Creek currently exist that represent target conditions. Evaluations of potential reference sites are ongoing but it may be difficult to find reference conditions given dam operations and the legacy of land use in the watershed. Summary of effectiveness monitoring steps

• Prior to implementing habitat enhancement measures (pre-construction), quantitative data on velocity, depth, shelter value and pool:riffle ratio (primary metrics) will be collected. These data will be collected in the same areas where habitat enhancement will be implemented; quantitative data will be qualitatively rated.

• Following habitat implementation (post-construction) and the first geomorphically-effective flow (i.e., flow that deposits substantial sediment on the flood plain) or within 3 years, quantitative data on velocity, depth, shelter value and pool:riffle ratio (primary metrics) will be collected at the appropriate scale (feature, habitat unit or project reach).

• Qualitative ratings of velocity, depth and shelter value at the feature- or habitat unit-scale will be developed and rolled-up to the site (Table 4) and enhancement reach ( Table 5) scales in order to evaluate the project reach ( Table 5). Pool:riffle ratio will be directly measured and evaluated at the project reach scale.

• Data for secondary PMs will be used as an aid in understanding unintended detriments (e.g., degraded water quality) or benefits (e.g., spawning gravel aggradation) from habitat enhancements which are primarily targeted at addressing primary PMs.

• If effectiveness monitoring reveals insufficiency (less than ‘good’ rating in either Table 4 or Table 5) in meeting primary PM targets (Table 3), the Joint Monitoring Team may recommend additional monitoring, feature or site remediation, and/or reductions in habitat crediting (Table 4 and Table 5).

3.3.3. Validation monitoring design and ratings While biological response (validation) monitoring in mainstem Dry Creek will represent a significant effort in Dry Creek over the next several years, the utility of these data for validating the benefits of habitat enhancement is uncertain for a number of reasons inherent to the complexities of monitoring fish in open systems, and due to prevailing conditions in Dry Creek. Validation monitoring in general is often difficult to implement in a meaningful way (see Roni 2005 and references therein) and certain fisheries monitoring methods are particularly difficult to apply in Dry Creek where velocities are high (Water Agency 2009). It is also expected that a significant biological response will not occur until after appreciable suitable habitat has been created (Bradford et al. 2005; Parnell et al. 2003). As such, when crediting the amount of habitat enhanced in Dry Creek, results from validation monitoring will not be weighted as heavily as results from effectiveness monitoring. In cases where effectiveness monitoring alone leads to ambiguous results, validation monitoring will be incorporated as a modifier to aid in the final assessment of whether habitat enhancements in miles 1-3 are working as intended (this concept is reflected in the conceptual model (Figure 4) and ratings process (Figure 6)). Validation monitoring will consist of methods to gather fish demographic/behavioral data for both primary and secondary PMs with greater emphasis placed on data that facilitate the

23

Page 35: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

evaluation of primary PM’s (Table 6). Habitat utilization and abundance (density) will be based on snorkeling observations augmented with data from electrofishing surveys and stationary PIT antennas for juveniles. In 2012-2014 the Water Agency used continuously-operated PIT antennas to successfully document use by PIT-tagged juvenile coho and steelhead of newly-created off-channel winter habitat in the Demonstration Mile. This same approach should prove useful for other sites and, possibly, some features or reaches. Each spring since 2009 a downstream migrant trap on the lower portion of Dry Creek has been operated in order to detect changes in relative smolt abundance over time (a primary PM). Baseline (pre-habitat enhancement) growth and survival (secondary PMs) of juvenile steelhead at the reach scale have been successfully estimated with the use of PIT tags, backpack electrofishing and continuously-operated PIT antennas. Accounting for variation due to spatial scale via PM’s Responses to habitat enhancement via validation PM’s may be difficult to detect or interpret at some spatial scales given the necessary assumptions, which may be impossible or prohibitive to test. For example, each summer from 2010-2012 the Water Agency has been conducting repeated electrofishing sampling in conjunction with continuous-operation of PIT antennas to allow decoupled reach-specific survival and fidelity estimates for juvenile steelhead (Manning and Martini Lamb 2012). An important assumption when interpreting these estimates is that all individuals in the population of inference (juvenile steelhead in the reach) experience the same probability of survival regardless of habitat type, body size, behavior, etc. The consequences of violating this assumption could perhaps be partially alleviated by sampling at a small spatial scale (i.e., less habitat variability); however, that may not possible given the tradeoff between the numbers of individuals (sample size, which may be exacerbated by movement out of the reach), and available resources (the equipment and personnel needed to sample). All approaches that could be used for estimating validation PMs listed in Table 6 will require some basic assumptions that may be difficult to satisfy. Such considerations provide yet further reason to exercise caution when interpreting and applying results from validation monitoring.

24

Page 36: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Table 6 Primary and secondary biological response performance measures and their associated target ranges at feature, site, and enhancement reach scales that will be evaluated during Dry Creek validation monitoring.

Type of Performance Measure

Performance Measure

Life Stage/ Species

Spatial Scale

Evaluation Method Target Ranges

PRIMARY

Habitat utilization

Juvenile salmonid

Feature/ Site

PIT antennas/ Snorkeling

Evidence of use (presence/absence)

Abundance/ Density1

Juvenile salmonid

Site/ Enhancement reach

Electrofishing Coho: 0.3/m2 Steelhead: 0.5-1.5/m2

Relative Abundance

Smolt salmonid

Enhancement reach

Downstream migrant trap Increasing trend

SECONDARY

Growth/ Size

Smolt salmonid

Enhancement reach

Downstream migrant trap/ PIT tags

Comparable to other Russian River coho tributaries

Growth/ Size

Juvenile salmonid

Enhancement reach

Electrofishing/ PIT tags & antenna

Comparable to other Russian River coho tributaries

Survival Juvenile salmonid

Enhancement reach

Electrofishing/ PIT tags & antenna

Comparable to seasonal survival from other Russian River coho tributaries

Fidelity Juvenile salmonid

Enhancement reach

Electrofishing/ PIT tags & antenna

Comparable to reference sites

Community indices

Aquatic macro-invertebrate

Site To be determined Comparable to reference sites

Summary of validation monitoring steps

• As with effectiveness monitoring, the focus of validation monitoring will be on evaluating primary PMs (habitat utilization, abundance/density). The methods for gathering data to evaluate primary PMs will include snorkeling observations (juveniles) and downstream migrant trapping (trend monitoring for smolts) augmented with data from electrofishing surveys and stationary PIT antennas.

• It is expected that a significant biological response will not occur until after appreciable suitable habitat has been created and that separating the effects of habitat enhancement from natural variability will be difficult.

• For these reasons, results from validation monitoring will not be weighted as heavily as results from effectiveness monitoring. In cases where effectiveness monitoring alone leads to ambiguous results, however, validation monitoring will be incorporated as a

1 Target juvenile densities listed for juvenile coho and steelhead are from the RPA.

25

Page 37: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

modifier to aid in the final assessment of whether habitat enhancements in miles 1-3 are working as they should.

3.4 Monitoring timeline The Water Agency and NMFS have developed an initial timeline (Table 7) for comprehensive monitoring (involving spatial and temporal contrasts within a proposed BACI-based design) of fish habitat and fish population response to Dry Creek enhancements over the duration of the project (commencing with baseline and Mile 1 Demonstration Project monitoring). While the proposed monitoring timeline and crediting strategy for Dry Creek is expected to be adaptively revised based on feedback from monitoring results over time (e.g., appropriate performance metrics to apply for the different types of monitoring, adequate sample sizes, ability to carry out a full BACI-based design, etc.), Table 7 is expected to provide the initial foundation for implementation and effectiveness evaluations of Dry Creek habitat enhancements for the Mile 1 Demonstration Project and will guide at least the first 3 years of monitoring.

3.5 Reporting schedule Results from implementation monitoring will be reported to NMFS and CDFW during the first six months following the completion of implementation monitoring for all enhancement reaches within a given project reach. Results from effectiveness and validation monitoring will be reported during the first six months following completion of effectiveness monitoring for all enhancement reaches within a given project reach.

26

Page 38: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Table 7 Initial design and timeline for implementation, effectiveness and validation monitoring in Dry Creek. The proposed BACI component of the design will be dependent on establishing concurrently monitored reference sites for comparison.

Feature Reach Feature/Site Enhancement Reach Watershed

2009 Yes (baseline) Yes Yes Yes

2010 Yes Yes Yes

2011 N/A Yes Yes Yes

2012 Yes Yes Yes

2013 Yes Yes Yes

2014 Yes Yes Yes

2015 Yes Yes Yes

2016 Yes Yes Yes

2017 Yes Yes Yes

2018 Yes Yes Yes

2019 Yes Yes Yes

2020 Yes Yes Yes

2021 Yes Yes Yes

2022 Yes Yes Yes

2023 Yes Yes Yes

2009 Yes (baseline) Yes Yes

2010 Yes Yes

2011 Yes (pre-project) Yes2012 Yes (pre-project) Yes

2013-14 (year 0) Yes Yes (baseline) No Yes (pre-project) Yes (pre-project) Yes2014-15 Yes (post-project) Yes (post-project) Yes2015-16 Yes (post-project) Yes (post-project) Yes2016-17 Yes (post-project) Yes (post-project) Yes2017-18 Yes (post-project) Yes2018-19 Yes (post-project) Yes2019-20 Yes (post-project) Yes2020-21 Yes (post-project) Yes2021-22 Yes (post-project) Yes

2022-23 Yes (post-project) Yes (post-project)3 Yes (post-project) Yes (post-project) Yes

2009 Yes (baseline) Yes

2010 Yes

2011 Yes2012 Yes2013 Yes2014 Yes (pre-project) Yes2015 Yes (pre-project) Yes

2016-17 (year 0) Yes Yes (baseline) Yes (pre-project) Yes (pre-project) Yes2017-18 Yes (post-project) Yes (post-project) Yes2018-19 Yes (post-project) Yes (post-project) Yes2019-20 Yes (post-project) Yes (post-project) Yes2020-21 Yes (post-project) Yes2021-22 Yes (post-project) Yes2022-23 Yes (post-project) Yes

2009 Yes (baseline) Yes

2010 Yes

2011 Yes2012 Yes2013 Yes2014 Yes2015 Yes2016 Yes2017 Yes (pre-project) Yes2018 Yes (pre-project) Yes

2019-20 (year 0) Yes Yes (baseline) Yes (pre-project) Yes (pre-project) Yes2020-21 Yes (post-project) Yes (post-project) Yes2021-22 Yes (post-project) Yes (post-project) Yes2022-23 Yes (post-project) Yes (post-project) Yes

Mile

1

N/A

EffectivenessImplementation

Year

Validation

pilot / baseline monitoring N/A N/A

Reference1

Yes (1x within 1-3 years depending on

mobility flow)

N/A

Yes (1x within 1-3 years depending on

mobility flow)

N/A N/A

pilot / baseline monitoring

N/A

2-3

N/A

N/A N/A N/A

Yes (1x within 1-3 years depending on

mobility flow)2

N/A N/A

N/A

N/A

pilot / baseline monitoring N/A N/A N/A

Repeat baseline if necessary (e.g. major changes)

4-6

Yes (1x within 1-3 years depending on

mobility flow)

Yes (1x within 1-3 years depending on

mobility flow)

As soon as reach is identified

pilot / baseline monitoring N/A N/A N/A N/A

Yes (1x within 1-3 years depending on

mobility flow)2

Repeat baseline if necessary (e.g. major changes)

N/A

N/A

N/A

As soon as reach is identified

N/A

N/A

N/A N/A

BACI for mile 1

BACI for miles 4-6

BACI for miles 2-3

1 Section of Dry Creek a few hundred meters upstream of Westside Road Bridge. On a site visit on 6/23/10, participants agreed this section of stream probably represents best example of desired habitat conditions for juvenile coho in mainstem Dry Creek. Purpose of monitoring this reference section is to compare effectiveness and validation metrics with metrics in treatment reaches 2 Level 2 habitat survey (use modified Harris (2004) effectiveness monitoring protocols) 3 Repeat baseline habitat survey (use protocols in Inter-Fluve’s 2010 “Current Conditions” report).

27

Page 39: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

4.0 Implementing an adaptive management strategy Implementation of the adaptive management plan for Dry Creek habitat enhancements as outlined in this document will follow the adaptive management cycle shown in Figure 2 and decisions (Figure 6) will be made on the basis of relevant sources (Figure 9).

Figure 9 The adaptive management cycle (Murray and Marmorek 2003; Williams et al. 2007) including the releveant sources of information necessary to implement the AMP on Dry Creek.

Because of the period covered by this project (2009-2023), there is opportunity to learn which habitat measures are providing the greatest benefit in terms of physical habitat change to enhanced areas of Dry Creek and the associated biological responses. We will use this opportunity to learn which monitoring and sampling intensities provide the greatest benefit in terms of what we learn and can apply to later project phases. In the spirit of adaptive monitoring and management, effectiveness monitoring in the AMP must reflect the need to understand the intended functioning of habitat enhancements of a dynamic, process-based nature (e.g., side channel location moving from time to time as dictated by geomorphologic changes) vs. enhancements that are static and fixed permanently to a specific location (e.g., boulder cluster). Questions that will guide effectiveness evaluations and allow incorporation of information learned into future designs and monitoring include:

• Did the project affect the physical, chemical and biological attributes at the appropriate scale (e.g., feature, site, or reach scale) as intended by the action?

• Has sufficient time passed for the project to be fully effective (e.g., riparian vegetation planting on newly constructed side channels would require multiple years to create shade depending on the species and local conditions)?

• Are there non-project activities in the Dry Creek watershed that are influencing the response of habitat to the enhancement projects, either positively or negatively?

• Is the extent/intensity of monitoring sufficient to assess habitat response to the project actions?

Assess (Current Conditions Inventory

Report Dry Creek, Inter-Fluve 2010a)

Design (Demonstration Project,

Inter-Fluve 2011c)

Implement (Table 2)

Adjust (Figure 5, Tables 4-5)

Evaluate (Tables 4-5)

Monitor (Tables 3, 6, 7)

Adaptive Management

Cycle

28

Page 40: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Similar to effectiveness monitoring, example questions that may guide future validation monitoring include:

• What biological response PMs are most appropriate to monitor at site, reach and watershed scales, and what are their associated targets?

• How should monitoring be conducted over space and time to assess the cause-effect linkages between habitat projects and associated fish population responses?

5.0 References Cited Antcliffe, B.L. 1992. Impact assessment and environmental monitoring: the role of statistical

power and decisions analysis, Master’s thesis, School of Resource and Environmental Management, Simon Fraser University, Burnaby, British Columbia.

Baker, E.A. and T.G. Coon. 1997. Development and evaluation of alternative habitat suitability criteria for brook trout. Transactions of the American Fisheries Society 126: 65-76.

Beecher, H.A., B.A. Caldwell, and S.B. DeMond. 2002. Evaluation of depth and velocity preferences of juvenile coho salmon in Washington streams. North American Journal of Fisheries Management 22: 785–795.

Beecher, H.A., B.A. Caldwell, S.B.Demond, D. Seiler, and S.N. Boessow. 2010. An empirical assessment of PHABSIM using long-term monitoring of coho smolt production in Bingham, Creek, Washington. North American Journal of Fisheries Management 30: 1529-1543.

Bisson, P.A., K. Sullivan, and J.L. Nielsen. 1988. Channel hydraulics, habitat use, and body form of juvenile coho salmon, steelhead, and cutthroat trout in streams. Transactions of the American Fisheries Society 117: 262-273.

Botkin, D.B., D.L. Peterson, and J.M. Calhoun (technical editors). 2000. The Scientific Basis for Validation Monitoring of Salmon for Conservation and Restoration Plans. Olympic Natural Resources Technical Report. University of Washington, Olympic Natural Resources Center, Forks, Washington, USA.

Bovee, K.D. 1978. Probability-of-use criteria for the family Salmonidae. Instream flow information paper No. 4. Cooperative Instream Flow Service Group, Western Energy and Land Use Team, Office of Biological Services, Fish and Wildlife Servic, U.S. Department of the Interior.

Bradford, M.J., J. Korman, and P.S. Higgins. 2005. Using confidence intervals to estimate the response of salmon populations (Oncorhynchus spp.) to experimental habitat alterations. Canadian Journal of Fisheries and Aquatic Sciences 62: 2716-2726.

Bugert, R.M., T.C. Bjornn, and W.R. Meehan. 1991. Summer habitat use by young salmonids and their responses to cover and predators in a small southeast Alaska stream. Transactions of the American Fisheries Society 120: 474-485.

Cochran, W.G. 1977. Sampling Techniques. John Wiley & Sons, Inc., New York, NY. Dolloff, C.A., and G.H. Reeves. 1990. Microhabitat partitioning among stream-dwelling juvenile

coho salmon, Oncorhynchus kisutch, and Dolly Varden, Salvelinus malma. Canadian Journal of Fisheries and Aquatic Sciences 47: 2297-2306.

29

Page 41: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Eberhardt, L.L., and J.M. Thomas. 1991. Designing Environmental Field Studies. Ecological Monographs 61:53-73.

Goodman, D.H., A.M. Martin, J. Alvarez, A. Davis and J. Polos. 2010. Assessing Trinity River salmonid habitat at channel rehabilitation sites, 2007-2008. United States Fish and Wildlife Service, Arcata Fish and Wildlife Office, Yurok Tribe, and Hoopa Valley Tribe. Arcata Fisheries Technical Report Number TR 2010-13, Arcata, CA.

Harris, H. 2004. Protocol for quantitative studies of instream restoration effectiveness, Version 1. Prepared by Center for Forestry, University of California, Berkeley for California Department of Fish and Game, Salmon and Steelhead Trout Restoration Agreement No. P0210566.

Inter-Fluve, Inc. 2010a. Current Conditions Inventory Report Dry Creek: Warm Springs Dam to Russian River, Sonoma County, CA. Prepared for Sonoma County Water Agency 404 Aviation Boulevard Santa Rosa, CA 95403.

Inter-Fluve, Inc. 2010-b. 30% Complete Design Report. Dry Creek Enhancement Demonstration Projects: River Miles 6.2 to 7.3. Prepared for Sonoma County Water Agency 404 Aviation Boulevard Santa Rosa, CA 95403.

Inter-Fluve, Inc. 2011-a. 60% Complete Design Report. Dry Creek Enhancement Demonstration Projects: River Miles 6.2 to 7.3. Prepared for Sonoma County Water Agency 404 Aviation Boulevard Santa Rosa, CA 95403.

Inter-Fluve, Inc. 2011-b. Fish Habitat Feasibility Study Dry Creek: Warm Springs Dam to the Russian River Sonoma County. Prepared for Sonoma County Water Agency 404 Aviation Boulevard Santa Rosa, CA 95403.

Inter-Fluve, Inc. 2011-c. 90% Complete Design Report. Dry Creek Enhancement Demonstration Projects: River Miles 6.2 to 7.3. Prepared for Sonoma County Water Agency 404 Aviation Boulevard Santa Rosa, CA 95403.

Inter-Fluve, Inc. 2012. Dry Creek fish habitat enhancement feasibility study: Conceptual Design Report (Final Report, July 2012). Prepared for Sonoma County Water Agency 404 Aviation Boulevard Santa Rosa, CA 95403.

Manning, D.J., and J. Martini-Lamb, editors. 2012. Russian River Biological Opinion status and data report year 2011-12. Sonoma County Water Agency, Santa Rosa, CA. 208 P.

Mellina, E., and S.G. Hinch. 1995. Overview of Large-scale Ecological Experimental Designs and Recommendations for the British Columbia Watershed Restoration Program. Province of British Columbia Ministry of Environment, Lands and Parks and Ministry of Forests. Watershed Restoration Management Report No. 1.

Murphy, M. L., J. Heifetz, J.F. Thedinga, S.W. Johnson, K.V. Koski. 1989. Habitat utilization by juvenile pacific salmon (Onchorynchus) in the glacial Taku River, Southeast Alaska. Canadian Journal of Fisheries and Aquatic Sciences 46: 1677-1685.

Murray, C. and D.R. Marmorek. 2003. Adaptive Management and ecological restoration. In Ecological Restoration of Southwestern Ponderosa Pine Forests. P. Friederici, ed. Ecological Restoration Institute, Flagstaff, AZ. p. 417-428.

30

Page 42: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Murray, C. 2008. Workshop: Understanding & Enabling Adaptive Management in Natural Resource Management. Participant Binder. Prepared for the BC Ministry of Forests and Range, Victoria BC, 52 pp.

National Marine Fisheries Service, Southwest Region (NMFS). 2008. Endangered Species Act. Section 7 Consultation. Biological Opinion for Water Supply, Flood Control, and Channel Maintenance conducted by the U.S. Army Corps of Engineers, the Sonoma County Water Agency, and the Mendocino County Russian River Flood Control and Water Conservation Improvement District in the Russian River watershed. Sept. 24, 2008. 386 pp.

Nielsen, J.L. 1992. Micro-habitat specific foraging behavior, diet, and growth of juvenile coho salmon. Transactions of the American Fisheries Society 121: 617-634.

Parnell I.J., D.R. Marmorek, B. Lister and J. Korman. 2003. Cheakamus Water Use Plan: Quantitative evaluation of the statistical and cost performance of alternative salmonid monitoring design options. Final report prepared by ESSA Technologies Ltd., Vancouver, BC. for BC Hydro, Burnaby, BC. 81 pp.

Parnell, I.J., D.R. Marmorek and M. Porter. 2005. Collaborative Systemwide Monitoring and Evaluation Project, Definition and Evaluation of Design Templates. DRAFT. Prepared for Columbia Basin Fish and Wildlife Authority, Portland, OR. Prepared by ESSA Technologies Ltd., British Columbia, Canada.

Roni, P., editor. 2005. Monitoring stream and watershed restoration, American Fisheries Society, Bethesda, Maryland.

Roni, P., G. Pess, T. Beechie, and S. Morley. 2010. Estimating changes in coho salmon and steelhead abundance from watershed restoration: How much restoration is needed to measurable increase smolt production? North American Journal of Fisheries Management 30: 1469-1484.

Rosenfeld, J.S., T. Leiter, G. Lindner, and L. Rothman. 2005. Food abundance and fish density alters habitat selection, growth, and habitat suitability curves for juvenile coho salmon (Oncorhynchus kisutch). Canadian Journal of Fisheries and Aquatic Sciences 62: 1691-1701.

Ruggles, C. P. 1966. Depth and velocity as a factor in stream rearing and production of juvenile Coho Salmon. Canadian Fish Culturist 38:37-53.

Schwarz, C. 2006. Course notes for beginning and intermediate statistics. Available at: http://www.stat.sfu.ca/~cschwarz/CourseNotes.html. Accessed on: March 20, 2008.

Sheppard, J.D., and J.H. Johnston. 1985. Probability-of-use for depth, velocity and substrate by subyearling coho salmon and steelhead in Lake Ontario tributary streams. North American Journal of Fisheries Management 5: 277-282.

Shirvell, C. S. 1994. Effect of changes in streamflow on the microhabitat use and movements of sympatric juvenile coho salmon (Oncorhynchus kisutch) and chinook salmon (O. tshawytscha) in a natural stream. Canadian Journal of Fisheries and Aquatic Sciences 51:1644–1652.

Sonoma County Water Agency (SCWA). 2009. Proposed juvenile salmonid monitoring in Dry Creek: Russian River Biological Opinion Implementation – Draft. February 10, 2009.

Taylor, B., L. Kremsater and R. Ellis. 1997. Adaptive management of forests in British Columbia. B.C. Ministry of Forests, Victoria, British Columbia, Canada.

31

Page 43: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Underwood, A.J. 1994. On Beyond BACI: Sampling Designs that Might Reliably Detect Environmental Disturbances. Ecological Applications. 4:3-15.

Walters, C. 1986. Adaptive Management of Renewable Resources. MacMillan Publishing Company, New York.

Williams, B.K., R.C. Szaro and C.D. Shapiro. 2007. Adaptive Management: The U.S. Department of the Interior Technical Guide. Adaptive Management Working Group, U.S. Department of the Interior, Washington, D.C. 72 pp. http://www.doi.gov/initiatives/AdaptiveManagement/index.html

32

Page 44: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Appendices

33

Page 45: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Appendix 1 Timeline of development of the Dry Creek Adaptive Management Plan (AMP).

Task Responsibility Timing 1. Review RRBIOP, other literature, prepare draft outline

of AMP, face-to-face meetings with Water Agency, NMFS, CDFW

ESSA May-June 2010

2. Prepare and Facilitate Workshop 1 (3 days) ESSA June 23-25, 2010

3. Write up results of Workshop 1 into draft AMP sections & presentation materials

ESSA June – July, 2010

4. Iterative conference calls and revision of Workshop 1 outputs

ESSA August, 2010

5. Prepare and Facilitate Workshop 2 (3 days) ESSA October 19-21, 2010

6. Send out this schedule. ESSA Oct 25, 2010

7. Write short technical memo summarizing Workshop 2 discussions, including summary of intended processes and description of how all the products work together.

ESSA Dec. 2010 (this memo)

8. Water Agency, NMFS, and CDFW work together to ensure engineers and others are queued up to review the Inter-Fluve 60% design document when completed. Conduct site visit with agency engineers.

Water Agency, NMFS, CDFW

Dec. 2010

9. Inter-Fluve sends preliminary predicted habitat typing and area for demonstration reach & area

Inter-Fluve Oct. 29, 2010.

10. NMFS, CDFW and USACE (Jane Hicks) provide biological feedback on 30% Report to Inter-Fluve – preliminary review of content. Dave Cuneo to forward doc to USACE and N. Coast Regional Water Quality Control Board.

NMFS, CDFW, USACE

Nov. 10, 2010.

11. Statistical analyses and modeling in support of design step

ESSA Nov 2010- Dec, 2011

12. One-on-one meetings with landowners regarding 30% Design Report (after NMFS/CDFW/USACE feedback).

Water Agency Dec 6 - 10

13. Public Meeting – Public Policy Facilitating Committee PPFC (USACE, NMFS, CDFW) – show 10% report.

Water Agency Dec. 13

14. Write up results of Workshop 2 within draft AMP sections & presentation materials

ESSA Jan 2011

15. ESSA to go through Harris (2004) and determine which questions are appropriate and which are not for different scales, based on Inter-Fluve’s design doc for Mile 1, interacting with Inter-Fluve staff. Build this into AMP, drawing from other Harris, Flosi etc. as appropriate

ESSA Feb 2011

16. Review literature on habitat preference curves with respect to stream velocities and depth for juvenile coho and provide summary of alternative methods for measuring suitable habitat.

ESSA with input from all parties

Feb 2011

34

Page 46: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

17. 60% Design Report including design criteria, and intended evaluation method

Inter-Fluve April 15 2011

18. NMFS, CDFW, USACE engineering and biological feedback on 60% Design Report – meeting in May

NMFS, CDFW, USACE

May 2011

19. Draft 0.8 of AMP ESSA July 2011

20. Prepare and Facilitate AMP Workshop 3 (1 day) ESSA July 19, 2011

21. Review of AMP 0.8 by Water Agency, NMFS, CDFW, USACE

Water Agency, NMFS, CDFW, USACE

July-Aug, 2011

22. 90% Design Report Inter-Fluve Oct 2011

23. Draft Final AMP (version 0.9) ESSA Sept, 2012

24. Review of AMP 0.9 by Water Agency Water Agency, Oct. 2012

25. Draft Final AMP (version 0.92) ESSA March, 2013

26. Review of AMP 0.92 by Water Agency, NMFS, CDFW, USACE

Water Agency, NMFS, CDFW, USACE

April 2013

27. Final AMP document (1.0) ESSA November 2013

35

Page 47: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Appendix 2 Habitat enhancement monitoring checklists and associated codes for

implementation and effectiveness monitoring of instream habitat, off-channel habitat and bank stabilization projects (modified Harris (2004) protocols).

36

Page 48: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

2.

4.

8.

10.

17.18.

IMPLEMENTATION

page of

If applicable, was the approved bank or channel excavation carried out?

d. Length of aquatic habitat disturbed during implementation: (ft)

a. If not, were modifications beneficial to performance?b. Is non-compliance significant enough to jeopardize performance?c. Are corrections needed?Would a different treatment or design have been preferable? If Y, comment.

FINAL SITE LEVEL RATING (feature level rollup): Excellent, Good, Fair, Poor, Fail

Feat

ure

(Str

uctu

re)

Structural condition: Excl, Good, Fair, Poor, FailAre problems with the feature visible?

a. Materials:CON, LWD, MTL, NTR, OFR, REB, RTW, VEG, WOO, OTH Were the sizes of materials used the same as approved?Was the feature anchored as approved?

a. Types: ANC, BBB, CRF, MAT, SHF, STR, SWA, UND, UNS, WSH, OTHWas the feature placed in the approved location along the channel?Was the feature placed in the approved position?a. Position: LBK, MDC, RBK, SPN, OTHWas the feature oriented as approved?

a. Anchoring: BUR, CBL, REB, STK, TIE, NON, OTH

Were approved erosion control measures applied to disturbed areas?a. Types: FAB, NTR, NTM, OFR, PLN*, SEE, SLF, STM, OTH

Met

rics

Was the length of channel or bank treated the same as approved?a. Actual length of feature: (ft)b. Width of the feature: (ft)c. Area of the feature installed within bankfull channel: (ft²)

1.

3.

5.

6.

7.

9.

a. Orientation: DNS, MUL, PRL, PRP, UPS, OTHWere approved materials used for the feature?

Hab

itat

If applicable, was the habitat type modification completed as approved?a. Habitat created: FLT, POO, RIF, OTHIf applicable, was gravel added to the stream as approved?a. Volume of gravel added to stream: (cy)Total number of pieces of Large Woody Debris used in this feature:

□ Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

INSTREAM HABITAT ENHANCEMENT

Feature Implementation Rating: Excellent, Good, Fair, Poor, Fail

Com

men

ts

a. Type: LWD / RTW / LWD with attached RTW: (#)

Ban

k If applicable, was the bank constructed to the approved angle?a. As-built bank angle: (degrees)

Impl

emen

tatio

n Does the feature meet design, contract & permit specifications?16.

11.

12.

13.

14.

15.

37

Page 49: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

2.

4.

8.

10.

/ / / / / /

17.18.

IMPLEMENTATION

page of

If applicable, was the approved bank or channel excavation carried out?

d. Length of aquatic habitat disturbed during implementation: (ft)

a. If not, were modifications beneficial to performance?b. Is non-compliance significant enough to jeopardize performance?c. Are corrections needed?Would a different treatment or design have been preferable? If Y, comment.

FINAL SITE LEVEL RATING (feature level rollup): Excellent, Good, Fair, Poor, Fail

Feat

ure

(Str

uctu

re)

Structural condition: Excl, Good, Fair, Poor, FailAre problems with the feature visible?

a. Materials:CON, LWD, MTL, NTR, OFR, REB, RTW, VEG, WOO, OTH Were the sizes of materials used the same as approved?Was the feature anchored as approved?

a. Types: ANC, BBB, CRF, MAT, SHF, STR, SWA, UND, UNS, WSH, OTHWas the feature placed in the approved location along the channel?Was the feature placed in the approved position?a. Position: LBK, MDC, RBK, SPN, OTHWas the feature oriented as approved?

a. Anchoring: BUR, CBL, REB, STK, TIE, NON, OTH

Were approved erosion control measures applied to disturbed areas?a. Types: FAB, NTR, NTM, OFR, PLN*, SEE, SLF, STM, OTH

Met

rics

Was the length of channel or bank treated the same as approved?a. Actual length of feature: (ft)b. Width of the feature: (ft)c. Area of the feature installed within bankfull channel: (ft²)

1.

3.

5.

6.

7.

9.

a. Orientation: DNS, MUL, PRL, PRP, UPS, OTHWere approved materials used for the feature?

Hab

itat

If applicable, was the habitat type modification completed as approved?a. Habitat created: FLT, POO, RIF, OTHIf applicable, was gravel added to the stream as approved?a. Volume of gravel added to stream: (cy)Total number of pieces of Large Woody Debris used in this feature:

□ Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

OFFCHANNEL HABITAT ENHANCEMENT

Feature Implementation Rating: Excellent, Good, Fair, Poor, Fail

Com

men

ts

a. Type: LWD / RTW / LWD with attached RTW: (#)

Ban

k If applicable, was the bank constructed to the approved angle?a. As-built bank angle: (degrees)

Impl

emen

tatio

n Does the feature meet design, contract & permit specifications?16.

11.

12.

13.

14.

15.

38

Page 50: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

3.4.5. Structural condition: Excl, Good, Fair, Poor, Fail

Are problems with the feature visible?a. Types: ANC, BBB, CRF, MAT, SHF, STR, SWA, UND, UNS, WSH, OTH

7.

11.

13.14.

20.21.

b. Length of bank stabilized by the feature: (ft)a. Actual length of feature: (ft) Was the length of channel or bank treated the same as approved?

Was bioengineering used at this feature? If Y, use RT also.

If applicable, was gravel added to the stream as approved?a. Volume of gravel added to stream: (cy)

d. Length of aquatic habitat disturbed during implementation: (ft)c. Area of the feature installed within bankfull channel: (ft²)

a. If not, were modifications beneficial to performance?

c. Are corrections needed?b. Is non-compliance significant enough to jeopardize performance?

Was the feature placed in the approved position?

Is feature a grade control boulder weir? If Y, use FB instead.

Would a different treatment or design have been preferable? If Y, comment.

Was the feature placed in the approved location along the channel?

a. Position: LBK, MDC, RBK, SPN, OTHWas the feature oriented as approved?a. Orientation: DNS, MUL, PRL, PRP, UPS, OTHWere approved materials used for the feature?a. Materials: CON, LWD, MTL, NTR, OFR, RTW, VEG, WOO, ROC, OTH Were the sizes of materials used the same as approved?Was the feature anchored as approved?a. Anchoring: BUR, CBL, REB, STK, TIE, NON, OTH Number of pieces of large wood debris used in this feature: (#)If applicable, was the approved bank or channel excavation carried out?Was the channel recontoured as approved?

Were approved erosion control measures applied to disturbed areas?a. Type: FAB, NTM, PLN*, ROC, SEE, SLF, STM, OTHDoes the feature meet design, contract & permit specifications?

CHANNEL RECONSTRUCTION & BANK STABILIZATION IMPLEMENTATIONM

etri

csSt

ruct

ure

Rec

onst

ruct

ion

page of

a. Was the channel reconstructed in a new location?b. Length of channel recontoured: (ft)Were streambanks reconstructed as approved?a. Were the banks reconstructed in a new location?b. Length of bank reconstructed (note if length includes both banks): (ft)Was the bank constructed or recontoured to the approved angle?a. Average as-built bank angle: (degrees)

Com

men

ts

□ Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

Impl

emen

tatio

n

1.

2.

6.

8.

9.

12.

15.

19.

18.

16.

17.

10.

FINAL SITE LEVEL RATING (feature level rollup): Excellent, Good, Fair, Poor, FailFeature Implementation Rating: Excellent, Good, Fair, Poor, Fail

39

Page 51: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

1.2.3.4.

6.

8.9.

10. / / /

12. / / /13.14. / / /15. / / /16.16.17.

Dep

th /

Hab

itat

Met

rics

Oth

er

Current 1st/2nd dominant substrate: BED, BOL, COB, GRV, SND, SLC, OTHIs increasing LWD count in the treatment area an objective of the feature?Large woody debris count in treatment area: D >1', L 6-20' / D >1', L >20'a. Targeted minimum shelter rating: 0-300Is increasing instream shelter rating an objective of the feature?

Current level II habitat type: FLT, POO, RIF, DRY, OTHEstimate area of the targeted feature: (ft²)Width of targeted treatment: (ft)Length of targeted treatment: (ft)

a. Targeted depth or range: (ft)Is changing water depth in the treatment area an objective? Maximum residual water depth in treatment area: (ft)a. Targeted level II habitat type: FLT, POO, RIF, OTH

INSTREAM HABITAT ENHANCEMENT PRE-TREATMENT

page of

b. Targeted velocity/range: (ft/sec)a. Current avg velocity: (ft/sec)Is changing velocity in the treatment area an objective? a. Targeted: AGG, FPD, GRC, INC, NAR, SIN, STB, TOG, WID, OTHIs improving stream channel conditions an objective of the feature?Current stream channel problems: AGG, BRD, FLO, GRC, HDC, INC, NAR, Photopoint data collected: yes / no% Canopy MeasurementTargeted 1st/2nd dominant: BED, BOL, COB, GRV, SND, SLC, OTH

1st/2nd dominant: BED, BOL, BUB, LWD, RTW, SWD, UCB, VEG, OTHPercent of treatment area covered by shelter: (%)Instream shelter value in the targeted treatment area: 0, 1, 2, 3

5.

7.

11.

Is change in habitat type an objective of the feature?

18.

19.

Com

men

tsV

eloc

itySh

elte

rC

hann

el

□ Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

40

Page 52: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

1.2.3.

Is change in habitat type an objective of the feature?a. Targeted level II habitat type: FLT, POO, RIF, ALC, OTH

5. Maximum residual water depth in treatment area: (ft)Is changing water depth in the treatment area an objective? a. Targeted depth or range: (ft)

7. Instream shelter value in the targeted treatment area: 0, 1, 2, 38. Percent of treatment area covered by shelter: (%)9. 1st/2nd dominant: BED, BOL, BUB, LWD, RTW, SWD, UCB, VEG, OTH / / /

Is increasing instream shelter rating an objective of the feature? a. Targeted minimum shelter rating: (0-300)

11. Large woody debris count in treatment area: D >1', L 6-20' / D >1', L >20' / / /12. Is increasing LWD count in the treatment area an objective of the feature?13. / / /14. Targeted 1st/2nd dominant: BED, BOL, COB, GRV, SND, SLC, OTH / / /15. % Canopy Measurement16. Photopoint data collected: yes / no

Is changing velocity in the treatment area an objective? a. Current avg velocity: (ft/sec)b. Targeted velocity/range: (ft/sec)

PRE-TREATMENT

page of

Met

rics

Dep

th /

Hab

itat

Shel

ter

Oth

erOFFCHANNEL HABITAT ENHANCEMENT

10.

Length of targeted treatment: (ft)Width of targeted treatment: (ft)Estimate area of the targeted feature: (ft²)

4.

6.

□ Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

Current 1st/2nd dominant substrate: BED, BOL, COB, GRV, SND, SLC, OTH

Com

men

tsV

eloc

ity 17.

41

Page 53: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

1.2.3.4.5. / / /6.7.

12. / / /

16.

Com

men

tsM

etri

csSh

elte

rC

hann

el

? Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

Is stabilizing the streambank and/or reducing bank erosion an objective?a. Length of targeted treatment area: (ft)b. Length of unstable bank within treatment area: (ft)Average bank angle at treatment site: (degrees)Is reducing bank angle an objective of the feature?

a. Is decreasing the frequency and/or length of dry stream an objective?*

a. Targeted bank angle: (degrees)

Stre

amba

nks

a. Is sediment deposition intended to narrow the stream channel?b. Is sediment deposition intended to fill in a side channel?Is there bank erosion or instability in the vicinity of the treatment area?a. Locations: UPS, DNS, WIN and LBK, RBKb. Apparent causes: BAR, CNR, EMG, GRZ, HYD, RDS, UND, USG, OTH

14.

15.

17.

Is increasing residual max. water depth in the treatment area an objective?a. Maximum residual water depth in treatment area: (ft)1st/2nd dominant substrate: SLC, SND, GRV, COB, BOL, BED, OTHIs sediment deposition at the feature an objective?

11.

Is reducing the active channel width within the treatment area an objective?

Length of channel and/or bank to be treated: (ft)Is feature a grade control boulder weir? If Y, use FB instead.Will bioengineering be used at this feature? If Y, use RT also.Is improving instream shelter and habitat an objective?Large woody debris count in treatment area: D >1', L 6-20' / D >1', L >20'

13.

a. Average active channel width in the treatment area: (ft)Does the stream usually go dry or sub-surface through the treatment area?

CHANNEL RECONSTRUCTION & BANK STABILIZATION PRE-TREATMENT

page of

8.

9.

10.

Is increasing LWD count in the treatment area an objective of the feature?Stream channel problems within the treatment area: AGG, BRD, FLO, GRC, Is improving stream channel conditions an objective of the feature?a. Targeted: AGG, FPD, GRC, INC, NAR, SIN, STB, TOG, WID, OTH

42

Page 54: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

1.2.3.4.5.

6.7.8.9.

10.

13.14.15.16. / / /

18. / / /

20.

22.23.24.25.26.27.28.29.30. / / /31.32.33.34.35.36.37.38.39.

□ Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

Com

-m

ents

Rat

ng

% area where targeted depth, velocity and shelter criteria overlap

Feature Implementation Rating: Excellent, Good, Fair, Poor, Fail

Does this feature need: DEC, ENH, MNT, REP, NON, OTHAre additional restoration treatments recommended at this location?

FINAL SITE LEVEL RATING (feature level rollup): Excellent, Good, Fair, Poor, Fail

If an objective, did the feature decrease/increase velocity in the treatment area?

a. Conditions: AGG, FPD, GRC, INC, NAR, SIN, STB, TOG, WID, OTH

Targeted velocity/range: (ft/sec)Did the feature achieve the targeted velocity?Measure the velocity/range: (ft/sec)Area of habitat unit within targeted velocity: (ft2)Percent of habitat unit within targeted velocity (see above): (%)

Photopoint data collected: yes / no

Were there any unintended effects on the stream channel? If Y, comment.

Cha

nnel

Current stream channel problems: AGG, BRD, FLO, GRC, HDC, INC, NAR, SCU, STT, WID, NON, OTHIf an objective, did the feature lead to the targeted channel conditions?

Were there any unintended effects on the stream channel? If Y, comment.

Oth

er

1st/2nd dominant substrate: BED, BOL, COB, GRV, SND, SLC, OTH

% Canopy Measurement:

Temperature Profile: yes / noDissolved Oxygen Profile: yes / no

If an objective, did the feature achieve the targeted substrate composition?

21.

Vel

ocity

Shel

ter

Instream shelter value in the treatment area: 0, 1, 2, 3Percent of habitat unit covered by shelter: %1st/2nd dominant: BED, BOL, BUB, LWD, RTW, SWD, UCB, VEG, OTHIf an objective, did the feature increase instream shelter rating?a. Calculate the shelter rating: 0-300Large woody debris count in treatment area: D >1', L 6-20' / D >1', L >20'If an objective, did the feature increase LWD count in the treatment area?a. LWD recruitment methods: ANC, EXC, EXH, INT, RPR, UNA, OTH

17.

19.

Dep

th /

Hab

itat

Current level II habitat type: FLT, POO, RIF, DRY, ALC, OTHIf an objective, did the feature create the targeted instream habitat type?Were there any unintended effects on the habitat type? If Y, comment.Maximum residual water depth in main channel area: ftMaximum residual depth associated with the feature: fta. If an objective, did the feature increase/decrease water depth in the Measure the targeted depth or range ft

a. Estimate area of feature within targeted depth or range ft 2 :Were there any unintended effects on the water depth? If Y, comment.

12.

11.

Feat

ure

Length of targeted treatment: (ft)Width of targeted treatment: (ft)Estimate area of the targeted feature: (ft²)Structural condition: Excl, Good, Fair, Poor, FailAre problems with the feature visible? Types: ANC, BBB, CRF, MAT, SHF, STR, SWA, UND, UNS, WSH, OTHIs the feature still in its original location, position & orientation?

INSTREAM HABITAT ENHANCEMENT POST-TREATMENT

page of

43

Page 55: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

1.2.3.4.5.

6.7.8.9.

10.

13.14.15.16. / / /

18. / / /

20.

22.

24.25.26. / / /27.28.29.30.31.32.33.34.

=No, P=Partially, D=Don't know, A=Not Applicable.

Com

-m

ents

% area where targeted depth, velocity and shelter criteria overlap:

Feature Effectiveness Rating: Excl, Good, Fair, Poor, Fail

Does this feature need: DEC, ENH, MNT, REP, NON, OTHAre additional restoration treatments recommended at this location?

FINAL SITE LEVEL RATING (feature level rollup): Excellent, Good, Fair, Poor, Fail

Cha

nnel

Feat

ure

Vel

ocity

Oth

er

Length of targeted treatment: (ft)Width of targeted treatment: (ft)

Area of offchannel habitat improved: ft2Structural condition: Excl, Good, Fair, Poor, FailAre problems with the feature visible? Types: ANC, BBB, CRF, MAT, SHF, STR, SWA, UND, UNS, WSH, OTHIs the feature still in its original location, position & orientation?Current level II habitat type: FLT, POO, RIF, DRY, ALC, OTH

Rat

ng

Measure the targeted depth or range ft

a. Estimate area of feature within targeted depth or range ft 2 :

Dep

th /

Hab

itat

Were there any unintended effects on the water depth? If Y, comment.Instream shelter value in the treatment area: 0, 1, 2, 3

If an objective, did the feature create the targeted instream habitat type?Were there any unintended effects on the habitat type? If Y, comment.Maximum residual water depth in main channel area: ftMaximum residual depth associated with the feature: fta. If an objective, did the feature increase/decrease water depth in the

Shel

ter

Percent of habitat unit covered by shelter: %1st/2nd dominant: BED, BOL, BUB, LWD, RTW, SWD, UCB, VEG, OTHIf an objective, did the feature increase instream shelter rating?a. Calculate the shelter rating: 0-300Large woody debris count in treatment area: D >1', L 6-20' / D >1', L >20'If an objective, did the feature increase LWD count in the treatment area?a. LWD recruitment methods: ANC, EXC, EXH, INT, RPR, UNA, OTH

1st/2nd dominant substrate: BED, BOL, COB, GRV, SND, SLC, OTHWere there any unintended effects from velocity change? If Y, comment.

% Canopy Measurement:Photopoint data collected: yes / noTemperature Profile: yes / noDissolved Oxygen Profile: yes / no

Current main channel problems: AGG, BRD, FLO, GRC, HDC, INC, NAR, SCU, STT, WID, NON, OTHDid the feature lead to the targeted off channel conditions?a. Overall Offchannel Condition: AGG, FPD, GRC, INC, NAR, SIN, STB, TOG, WID, OTHb. Outlet Conditions: AGG, FPD, GRC, INC, NAR, SIN, STB, TOG, WID, OTHc. Inlet Conditions: AGG, FPD, GRC, INC, NAR, SIN, STB, TOG, WID, OTHWere there any unintended effects on the main channel? If Y, comment.If an objective, did the feature decrease/increase velocity in the treatment area?a. Targeted velocity/range: ft/secb. Did the feature achieve the targeted velocity/range?c. Measure the velocity/range ft/sec:

d. Area of habitat unit within targeted velocity: ft 2

Percent of habitat unit within targeted velocity see above: %

OFFCHANNEL HABITAT ENHANCEMENT

page of

POST-TREATMENT

23.

21.

17.

11.

12.

19.

44

Page 56: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Reach #: Project Title:Site ID: Site Name:

Date&Time: Evaluator:

Project Feature NumberFeature Type Code

1.2.3.4.5.6.

8.

10. / / /

12.

15.

17. / / /

19.

22.

23.24.25.26.27. Feature Effectiveness Rating: Excl, Good, Fair, Poor, Fail

Com

-m

ents

□ Comment on back. Y=Yes, N=No, P=Partially, D=Don't know, A=Not Applicable.

Were there any unintended effects on the banks? If Y, comment.Feature Effectiveness Rating: Excl, Good, Fair, Poor, FailDoes this feature need: DEC, ENH, MNT, REP, NON, OTHAre additional restoration treatments recommended at this location?

Stre

amba

nks

Rat

ing

FINAL SITE LEVEL RATING (feature level rollup): Excellent, Good, Fair, Poor, Fail

b. Apparent causes: BAR, CNR, EMG, GRZ, HYD, RDS, UND, USG, OTHIf an objective, was streambank instability and/or bank erosion reduced?a. Length of streambank stabilized: (ft)b. Length of treated bank that is still unstable: (ft)Average bank angle at treatment site: (degrees)If an objective, did the feature reduce the bank angle?a. Did the feature create ≤ the targeted bank angle?

a. Locations: UPS, DNS, WIN and LBK, RBK

Cha

nnel

If an objective, did the treatment lead to the targeted channel conditions?a. Conditions: AGG, FPD, GRC, INC, NAR, SIN, STB, TOG, WID, OTHIf an objective, was active channel width reduced within the treatment area?a. Average active channel width in the treatment area: (ft)If an objective, was the frequency or length of dry stream decreased?*Did the residual maximum water depth in the treatment area increase?a. Maximum residual water depth in treatment area: (ft)1st/2nd dominant substrate: SLC, SND, GRV, COB, BOL, BED, OTH

13.

14.

16.

18. Was there sediment deposition at the feature?a. Did sediment deposition at the feature narrow the stream channel?b. Did sediment deposition at the feature fill in a side channel?

Stru

ctur

eSh

elte

r

7.

9.

Are problems with the feature visible?a. Type: ANC, BBB, CRF, MAT, SHF, STR, SWA, UND, UNS, WSH, OTHIs the feature still in its original location, position & orientation?If an objective, was instream shelter and habitat improved?a. Calculate the shelter rating: (0-300)

CHANNEL RECONSTRUCTION & BANK STABILIZATION POST-TREATMENT

page of

Length of channel and/or bank to be treated: (ft)Width of instream habitat improved: (ft)

Area of instream habitat improved: (ft 2 )Was bioengineering used at this feature? If Y, use RT also.M

etri

cs

20.

21.

22.

11.

Is feature a grade control boulder weir? If Y, use FB instead. Feature condition: Excl, Good, Fair, Poor, Fail

Large woody debris count in treatment area: D >1', L 6-20' / D >1', L >20'If an objective, did the feature increase LWD count in the treatment area?a. LWD recruitment methods: ANC, EXC, EXH, INT, RPR, UNA, OTHStream channel problems within the treatment area: AGG, BRD, FLO, GRC, HDC,

Were there any unintended effects on the stream channel? If Y, comment.Is there bank erosion or instability in the vicinity of the treatment area?

45

Page 57: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

ANC Anchor failure SLF Silt fence AGG Aggradation POO Pool AGG Aggradation MIG Migration

BBBBuried by bedload SPN Spanning ANC Anchor failure RBK Right bank ANC Anchor failure MNT Maintenance

BURBuried or “key ed in” STK Staked BAR

Lack of stabilizing v egetation RIF Riffle ANC Anchored NAR Narrow ing

CBL Cabled STM Straw mulch BBBBuried by bedload RTW Rootw ad BAR

Lack of stabilizing v egetation NON None

CON Concrete STR

Stranded out of activ e channel (horizontally ) BED Bedrock SCU Side cutting BBB

Buried by bedload OTH Other

CRFCable/rebar failure SWA

Stranded out of w ater (v ertically ) BOL Boulder SHF

Structure shifted BED Bedrock POO Pool

DNS Dow nstream TIE Tied BRD Braiding SIN Sinuosity BOL Boulder RBK Right bank

Dry Dry UNDUndercut/ undermined BUB Bubble curtain SLC Silt/clay BRD Braiding REP Repair

FAB Fabric UNSUndersized/ under-built CNR

Concentrated runoff SND Sand BUB Bubble curtain RIF Riffle

FLT Flatw ater UPS Upstream COB Cobble SPN Spanning CNRConcentrated runoff RPR

Riparian recruitment

LBK Left bank VEG Vegetation CRFCable/rebar failure STB Stability COB Cobble RTW Rootw ad

LWDLarge w oody debris WOO Wood/w ooden DNS Dow nstream STR

Stranded out of activ e channel (horizontally ) CRF

Cable/rebar failure SCU Side cutting

MATStructure material failure WSH Washed out Dry Dry STT Straightening DNS Dow nstream SHF

Structure shifted

MDC Mid-channel EMGEmergent groundw ater SWA

Stranded out of w ater (v ertically ) Dry Dry SIN Sinuosity

MTL Metal FLOFlow obstructions SWD

Small w oody debris EMG

Emergent groundw ater SLC Silt/clay

MULMultiple angles FLT Flatw ater TOG To grade ENH Enhancement SND Sand

NON None FPDFloodplain deposition UCB

Undercut bank EXC Ex cav ated STB Stability

NTM Nativ e mulch GRC Grade control UNDUndercut/ undermined EXH Ex humed STR

Stranded out of activ e channel (horizontally )

NTR Nativ e rock GRV Grav el UNSUndersized/ under-built FLO

Flow obstructions STT Straightening

OFR Off-site rock GRZGrazing/grazing animal UPS Upstream FLT Flatw ater SWA

Stranded out of w ater (v ertically )

OTH Other HDC Headcut USGUnstable soils/ geology FPD

Floodplain deposition SWD

Small w oody debris

PLN Planting HYDHy drologic processes VEG Vegetation GRC Grade control TOG To grade

POO Pool INC Incision WID Widening GRV Grav el UCBUndercut bank

PRL Parallel LBK Left bank WIN Within GRZGrazing/grazing animal UNA Unanchored

PRP Perpendicular LWDLarge w oody debris WSH Washed out HDC Headcut UND

Undercut/undermined

RBK Right bank MAT Material failure HYDHy drologic processes UNS

Undersized/under-built

REB Rebar MDC Mid-channel INC Incision UPS Upstream

RIF Riffle MIGLateral migration INT Intercepted USG

Unstable soils/geology

RTW Rootw ad NAR Narrow ing LBK Left bank VEG Vegetation

SEE Seeding NON None LWDLarge w oody debris WID Widening

SHL Shelter OTH Other MATStructure material failure WIN Within

SHFStructure shifted

Pre-treatment - Code Key Post-treatment - Code Key

Codes for instream habitat enhancement checklists

Implementation - Code Key Pre-treatment - Code Key Post-treatment - Code Key

Implementation - Code Key

46

Page 58: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

ANC Anchor failure SLF Silt fence AGG Aggradation POO Pool AGG Aggradation MIG Migration

BBBBuried by bedload SPN Spanning ANC Anchor failure RBK Right bank ANC Anchor failure MNT Maintenance

BURBuried or “key ed in” STK Staked BAR

Lack of stabilizing v egetation RIF Riffle ANC Anchored NAR Narrow ing

CBL Cabled STM Straw mulch BBBBuried by bedload RTW Rootw ad BAR

Lack of stabilizing v egetation NON None

CON Concrete STR

Stranded out of activ e channel (horizontally ) BED Bedrock SCU Side cutting BBB

Buried by bedload OTH Other

CRFCable/rebar failure SWA

Stranded out of w ater (v ertically ) BOL Boulder SHF

Structure shifted BED Bedrock POO Pool

DNS Dow nstream TIE Tied BRD Braiding SIN Sinuosity BOL Boulder RBK Right bank

Dry Dry UNDUndercut/ undermined BUB Bubble curtain SLC Silt/clay BRD Braiding REP Repair

FAB Fabric UNSUndersized/ under-built CNR

Concentrated runoff SND Sand BUB Bubble curtain RIF Riffle

FLT Flatw ater UPS Upstream COB Cobble SPN Spanning CNRConcentrated runoff RPR

Riparian recruitment

LBK Left bank VEG Vegetation CRFCable/rebar failure STB Stability COB Cobble RTW Rootw ad

LWDLarge w oody debris WOO Wood/w ooden DNS Dow nstream STR

Stranded out of activ e channel (horizontally ) CRF

Cable/rebar failure SCU Side cutting

MATStructure material failure WSH Washed out Dry Dry STT Straightening DNS Dow nstream SHF

Structure shifted

MDC Mid-channel EMGEmergent groundw ater SWA

Stranded out of w ater (v ertically ) Dry Dry SIN Sinuosity

MTL Metal FLOFlow obstructions SWD

Small w oody debris EMG

Emergent groundw ater SLC Silt/clay

MULMultiple angles FLT Flatw ater TOG To grade ENH Enhancement SND Sand

NON None FPDFloodplain deposition UCB

Undercut bank EXC Ex cav ated STB Stability

NTM Nativ e mulch GRC Grade control UNDUndercut/ undermined EXH Ex humed STR

Stranded out of activ e channel (horizontally )

NTR Nativ e rock GRV Grav el UNSUndersized/ under-built FLO

Flow obstructions STT Straightening

OFR Off-site rock GRZGrazing/grazing animal UPS Upstream FLT Flatw ater SWA

Stranded out of w ater (v ertically )

OTH Other HDC Headcut USGUnstable soils/ geology FPD

Floodplain deposition SWD

Small w oody debris

PLN Planting HYDHy drologic processes VEG Vegetation GRC Grade control TOG To grade

POO Pool INC Incision WID Widening GRV Grav el UCBUndercut bank

PRL Parallel LBK Left bank WIN Within GRZGrazing/grazing animal UNA Unanchored

PRP Perpendicular LWDLarge w oody debris WSH Washed out HDC Headcut UND

Undercut/undermined

RBK Right bank MAT Material failure HYDHy drologic processes UNS

Undersized/under-built

REB Rebar MDC Mid-channel INC Incision UPS Upstream

RIF Riffle MIGLateral migration INT Intercepted USG

Unstable soils/geology

RTW Rootw ad NAR Narrow ing LBK Left bank VEG Vegetation

SEE Seeding NON None LWDLarge w oody debris

SHL Shelter OTH Other MATStructure material failure

SHFStructure shifted

Codes for off-channel enhancement checklists

Implementation - Code Key Pre-treatment - Code Key

Post-treatment – Code Key

Implementation - Code Key Pre-treatment - Code Key

Post-treatment – Code Key

47

Page 59: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

AGG Aggradation NAR Narrow ing

ANC Anchor failure NON None

ANC Anchored OTH Other

BAR

Lack of stabilizing v egetation POO Pool

BBBBuried by bedload RBK Right bank

BED Bedrock REP Repair

BOL Boulder RIF Riffle

BRD Braiding RPRRiparian recruitment

BUB Bubble curtain RTW Rootw ad

CNRConcentrated runoff SCU Side cutting

COB Cobble SHFStructure shifted

CRFCable/rebar failure SIN Sinuosity

DNS Dow nstream SLC Silt/clay

DRY Dry SND Sand

EMGEmergent groundw ater STB Stability

ENH Enhancement STR

Stranded out of activ e channel (horizontally )

EXC Ex cav ated STT Straightening

EXH Ex humed SWA

Stranded out of w ater (v ertically )

FLOFlow obstructions SWD

Small w oody debris

FLT Flatw ater TOG To grade

FPDFloodplain deposition UCB

Undercut bank

GRC Grade control UNA Unanchored

GRV Grav el UNDUndercut/undermined

GRZGrazing/grazing animal UNS

Undersized/under-built

HDC Headcut UPS Upstream

HYDHy drologic processes USG

Unstable soils/geology

INC Incision VEG Vegetation

INT Intercepted WID Widening

LBK Left bank WIN Within

LWDLarge w oody debris WSH Washed out

MAT

Structure material failure

MNT Maintenance

Codes for channel reconstruction & bank stabilization enhancement checklists

Bank stabilization - Code Key

Bank stabilization - Code Key

48

Page 60: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Appendix 3 List of reference sources used to identify “near-optimal” criteria that will be used for evaluating condition of coho salmon habitat at enhanced features, sites and reaches in Dry Creek.

Preferred microhabitats for coho salmon Beecher, H.A., B.A. Caldwell, and S.B. Demond. 2002. Evaluation of depth and velocity

preferences of juvenile coho salmon in Washington Streams. North American Journal of Fisheries Management 22: 785-795.

Bisson, P.A., K. Sullivan, and J.L. Nielsen. 1988. Channel hydraulics, habitat use, and body form of juvenile coho salmon, steelhead and cutthroat trout in stream. Transaction of the American Fisheries Society 117(3): 262-273.

Bovee, K.D. 1978. Probability of use criteria for the family Salmonidae. US Environmental Protection Agency. Cooperative Instream Flow Service Group. Fort Collins, Colorado.

Bugert, R.M., T.C. Bjornn, and W.R. Meehan. 1991. Summer habitat use by young salmonids and their responses to cover and predators in a small southeast Alaska stream. Transactions of he American Fisheries Society 120(4): 474-485.

Chambers, J.S., G.A. Allen, and T. Pressey. 1955. Research relating to study of spawning grounds in natural areas. Washington Department of Fish. Olympia, Washington. Unpub MS.

Chapman, D.W., and T.C. Bjornn. 1969. Distribution of salmonids in streams, with special reference to food and feeding. Pages 153-176 In T.G. Northcote (Ed). Symposium on salmon and trout in streams. H.R. Macmillan Lectures in Fisheries. University of British Columbia, Institute of Fisheries.

Dolloff, C. A., and G. H. Reeves. 1990. Microhabitat partitioning among stream-dwelling juvenile coho salmon, Oncorhynchus kisutch, and Dolly Varden, Salvelinus malma. Canadian Journal of Fisheries and Aquatic Sciences 47: 2297-2306.

Everest, F.H. and D.W. Chapman. 1972. Habitat selection and spatial interaction by juvenile Chinook salmon and steelhead trout. Journal of the Fisheries Research Board of Canada 29: 91-100.

Gard, M. 2006: Modeling changes in salmon spawning and rearing habitat associated with river channel restoration. International Journal of River Basin Management, 4:3, 201-211

Hampton, H. 1988. Development of habitat preference criteria for anadromous salmonids of the Trinity River. U.S. Dept. Int., Fish Wildl. Serv., Div. Ecol. Serv., Sacramento, California.

Nielsen, Jennifer L. 1992. Microhabitat-specific foraging behavior, diet, and growth of uvenile Coho Salmon, Transactions of the American Fisheries Society, 121(5): 617-634.

Pearson, L.S., K.R. Conover, and R.E. Sams. 1970. Factors affecting the natural rearing of juvenile coho salmon during the summer low flow season. Oregon Fish Commission. Portland, Oregon. Unpub. MS.

Reeves, Gordon H.; Everest, Fred H.; Nickelson, Thomas E. 1989. Identification of physical habitats limiting the production of coho salmon in western Oregon and Washington. Gen. Tech. Rep. PNW-GTR-245. Portland, OR: U.S. Department of Agriculture, Forest Service, Pacific Northwest Research Station.

49

Page 61: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Rosenfeld, J., T. Leiter, G. Lindner, and L. Rothman. 2005. Food abundance and fish density alters habitat selection, growth, and habitat suitability curves for juvenile salmon (Oncorhynchus kisutch). Canadian Journal of Fisheries and Aquatic Sciences 62: 1691-1701.

Smith, A.K. 1973. Development and application of spawning velocity and depth criteria for Oregon salmonids. Transactions of the American Fisheries Society 102(2): 312-316.

Stalnaker, C.B. and J.L. Arnette (eds). 1976. Methodologies for the determination of stream resource flow requirements: An assessment. U.S. Fish and Wildlife Service, Office of Biological Sciences, Western Water Allocation.

U.S. Environmental Protection Agency (EPA). 2003. EPA Region 10 guidance for Pacific Northwest State and Tribal Temperature Water Quality Standards. EPA 910-B-03-002. Region 10 Office of Waters, Seattle, WA.

Thompson, K.E. 1972. Determining streamflows for fish life. In Proceedings of instream flow requirement workshop. Pacific North West River Basins Commission. Portland, Oregon.

Flow velocity maximums for juvenile coho (based on critical fish swimming speeds) Flosi, G., S.Downie, J. Hopelain, M. Bird, R.Cooey, and B. Collins. 2003. California salmonid

stream habitat restoration manual, 4th edition. Part IX: Fish passage evaluation at stream crossings. California Department of Fish and Game.

Glova, G. L. , and J.E. McInerney. 1977. Critical swimming speeds of coho salmon (Oncorhynchus kisutch) fry to smolt stages in relation to salinity and temperature. Journal of Research Board of Canada 34: 151-154.

Hawkins, D.K., and T.P. Quinn. 1995. Critical swimming velocity and associated morphology of juvenile coastal cutthroat trout (Oncorhynchus clarki clarki), steelhead trout (Oncorhynchus mykiss), and their hybrids. Canadian Journal of Fisheries and Aquatic Sciences 53: 1487-1496.

Powers, P.D. 1997. Culvert hydraulics related to upstream juvenile salmon passage. Washington Department of Fish and Wildlife, Land and Restoration Services Program.

Taylor, E.B., and J.D. McPhail. 1985. Variation in burst and prolonged swimming performance among British Columbia populations of coho salmon, Oncorhychus Kisutch. Canadian Journal of Fisheries and Aquatic Sciences 42: 2029-2033.

Van Leeuwen, T.E., J.S. Rosenfeld, and J.G. Richards. 2011. Adaptive trade-offs in juvenile salmonid metabolism associated with habitat partitioning between coho salmon and steelhead trout in coastal streams. Journal of Animal Ecology 80: 1012-1023.

50

Page 62: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Appendix 4 Assessment of engineered Dry Creek habitat enhancements in regards to desired near-optimal flows for coho salmon

There is uncertainty regarding the extent of habitat response that will be achievable in Dry Creek even when all feasible habitat enhancement techniques are undertaken, given the historical evolution of the stream channel and current land uses. Feasibility analyses undertaken (Inter-Fluve 2011b) suggest that the current width of the Dry Creek channel is insufficient to consistently meet desired RPA criteria for pool-riffle in-channel habitat (i.e., optimal pool conditions of 2 to 4 feet deep with significant areas where water column velocities are less than 0.2 ft/sec). Meeting these criteria would likely require a substantially wider channel than currently exists for Dry Creek. Attempting to widen the channel (where possible) would create a multitude of hydraulic expansions and contractions, creating discontinuities in sediment transport and other processes. Furthermore, given current hydrology and vegetation patterns, it is expected that a widened channel would ultimately evolve back towards a state similar to that currently observed in Dry Creek (Inter-Fluve 2011b). These factors suggest difficulties in engineering habitat enhancements in the mainstem which could be expected to consistently achieve average flow velocities within RPA-defined target ranges. The velocity target defined in the RPA (NMFS 2008) was however based primarily on optima from habitat preference curves developed for juvenile coho in small streams by Beecher et al. (2002), and supported by similar velocity values from earlier studies of juvenile coho salmon (e.g., Ruggles 1966; Bovee 1978; Sheppard and Johnson 1985; Bison et al. 1988; Murphy et al. 1989; Dolloff and Reeves 1990; Bugert et al. 1991; and Shirvell 1994). More recently, however, work evaluating habitat suitability curves (i.e., Rosenfeld et al. 2005; Beecher et al. 2010) suggests that the narrow 3-6 cm/sec preference range defined for juvenile coho velocity by Beecher et al. (2002) fails to recognize the potential interactive effects of life history behaviors and food supply. Additionally, Rosenfeld et al. (2005) found that the shapes of habitat suitability curves may be sensitive to food abundance. Increased food availability can allow juvenile coho to exploit higher velocity microhabitats that might be bioenergetically unsuitable at lower food levels. Experimental studies (Rosenfeld et al. 2005) showed that increased food caused a shift to higher average focal velocities (from 6.5 to 8.4 cm/sec) with maximum growth of juvenile coho occurring in the higher velocity range of 10-12 cm/sec. The latter result is thought to relate to the territorial nature of coho and alternative feeding strategies displayed: dominant fish appear to forage first on drift in higher velocities in defended territories and grow faster, whereas more numerous subdominants forage on terrestrial drop and benthos in low-velocity habitats and grow slower. Faster growth of juvenile coho in faster velocities is also consistent with observations by Nielsen (1992) who found that dominant fish in a natural stream had focal velocities averaging 11 cm/sec, with coho using velocities below a threshold of 6 cm/sec experiencing growth rates less than half those of fish holding at velocities greater than 6 cm/sec. In strongly territorial species, dominant fish occupying preferred habitat at low densities can force subdominant fish into lower-quality habitat at high densities. In such a scenario, effects associated with territoriality may cause suitability curves to poorly represent true habitat quality (Baker and Coon 1997; Rosenfeld et al. (2005). Consistent with the assertions of Rosenfeld et al. (2005), Beecher et al. (2010) found that PHABSIM-based results (using his defined coho habitat suitability maxima)

51

Page 63: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

were contrary to empirical measurement of coho smolt production in a study creek in Washington. It was determined that if flows were reduced to levels that would maximize Weighted Useable Area (WUA) then production of smolts would decline (i.e., more smolts were produced under higher flow conditions that generated an apparent decrease in the amount of suitable, velocity-based habitat for coho). Beecher et al. (2010) concluded that this apparently counter-intuitive result may have been the result of using a habitat suitability model influenced heavily by the more numerous subdominant, schooling juvenile coho salmon and less by the dominant, territorial individuals, which had higher survival and preferred higher velocities. In essence, there was a difference between the habitat occupied by most rearing coho salmon (low velocity) and that occupied by the most successful in terms of growth and survival (higher velocity). Rosenfeld et al. (2005) suggested that traditional physical habitat-based suitability curves can provide a reasonable representation of the range of habitats that are likely to support a species (i.e., the extent of exploitable habitat) but perform poorly in discriminating habitat quality within this subset of suitable habitat. In regards to a preferred velocity for juvenile coho being 3-6 cm/sec Rosenfeld et al. (2005) suggested that Beecher et al.’s (2002) reported suitability of 0.97 for the wider velocity range of 3-12 cm/sec would more accurately reflect true habitat quality and a realistic level of confidence in the resolution of suitability curves. Recent coho habitat mapping in California’s Trinity River (Goodman et al. 2010) approaches this velocity range with an even more liberal definition of suitable velocity for coho fry: any habitats less than 15 cm/sec (0.49 ft/sec), a value based on historical fish sampling undertaken throughout the Trinity River. Based on Inter-Fluve’s engineering work and the supporting literature that more clearly defines what should be considered “near-optimal” conditions for juvenile coho the enhancement criteria for target pool velocity that will be used within the AMP has been adjusted upwards from that defined originally in the RPA: the pool velocity target range for the AMP will be 0.0 – 0.5 ft/sec instead of the original RPA target of 0.1 - 0.2 ft/sec.

52

Page 64: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Appendix 5 Dry Creek Adaptive Management Plan (AMP) workshops.

Workshop 1 participants (June 23-24, 2010 at Water Agency offices) Name Affiliation Gregg Horton Sonoma County Water Agency (Water Agency) David Manning Sonoma County Water Agency (Water Agency) Erik Brown Sonoma County Water Agency (Water Agency) Bob Coey National Marine Fisheries Service (NMFS) Bill Hearn National Marine Fisheries Service (NMFS) Rick Rogers National Marine Fisheries Service (NMFS) Eric Larson California Department of Fish and Wildlife (CDFW) Adam McKannay California Department of Fish and Wildlife (CDFW) Joel Pliskin Army Corp of Engineers (USACE) Mike Burke Inter-Fluve Greg Koonce Inter-Fluve David Marmorek ESSA Technologies Ltd. Darcy Pickard ESSA Technologies Ltd. Marc Porter ESSA Technologies Ltd. Katherine Wieckowski ESSA Technologies Ltd. Workshop 2 participants (Oct 19-21, 2010 at Water Agency offices) Name Affiliation Gregg Horton Sonoma County Water Agency (Water Agency) David Manning Sonoma County Water Agency (Water Agency) Erik Brown Sonoma County Water Agency (Water Agency) Dave Cuneo Sonoma County Water Agency (Water Agency) Grant Davis Sonoma County Water Agency (Water Agency) Renee Webber Sonoma County Water Agency (Water Agency) Pam Jeane Sonoma County Water Agency (Water Agency) Bob Coey National Marine Fisheries Service (NMFS) Bill Hearn National Marine Fisheries Service (NMFS) Rick Rogers National Marine Fisheries Service (NMFS) Adam McKannay California Department of Fish and Wildlife (CDFW) Joel Pliskin Army Corp of Engineers (USACE) Daria Mazey Army Corp of Engineers (USACE) Merle Griffin Army Corp of Engineers (USACE) Mike Burke Inter-Fluve Greg Koonce Inter-Fluve David Marmorek ESSA Technologies Ltd. Darcy Pickard ESSA Technologies Ltd. Marc Porter ESSA Technologies Ltd.

53

Page 65: Dry Creek Adaptive Management Plan (AMP) - ESSA2014/05/09  · Dry Creek Adaptive Management Plan (AMP) Final Prepared for Sonoma County Water Agency Prepared by Marc Porter, David

Dry Creek Adaptive Management Plan

Workshop 3 participants (July 19, 2011 at Water Agency offices) Name Affiliation Gregg Horton Sonoma County Water Agency (Water Agency) David Manning Sonoma County Water Agency (Water Agency) Erik Brown Sonoma County Water Agency (Water Agency) Dave Cuneo Sonoma County Water Agency (Water Agency) Bob Coey National Marine Fisheries Service (NMFS) Bill Hearn National Marine Fisheries Service (NMFS) Rick Rogers National Marine Fisheries Service (NMFS) Brian Cluer National Marine Fisheries Service (NMFS) Adam McKannay California Department of Fish and Wildlife (CDFW) Ryan Wantanabe California Department of Fish and Wildlife (CDFW) Peter LaCivita Army Corp of Engineers (USACE) Mike Burke Inter-Fluve Greg Koonce Inter-Fluve David Marmorek ESSA Technologies Ltd. Marc Porter ESSA Technologies Ltd. Workshop 4 participants (May 23, 2012 at Water Agency offices) Name Affiliation Gregg Horton Sonoma County Water Agency (Water Agency) David Manning Sonoma County Water Agency (Water Agency) Erik Brown Sonoma County Water Agency (Water Agency) Dave Cuneo Sonoma County Water Agency (Water Agency) Bob Coey National Marine Fisheries Service (NMFS) Rick Rogers National Marine Fisheries Service (NMFS) Adam McKannay California Department of Fish and Wildlife (CDFW) Peter LaCivita Army Corp of Engineers (USACE) Mike Burke Inter-Fluve Greg Koonce Inter-Fluve David Marmorek ESSA Technologies Ltd. Marc Porter ESSA Technologies Ltd.

54