DRAGLINES (GẦU DÂY)

Draglines & Clamshell in Construction of Materials

Embed Size (px)

DESCRIPTION

Draglines & Clamshell

Citation preview

Page 1: Draglines & Clamshell in Construction of Materials

DRAGLINES(GẦU DÂY)

Page 2: Draglines & Clamshell in Construction of Materials

I. OPERATION & EMPLOYMENT

DRAGLINE IS A VERSATILE MACHINE

6MAIN COMPONENTS

Page 3: Draglines & Clamshell in Construction of Materials

DRAGLINE BUCKET

Page 4: Draglines & Clamshell in Construction of Materials

DRAGLINE BUCKET

Page 5: Draglines & Clamshell in Construction of Materials

EMPLOYMENT

DOES NOT HAVE THE POSITIVE DIGGING ACTION OR LATERAL CONTROL

EASY OCCUR SPILLAGE

DRAGLINE LOADING IS GREATER THAN EACH OTHERS

MAXIMUM BUCKET SIZE DEPENDS ON MACHINE POWER, BOOM LENGTH,

MATERIAL WEIGHT.

Page 6: Draglines & Clamshell in Construction of Materials

PRODUCTION ESTIMATING

USING TABLE TO ESTIMATE DRAGLINE PRODUCTION

TABLE 3.7:IDEAL OUTPUT

OF THE DRAGLINE

TABLE 3.8:OPTIMUM

DEPTH OF CUTFOR SHORT

BOOM

TABLE 3.9:SWING-DEPTH

FACTORFOR

DRAGLINE

EXPECTED PRODUCTION = IDEAL OUTPUT X SWING-DEPTH FACTOR X EFFICIENCY

Page 7: Draglines & Clamshell in Construction of Materials
Page 8: Draglines & Clamshell in Construction of Materials
Page 9: Draglines & Clamshell in Construction of Materials

EXAMPLE 3.4

Page 10: Draglines & Clamshell in Construction of Materials
Page 11: Draglines & Clamshell in Construction of Materials

JOB MANAGEMENT

MINIMUM SWING ANGLEMAXIMUM PRODUCTION IN

SHOVEL OPERATION

LIGHTEST BUCKET SHOULD BE USED

INCREASEING THE ALLOWABLE BUCKET SIZE

& REDUCE CYCLE TIME

Page 12: Draglines & Clamshell in Construction of Materials

JOB MANAGEMENT

-The most efficient digging area is located within 15 degree forward and back of a vertical line

Page 13: Draglines & Clamshell in Construction of Materials

CLAMSHELLS(MÁY ĐÀO GẦU NGOẠM)

Page 14: Draglines & Clamshell in Construction of Materials

CLAMSHELLS ARE

COMMONLY USED FOR

EXCAVATING VERTICAL

SHAFTS AND FOOTINGS

UNLOADING BULK

MATERIALS FROM RAIL CARS AND

SHIPSMOVING

BULK MATERIAL

FROM STOCKPILES

TO BINS,HOPPE

RS

Page 15: Draglines & Clamshell in Construction of Materials

OPERATION & EMPLOYMENT

Page 16: Draglines & Clamshell in Construction of Materials

2 bucket halves are forced

together by action of sheaves

Closing line is released

The counterweights cause the bucket

halves to open as the bucket is held by the

holding line

Bucket penetration depends on

bucket weight - Light

- Medium- Heavy

- With and with out teeth

Page 17: Draglines & Clamshell in Construction of Materials

ORANGE PEEL BUCKET

-ROCK PLACEMENT

-UNDER WATER

EXCAVATION

Page 18: Draglines & Clamshell in Construction of Materials

PRODUCTION ESTIMATINGUSE EQUATION 2-1

PRODUCTION = VOLUME PER CYCLE X CYCLES PER HOUR

Page 19: Draglines & Clamshell in Construction of Materials

EXAMPLE 3-5

Page 20: Draglines & Clamshell in Construction of Materials

SOLUTION OF EXAMPLE 3.5

Page 21: Draglines & Clamshell in Construction of Materials

JOB MANAGEMENT

• Continue operation

Have clamshell loading chart

• Limit load to 80% of the safe lifting capacity

• Limit to 90% for crawler-mounted equipment

Clamshell loading chart is

NOT avaiable

Page 22: Draglines & Clamshell in Construction of Materials

JOB MANAGEMENTTest maybe

necessary to determine the size

of bucket

Cycle time is reduced by

organizing the job

Keep the machine level to avoid

swinging uphill or downhill