DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A0.0COVER
NTS
SHEET INDEX:A0.0 COVERA0.1 PROJECT INFORMATIONA0.2 SITE PHOTOGRAPHSA0.3 PROPOSED ADJACENT DEVELOPMENTSA1.1 SITE PLANA1.2 STREET ELEVATIONS, EXISTINGA1.3 STREET ELEVATIONS, PROPOSEDA2.1 GROUND LEVEL FLOOR PLANA2.2 SECOND LEVEL FLOOR PLANA2.3 THIRD LEVEL FLOOR PLANA2.4 FOURTH LEVEL FLOOR PLANA2.5 FIFTH & SIXTH LEVEL FLOOR PLANA2.6 ROOFA3.1 BUILDING CROSS SECTION EXISTINGA3.2 BUILDING CROSS SECTION PROPOSEDA3.3 BUILDING SECTION EXISTINGA3.4 BUILDING SECTION PROPOSEDA4.1 EXTERIOR ELEVATIONS EXISTINGA4.2 EXTERIOR ELEVATIONS EXISTINGA4.3 EXTERIOR NORTH ELEVATION - PROPOSEDA4.4 EXTERIOR EAST ELEVATION - PROPOSEDA4.5 EXTERIOR SOUTH ELEVATION - PROPOSEDA4.6 EXTERIOR WEST ELEVATION - PROPOSEDA5.1 SHADOW STUDIES - DECEMBER 21A5.2 SHADOW STUDIES - JUNE 21A5.3 SHADOW STUDIES - MAY 29A6.1 RENDERINGSA6.2 RENDERINGSA6.3 RENDERINGSA6.4 COLOR OPTIONSL1 LANDSCAPE PLANS
PROJECT:
UC PRESS BUILDING2120 BERKELEY WAYBERKELEY, CA 94704APPLICANT:
MARK RHOADESRHOADES PLANNING GROUP1611 TELEGRAPH AVE, SUITE 200OAKLAND, CA 94612510-545-4341
PROJECT SITE
ARCHITECT:
DEVI DUTTA-CHOUDHURY, AIADEVI DUTTA ARCHITECTURE1958A UNIVERSITY AVENUEBERKELEY, CA 94704510/[email protected]
OWNER:
BERKELEY WAY LLC.1958A UNIVERSITY AVEBERKELEY, CA 94704
ADDITION &RENOVATION
ATTACHMENT 1 DRC 09-17-2015
Page 1 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A0.1PROJECT DATA
NTS
PROJECT:
UC PRESS BUILDING2120 BERKELEY WAYBERKELEY, CA 94704
DESCRIPTION:
SITE ADDRESS:
ASSESSOR'S PARCEL #:
TENANT IMPROVEMENT OF EXISTING3-STORY CONCRETE OFFICE BUILDING;NEW ADDITION OF 3 STORIES
2120 BERKELEY WAYBERKELEY, CALIFORNIA 94705
057-2046-2
PROJECT SITE
OCCUPANCY :
CONSTRUCTION TYPE:
ZONING:
GENERAL PLAN:
LOT AREA:
LOT COVERAGE:
EXISTING BUILDING GFA:
PROPOSED:RENOVATED BUILDING GFA:
NEW BUILDING GFA:
PROPOSED TOTAL GFA:
BUSINESS + MERCANTILE ATGROUND FLOOR; BUSINESS ABOVE
EXISTING: TYPE VA(CONCRETE CONSTRUCTION)PROPOSED: TYPE IIA FOR 6 STORIES
C-DMU OUTER CORE
DT
8,800 SF
(E) 8,000 SF (80%)
1ST: 7,635 SF2ND: 7,500 SF3RD: 7,500 SFTOTAL: 22,635 SF
1ST: 7,430 SF2ND: 7,201 SF3RD: 7,201 SFTOTAL: 21,832 SF
4TH: 6,703 SF5TH: 6,703 SF6TH: 6,386 SFTOTAL: 19,792 SF
41,624 SF
ADDITION &RENOVATION
HEIGHT LIMITS:
REQ. SETBACKS: (BLDG HEIGHTS) 0-20' 21-75'
REQ. OPEN SPACE / PUBLICALLYOWNED / PRIVATELY OPERATED:
PROVIDED POPO:
REQ. PARKING:
PROVIDED PARKING:
REQ. BIKE PARKING:
PROVIDED BIKE PARKING:
EXISTING FAR:
PROPOSED FAR:
MIN-40'MAX-60'MAX WITH UP - 75'
FRONT SIDE REAR0' 0' 0'0' *5' 5'*MIN AT >65' FROM FRONT
1 SF POPO / 50 SF COMMERCIALFLOOR AREA = 400 SF
309 SF AT ENTRY
1- 12 / 1000 GFA (NEW FLOOR AREA)19,792 SF = 30 PARKING SPACES
IN-LIEU FEE
1 / 2,000 GFA19,792 NEW SF = 10 BIKE PARKING
28 COVERED BIKE PARKINGSPACES AT WEST SETBACK
2.57
4.73
ATTACHMENT 1 DRC 09-17-2015
Page 2 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A0.2SITE PHOTOS
NTS
BACHENHEIMERRESIDENTIAL BUILDING
(E) RETAIL & FUTUREHIGH RISEDEVELOPMENT
ATTACHMENT 1 DRC 09-17-2015
Page 3 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A0.3PROPOSED ADJACENT DEVELOPMENT
NTS
3
1
1
11
2
3
BERKELEY WAY WEST ACADEMIC BUILDING,CURRENTLY IN PLANNING BY UC BERKELEY
ACHESON COMMONS, APPORVED USE PERMIT
2 L'ARGENT HIGHRISE , CURRENTLY UNDER REVIEW
PROPOSEDDEVELOPMENT
EXISTINGBLDG
BERKELEY WAY
UNIVERSITY AVE.
WAL
NUT
ST.
SHAT
TUCK
AVE
.
SUBJECT PROPERTY
MIKESBIKES
MIXED USE5 STORYBUILDING
UC BIOSCIENCEBUILDING
ENTERPRISERENT-A-CAR
U CTRANSPORTATION
ATTACHMENT 1 DRC 09-17-2015
Page 4 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A1.1SITE PLAN
1/16" = 1'-0"
UNIVERSITY AVE.
BACHENHEIMERRESIDENTIALBUILDING - 6 STORIES
BLOWSALON
(e) D
RIVE
WAY
TO
BACH
ENHE
IMER
PROPOSED ACHESONCOMMONS MIXED USEDEVEOPMENT -
PROPOSED L'ARGENTHIGH-RISE DEVELOPMENT
5'REQ.
SETBACKAT UPPER
LEVELS
5'RE
Q.SE
TBAC
KAT
UPP
ERLE
VELS
6' FENCE ALONGPROPERTY LINE
5'REQ.
SETBACKAT UPPER
LEVELS
88'-8
" ADD
ITIO
N
90' (E
) BUI
LDIN
G
BUILDING SETBACK AT4TH AND 5TH FLOOR
65'
90' (E) BUILDING7'-5"
97'-6" SITE
(E) BUILDING BELOW
ROOF DECK AT 6TH FLOOR
ROOF DECK
ELEVATORPENTHOUSE
STAIR PENTHOUSE
DECK BELOW
6 - STORY BUILDING(3 STORIESIN CONCRETE &3 STORIES IN METALFRAMING)
1'-8"
ADD TREE TO (E) WELL(E) TREE TO REMAIN(E) TREE TO REMAIN
88'-8" ADDITION
8'-9 1/2"
90'-1
" SIT
E
5'-9 1
/2"
5'-1"
5'-8"
23'-11 1/2"
10'-1 1/2"
ATTACHMENT 1 DRC 09-17-2015
Page 5 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A1.2STREET ELEVATION
NTS
BERKELEY WAY SOUTH ELEVATION, EXISTING2120 BERKELEY WAYBERKELEY, CA 94707
BERKELEY WAY NORTH ELEVATION
ACROSS STREETFROM PROJECT SITE
PROPOSED UC HIGHRISE BLDG. UC BIOSCIENCE BLDG. (E) MULTI-FAMILY BLDG.
(E) BUILDINGS TO BE REMOVEDFOR ADJACENT ACHESONDEVELOPMENT
ATTACHMENT 1 DRC 09-17-2015
Page 6 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A1.3STREET ELEVATION
NTS
BERKELEY WAY SOUTH ELEVATION, PROPOSED2120 BERKELEY WAYBERKELEY, CA 94707
BERKELEY WAY SOUTH ELEVATIONWITH PROPOSED ADJACENT DEVELOPMENTS
2120 BERKELEY WAYBERKELEY, CA 94707
PROPOSED ACHESON COMMONS
PROPOSED L'ARGENT
ATTACHMENT 1 DRC 09-17-2015
Page 7 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A2.1Ground Floor Plan, Renovation
1/16" = 1'-0"
UP
UP
UP
A3.3A3.3
UP
18'
18'
18'
18'
18'
18'18'18'18'18'
1 / A4.2
2 / A4.1
1 / A
4.1
2 / A
4.2
BIKESTORAGE
GARAGEENTRY
01 EXISTING/DEMO00 04 08 16'-0" 32 64
02 PROPOSED00 04 08 16'-0" 32 64
(E) ⅊ WINDOWS W/ SPRINKLER HEADS
REMOVE (E)⅊WINDOWS WITHSPRINKLERHEADS TYP.
BERKELEY WAY
BUSINESS/OFFICE
OFFICE
OFFICE
OFFICE
SERVER STORAGE MECHANICAL
ELEVATORLOBBY
BUSINESS/RETAIL
OFFICE
OFFICE
OFFICE
HALLEXIT
ELEC.
TOILET RM
TOILET RM
RAMP UP,10.25"
SALON/ RETAIL,922 SF
LOBBY
MICRO RETAIL,593 SF
UTILITIES/MECHANICAL730 SF
MICRO RETAIL,593 SF
BUSINESSAREA 2835 SF
REMOVE WALLSSHOWN DASHED
SERVICEENTRY
BIKESTORAGE
GARAGEENTRY
ENTRY PATIO /POPO309 SF
RAMP
NEW DOUBLEELEVATORLOCATION
REMOVE EXISTINGGRAND STAIR
REMOVE EXISTING ELEVATOR &SHAFT (CURRENT SIZE DOESNOT MEET NEW CODE FORUPPER LEVELS
TOILETTOILET
NEWSTAIR
BACHENHEIMERRESIDENTIALBUILDING
BACHENHEIMERRESIDENTIALBUILDING
A3.4A3.4
A4.3A4
.6
BERKELEY WAY
NEW WINDOWS
EXIT
NEWSTAIR
HALL HALL
A4.5
A4.4
(E) CONCRETE COLUMNSTO REMAIN
NEW RECESSEDWINDOW BAY TYP.
WALL MOUNTEDVERTICAL BIKE
PARKING
NEW FRONTGATE FOR BIKE
PARKING ACCESS
REMOVE WINDOWS& PORTIONS OF
WALL FORNEW WINDOWS
REMOVE (E)EXIT STAIRS
REMOVE (E) STAIRS
UP
UP
UP
UP
NEW STORE FRONT WINDOWS
NEW AWNING ABOVE
1L1
WALK-OFFMAT
STAIRSTAIR
ATTACHMENT 1 DRC 09-17-2015
Page 8 of 31
WH
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A2.2Second Floor Plan, Renovation
1/16" = 1'-0"
DN
UP
EXISTING SKYLIGHTTO ABOVE TO BE REMOVED
UP
DN
A3.3A3.3
1 / A4.2
2 / A4.1
1 / A
4.1
2 / 4.
2
01 EXISTING/DEMO00 04 08 16'-0" 32 64
02 PROPOSED00 04 08 16'-0" 32 64
BUSINESS2865 SF
BUSINESS3565 SF
LOBBY
BACHENHEIMERRESIDENTIALBUILDING
REMOVE EXISTINGGRAND STAIR, PARTIALINFILL OPENING FORNEW ELEVATOR SHAFT
REMOVE EXISTINGKITCHEN ANDRESTROOMS
REMOVE EXISTINGELEVATOR ANDCONVENIENCE STAIR
OPENOFFICE
LOW WALLS & BUILT-INFURNITURE TO BEREMOVED
KITCHEN
TOILET
TOILET
WH
WORKROOM
RECEPTION
OPENOFFICE
KITCHEN
A3.4A3.4
A4.3A4
.6
NEWSTAIR
NEWSTAIR
NEW RECESSEDBAY WINDOWS
TOILETTOILET
HALL HALL
A4.5A4
.4
NEW OPENING REMOVE WALLFOR NEW WINDOWS
REMOVE(E) WINDOWS
ENLARGE (E)WINDOW OPENINGS
REMOVE(E) WINDOWS
INFILL (E) WINDOW
REMOVE (E) STAIRS
REMOVE (E) AREAFOR NEWELEVATOR SHAFT
UP
UP
BEDROOM BEDROOM CORRIDOR BEDROOM BEDROOMLIVING RM
KITCHENHALL
LIVING
STAIR BACHENHEIMERRESIDENTIALBUILDING
STAIR
3'
NEW WINDOWSTYP.
ATTACHMENT 1 DRC 09-17-2015
Page 9 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A2.3Third Level Floor Plan, Renovation
1/16" = 1'-0"
OPEN TOBELOW,
SKYLIGHTABOVE
OPEN TO BELOW
DN
DN UP
DN
1 / A8
01 EXISTING/DEM000 04 08 16'-0" 32 64
02 PROPOSED00 04 08 16'-0" 32 64
OPENOFFICE
TOILET
TOILET
OFFICE
OFFICE OFFICE
CONFERENCE
OFFICEOFFICE
OFFICE
OFFICE
LOBBY
REMOVE EXISTINGINTERIOR WALLS AS
SHOWN
INFILL EXISTINGOPENINGS BETWEEN
LEVELS
BUSINESS2865 SF
BUSINESS3565 SF
NEWSTAIR
NEWSTAIR
TOILET
HALL HALL
TOILET
A3.3
1 / A4.2
2 / A4.1
1 / A
4.1
2 / A
4.2
A3.4A3.4
A4.3A4
.6
A4.5
A4.4
REMOVE (E) STAIR
UP
UP
BACHENHEIMERRESIDENTIALBUILDING
STAIRBACHENHEIMERRESIDENTIALBUILDING
BEDROOM BEDROOM CORRIDOR BEDROOM BEDROOMLIVING RM
KITCHENHALL
LIVING
STAIR
ATTACHMENT 1 DRC 09-17-2015
Page 10 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A2.4Existing Roof Level / Fourth Floor Plan, Addition
1/16" = 1'-0"
18'
18'
18'
18'
18'
18'18'18'18'18'
01 EXISTING/DEMO00 04 08 16'-0" 32 64
02 PROPOSED00 04 08 16'-0" 32 64
(E) SKYLIGHTS
(E) ELEVATOROVERRIDE
EXISTING ROOF HATCH
BUSINESS2780 SF
EXISTING ROOF -REMOVE (E)CONCRETE ROOF &COLUMNS BELOW
LOBBY
SKY DECK278 SF
BUSINESS3115 SF
NEWSTAIR
NEWSTAIR
TOILET
HALL HALL
TOILET
A3.4A3.4
A4.3A4
.6
A4.5A4
.4
1 / A8A3.3
1 / A4.2
2 / A4.1
1 / A
4.1
2 / A
4.2
17'
UP
UP
BACHENHEIMERRESIDENTIALBUILDING
STAIR
BAY ABOVE
16'-8"
BAY ABOVE
RECESSED WINDOWS
RECESSED WINDOWS
BAY ABOVE
BACHENHEIMERRESIDENTIALBUILDING
BEDROOM BEDROOM CORRIDOR BEDROOM BEDROOMLIVING RM
KITCHENHALL
LIVING
STAIR
2L1
ATTACHMENT 1 DRC 09-17-2015
Page 11 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A2.5Proposed 5TH & 6TH Floor Plans, Addition
1/16" = 1'-0"
BACHENHEIMER RESIDENTIALBUILDING (roof below @ 6th floor)
01 PROPOSED 5TH FLOOR00 04 08 16'-0" 32 64
BUSINESS6000 SF
ROOF DECKBELOW
02 PROPOSED 6TH FLOOR00 04 08 16'-0" 32 64
BUSINESS6000 SF
NEWSTAIR
TOILET TOILET
NEWSTAIR
NEWSTAIR
TOILET TOILET
SKY DECK306 SF
A3.4A3.4
A4.3
A4.6
A4.5A4
.4
A3.4A3.4
A4.3
A4.6
A4.5
A4.4
5'
UP
UPDN
UP
NEWSTAIR
ROOF
7'-5"
1'-8"
1'-8"
3'
3'
3'
3'
3L1
SKY DECK135 SF
ATTACHMENT 1 DRC 09-17-2015
Page 12 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
A2.6Roof Plan, Addition
1/16" = 1'-0"
BACHENHEIMER RESIDENTIALBUILDING (roof below )
MECH/SOLAREQUIPMENT
ROOF DECK<750 SF
LOBBY
17'-3" 21'-0 1/2" 44'-2 1/2" 7'-6"
18'-4
"
23'-1" 18'-8"
OPEN TO DECK BELOW
BAY BELOW
A3.4A3.4
A4.3
A4.6
A4.5
A4.4
FUTURE SOLARPANELS
DN
4L1
GLASS GUARD
DECK BELOW
ATTACHMENT 1 DRC 09-17-2015
Page 13 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A3.1EXISTING CROSS SECTION
1/16" = 1'-0"
BACHENHEIMERBLDG. BEYOND
GROUND LEVEL
0'-0"
SECOND LEVEL
13'-2"
THIRD LEVEL
22'-9"
ROOF LEVEL
32'-4"
REMOVE EXISTINGCONCRETE ROOF
EXISTING OPEN STAIR
EXISTING CONCRETECOLUMNS & CAPITALSTO REMAIN
EXISTING SKYLIGHTSAT ROOF
ACE HARDWAREPARKING LOT
ATTACHMENT 1 DRC 09-17-2015
Page 14 of 31
13'-2
"9'-
7"11
'-8"
12'-9
"12
'-9"
12'-9
"
11'
11'
10'
8'-7"
12'-2
"
9"
74'-7
7/8"
72'-7
7/8"
11'
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A3.2PROPOSED CROSS SECTION - 3-story addition
1/16" = 1'-0"
BACHENHEIMER BLDG. BEYOND
BLOW SALON &FUTURE L'ARGENTDEVELOPMENT
NEW STEEL FRAMEDFLOORS/ROOF
REBUILT 4TH FLOOR/ROOF
EXISTING CONCRETE STRUCTURE TO REMAIN
NEW RECESSED WINDOWS ATEAST PROPERTY LINE
REINFORCED FOUNDATION
ELEVATOR PENTHOUSEWITH LOBBY
ADJACENT DRIVEWAY
COVEREDBIKE PARKING
SLOPE SILL ATRECESSED WINDOWS TYP.
NEW FENCE
3'-6"
ROOF DECKGLASS RAILING
ATTACHMENT 1 DRC 09-17-2015
Page 15 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A3.3EXISTING SECTION
1/16" = 1'-0"
BACHENHEIMERBLDG. BEYOND
GROUND LEVEL
0'-0"
SECOND LEVEL
13'-2"
THIRD LEVEL
22'-9"
ROOF LEVEL
32'-4"
EXISTING CONCRETEBUILDING
EXISTING ROOFSKYLIGHTS
EXISTING OPEN STAIR
EXISTINGELEVATOR
GARAGE
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
ATTACHMENT 1 DRC 09-17-2015
Page 16 of 31
13'-2
"9'-
7"11
'-8"
12'-9
"12
'-9"
12'-9
"
11'
11'
11'
10'
8'-7"
12'-2
"
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A3.4PROPOSED SECTION - 3 story addition
1/16" = 1'-0"
BACHENHEIMER BLDG.
BERKELEY WAY
REBUILT 4THFLOOR/ROOF
NEW 3-STORY STEELFRAMED ADDITION
NEW ELEVATOR SHAFT
ABANDON (E) ELEVATOR &SHAFT, INFILL FLOOROPENINGS
(E) GROUND FLOOR & 2NDFLOOR COLUMNS TO REMAIN
6TH FLOOR DECK
ROOF DECK
EXISTING CONCRETEBLDG TO REMAIN
AT BASE
NEW STAIR SHAFT
REINFORCED (E)FOUNDATION
2° SLOPED SILL
8'
SOLAR EQUIPMENT
3'-6"
ROOF DECKRAILING
GARAGE
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
ATTACHMENT 1 DRC 09-17-2015
Page 17 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A4.1EXISTING EXTERIOR ELEVATIONS
1/16" = 1'-0"
2 - FRONT / NORTH ELEVATION 1 - EAST ELEVATION
PROPERTY LINE WINDOWS(FACING FUTURE ACHESON)
WINDOW SPRINKLER
BACHENHEIMER BLDG BEYOND
GROUND LEVEL
0'-0"
SECOND LEVEL
13'-2"
THIRD LEVEL
22'-9"
ROOF LEVEL
32'-4"
(E) CONCRETE STRUCTUREWITH STUCCO SKIM COAT
39'-8
"
37'-8
"
PAINTED CONCRETE
ATTACHMENT 1 DRC 09-17-2015
Page 18 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A4.2EXISTING EXTERIOR ELEVATIONS
1/16" = 1'-0"
1 - SOUTH ELEVATION
PROPERTY LINE WINDOWS(FACING BACHENHEIMER)WITH SPRINKLER HEADS
2 - WEST ELEVATION
GROUND LEVEL
0'-0"
SECOND LEVEL
13'-2"
THIRD LEVEL
22'-9"
ROOF LEVEL
32'-4"
CONCRETE STRUCTUREWITH STUCCO SKIM COAT PAINTED CONCRETE
(E) SIDE EGRESS
ATTACHMENT 1 DRC 09-17-2015
Page 19 of 31
North Elevation
UC PressBLDG2120 BERKELEY WAY
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A4.3BERKELEY WAY/NORTH ELEVATION - PROPOSED
1/16" = 1'-0"
RECESSED DECK AT 6THFLOOR
EXISTING CONCRETEBUILDING
NEW, LARGEROPENINGS IN
EXISTINGCONCRETE
STRUCTURE
NEWSTOREFRONT
NEW RECESSED MAINENTRY
NEW EGRESS DOOR
NEW METAL FRAMEDUPPER STORIES W/
METAL PANEL FINISH
METAL RAILING
ELEVATOR PENTHOUSEBEYOND
HORIZONTALMETAL PANEL
2ND
3RD
4TH
5TH
6TH
ROOF
BACHENHEIMER BEYOND
NEW GATE WITH BIKE PARKINGBEYOND
PROPOSED L'ARGENTDEVELOPMENT
PROPOSED ACHESONCOMMONS DEVELOPMENT
NEW METALAWNING
75'-2
"
39'-8
"
77'-2
"
NEW METALAWNING
NEW METALAWNING
NEW SIGNAGE
STREET TREES
METAL TRIM COURSEAT 6TH FLOOR
NEW SMOOTH FINISH VENEERPLASTE AT (E) BUILDING
SMOOTH FINISH CEMENT PLASTE
6"
2'-8"
ATTACHMENT 1 DRC 09-17-2015
Page 20 of 31
East Elevation
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A4.4EAST ELEVATION - PROPOSED
1/16" = 1'-0"
NEW ENLARGEDOPENINGS IN EXISTING
BLDG
RECESSEDWINDOWS
38'-2
"
SMOOTH CEMENTPLASTER
PATCH / PAINT(E) CONCRETE
2ND
3RD
4TH
5TH
6TH
ROOF
BERKELEY WAY
BACHENHEIMERBLDG.
15% ALLOWABLE OPENINGSAT 3' FROM
METAL TRIMCOURSE
HORIZONTALMETAL PANEL
ATTACHMENT 1 DRC 09-17-2015
Page 21 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A4.5SOUTH ELEVATION - PROPOSED
1/16" = 1'-0"
SOUTH ELEVATION
BACHENHEIMERBUILDING INFOREGROUNDSHOWN DASHED
RECESSEDWINDOWS
RECESSED DECK
(E) SPRINKLEROPENINGS TO REMAIN
METAL PANELEXTERIOR
PROPOSEDACHESON COMMONSDEVELOPMENT
PROPOSED L'ARGENTDEVELOPMENT
BIKE PARKING
2ND
3RD
4TH
5TH
6TH
ROOF
15% ALLOWABLE OPENINGSAT 3' FROM
(E) DRIVEWAY TO BACHENHEIMER PARKING
METAL TRIMCOURSE
SMOOTH CEMENTPLASTER
ATTACHMENT 1 DRC 09-17-2015
Page 22 of 31
West Elevation
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A4.6WEST ELEVATION - PROPOSED
1/16" = 1'-0"
BAY WINDOWPROJECTION
DECK
NEWENLARGED
OPENINGS INEXISTING BLDG
NEWMECHANICAL/UTILITYACCESS
STAIR PENTHOUSEBEYOND
ELEVATORPENTHOUSE BEYOND
METAL PANEL
NEW WINDOWS @ (E) WINDOWS
(E) DRIVEWAY IN FOREGROUNDTO BACHENHEIMER
BIKE PARKINGWITH AWNING
BIKE PARKING WITH AWNINGGATE
2ND
3RD
4TH
5TH
6TH
ROOF
BERKELEY WAY
25% ALLOWABLE OPENINGSAT 5' FROM
6' HIGH FENCE INBACKGROUND
METAL TRIM COURSEAT 6TH FLOOR LINE
BACHENHEIMER
ATTACHMENT 1 DRC 09-17-2015
Page 23 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A5.1SHADOW STUDIES - DECEMBER 21, WINTER SOLSTICE
NTS
09:21 AM 12 NOON 2:53 PM
PROPOSED
EXISTING
PROPOSED
EXISTING
PROPOSED
EXISTING
EXISTING SHADOW
PROPOSED SHADOW
ATTACHMENT 1 DRC 09-17-2015
Page 24 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A5.2SHADOW STUDIES - JUNE 21, SUMMER SOLSTICE
NTS
07:47 AM 12 NOON 6:35 PM
PROPOSED
EXISTING
PROPOSED
EXISTING
PROPOSED
EXISTING
EXISTING SHADOW
PROPOSED SHADOW
ATTACHMENT 1 DRC 09-17-2015
Page 25 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A5.3SHADOW STUDIES - MAY 29, PROJECT SUBMITTAL DATE
NTS
07:50 AM 12 NOON 6:23 PM
PROPOSED
EXISTING
PROPOSED
EXISTING
PROPOSED
EXISTING
EXISTING SHADOW
PROPOSED SHADOW
ATTACHMENT 1 DRC 09-17-2015
Page 26 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A6.1RENDERINGS
NTS
NORTH EAST WITH PROPOSED DEVELOPMENT
NORTH WEST WITH PROPOSED DEVELOPMENT
NORTH EAST WITH PROPOSED DEVELOPMENT
NORTH WEST WITH PROPOSED DEVELOPMENT
ATTACHMENT 1 DRC 09-17-2015
Page 27 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A6.2RENDERINGS
NTS
AERIAL VIEW WITH PROPOSED DEVELOPMENTNORTH ELEVATION WITH PROPOSED DEVELOPMENT
SOUTH EAST ELEVATION WITH PARTIAL PROPOSED DEVELOPMENTSOUTH WEST ELEVATION WITH EXISTING BUILDINGS
ATTACHMENT 1 DRC 09-17-2015
Page 28 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A6.3RENDERINGS
NTS
ROOF DECK UPPER FLOOR DETAIL
4TH FLOOR SKY DECK SIDEWALK VIEW
ATTACHMENT 1 DRC 09-17-2015
Page 29 of 31
DEVI DUTTA ARCHITECTURE 9/02/15SCALE:ZONINGUC PRESS N
A6.4COLOR OPTIONS
NTS
1
2
3
4
ATTACHMENT 1 DRC 09-17-2015
Page 30 of 31
DEVI DUTTA ARCHITECTURE, inc. 9/02/15SCALE:ZONINGUC PRESS N
L1LANDSCAPE PLANS
1/8" = 1'-0"
01 GROUND FLOOR 00 02 04 8'-0" 16 32
RAMP UP
SIDEWALK
UP
TWO STEPS UP
BENCHBERKELEY WAY
02 4TH FLOOR SKY DECK00 02 04 8'-0" 16 32
03 6TH FLOOR SKY DECK00 02 04 8'-0" 16 32
04 ROOF SKY DECK00 02 04 8'-0" 16 32
UP
NEW STREET TREEIN (E) WELL
RETAILRETAIL
LOBBY
AWNING ABOVE
PLANTER WITH IRRIGATION
OFFICE
COMPOSITE WOODPEDESTAL PAVERSOFFICE
CABLE RAILING
COMPOSITE WOODPEDESTAL PAVERS
CABLE RAILING
PLANTERS WITH IRRIGATION
LOBBY
SKY DECKBELOW
COMPOSITE WOODPEDESTAL PAVERS
CABLE RAILING
PLANTERS WITHIRRIGATION
TOEXIT
CABLE & WOOD SCREEN,42" HIGH
ATTACHMENT 1 DRC 09-17-2015
Page 31 of 31