7
Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear Regulatory Commission – Region III

Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

Dre

sden

Nuc

lear

Pow

er S

tatio

nU

nits

2 a

nd 3

Ann

ual A

sses

smen

t Mee

ting

Ope

n H

ouse

May

19,

201

5

2014

Rea

ctor

Ove

rsig

ht P

roce

ssN

ucle

ar R

egul

ator

y C

omm

issi

on –

Reg

ion

III

Page 2: Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

1

Our M

ission

To license an

d regulate th

e na

tion’s c

ivilian

 use of 

byprod

uct, source, and

 special nuclear m

aterials to

 en

sure ade

quate protectio

n of pub

lic health

 and

 safety, 

prom

ote the common

 de

fense an

d security, and

 protect the

 enviro

nmen

t.

2

The NRC

 Regulates

•Nuclear re

actors‐com

mercial pow

er re

actors, research and 

test re

actors, new

 reactor d

esigns

•Nuclear materials‐n

uclear re

actor fue

l, radioactive materials 

for m

edical, ind

ustrial, and academ

ic use

•Nuclear waste

–transportatio

n, storage and disposal of 

nuclear m

aterial and

 waste, decom

missioning

 of n

uclear 

facilities

•Nuclear se

curity–ph

ysical se

curity of nuclear facilities a

nd 

materials from

 sabo

tage or a

ttacks

3

What W

e Do

n’tD

o

•Re

gulate nuclear weapo

ns, m

ilitary re

actors, 

or sp

ace vehicle reactors 

•Own or ope

rate nuclear pow

er plants

•Re

gulate so

me radioactive materials, su

ch as 

X‐rays and

 naturally occurrin

g rado

4

Some Nuclear Facts                                    

•99

 nuclear pow

er plants supp

ly 

abou

t 20 pe

rcen

t of the

 electricity

 in 

the U.S.

•Nuclear m

aterials are used

 in 

med

icine for d

iagnosis and cancer 

treatm

ent.

•Nuclear m

aterials are widely used

 in 

indu

stry, such as in

 den

sity gauges, 

flow m

easurement d

evices, 

radiograph

y de

vices, and

 irradiators.

5

Page 3: Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

2

NRC

 Perform

ance Goa

ls

Safety

–En

sure ade

quate protectio

n of pub

lic 

health and

 safety and

 the en

vironm

ent

Security–En

sure ade

quate protectio

n in th

e secure use and

 man

agem

ent o

f rad

ioactiv

e materials

66

How

We

Reg

ulat

e

7

Reg

ulat

ory

Fram

ewor

kN

RC

’s S

afet

y M

issi

on

Stra

tegi

c Pe

rform

ance

Ar

eas

Cor

ners

tone

s

Cro

ss-C

uttin

g A

reas

Hum

an P

erfo

rman

ce--

Saf

ety

Con

scio

us W

ork

Env

ironm

ent

Pro

blem

Iden

tific

atio

n &

Res

olut

ion

8

Reactor O

versight Process

9

Safe

tyC

orne

rsto

nes

Bas

elin

e In

spec

tion

Res

ults

Sign

ifica

nce

Thre

shol

d

Actio

n M

atrix

Sign

ifica

nce

Thre

shol

d

Perf

orm

ance

Indi

cato

rR

esul

ts

Reg

ulat

ory

Res

pons

e

Stra

tegi

cPe

rfor

man

ce A

reas

Safe

tyC

orne

rsto

nes

Bas

elin

e In

spec

tion

Res

ults

Sign

ifica

nce

Thre

shol

d

Actio

n M

atrix

Sign

ifica

nce

Thre

shol

d

Perf

orm

ance

Indi

cato

rR

esul

ts

Reg

ulat

ory

Res

pons

e

Stra

tegi

cPe

rfor

man

ce A

reas

Page 4: Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

3

Sig

nific

ance

Thr

esho

ld

Incr

easi

ng S

afet

y S

igni

fican

ce

Gre

enW

hite

Yello

wR

ed

Per

form

ance

Indi

cato

rs

Insp

ectio

n Fi

ndin

gs

Gre

enW

hite

Yello

wR

ed

Incr

easi

ng S

afet

y S

igni

fican

ce

10

Significance Th

reshold

Green

Baselin

e Inspectio

nWhite

Requ

ires a

ddition

al NRC

 oversight

Yello

wRe

quire

s more NRC

 oversight

Red

Requ

ires m

ost N

RC oversight

Performan

ce In

dicators

Inspectio

n Find

ings

Green

Very low sa

fety issue

White

Low to

 mod

erate safety issue

Yello

wSubstantial safety issue

Red

High safety issue

1111

Act

ion

Mat

rix C

olum

ns

Incr

easi

ng•

Safe

ty S

igni

fican

ce•

Insp

ectio

n •

Man

agem

ent I

nvol

vem

ent

•R

egul

ator

y A

ctio

n

Lice

nsee

R

espo

nse

Reg

ulat

ory

Res

pons

eD

egra

ded

Mul

tiple

/Rep

etiti

veD

egra

ded

Una

ccep

tabl

ePe

rform

ance

12

Indu

stry

-Wid

e P

erfo

rman

ce

80

14

501

As of 1

2/31

/201

4

Licensee

 Respo

nse

Regulatory Respo

nse

Degraded

 Corne

rstone

Multip

le/Rep

etitive

Degraded

 Corne

rstone

Unaccep

table

IMC 03

50 Process

13

Page 5: Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

4

Indu

stry

-Wid

e In

spec

tion

Find

ings

Find

ing

data

cur

rent

as

of 1

/31/

2015

703

16 3 0

Calend

ar Year 

2014

 data

Green

White

Yellow

Red

14

Indu

stry

-Wid

e P

erfo

rman

ce In

dica

tors

6740

16 00

Calend

ar Year 

2014

data

Green

White

Yellow

Red

15

NRC

 Ann

ual A

ssessm

ent S

ummary

Exelon

 ope

rated the station safely and

 in a m

anne

r tha

t preserved

 the 

public health

 and

 safety and

 protected

 the en

vironm

ent.

Dresden

 Unit 2

 was in

 the Licensee

 Respo

nse Co

lumn of th

e NRC

’s Ac

tion Matrix

 for the

 all four qua

rters of 201

4Dresden

 Unit 2

 tran

sitio

ned to Regulatory Re

spon

se Colum

n in first 

quarter o

f 201

5 du

e to a W

hite perform

ance in

dicator for greater th

an 3 

scrams p

er 700

0 op

erating ho

urs 

Dresden

 Unit 3

 was in

 the Licensee

 Respo

nse Co

lumn of th

e NRC

’s Ac

tion Matrix

 for the

 first three

 qua

rters of 201

4.Dresden

 Unit 3

 was in

 the Re

gulatory Respo

nse Co

lumn for the

 fourth 

quarter o

f 201

4 du

e to a W

hite find

ing associated

 with

 the inop

erab

ility 

of an Electrom

aticRe

lief V

alve

No Substantive Cross‐Cu

tting Issues were iden

tified

Dresden

 Nuclear Pow

er Statio

n2014

1616

NRC

 Inspectio

n Ac

tivities

5418

 total hou

rs expen

ded by

 NRC

 on Re

actor 

Oversight Process activities

2459

 inspector h

ours of d

irect inspectio

n activ

ity58

6 inspector h

ours re

view

ing an

d ob

serving plan

t op

erating status

1723

 inspector h

ours of p

repa

ratio

n for a

nd 

documen

tatio

n of in

spectio

n activ

ities 

649 ho

urs for other Reactor Oversight Process 

elem

ents (e

.g., assessmen

ts and

 com

mun

ications)

17Dresden

 Statio

n 2014

17

Page 6: Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

5

NRC

 Inspectio

n Ac

tivities

2 reside

nt inspectors on site –reside

nts p

rodu

ced four 

quarterly

 inspectio

n repo

rts a

nd perform

ed daily plant 

walk‐throug

hs

36 re

gion

 based

 inspectors partic

ipated

 in various 

inspectio

ns

2 major te

am inspectio

ns –Trienn

ial Fire

 Program

 and

 Bien

nial Problem

 Iden

tification an

d Re

solutio

n

Dresden

 Nuclear Statio

n2014

1818

Dresden

 PIs and

 Findings

All G

reen

 Perform

ance Indicators

11 Green

/Severity

 Level IV

 Inspectio

n Find

ings

1 White In

spectio

n Find

ing

Janu

ary 1 through Decem

ber 3

1, 2014

1919

Safety Significan

t/White Findings

NRC

 Iden

tified on

e White find

ing in Fou

rth Qua

rter of 2

014 

Involved

 one

 of fou

r ElectromaticRe

lief V

alves o

n Main 

Steam Lines  

Valves are designe

d to ra

pidly redu

ce re

actor v

essel pressure 

if ne

eded

Licensee

 failed to ensure continue

d op

erab

ility of valve with

 increased steam flow

s after im

plem

entin

g an

 app

roved 

power uprate

Unit 3

 tran

sitio

ned to Regulatory Re

spon

se Colum

n of th

e Re

actor O

versight Process effe

ctive for the

 Fou

rth Qua

rter of 

2014

   Dresden

 Nuclear Unit 3

20

NRC

 Inspectio

n Find

ings

Deficiencies in evacua

tion tim

e estim

ates

Failu

re to

 correct una

ccep

table indicatio

ns in

 mecha

nical sup

ports for a safety‐related he

at 

exchan

ger 

Failu

re to

 take app

ropriate co

rrectiv

e actio

n whe

n a 

Mainten

ance Rule pe

rforman

ce goa

l was not m

etFailu

re to

 ade

quately incorporate op

erating 

expe

rience into site cop

y of a ven

dor m

anua

l used 

for e

quipmen

t mainten

ance inform

ation

Dresden

 Nuclear Pow

er Statio

nSome Exam

ples of 2

014 Green

 Finding

s

2121

Page 7: Dresden Nuclear Power Station Units 2 and 3 · Dresden Nuclear Power Station Units 2 and 3 Annual Assessment Meeting Open House May 19, 2015 2014 Reactor Oversight Process Nuclear

6

NRC

 Inspectio

n Plan

s for 201

5

NRC

 Plans Baseline Inspectio

ns and

 Sup

plem

ental Inspe

ctions 

for 2

015.   Th

is includ

es th

e follo

wing major te

am and

 supp

lemen

tal inspe

ctions

Review

 of corrective actio

ns fo

r White issue involving 

operab

ility of E

lectromaticRe

lief V

alve –after n

otificatio

n from

 licensee

 that th

ey are re

ady for inspe

ction

Review

 of corrective actio

ns fo

r White perform

ance 

indicator –

after n

otificatio

n from

 licensee

 that th

ey are 

read

y for the

 inspectio

nTrienn

ial M

odificatio

ns / 10C

FR50

.59 Ch

anges  Inspectio

n –

second

 qua

rter 2015

Initial Licen

sed Ope

rator E

xaminations (com

pleted

 first 

and second

 qua

rter)

22Dresden

 Nuclear Pow

er Statio

n

22

Actio

ns in

 Respo

nse to th

e Japa

n Nuclear Acciden

t

•Ac

tions in

 respon

se to

 Japa

n Nuclear 

Accide

nt: http://w

ww.nrc.gov/jap

an/jap

an‐

info.htm

l

•Mailbox

 for com

men

ts on staff a

ctions: 

JLD_P

ublic.Resou

rce@

nrc.gov

•Office of Pub

lic Affa

irs Point of C

ontact: 

OPA

[email protected] 301

‐415

‐8200

2323

NRC

 Social M

edia 

Chan

nels

•Blog:

http://pub

lic‐blog.nrc‐gateway.gov/

•Flickr:

http://w

ww.flickr.com

/pho

tos/nrcgov/

•Tw

itter:

https://tw

itter.com

/#!/nrcgov

•YouTub

e: http://www.you

tube

.com

/user/NRC

gov

•RS

S:http://w

ww.nrc.gov/pub

lic‐

involve/listserver.h

tml#rss

2425

Additio

nal Q

uestions?

NRC

 Rep

resentatives

Sr. P

ublic Affa

irs Officer:V

iktoria

Mitlyng‐6

30‐829

‐9662

Public Affa

irs Officer:P

rema Ch

andrathil ‐630‐829‐9663

Email:O

PA3.Re

[email protected]

NRC

 Residen

t Inspe

ctor Office –Dresde

n Nuclear Pow

er 

Station –815‐942‐9267