PUBLIC NOTICE Release Date: August 29 th , 2016 Deadline for Submission: September 23 rd , 2016; 5:00p.m. (CDT) REQUEST FOR PROPOSALS Planning Services MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) 2017 BICYCLE AND PEDESTRIAN PLAN (Town of Coosada, Town of Deatsville, Town of Elmore, City of Millbrook, City of Montgomery, Town of Pike Road, City of Prattville, City of Wetumpka, and Parts of Autauga, Elmore and Montgomery Counties) A copy of this Solicitation may be obtained by either of the following methods: 1. Retrieve this document from the Department of Planning - City of Montgomery, AL website at: http://montgomeryal.gov 2. Request a copy of this RFP Document by calling The Department of Planning - City of Montgomery at 334-625-2218 RESPONDERS ARE RESPONSIBLE FOR CHECKING THE WEBSITE FOR ANY AMENDMENTS OR ADDENDA TO THE RFP Requested By: Montgomery MPO/City of Montgomery, AL 495 Molton Street Montgomery, AL 36104

Draft rfp MontgOMERY mETROPOLITAN pLANNING …€¦ · establish a meeting and presentation schedule, and establish communication channels with municipalities and counties and with

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

PUBLIC NOTICE Release Date: August 29

th, 2016

Deadline for Submission: September 23rd

, 2016; 5:00p.m. (CDT)

REQUEST FOR PROPOSALS Planning Services

MONTGOMERY METROPOLITAN PLANNING

ORGANIZATION (MPO) 2017 BICYCLE AND

PEDESTRIAN PLAN

(Town of Coosada, Town of Deatsville, Town of Elmore, City of Millbrook,

City of Montgomery, Town of Pike Road, City of Prattville, City of

Wetumpka, and Parts of Autauga, Elmore and Montgomery Counties)

A copy of this Solicitation may be obtained by either of the following methods:

1. Retrieve this document from the Department of Planning - City of

Montgomery, AL website at: http://montgomeryal.gov

2. Request a copy of this RFP Document by calling The Department

of Planning - City of Montgomery at 334-625-2218

RESPONDERS ARE RESPONSIBLE FOR CHECKING THE WEBSITE FOR

ANY AMENDMENTS OR ADDENDA TO THE RFP

Requested By:

Montgomery MPO/City of Montgomery, AL

495 Molton Street

Montgomery, AL 36104

Table of Contents

I. Introduction

Montgomery MPO Description

Background

Project Description

II. Scope of Work

Task 1: Prepare Detailed Work Plan and Schedule

Task 2: Conduct Base Survey

Task 3: Public Participation/Outreach

Task 4: Define Goals, Polices, and Objectives

Task 5: Inventory Existing Facilities

Task 6: Conduct Needs and Demand Analysis

Task 7: Develop Recommended Bicycle and Pedestrian Network

Task 8: Develop Implementation and Financial Plan

Task 9: Prepare 2017 Bicycle and Pedestrian Plan Report

III. Evaluation Criteria for Selection Narrative

IV. Consultant Selection Procedure

V. Estimated Project Timeline

VI. Submittal Instructions

Exhibits:

A. Montgomery MPO FY 2017 Meeting Schedule

B. Montgomery MPO Study Area

C. Existing Montgomery MPO Bike Map

I. Introduction

A. Montgomery MPO Description The Montgomery MPO study area is the planning area defined by the Montgomery MPO. The study area is 1,005.5 square miles and encompasses the urbanized area as defined by the U.S. Census Bureau (area within the Town of Coosada, Town of Deatsville, Town of Elmore, City of Montgomery, City of Prattville, and Town of Pike Road) and the region surrounding these municipalities including portions of Montgomery, Elmore and Autauga Counties and the City of Wetumpka. The study area is characterized by its physiographic province as a settlement within the Alabama-Coosa-Tallapoosa River basin. The Alabama and Tallapoosa Rivers divide the study area and serve as county boundary lines between Montgomery, Elmore and Autauga Counties. Numerous bridge crossings unite the area, and Interstates 65 and 85 meet near the midpoint of the study area. The area has a rich history of human settlement from prehistoric Indians to French occupation of Fort Toulouse to the development of the City of Montgomery as Alabama’s State Capital.

B. Background The Montgomery MPO is seeking to improve the overall level of safety and accessibility for bicyclists and pedestrians. The central goal of this plan is to develop a comprehensive, functional network of biking and walking facilities facilitating access to attractions and destinations, with particular attention to enhancing access to parks, schools, activity centers and commercial nodes. While a comprehensive bicycle and pedestrian network remains the overall goal, the plan should also detail designated bicycle and pedestrian routes connecting major destinations and attractions. In addition, this plan will act as the reference document to ensure that bicycle and pedestrian facilities are implemented both during road maintenance and / or reconstruction work and as independent projects.

C. Project Description The Montgomery MPO in coordination with member municipalities and counties is interested in improving upon the existing bicycle and pedestrian network and in developing new facilities to increase the safety of bicyclists and pedestrians. The proposed bicycle and pedestrian plan should detail a comprehensive transportation network utilizing roadway and land use characteristic guidelines to create bicycle and pedestrian facility options and complementary design guidelines. At a minimum, the proposed network should include functionally classified roadways plus adjacent, complementary, and connecting local streets for bicycle and pedestrian facilities. Options should include sidewalks, shared use paths, trails, bike lanes, shared lanes, multi-use pathways and other facilities. The plan should utilize existing and planned bicycle and pedestrian facilities, roadway infrastructure, utility and drainage easements, open spaces and linear parks to connect users to neighborhoods, parks, the central business district, work centers, schools, and places of interest. The plan will depict a comprehensive system of off-road and on-road facilities that safely connects neighborhoods and destinations and encourages walking and bicycle travel.

II. Scope of Work

The Scope of Work for the 2017 Bicycle and Pedestrian Plan includes the following task: 1. Prepare Detailed Work Plan and Schedule 2. Review Existing Plans 3. Conduct Base Survey 4. Public Participation/Outreach 5. Define Goals, Polices, and Objectives 6. Inventory Existing Facilities 7. Conduct Needs and Demand Analysis 8. Develop Recommended Bicycle and Pedestrian Network 9. Develop Implementation and Financial Plan 10. Prepare 2017 Bicycle and Pedestrian Plan Report

Task 1: Prepare Detailed Work Plan and Schedule

This task involves developing a work plan and schedule which at a minimum will review objectives of the 2017 Bicycle and Pedestrian Plan, introduce a scope of work, confirm study area boundaries, establish a meeting and presentation schedule, and establish communication channels with municipalities and counties and with local bicycle and pedestrian advocates. Deliverables: Present an outline of a work plan strategy and approach, schedule of meetings, meetings documentation, expectations, and proposed communications network.

Task 2: Review Existing Plans

This task involves reviewing existing plans to determine the current status of the plans in terms of element implementation, elements pending, and elements discarded relevant to bicycle and pedestrian facilities/policies and to ensure coordination with applicable plans. The review will also serve as a guide to indicate the relevance of previous planning efforts to current conditions. At a minimum, the consultant should review the following:

2040 Montgomery Metropolitan Planning Organization (MPO) Long Range Transportation Plan

Montgomery Metropolitan Planning Organization (MPO) FY 2016-2019 Transportation Improvement Program

ALDOT FY 2016-2019 Transportation Improvement Program 2012 Montgomery Metropolitan Planning Organization (MPO) Bicycle and Pedestrian Plan Comprehensive Plans (All Municipalities/Counties) Major Street Plans Neighborhood Plans Downtown Montgomery Plan ALDOT Bicycle and Pedestrian Plan Pike Road Trails Plan

Corridor Studies within the Study Area Bicycle and Pedestrian Plans (All municipalities/counties not previously mentioned) ADA Transition Plans (Adopted and Ongoing)

Deliverables: Summary of previous plans and relevancy to 2017 Bicycle and Pedestrian Plan.

Task 3: Conduct Base Survey

This task involves developing and administering a statistically valid survey to assess bicycle and pedestrian demand and awareness. The survey will assist in determining the current number of the miles traveled by vehicle, bicycle, or on foot. Additional items to be identified include: current areas of deficiency; public awareness of bicycle and pedestrian safety issues; knowledge and opinion of existing conditions for bicycle and pedestrian travel; and desirable items for inclusion in the plan. The expected results of this component of the project are an understanding of trips made which are less than one mile; less than five miles; school trips; and commute trips. The survey results will illustrate the needs of river region residents and yield the baseline data needed to gauge and measure future impacts and successes of the 2017 Bicycle and Pedestrian Plan. After the 2017 Bicycle and Pedestrian Plan is in place and project implementation has commenced, a follow up survey will be distributed to measure progress and successes. Deliverables: Recommendations for data collection, data collection results and summary memo. Task 4: Public Participation/Outreach

This task includes working with the Technical Advisory Committee (TAC), the Citizen’s Advisory Committee (CAC), and the Bicycle and Pedestrian Subcommittee (BPS) at bimonthly meetings to provide updates on the development of the 2017 Bicycle and Pedestrian Plan, review the scope, products, and methods, and to receive input on work products. In lieu of the three sets of meetings, it is possible a single steering committee will be created, comprised of staff members, members of the three previously mentioned committees/subcommittee, and interested citizens. The consultant will meet with this committee during the planning process. In addition, public outreach will be performed by way of public workshops held to solicit feedback regarding any major concerns or ideas expressed by the general public, and all documents will be posted on the MPOs web site. At a minimum, a series of two sets of public workshops will be required. The first set of workshops will present the draft network of bicycle and pedestrian facilities and request feedback from the community on the proposal. The second set of workshops will present the final bicycle and pedestrian network plus a presentation on the 2017 Bicycle and Pedestrian Plan including the recommendations, implementation and funding. The number of workshops per round will be discussed, but at a minimum three workshops will be required, one in in each of the three counties within the study area. Additionally, attendance will be required at a series of Metropolitan Planning Organization Board meetings (4-6) throughout the duration of the project. Deliverables: Delivery of an effective, inclusive “Public Outreach Strategy” with documentation of meetings stakeholders, comments, and findings. Task 5: Define Goals, Polices, and Objectives

This task promotes development of a long range vision and direction for bicycle and pedestrian routes and facility planning by reviewing existing plans and policies at the MPO level as well as at

individual municipalities and counties. In addition, the review will include concepts and policies from comparable regions and from national organizations, and a review of all relevant state legislation and local ordinances, resolutions and policies that might affect implementation of the 2017 Bicycle and Pedestrian Plan. New goals, objectives, policies and standards will be developed for the 2017 Bicycle and Pedestrian Plan by building on existing plans and policies. Draft proposed Standards, Orders and other appropriate regulations that require all roadway projects and new developments comply with the adopted 2017 Bicycle and Pedestrian Plan. Deliverables: Recommendations for 2017 Bicycle and Pedestrian Plan goals, objectives, policies and standards. Task 6: Inventory Existing Facilities

Inventory and analyze the existing off-road and on-road pathways, bikeways, trails and all other walking and biking facilities in the Montgomery MPO study area. The inventory will include a review of existing activity areas, as well as identifying and evaluating potential bicycle and pedestrian access areas. When available, the Montgomery MPO and member municipalities/counties will provide assistance in providing maps, AutoCAD, and ArcMap files of existing facilities. The inventory and analysis should include recommendations to amend, enhance, improve or alter the existing facilities. Deliverables: A listing and inventory of existing facilities and summary of conditions. As part of the deliverable, maps of existing facilities and updated ArcGIS shapefiles will be required. Task 7: Conduct Needs and Demand Analysis

This task includes initiating a user needs and demands analysis of bicyclists in the River Region to ensure that the proposed system meets the needs of cyclists of all ages and abilities. The work should include, but not be limited to, measurement of safety needs by reviewing existing education programs and conducting field research into site specific hazards; performance of region wide accident analysis; identification of existing constraints; and a review of general performance of the existing systems. Deliverables: Delivery of recommended needs analysis survey and methodology, and a database inventory of existing conditions. Task 8: Develop Recommended Bicycle and Pedestrian Network

This task includes the development of a recommended region wide bicycle and pedestrian network. The selection criterion will generally consist of needs, available right of way, connectivity and directness, barriers, multi-mode linkages, safety and conflicts, and security. A listing of recommended bicycle and pedestrian systems and programs as well as recommended improvements should be provided. The system shall incorporate potential linkages, as appropriate, such as existing and future roadways, pathways, trails, linear parks, open spaces, utility easements and drainage easements and drainage ditches. All proposed facilities will be required to be included in a deliverable to include an excel table and an ArcGIS shapefile. In addition, a list of high priority corridors should be developed for future standalone Corridor Studies.

To facilitate ease of implementation, develop guidelines for selecting pedestrian and bicycle facilities for each type and location of roadway. In particular, include criteria for rural vs. urban roadways, AADT, freight percentages, posted speed, and access point density. Additionally, with 8 municipalities and portions of 3 counties, the region wide plan needs to be parceled to each municipality or county (unincorporated area within the study area) boundary with a deliverable available for each. These deliverables will be included as an appendix of the overall plan. Deliverables:

Recommendations to amend, enhance, improve or alter the existing pathway and trail facilities.

A comprehensive network of proposed bicycle and pedestrian facilities. The deliverable will be required to include both maps and ArcGIS shapefiles.

Renderings of typical cross sections of different street and facility types. Recommendations of high priority bicycle and pedestrian corridors. Proposed guidelines for selecting pedestrian and bicycle facilities for each type and

location of roadway. Municipality (8) and county (3) specific reports.

Task 9: Develop Implementation and Financial Plan

This task requires the development of an implementation strategy that includes cost estimates, responsible party, priority, and suggested funding. All details should be included in a deliverable consisting of excel tables and ArcGIS shapefiles. An Implementation Plan for high priority projects over the next 10 years should be developed, along with an unconstrained implementation plan for the next 20 years. The implementation plan must incorporate projects in the FY 2016-2019 TIP and the 2040 LRTP. Based on the information available, a financial plan should be developed. Deliverables:

Develop preliminary pedestrian-bicycle project recommendations for previously identified high-priority transportation corridors.

For projects within the 10 year time frame, a proposed implementation strategy that includes cost estimates, responsible party, priority, and suggested funding. All details should be included in a deliverable consisting of excel tables and ArcGIS shapefiles.

For projects beyond 10 years, a proposed implementation strategy with estimated costs. All details should be included in a deliverable consisting of excel tables and ArcGIS shapefiles.

An economic evaluation to suggest funding strategies for plan implementation, including recommendations for obtaining grants, private funding and user fees.

Task 10: Prepare 2017 Bicycle and Pedestrian Plan Report

This task will assemble information into a Draft 2017 Bicycle and Pedestrian Plan for review and comment by staff, the Technical Advisory Committee (TAC), the Citizen’s Advisory Committee (CAC), and the Bicycle and Pedestrian Subcommittee (BPS). Once in draft form, the 2017 Bicycle

and Pedestrian Plan will be presented in public meetings. Following comments and feedback received, consultant will prepare a final version of the plan. Deliverables: A draft 2017 Bicycle and Pedestrian Plan to be presented in public meetings and once comments/feedback are received the consultant will prepare a final version of the plan for adoption (30 copies).

RIGHT TO REJECT PROPOSALS

The City of Montgomery/Montgomery MPO reserves the right to reject any or all proposals, or portion thereof, or all proposals, or portion thereof, or to accept a proposal, or portion thereof, if appears to be in the best interest of the City of Montgomery/ The M (formerly MATS). MAINTENANCE OF RECORDS

The contractor shall, at all times, maintain records of actual overhead costs and actual general and administrative costs in conformity with generally accepted accounting principles, and subject to Title 41 of the C.F.R. The Contractor shall maintain records of direct labor costs and other applicable payroll expenses. Labor and payroll records shall be in sufficient detail to indicate, at a minimum, employees by name, employee’s time spent on the project and itemization of applicable fringe benefit expenses.

III. Evaluation Criteria for Selection Narrative

The proposal shall consist of five (5) bound sets containing 8-1/2" x 11" sheet sizes for the text and 11" x 17" sheet sizes for any fold-out drawings. Proposals shall be limited to no more than twenty-five (25) pages, and shall include the following: A. Previous experience compatible with the proposed 2017 Bicycle and Pedestrian Plan and other

Bicycle and Pedestrian Plan work. B. Relevant past work experience in doing Bicycle and Pedestrian Plan work for cities and

regions, particularly MPOs. C. Qualifications and experience the firm(s) and individuals that will be directly involved with the

Bicycle and Pedestrian Plan project. D. Proposer’s apparent resources and capacity to meet the needs of this project. E. Proposers approach in how they would handle and approach scope of work. F. Statement of legal/professional standing, including any pending controversies and legal

disputes. If none exists, a statement to that effect should be included. G. References of previous clients for which previous Bicycle and Pedestrian Plan or related work

was performed that is similar in scope and complexity to this project that the City of Montgomery/Montgomery MPO can verify the firms past experience.

IV. Consultant Selection Procedure

Technical work plan and approach to accomplishing work 30% Prior experience/qualifications by firm(s) and sub consultants on similar projects and personnel

qualifications and their experience on comparable projects 50%

Cost of project 15% Project schedule and ability to meet schedules or deadlines 5% The City of Montgomery/Montgomery MPO strongly encourages the use of Disadvantaged

Business Enterprises (DBE) for projects financed with federal funds. The City of Montgomery has an overall DBE goal of 30% of any federal or City funds expended on this project. Firms that respond to this RFP should demonstrate their ability to meet this goal or a reasonable percentage of this goal. Should the goal not be able to be met, evidence of a good faith effort is required to be provided.

V. Estimated Project Timeline

August 29th, 2016: RFP Release Data September 23rd, 2016: Responses from interested firms due by 5 p.m. (CDT) October 17th, 2016: Consultant Interview (tentative) October 19th, 2016: Consultant selected and prepare contract (tentative) November 9th, 2016: Contract award (tentative) November 17th, 2016: Project Kick-Off Presentation to MPO Board Meeting (tentative)

VI. Submittal Instructions

Firms are requested to respond to the evaluation criteria and proposed Scope of Work, including professional registrations, memberships and credentials and any other appropriate design and planning credentials pertinent to this project by the deadline date. Ten (10) copies of your proposal should be submitted to the following address before 5:00 p.m. on September 23rd, 2016. Proposals will be accepted by U.S. mail or Delivery Service Only.

Mailed to:

Robert Smith Director of Planning City of Montgomery

25 Washington Avenue, 4th Floor Montgomery, AL 36104

Bike Rack Locations

1 Union Station 300 Water Street

2 Harriott II Riverboat on Riverfront 335 Coosa Street

3 Splash Pad 335 Coosa Street

4 Court Square 10 Court Square

5 Freedom Rides Museum (old Greyhound Station) 210 S. Court Street

6 King Memorial Baptist Church 454 Dexter Avenue

7 State Capitol 600 Dexter Avenue

8 Archives and History Museum 624 Washington Avenue

9 First White House of the Confederacy 644 Washington Avenue

10 Civil Rights Memorial/Southern Poverty Law Center 400 Washington Avenue

11 Old Alabama Town 301 Columbus Street

12 St. Johns Episcopal Church 200 Block of N. Lawrence Street

13 Wells Fargo Bank 828 Madison Avenue

14 Morgan Library 245 High Street

Attraction/Restaurant/Business/District Park/Community Center/Library Public School

15 Farmers Market 1004 Madison Avenue

16 SA ZA Restaurant 130 Commerce Street

17 Wright Brothers/Overlook Park 550 Maxwell Boulevard

18 Well's Fargo Bank 210 Water Street

19 Lower Dexter 36 Dexter Avenue

20 Railyard Brewing Co 12 W. Jeferson Street

21 Tang's Alterations 500 Cloverdale Road

22 Filet and Vine Restaurant 431 Cloverdale Road

23 E. Fairview Avenue 1125 E. Fairview Avenue

24 Chisholm Community Center 545 E. Vandiver Boulevard

25 Sheridan Heights Community Center 3501 Faro Drive

26 Highland Gardens Community Center 2805 Willena Avenue

27 E.D. Nixon (Goode) Community Center 1000 Edgar D Nixon Avenue

28 Smiley Court Community Center 3200 Otis Lane

29 Hunter Station Community Center 20 Judge C. Price Street

30 King Hill Community Center 814 Claremont Avenue

31 Wares Ferry Elementary School 6425 Wares Ferry Road

32 Garrett Elementary School 555 McLemore Road

33 Halcyon Elementary School 1501 Parkview Drive

34 Vaughn Rd Elementary School 4407 Vaughn Road

35 Dalraida Elementary School 440 Dalraida Road

36 Morningview Elementary School 2849 Pelzer Avenue

37 Chisholm Elementary School 307 E. Vandiver Boulevard

38 Crump Elementary School 3510 Woodley Road

39 Fitzpatrick Elementary School 4055 Fitzpatrick Boulevard

40 Seth Johnson Elementary School 4550 Narrow Lane Road

41 Walgreens Drug Store 3110 Taylor Road

42 Old Cloverdale Community Garden 1128 Woodward Ave

43 Twin Peaks Restaurant 6814 Eastchase Parkway

44 Kiwanis Park 301 Columbus Street

45 EL Lowder Public Library 2590 Bell Road

46 Coliseum Branch Public Library 840 Coliseum Boulevard

47 Social Security Office 4344 Carmichael Road

Exhibit A

(

(

(

(

(

(

((

(

(

(

( (

(

((

(

(

(

(

(

Clay St

N Union St

Oak Park Dr

Watts

St

N Hi

lliard

St

Lee St

Church St

S Holt

St

Pelham StN

Goldt

hwait

e St

N Ho

lt St

Whitm

an S

t

Coosa St

N Co

urt S

t

Tuscaloosa St

Rosa

L Pa

rks Av

e

NJackso nSt

Commerce StI- 85

Lake St

Clayton StSa

yre S

t

Tallapoosa St

Catoma St

Highland Ave

S Ripl

ey S

t

Dick

erso

n St

Martha St

Hutchinson St

Bibb St

Mobile S

t

Randolph St

Dexter Ave

N Bainbridge StN De

catur

St

Herron St Montgomery St

N Hu

ll St

Clayton St

N Mc

Dono

ugh S

t

N Ripley St

N La

wren

ce St

N Perry St

Holco

mbe S

t

Grove St

E South St

Arba St

S Bainbridge St

Grove St

Scott St

Molton St

Bell St

Columbus St

Alabama St

Washington Ave

High St

Mildred StS P

erry

StS Lawrence St

S Unio

n St

SMcDonoughS t

S Hull

St

SJac

kson

St

S Cou

rt St

S Decatur St

E Jefferson St

Monroe St

HallSt

Adams Ave

Madison Ave

I- 65

I- 85§̈¦85

§̈¦65

§̈¦65

ArmoryLearning

Arts Center

CourtSquare

CramptonBowl

Houston HillCommunity

Center

KiwanisPark

ListerHill

Plaza

Oak Park

WrightBrothers

Park

PattersonField

RiverfrontPark

TuscaloosaPark

RiverwalkStadium

RotaryPark

HamsteadDown Town

Farm

ALABAMA RIVER

¬«13

¬«11

¬«12

¬«5

¬«1

¬«4

¬«9¬«8

¬«7

¬«10

¬«6

¬«2 ¬«3

¬«14

¬«15¬«16

¬«17

¬«18

¬«19

¬«20

¬«44Source: City of MontgomeryLegend

InterstateRailroadsBuilding FootprintsParksSchoolsWaterways

Existing Bicycle Facilities& Bike Racks in DowntownCity of Montgomery Ü

Existing Bicycle FacilitiesBrown Springs Rd Bike LaneHall St Bike LanePark Crossing Shared Use Path & Bike Lane

Maxwell Blvd Two-Way Cycle TrackPark Crossing Shared Use PathMontgomery Riverwalk (Shared Use Path)

Riverwalk Extension (Shared Use Path)(Open Fall 2016)Congressman WL Dickinson Share the Road SignsGunter Park Dr Shared Lane Markings/Signs

Pike Road Share the Road SignsRay Thorington Road Share the Road Signs

( Bike Racks

MAP FOR REFERENCE ONLY. NOT A LEGAL DOCUMENT This map has been created from data within the City of Montgomery Geographic Information System (GIS) database. The City of Montgomery makes no claims, no representations, and no warranties, expressed or implied, concerning the validity, the reliability, or the accuracy of this map.

0 0.25 0.50.125Miles

(

(

(

(

(

(((

(((

((

(

((

(

(

(

(

(

(

(

(

(

(

(

(

(

(

((

(

(

(

(

(

River Rd

Early St

Ray Dr

Old Selma Rd

Felder Ave

Dalra

ida R

d

Biltmore Ave

Hall S

t

Ann St

Youn

g Mea

dows

Rd

Hill S

t

S Hull

St

Harmony St

WoodmereBlvd

Fairg

roun

d Rd

Birmingham H wy

NRip

leySt

Gilmer Ave

Todd Rd

Upper Wetumpka Rd

Mobil

e Hwy

US Hwy 82 US Hwy 80

Willow Lane DrState Rte 108

Pelzer Ave

Audubo n

Rd

Fieldc

restD r

NMcDonoughS t

Co Rd 54

Concr

eteDr

Edga

r D N

ixon A

ve

NDe

catur

St

Perry Hil lRd

Parallel St

South

mon t

Dr

Lowe

r Wetu

mpka

Rd

N Co

urt S

t

Foshee Rd

Gaston Ave

Highland Ave

Federal Dr

Oak S

t

State

Rte 2

1

Gunter Park

Dr W

Washington Ferry Rd

State Rte 6US Hwy 82

Air Base Blvd

Carmichael Rd

McGehee RdHayneville Rd

Carter Hill Rd

Norm

an B

ridge

Rd

Narro

w La

ne R

d

Cong W L Dickinson Dr

Bell St

FernwayDrFernw ay Rd

Wares Ferry Rd

WoodleyRd

Coliseum Blvd

S Per

ry St

South Blvd

State

Rte15

2

Northern Blvd

State Rt e 53State Rte 152

US Hwy 231

Rosa

L Pa

rks Av

e

Vaughn Rd

US Hwy 82

S Cou

rt St

Atlanta Hwy

March St

US Hwy 82

State Rte 6

Eastern Blvd

State

Rte 8

State Rte 3

US Hwy31

US Hw

y 231

State

Rte 5

3

State Rte 110

State Rte 6State Rte 8

I- 85

US Hwy 80

I- 65

State Rte 21

State Rte 9

West Blvd

§̈¦65

§̈¦65

§̈¦85

CloverdaleRoad Park

BellingerHills

BellingrathCommunity

Center

Capital HeightsCommunity Center

CloverdalePark (Church)

CollegeStreetPark

CountryClub

Drive Park

DanellyPark

DayStreetPark

BlountCultural

Park

DiffleyPark

FitzgeraldPark

FloydCommunity

Center

FoxHollow

ParkGoodwyn

Park

HaynevilleRoad Park

HighlandGarden

Community Center

HomeviewPark

Houston HillCommunity

Center

JacksonFerry

Road Park

James A.Shannon (Mobile

Heights)

KiwanisPark

LagoonPark

PetePetersonLodge

LeGrandePark

LovelessCommunity

CenterMcIntire

CommunityCenter

MorningviewPark

MyrtlewoodDrive Park

O'ConnorTennisCenter

OakPark

Old Selma RoadCommunity

Center

PattersonField

RidgecrestPark

RiverfrontPark

Rosa L. Parks Park

ThunderbirdPark

TuscaloosaPark

VaughnRoad Park

VickersPark

WashingtonPark

WesternHillsPark

WoodmerePark

Hayneville RoadCommunity Center

PecanGroveParkNewtown

CommunityCenter

PowderMagazine

Brewbaker Park& Community

Center

BellStreetPark

ForestHillsPark

GatewayPark

Ida BelleYoung Park

MontgomeryZooALABAMARIV ER

ALABAMARIVER

GALBRAITHMILL

¬«13¬«11

¬«12

¬«5

¬«1

¬«4¬«9¬«8¬«7

¬«10¬«6

¬«2¬«3

¬«14

¬«15¬«16¬«17

¬«18

¬«19

¬«20

¬«22

¬«23

¬«21

¬«26

¬«29

¬«24

¬«27

¬«28

¬«30

¬«34

¬«35¬«36

¬«37

¬«42

¬«44

¬«46

¬«47

Source: City of MontgomeryLegend

InterstateRoadwaysRailroadsParksSchoolsWaterways

Existing Bicycle Facilities& Bike Racks in City of Montgomery Urban Core Ü

Existing Bicycle FacilitiesBrown Springs Rd Bike LaneHall St Bike LanePark Crossing Shared Use Path & Bike Lane

Maxwell Blvd Two-Way Cycle TrackPark Crossing Shared Use PathMontgomery Riverwalk (Shared Use Path)

Riverwalk Extension (Shared Use Path)(Open Fall 2016)Congressman WL Dickinson Share the Road SignsGunter Park Dr Shared Lane Markings/Signs

Pike Road Share the Road SignsRay Thorington Road Share the Road Signs

( Bike RacksMAP FOR REFERENCE ONLY. NOT A LEGAL DOCUMENT This map has been created from data within the City of Montgomery Geographic Information System (GIS) database. The City of Montgomery makes no claims, no representations, and no warranties, expressed or implied, concerning the validity, the reliability, or the accuracy of this map.

0 0.5 1 1.50.25Miles

((¬«21¬«22

Felder AveGra

ham

St

G ra ha mLnCloverdale Rd

Clanton Ave

Norm

an B

ridge

Rd

(

(

(

(

(

(

(

(

Malaba r Rd

Service Rd

Stra

thmore

Dr

Remington Rd

Halcyon Blvd

Sprin

g Valley

Rd

Harrison Rd

W entworth Dr

Rya nRd

Lake ridge

Dr

Baldwin BrookDr

Payn

e Rd

YoungMeadowsRd

Co Rd 39

West BlvdUS Hwy 82

US Hwy 80

Atlanta Hwy

Fieldc

restDr

Fernway DrFernway Rd

McInnis Rd

State Rte 126

McGehee Rd

Co Rd 33

Deer Creek Bl vd

Chantilly Pkwy

Virgin

iaLo

opRd

WynlakesBlvd

Woodmere Blvd

Eastchase Pkwy

Foxhall Rd

Carmichael Rd

Park XingTroy Hwy

Eastern Blvd

State R

te8

Ray Thorington Rd

Woodley RdUS Hwy 82

US Hwy 80

Bell Rd

Co Rd 43

US Hw

y 80

Taylor

RdState Rte 6

US Hwy 80 State Rte 8

US Hwy 231State Rte 53

Vaughn Rd

I- 85

State Rte 110

§̈¦85

BuddyWatson

Park

DanellyPark

BlountCultural

Park

DeanFainPark

DorchesterPark

PeterCrumpPark

ThompsonPark

VaughnRoad Park

VirginiaEstates

Park

WoodmerePark

Willie CookCommunity

Center

Brewbaker Park &Community Center

ForestHillsPark

Ida BelleYoung Park

CATOMA

CATOMA

JENKINS

JENKINS

¬«43

¬«33

¬«34

¬«38

¬«39

¬«41

¬«45

¬«47

Source: City of MontgomeryLegend

InterstateRoadwaysRailroadsParksSchoolsWaterways

Existing Bicycle Facilities& Bike Racks in City of Montgomery South & East Ü

MAP FOR REFERENCE ONLY. NOT A LEGAL DOCUMENT This map has been created from data within the City of Montgomery Geographic Information System (GIS) database. The City of Montgomery makes no claims, no representations, and no warranties, expressed or implied, concerning the validity, the reliability, or the accuracy of this map.

Existing Bicycle FacilitiesBrown Springs Rd Bike LaneHall St Bike LanePark Crossing Shared Use Path & Bike Lane

Maxwell Blvd Two-Way Cycle TrackPark Crossing Shared Use PathMontgomery Riverwalk (Shared Use Path)

Riverwalk Extension (Shared Use Path)(Open Fall 2016)Congressman WL Dickinson Share the Road SignsGunter Park Dr Shared Lane Markings/Signs

Pike Road Share the Road SignsRay Thorington Road Share the Road Signs

( Bike Racks

0 0.7 1.4 2.10.35Miles

Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (HongKong), Esri (Thailand), TomTom, 2013

2010 US Census Montgomery Urban Area, Wetumpka Urban Cluster, and Montgomery Study AreaData Source: 2010 U.S. Census Data, ESRI, 2014 US Census TIGER/Line Shapefiles

Source: MPO Staff

LegendStudy AreaMontgomery Urbanized AreaWetumpka Urban Cluster

0 7 143.5Miles

ÜExhibit B

Fact She Final Montgomery MPO – MPO, TCC and CAC FY2017 Meeting

Dates

MPO POLICY BOARD

The MPO (Policy Board) will meet in even months on the third Thursday at 11:30 a.m., unless changed.

Upcoming MPO (Policy Committee) Meeting Dates for Fiscal Year 2016:

Thursday, November 17, 2016 at 11:30 a.m.

Thursday, January 19, 2017 at 11:30 a.m.

Thursday, March 16, 2017 at 11:30 a.m.

Thursday, May 18, 2017 at 11:30 a.m.

Thursday, July 20, 2017 at 11:30 a.m.

Thursday, September 21, 2017 at 11:30 a.m.

TECHNICAL COORDINATING COMMITTEE (TCC)/TECHNICAL ADVISORY COMMITTEE (TAC)

The TCC usually meets every other month on the second Thursday at 10:00 a.m., unless changed.

Upcoming TCC Meeting Dates for Fiscal Year 2016:

Thursday, November 10, 2016 at 10:00 a.m.

Thursday, January 12, 2017 at 10:00 a.m.

Thursday, March 9, 2017 at 10:00 a.m.

Thursday, May 11, 2017 at 10:00 a.m.

Thursday, July 13, 2017 at 10:00 a.m.

Thursday, September 14, 2017 at 10:00 a.m.

Citizens Advisory Committee (CAC)

The CAC usually meets every other month on the third Tuesday at 2:00 p.m., unless changed.

Upcoming CAC Meeting Dates for Fiscal Year 2016:

Tuesday, November 15, 2016 at 2:00 p.m.

Tuesday, January 17, 2017 at 2:00 p.m.

Tuesday, March 14, 2017 at 2:00 p.m.

Tuesday, May 16, 2017 at 2:00 p.m.

Tuesday, July 18, 2017 at 2:00 p.m.

Tuesday, September 19, 2017 at 2:00 p.m.

LOCATION

Meetings will rotate between MPO member municipalities/counties. Locations for other meetings will be

determined before each meeting.

NOTE

All meeting days, dates, and times are subject to change.

FOR MORE INFORMATION

April Delchamps, Senior Planner, Montgomery MPO, [email protected], tel 334.625.2734

Kindell Anderson, Senior Planner, Montgomery MPO, [email protected], tel 334.625.2754

Robert Smith, Director of Planning, Montgomery MPO, [email protected], tel 334.625.2218

Exhibit C

Exhibit B