DRAFT Oberon Community Strategic Plan 2014 Index Page No 1. Draft Oberon Community Strategic Plan 2014 1 – 30 2. Draft Community Engagement Strategy May 2014 31 - 36 3. Draft Resourcing Strategy 2014/2015 37 - 42 a. List of Donations (proposed) 43 b. Capital Expenditure (proposed) 44 4. Draft Long Term Financial Plan 2014/15 to 2023/24 45 – 50 5. Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 – 201 8. Draft Operational Plan 2014/2015 202 – 205 9. Draft Schedule of Fees & Charges 2014/2015 206 – 235 10. FEEDBACK SHEET / SUBMISSION FORM 236 - 237

DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

 

DRAFT Oberon Community Strategic Plan 2014    

Index Page No

1. Draft Oberon Community Strategic Plan 2014 1 – 30

2. Draft Community Engagement Strategy May 2014 31 - 36

3. Draft Resourcing Strategy 2014/2015 37 - 42

a. List of Donations (proposed) 43

b. Capital Expenditure (proposed) 44

4. Draft Long Term Financial Plan 2014/15 to 2023/24 45 – 50

5. Draft Workforce Management Plan May 2014 51 – 76

6. Draft Road Asset Management Plan May 2014 77 – 180

7. Draft Delivery Program 2014/2015 181 – 201

8. Draft Operational Plan 2014/2015 202 – 205

9. Draft Schedule of Fees & Charges 2014/2015 206 – 235

10. FEEDBACK SHEET / SUBMISSION FORM 236 - 237

 

Page 2: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014

This QR Code is linked to Oberon Council’s website www.oberon.nsw.gov.au

Page 3: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 2

Page 4: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 3

OBERON AND OUR COMMUNITY- A DEFINITION In this document OBERON is used to refer to the whole Local Government Area (LGA). The terms ‘our’ and ‘community’ include all those who live in the town, villages and rural communities of the Shire, those who own property here, do business here or visit. CONTENTS Page

OBERON AND OUR COMMUNITY – A DEFINITION 3

INTRODUCTION 4

MAP of OBERON LGA 5

OUR PRESENT SITUATION – Overview of Oberon LGA 6

THE BUILDING BLOCKS OF OUR FUTURE – our strengths and challenges 7

INTEGRATED PLANNING and REPORTING FRAMEWORK 8

THE RESOURCING STRATEGY 9

THE DELIVERY PROGRAM and OPERATIONAL PLANS 9

THE ANNUAL REPORT 9

INTEGRATION – CSP and other PROGRAMS, PLANS and REPORTS 10

HOW THE CSP IS ORGANISED 11

THE ROLE OF OBERON COUNCIL 11

OBERON 2025 - OUR PREFERRED FUTURE – Vision Statement 12

VALUES TO GUIDE OUR CHOICE AND BEHAVIOUR – Values Statement 12

FUTURE DIRECTIONS 13

FUTURE DIRECTIONS AND STRATEGIC OUTCOMES 13

1. OUR COMMUNITY 14

2. BASIC SERVICES 16

3. ECONOMIC PROSPERITY 18

4. RESPONSIVE and CARING 20

5. OPEN COMMUNICATION 22

6. NATURAL ENVIRONMENT 24

LINKAGES 26

PRINCIPLES OF SOCIAL JUSTICE AND SUSTAINABILITY 26

THE QUADRUPLE BOTTOM LINE 26

NSW STATE PLAN 28

COMMUNITY ENGAGEMENT 30

PUBLIC EXHIBITION 30

Page 5: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 4

INTRODUCTION Our first COMMUNITY STRATEGIC PLAN (CSP) for the Oberon LGA was developed in 2012 and the Oberon CSP 2013 was a review conducted by the current Oberon Council, which was elected in September 2012 for a four year term. The DRAFT Oberon CSP 2014 is a further review and is on formal Public Exhibition from Monday 26 May to Monday 23 June 2014. Council will hold an Extraordinary Meeting on Thursday 26 June to consider Written Submissions. The Elected Councillors are:

John McMahon, Mayor (re-elected in September 2013)

Kerry Gibbons, Deputy Mayor (re-elected in September 2013)

Ian Doney

Jill Evans

Neil Francis

Samantha Lord

Clive McCarthy

John Morgan

Kathy Sajowitz

The Mayor and Deputy Mayor is elected each September for the next 12 months. For more details on the workings of Council, including Business Papers and Minutes please visit the Website for Oberon Council: www.oberon.nsw.gov.au OR scan with a “smart phone” or similar device

The CSP is for ALL the people of our area and provides a direction for enhancing community and social wellbeing. The Plan looks at groups within our community who need additional support particularly the Aged and Youth. However it takes a whole of community approach to improve community and social wellbeing. The CSP highlights community and social priorities based on consultation with our community, and gives us strategies to work together in achieving these priorities. Please review this document and consider how your group or organisation, or how you as an individual can contribute to making a difference to our community.

Page 6: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 5

Page 7: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 6

OUR PRESENT SITUATION – Overview of Oberon LGA The information in this overview has been sourced from the 2011 census data, which is the most recently published information by the Australian Bureau of Statistics.

AT A GLANCE The Oberon Local Government Area (LGA) is located adjacent to the Blue Mountains of New South Wales on the Great Dividing Range, 196 km west (two-hour drive) of Sydney. Much of the area is considered to be sub-alpine with the Oberon township 1,113 metres above sea level.

Our LGA neighbours are Bathurst Regional, Blue Mountains City, Upper Lachlan Shire, Lithgow City and Wollondilly Shire. Within our LGA is the town of Oberon and the villages of Black Springs, Burraga, Edith, Mount David, O’Connell, and Shooters Hill. Jenolan Caves is also in our LGA.

The total land area of the LGA is 3660 square km. This area includes the Kanangra-Boyd National Park, which is approximately 180,000 hectares, and the Jenolan Caves Reserve which is World Heritage listed and a major attraction for visitors to the area.

The population of the LGA at the 2011 census was 5,138 with 54.2% males and 45.8% females. The percentage of Indigenous persons was 3.0% compared with 2.5% for Australia. 84.6% of persons living in Oberon were born in Australia with English spoken by 89.5% of persons compared to 72.5% in NSW. INDEPENDENT LOCAL GOVERNMENT REVIEW PANEL (the Panel) At the time of finalising the DRAFT Oberon CSP 2014 the final report of the Panel had been released by the former Minister for Local Government, Don Page MP. The Oberon Council response to the final report included opposition to forced amalgamations or mergers and to again suggest boundary adjustments to include in the Oberon Local Government Area (LGA) parts of Bathurst Regional Council and Lithgow City Council, which can be better serviced by Oberon Council and therefore provide further economies of scale to improve the sustainability of all 3 LGA’s. This decision was first made in May 2013 and Oberon Council has actively participated in discussions with our neighbouring Council’s and also Blayney Shire Council regarding the Upper Macquarie County Council (our local Weeds Authority with the other three Councils). See Council’s website for updated information – www.oberon.nsw.gov.au

Page 8: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 7

THE BUILDING BLOCKS OF OUR FUTURE - our strengths and challenges One of the key advantages of living in Oberon is its location on the Tablelands Way and its close proximity to the larger cities of Sydney, Canberra and the regional centre of Bathurst. Oberon enjoys a temperate climate of four distinct seasons. These seasons not only provide scenic beauty but also deliver a rich and diverse range of agricultural produce and products. There are many value adding opportunities that could be explored and developed and also used to build the reputation of the area’s productive landscapes. Although Oberon is connected to other centres, the road network in places, does not adequately meet the needs of industry. Both residents and visitors to the area also use the road network. This potential conflict needs to be understood and where possible managed to assist both safety and efficiency. The new digital communications throughout the area are not adequate to maintain connections to each other and the rest of the world. The lack of fast, reliable internet connection is a significant barrier to attracting professionals and others to this desirable ‘tree-change’ destination. The town, villages and rural communities are spread throughout a beautiful landscape of rolling hills and tablelands. Here there is the potential to live a life that is genuine, relaxed and invigorating. Community spirit is strong and caring and there is a tradition of helping each other in times of need. Newcomers to the area however, sometimes feel resented. This is a tension between continuing to do things as they have always been done and new perspectives and ways of doing things. New people will come to the area and they have different ideas. Our communities need to work towards being welcoming and tolerant. The community is proud of its health and education assets. There are some services that can only be accessed in larger regional centres. Whilst there is an understanding and acceptance of the relationship between population and economies of scale, the community is keen to maintain and improve the services they have. There is concern over being able to grow old in the community. The development of aged care facilities will, to some extent address this concern, but successful ageing means being able to remain fit and healthy, living in your own home in your own community, for as long as is possible. Oberon Council welcomes the commitment of Columbia Homes in constructing a 66 bed Aged Care Facility prosed to be completed in August 2014. There is a full range of sport and recreation facilities. An integrated sport and recreation centre will provide a hub for programs and activities. Access to the swimming pool during summer months, regardless of weather, needs to involve further community consultation. Oberon Shire is home to the iconic Jenolan Caves. The area enjoys a broad range of events that also attract visitors to the area. However we do not want to lose the relaxed rural environment and pace of living we now enjoy. Opportunities and facilities to help young people fully reach their potential and engage in community life need to be provided.

Page 9: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 8

INTEGRATED PLANNING & REPORTING FRAMEWORK

OBERON 2025 - MAKING OUR FUTURE TOGETHER was the working title” for the community consultations that helped in preparing our first DRAFT CSP document in 2012. From the start of this process we engaged our community to help create the picture of what the community wanted the Oberon Shire LGA to be like in the future. In the initial community consultation process we sought to determine: a description of the preferred future a description of the values guiding our choices and how we will work together an outline of the strategic outcomes to achieve the preferred future a long-term focus for decision making and resource allocation – including long term

financial planning, workforce management planning and asset management planning to provide a basis for measuring our progress opportunities for community participation in decision making ways to address social, economic, environmental and civic leadership issues.

Page 10: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 9

THE RESOURCING STRATEGY The initial CSP documents plus the further revisions in 2013 and 2014, provide a mechanism for expressing long-term community priorities. However, these will not be achieved without sufficient resources – time, money, assets and people. The RESOURCING STRATEGY consists of three components: Long Term Financial Planning - financial modeling and 10 year plan

Workforce Management Planning - organisational capability, with a 4 year plan

Asset Management Planning - asset strategy, with a 10 year plan

The RESOURCING STRATEGY highlights responsibility for issues and directions to be achieved with only some issues the responsibility of Oberon Council. Other issues are the responsibility of the other levels of Government, whilst others require input and action from community groups or individuals. THE DELIVERY PROGRAM and OPERATIONAL PLAN The DELIVERY PROGRAM is developed for each elected term of Council. The four year Program that sets out ACTIONS across the full range of Council’s Services & Operations. The DELIVERY PROGRAM is a statement of commitment to the community. This is a single point of reference for activities undertaken by the Elected Council during their four year term. All projects and activities are directly linked to the DELIVERY PROGRAM. The DELIVERY PROGRAM contains the Future Directions and Strategic Outcomes outlined in the CSP which are directly Council’s responsibility. The OPERATIONAL PLAN is a one year Plan that supports the DELIVERY PROGRAM and outlines in more detail the individual activities that Council will undertake within each financial year along with a financial budget. The OPERATIONAL PLAN includes Council’s Revenue Policy and a Statement of Council’s estimate of Income and Expenditure. The OPERATIONAL PLAN links directly to the DELIVERY PROGRAM, COMMUNITY STRATEGIC PLAN, and RESOURCING STRATEGY and should not be viewed in isolation. THE ANNUAL REPORT The ANNUAL REPORT will focus on Council’s implementation of the DELIVERY PROGRAM and OPERATIONAL PLAN. The ANNUAL REPORT will act as a “Report Card” on how Oberon Council performs each year.

Page 11: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 10

INTEGRATION – CSP and other PROGRAMS, PLANS and REPORTS The following diagram shows the relationship between the Community Strategic Plan (CSP), the Delivery Program (DP) and Operational Plans (OP). The CSP is the highest level of planning undertaken by Oberon Council. All other Plans and Programs INFORM the CSP. Underpinning this is the Vision, Values and Future Directions. The Delivery Program deals with the work Council can do to achieve the CSP and the Strategic Outcomes in the CSP, where Council has a role is an action in the Delivery Program and Operational Plans. Oberon Council alone cannot deliver all the Strategic Outcomes in the CSP. Many of these will require cooperation from groups and individuals within the Oberon Shire community.

COMMUNITY STRATEGIC PLAN

(10 years+)

VISION

what we want Oberon LGA to belike in 2025

VALUES

to guide our choices and behavior

FUTURE DIRECTIONS

(6 future directions to follow toachieve our preferred future)

DELIVERY PROGRAM

(4 years)

Supported by

Long Term Financial Plan

Workforce Management Plan

Asset Management Plan

STRATEGIC OUTCOMES

COUNCIL’S ROLE

Provider, Regulator, Facilitator or Advocate

STRATEGIC OUTCOMES

Where Council has a role

OPERATIONAL PLAN

Annual (Year 1)

ACTIONS

Programs

& Projects

ACTIONS

Programs

& Projects

& Budget Performance Measures Performance Measures Tasks

What What and How How

Page 12: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 11

HOW THE CSP IS ORGANISED On the following pages there is: A VISION STATEMENT of the preferred future for the Oberon LGA. This is written in

the present tense as if the ideal has been achieved. This helps express the aspiration and passion for the end destination and the place we call home.

A VALUES STATEMENT guides future choices and how we will work together.

Six FUTURE DIRECTIONS and associated STRATEGIC OUTCOMES to achieve our VISION. The FUTURE DIRECTIONS and STRATEGIC OUTCOMES are written in the present tense too. They describe the ideal outcomes that the community want to see happen.

The role that Oberon Council will play in achieving each of the Strategic Outcomes;

Those groups and organisations that assist in achieving the Strategic Outcomes;

Performance Measures to help us know if our efforts are making a difference.

THE ROLE OF OBERON COUNCIL The CSP is for the whole Oberon LGA and Oberon Council cannot deliver all the strategic outcomes. Council has three roles: Provider – where Council does the work e.g. road maintenance. Council is also a

regulator and this is similar to being the provider. It is where Council undertakes a regulatory responsibility e.g. building inspections and the local planning scheme.

Facilitator – this is where Council will help or work with others to get things done.

Advocate – where Council will proactively support a community initiative or issue. Where Council is not the Provider or the Regulator, relevant members of our community will need to work on these things, together.

Page 13: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 12

OBERON 2025 - OUR PREFERRED FUTURE (our VISION) What we want Oberon LGA to be like in 2025 VISION STATEMENT A prosperous town, villages and rural communities set amongst the rolling hills, rivers, forests, mountains and caves of the Great Divide. A breath of fresh air in a landscape of light, colour and seasonal beauty. Life as it should be! The town, villages and rural communities throughout the LGA thrive and prosper. Each area has its own identity and together make up ‘Oberon’; a place for all ages and aspirations; the place we call home. Our physical attributes define us. We are inspired by the natural landscape. Here the big rivers of the area have their beginnings; the rolling hills are rich and productive; the forests add to the wealth of our community both economically and culturally. We are home to the iconic Jenolan Caves and Kanangra Walls. People from all over the world come to visit. You can come up here to Oberon for a breath of fresh air in a clean and healthy environment. Four distinct seasons provide the backdrop for life and living here. Each offering its own colour range, temperatures, spoils of the land and calendar of events. Here in Oberon we enjoy, a pace of living that is both relaxed and invigorating; a welcome that is warm and genuine; Community life that is caring, full and active. Rural living in a beautiful landscape.

VALUES TO GUIDE OUR CHOICE AND BEHAVIOR As a Community, in all we do, we will:

VALUES STATEMENT We respect the past, the future and position of others. We take pride in community achievement, and we work together in an open and co-operative manner. The knowledge and wisdom of the past guides our present and future. We do for today with tomorrow in mind, aiming to leave a better place for those to come. We seek to understand the thoughts, ideas and ways of others so our own lives are enriched. We are proud of what our community achieves, the skill and creativity of our people. We take the initiative and don’t wait for someone else to do what we can do ourselves. Working together is the way we approach our challenges and opportunities. We seek to be open to new ideas and ways and to co-operate with each other.

Page 14: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 13

FUTURE DIRECTIONS There are six FUTURE DIRECTIONS we will follow to achieve our preferred future

OUR COMMUNITY

BASIC SERVICES

ECONOMIC PROPSERITY

RESPONSIVE and CARING

OPEN COMMUNICATION

NATURAL ENVIRONMENT

FUTURE DIRECTIONS AND STRATEGIC OUTCOMES For each FUTURE DIRECTION there are identified Strategic Outcomes PLEASE refer to the following separate documents: DELIVERY PROGRAM and OPERATIONAL PLANS Including SCHEDULE of FEES and CHARGES RESOURCING STRATEGY Draft Long Term Financial Plan Workforce Management Plan Asset Management Plan

Public Exhibition - Submissions The DRAFT Oberon Community Strategic Plan 2014 (CSP) will be on Public Exhibition from 26 May to 23 June 2014. WRITTEN SUBMISSIONS are to be addressed to General Manager Oberon Council PO Box 84 OBERON NSW 2787

Page 15: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 14

FUTURE DIRECTION 1 – OUR COMMUNITY

Background and Issues Active communities are healthier communities, better able to respond positively and constructively to present and future opportunities and challenges. There are many facilities within our community that can help maximise health and fitness. The emerging integrated Sport and Recreation Centre is central to this objective. Covering the Swimming Pool so aquatic activities and learning can proceed during summer no matter what the weather is a key issue. Existing facilities need to be promoted to not only encourage participation but also to avoid wasteful duplication of community assets. The Showground and utilization of school facilities can also be used to support active community living. Activities and programs should be available and appropriate to all ages and capabilities. The work patterns of the community also need to be taken into consideration when setting opening hours and developing programs. Active communities are also volunteering communities. Volunteer involvement should be encouraged and appreciated. Young people should also be encouraged to participate in volunteering with their ideas and aspirations being listened to and heard. Rules, regulations and requirements can be overwhelming for volunteers and community groups. Understanding the rules and regulations and the reasoning behind them should be communicated, and a whole of community approach to risk management investigated. The Oberon Library and Community Technology Centre are central to community life. Their use needs to be promoted. Opportunities should be developed and encouraged to showcase our community’s creative talents, stories and identities. Performances and activities from outside the area should be facilitated so our community has the opportunity to experience a broad range of cultural endeavours. The Parks and Gardens of our Shire provide many opportunities for recreational and cultural activities. No. Strategic Outcome Council

Role Who should collaborate

1.1 Healthy Active Community Members Facilitator Advocate

Health care professionals Community groups Personal trainers Schools Village communities Sporting groups and PCYC Oberon Neighbourhood Centre

1.2 Integrated well utilised and appropriate facilities for sporting arts and community activities

Provider Facilitator Advocate

Churches and Schools Clubs Showground Trust PCYC NSW State Departments Charitable trusts Village Associations Oberon Neighbourhood Centre

Page 16: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 15

1.3 Young people prepared for and involved

in community life Facilitator Advocate

PCYC Schools Church groups Service and sports clubs Library and Community Technology Centre Men’s Shed Oberon Neighbourhood Centre

1.4 Well maintained and utilised Parks and passive recreation opportunities

Provider Facilitator Advocate

State Government Agencies Private gardens Jenolan Caves Oberon Arts Council Service Clubs Men’s Shed Oberon Plateau Tourism Association

1.5 Lake Oberon a Recreational Asset see also 3.5

Advocate Facilitator

State Water Lake user groups Acclimatisation Society Fishing Clubs Oberon Plateau Tourism Association

1.6 Strong community participation in Arts & Cultural activities

Provider Facilitator Advocate

Arts Out West Oberon Arts Council Schools Men’s Shed Craft groups Service Clubs Oberon Neighbourhood Centre Friends of Oberon Library Inc.

Key Performance Indicators Attendance at community events Number of volunteers Number of young volunteers Health statistics Facility usage Participation in sporting activities Youth employment statistics Grant funding achieved Library usage Community Centre usage

Additional details including ACTIONS and Performance Indicators along with a Financial Budget has been prepared (see the Delivery Program and Operational Plans)

Page 17: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 16

FUTURE DIRECTION 2 – BASIC SERVICES

Background and Issues Physical infrastructure is the skeleton of the community. A functional and strong skeleton will support and promote social, economic and environmental activities. Providing functional physical infrastructure requires adequate funding to make sure what is needed is not only developed but also well maintained. Water quality and security are major social, economic and environmental issues. Road and adequate road maintenance is essential to all activities that occur in, out and around the Shire. Good roads will assist in decreasing the conflict between economic transportation and the movement of residents and visitors throughout the Shire. The new infrastructure and highways of the 21st Century are digital in nature. The terrain of Oberon Shire is challenging to achieving comprehensive communication technology coverage. To make sure that the entire Shire has the opportunity to be connected to the world and the world to them, communication coverage and access to new technologies needs to be assured. This is also a key issue in the Shire’s ability to present itself as an attractive alternative for new business and people relocating. The financial capacity of a community is linked to population. Investigating how to increase capacity and diversify the Shire’s potential funding mix will help build an understanding and realisation of how future infrastructure can be provided. No. Strategic Outcome Council

RoleWho should collaborate

2.1 Ongoing and secure water supply for domestic and industrial use

Provider Facilitator Advocate

State Water Fish River Water CENTROC Save Water Alliance NSW Office of Water Industry

2.2 Effective collection and treatment of Sewage

Provider Regulator

Office of Environment and Heritage Environment Protection Authority

2.3 Continue Council management and control of water and sewerage systems

Facilitator Advocate

State Water State Treasury CENTROC Media Community groups

2.4 A useful and safe local, regional and state road network that connects communities

Provider Roads and Maritime Services Forestry and Industry Local Members of Parliament

2.5 Full coverage and access to wireless, NBN and mobile communication technologies

Advocate Federal Government Telco’s NBN Co. Local Members of Parliament

2.6 An effective public transport system between communities

Facilitator Advocate

State Government Agencies Community user groups Transport companies

Page 18: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 17

2.7 An effective commercial and domestic waste management.

Provider Facilitator

Office of Environment and Heritage Environment Protection Authority Netwaste Land owners and Industry

2.8 Effective Plant and Fleet Management Provider Local Dealers Local Government Procurement Industry

Key Performance Indicators Funds to provide water for future growth Number of breakdowns in the water supply Benchmarked costs for providing services Non Compliance events with water and sewer Road accident statistics Road usage data Per-capita water consumption Water restrictions Water system loss Coverage of technology Public transport availability and usage Volumes of waste collected and transferred to landfill Asset management plan data Customer satisfaction and complaints

Additional details including ACTIONS and Performance Indicators along with a Financial Budget has been prepared (see the Delivery Program and Operational Plans)

Page 19: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 18

FUTURE DIRECTION 3 – ECONOMIC PROSPERITY

Background and Issues Agriculture and forestry are integral to the prosperity of our community. International influences, external costs, generational and community expectations affect the viability of both farming and forestry. Strategies need to be developed to innovate and value add to these economic pillars. We also need to ensure that our agricultural land is maintained. The produce and products of the area should be easily recognized as coming from Oberon. In this way, the reputation of our Shire will grow. There is a potential for mining activity in the area and this needs to be managed to ensure harmony between community aspirations and mining endeavours. Tourism is also an important and continually emerging economic activity. Oberon is home to the Jenolan Caves, an iconic Australian attraction. This attracts visitors from around the world. The physical attributes of the area – rolling hills, rivers, forests, mountains and caves facilitate activities for the visitor to experience. The town, villages and rural communities of the Shire also offer the visitor the opportunity to experience authentic rural life. Showcasing local produce, products, arts and culture is integral to this experience. Customer Service levels need to be continually improved. An active program to ‘buy local and locally’ can be a way of supporting existing businesses. Encouraging new businesses, particularly in areas where there are gaps will also help ensure business is vibrant and prosperous. No. Strategic Outcome Council

Role Who should collaborate

3.1 A Diverse Economic Base Facilitator Advocate

Section 355 Committees Oberon Timber Complex Essential Energy PGL State Water Forest NSW Roads and Maritime Services Oberon Business Association Employment Agencies Oberon Plateau Tourism Association

3.2 A diverse and viable agricultural industry with a strong brand

Facilitator Advocate

NSW Farmers Federation Section 355 Committees Oberon Business Association Sydney University Ag. College Farming businesses Rural suppliers

3.3 Customer responsive businesses and services

Provider Facilitator Advocate

Oberon Business Association Oberon Plateau Tourism Association Service clubs Training organisations Business owners

Page 20: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 19

3.4 A value adding Timber Industry

Facilitator Advocate

State Government Timber companies Oberon Timber Complex Roads and Maritime Services Environment Protection Authority State Water Community groups

3.5 A thriving tourism sector addition of Reef Reserve and Lake Oberon

Provider Facilitator Advocate

Oberon Business Association Oberon Plateau Tourism Association Blue Mountains Lithgow and Oberon Tourism Oberon Tarana Heritage Rail Mayfield Garden Highland Steam and Vintage Fair Oberon Show Jenolan Caves Forest NSW National Parks Accommodation and experience providers

Key Performance Indicators Visitor numbers and yield Employment data New industry start ups Development applications Local output data Customer service satisfaction Brand recognition Customer service satisfaction

Additional details including ACTIONS and Performance Indicators along with a Financial Budget has been prepared (see the Delivery Program and Operational Plans)

Page 21: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 20

FUTURE DIRECTION 4 – RESPONSIVE and CARING

Background and Issues Social infrastructure and services provide the support within a community and should be based on need. The people of Oberon Shire should be able to go from birth to ageing well in their communities with services to support their changing life circumstances and abilities. The provision of health services through the hospital and health professionals delivers certainty to the community and needs to continue to respond to changing community needs. Policing services however need to be more consistent with an officer located in the Shire at all times. Other emergency services need to be maintained and the skills and knowledge of locals on emergency responses developed. Our schools are important to our children and the community’s future. The young people of Oberon Shire should have the same educational opportunities as young people anywhere else in the nation. The standards of education and learning need to help each and every child reach their full potential. The entire community can play a role as well, encouraging our young people, mentoring them, seeking to understand their world and perceptions and celebrating their achievements. Activities and programs for young people of all ages will help keep them engaged in community life. No. Strategic Outcome Council

RoleWho should collaborate

4.1 Responsive, local and well trained emergency services maybe list as a Basic Service

Facilitator Advocate

Police Ambulance service Rural Fire Service State Emergency Service State Government Agencies

4.2 Local schools providing quality education services and facilities

Advocate Local Schools Dept. of Education Parents and Friends Teachers

4.3 Locally available vocational and adult learning, facilities and opportunities

Provider Facilitator Advocate

Central West Community College TAFE Local Business Distance learning providers Dept. of Education Dept. Corrective Services

4.4 Locally available core health and medical services

Facilitator Advocate

Greater Western Area Health Service HACC Ageing Disability and Home Care Dept. of Health and Ageing Medical Centre Health professionals

4.5 Ageing well in Oberon Facilitator Advocate

Columbia Homes HACC Section 355 Committees State Agencies Aged service providers Churches Oberon Neighbourhood Centre

Page 22: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 21

4.6 Utilised after school and holiday programs for young people

Facilitator Advocate

Parents and friends Schools Education Dept. Service groups Parkview Family Day Care Library

4.7 A safe community with a high standard of public health

Provider Facilitator Advocate

Police Health professionals Food shops and restaurants Pet owners Oberon Neighbourhood Centre

Key Performance Indicators Emergency service response times Emergency services coverage hours School retention rates Enrolment in adult training and learning courses NAPLAN results Health services usage stats Participation in after school and holiday programs Number of retirement living places.

Additional details including ACTIONS and Performance Indicators along with a Financial Budget has been prepared (see the Delivery Program and Operational Plans)

Page 23: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 22

FUTURE DIRECTION 5 – OPEN COMMUNICATION

Background and Issues The strength of a community will be gauged on their ability to agree and plan where they want to be in the future and their capacity to do the things they need to do to get there. This will require leadership and the knowledge and skills to work together on projects. Often these skills need to be learnt. Building the capacity and capabilities of community members is central to success. Communication and engagement in community life across the Shire needs to be strengthened. This is also part of building strong, connected communities. When we know what is going on we are better able to participate and contribute. Different communication mediums can be used to make sure all areas and sectors of the community have the opportunity to be listened to and heard. The preservation and celebration of the built, social, oral and natural heritage of our area is important to the community. Within our heritage are ‘our stories’ which help define who we are and how we relate to the rest of the world. Part of the presentation of our unique identity is planning and implementing beautification programs for our town, villages and rural communities. We all have a role to play in this. No. Strategic Outcome Council

Role Who should collaborate

5.1 Vibrant connected and engaged villages Provider Facilitator Advocate

Progress Associations Community groups Oberon Arts Council Section 355 Committees Oberon Business Association Schools Government providers Oberon Neighbourhood Centre Friends of Oberon Library Inc. Oberon Plateau Tourism Association

5.2 Conserved and valued heritage maybe list as Natural Environment

Provider Facilitator Advocate

Heritage Office Local committees Owners National Trust Library

5.3 Well planned, presented and maintained towns and villages

Provider Facilitator Advocate

Land use planning agencies Service groups Industry and property owners Progress Associations Tidy Towns Keep Australia Beautiful Oberon Business Association Oberon Plateau Tourism Association

Page 24: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 23

5.4 Well-informed communities whose views are heard.

Provider Facilitator Advocate

Service groups Oberon Business Association Oberon Plateau Tourism Association Progress Associations Section 355 Committees Media Government Agencies Schools Oberon Neighbourhood Centre

5.5 A community with contemporary governance and leadership

Provider Facilitator Advocate

Business Community groups

Key Performance Indicators: NBN connection Articles and media coverage Website statistics Heritage projects funded and completed Attendance at community events Population statistics Development applications Awards won Community satisfaction Compliance with planning requirements.

Additional details including ACTIONS and Performance Indicators along with a Financial Budget has been prepared (see the Delivery Program and Operational Plans)

Page 25: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 24

FUTURE DIRECTION 6 – NATURAL ENVIRONMENT

Background and Issues The environment surrounds us and is the source of both the beauty of the area and our economic prosperity. It is an inspiring environment, a productive environment and a defining environment. Ensuring it remains healthy is a responsibility we all have. We need to be good at balancing the protection of our natural resources with the needs of industry particularly farming and forestry. This is our challenge and it is also an opportunity to show the rest of the world how it can be successfully achieved. Food production through our agricultural efforts is well known. There is growing consumer demand for organic food production and our Shire can respond and further its reputation by producing organic foods. Each of us within our daily lives can take responsibility for reducing our impact on the environment. This can begin with learning more about how to care for our environment as well as conserving, reducing and recycling. Also, as a community we need to eradicate noxious weeds and pest species. There will be both the need and the opportunities to develop and use alternative energies more widely in the future. All future planning and developments should take this into consideration. No. Strategic Outcome Council

RoleWho should collaborate

6.1 Compliance with environmental legislation and guidelines

Provider State Gov’t agencies Industry Developers Community members Contractors

6.2 Scenic beauty and landscapes are protected

Provider Advocate

Developers Forests NSW Land owners Industry Contractors

6.3 An environment free of weeds and feral animals

Provider Facilitator Advocate

National Parks Upper Macquarie County Council Landcare and National Resource Management groups Land owners Farmers Livestock Health and Pest Authority

6.4 Responsible management of natural resources

Provider Facilitator Advocate

State Government Agencies Landowners Environment Protection Authority Landcare and NRM groups Farmers Industry

Page 26: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 25

6.5 Diversified energy sources and usage Facilitator Advocate

Essential energy Energy suppliers and retailers Industry Emerging technology developers

Key Performance Indicators Breaches of environmental requirements Loss of scenic areas Participation in recycling and volumes Landfill reduction Removal of pest species Health of waterways Loss of agricultural land Alternative energy usage Community involvement in environmental activity

Additional details including ACTIONS and Performance Indicators along with a Financial Budget has been prepared (see the Delivery Program and Operational Plans)

Page 27: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 26

LINKAGES

PRINCIPLES OF SOCIAL JUSTICE AND SUSTAINABILITY The principles that underpin the Community Strategic Plan are social justice and sustainability. All FUTURE DIRECTIONS and STRATEGIC OUTCOMES seek to achieve sustainability and aspire for equity, access, participation and equal rights particularly for the disadvantaged and vulnerable within our community. SOCIAL JUSTICE Equity: Decisions will reflect equality in prioritising and allocating resources Access: All people should have access to services, resources and opportunities to maintain

and improve their quality of life. Participation: Everyone should have the opportunity to genuinely participate in decisions that

affect their lives. Rights: Equal rights should be established and promoted, with opportunities provided for

people from diverse linguistic, cultural and religious backgrounds to participate in community life.

SUSTAINABILITY Sustainability describes the integration of environmental, social, economic and governance goals, processes and performances. However, these elements are not always in harmony. Oberon has many competing elements and a balance is required to ensure that the environment, agriculture, natural resources, population growth and economic development are considered at a local, state and national level; and that we remain attractive to live in and visit. THE QUADRUPLE BOTTOM LINE The quadruple bottom line approach ensures that the CSP is balanced. It needs to adequately address social, environmental, economic and civic leadership considerations. The following table shows the relationship of the Strategic Outcomes in each Future Directions to the quadruple bottom line framework. Some Strategic Outcomes address more than one area of the quadruple bottom line framework.

Future Direction Strategic Outcome Social Environmental Economic Civic Leadership

OUR COMMUNITY Healthy active community members

Integrated well utilised and appropriate facilities for sporting arts and community activities

Young people prepared for and involved in community life

Well maintained and utilised Parks and passive recreation opportunities

Lake Oberon a recreational asset

Strong community participation in Arts & Cultural activities

BASIC SERVICES

Ongoing and secure water supply for domestic and industrial use

Effective collection and treatment of Sewage

Continue Council management and control of water and sewerage systems

Page 28: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 27

A useful and safe local, regional and state road network that connects communities

Full coverage and access to wireless, NBN and mobile communication technologies

An effective public transport system between communities

An effective commercial and domestic waste management.

ECONOMIC PROSPERITY

A diverse economic base

A diverse and viable agricultural industry with a strong brand

Customer responsive businesses and services

A value adding timber Industry

A thriving tourism sector

RESPONSIVE AND CARING

Responsive, local and well trained emergency services

Local schools providing quality education services and facilities

Locally available vocational and adult learning, facilities and opportunities

Ageing well in Oberon Utilised after school and

holiday programs for young people

A safe community with a high standard of public health

OPEN COMMUNICATION

Vibrant connected and engaged villages

Conserved and valued heritage

Well planned, presented and maintained towns and villages

Well-informed communities whose views are heard.

Sound governance and leadership across the community

NATURAL ENVIRONMENT

Compliance with environmental legislation and guidelines

Scenic beauty and landscapes are protected

An environment free of weeds and feral animals

Responsible management of natural resources

Diversified energy sources and usage

Page 29: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 28

NSW STATE PLAN NSW 2021 is the ten-year strategic plan to make New South Wales number one in the nation. It is based around five strategies. The table below shows the linkages between the Future Directions and Strategic Outcomes of the Oberon Community Strategic Plan and the NSW 2021 Strategies. There are many areas where the NSW State Plan and Oberon CSP share directions and outcomes.

NSW 2021 STRATEGIES OBERON CSP FUTURE DIRECTIONS AND STRATEGIC OUTCOMES

Rebuild the Economy

Improve performance of the NSW economy

Rebuild State finances Drive economic growth in regional

NSW Competiveness of doing business in

NSW Downward pressure on the cost of

living Strengthen NSW skill base

ECONOMIC PROSPERITY

A diverse economic base A diverse and viable agricultural industry

with a strong brand Customer responsive businesses and

services A value adding timber Industry A thriving tourism sector

Return Quality Services

Transport Health Family and community services Education Police and justice

RESPONSIVE AND CARING

An effective public transport system between communities

Responsive, local and well trained emergency services

Local schools providing quality education services and facilities

Locally available vocational and adult learning, facilities and opportunities

A safe community with a high standard of public health

Renovate Infrastructure

Invest in critical infrastructure Build liveable centres Secure potable water supplies

BASIC SERVICES

Ongoing and secure water supply for domestic and industrial use

Effective collection and treatment of Sewage

Continue Council management and control of water and sewerage systems

A useful and safe local, regional and state road network that connects communities

Full coverage and access to wireless, NBN and mobile communication technologies

An effective commercial and domestic waste management.

Page 30: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 29

Strengthen our local environment and communities

Protect local environment Opportunities for people to look after

their own neighbourhoods and environments

Easier for people to be involved in their communities

Increase opportunities for seniors Opportunity and partnership with the

Aboriginal People Cultural creative sporting and

recreation opportunities Prepared for major emergencies and

natural disasters

OUR COMMUNITY

Integrated well utilised and appropriate facilities for sporting arts and community activities

Young people prepared for and involved in community life

Well maintained and utilised Parks and passive recreation opportunities

Lake Oberon a recreational asset Strong community participation in Arts &

Cultural activities Ageing well in Oberon Utilised after school and holiday programs

for young people

OPEN COMMUNICATION

Vibrant connected and engaged villages Conserved and valued heritage Well-informed communities whose views

are heard.

NATURAL ENVIRONMENT

Compliance with environmental legislation and guidelines

Scenic beauty and landscapes are protected

An environment free of weeds and feral animals

Responsible management of natural resources

Diversified energy sources and usage

Restore Accountability to Government

Confidence and integrity in the planning system

Trust in State and Local governments as service providers

Government transparency and access to government information

Involve the community in decision making

OPEN COMMUNICATION

Sound governance and leadership across the community

Well planned, presented and maintained towns and villages

Page 31: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Oberon Community Strategic Plan 2014 30

COMMUNITY ENGAGEMENT THE PROCESS USED TO DEVELOP THE CSP The process for engaging with the community for the development of our first Community Strategic Plan (CSP 2012) began with identifying the complex network of groups, agencies, organisations and others that are influenced by what happens in the Shire. The following broad groupings were identified Council, government and neighbours Agriculture, Forestry Business Groups, and individual businesses Education, training and learning Arts and culture Health and Well being Transport and Infrastructure Sports and Recreation Emergency Services Representatives from each of these groups attended a planning workshop to consider our internal strengths and weaknesses, external opportunities and threats; and then to “design” a preferred vision for our future. The “working title” for this community consultation process is “OBERON 2025 - MAKING OUR FUTURE TOGETHER” Councillors and key staff (General Manager and the Departmental Directors) held informal discussions and made formal presentations to our community at meetings in Blacks Springs, Burraga, Oberon and O’Connell for the review of the inaugural CSP and the development of the CSP 2013. This process continues for the Oberon CSP 2014 and an updated COMMUNITY ENGAGEMENT STRATEGY is included on the following pages.

PUBLIC EXHIBITION - SUBMISSIONS The DRAFT Oberon Community Strategic Plan 2014 (CSP) will be on Public Exhibition from 26 May to 23 June 2014. WRITTEN SUBMISSIONS are to be addressed to General Manager Oberon Council PO Box 84 OBERON NSW 2787

Page 32: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Community Engagement Strategy – May 2014 Page 1

DRAFT Community Engagement Strategy replaces Policy 1120

May 2014

TABLE OF CONTENTS ......................................................................... page

  INTRODUCTION ................................................................................................... 2 1.

  WHO WE ARE ....................................................................................................... 2 2.

  BACKGROUND .................................................................................................... 2 3.

  THE ENGAGEMENT FRAMEWORK, PRINCIPLES & OBJECTIVES ................. 3 4.

Framework ............................................................................................................. 3 

Engagement Principles .......................................................................................... 3 

Objectives .............................................................................................................. 3 

  RECENT ENGAGEMENT ..................................................................................... 4 5.

  RESOURCING REQUIREMENTS ........................................................................ 4 6.

Resources .............................................................................................................. 4 

  ENGAGEMENT TECHNIQUES ............................................................................ 4 7.

Engagement Tools ................................................................................................. 4 

Tools for Oberon Council ....................................................................................... 4 

Visitations .............................................................................................................. 5 

Newsletters and Advertising .................................................................................. 5 

Public Exhibition Processes ................................................................................... 5 

  ENGAGEMENT FOR THE DRAFT COMMUNITY STRATEGIC PLAN ............... 6 8.

Page 33: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Community Engagement Strategy – May 2014 Page 2

INTRODUCTION 1.This Community Engagement Strategy has been prepared to explain how the Oberon Council will consult and engage with the community in future planning and decision making processes. The Strategy confirms the Council’s commitment to meaningful engagement and collaboration with the community in general and with specific local organisations and groups. Council wants to ensure that all groups and members of the community have an equal opportunity to participate in the development of the Community Strategic Plan, Delivery Program and Operational Plan as well as in general decision making by the Council that will affect parts or all of the Oberon Local Government Area (LGA) community. The Strategy will also provide a guide as to how the Council will consult with and engage with the community on other specific issues, such as topical State Government and Federal Government initiatives and other issues referred directly from segments of our community.

WHO WE ARE 2.Our Community The Oberon Council LGA consists of a community of with a resident population around 5,500 and an area of 3660 square km. The main centre of population and commercial “hub” is the town of Oberon, with three smaller communities at Black Springs, Burraga and O’Connell, together with a number of other rural localities. The character of the LGA is mainly rural/agricultural with softwood forest plantations, and an emerging tourism industry. A large proportion of the Oberon LGA consists of National Parks and State Forests, which are non-rateable. The town of Oberon is the base for many commercial businesses that service the local community and industries. The Oberon Timber Complex which processes the softwood timber produced in the area employs over 500 people when in full production. The area prides itself on the relaxed lifestyle enjoyed by residents and with the natural beauty that can be enjoyed by both visitors and locals alike. Our Council Oberon Council is a relatively small local government area however the efforts of Council are highly visible and highly scrutinised by ratepayers and residents. The Elected Council consists of nine Councillors, with a Mayor and Deputy Mayor elected annually by the Elected Council. The Council is responsible for making “strategic decisions” with the General Manager responsible for the day to day management of employees and in the operational aspects of Council work. The work done by Oberon Council is considered more obvious than in larger towns and cities because what we do is so crucial to basic expectations, like having decent roads to travel on. Nearly everyone who lives in the Shire knows several people who work for Council, and the Elected Councillors themselves are generally well known within the community.

BACKGROUND 3.As part of the process of preparing and adopting a Community Strategic Plan (CSP), Council is required to adopt a Community Engagement Strategy (CES). This Strategy will guide Council on how to engage the community and the tools and techniques it will use to be more effective.

Page 34: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Community Engagement Strategy – May 2014 Page 3

Outside the town of Oberon and the village areas of Black Springs, Burraga and O’Connell the population is generally quite remote and this provides a practical challenge in engaging with the whole community. In addition to this challenge, new long-term financial sustainability and accountability requirements along with increased reporting have placed an increased emphasis on community engagement. This means that Council decisions need to be made with the knowledge of community aspirations and preferences. This does not mean that Council will “abdicate” its decision making, but rather when making key decisions that Council will consider the views of the community. One of the new requirements is the development of a Community Strategic Plan. The CSP seeks to identify the community’s main aspirations and priorities over the next 10 years including establishing objectives and strategies to help achieve these priorities. An integral part of developing the CSP is engaging with the community to determine these aspirations and priorities. The Community Engagement Strategy will guide Council in its community engagement initiatives.

THE ENGAGEMENT FRAMEWORK, PRINCIPLES & OBJECTIVES 4.Framework Council’s community engagement activities will focus on providing information to, consultation with and involvement of the community. Council will use involvement techniques and collaborative engagement processes where these are practical. Engagement Principles Oberon Council is committed to meaningful community engagement. In order to meet this commitment the following principles will apply:

Social Justice – All parts of the community should have an equal opportunity for input Creating the right debate – Council will seek to inform and educate the community on the key

issues and available options when decisions are made that affect the community. Community input is valued – Council is open to ideas and values all contributions. All input

will be considered and acknowledged. Engage Creatively – The community will be creatively and actively engaged to maximise the

value and range of feedback. This may involve multiple methods of engagement. Objectives Through the application of the engagement principles above and the application of selected engagement tools, the community engagement process will:

“ground truth” previous assumptions made by Council; ensure residents are informed and educated on key issues identify and confirm community views on issues, challenges and priorities; focus discussion on the strategic issues facing the Council and the community; seek to create community “buy-in and ownership” of local issues and strategies; provide input for future decision making by Council; develop ongoing community partnerships and shared responsibility for local issues.

A successful community engagement process will deliver on the majority of these objectives. Council will measure the success of these methods of engagement by:

a reasonable level of community involvement in the engagement process; the representative nature of those individuals or groups who are engaged; the level of support for the identified strategic directions.

Page 35: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Community Engagement Strategy – May 2014 Page 4

RECENT ENGAGEMENT 5.Due to the nature and size of the Oberon LGA community, Councillors and key employees know personally many people within the community. This can greatly assist in keeping in touch with the views of the community. The Council however does not wish to ‘over consult’ its residents when it already has considerable community feedback on key issues, nor does Council want to ignore, nor appear to have ignored, the valuable information that came from earlier engagement processes, which have included: Proposed Fluoridation of Town Water Supply – Information Session & Community Forums Land Use Strategy (LUS) developed for the current Local Environmental Plan (LEP)

Review process (final Public Exhibition of these documents in May 2013); Our first Community Strategic Plan adopted in June 2012; and the Oberon CSP 2013 Social and Community Plan reviewed in 2010; Management Plan adopted in June 2011 (and previous versions); Regular “Informal” Meetings with residents of Black Springs, Burraga and O’Connell; Consultation on specific issues (for example proposals for waste management facilities at

Black Springs and Burraga).

RESOURCING REQUIREMENTS 6.Resources This Community Engagement Strategy (CES) will be undertaken by Council employees, mainly through the direction of the General Manager, and with the involvement of the Elected Councillors. In addition there will be involvement from external resources on an ‘as needs’ basis, particularly with respect to specific skill sets that are not held by current Council employees. For example with “heritage issues”, a Heritage Consultant has been engaged to assist as required.

ENGAGEMENT TECHNIQUES 7.Engagement Tools There are a number of different and complimentary engagement tools available when seeking to engage with the community. The characteristics of Oberon Council and its community means that the techniques used should be selected for their “appropriate fit” to our local circumstances. To be effective the engagement techniques must take into consideration Oberon LGAs:

Geographic area Population size, density and location Demographics ( age, ethnicity, education, etc) Social structure Cultural sensitivities

Tools for Oberon Council From previous experience the most effective consultation techniques for Oberon LGA are those that engage directly with the community. The preferred means of consultation is a combination of:

Visitations – to villages and other locations; Small meetings & focus groups – as a result of a specific request or on a needs basis; Newsletters – distributed to either selected groups or the whole community; Formal Submission and Public Exhibition processes.

In addition electronic engagement tools will be used where practical. However given the community demographic, this form of engagement will not be used as a primary tool.

Page 36: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Community Engagement Strategy – May 2014 Page 5

Where Significant Community Engagement is important the following five stages will be used: A. Prepare:

a. Define the purpose of the engagement; b. Review and select engagement tools; c. Plan engagement; d. Review relevant information; e. Develop supporting information.

B. Awareness - create awareness of the engagement initiatives among:

a. Councillors; b. Employees; c. Community.

C. Engage- implement an Engagement Plan. D. Respond:

a. Summarise engagement; b. Advise participants of result.

E. Validate – Submissions and Public Exhibition. Visitations A visit to village areas by Councillors and key employees is seen as a key component of the engagement process. Personal representations to those individuals and groups directly affected and those who live away from the town of Oberon is also integral to the consultation process. Management staff and Councillors will arrange Informal Visits to meet with groups and individuals: October – Oberon

December – O’Connell

March – Black Springs

June - Burraga

The Informal Visits will be without an Agenda and will follow a format of “we’re here to listen” Newsletters and Advertising Newsletters sent directly to residents and ratepayers are a useful engagement tool. This may also include linking into promotional material for local events and will be a means of engagement as well as informing the community of road shows or the attendance at events. Other appropriate methods of advertising to be considered include: Rate Notice Insertions – for particular topical issues, and also printed messages on Notices

Regular Newsletter – hard copy as well as e-newsletter (generally issued each month)

Newspaper Insertion – a feature Oberon Council single page advertising is now in place.

Australia Post-delivery or other mail-outs for topical issues.

Public Exhibition Processes Council is required by legislation, regulations and guidelines to have a formal Public Exhibition of documents and to invite submissions. This must be done in accordance with those requirements. For all Public Exhibition of documents copies will be available at the Oberon Library and the Oberon Council Administration Centre. All documents will contain a QR Code with a link to the Oberon Council Website and all Notices will include the QR Code. Notices will be placed on the Community Notice Boards in Black Springs, Burraga, O’Connell and Oberon.

Page 37: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Community Engagement Strategy – May 2014 Page 6

ENGAGEMENT FOR THE DRAFT COMMUNITY STRATEGIC PLAN 8.Council and Management Staff (General Manager and Department Directors) will identify a range of key stakeholders and will endeavour to ensure that each group or individual is engaged in and able to participate in the initiatives below: Public Exhibition – the period for Public Exhibition of the draft documents will be determined by a Council decision and documents will be available on the Oberon Council website www.oberon.nsw.gov.au and hard copies available at the Oberon Library, Visitor Information Centre and Council’s Administration Centre. Meetings and Visits – these will be held in Oberon and the villages of Black Springs, Burraga and O’Connell with Councillors and Management Staff attending. At these meetings a PowerPoint presentation (or similar) is to be made and an Information Sheet to be available as well as a Submission Form to facilitate written submissions. Councillors and Management Staff will also be available to meet with smaller groups and attend meetings and to make a brief presentation or answer questions relating to the draft CSP documents. Advertising & Promotion – this should be generated to maximise community awareness of the Public Exhibition of the DRAFT CSP. This will include the Weekly Single Page Advertising in the Oberon Review, and placement of a copy of the formal advertisement in the Community Noticeboards plus details on the Oberon Council Facebook Page. Approving Authority Oberon Council

Contact General Manager

Approval 20 May 2014 Draft

Revised replaces May 2013 / Policy 1120

Revision Date May 2014

Issue Date to Staff June 2013 / from July 2014

Page 38: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Resourcing Strategy 2014

DRAFT Resourcing Strategy 2014/2015

THE RESOURCING STRATEGY Financial Sustainability of Oberon Council

DRAFT Long Term Financial Plan (LTFP) DRAFT Workforce Management Plan (AMP) DRAFT Asset Management Plan (AMP) OTHER PLANS DRAFT DELIVERY PROGRAM and OPERATIONAL PLANS LIST OF DONATIONS (and Financial Assistance for 2014/15) CAPITAL EXPENDITURE 2014/2015 and LOCAL INFRASTRUCTURE

RENEWAL SCHEME

Page 39: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Resourcing Strategy 2014

THE RESOURCING STRATEGY The RESOURCING STRATEGY consists of three components: LONG TERM FINANCIAL PLAN (LTFP) - financial modelling and 10 year plan

o how we propose to manage financial commitments and maintain financial sustainability WORKFORCE MANAGEMENT PLAN (WMP) - organisational capability, with a 4 year plan

o how we will manage our workforce ensuring that we have the right number of people with the right skills, in the right job at the right time

ASSET MANAGEMENT PLAN (AMP) - asset strategy, with a 10 year plan

o providing the information needed to plan for future management of assets and identifies ways to fund the repair and maintenance of current assets.

FINANCIAL SUSTAINABILITY OF OBERON COUNCIL A report prepared by NSW Treasury Corporation (TCorp) for Oberon Council, the Division of Local Government and the Independent Local Government Review Panel considered that Oberon Council is currently in a sound Sustainability position. The report by TCorp noted that Council has reported $16.1m of Infrastructure Backlog in 2012 which represent 13.3% of its infrastructure asset value of $120.9m. The majority of the Backlog relates to public roads infrastructure which increased by almost $9m over the review period (2009 to 2012) following Asset Revaluations.

A definition of Infrastructure Backlog is the amount of deterioration, or the amount required to bring the asset back to its original (as new) condition. TCorp observed that Council appears “to be underspending the required amount to maintain their existing assets at a satisfactory level”. However Council, and the community MAY NOT require all assets to be maintained at the “satisfactory level”, and the statement that Council is “underspending” may not be accurate. TCorp notes that Council will be debt free by 2016 and has not forecast any additional borrowings, and that Council has the capacity to borrow up to $11.9m. At its Ordinary Meeting held on 16 April 2013 Council decided to address the Infrastructure Backlog in the current review of the Delivery Program and Operational Plans and to allocate funding to reduce their current Backlog Council also decided to undertake further consultation with the community and to review the service levels for roads infrastructure maintenance, and to then review its LTFP to provide a more certain picture of its forecast financials

Page 40: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Resourcing Strategy 2014

LONG TERM FINANCIAL PLAN (LTFP) The LTFP continues to show a negative trend from years 2016/2017 and beyond. This is due to the requirement to maintain the Community Infrastructure Assets as shown in the Asset Management Plan. The LTFP will be revised to complement the Future Directions and Strategic Outcomes which are shown in the Draft Oberon CSP 2014, the Draft Delivery Program and Draft Operational Plans. The LTFP has been prepared with some assumptions (the estimated increases in the cost of materials etc.) and forecasts for revenues and expenditures and also sensitivity analysis (for example what effect increases in interest rates will have and population projections). The LTFP has been calculated utilising the latest estimated figures for 2014/15: (2013/14)

Consumer Price Index (CPI) 3.00% (3.0%) Salaries & Wages Increases 4.00% (4.0%) Insurance Premiums Increases 3.00% (3.4%) Electricity Supply Charges 3.00% (7.0%) Gas Supply Charges 20.00% (10.0%)

WORKFORCE MANAGEMENT PLAN (WMP) In May 2012 an initial Survey was carried out which provided details of our Workforce Profile. A further Survey was done in May 2014 and the following variations: There is a slight change in Gender Comparison with 67.47% of Males and 32.53% Females

in 2014 which compares with 65.44% and 34.56% in 2012.

Full-time employment has increased to 69.61% from 60.58% in 2012.

Part-time and Casuals have decreased to 8.83% (was 13.47%) and 18.62% (was 22.11%).

Total Full-time and Trainee/Apprentice employees increased from around 84% to 89% with Part-time decreasing from 16.05% to 10.85%

The Average Age for employees is 42 years, with 39 years for Administration/Indoor and 48 years for Outdoor/Works and Depot employees.

In 2012 the total accumulated Years of Service was 682 years for 81 Permanent Employees which represents an average length of service at 8.41 years

In 2014 the total accumulated Years of Service is now 787 years for 83 Permanent Employees which represents an average length of service at 9.42 years

In most areas of the organisation there is a highlighted need to implement good succession planning with a number of key employees either close to retirement or where there is not a qualified or experienced replacement available. During 2014/15 the requirement for either a part-time or casual employee to undertake Economic Development activities will be reviewed. There are no other significant impacts or changes to the WMP for 2014/15.

Page 41: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Resourcing Strategy 2014

ASSET MANAGEMENT PLAN (AMP) The AMP for Roads, which is the most significant asset category, was presented at a Councillor Workshop in early April 2014. Councillors have expressed a desire to reconsider the existing Policy of NOT Policy of not undertaking any further sealing of the Unsealed Rural Road Network. Further Modelling of scenarios about service levels for the Road Network is being undertaken and will be presented to Councillors for consideration. This will also take account of the proposed LIRS Funding of $1.6M on Mayfield Rd and $3.4M on the Unsealed Road Network. Other Asset Management Plans and Strategies remain unchanged (refer CSP 2013). OTHER PLANS There are a number of other Plans which support Council’s Operational Activities. These Plans form part of Council’s overall planning processes and are “integrated” into the Oberon Community Strategic Plan 2014 through the Delivery Program and Operational Plans. Some of these plans are: STRATEGIC BUSINESS PLAN FOR WATER SUPPLY OPERATIONS STRATEGIC BUSINESS PLAN FOR SEWER OPERATIONS PLANT REPLACEMENT PROGRAM OR PLAN DRAFT DELIVERY PROGRAM (DP) and OPERATIONAL PLANS (OP) The Delivery Program (DP) outlines the principal strategies that Council has prioritised over a four year term to achieve the Strategic Outcomes in the CSP. The Operational Plan (OP) shows the detailed Actions that will be undertaken over the next 12 months from 1 July 2014. The DP and OP set out in practical terms the tasks involved in delivering our community expectations. These are the documents that direct the day to day work of Council and are what we report on to show how we are progressing towards our goals and the 6 Future Directions. The Operational Plan 2014/2015 includes the Council’s Revenue Policy and an Estimate of Income and Expenditure along with the annual Fees and Charges. Assumptions A 3% increase for Consumer Price Index (CPI) being the average rate over the last 10 years. Charges not increased by 3% include Ordinary Rates which will increase by 2.3% as set by the Independent Pricing and Regulatory Tribunal (IPART). Water Rates and Charges will increase by 10% and Sewer by 15%. Salaries and Wages will increase by 4% to include a CPI and skill progression increase. There is also a statutory adjustment for compulsory superannuation of a quarter of percent to 9.50%.

Page 42: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Resourcing Strategy 2014

Revenue Policy Fees and Charges have generally been increased by the CPI rate of 3%. Statutory charges are set by the State Government and therefore increases are only made when advised by the Office of Local Government (OLG) or other Government Departments. The Fees and Charges Schedule form part of the Operational Plan and a DRAFT copy of this will be distributed to Councillors as a separate document. Ordinary Rates An Ordinary Rate is raised on every rateable assessment within the Council area. The Local Government Act, 1993 requires all rateable assessments to be categorised. The categories applicable are Farmland, Business, Residential, and Mining. Further sub-categories apply to each category and these are - Residential, Rural Residential (definition Local Government Act, 1993), Non-Urban Centres of Population (covering the areas known as the Village of Black Springs, Oberon Hills Estate, Stratford Downs Estate and Titania Park Estate). Town Improvement Rates A Town Improvement Rate is raised on every rateable assessment within the defined Oberon “Village” area. The purpose of this rate is to provide for town improvements. The categories applicable are – Residential, Business, and Farmland. It is proposed to review the Town Improvement Rate to include the Stratford Downs Estate into the area defined as the Oberon “Village”. This is due to the premise that residents of this area have a close proximity to the urban area of the town of Oberon and therefore, have easy access to the use of the “town services” which include the parks and playground areas, sporting fields, the Common and other town related facilities. All rating categories will be reviewed leading up to the 2015/16 rating period to ensure that Council meets the Local Government Act 1993 requirements. It is expected that this will include a new Special Rate for Wind Farms and to possibly replace the Town Improvement Rate with specific Special Rates that have Programs/Projects attached to them. Sewerage Charges Sewerage Charges for 2014/15 will incorporate an access and usage component. Access charges have been calculated to cover the capital costs of the sewer scheme while the usage charge covers operational costs. An increase of 15% is proposed. Water Charges Water Charges for 2014/15 will incorporate an access and usage component. The access or base has been calculated to cover the fixed costs of the water reticulation scheme. An increase of 10% is proposed. Waste Charges Domestic Waste Charges - Council must make a levy and annual charge for the provision of domestic waste management services for each parcel of rateable land for which that service is available. Currently, the service is available to all parcels of land within the town of Oberon, as well as Stratford Downs. Council is required to levy this charge on all parcels of land, whether the land is occupied or vacant. A 3% increase is proposed. Loan Borrowings Two applications were submitted for funding under the NSW Governments Local Infrastructure Renewal Scheme (LIRS). A separate section is included on the LIRS applications. Transfer to/from Restricted Assets and Reserve Funds A list of the current Reserve Balances will be included in the Draft Operational Plan 2014/2015.

Page 43: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Resourcing Strategy 2014

Financial Assistance Program Section 356 of the Local Government Act 1993 details the requirements for providing financial assistance to others (including charities, community & sporting organisations). LIST OF DONATIONS A list of suggested Community Donations was submitted to the Finance Committee on 13 May 2014. This will be reviewed prior to Council determining to place the Draft Oberon CSP 2014 on Public Exhibition. This list is in 3 parts with the first part including “Civic” type donations which are annual donations to Schools end of year Presentations, and regular contributions towards Rates and Charges (Water) for the RSL, Museum, Showground, Masonic Centre and also a donation to Council’s Social Club. The second part includes specific requests from community groups and the third part is contributions toward projects as in kind work, to external organisations. CAPITAL EXPENDITURE 2014/2015 and LOCAL INFRASTRUCTURE RENEWAL SCHEME A list of Capital Expenditure Items was considered during the Council Workshop process and is included in the Operational Plan for 2014/2015. In addition Oberon Council has submitted Two Applications to the Office of Local Government (OLG) for Round Three Projects under the Local Infrastructure Renewal Scheme (LIRS). Round three provides a 3% interest subsidy on loans for Infrastructure Backlog Works. Successful Projects are expected to be announced in mid to late June 2014. The likely impacts on the draft Oberon Community Strategic Plan 2014, Delivery Program and Operational Plans, should any offers for LIRS funding be accepted is as follows: The LIRS Priority One Project for Mayfield Rd has been amended to reflect Grant Funding of

$600,000 and therefore borrowings of $1M. The LIRS Priority Two Project for Rural Roads has been split over a three year period with

$1M, $1.2M and $1.2M being spent from 2014/15, 2015/16 and 2017/2018. Borrowings of $3.4M remain unchanged also with $654K Unsealed Rural Rds.

A decision on both LIRS Applications is expected to be made during June and therefore the two Projects will be subject to an offer and acceptance process (ie the NSW Govt makes the offer and Oberon Council decides to accept or reject the offer.)

Page 44: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Proposed List of Donations – 2013/14

DRAFT List of Donations 2014/2015 Group/Activity Purpose $ Amount

Civic Type Donations

Black Springs Public School  Annual presentations 200

Burraga Public School  Annual presentations 200

Oberon High School  Annual presentations 200

Oberon Public School  Annual presentations 200

O’Connell Public School  Annual presentations 200

St Joseph’s Central School  Annual presentations 200

RSL Sub Branch Memorial/Museum  Difference between business & residential rates 450

RSL Sub Branch Memorial  Water charges & consumptions 304

Showground trust  Sewer 898

Oberon Masonic Centre  Difference between business & residential rates 430

Oberon Council staff Social Club  Staff social events 3,000

Country Women’s Association of NSW  Public speaking contest for Schools 100

Oberon Show Society  Miss Showgirl events and judging 1,500

Western Regional Academy of Sport  Assist with operating costs 275

Community Requests

Friends of Oberon Library Inc.  Waste to Art 2015 700

Oberon Men’s Shed  Assist with insurance and rent 1,000

Oberon Heritage & Collectors  Stage Oberon Highlands and Vintage Fair 2015 4,000

Bathurst Harness Racing  Oberon Community Harness Racing Night 600

CHOICE – Genr8 Ministries Sub‐Committee  Ongoing OHS initiative held in OHS 1,000

Oberon Netball Club  Reducing Netball fees and EOY player gift 500

Evans Community Options  Continued support to provide services 1,000

Lifeline Central West Inv.  Assist with face to face Financial & Gambling Counsellor within Oberon

500

Central West Life Education  Assist Education Mobile Learning Centre 1,000

Oberon Junior Rugby League  Annual presentation day 500

Oberon Tigers Rugby League  Purchase & install new hot water units 1,000

Black Springs Public School  Purchase set of Ipads for classroom use 1,000

Burraga Public School  Outdoor workbench with BBQ 900

Oberon Junior Hockey Association  Sponsorship of teams for 2014 season 500

Can Assist Oberon Branch  Assistance for Can Assist programs 500

Oberon United Football Club  Assist with new jerseys, equipment and canteen 500

TOTAL FUNDED $23,357

Contributions in Kind

Oberon Golf Club  Sewer costs 5,000

Oberon Golf Club  Water at cost 15,000

Oberon Tennis Centre  Centre improvements 5,000

Oberon Heritage & Collectors  Stage Oberon Highlands and Vintage Fair 2015 4,000

Page 45: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Capital Expenditure 2014/2015

DRAFT Capital Expenditure 2014/2015

MAJOR CAPITAL EXPENDITURE

PLANT REPLACEMENTS

some items planned for replacement in 2013/2014 is deferred to 2014/2015

$1,558,000

ROADS

Urban Local Streets $55k

Sealed Local Roads $314,500

Sealed Rural Roads $1,119k

Unsealed Rural Roads $654k

Regional Road Resealing Program $898k

$3,041,000

LOCAL INFRASTRUCTURE RENEWAL SCHEME

Mayfield Road – Reconstruction & Bitumen Sealing

Resheeting Gravel Roads

subject to receiving an offer and acceptance

$1,600,000

$3,400,000

RECORDS STORAGE at WORKS DEPOT $30,000

TOWN IMPROVEMENTS

Street Tree Planting $5,346

The Common $10,000

Footpaths $10,000

Oberon Street Paving $30,000

Church Hill Rock Wall $15,000

Lowes Mt Railway Crossing $50,000

Stormwater Drainage $70,000

Unallocated Works – balance of around $145k to be considered

$355,401

WATER MAINS REPLACEMENT $160,000

SEWERAGE TREATMENT PLANT $642,000

SEWER MANHOLE REHABILITATION $50,000

INFLOW/INFILTRATION PROGRAM $100,000

Page 46: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT COMMUNITY STRATEGIC PLAN 2014

DRAFT Long Term Financial Plan 2014/15 to 2023/24

Page 47: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

 

2 | P a g e  DRAFT Long Term Financial Plan 2014/15 to 2023/24 ‐ SUMMARY 

DRAFT Long Term Financial Plan 2014/15 to 2023/24 SUMMARY

Item 2014/15

OperationalPlan

2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

Income from Continuing Operations 2.3% 15% 10%

Rates & Annual Charges 4,385,102 4,945,651 5,355,443 5,549,621 5,709,511 5,874,199 6,043,826 6,218,543 6,398,501 6,583,857

User Charges & Fees 4,236,774 4,449,829 4,690,573 4,833,788 4,898,485 4,965,122 5,033,759 5,104,454 5,177,271 5,252,271

Investment & Investment Revenue 175,789 97,578 81,887 71,138 84,301 63,011 57,132 55967 68513 82428

Other Revenues 293,144 304,461 315,421 324,029 332,895 342,027 351,432 361120 371099 381377

Operating Grants 3,351,420 3,489,315 3,639,519 3,717,152 3,797,115 3,879,476 3,964,307 4051684 4141682 4234381

Capital Grants 1,413,496 1,413,703 1,413,916 1,413,916 1,413,916  1,413,916  1,413,916  1413916  1413916  1413916 

Gain from Disposal of Assets 100,000 100,000  100,000  100,000  100,000  100,000  100,000  100,000  100,000  100,000 

TOTAL INCOME 13,955,725 14,800,537 15,596,759 16,009,645 16,336,222 16,637,750 16,964,373 17,305,684 17,670,982 18,048,230

Expenses from Continuing Operations

Employee Benefits & Oncosts 4,962,427 5,206,849 5,393,081 5,524,657 5,660,180 5,799,769 5,943,546 6,091,636 6,244,169 6,401,277

Borrowing Costs 81,881 168,646 236,769 291,616 291,992 274,934 257,196 238,749 219,562 199,601

Materials & Contracts 3,506,505 3,718,828 3,845,766 3,933,778 4,061,461 4,165,820 4,302,087 4,415,682 4,545,645 4,678,157

Depreciation & Amortisation 3,487,157 3,487,157 3,487,157 3,487,157 3,487,157 3,487,157 3,487,157 3,487,157 3,487,157 3,487,157

Other Expenses 2,048,230 2,212,832 2,156,720 2,204,663 2,270,803 2,338,928 2,409,095 2,481,368 2,555,809 2,632,484

TOTAL EXPENSES 14,086,200 14,794,312 15,119,492 15,441,871 15,771,593 16,066,607 16,399,081 16,714,592 17,052,341 17,398,676

Operating Results – Surplus/(Deficit) (130,474) 6,226 477,266 567,774 564,630 571,143 565,291 591,092 618,640 649,554

Net Operating Results before Grants & Contributions provided for Capital Purposes

(1,543,970) (1,407,477) (936,650) (846,142) (849,286) (842,773) (848,625) (822,824) (795,276) (764,362)

Page 48: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

 

3 | P a g e  DRAFT Long Term Financial Plan 2014/15 to 2023/24 ‐ SUMMARY 

DRAFT Long Term Financial Plan 2014/15 to 2023/24 GENERAL FUND

Item 2014/15

OperationalPlan

2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

Income from Continuing Operations 2.3%

Rates & Annual Charges 3,225,841 3,661,699 3,999,019 4,118,989 4,242,559 4,369,836 4,500,931 4,635,959 4,775,037 4,918,289 

User Charges & Fees 2,781,592 2,856,307 2,934,244 2,942,022 2,950,034 2,958,285 2,966,785 2,975,539 2,984,556 2,993,843

Investment & Investment Revenue 115,176 25,858 19,997 19,997 19,997 19,997 19,997 19,997 19,997 19,997 

Other Revenues 264,644 275,961 286,921 295,529 304,395 313,527 322,932 332,620 342,599 352,877

Operating Grants 3,314,912 3,451,243 3,599,754 3,677,089 3,756,745 3,838,790 3,923,296 4,010,337 4,099,990 4,192,332 

Capital Grants 1,409,783 1,409,878 1,409,977 1,409,977 1,409,977 1,409,977 1,409,977 1,409,977 1,409,977 1,409,977 

Gain from Disposal of Assets 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 

TOTAL INCOME 11,211,948 11,780,947 12,349,912 12,563,603 12,783,706 13,010,411 13,243,917 13,484,429 13,732,156 13,987,315

Expenses from Continuing Operations

Employee Benefits & Oncosts 4,372,171 4,574,262 4,736,625 4,849,037 4,964,822 5,084,080 5,206,917 5,333,438 5,463,755 5,597,981

Borrowing Costs 35,621 88,179 12,2028 119,611 106,021 91,961 77,415 62,364 46,792 30,680

Materials & Contracts 1,659,270 1,807,851 1,854,457 1,918,623 1,991,717 2,067,004 2,144,550 2,224,422 2,306,690 2,391,427

Depreciation & Amortisation 3,219,439 3,219,439 3,219,439 3,219,439 3,219,439 3,219,439 3,219,439 3,219,439 3,219,439 3,219,439 

Other Expenses 1,855,348 2,013,764 1,951,267 1,993,047 2,052,838 2,114,423 2,177,856 2,243,192 2,310,488 2,379,802

TOTAL EXPENSES 11,141,849 11,703,494 11,883,816 12,099,756 12,334,837 12,576,908 12,826,176 13,082,855 13,347,164 13,619,329

Operating Results – Surplus/(Deficit) 70,099 77,452 466,096 463,874 448,868 433,502 417,741 401,574 384,992 367,986

Net Operating Results before Grants & Contributions provided for Capital Purposes

(1,339,684) (1,332,426) (943,881) (946,130) (961,109) (976,475) (992,236) (1,008,403) (1,024,985) (1,041,991)

Page 49: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

 

4 | P a g e  DRAFT Long Term Financial Plan 2014/15 to 2023/24 ‐ SUMMARY 

DRAFT Long Term Financial Plan 2014/15 to 2023/24 WATER FUND

Item 2014/15

OperationalPlan

2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

Income from Continuing Operations 10%

Rates & Annual Charges 363,410 401,423 454,369 501,515 516,561 532,057 548,019 564,460 581,393 598,835

User Charges & Fees 953,740 1,048,964 1,184,582 1,302,891 1,341,932 1,382,145 1,423,565 1,466,227 1,510,168 1,555,428

Investment & Investment Revenue 6,996 7,212 7,435 7,435 7,435 9,716 19,546 30,535 43,081 56,996

Other Revenues - - - - - - - - - -

Operating Grants 15,722 17,006 18,409 18,409 18,409  18,409 18,409 18,409 18,409 18,409 

Capital Grants - - - - - - - - - -

Gain from Disposal of Assets - - - - - - - - - -

TOTAL INCOME 1,339,868 1,474,605 1,664,795 1,830,250 1,884,337 1,942,328 2,009,539 2,079,630 2,153,052 2,229,669

Expenses from Continuing Operations

Employee Benefits & Oncosts 182,117 208,286 215,357 221,817 228,472 235,326 242,386 249,657 257,147 264,862

Borrowing Costs 11,322 16,902 18,979 18,407 17,797 17,150 16,461 15,728 14,949 14,121

Materials & Contracts 1,023,724 1,070,293 1,087,771 1,099,847 1,141,111 1,156,460 1,201,046 1,220,210 1,252,909 1,285,239

Depreciation & Amortisation 172,458 172,458 172,458 172,458 172,458  172,458 172,458 172,458 172,458 172,458 

Other Expenses 108,839 112,507 116,292 119,781 123,374 127,075 130,887 134,814 138,858 143,024

TOTAL EXPENSES 1,496,460 1,580,446 1,610,856 1,632,309 1,683,213 1,708,469 1,763,238 1,792,868 1,836,322 1,879,703

Operating Results – Surplus/(Deficit) (158,592) (105,842) 53,939 197,941 201,124 233,859 246,300 286,763 316,730 349,965

Net Operating Results before Grants & Contributions provided for Capital Purposes

(158,592) (105,842) 53,939 197,941 201,124 233,859 246,300 286,763 316,730 349,965

Page 50: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

 

5 | P a g e  DRAFT Long Term Financial Plan 2014/15 to 2023/24 ‐ SUMMARY 

DRAFT Long Term Financial Plan 2014/15 to 2023/24 WASTE FUND

Item 2014/15

OperationalPlan

2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

Income from Continuing Operations 2.3%

Rates & Annual Charges 214,578 214,065 213,537 219,943 219,943 219,943 219,943 219,943 219,943 219,943 

User Charges & Fees 352,042 373,141 395,187 407,019 419,207 431,760 444,690 458,008 471,725 485,854

Investment & Investment Revenue - - - - - - - - - -

Other Revenues 28,500 28,500 28,500 28,500 28,500  28,500 28,500 28,500 28,500 28,500 

Operating Grants 9,363 9,643 9,933 10,231 10,538  10,854 11,180 11,515 11,861 12,216 

Capital Grants - - - - - - - - - -

Gain from Disposal of Assets - - - - - - - - - -

TOTAL INCOME 604,483 625,348 647,156 665,693 678,188 691,057 704,313 717,966 732,028 746,513

Expenses from Continuing Operations

Employee Benefits & Oncosts 133,124 138,449 143,986 148,306 152,755 157,337 162,058 166,919 171,927 177,085

Borrowing Costs - - - - - - - - - -

Materials & Contracts 342,429 349,796 357,383 364,770 372,379 380,216 388,289 396,604 405,168 413,989

Depreciation & Amortisation 6,685 6,685 6,685 6,685 6,685  6,685 6,685 6,685 6,685 6,685 

Other Expenses 3,611 3,719 3,832 3,947 4,065 4,187 4,313 4,442 4,576 4,713

TOTAL EXPENSES 485,849 498,649 511,886 523,707 535,884 548,426 561,344 574,650 588,355 602,471

Operating Results – Surplus/(Deficit) 118,633 126,699 135,271 141,986 142,303 142,631 142,968 143,316 143,673 144,042

Net Operating Results before Grants & Contributions provided for Capital Purposes

118,633 126,699 135,271 141,986 142,303 142,631 142,968 143,316 143,673 144,042

Page 51: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

 

6 | P a g e  DRAFT Long Term Financial Plan 2014/15 to 2023/24 ‐ SUMMARY 

DRAFT Long Term Financial Plan 2014/15 to 2023/24 SEWER FUND

Item 2014/15

OperationalPlan

2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

Income from Continuing Operations 15%

Rates & Annual Charges 581,273 668,464 688,518 709,174 730,449 752,363 774,933 798,181 822,127 846,791 

User Charges & Fees 149,400 171,417 176,560 181,856 187,312 192,931 198,719 204,681 210,821 217,146

Investment & Investment Revenue 53,617 64,508 54,455 43,706 56,869 33,298 17,589 5,435 5,435 5,435

Other Revenues - - - - - - - - - -

Operating Grants 11,423 11,423 11,423 11,423  11,423 11,423 11,423 11,423 11,423 11,423 

Capital Grants 3,713 3,825 3,939 3,939 3,939 3,939 3,939 3,939 3,939 3,939 

Gain from Disposal of Assets - - - - - - - - - -

TOTAL INCOME 799,427 919,637 934,895 950,098 989,992 993,954 1,006,604 1,023,659 1,053,745 1,084,734

Expenses from Continuing Operations

Employee Benefits & Oncosts 275,015 285,852 297,113 305,496 314,131 323,025 332,186 341,621 351,340 361,350

Borrowing Costs 34,938 63,564 95,762 153,598 168,173 165,823 163,320 160,656 157,820 154,801

Materials & Contracts 481,082 490,888 546,156 550,539 556,253 562,139 568,202 574,446 580,878 587,503

Depreciation & Amortisation 88,575 88,575 88,575 88,575  88,575 88,575 88,575 88,575 88,575 88,575 

Other Expenses 80,432 82,842 85,329 87,889 90,526 93,242 96,039 98,920 101,888 104,944

TOTAL EXPENSES 960,042 1,011,722 1,112,935 1,186,098 1,217,659 1,232,804 1,248,322 1,264,219 1,280,501 1,297,173

Operating Results – Surplus/(Deficit) (160,615) (92,084) (178,040) (235,999) (227,666) (238,850) (241,718) (240,560) (226,756) (212,439)

Net Operating Results before Grants & Contributions provided for Capital Purposes

(164,328) (95,909) (181,979) (239,938) (231,605) (242,789) (245,657) (244,499) (230,695) (216,378)

Page 52: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

WORKFORCE MANAGEMENT PLAN 2014 – July 2014

DRAFT Workforce Management Plan 2014 INDEX

1 INTRODUCTION – WHY WORKFORCE MANAGEMENT PLANNING IS REQUIRED .......................................... 2

2 CURRENT WORKFORCE – ORGANISATIONAL STRUCTURE ............................................................................ 3

3 ORGANISATIONAL STRUCTURE – MANAGEMENT DETAILS ............................................................................. 4

4 EMPLOYMENT STATUS, GENDER PROFILE and AGE DATA ............................................................................. 5

5 WORKFORCE CAPACITY, CRITICAL POSITIONS and SKILLS GAPS ............................................................... 11

6 WORKFORCE PLANNING OBJECTIVES and STRATEGIES .............................................................................. 14

ATTRACTION and RETENTION ............................................................................................................................... 14

TRAINING and DEVELOPMENT .............................................................................................................................. 14

PERFORMANCE MANAGEMENT ............................................................................................................................ 15

ORGANISATIONAL DEVELOPMENT ...................................................................................................................... 15

WORKPLACE HEALTH and SAFETY (WHS)........................................................................................................... 16

IMPLEMENTING ACTIONS and ANNUAL REVIEWS .............................................................................................. 17

DELIVERY PROGRAM and OPERATIONAL PLANS (Year 1 to Year 4) ................................................................. 22

Page 53: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 21 INTRODUCTION – WHY WORKFORCE MANAGEMENT PLANNING IS REQUIRED In developing our Community Strategic Plan (CSP), Oberon Council undertook an analysis of our current workforce capacity and identified areas where we need to reshape and restructure the organisation to achieve the strategic outcomes detailed within the CSP.

A Workforce Management Plan (WMP) aims to have the right people in the right places with the right skills doing the right jobs.

Another definition is that WMP is about having a strategic focus to provide the right number of people with the right skills at anytime now and in the future to deliver the required services.

Where there are gaps in skills the WMP aims to identify what Strategies and Actions are needed to fill these gaps. We have also taken account of projected requirements into the future as might be expected with an ageing workforce and with planned retirements.

As an example an employee with 30 years of “grass roots” experience with Oberon Council would be expected to have a wide and comprehensive knowledge and set of skills which seem to make this staff member “irreplaceable”. The WMP aims to lessen the pain, when this long serving employee retires through implementing a “succession plan” and training a replacement.

BACKGROUND The NSW Government, through the Office of Local Government requires all NSW Councils to prepare a Community Strategic Plan (CSP) and other documents in an “integrated” framework. These documents replace the former Management Plan / Budget and Social Plan. The initial WMP for Oberon Council was prepared in May 2012, and was revised in 2013 and again in 2014 as part of the process of developing the Oberon Community Strategic Plan 2014. OUR WORKFORCE MANAGEMENT PLAN and ACTIONS In preparing our Workforce Management Plan (WMP) we looked at a range of issues which were identified at workshops with Councillors and management. We looked at our current workforce structure and management and also specific employee data (workforce profile). This work provided the background to the development of Objectives and Strategies targeted to achieve the Strategic Outcomes within the CSP. Specific Actions have been included in this WMP along with an implementation plan and timetable linked to the Delivery Program and Operational Plan.

Page 54: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 32 CURRENT WORKFORCE – ORGANISATIONAL STRUCTURE The Organisation Structure was reviewed by Council in March 2013. The following represents the current structure in operation.

GENERAL MANAGER

(Senior Staff position)

PLANNING AND DEVELOPMENTDirector

Health & Building ManagerSenior Development Control Officer

FINANCE AND COMMUNITY SERVICESDirector

Finance CoordinatorCommunity Services Coordinator

WORKS AND ENGINEERINGDirector

Works ManagerProject Engineer

EXECUTIVE AND CUSTOMER SERVICES

Executive CoordinatorHuman Resources Coordinator

Work Health & Safety CoordinatorInformation, Communications & GIS Coordinator

Page 55: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 43 ORGANISATIONAL STRUCTURE – MANAGEMENT DETAILS OBERON COUNCIL Council has 9 elected members representing the whole of the Oberon Local Government Area. Elections were held in September 2012. The Council area is approximately 3600km2 serving a population of around 5500 people. More accurate details are shown in the CSP 2013 document. COUNCIL COMMITTEES There are presently two (2) Committees, comprising the whole of the elected members of Council. These are the Finance Committee and the Works Committee. These Committee Meetings follow the Council’s adopted Code of Meeting Practice and are generally less formal than a Council Meeting. It is proposed that these two Committees make their own decisions as ALL Councillors are members. COUNCIL COMMITTEES - SECTION 355 (Advisory Committees) To assist Council in managing community activities a number of Advisory Committees have been formed. These Committees do not have decision making power or authority to commit expenditure. Membership on these Committees is either voluntary of by appointment from Council. All recommendations of these Committees are referred to Council for consideration. In June 2013 the Council reviewed the Committee Structure. GENERAL MANAGER (see also GENERAL MANAGER’S UNIT below) The General Manager (GM) is appointed by Council, on a performance based contract, to oversee and manage the day to day operations. The GM is also assisted by three Directors. Council does not manage or direct staff, other than through the adopted CSP, Delivery Program and other Plans. GENERAL MANAGER’S UNIT / EXECUTIVE and CUSTOMER SERVICES These work units support the GM with work associated with Communication & Support Services to enable effective functioning of the Elected Council, Tourism and Human Resources. Main staff is the Executive Coordinator, Human Resources Coordinator, Work Health & Safety Coordinator and Information, Communications and GIS Coordinator. FINANCE and COMMUNITY SERVICES DIRECTOR The Director oversees Council’s Finances, the preparation of Annual Financial Statements, Revenue and Cash Flow Management, Investments, Contract Management, Procurement, Asset Management, Accounting Systems and Leasing arrangements, and a range of Community Services. The main support staff for the Director is the Finance Coordinator and Community Services Coordinator. PLANNING and DEVELOPMENT DIRECTOR The Director manages the Development Control, Health and Building approval processes, along with Environment and Heritage control, Animal and Stock Control. An important function of this position is the development of a Land Use Planning Strategy, Development Control Plans and a Local Environmental Plan for the whole of the Oberon Local Government Area. The main support for the Director is the Health & Building Manager. WORKS and ENGINEERING DIRECTOR The Director is supported by professional and technical specialists to manage major infrastructure. This includes the road network (Local, Regional and State Roads), Water and Wastewater (sewerage scheme), Public Amenities, Parks and Gardens, Sporting Ovals and Plant and Fleet Management. The majority of the workforce is employed in this area.

Page 56: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 5

0

10

20

30

40

50

60

70

80

Fulltime Part‐time Trainees Apprentices Casuals

EmploymentType

2012

2014

0

10

20

30

40

50

60

Males Females

GenderComparison

2012

2014

4 EMPLOYMENT STATUS, GENDER PROFILE and AGE DATA (Survey carried out in May 2012 and May 2014) Current staffing levels are examined by Number of Employees and Gender, Type of Employment, Employment Type by Work Area and by Age of Employees. This will help to identify potential skills required into the future and any gaps in those skills in our current workforce. Council has a relatively stable workforce with low levels of staff turnover. We generally receive excellent response to any advertised vacancies by suitably qualified and skilled applicants. Local Government is experiencing difficulties in recruiting skilled and qualified staff in the areas of Technical Works & Engineering and Planning & Development, in recent years we have been successful in recruiting in these areas. OUR WORKFORCE PROFILE - We have 83 permanent employees (up from 81 in 2012); however we also have casual and seasonal employees (mainly for the Swimming Pool) which bring this number to 102 (down from 104). The majority of our employees are males, employed in the Outdoor/Works and Depot area. For our 83 permanent employees 67.47% are male, and 32.53% female. Since 2012 there has been a decrease in part-time staff numbers. This was mainly achieved through the restructure in the Finance and Community Services area. There has been a further decrease in casuals and this is expected to be further reduced with work practices at the swimming pool currently under review.

GENDER COMPARISON (excluding Casuals) EMPLOYMENT TYPE (all employees)

Full-Time Part-Time Trainee Apprentice Casuals

2012 63 (60.58%) 14 (13.47%) 3 (2.88%) 1 (0.96%) 23 (22.11%)

2014 71 (69.61%) 9 (8.83%) 2 (1.96%) 1 (0.98%) 19 (18.62%)

MALE FEMALE TOTAL

2012 53 (65.44%) 28 (34.56%) 81 (100%)

2014 56 (67.47%) 27 (32.53%) 83 (100%)

Page 57: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 6EMPLOYMENT TYPE BY WORK AREA (excluding Casual employees) Casual staffing is excluded as these positions generally replace existing positions or are short term placements only.

There has been a slight increase in the number of employees in the Outdoor/Works and Depot from 55.55% to 56.63%

0

5

10

15

20

25

30

35

40

45

50

Indoor/Administration Outdoor/Works/Depot

2012EmploymentTypebyWorkArea

2012Full‐time

2012Part‐time

2012TraineeandApprentice

0

5

10

15

20

25

30

35

40

45

50

Indoor/Administration Outdoor/Works/Depot

2014EmploymentTypebyWorkArea

2014Full‐time

2014Part‐time

2014TraineeandApprentice

2012 2014

Total Full-time Part-time Trainee and Apprentice

Total Full-time Part-time Trainee and Apprentice

Total Employees 81 (100%) 64 (79.01%) 13 (16.05%) 4 (4.94%) 83 (100%) 71 (85.54% 9 (10.85%) 3 (3.61%)

Indoor/Administration 36 (44.45%) 20 (55.55%) 13 (36.11%) 3 (8.33%) 36 (43.37%) 26 (72.22%) 8 (22.22%) 2 (5.56%)

Outdoor/Works & Depot 45 (55.55%) 44 (97.78%) NIL (0%) 1 (2.22%) 47 (56.63%) 45 (95.76%) 1 (2.12%) 1 (2.12%)

Page 58: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 7AGE OF EMPLOYEES

2012 2014 Age Indoor/

Administration Outdoor/Works and Depot

Total Number of Employees

Age Indoor/ Administration

Outdoor/Works and Depot

Total Number of Employees

<21 3 (8.33%) 1 (2.22%) 4 (4.94%) <21 2 (5.27%) 2 (4.44%) 4 (4.82%)

22-30 9 (25.00%) 2 (4.44%) 11 (13.58%) 22-30 5 (13.16%) 1 (2.22%) 6 (7.23%)

31-40 10 (27.78%) 4 (8.89%) 14 (17.28%) 31-40 9 (23.68%) 3 (6.66%) 12 (14.46%)

41-50 4 (11.11%) 12 (26.67%) 16 (19.75%) 41-50 9 (23.68%) 14 (31.12%) 23 (27.71%)

51-64 10 (27.78%) 25 (55.56%) 35 (43.21%) 51-64 12 (31.58%) 25 (55.56%) 37 (44.58%)

>65 0 (0.00%) 1 (2.22%) 1 (1.23%) >65 1 (2.63%) 0 1 (1.20%)

Total 36 45 81 Total 38 45 83

The largest age bracket is 51 to 64 years of age. About 88% of all employees aged over 31. The Outdoor/Works and Depot area have an obvious aging workforce with over half of employees (55.56%) aged over 51 years. Employees under the age of 30 represents only 12.05% of all employees, with only one employee aged over 65.(this employee

changed Departments from Outdoor/Works and Depot to Indoor/Administration since the 2012 Survey). The average age of the total workforce is 42 years. The average age of Administration/Indoor employees is 39. The average age of

Outdoor/Works and Depot employees is 48.

Page 59: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 8

5%

14%

17%

20%

43%

1%

2012AgeofEmployees

<21

22‐30

31‐40

41‐50

51‐64

>65

5%

7%

14%

28%

45%

1%

2014AgeofEmployees

<21

22‐30

31‐40

41‐50

51‐64

>650

5

10

15

20

25

30

35

40

<21 22‐30 31‐40 41‐50 51‐64 >65

2014AgebyWorkArea

2014Indoor/Administration

2014Outdoor/WorksandDepot

2014TotalNumberofEmployees

The 41-50 years age group has seen the largest increase since 2012 with 28% of the workforce now represented in this bracket. This will further impact on the succession planning requirements in the next 2 years. The 22-30 year age group has halved since 2012 indicating a need to focus on the attraction and retention of suitably skilled and qualified staff in this demographic group. The 51-64 years age group remains relatively steady, but with bracket creep, an increase to the >65 age group is expected in the next two years with an increase in retirements also expected .

0510152025303540

<21 22‐30 31‐40 41‐50 51‐64 >65

2012AgebyWorkArea

2012Indoor/Administration

2012Outdoor/WorksandDepot

2012TotalNumberofEmployees

Page 60: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 9LENGTH OF SERVICE The following information breaks employee groups into six (6) distinct work areas. This information illustrates the Total Length of Service by Work Area (in accumulated years)

There has been a significant reduction in employees with 2-5 years experience with a correlating increase in the 6-10 year and 11-20 year service brackets. A further reduction is also seen for employees with less then 1 year of service with 15% in 2012 falling to just 5% in 2014. Employees with over 31 years experience remains static at just 2% of the workforce. With three quarters of the workforce having more than 6 years of experience, the organisation is in a positive position. Future challenges will lie in retaining corporte knowledge as employees move towards retirement.

0

2

4

6

8

10

12

14

<1 2‐5 6‐10 11‐20 21‐30 >31

2012LengthofServicebyWorkArea

Works/Depot

Engineering

CorporateServices

Community

Development

GeneralManagerUnit

15%

31%

22%

20%

10%

2%

2012YearsofService

<1

2‐5

6‐10

11‐20

21‐30

>31

0

5

10

15

20

<1 2‐5 6‐10 11‐20 21‐30 >31

2014LengthofServicebyWorkArea

Works/Depot

Engineering

CustomerServices

Finance&Community

Development

OrganisationalDevelopment

5%

25%

33%

27%

8%

2%

2014YearsofService

<1

2‐5

6‐10

11‐20

21‐30

>31

Page 61: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 102012

Accumulated

Years

<1 year 2-5 Years 6-10 Year 11-20 Years 21-30 Years >31 Years

Outdoor Works/Depot 496 3 12 12 8 8 2

Engineering 36 1 1 1 2 0 0

Corporate Services 70 1 3 1 4 0 0

Community 15 4 3 1 0 0 0

Development 34 1 2 1 2 0 0

General Managers Unit 31 2 4 2 0 0 0

682 years / 81

100.00%

12

14.81%

25

30.87%

18

22.22%

16

19.75%

8

9.88%

2

2.47%

2014

Accumulated

Years

<1 year 2-5 Years 6-10 Year 11-20 Years 21-30 Years >31 Years

Outdoor Works/Depot 542 0 6 17 12 7 2

Engineering 52 0 3 1 3 0 0

Customer Services 35 0 3 3 1 0 0

Finance & Community 51 3 5 1 2 0 0

Planning & Development 62 0 3 1 3 0 0

Organisational Development 45 1 1 4 1 0 0

787 years / 83

100.00%

4

4.82%

21

25.30%)

27

32.54%

22

26.50%

7

8.44%

2

2.40%

Our employees have accumulated a total of 787 years of service, which equates to an average of 9.42 years (based on 83 employees). Close to two thirds (62.66%) of employees have worked with Oberon Council for 10 years or less. The longest serving employee is in the Works/Depot area with 40 years.

Page 62: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 115 WORKFORCE CAPACITY, CRITICAL POSITIONS and SKILLS GAPS Following the workshops with Councillors and management staff further work has been completed on the workforce profile taking into account the type of employment (Full-time, Part-time, casuals), the age of employees and the length of service with Oberon Council. The most critical issues identified in each of our six (6) distinct work areas are listed below: FINANCE and COMMUNITY SERVICES A Finance & Community Services Director was appointed in November 2013, after the position had been vacant for around 7 months. The appointment of a full-time Finance Coordinator and converting other part-time roles provide better management of finance issues. Information Technology role originally part-time has been restructured to a full-time position. Now reporting to the General Manager. Storeman (Procurement Officer/Coordinator) role is critical and succession planning is urgently required. Revenue Officer has verbally indicated intention to retire in the next 2 to 3 years. Succession planning is currently underway with

existing employees undertaking formal training and on the job training. PLANNING and DEVELOPMENT SERVICES Health and Building Manager resigned in April 2014 with a replacement expected in early July. Identified skill shortage in technical issues and although the appointment of trainee was included in the Delivery Program and

Operational Plan 2013/2014, this will now be actioned during 2014/2015. OUTDOOR WORKS/DEPOT WORKS and ENGINEERING SERVICES Succession Planning in the Water/Waste Water Treatment areas is continuing and proving to be successful using existing employees

although the plan to involve the Project Engineer in these activities will be reviewed in 2014/2015. Succession Planning is required in the Plant Workshop area. Current Apprentice will complete his indenture by the end of 2014. The

appointment of another Apprentice will be dependent upon succession planning requirements. Succession Planning for a number of Works positions is also required with a number of employees nearing retirement. Management of Waste Services Collection requires further investigation. Recycling is currently under utilised. GENERAL MANAGER’S UNIT & ORGANISATIONAL DEVELOPMENT & CUSTOMER SERVICES The movement of Payroll to Organisational Development allows a focus on non-finance related employee issues. The Information, Communications and GIS Coordinator position now forms part of the General Manager’s Unit. The position has

become vacant again in May 2014 and a replacement is expected by early July. Risk Management and implementation of Workplace Health & Safety guidelines requires further support in the organisation. A review of current staffing arrangements in the Oberon Visitor Information Centre is currently being undertaken.

Page 63: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 12OVERALL ISSUES – showing the issues identified in 2012 and the outcomes noted in 2014

2012 - High number of “key” Indoor/Administrative employees do NOT live within the LGA and less than 50% of Managers live in Oberon.

2014 – An increased number of employees including Directors and Operational Managers reside in the Oberon LGA

2012 - Councillor involvement with staff – potential Code of Conduct breaches, further training and enforcement required. 2014 - Code of Conduct was undertaken in 2013 for employees and Councillors. Regular reinforcement was provided to

staff and Councillors who continued to potentially breach the Code of Conduct. Issues have reduced significantly.

2012 - Poor communication – both internally and externally. 2014 – Communication is improving with regular formal and informal communication mechanisms now in place.

2012 - An “Outdoor” v’s “Indoor” mentality still exists between employees and a silo affect still exists.

2014 - this culture will be difficult to completely change. However proactive measures have been undertaken to reduce the affect including a joint Christmas and Easter function for all staff and their families.

2012 - Lack of coordination between Strategic documents and “operational decisions” – too many ad hoc decisions. 2014 – At a Councillor level this has improved with Informal Briefing Sessions, Workshops and Inspections. At a staff level

an increased focus on outcomes through more effective Executive Management Team meetings and project work.

2012 - Poor Risk Management processes -perception that it sits with one employee rather than whole of organisation approach. 2014 - More internal focus on Risk Management with regular internal meetings held with key staff to review the annual Risk

Management Action Plan and associated issues. Overall Risk Management now given oversight by General Manager. Training has been highly emphasized during 2013 and has continued into 2014 with a focus on core competencies and compliance based training, Professional Development and Certificate Level Traineeships. A number of Management Staff also attend industry Conferences relative to their work areas. Significant resources have also been invested to achieve improvements to Information Technology (IT) software and hardware across the organisation. The implementation of Civica’s Business Intelligence System (BIS) was conducted in late 2013. The system will allow for more effective and timely analysis of financial information by key management staff responsible for managing operational programs and projects (and budgets). Further training of end users in the product has been identified.

Page 64: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 13Although there were many other issues identified, the above issues were considered most critical and along with specific employee data (workforce profile) have been used to develop a number of Objectives and Strategies which broadly target these issues. It should be noted is the relative lack of reference to the major work area in the Outdoor/Works and Depot areas. In most cases the workforce is very dependent on teamwork and has typically built capacity of the workforce from within. This is not to say that some of the more critical positions do not require succession planning. The two (2) most long serving employees are from within this work area. Due to the “hands on” nature of the work carried out by the Outdoor/Works and Depot employees there has been a high level of on the job training over many years and this will continue. The critical issues identified in each work area and the specific employee data has been used to develop Objectives and Strategies for the following Key Themes:

ATTRACTION and RETENTION

TRAINING, LEARNING and DEVELOPMENT

ORGANISATIONAL DEVELOPMENT

PERFORMANCE MANAGEMENT

WORKPLACE HEALTH and SAFETY

Page 65: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 146 WORKFORCE PLANNING OBJECTIVES and STRATEGIES Actions have been included to state what we intend doing to address the Objectives and Strategies listed for each of the Key Themes.

ATTRACTION and RETENTION OBJECTIVES

o To employ and retain excellent professional and general operations employees that meet present and future skill needs.

o To be viewed as an employer of choice and to retain and motivate a high performing workforce.

STRATEGY

o Review position responsibilities to maintain competitive position within market place.

o Monitor recruitment processes to ensure fair, transparent and merit based employment selection processes.

o Develop Human Resource protocols that reflect expectations of a modern workforce including effective performance management and staff incentives.

ACTIONS

o Complete review of recruitment practices. o Complete review of salary system (and structure). o Implement an effective performance management system with an aim to conduct regular salary reviews. o Implement a long service recognition program. o Review working conditions, non-salary benefits to attract and retain employees.

TRAINING and DEVELOPMENT OBJECTIVES

o Provide opportunities for training and development to ensure employees have the necessary skills and knowledge.

o Create a culture which encourages employees to participate in training and development opportunities.

STRATEGY

o Align training needs and requests with Council priorities and within budget constraints (CSP and Delivery Program).

o Determine skill and knowledge requirements with our current workplace requirements. o Determine skill and knowledge requirements to meet future workplace demands.

o Develop training plans and opportunities for employees wishing to undertake career advancement studies.

o Link training and development with the performance management system.

ACTIONS

o Develop a Training Plan and Policy. o Update skills register and link to position requirements. o Development of Gap analysis and action plan.

Page 66: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 15PERFORMANCE MANAGEMENT OBJECTIVES

o Develop a performance management system to assist employees to achieve their position outcomes.

o Ensure employees are managed effectively to meet Council’s strategic outcomes and objectives.

STRATEGY

o Implement a performance, grading and skill steps system following a consultative process.

o Provide opportunity for employees to receive feedback about performance.

o Develop processes to identify issues of poor performance.

ACTIONS

o Review the performance management system. o Develop a performance management policy o All staff with supervisory responsibilities to undergo performance management training.

ORGANISATIONAL DEVELOPMENT OBJECTIVES

o Develop a culture focused on providing the highest level of service and being responsive to the whole community.

o Communicate Council’s strategic objectives and desired outcomes to all employees.

STRATEGY

o Develop employee programs which deliver an exceptional Customer Service.

o Develop systems to monitor organisational (Council) performance on a range of key indicators

ACTIONS

o Effective communication with all employee groups to gain cooperation in the delivery of services.

o Empower employees to deliver good performance, and create a climate of respect and trust to enhance motivation.

o Ensure employee engagement in the development and review process and work and practices.

Page 67: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 16

WORKPLACE HEALTH and SAFETY (WHS) OBJECTIVES

o Ensure the health, safety and welfare of employees.

o Develop a positive culture of workplace health, safety and risk awareness.

STRATEGY

o Increase awareness of WHS and risk management principles and practices.

o Ensure a proactive approach to injury management and prevention.

ACTIONS

o Develop and implement a WHS Management Plan.

o Develop training in workplace/occupational risks, health, safety and well being.

o Develop a program for inspections and audits as part of a risk minimisation strategy.

o Create a greater visibility of WHS initiatives and programs to staff. o Proactively encourage employees to utilise accrued leave to enhance employee’s health and wellbeing.

Page 68: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 17

IMPLEMENTING ACTIONS and ANNUAL REVIEWS ATTRACTION and RETENTION ACTIONS RESPONSIBILITY TIMETABLE May 2013 Update / May 2014

Complete review of recruitment practices

General Manager

HR Coordinator

By Sept 2012 Recruitment Process reviewed and updated.

Completed and is being implemented..

Complete review of Salary System (and structure)

General Manager

HR Coordinator

Executive Mgmt Team

By Oct 2012 A number of key positions have been reassessed through the Salary System.

The review of the Salary Structure is still underway

Implement an effective performance management system with an aim to conduct regular salary reviews

Executive Mgmt Team By Jan 2013 Annual Performance Review timeframes have been reviewed with key dates determined for annual Performance Reviews.

Annual Performance Assessment Form has been redesigned into a more useable document and has been used on a trial basis.

Review of actual Performance Criteria is on-going.

Human Resources Coordinator has participated in a joint Performance Management System review as part of the CENTROC HR group.

Implement a Long Service Recognition program

General Manager By July 2012 Implemented Dec 2012.

Will be an annual program. Completed.

Review working conditions, non-salary benefits to attract and retain employees

HR Coordinator By Aug 2012 Flexible Working Policy drafted – to be reviewed by GM/EMT.

General conditions/incentives including provision of motor vehicles, relocation allowances determined case by case.

Policy/practices need to be documented. Ongoing.

Page 69: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 18 TRAINING and DEVELOPMENT ACTIONS RESPONSIBILITY TIMETABLE May 2013 Update / May 2014

Develop a Training Plan and Internal Policy

HR Coordinator By Dec 2012 Draft Training Policy submitted to GM for review.

Oberon has joined with Lachlan, Cowra and Parkes to utilise Federal Government funding to initiate a Skills Training Audit, perform a gap analysis and develop a comprehensive training plan which will be a key document in the ongoing revision of the Workforce Management Plan and provide accurate information to link the WMP with other strategic documents including LTFP..

May 2014

Training Plan finalised and form part of the annual review program.

Update skills register and link to position requirements

HR Coordinator By Dec 2012 As Above.

May 2014

The maintenance of the Skills Register and Review of Position requirements is ongoing as part of the annual review program.

Development of gap analysis and action plan

HR Coordinator

Executive Mgmt Team

By Dec 2012 As Above.

Page 70: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 19 PERFORMANCE MANAGEMENT ACTIONS RESPONSIBILITY TIMETABLE May 2013 Update / May 2014

Effective communication with all employee groups to gain cooperation in the delivery of services.

Executive Mgmt Team By Dec 2012 Significant improvements have occurred with internal communications. A more adhesive and cooperative team environment within work teams, Departments and across the organisation is developing/improving.

May 2014

A significant change and improvement has been made to the overall cultural wellbing of the organisation. With the resignation and replacement of a number of staff during 2013 and 2014, a fresh and vibrant approach to the Organisation’s values and goals has been achieved.

Empower employees to deliver good performance, and create a climate of respect and trust to enhance motivation.

Executive Mgmt Team By Dec 2012 May 2014

Further emphasis needs to be given to employees working effectively as a team and in individual work teams. EMT and Senior Managers will embark on a Corporate Leadership Program in May/June 2014 to assist in further developing skills and resilience in this area.

Ensure employee engagement in the development and review process and work practices.

Executive Mgmt Team By Dec 2012 Significant improvements have been achieved in operational workflows in a number of areas.

Currently exploring options for an internal audit of Council’s financial management software and financial processes to determine effective use of technology to meet internal and external service expectations.

May 2014

Further emphasis on the utilization of Program based workflows is required. Manual processes are still excessive in an organisation which is well resourced to deliver more advanced services.

Page 71: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 20 ORGANISATIONAL DEVELOPMENT ACTIONS RESPONSIBILITY TIMETABLE May 2013 Update / May 2014

Review the Performance Management System.

General Manager

HR Coordinator

Executive Mgmt Team

By Dec 2012 See above comments about Performance Management.

Develop a Performance Management Policy

HR Coordinator By Dec 2012 Policy has been drafted and is currently being reviewed by GM prior to presentation to the Consultative Committee.

May 2014

Performance Management Policy has been implemented.

All staff with supervisory responsibilities to undergo performance management training.

Executive Mgmt Team By Feb 2013 HR Coordinator arranged Performance Management training for a number of Middle Managers responsible for performance management (in line with EEO good practice and Council’s EEO policy). Response was somewhat negative and un-cooperative.

Recent internal issues have reinforced the necessity for a consistent approach to performance management and for all employees with supervisory responsibility to undergo training.

GM has indicted support for this direction.

May 2014

Training for all staff responsible for Performance Management has still not been completed. This will be a training priority for 2014-2015.

Page 72: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 21 WORKPLACE HEALTH and SAFETY ACTIONS RESPONSIBILITY TIMETABLE May 2013 Update / May 2014

Develop and implement a WHS Management Plan.

WH&S Coordinator

HR Coordinator

By Dec 2012 Work is progressing on this in conjunction with Centroc Risk Management Group.

May 2014

This work is continuing with Centroc and included in RMAP meetings

Develop training in workplace/occupational risks, health, safety and well being.

WH&S Coordinator

HR Coordinator

By Jan 2013 E-learning modules – Drug & Alcohol, Bullying & Harassment, WHS, Code of Conduct, EEO, Privacy provided to office based employees. Works staff will undergo training in early June.

E-learning trial has been a successful joint project for CENTROC

May 2014

E-Learning modules continue to be delivered as part of the Induction Program. Additional programs are being designed including Developing Cultural Awareness, and Working in a Local Government Context. This will be available during 2014-2015.

Develop a program for inspections and audits for risk minimisation strategy.

WH&S Coordinator

GM

By Jan 2013 This is being undertaken on a regular basis, and is being reported to the GM and Works & Engineering Director.

May 2014

This is reviewed with the GM, who also conducts inspections with WH&S Coordinator and other Directors.

Create a greater visibility of WHS initiatives and programs to staff.

WH&S Coordinator

GM

By Nov 2012 WH&S Coordinator now reports to GM. Introduction of Indoor Toolbox Talks. More focus on distribution of practical information to Works employees.

May 2014

Indoor Toolbox Sessions are continuing less frequently, with a focus on WH&S issues.

Page 73: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 22DELIVERY PROGRAM and OPERATIONAL PLANS (Year 1 to Year 4) Year 1 is 2012/2013 GENERAL MANAGER and GENERAL MANAGER’S UNIT Review

Year 1

2012/13

Review Organisation Structure

requirement with new Elected Council.

Provide dedicated relief/support for Community Services Manager (CSM) and Executive Assistant position.

Higher Grade Pay provisions apply. Determine career path for Administrative Trainee.

Organisation Structure adopted in March 2013.

CSM position restructured. Administrative Trainee dedicated relief for Executive Coordinator with Higher Duty Payments initiated.

Administrative Trainee position restructured to Administrative Assistant (roles now with Finance & Community Services).

Year 2

2013/14

Possible additional Trainee Position in Administration.

Establish a Trainee position in Library Services to reduce casual/permanent part-time staff.

See Finance & Community Services

See comment for GRANTS OFFICER role.

Grants Coordinator reports to F&CS Director

Current School Based Trainee (SBT) role to continue for 2013. Establishment of new Trainee or SBT to be reviewed at this time.

A Customer Services Trainee position was successfully recruited early 2014. The position assists in the Administration, Library and Visitor Information Centre areas. The employee will also undertake a Certificate II in Business. The opportunity for higher duties will become available once the employee gains further skills and experience.

A casual Grants Coordinator was appointed during 2013. The area of Economic Development to be reconsidered in 2014/15

Year 3

2014/15

Economic Development position.

Workplace Health and Safety / Risk Coordinator (WHS&RC)

Review Staff Roster at the Oberon Visitor Information Centre

The Economic Development position will be reassessed in 2014.

Succession Planning for the position of WHS&RC will continue.

During High Visitation months at the OVIC consideration will be given to increasing casual staffing hours

Year 4

2015/16

Review of Staffing/Organisational Structure and analysis of effectiveness of previous 4 year WMP.

Ongoing

Page 74: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 23 FINANCE and COMMUNITY SERVICES Review

Year 1

2012/13

Succession Plan for Director, Revenue Officer and Storeman (Procurement) positions.

Temporary Asset Accountant position to be made permanent – partly off set by reduction in part-time employees and casuals. Information Technology position to be increased from 20 to 28 hours per week.

Resignation of Director in April 2013 with replacement expected in June 2013. Other Succession Plans on hold.

Asset Accountant role redesigned into full-time Management Accountant role. IT role increased to 28 hrs.

Year 2

2013/14

Aim to convert part-time to full time positions within Finance area (through negotiation). Nil or minor cost implications.

Establish a Trainee position in Library Services to reduce casual/permanent part-time staff.

See comment for GRANTS OFFICER role.

Grants Coordinator reports to F&CS Director

Only one from a total of four permanent part-time positions remains in the Finance area. Full-time employees have increased from three to five with no additional financial cost to Council.

This provides a more cost effective method of delivering key services to internal and external customers of Council

SBT position advertised with no applicants. With the resignation of the Library Assistant the two roles were redesigned to offer a full-time Traineeship. A full-time Library Trainee was appointed in 2013. This position has been a successful addition to the Library and Community Services area.

A casual Grants Coordinator was appointed during 2013.

IT position now reports to General Manager

Year 3

2014/15

Community Services Assistant – vacancy

Revenue Officer – identified Succession Planning

With the resignation of the Community Services Assistant in May 2014, this position was reviewed and a Trainee is being recruited during May 2014.

Succession Planning for the position of Revenue Officer is continuing.

Year 4

2015/16

To be determined after review of Year 1 & 2 outcomes. Ongoing.

Page 75: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 24

PLANNING and DEVELOPMENT SERVICES Review

Year 1

2012/13

Appoint summer casual work Program for students studying related discipline. Nil or minor costs to Council.

Not yet commenced. Discuss with Director and GM.

Year 2

2013/14

Trainee position for Environmental Health and Building.

Senior Development Control Officer

Discussion with Director and GM.

The Senior Development Control Officer position was changed from Part-time to Full-time to assist the Department meet increasing demand with planning issues.

Year 3

2014/15

Succession Plan for Development Control Admin. Assistant.

Recruitment of Health and Building Manager - vacancy

Director to review Succession Planning requirements.

The H&B Manager resigned in May 2014. Recruitment for the position is underway with appointment expected by early July 2014.

Requirements for the Department will be reassessed dependent upon the skills and qualifications of the successful applicant for the Managers position.

Year 4

2015/16

Succession Plan for Domestic Animal Control Officers and combine with Livestock Officer position.

Not yet commenced.

Page 76: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 25

WORKS and ENGINEERING SERVICES Review

Year 1

2012/13

Establish dedicated relief for Water and Wastewater. Provide training for Water/Waste Water Operators.

Establish dedicated relief and Succession Planning for WHS/Risk Manager position.

Review (in consultation with GM) Contract Engineering role – employ Professional Engineer in lieu of this.

Establish a hierarchy of management for ALL works, including Overseer, Ganger and Team Leader roles.

Two Relief Water/Waste Water Operators were appointed.

Training of new operators underway. Completed.

Underway. Position now reports to General Manager.

Completed. Project Engineer commenced in October 2012.

Not yet commenced. Discuss with GM.

Year 2

2013/14

Succession Planning for Works Manager. See also Professional Engineer above.*

Implementation of summer casual work program for

Engineering students. Nil or minor costs to Council.

Succession and/or Career Planning for Design Engineer – Engineering Administrative Assistant to continue formal qualifications.

Will include with Project Engineer position.

Formal review of program to be undertaken. Work placement student currently undertaking casual employment to meet work demands.

Engineering Administrative Assistant has completed preliminary TAFE qualifications. Discussions needed with GM and Director regarding direction of this role.

Year 3

2014/15

Succession Plan for Plant Foreman and Senior Mechanic.

Possible employment of Apprentice Mechanic.

Discussions are underway regarding Succession Planning of the Senior Mechanic and Apprentice position requirements.

Year 4

2015/16

To be determined after Year 4. Not yet commenced.

Page 77: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Workforce Management Plan 2014 – May 2014 26

A photograph of our Workforce in 2010 around the time of the Retirement of former General Manager, Bruce Fitzpatrick

Page 78: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

 

 

DRAFT

Road Asset Management Plan 2014  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scenario 1     Version 2 

March 2014 

Page 79: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Road Asset Management Plan 2014 

 

Document Control 

 

 

Document ID:  59.299.120815 nams.plus2 amp template v2 

Rev No  Date  Revision Details  Author  Reviewer  Approver 

1  January 2014  First draft   JH  AW   

2  March 2014  Qualitative improvements in road asset data Date of acquisition and useful lives updated   Bridge data added 

JH AW   

           

           

           

         

         

         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

© Copyright 2012 – All rights reserved. 

The Institute of Public Works Engineering Australia. 

www.ipwea.org.au/namsplus 

Page 80: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Road Asset Management Plan 2014 

TABLE OF CONTENTS 

1.  EXECUTIVE SUMMARY ....................................................................................................... 1 Context .................................................................................................................................. 1 What does it Cost? ................................................................................................................ 1 What we will do ..................................................................................................................... 1 What we cannot do ............................................................................................................... 1 Managing the Risks ................................................................................................................ 1 Confidence Levels .................................................................................................................. 2 The Next Steps ....................................................................................................................... 2 

2.  INTRODUCTION ................................................................................................................. 4 2.1  Background ................................................................................................................ 4 2.2  Goals and Objectives of Asset Management ............................................................. 5 2.3  Plan Framework ......................................................................................................... 5 2.4  Core and Advanced Asset Management ................................................................... 7 2.5  Community Consultation ........................................................................................... 7 

3.  LEVELS OF SERVICE ............................................................................................................ 8 3.1  Customer Research and Expectations ....................................................................... 8 3.2  Strategic and Corporate Goals .................................................................................. 8 

FUTURE DIRECTIONS ................................................................................................................. 8 3.3  Legislative Requirements .......................................................................................... 9 3.4  Current Levels of Service ........................................................................................... 9 3.5  Desired Levels of Service ......................................................................................... 14 

4.  FUTURE DEMAND ............................................................................................................ 15 4.1  Demand Drivers ....................................................................................................... 15 4.2  Demand Forecast ..................................................................................................... 15 4.3  Demand Impact on Assets ....................................................................................... 15 4.4  Demand Management Plan ..................................................................................... 15 4.5  Asset Programs to meet Demand............................................................................ 17 

5.  LIFECYCLE MANAGEMENT PLAN ..................................................................................... 18 5.1  Background Data ..................................................................................................... 18 5.2  Infrastructure Risk Management Plan ..................................................................... 22 5.3  Routine Operations and Maintenance Plan ............................................................ 23 5.4  Renewal/Replacement Plan .................................................................................... 27 5.5  Creation/Acquisition/Upgrade Plan ........................................................................ 32 5.6  Disposal Plan ............................................................................................................ 34 5.7  Service Consequences and Risks ............................................................................. 34 

6.  FINANCIAL SUMMARY ..................................................................................................... 36 6.1  Financial Statements and Projections ..................................................................... 36 6.2  Funding Strategy ...................................................................................................... 41 6.3  Valuation Forecasts ................................................................................................. 42 6.4  Key Assumptions made in Financial Forecasts ........................................................ 45 6.5  Forecast Reliability and Confidence ........................................................................ 46 

7.  PLAN IMPROVEMENT AND MONITORING ...................................................................... 48 7.1  Status of Asset Management Practices ................................................................... 48 7.2  Improvement Program ............................................................................................ 50 7.3  Monitoring and Review Procedures ........................................................................ 50 7.4  Performance Measures ........................................................................................... 50 

8.  REFERENCES .................................................................................................................... 51 9.  APPENDICES ..................................................................................................................... 51 Appendix A   Maintenance Response Levels of Service ...................................................... 51 

Page 81: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Road Asset Management Plan 2014 

Appendix B   Projected 10 year Capital Renewal and Replacement Works Program ......... 52 Appendix C   Projected Upgrade/Exp/New 10 year Capital Works Program ...................... 91 Appendix D   Budgeted Expenditures Accommodated in LTFP ........................................... 92 Appendix E   Abbreviations .................................................................................................. 93 Appendix F   Glossary .......................................................................................................... 94 

 

 

Page 82: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 1 ‐ 

DRAFT Road Asset Management Plan 2014 

1.  EXECUTIVE SUMMARY 

Context 

The Oberon  Local Government Area  (LGA)  is  located adjacent  to  the Blue Mountains of New South Wales on  the Great Dividing Range, 196 km west  (two‐hour drive) of Sydney. Much of the area is considered to be sub‐alpine  with  the  Oberon  township  1,113  metres above sea level. 

 The sub‐alpine climate creates challenges  for Council in  effectively managing  the  road  network.   Minimal road work can be undertaken  in  the winter and  sub‐surface  water  erupts  from  the  ground  in  spring, resulting in localised pavement deterioration.    

Council  is  committed  to  maintaining  a  quality  road network for the community and  industry. Oberon has a  thriving  forestry  industry,  which  requires  reliable sealed road access.  

The major issue facing Council in maintaining the road network  is  the  aging  of  the  sealed  road  network. Council must act promptly to reseal and renew sealed roads  across  the  Shire  before  they  reach  the  end  of their useful life.  

The Road Service The Road network comprises:  Bridges  Sealed roads pavement  Sealed roads surface  Kerb and gutter  Footpaths   Unsealed roads pavement   These  infrastructure assets have a  replacement value of  $178,411,418. 

What does it Cost? 

The  projected  outlays  necessary  to  provide  the services covered by this Asset Management Plan (AM Plan)  includes operations, maintenance,  renewal and upgrade of existing  assets over  the 10  year planning period  is  $46,900,000  or  $4,690,000  on  average  per year.   

Estimated  available  funding  for  this  period  is $45,620,000 or $4,562,000 on average per year which is  97%  of  the  cost  to  provide  the  service.  This  is  a funding  shortfall  of  $128,000  on  average  per  year. Projected expenditure required  to provide services  in the  AM  Plan  compared  with  planned  expenditure currently included in the Long Term Financial Plan are shown in the graph below.   

 

What we will do 

We plan to provide road services for the following:  Operation, maintenance, renewal and upgrade of 

bridges,  roads  and  footpaths  to  meet  service levels set in annual budgets. 

Plan  to  reconstruct  urban  roads  before  the pavement and seal reach end of life within the 10 year planning period. 

 

What we cannot do 

We do not have enough funding to provide all services at  the desired  service  levels or provide new  services. Works  and  services  that  cannot  be  provided  under present funding levels are:  Seal  all  of  the  unsealed  roads  across  the  Shire 

which the community would like to see sealed.   Repair  all  of  the  road  defects  across  the  road 

network.   

Managing the Risks 

There  are  risks  associated with providing  the  service and not being able to complete all identified activities and projects. We have identified major risks as:  Again  infrastructure  requiring  renewal  or 

replacement   Rising costs of managing infrastructure   Managing  the  community expectations  for  levels 

of service   Impact of climate change on road assets   We  will  endeavour  to  manage  these  risks  within available funding by:  Assessing  the  condition  of  road  assets  and 

renewing/  replacing  as  funding  becomes available.   

Page 83: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 2 ‐ 

DRAFT Road Asset Management Plan 2014 

Move  towards  planned  and  proactive  asset management,  which  is more  cost‐effective  than reactive management  

Work  with  the  community  to  determine achievable  performance  targets  for  levels  of service.   

 

Confidence Levels 

This AM Plan is based on medium level of confidence information. 

The Next Steps 

The actions resulting from this asset management plan are:  Maintain  road  assets  in  a  safe  condition  within 

available funding   Continue  to  assess  and  rate  the  condition  of 

assets to better inform future versions of this AM Plan 

Define  the maintenance  standards  and  levels  of service which can be delivered to the community at various funding levels 

Improve  the  analysis  of  options  so  that  an informed  discussion  can  be  had  with  the community  about  priorities  and  future  levels  of service and funding, 

Prioritise  renewal  and  upgrade  works  based  on risk,  

Continue  to  improve  asset  information  and knowledge, 

Monitor  the  provision  of  road  infrastructure  in line with community expectations as expressed in the Oberon Community Strategic Plan. 

Increase knowledge of asset management within the  community  and elected  council with  respect to  road maintenance,  renewal,  replacement  and upgrades.   

 

Page 84: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 3 ‐ 

DRAFT Road Asset Management Plan 2014 

Questions you may have 

What is this plan about? 

This  asset  management  plan  covers  the infrastructure  assets  that  serve  the  Oberon community’s  road  needs.    These  assets  include bridges,  roads  and  footpaths    throughout  the community  area  that  enable  people  to  get  to where they would like to go. 

What is an Asset Management Plan? 

Asset management planning  is  a  comprehensive process  to  ensure  delivery  of  services  from infrastructure  is  provided  in  a  financially sustainable manner. 

An  asset  management  plan  details  information about  infrastructure  assets  including  actions required  to provide an agreed  level of service  in the  most  cost  effective  manner.      The  plan defines  the  services  to  be  provided,  how  the services  are  provided  and  what  funds  are required to provide the services. 

Why is there a funding shortfall? 

Most  of  the  organisation’s  road  network  was constructed by developers and from government grants,  often  provided  and  accepted  without consideration  of  ongoing  operations, maintenance and replacement needs.  

Many  of  these  assets  are  approaching  the  later years  of  their  life  and  require  replacement, services  from  the  assets  are  decreasing  and maintenance costs are increasing.   

Our  present  funding  levels  are  insufficient  to continue  to  provide  existing  services  at  current levels in the medium term.  

What options do we have? Resolving the funding shortfall involves several steps: 1. Improving  asset  knowledge  so  that  data 

accurately records the asset inventory, how assets are performing  and when  assets  are not  able  to provide the required service levels, 

2. Improving  our  efficiency  in  operating, maintaining,  renewing  and  replacing  existing assets to optimise life cycle costs, 

3. Identifying  and  managing  risks  associated  with providing services from infrastructure, 

4. Making  trade‐offs  between  service  levels  and costs  to ensure  that  the  community  receives  the best return from infrastructure, 

5. Identifying assets surplus to needs for disposal to make  saving  in  future  operations  and maintenance costs, 

6. Consulting  with  the  community  to  ensure  that road  services  and  costs meet  community  needs and are affordable, 

7. Developing partnership with other bodies, where available to provide services, 

8. Seeking additional funding from governments and other  bodies  to  better  reflect  a  ‘whole  of government’  funding  approach  to  infrastructure services.  

What happens if we don’t manage the shortfall? 

It  is  likely  that  we  will  have  to  reduce  service levels  in  some  areas,  unless  new  sources  of revenue  are  found.  For  roads,  the  service  level reduction may  include  allowing  the  condition of some roads to deteriorate to failure. 

 

Horace Street, Oberon  

What can we do? 

We  can develop options,  costs and priorities  for future  roads  services,  consult  with  the community  to plan  future  services  to match  the community  service needs with  ability  to pay  for services  and  maximise  community  benefits against costs. 

What can you do? 

We will be pleased to consider your thoughts on the  issues  raised  in  this  asset management plan and  suggestions  on  how  we  may  change  or reduce  the  mix  of  services  to  ensure  that  the appropriate  level  of  service  can  be  provided  to the community within available funding. 

Page 85: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 4 ‐ 

DRAFT Road Asset Management Plan 2014 

2.  INTRODUCTION 

2.1  Background 

This asset management plan is to demonstrate responsive management of assets (and services provided from assets), compliance with regulatory requirements, and to communicate funding needed to provide the required levels of service over a 20 year planning period. 

The asset management plan follows the format for AM Plans recommended in Section 4.2.6 of the International Infrastructure Management Manual1. The asset management plan is to be read with the organisation’s Asset Management Policy, Asset Management Strategy and the following associated planning documents: 

Oberon Community Strategic Plan 2013  Oberon Community Engagement Strategy May 2013 

 

The infrastructure assets covered by this asset management plan are shown in Table 2.1. These assets are used to provide road services to its community. 

Table 2.1:  Assets covered by this Plan 

Asset category  Dimension Replacement Value 

Bridges  29  $7,363,626 

Footpaths  21.4km $2,860,239 

Kerb and gutter  33.8km  $3,289,569 

 Road formation   966m  $18,398,793 

Road pavement  966km  $129,848,003 

Sealed road surface  437km  $16,650,688 

TOTAL    $178,411,418 

 

Key stakeholders in the preparation and implementation of this asset management plan are: Shown in Table 2.1.1. 

Table 2.1.1:  Key Stakeholders in the AM Plan Key Stakeholder  Role in Asset Management Plan

Councillors/Board Members  Represent needs of community/shareholders,  Allocate resources to meet the organisation’s objectives in providing services 

while managing risks,  Ensure organisation is financial sustainable. 

CEO/General Manager  Supporting implementation of best practice asset management at Oberon,  Ensuring  that  staff  are  provided  with  appropriate  systems,  training  and 

resources  because  it  is  difficult  to  develop  a  long  term  vision when  crisis management and short term asset development are stretching resources. 

Rate payers and residents  Consumer of the services provided by road assets 

Business and industry   Consumer  (and  funder  in  some  circumstances    i.e.  timber  industry  funds  some roads) 

NSW Roads and Maritime Services  Funder   Confident  that  their  investment  is  secure  and  economic  returns  are  being 

maximised  Operational capability of roads is being maintained  Regulator  ‐Ensuring  that  Council  complies  with  service  performance,  risk management and network access requirements.  

1 IPWEA, 2011, Sec 4.2.6, Example of an Asset Management Plan Structure, pp 4|24 – 27. 

Page 86: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 5 ‐ 

DRAFT Road Asset Management Plan 2014 

2.2  Goals and Objectives of Asset Management 

The organisation exists to provide services to its community.  Some of these services are provided by infrastructure assets.  We have acquired infrastructure assets by ‘purchase’, by contract, construction by our staff and by donation of assets constructed by developers and others to meet increased levels of service. 

Our goal in managing infrastructure assets is to meet the defined level of service (as amended from time to time) in the most cost effective manner for present and future consumers.  The key elements of infrastructure asset management are: 

Providing a defined level of service and monitoring performance,  Managing the impact of growth through demand management and infrastructure investment,  Taking a lifecycle approach to developing cost‐effective management strategies for the long‐term that meet 

the defined level of service,  Identifying, assessing and appropriately controlling risks, and   Having a long‐term financial plan which identifies required, affordable expenditure and how it will be 

financed.2  

2.3  Plan Framework 

Key elements of the plan are 

Levels of service – specifies the services and levels of service to be provided by the organisation,  Future demand – how this will impact on future service delivery and how this is to be met,  Life cycle management – how we will manage our existing and future assets to provide defined levels of 

service,  Financial summary – what funds are required to provide the defined services,  Asset management practices,  Monitoring – how the plan will be monitored to ensure it is meeting the organisation’s objectives,  Asset management improvement plan. 

 

A road map for preparing an asset management plan is shown on the following page. 

2 Based on IPWEA, 2011, IIMM,  Sec 1.2  p 1|7. 

Page 87: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 6 ‐ 

DRAFT Road Asset Management Plan 2014 

Road Map for preparing an Asset Management Plan Source: IPWEA, 2006, IIMM, Fig 1.5.1, p 1.11. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS THE PLAN AFFORDABLE?

CORPORATE PLANNINGConfirm strategic objectives and establish AM policies, strategies & goals. Define responsibilities & ownership.Decide core or advanced AM Pan.Gain organisation commitment.

REVIEW/COLLATE ASSET INFORMATIONExisting information sourcesIdentify & describe assets.Data collectionCondition assessmentsPerformance monitoringValuation Data

ESTABLISH LEVELS OF SERVICEEstablish strategic linkagesDefine & adopt statementsEstablish measures & targetsConsultation

LIFECYCLE MANAGEMENT STRATEGIESDevelop lifecycle strategiesDescribe service delivery strategyRisk management strategiesDemand forecasting and managementOptimised decision making (renewals, new works, disposals)Optimise maintenance strategies

FINANCIAL FORECASTSLifecycle analysisFinancial forecast summaryValuation DepreciationFunding

IMPROVEMENT PLANAssess current/desired practicesDevelop improvement plan

ITERATIONReconsider service statementsOptions for fundingConsult with CouncilConsult with Community

DEFINE SCOPE & STRUCTURE OF PLAN

INF

OR

MA

TIO

N M

AN

AG

EM

EN

T, a

nd D

AT

A I

MP

RO

VE

ME

NT

AM PLAN REVIEW AND

AUDIT

IMPLEMENT IMPROVEMENT

STRATEGY

ANNUAL PLAN / BUSINESS PLAN

INF

OR

MA

TIO

N M

AN

AG

EM

EN

T, a

nd D

AT

A I

MP

RO

VE

ME

NT

Page 88: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 7 ‐ 

DRAFT Road Asset Management Plan 2014 

2.4  Core and Advanced Asset Management 

This asset management plan is prepared as a ‘core’ asset management plan over a 20 year planning period in accordance with the International Infrastructure Management Manual3.  It is prepared to meet minimum legislative and organisational requirements for sustainable service delivery and long term financial planning and reporting.  Core asset management is a ‘top down’ approach where analysis is applied at the ‘system’ or ‘network’ level. 

Future revisions of this asset management plan will move towards ‘advanced’ asset management using a ‘bottom up’ approach for gathering asset information for individual assets to support the optimisation of activities and programs to meet agreed service levels. 

2.5  Community Consultation 

This ‘core’ asset management plan is prepared to facilitate community consultation initially through feedback on public display of draft asset management plans prior to adoption by the Council.  Future revisions of the asset management plan will incorporate community consultation on service levels and costs of providing the service. This will assist the Council and the community in matching the level of service needed by the community, service risks and consequences with the community’s ability and willingness to pay for the service. 

3 IPWEA, 2011, IIMM. 

Page 89: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 8 ‐ 

DRAFT Road Asset Management Plan 2014 

3.  LEVELS OF SERVICE 

3.1  Customer Research and Expectations 

The organisation has not carried out any research on customer expectations.   This will be investigated for future updates of the asset management plan. 

3.2  Strategic and Corporate Goals 

This asset management plan is prepared under the direction of the organisation’s vision, mission, goals and objectives. 

Our vision is: 

A prosperous town, villages and rural communities set amongst the rolling hills, rivers, forests, mountains and caves of the Great Divide. A breath of fresh air in a landscape of light, colour and seasonal beauty. Life as it should be!

FUTURE DIRECTIONS There are six FUTURE DIRECTIONS Council will follow to achieve our preferred future

 

OUR COMMUNITY

BASIC SERVICES

ECONOMIC PROSPERITY

RESPONSIVE and CARING

OPEN COMMUNICATION

NATURAL ENVIRONMENT

 

Relevant organisation goals and objectives and how these are addressed in this asset management plan are: 

Table 3.2:  Organisation Goals and how these are addressed in this Plan 

Goal  Objective How Goal and Objectives are addressed in AM Plan

Basic Services  A  useful  and  safe  local,  regional and  state  road  network  that connects communities 

This AM will  enable  council  to plan more  effectively  the sustainable  management  of  road  assets  and  allocate funding to road works in a manner that achieves the most value for the community. 

Open communication  Well‐informed  communities whose views are heard 

This  AM  plan  sets  out  transparently  how  Council  will manage  road  assets.  The  input  and  feedback  of  the community is sought.  

Open communication   Sound governance and leadership across the community 

In  implementing  asset management  practices,  Council  is seeking to make  improvements  in the management of  its road  asset  portfolio,  across  the  whole  of  the  asset lifecycle.  

 

Page 90: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 9 ‐ 

DRAFT Road Asset Management Plan 2014 

The Council will exercise its duty of care to ensure public safety in accordance with the infrastructure risk management plan prepared in conjunction with this AM Plan.  Management of infrastructure risks is covered in Section 5.2 

3.3  Legislative Requirements 

We have to meet many legislative requirements including Australian and State legislation and State regulations.  These include: 

Table 3.3:  Legislative Requirements 

Legislation  Requirement 

Local Government Act  Sets out  role, purpose,  responsibilities and powers of  local governments  including the preparation of a long term financial plan supported by asset management plans for sustainable service delivery. 

Roads Act, 1993  Sets out the rules to be  followed and responsibilities of users of the roads system and how the rules are enforced 

 Work Health and Safety Act 2011   This Act aims  to  secure and promote  the health,  safety and welfare of people at work  and  to  protect  people  at  a  place  of work  against  risks  to  health  or  safety arising out of the activities at work.  

Environmental  Planning  and Assessment Act, 1979 

Provides for the protection of the environment, established the Department of the Environment and defines its functions and powers 

Australian  Standards  and  RTA  Traffic Control at Worksites Manual, 2010 

Provides guidance for transport asset managers in use of transport services such as AS 1742; Manual of Uniform Traffic Control Devices 

Australian Road Rules  The Australian Roads Rules are incorporated into State Traffic Regulations under the Road Traffic Act 

 

3.4  Current Levels of Service 

We have defined service levels in two terms. 

Community Levels of Service measure how the community receives the service and whether the organisation is providing community value. 

Community levels of service measures used in the asset management plan are: 

Quality      How good is the service? Function     Does it meet users’ needs? Capacity/Utilisation  Is the service over or under used? 

Technical Levels of Service ‐ Supporting the community service levels are operational or technical measures of performance. These technical measures relate to the allocation of resources to service activities that the organisation undertakes to best achieve the desired community outcomes and demonstrate effective organisational performance. 

Technical service measures are linked to annual budgets covering: 

Operations – the regular activities to provide services such as opening hours, cleansing frequency, mowing frequency, etc. 

Maintenance – the activities necessary to retain an asset as near as practicable to an appropriate service condition (eg road patching, unsealed road grading, building and structure repairs), 

Renewal – the activities that return the service capability of an asset up to that which it had originally (eg frequency and cost of road resurfacing and pavement reconstruction, pipeline replacement and building component replacement), 

Upgrade – the activities to provide an higher level of service (eg widening a road, sealing an unsealed road, replacing a pipeline with a larger size) or a new service that did not exist previously (eg a new library). 

Page 91: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 10 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset managers plan, implement and control technical service levels to influence the customer service levels.4 

Our current service levels are detailed in Tables 3.4.a to 3.4.g. Levels of Service for road assets were workshopped by Councillors on Tuesday 12 November 2013.  

Table 3.4a 

Levels of Service‐ Bridges  

Key Performance

Measure

Level of Service Performance Measure Process

Current Performance Performance Target

COMMUNITY LEVELS OF SERVICE Quality Bridges and culverts will

provide on-going, uninterrupted and safe access for the community across the Shire.

Number of bridges in unserviceable condition that have been closed for safety reasons.

No bridges closed in Oberon due to poor condition for safety reasons.

No “closed” bridges.

Function Bridges and culverts are fit for purpose (i.e. satisfy minimum width requirements for road users, with no restrictive height or weight limits)

Monitor and track customer requests and complaints.

No complaints No requests or complaints about the poor Council maintenance or management of bridges

Capacity/ utilisation

Bridges and culverts can be used by all traffic

Number of bridges with load restrictions/ weight limits

No bridges with load restrictions

No bridges with inappropriate local restrictions

TECHNICAL LEVELS OF SERVICE Operations Bridges and culverts will be

renewed and replaced as they age and their condition deteriorates.

Condition assessment of bridges to be undertaken every three years.

Of 23 bridges, 3 are in fair condition and 4 in poor condition.

No bridges in “poor” condition. Less than 50% of bridges to be in “fair” condition

Maintenance Bridges and culverts are maintained in the most cost effective manner.

Maintenance expenditure to be tracked against bridge and culvert condition ratings.

Bridge maintenance expenditure within budget. Bridge maintenance performed by a contractor.

Bridges and culverts with high maintenance costs and poor condition to be identified and targeted for replacement

Renewal Bridges are fit for purpose Useful life of assets No bridges failing before useful life is reached

100 years

Upgrade Bridges are replaced with modern structures before they reach the end of their useful life

Useful life of assets No bridges older than 100 years

100 years

 

4 IPWEA, 2011, IIMM, p 2.22 

Page 92: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 11 ‐ 

DRAFT Road Asset Management Plan 2014 

Table 3.4b 

Levels of Service‐ Regional Roads  

Key Performance

Measure

Level of Service Performance Measure Process

Current Performance Performance Target

COMMUNITY LEVELS OF SERVICE Quality Provide smooth ride. Customer service requests

3 per month or less

2 per month

Function Meets user requirements for -Road width -accessibility -use of traffic control device

Customer service requests relating to width, access and traffic control

1 per month

5 per year

Capacity/ Utilisation

Regional roads meet users needs

Customer requests relating to road capacity

1 per month 5 per year

TECHNICAL LEVELS OF SERVICE Operations Regional roads are closed

when conditions are unsafe. Council responds promptly.

Time taken to close the road following notification

Closure occurs within 4 hours of Council becoming aware that conditions are unsafe

Closure occurs within 2 hours of Council becoming aware that conditions are unsafe. Road reopened promptly once safe.

Provide a safe suitable road, free from hazards

Inspection frequency Once a month Once a month

Maintenance Ensure facilities are safe- clear signage, good traffic control devices and facilities, no major surface defects

On-going program of regional road maintenance

Road maintenance budget is inadequate

Road maintenance budget is adequate to meet needs.

Renewal Condition of road is acceptable to drivers

Number of kilometres of regional road resealed each year

1km (2012/13) 10km

Upgrade Roads are reconstructed to a higher standard where need exists.

Number of kilometres of regional road reconstructed each year

1km (2012/13) 4km

 

Page 93: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 12 ‐ 

DRAFT Road Asset Management Plan 2014 

Table 3.4c Levels of Service‐ Urban Roads Sealed 

Key Performance

Measure

Level of Service Performance Measure Process

Current Performance Performance Target

COMMUNITY LEVELS OF SERVICE Quality Provide smooth ride. Customer service requests

3 per month 6 per year

Function Meets user requirements for -Road width -accessibility -use of traffic control device

Customer service requests relating to width, access and traffic control

3 per month 6 per year

Capacity/ utilisation

Streets are appropriate for usage

Customer service requests relating to road capacity

0 per month

0 per month

TECHNICAL LEVELS OF SERVICE Operations Streets are clean Street sweeping frequency 3 blocks around Main

St swept daily. Occasional sweeping of industrial area.

3 blocks around Main St swept daily. Occasional sweeping of industrial area.

Maintenance Streets are suitable for purpose

On-going program of urban road maintenance.

Road maintenance budget is inadequate

Road maintenance budget is adequate to meet needs.

Renewal Streets are fit for use Condition of sealed pavements

Less than 5% with condition

Less than 5% with condition 5

Reseal program 1km per year 3km per year Upgrade Streets are reconstructed

before they fail Budget for sealed urban road reconstruction.

Nil. No budget. 500m per year

 Table 3.4d 

Levels of Service‐ Rural Roads Sealed 

Key Performance

Measure

Level of Service Performance Measure Process

Current Performance Performance Target

COMMUNITY LEVELS OF SERVICE Quality Provide smooth ride. Customer service requests

relating to road condition 6 per month 3 per month

Function Meets user requirements for -Road width -accessibility

Customer service requests relating to width, access and traffic control

3 per month 1 per month

Capacity/ utilisation

Rural roads are appropriate for usage

Customer service requests relating to road capacity

1 per month

0 per month

TECHNICAL LEVELS OF SERVICE Operations Rural roads are safe Inspection frequency Inspections are per

Council’s Road Response Risk Management Policy

Inspections are per Council’s Road Response Risk Management Policy

Maintenance Rural Roads are suitable for purpose

On-going program of rural sealed road maintenance within budget.

Road maintenance budget is inadequate

Road maintenance budget is adequate to meet needs.

Renewal Rural roads are fit for use Condition of sealed pavements

Less than 5% with condition 5

Less than 5% with condition 5

Reseal program 4.7km (2012/13) 28 km Upgrade Roads are reconstructed

before they fail Budget for sealed rural road reconstruction.

Nil (2012/13) 5km

Page 94: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 13 ‐ 

DRAFT Road Asset Management Plan 2014 

Table 3.4e Levels of Service‐ Rural Roads Unsealed 

Key Performance

Measure

Level of Service Performance Measure Process

Current Performance Performance Target

COMMUNITY LEVELS OF SERVICE Quality Provide smooth all weather

access Customer service requests 6-10 per month 1-3 per month

Function Access is available at all times

Customer service requests 6-10 per month 1-3 per month

Capacity/ Utilisation

Roads are appropriate for usage

Customer service requests relating to road capacity

2 per month

1 per month

TECHNICAL LEVELS OF SERVICE Operation Unsealed roads meet users

needs Annual condition and defects inspection

Inspections carried out in accordance with Council’s road Response Risk Management Policy

Inspections carried out in accordance with Council’s road Response Risk Management Policy

Maintenance Unsealed roads are fit for purpose

Grading frequency

3 graders in constant use around the Shire when moisture conditions are suitable for grading

Dedicated wet grading crew with water cart working all year round and a supplementary grader in use when moisture conditions are suitable.

Budget All maintenance is reactive

Implement planned maintenance schedule for unsealed rural roads.

Renewal Unsealed roads are fit for purpose

Number of kilometres of unsealed road resheeted per year

4km (2012/13) 5% of network (approximately 26km) = 20 year useful life.

Upgrade Residents have sheeted road access

Number of dwellings without sheeted road access

Less than 50 (approximate)

All dwellings are served by a sheeted road.

 

Page 95: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 14 ‐ 

DRAFT Road Asset Management Plan 2014 

 Table 3.4f 

Levels of Service‐ Kerb and Gutter 

Key Performance

Measure

Level of Service Performance Measure Process

Current Performance Performance Target

COMMUNITY LEVELS OF SERVICE Quality Provide road drainage and

collection system Customer service requests Less than 1 per month 2 per year

Function Ensure that road drainage is fully operational and meets users requirements

Customer service requests relating to lack of kerb and gutter

Less than 1 per month 2 per year

Capacity/ Utilisation

Kerbs are appropriate for water flow

Customer service requests relating to kerb capacity.

Less than 1 per month 1 per year

TECHNICAL LEVELS OF SERVICE Operation Kerb and gutter meets users

needs Cleaning to remove blockages from kerb and gutter.

Upon request – as required

Issues to be investigated within 24 hours, work prioritised, and resident notified accordingly

Maintenance Kerb and gutter is suitable for purpose

Reactive service requests are completed within adopted timeframe

To be measured 100%

Upgrade Urban residents have kerb and gutter at their frontage

Number of urban dwellings without kerb and gutter

Less than 10% Less than 10%

 Table 3.4g 

Levels of Service‐ Footpaths 

Key Performance

Measure

Level of Service Performance Measure Process

Current Performance Performance Target

COMMUNITY LEVELS OF SERVICE Quality Provide an even surface for

pedestrians Customer service requests relating to surface condition

1-2 per year Nil

Function Meets users needs for accessibility

Customer service requests relating to lack of footpath

Nil Nil

Capacity/ Utilisation

Footpaths are appropriate for usage

Customer service requests relating to footpath capacity and/ or usage.

Nil Nil

TECHNICAL LEVELS OF SERVICE Operation Footpaths meet the user’s

needs Six monthly condition and defects inspection

Inspections carried out Inspections carried out.

Maintenance Footpaths are fit for purpose Maintenance budget All footpath maintenance is reactive.

Implement planned maintenance schedule for footpaths.

Upgrade Urban residents have paved footpath access to shops and schools

Number of urban residences without access to a footpath

33% approximately Urban residences are within 100m of a paved footpath

3.5  Desired Levels of Service 

Indications of desired levels of service are obtained from community consultation/engagement.  The asset management planning process includes the development of 3 scenarios to develop levels of service that are financially sustainable. 

Page 96: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 15 ‐ 

DRAFT Road Asset Management Plan 2014 

4.  FUTURE DEMAND 

4.1  Demand Drivers 

Drivers affecting demand include population change, changes in demographics, seasonal factors, vehicle ownership rates, consumer preferences and expectations, technological changes, economic factors, agricultural practices, environmental awareness, etc. 

4.2  Demand Forecast 

The present position and projections for demand drivers that may impact future service delivery and utilisation of assets were identified and are documented in Table 4.3. 

4.3  Demand Impact on Assets 

The impact of demand drivers that may affect future service delivery and utilisation of assets are shown in Table 4.3. 

Table 4.3:  Demand Drivers, Projections and Impact on Services 

Demand drivers  Present position  Projection  Impact on services 

Population change   Population  has  fluctuated between  5238  (2007)  and  5207 (2011). Relatively static.  Population  is  aging. Median  age during this period has risen from 39.2 (2007) to 41.5 (2011). 

Population will  remain  constant but continue to age.  

Community  expectations  may change.  Older  residents  may be  more  vocal  in  expressing their  opinions  to  Council regarding  road  related matters.  

Industry   Highest employers in Oberon are agriculture,  forestry  and  fishing 17.4% and electricity, gas, water and waste services 18.9%. (2011) 

Forestry  industry  in  particular will  demand  better  road  access to  tree  plantations,  and improved  road  to  transport freight.  

Pressure  on  Council  to  seal unsealed  roads  and  upgrade existing  sealed  roads.  Industry may be willing to contribute to costs.  

Climate change   Sub‐surface  water  rises  to ground  level  via  springs. Water damages  road  pavement  and seal.  

Changes  in  climate may  lead  to changes  in  the  frequency  of springs  causing  road  pavement defects.  

Regular  condition  assessment of  roads  will  be  required  to identify hazards.  

Vehicle ownership   Number  of  registered  motor vehicles has  increased  from 813 (2007) to 875 (2011). 

Number  of  registered  motor vehicles will  continue  to  rise  as public  transport  options  in Oberon are limited.  

Increased  traffic  on  roads leading  to  more  rapid deterioration of road surfaces.  

 

4.4  Demand Management Plan 

Demand for new services will be managed through a combination of managing existing assets, upgrading of existing assets and providing new assets to meet demand and demand management.  Demand management practices include non‐asset solutions, insuring against risks and managing failures.    

Non‐asset solutions focus on providing the required service without the need for the organisation to own the assets and management actions including reducing demand for the service, reducing the level of service (allowing some assets to deteriorate beyond current service levels) or educating customers to accept appropriate asset failures5.  Examples of non‐asset solutions include providing services from existing infrastructure such as aquatic centres and libraries that may be in another community area or public toilets provided in commercial premises. 

5 IPWEA, 2011, IIMM, Table 3.4.1, p 3|58. 

Page 97: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 16 ‐ 

DRAFT Road Asset Management Plan 2014 

Opportunities identified to date for demand management are shown in Table 4.4.  Further opportunities will be developed in future revisions of this asset management plan. 

Table 4.4:  Demand Management Plan Summary 

Demand Driver  Impact on Services Demand Management Plan 

Population change   Changes  to  community expectations.  

Council  to publicise draft  levels of  services  for  roads  and  see community feedback. Levels of service only to be adopted after thorough community consultation.  

Industry   Pressure  on  Council  to  seal unsealed  roads  and  upgrade existing sealed roads.  

Council to liaise with Forestry NSW to identify candidate roads, then negotiate funding contributions for targeted works.  

Climate change   Regular  condition  assessment  of roads will be  required  to  identify hazards.  

Hazards  caused  by  underground  springs  to  be  identified  and rectified in accordance with Council’s Road Response Policy.  

Vehicle ownership   Increased traffic on roads  leading to  more  rapid  deterioration  of road surfaces.  

Council  to  facilitate  community  transport  and  support  public transport,  to  give  residents,  particularly  aging  residents, transport options.  

 

 

Page 98: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 17 ‐ 

DRAFT Road Asset Management Plan 2014 

4.5  Asset Programs to meet Demand 

New road assets required to meet growth are generally acquired free of cost from land developments or constructed/acquired by the organisation.  

Oberon is not experiencing growth. The population of Oberon is static. According to the Australian Bureau of Statistics, population has fluctuated between 5238 (2007) and 5207 (2011). 

Council is does however upgrade road assets to satisfy current standards and meet community expectations.   

Figure 1:  Upgrade and New Assets  

 

Page 99: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 18 ‐ 

DRAFT Road Asset Management Plan 2014 

5.  LIFECYCLE MANAGEMENT PLAN 

The lifecycle management plan details how the organisation plans to manage and operate the assets at the agreed levels of service (defined in Section 3) while optimising life cycle costs. 

5.1  Background Data 

5.1.1  Physical parameters 

The assets covered by this asset management plan are; 

Bridges  Regional roads (All regional roads in Oberon are sealed)  Urban roads (All urban roads in Oberon are sealed)   Rural roads (both sealed and unsealed)  Kerb and gutter  Footpaths 

   Dimensions and replacement values are shown in Table 2.1.  

The age profile of the assets included in this AM Plan is shown in Figure 2. 

Figure 2.1:  Asset Age Profile‐ All road assets combined 

 

The road assets covered by this asset management plan are divided into components for the purpose of analysis. This is because each of the components has a different useful life and residual value.  

Page 100: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 19 ‐ 

DRAFT Road Asset Management Plan 2014 

Figure 2.2:  Asset Age Profile‐ Bridges  

 

Figure 2.3:  Asset Age Profile‐ Footpaths 

 

Figure 2.4:  Asset Age Profile‐ Formation 

 

 

 

Figure 2.4:  Asset Age Profile‐ Kerb and Gutter  

 

Figure 2.5:  Asset Age Profile‐ Pavement 

 

 

Figure 2.5:  Asset Age Profile‐ Surface 

 

Page 101: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 20 ‐ 

DRAFT Road Asset Management Plan 2014 

 

The plans which show the road assets are the parish maps. Information about road assets is also available in the MapInfo GIS System. 

5.1.2  Asset capacity and performance 

The organisation’s services are generally provided to meet design standards where these are available.   

 

Locations where deficiencies in service performance are known are detailed in Table 5.1.2. 

Table 5.1.2:  Known Service Performance Deficiencies 

Location  Service Deficiency 

Timber bridges   Require  replacement  with  a  modern  structure.  There  are  four  remaining  timber bridges in Oberon. They are; 

1. Swallows Nest Road (1975) condition 4 2. Bald Ridge Road (1950) condition 4 3. Boyd River Bridge (1948) condition 3 4. Snakes Valley Bridge (1955) condition 4 

Regional roads   More sections of Regional roads need to be rehabilitated and upgraded. The Regional Road standard adopted by Oberon Council consists of 7m carriageway width/ 9m seal width/ 11m shoulder width.  Deficiencies are identified by comparing the actual road conditions  to  these  standard  attributes,  taking  into  consideration  factors  such  as: condition ratings, traffic volumes and strategic routes. 

Sealed  roads   There are a number of locations where pavement failure has occurred. Dudley Street (segment 030) has failed due to a school bus zone. Jenolan Street (segment 020 and 030) has a failed seal due to excessive time interval between reseals. Meadows Road (segment (010) is a rural road with failed pavement and seal.  

Footpaths   More  footpaths  required around high pedestrian  traffic  zones however only a  few locations require consideration.  

 

The above service deficiencies were identified from discussions with key operational staff. 

Page 102: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 21 ‐ 

DRAFT Road Asset Management Plan 2014 

5.1.3  Asset condition 

Condition is routinely monitored by regular visual inspections. The frequency of inspections is stipulated in Council’s Draft Road Response Risk Management Policy. 

In addition, in 2012 Council engaged a specialist contractor to assess the condition of all sealed roads. The results of this inspection program are reflected in this document.  

The condition profile of our assets is shown in Figure 3. 

Fig 3:  Asset Condition Profile 

 

Condition is measured using a 1 – 5 grading system6 as detailed in Table 5.1.3. 

Table 5.1.3: Simple Condition Grading Model 

Condition Grading  Description of Condition

1  Very Good: only planned maintenance required

2  Good: minor maintenance required plus planned maintenance 

3  Fair: significant maintenance required 

4  Poor: significant renewal/rehabilitation required 

5  Very Poor: physically unsound and/or beyond rehabilitation 

 

 

6 IPWEA, 2011, IIMM, Sec 2.5.4, p 2|79. 

Page 103: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 22 ‐ 

DRAFT Road Asset Management Plan 2014 

5.1.4  Asset valuations 

The value of assets recorded in the asset register as at 30 June 2013 covered by this asset management plan is shown below.  Assets were last revalued at 30 June 2013.  Assets are valued at using current condition data applied to Councils’ adopted unit rates.  

Current Replacement Cost    $178,411,000 

Depreciable Amount      $101,581,000 

Depreciated Replacement Cost7   $144,912,000 

Annual Depreciation Expense    $3,790,000 

 

Useful lives were reviewed in 2013 by when a full condition assessment and revaluation was undertaken of road assets. 

 

Major changes from previous valuations are due to the methodology used to assess the condition of road assets. In previous years, the condition of road assets was assessed using visual inspections by experienced staff. In 2012/13 Council engaged a specialist contractor to inspect roads and assess their condition using laser technology and digital recording. The result is a more consistent and less subjective assessment of road condition.  

Various ratios of asset consumption and expenditure have been prepared to help guide and gauge asset management performance and trends over time. 

Rate of Annual Asset Consumption    3.7% (Depreciation/Depreciable Amount) 

Rate of Annual Asset Renewal    2.0% (Capital renewal exp/Depreciable amount) 

Rate of Annual Asset Upgrade/New   0.8% (Capital upgrade exp/Depreciable amount) 

Rate of Annual Asset Upgrade/New   0.8% (including contributed assets) 

In 2013 the organisation plans to renew assets at 52.8% of the rate they are being consumed and will be increasing its asset stock by 0.8% in the year.   

5.1.5  Historical Data 

Council has reliable road asset data spanning back a decade in the asset management system.  

5.2  Infrastructure Risk Management Plan 

An assessment of risks8 associated with service delivery from infrastructure assets has identified critical risks that will result in loss or reduction in service from infrastructure assets or a ‘financial shock’ to the organisation.  The risk assessment process identifies credible risks, the likelihood of the risk event 

7 Also reported as Written Down Current Replacement Cost (WDCRC). 

8 Council’s Draft Road Response Risk Management Policy 

Page 104: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 23 ‐ 

DRAFT Road Asset Management Plan 2014 

occurring, the consequences should the event occur, develops a risk rating, evaluates the risk and develops a risk treatment plan for non‐acceptable risks. 

Critical risks, being those assessed as ‘Very High’ ‐ requiring immediate corrective action and ‘High’ – requiring prioritised corrective action identified in the Infrastructure Risk Management Plan, together with the estimated residual risk after the selected treatment plan is operational are summarised in Table 5.2.  These risks are reported to management and Council. 

Table 5.2:  Critical Risks and Treatment Plans 

Service or Asset at Risk 

What can Happen  Risk Rating (VH, H) 

Risk Treatment Plan Residual Risk * 

Treatment Costs

Bridges  Compromised Safety  Railing  or  guard  rail on  bridge  damaged by a heavy vehicle 

H  Use of warning signs or  lights to alert road users to the potential hazard ahead 

Temporary  repairs  to  make defect safe 

Program in Long Term Works 

L  Low 

Regional Roads  Emergency  Situation Large spilled material on  the  road  i.e.  oil, clay  or  granular material  

VH  Emergency  response  traffic Management 

Use of warning signs or  lights to alert road users to the potential hazard ahead 

Clean up  repairs to make safe  

L  May  be  high  but Council  may  be able  to  recover costs  from negligent party.  

Sealed Local Roads  Defects Potholes  on  road  of large  size,  diameter greater  than  300mm or depth greater than 125mm 

H  Use of warning signs or  lights to alert road users to the potential hazard ahead 

Temporary  repairs  to  make defect safe 

Program  in  Long  Term  Works Program if required 

 

L  Medium  

Unsealed  Local Roads 

Defects Rutting  and  Scouring leading    to    heavy surface  deformations up  to  125mm  deep, 300mm  wide  and 10m long 

H Use of warning signs or  lights to alert road users to the potential hazard ahead 

Temporary  repairs  to  make defect safe 

Program  in  Long  Term  Works Program if required 

 

L Medium

Footpaths   Trip hazard > 100mm  H  Erection  of  temporary  barriers around  the  area  until  it  can  be repaired 

Temporary  repairs  to  make defect safe 

Program  in  Long  Term  Works Program if required 

L  Low 

Note *  The residual risk is the risk remaining after the selected risk treatment plan is operational.  

5.3  Routine Operations and Maintenance Plan 

Operations include regular activities to provide services such as routine inspections of roads and bridges and street sweeping.  

Routine maintenance is the regular on‐going work that is necessary to keep assets operating, including instances where portions of the asset fail and need immediate repair to make the asset operational again. 

Page 105: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 24 ‐ 

DRAFT Road Asset Management Plan 2014 

5.3.1  Operations and Maintenance Plan 

Operations activities affect service levels including quality and function. 

 Maintenance includes all actions necessary for retaining an asset as near as practicable to an appropriate service condition including the regular ongoing day‐to‐day work necessary to keep assets operating, eg road patching but excluding rehabilitation or renewal. Maintenance may be classifies into reactive, planned and specific maintenance work activities. 

Reactive maintenance is unplanned repair work carried out in response to service requests and management/supervisory directions. 

Planned maintenance is repair work that is identified and managed through a maintenance management system (MMS).  MMS activities include inspection, assessing the condition against failure/breakdown experience, prioritising, scheduling, actioning the work and reporting what was done to develop a maintenance history and improve maintenance and service delivery performance.   

Specific maintenance is replacement of higher value components/sub‐components of assets that is undertaken on a regular cycle including repainting, replacing air conditioning units, etc. This work falls below the capital/maintenance threshold but may require a specific budget allocation. 

Oberon has not historically split maintenance expenditure into reactive, planned and specific.  

Discussions with staff indicate that all maintenance is reactive. 

Table 5.3.1 following refers to total maintenance expenditure in recent years.  

The splitting of maintenance expenditure for road assets into Planned, Specific and Reactive is an identified asset management improvement action for Oberon.  

Actual past maintenance expenditure is shown in Table 5.3.1. 

Table 5.3.1:  Maintenance Expenditure Trends 

Maintenance  2010/2011   2011/2012   2012/2013  

Footpath/ Cycleway Maintenance  $19,253  $21,172  $42,159 

Regional Roads Maintenance Accident Response  $0  $0  $0 

Regional Roads Maintenance Bridges  $0  $0  $82 

Regional Roads Maintenance Rural  $301,540  $412,470  $429,607 

Regional Roads Maintenance Urban  $145,828  $75,000  $36,220 

Sealed Rural Roads Maintenance   $513,837  $394,675  $382,334 

Sealed Rural Roads Maintenance Bridges  $3,120  $0  $2,199 

Town Street Maintenance  $103,697  $95,681  $112,766 

Town Street Maintenance Bus Shelters  $0  $0  $130 

Town Street Maintenance Kerb and Gutter  $0  $5,187  $0 

Town Street Maintenance Parking Areas  $0  $148  $1,279 

Unsealed Rural Roads Maintenance   $782,357  $499,160  $552,889 

Unsealed Rural Roads Maintenance Bridges  $23,837  $11,442  $742 

   $1,893,469  $1,514,935  $1,560,407 

 

Page 106: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 25 ‐ 

DRAFT Road Asset Management Plan 2014 

Maintenance expenditure levels are considered to be adequate to meet projected service levels, which may be less than or equal to current service levels.  Where maintenance expenditure levels are such that will result in a lesser level of service, the service consequences and service risks have been identified and service consequences highlighted in this AM Plan.  

Assessment and prioritisation of reactive maintenance is undertaken by the organisation’s staff using experience and judgement.   

5.3.2  Operations and Maintenance Strategies 

The organisation will operate and maintain assets to provide the defined level of service to approved budgets in the most cost‐efficient manner.  The operation and maintenance activities include: 

Scheduling operations activities to deliver the defined level of service in the most efficient manner,  Review current and required skills base and implement workforce training and development to meet 

required operations and maintenance needs,  Review asset utilisation to identify underutilised assets and appropriate remedies, and over utilised assets 

and customer demand management options,  Maintain a current hierarchy of critical assets and required operations and maintenance activities,  Develop and regularly review appropriate emergency response capability,  Review management of operations and maintenance activities to ensure the organisation is obtaining best 

value for resources used.  

Asset hierarchy 

An asset hierarchy provides a framework for structuring data in an information system to assist in collection of data, reporting information and making decisions.  The hierarchy includes the asset class and component used for asset planning and financial reporting and service level hierarchy used for service planning and delivery.  

The organisation’s service hierarchy is shown is Table 5.3.2. 

Table 5.3.2:  Road Asset Service Hierarchy 

Service Hierarchy   Service Level Objective 

Regional  A classified road under the care and control of Council having regional significance and thus attracting a  level  of  State  funding  for  the  ongoing maintenance  and  improvements  of  the  road.    Access  is controlled in a similar way as a State Road, however ultimate control rests with the Council. 

Rural 1  A local rural road linking towns and villages, providing primary access to forestry, agriculture and other industries. 

Rural 2  A local rural road providing access to land uses other than the Rural 1 Roads 

Rural 3   Lower order rural road providing access to rural properties 

Rural 4  Lowest order rural road, often a no through road, providing access to a small number of properties 

Town 1  The highest order of road within an urban environment which has as its main function the convenient and safe distribution of traffic generated within the area 

Town 2  The second highest order of road within an urban environment having a residential function but also carries higher volumes of traffic collected from lower order streets 

Town 3  The next level road that provides a balance between the status of that street in terms of its access and residential amenity functions 

Town 4  The lowest order road within the urban environment having as its primary function residential space – amenity  features which  facilitate  pedestrians  and  cycle movements,  and where  vehicular  traffic  is subservient  in  terms  of  speed  and  volume,  to  those  elements  of  space,  amenity,  pedestrians  and cyclists 

 

 

Page 107: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 26 ‐ 

DRAFT Road Asset Management Plan 2014 

Critical Assets 

Critical assets are those assets which have a high consequence of failure but not necessarily a high likelihood of failure.  By identifying critical assets and critical failure modes, organisations can target and refines investigative activities, maintenance plans and capital expenditure plans at the appropriate time. 

Operations and maintenances activities may be targeted to mitigate critical assets failure and maintain service levels.  These activities may include increased inspection frequency, higher maintenance intervention levels, etc.  Critical assets failure modes and required operations and maintenance activities are detailed in Table 5.3.2.1. 

Table 5.3.2.1:  Critical Assets and Service Level Objectives 

Critical Assets  Critical Failure Mode Operations & Maintenance Activities

Bridges  Bridge condition deteriorates   Load  limit placed on bridge with warning  signs when condition  deteriorates  below  threshold.    Regular inspection  of  bridges  (Level  1  and  2).  Repair  of identified  defects  by  specialist  contractor  within budget limits.  

Regional Roads   Loss of sealed surface integrity and  increased  pavement failures  

Resurfacing  targeted  to  high  importance  routes. Regular  inspection  of  Regional  roads.  Repair  of identified defects within budget limits.  

Sealed Local Roads   Loss of sealed surface integrity and  increased  pavement failures 

Resurfacing  targeted  to  high  traffic  routes.  Regular inspection of sealed local roads – inspection frequency depending on road hierarchy.  Identified defects to be repaired within budget limits. 

Unsealed Local Roads   Loss of gravel surface  Rolling  program  resheeting  unsealed  local  roads. Regular  inspection  to  identify  defects  –  inspection frequency  depending  on  road  hierarchy.  Repair  of identified defects when budget is available.  

Footpaths   Trip hazards for pedestrians   Regular inspections of footpaths. Identified defects to be made safe for pedestrian traffic   and then repaired promptly.    Icy  footpaths  to  be made  safe  in winter weather.  

 

Standards and specifications 

Maintenance work is carried out in accordance with the following Standards and Specifications. 

AUSPEC (NATSPEC) Maintenance and Construction Standards  ARRB Unsealed Roads Manual  ARRB Sealed Local Roads Manual  Austroads Pavement Design  RTA Sprayed Sealing Guide  Relevant Australian Standards  Relevant RMS Standards 

 

Page 108: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 27 ‐ 

DRAFT Road Asset Management Plan 2014 

5.3.3  Summary of future operations and maintenance expenditures 

Future operations and maintenance expenditure is forecast to trend in line with the value of the asset stock as shown in Figure 4.  The value of the asset stock will increase each year as a consequence of planned upgrade work. Note that all costs are shown in current 2013 dollar values (ie real values). 

Figure 4:  Projected Operations and Maintenance Expenditure 

 

 

Deferred maintenance, ie works that are identified for maintenance and unable to be funded are to be included in the risk assessment and analysis in the infrastructure risk management plan.  

Maintenance is funded from the operating budget where available.  This is further discussed in Section 6.2. 

5.4  Renewal/Replacement Plan 

Renewal and replacement expenditure is major work which does not increase the asset’s design capacity but restores, rehabilitates, replaces or renews an existing asset to its original or lesser required service potential.  Work over and above restoring an asset to original service potential is upgrade/expansion or new works expenditure. 

5.4.1  Renewal plan 

Assets requiring renewal/replacement are identified from one of three methods provided in the ‘Expenditure Template’. 

Page 109: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 28 ‐ 

DRAFT Road Asset Management Plan 2014 

Method 1 uses Asset Register data to project the renewal costs using acquisition year and useful life to determine the renewal year, or 

Method 2 uses capital renewal expenditure projections from external condition modelling systems (such as Pavement Management Systems), or 

Method 3 uses a combination of average network renewals plus defect repairs in the Renewal Plan and Defect Repair Plan worksheets on the ‘Expenditure template’.   

 

Method 1 was used for this asset management plan. 

The useful lives of assets used to develop projected asset renewal expenditures are shown in Table 5.4.1.  

Asset useful lives were adopted following the 2013 condition assessment of road assets. 

Table 5.4.1:  Useful Lives of Assets 

Asset (Sub)Category  Useful life in years 

Bridges  Varied based on most recent bridge condition assessment 

Footpaths  100 (small number at 20 years based on their deteriorated condition 

Kerb and gutter  100 (small number at 20 years based on their deteriorated condition)  

Road formation   100 

Road pavement  25, 35, 50 (based on condition)   

Sealed road surface  12 

 

5.4.2  Renewal and Replacement Strategies 

The organisation will plan capital renewal and replacement projects to meet level of service objectives and minimise infrastructure service risks by:  

Planning and scheduling renewal projects to deliver the defined level of service in the most efficient manner,  Undertaking project scoping for all capital renewal and replacement projects to identify: 

o the service delivery ‘deficiency’, present risk and optimum time for renewal/replacement, o the project objectives to rectify the deficiency,  o the  range  of  options,  estimated  capital  and  life  cycle  costs  for  each  options  that  could 

address the service deficiency,  o and evaluate the options against evaluation criteria adopted by the organisation, and o select the best option to be included in capital renewal programs,  

Using ‘low cost’ renewal methods (cost of renewal is less than replacement) wherever possible,  Maintain a current infrastructure risk register for assets and service risks associated with providing services 

from infrastructure assets and reporting Very High and High risks and residual risks after treatment to management and the Council/Board, 

Review current and required skills base and implement workforce training and development to meet required construction and renewal needs, 

Maintain a current hierarchy of critical assets and capital renewal treatments and timings required ,  Review management of capital renewal and replacement activities to ensure the organisation is obtaining 

best value for resources used.  

Renewal ranking criteria 

Asset renewal and replacement is typically undertaken to either: 

Ensure the reliability of the existing infrastructure to deliver the service it was constructed to facilitate (eg replacing a bridge that has a 5 t load limit), or 

Page 110: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 29 ‐ 

DRAFT Road Asset Management Plan 2014 

To ensure the infrastructure is of sufficient quality to meet the service requirements (eg roughness of a road).9 

 

It is possible to get some indication of capital renewal and replacement priorities by identifying assets or asset groups that: 

Have a high consequence of failure,  Have a high utilisation and subsequent impact on users would be greatest,  The total value represents the greatest net value to the organisation,  Have the highest average age relative to their expected lives,  Are identified in the AM Plan as key cost factors,  Have high operational or maintenance costs, and  Where replacement with modern equivalent assets would yield material savings.10 

 

The ranking criteria used to determine priority of identified renewal and replacement proposals is detailed in Table 5.4.2.  

Table 5.4.2:  Renewal and Replacement Priority Ranking Criteria 

Criteria Weighting 

Road Hierarchy  30% 

Condition Rating   30% 

AADT  20% 

Degree of  compliance with Council  standards    (ie  for a Regional  road: 7m carriageway/ 9m seal/ 11m shoulder) 

20% 

Total  100% 

 

Renewal and replacement standards 

Renewal work is carried out in accordance with the following Standards and Specifications. 

AUSPEC (NATSPEC) Maintenance and Construction Standards  ARRB Unsealed Roads Manual  ARRB Sealed Local Roads Manual  Austroads Pavement Design  RTA Sprayed Sealing Guide  Relevant Australian Standards  Relevant RMS Standards 

  

9 IPWEA, 2011, IIMM, Sec 3.4.4, p 3|60. 

10 Based on IPWEA, 2011, IIMM,  Sec 3.4.5, p 3|66. 

Page 111: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 30 ‐ 

DRAFT Road Asset Management Plan 2014 

5.4.3  Summary of future renewal and replacement expenditure 

Projected future renewal and replacement expenditures are forecast to increase over time as the asset stock increases from growth.  The expenditure is summarised in Fig 5. Note that all amounts are shown in real values. 

The projected capital renewal and replacement program is shown in Appendix B. 

Fig 5.1a :  Projected Capital Renewal and Replacement Expenditure  

 

Figure 5.1 reveals that there is a backlog of assets in deteriorated condition requiring renewal.  

Outstanding renewals date back to the 1990’s for some lower value assets.  There are assets that should have been renewed in the 2000’s appearing in the figure. Some of these assets have a 12 year useful life and reappear as second generation renewals later years. This figure reveals that Council has an escalating wave of asset renewals to fund in the future.  

 

 

 

 

 

 

Page 112: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 31 ‐ 

DRAFT Road Asset Management Plan 2014 

Fig 5.1b :  Projected Capital Renewal and Replacement Expenditure ‐ unfunded 

 

This confronting figure (5b) shows in red, the renewals that should have occurred before today. It is a different version of Figure 5a shown on the previous page. In this figure, all of the unfunded renewals prior to 2014 are bundled together. 

 

Projected Renewals 

Deferred renewal and replacement, i.e. those assets identified for renewal and/or replacement and not scheduled in capital works programs are to be included in the risk analysis process in the risk management plan. 

Renewals and replacement expenditure in the organisation’s capital works program will be accommodated in the long term financial plan.  This is further discussed in Section 6.2. 

Page 113: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 32 ‐ 

DRAFT Road Asset Management Plan 2014 

5.5  Creation/Acquisition/Upgrade Plan 

New works are those works that create a new asset that did not previously exist, or works which upgrade or improve an existing asset beyond its existing capacity.  They may result from growth, social or environmental needs.  Assets may also be acquired at no cost to the organisation from land development.  These assets from growth are considered in Section 4.4. 

5.5.1  Selection criteria 

New assets and upgrade/expansion of existing assets are identified from various sources such as councillor or community requests, proposals identified by strategic plans or partnerships with other organisations. Candidate proposals are inspected to verify need and to develop a preliminary renewal estimate.  Verified proposals are ranked by priority and available funds and scheduled in future works programmes.  The priority ranking criteria is detailed below.  Note prioritisation is often determined by the elected council.  

 

Table 5.5.1:  New Assets Priority Ranking Criteria 

Criteria  Weighting 

Local significance (i.e. tourism)  40%

Industry (i.e. forestry haulage)  40%

Subdivisions  20%

Total  100% 

 

5.5.2  Capital Investment Strategies 

The organisation will plan capital upgrade and new projects to meet level of service objectives by:  

Planning and scheduling capital upgrade and new  projects to deliver the defined level of service in the most efficient manner, 

Undertake project scoping for all capital upgrade/new projects to identify: o the  service  delivery  ‘deficiency’,  present  risk  and  required  timeline  for  delivery  of  the 

upgrade/new asset, o the  project  objectives  to  rectify  the  deficiency  including  value management  for major 

projects, o the  range  of  options,  estimated  capital  and  life  cycle  costs  for  each  options  that  could 

address the service deficiency,  o management of risks associated with alternative options, o and evaluate the options against evaluation criteria adopted by Council/Board, and o select the best option to be included in capital upgrade/new programs,  

Review current and required skills base and implement training and development to meet required construction and project management needs, 

Review management of capital project management activities to ensure the organisation is obtaining best value for resources used. 

 

Standards and specifications for new assets and for upgrade/expansion of existing assets are the same as those for renewal shown in Section 5.4.2. 

Page 114: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 33 ‐ 

DRAFT Road Asset Management Plan 2014 

5.5.3  Discussion of future upgrade/new assets expenditure 

Recent Expenditures by Council on capital upgrade works are as follows; 

Capital Upgrade  2010/11 2011/12  2012/13Bike Tracks  $57,625 $40,000  $62,561Bike Tracks Capital Works   $0 $80,000  $0Dangerous Intersection Program (Rural)  $2,718 $0  $16,713Dangerous Intersection Program (Town)  $0 $0  $26,998Footpaths  $19,411 $6,589  $8,230Sealed Local Roads (Funded Projects)   $0 $295,018  $12,712Sealed Rural Local Roads Capital Works  $1,768,508 $0  $0Unsealed Local Roads Capital Works   $0 $600,000  $683,841Unsealed Local Roads Capital Works New  $40,104 $0  $0Unsealed Regional Roads Capital Works New  $34 $0  $0Unsealed rural local roads capital new  $1,575 $0  $0

Total  $1,889,975 $1,021,607  $811,055 

Average capital upgrade expenditure is $1,240,879. The 2012/13 upgrade expenditure ($811,055)  plus an allowance for CPI was used in this AM Plan to model future expenditure.  

Projected upgrade/new asset expenditures are summarised in Fig 6. The projected upgrade/new capital works program is shown in Appendix C.  All amounts are shown in real values. 

Fig 6:  Projected Capital Upgrade/New Asset Expenditure 

 

Page 115: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 34 ‐ 

DRAFT Road Asset Management Plan 2014 

Expenditure on new assets and services in the organisation’s capital works program will be accommodated in the long term financial plan.  This is further discussed in Section 6.2. 

 

5.6  Disposal Plan 

Disposal includes any activity associated with disposal of a decommissioned asset including sale, demolition or relocation. Assets identified for possible decommissioning and disposal are shown in Table 5.6, together with estimated annual savings from not having to fund operations and maintenance of the assets.  These assets will be further reinvestigated to determine the required levels of service and see what options are available for alternate service delivery, if any.  Any revenue gained from asset disposals is accommodated in the organisation’s long term financial plan. 

Where cashflow projections from asset disposals are not available, these will be developed in future revisions of this asset management plan. 

Council very rarely disposes of road assets. There are no road assets identified for disposal at this time.  

 

5.7  Service Consequences and Risks 

The organisation has prioritised decisions made in adopting this AM Plan to obtain the optimum benefits from its available resources.  Decisions were made based on the development of 3 scenarios of AM Plans. 

Scenario 1 ‐ What we would like to do based on asset register data  

Scenario 2 – What we should do with existing budgets and identifying level of service and risk consequences (ie what are the operations and maintenance and capital projects we are unable to do, what is the service and risk consequences associated with this position). This may require several versions of the AM Plan. 

Scenario 3 – What we can do and be financially sustainable with AM Plans matching long‐term financial plans. 

The development of scenario 1 and scenario 2 AM Plans provides the tools for discussion with the Council/Board and community on trade‐offs between what we would like to do (scenario 1) and what we should be doing with existing budgets (scenario 2) by balancing changes in services and service levels with affordability and acceptance of the service and risk consequences of the trade‐off position (scenario 3). 

 5.7.1  What we cannot do 

There are some operations and maintenance activities and capital projects that are unable to be undertaken within the next 10 years.  These include: 

Council does not perform planned roadside drainage maintenance   Council does not have in place a planned maintenance program for unsealed roads.  Council cannot seal all unsealed roads   Council is unable to reseal all sealed roads before the seal reaches end of life. Reseal interval is too high.  

 

5.7.2  Service consequences 

Operations and maintenance activities and capital projects that cannot be undertaken will maintain or create service consequences for users.  These include: 

Page 116: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 35 ‐ 

DRAFT Road Asset Management Plan 2014 

Poorly maintained and blocked table drains can overtop during rainfall events and cause an inconvenience to drivers 

Unsealed roads can become hazardous to drivers before maintenance takes place  Drivers must rely on unsealed roads to reach their destinations. Unsealed roads can become hazardous when 

wet or icy and thus impassable in adverse weather conditions.   Sealed roads in poor condition have uneven surfaces and potholes. They offer low driver comfort and can 

cause damage to vehicles.   

5.7.3  Risk consequences 

The operations and maintenance activities and capital projects that cannot be undertaken may maintain or create risk consequences for the organisation.  These include: 

Poor roadside drainage can result in increased rates of pavement deterioration, leading to more frequent pavement failures.  

All maintenance on unsealed roads is reactive, which is less cost‐effective than planned and proactive maintenance.  

Higher likelihood of adverse incidents such as crashes (i.e. injuries and fatalities) and road damage when drivers use wet and icy unsealed roads.  

Reconstructing sealed roads after the seal has failed is expensive. It is more cost effective to reseal before failure is reached.  

 

These risks have been included with the Infrastructure Risk Management Plan summarised in Section 5.2 and risk management plans actions and expenditures included within projected expenditures. 

Page 117: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 36 ‐ 

DRAFT Road Asset Management Plan 2014 

6.  FINANCIAL SUMMARY 

This section contains the financial requirements resulting from all the information presented in the previous sections of this asset management plan.  The financial projections will be improved as further information becomes available on desired levels of service and current and projected future asset performance. 

6.1  Financial Statements and Projections 

The financial projections are shown in Fig 7 for projected operating (operations and maintenance) and capital expenditure (renewal and upgrade/expansion/new assets).  Note that all costs are shown in real values. 

Fig 7:  Projected Operating and Capital Expenditure 

 

 

6.1.1  Sustainability of service delivery 

There are four key indicators for service delivery sustainability that have been considered in the analysis of the services provided by this asset category, these being the asset renewal funding ratio, long term life cycle costs/expenditures and medium term projected/budgeted expenditures over 5 and 10 years of the planning period. 

 

 

Page 118: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 37 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset Renewal Funding Ratio 

Asset Renewal Funding Ratio11    91% 

The Asset Renewal Funding Ratio is the most important indicator and reveals that over the next 10 years, the organisation is forecasting that it will have 91% of the funds required for the optimal renewal and replacement of its assets.  

Long term ‐ Life Cycle Cost  

Life cycle costs (or whole of life costs) are the average costs that are required to sustain the service levels over the asset life cycle.  Life cycle costs include operations and maintenance expenditure and asset consumption (depreciation expense).  The life cycle cost for the services covered in this asset management plan is $5,581,000 per year (average operations and maintenance expenditure plus depreciation expense projected over 10 years). 

Life cycle costs can be compared to life cycle expenditure to give an initial indicator of affordability of projected service levels when considered with age profiles. Life cycle expenditure includes operations, maintenance and capital renewal expenditure.  Life cycle expenditure will vary depending on the timing of asset renewals. The life cycle expenditure over the 10 year planning period is $3,729,000 per year (average operations and maintenance plus capital renewal budgeted expenditure in LTFP over 10 years). 

A shortfall between life cycle cost and life cycle expenditure is the life cycle gap.  The life cycle gap for services covered by this asset management plan is  ‐$1,852,000 per year (‐ve = gap, +ve = surplus).   

Life cycle expenditure is 67% of life cycle costs. 

The life cycle costs and life cycle expenditure comparison highlights any difference between present outlays and the average cost of providing the service over the long term.  If the life cycle expenditure is less than that life cycle cost, it is most likely that outlays will need to be increased or cuts in services made in the future. 

Knowing the extent and timing of any required increase in outlays and the service consequences if funding is not available will assist organisations in providing services to their communities in a financially sustainable manner.  This is the purpose of the asset management plans and long term financial plan. 

Medium term – 10 year financial planning period 

This asset management plan identifies the projected operations, maintenance and capital renewal expenditures required to provide an agreed level of service to the community over a 10 year period. This provides input into 10 year financial and funding plans aimed at providing the required services in a sustainable manner.  

These projected expenditures may be compared to budgeted expenditures in the 10 year period to identify any funding shortfall.  In a core asset management plan, a gap is generally due to increasing asset renewals for ageing assets. 

The projected operations, maintenance and capital renewal expenditure required over the 10 year planning period is $3,857,000 on average per year.   

Estimated (budget) operations, maintenance and capital renewal funding is $3,729,000 on average per year giving a 10 year funding shortfall of ‐$128,000 per year.  This indicates that the organisation expects to 

11 AIFMG, 2009, Financial Sustainability Indicator 8, Sec 2.6, p 2.18 

Page 119: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 38 ‐ 

DRAFT Road Asset Management Plan 2014 

have 97% of the projected expenditures needed to provide the services documented in the asset management plan. 

Short Term – 5 year financial planning period 

The projected operations, maintenance and capital renewal expenditure required over the first 5 years of the planning period is $4,659,000  on average per year.   

Estimated (budget) operations, maintenance and capital renewal funding is $3,729,000 on average per year giving a 5 year funding shortfall of ‐$930,000.  This indicates that the organisation expects to have 80% of projected expenditures required to provide the services shown in this asset management plan.  

Asset management financial indicators 

Figure 7A shows the asset management financial indicators over the 10 year planning period and for the long term life cycle. 

Figure 7A:  Asset Management Financial Indicators 

 

Providing services from infrastructure in a sustainable manner requires the matching and managing of service levels, risks, projected expenditures and financing to achieve a financial indicator of approximately 1.0 for the first years of the asset management plan and ideally over the 10 year life of the Long Term Financial Plan. 

Figure 8 shows the projected asset renewal and replacement expenditure over the 20 years of the AM Plan. The projected asset renewal and replacement expenditure is compared to renewal and replacement expenditure in the capital works program, which is accommodated in the long term financial plan   

Page 120: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 39 ‐ 

DRAFT Road Asset Management Plan 2014 

Figure 8:  Projected and LTFP Budgeted Renewal Expenditure 

 

Note the significant renewal load ahead as assets reach end of useful life.   

Page 121: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 40 ‐ 

DRAFT Road Asset Management Plan 2014 

Table 6.1.1 shows the shortfall between projected renewal and replacement expenditures and expenditure accommodated in long term financial plan.  Budget expenditures accommodated in the long term financial plan or extrapolated from current budgets are shown in Appendix D. 

Table 6.1.1:  Projected and LTFP Budgeted Renewals and Financing Shortfall 

Year  Projected Renewals ($000) 

LTFP Renewal Budget ($000) 

Renewal Financing Shortfall  ($000) (‐ve Gap, +ve Surplus) 

Cumulative Shortfall ($000) (‐ve Gap, +ve Surplus) 

2014  $8,235  $2,000 ‐$6,235 ‐$6,235

2015  $1,039  $2,000  $961  ‐$5,274 

2016  $1,547  $2,000  $453  ‐$4,821 

2017  $2,224  $2,000  ‐$224  ‐$5,045 

2018  $1,468  $2,000  $532  ‐$4,513 

2019  $1,363  $2,000  $637  ‐$3,876 

2020  $1,733  $2,000  $267  ‐$3,609 

2021  $1,026  $2,000  $974  ‐$2,635 

2022  $1,399  $2,000 $601 ‐$2,033

2023  $629  $2,000 $1,371 ‐$662

2024  $1,549  $2,000 $451 ‐$211

2025  $529  $2,000 $1,471 $1,260

2026  $8,407  $2,000  ‐$6,407  ‐$5,147 

2027  $1,441  $2,000  $559  ‐$4,588 

2028  $2,408  $2,000  ‐$408  ‐$4,996 

2029  $4,247  $2,000  ‐$2,247  ‐$7,243 

2030  $3,486  $2,000  ‐$1,486  ‐$8,728 

2031  $3,829  $2,000  ‐$1,829  ‐$10,557 

2032  $3,893  $2,000  ‐$1,893  ‐$12,450 

2033  $3,722  $2,000  ‐$1,722  ‐$14,172 Note: A negative shortfall indicates a financing gap, a positive shortfall indicates a surplus for that year. 

Providing services in a sustainable manner will require matching of projected asset renewal and replacement expenditure to meet agreed service levels with the corresponding capital works program accommodated in the long term financial plan. 

A gap between projected asset renewal/replacement expenditure and amounts accommodated in the LTFP indicates that further work is required on the AM Plan (including possibly revising  the LTFP).  

Future versions of this asset management plan will seek to improve the accuracy of Figure 8 and Table 6.1. to more closely match planned renewal budget with the Long Term Financial Plan to account for anticipated spikes and troughs in Council’s spending ability.  

We will manage the ‘gap’ by developing this asset management plan to provide guidance on future service levels and resources required to provide these services, and review future services, service levels and costs with the community. 

Page 122: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 41 ‐ 

DRAFT Road Asset Management Plan 2014 

6.1.2  Projected expenditures for long term financial plan 

Table 6.1.2 shows the projected expenditures for the 10 year long term financial plan.  

Expenditure projections are in 2013 real values.  

Table 6.1.2:  Projected Expenditures for Long Term Financial Plan ($000) 

Year Operations ($000) 

Maintenance ($000) Projected Capital Renewal ($000) 

Capital Upgrade/ New ($000) 

Disposals ($000) 

2014  $126.00  $1,603.00  $8,235.49  $833.00  $0.00 

2015  $126.59  $1,616.15  $1,038.73  $833.00  $0.00 

2016  $127.18  $1,629.29 $1,547.25 $833.00  $0.00

2017  $127.76  $1,642.44 $2,223.63 $833.00  $0.00

2018  $128.35  $1,655.58 $1,467.93 $833.00  $0.00

2019  $128.94  $1,668.73 $1,362.75 $833.00  $0.00

2020  $129.53  $1,681.87 $1,732.89 $833.00  $0.00

2021  $130.12  $1,695.02  $1,026.06  $833.00  $0.00 

2022  $130.71  $1,708.16  $1,398.70  $833.00  $0.00 

2023  $131.29  $1,721.31  $628.75  $833.00  $0.00 

2024  $131.88  $1,734.45  $1,549.28  $833.00  $0.00 

2025  $132.47  $1,747.60  $528.75  $833.00  $0.00 

2026  $133.06  $1,760.74  $8,406.56  $833.00  $0.00 

2027  $133.65  $1,773.89 $1,441.23 $833.00  $0.00

2028  $134.24  $1,787.03 $2,407.81 $833.00  $0.00

2029  $134.82  $1,800.18 $4,246.74 $833.00  $0.00

2030  $135.41  $1,813.32 $3,485.68 $833.00  $0.00

2031  $136.00  $1,826.47 $3,829.00 $833.00  $0.00

2032  $136.59  $1,839.61  $3,893.13  $833.00  $0.00 

2033  $137.18  $1,852.76  $3,721.51  $833.00  $0.00 

 

Note, operations and maintenance costs increase each year to reflect the increased cost of operating and maintaining Council’s upgraded assets.  

6.2  Funding Strategy 

After reviewing service levels, as appropriate to ensure ongoing financial sustainability projected expenditures identified in Section 6.1.2 will be accommodated in the organisation’s 10 year long term financial plan. 

Page 123: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 42 ‐ 

DRAFT Road Asset Management Plan 2014 

6.3  Valuation Forecasts 

Asset values are forecast to increase as additional assets are added to the asset stock from construction and acquisition by the organisation (upgrade work) and from assets constructed by land developers and others and donated to the organisation.  Figure 9 shows the projected replacement cost asset values over the planning period in real values. 

Figure 9:  Projected Asset Values 

 

Page 124: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 43 ‐ 

DRAFT Road Asset Management Plan 2014 

Depreciation expense values are forecast in line with asset values as shown in Figure 10. 

Figure 10:  Projected Depreciation Expense 

 

Depreciation increases slightly each year as the value of the asset stock increases.  

 

Page 125: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 44 ‐ 

DRAFT Road Asset Management Plan 2014 

The depreciated replacement cost will vary over the forecast period depending on the rates of addition of new assets, disposal of old assets and consumption and renewal of existing assets.  Forecast of the assets’ depreciated replacement cost is shown in Figure 11. The depreciated replacement cost of contributed and new assets is shown in the darker colour and in the lighter colour for existing assets. 

Figure 11:  Projected Depreciated Replacement Cost 

 

 

Page 126: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 45 ‐ 

DRAFT Road Asset Management Plan 2014 

6.4  Key Assumptions made in Financial Forecasts 

This section details the key assumptions made in presenting the information contained in this asset management plan and in preparing forecasts of required operating and capital expenditure and asset values, depreciation expense and carrying amount estimates.  It is presented to enable readers to gain an understanding of the levels of confidence in the data behind the financial forecasts. 

Key assumptions made in this asset management plan and risks that these may change are shown in Table 6.4.  

Table 6.4:  Key Assumptions made in AM Plan and Risks of Change 

Key Assumptions  Risks of Change to Assumptions Planned capital renewal expenditure  and capital new/ upgrade to match recent trends 

Plan  requires  modification  once  more  accurate  planned expenditure data is available.   

Definition of upgrade and new capital works   Council appears  to allocate  significant expenditure  to upgrade and new capital works, in the light of no network growth. These works may  actually  be  sorely  needed  renewal works.  Further investigation  is  required  to  improve  the  accuracy  of  this document.  

 

Page 127: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 46 ‐ 

DRAFT Road Asset Management Plan 2014 

6.5  Forecast Reliability and Confidence 

The expenditure and valuations projections in this AM Plan are based on best available data.  Currency and accuracy of data is critical to effective asset and financial management.  Data confidence is classified on a 5 level scale12 in accordance with Table 6.5. 

Table 6.5:  Data Confidence Grading System 

Confidence Grade  DescriptionA  Highly reliable  Data based on sound records, procedures, investigations and analysis, documented properly and recognised 

as the best method of assessment. Dataset is complete and estimated to be accurate ± 2% B  Reliable  Data based on sound records, procedures,  investigations and analysis, documented properly but has minor 

shortcomings, for example some of the data is old, some documentation is missing and/or reliance is placed on unconfirmed reports or some extrapolation.  Dataset is complete and estimated to be accurate ± 10% 

C  Uncertain  Data based on sound records, procedures,  investigations and analysis which  is  incomplete or unsupported, or extrapolated  from a  limited  sample  for which grade A or B data are available.   Dataset  is  substantially complete but up to 50% is extrapolated data and accuracy estimated ± 25% 

D  Very Uncertain  Data  is based on unconfirmed verbal reports and/or cursory  inspections and analysis.   Dataset may not be fully complete and most data is estimated or extrapolated.  Accuracy ± 40% 

E  Unknown  None or very little data held.  

The estimated confidence level for and reliability of data used in this AM Plan is shown in Table 6.5.1. 

Table 6.5.1:  Data Confidence Assessment for Data used in AM Plan 

 

Over all data sources, the data confidence is assessed as Medium confidence level for data used in the preparation of this AM Plan.  

Data   Confidence Assessment 

Comment

Demand drivers  B  Reliable  Estimated, however further substantiation may be required for next revision of the AMP 

Growth projections  B  Reliable  Estimated, however should be sufficient as Oberon is a low growth area.  

Operations expenditures  B Reliable  Direct from budget, breakdown into operations and maintenance and renewal is estimated. 

Maintenance expenditures 

B  Reliable   Direct from budget, breakdown into operations and maintenance and renewal is estimated. 

Projected Renewal expenditures. 

‐ Asset values 

B Reliable 

Asset register data used in the development of this AM plan has been cleansed, with best available acquisition dates inputted.  

Asset values are reliable. They have been recently updated

‐ Asset residual values  B Reliable  Reasonable 

‐ Asset useful lives  B Reliable  Useful lives have been modified to reflect actual asset condition. 

12 IPWEA, 2011, IIMM, Table 2.4.6, p 2|59. 

Page 128: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 47 ‐ 

DRAFT Road Asset Management Plan 2014 

‐ Condition modelling  B  Reliable  Recently updated. Condition data was collected in 2012/13. 

‐ Network renewals  C Unreliable  No data available on future works program

 ‐ Defect repairs  N/A 

Upgrade/New expenditures 

C Uncertain  No data available based on examination of trends in recent years only.

Disposal expenditures  B  Reliable  No disposal identified

 

Over all data sources, the data confidence is assessed as medium confidence level for data used in the preparation of this AM Plan. 

Page 129: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 48 ‐ 

DRAFT Road Asset Management Plan 2014 

7.  PLAN IMPROVEMENT AND MONITORING 

7.1  Status of Asset Management Practices 

7.1.1  Accounting and financial systems 

Council uses the “Authority” suite for its financial / accounting systems. Responsibility for the financial system lies with the Manager – Finance and the Director. Financial reporting is prepared in accordance with the requirements of the Local Government Act 1993 and relevant Australian Accounting Standards. 

The Finance Section reports in accordance with the relevant accounting standards and regulations 

Local Government Act (NSW) 1993 

Local Government Amendment (Planning and Reporting) Act 2009 

Local Government (Finance Plans and Reporting) Regulation 2010 

NSW Code of Accounting Practice 

AASB116 

Capital/maintenance threshold 

To be detailed in future versions of the this document  

Required changes to accounting financial systems arising from this AM Plan 

Maintenance expenditure by Council on road assets must be split into reactive and planned.  

A clearer separation is required between capital works expenditure on new/ upgraded assets and asset renewal expenditure.   

 

7.2.1  Asset management system 

Oberon Council uses the MyData Asset Management System. It was first implemented in 2007.  

Asset registers 

Council commenced collation of asset registers for input into the MyData Asset Management System in 2007. Data for the following asset types is stored in the system: 

Roads  Kerb and gutter  Footpaths  Water  Sewer  Stormwater  Bridges 

Buildings and structures  Plant and Equipment  Fleet  Land  Playground equipment   Street furniture  

    

Page 130: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 49 ‐ 

DRAFT Road Asset Management Plan 2014 

Linkage from asset management to financial system  The MyData Asset Management System does not link to the financial system. They are separate software packages developed by different companies.  

Accountabilities for asset management system and data maintenance 

The Civil Assets Coordinator is responsible for maintaining the currency of asset data in the MyData Asset Management System.  Every three years Council engages road data collection contractors to assess and record the condition of road assets, for input into the AM system.  

Required changes to asset management system arising from this AM Plan 

Useful lives of assets to reflect actual asset condition not just industry norms. 

Page 131: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 50 ‐ 

DRAFT Road Asset Management Plan 2014 

7.2  Improvement Program 

The asset management improvement plan generated from this asset management plan is shown in Table 7.2. 

Table 7.2:  Improvement Plan 

Task No  Task  Responsibility Resources Required  Timeline

1  Need  to  split  maintenance  expenditure  into  planned/ specific and reactive. Currently all bundled together.  

 

2  Utilise more accurate planned capital expenditure data –not just estimates based on recent trends 

 

3  More closely match planned capital  renewal expenditurewith  the  Long  Term  Financial  Plan  to  account  for anticipated spikes and troughs in Council’s spending ability 

 

4         

5     

6     

7  

   

 

7.3  Monitoring and Review Procedures 

This asset management plan will be reviewed during annual budget planning processes and amended to recognise any material changes in service levels and/or resources available to provide those services as a result of budget decisions.  

The AM Plan will be updated annually to ensure it represents the current service level, asset values, projected operations, maintenance, capital renewal and replacement, capital upgrade/new and asset disposal expenditures and  projected expenditure values incorporated into the organisation’s long term financial plan.The AM Plan has a life of 4 years (Council election cycle) and is due for complete revision and updating within one year of each Council election. 

7.4  Performance Measures 

The effectiveness of the asset management plan can be measured in the following ways: 

The degree to which the required projected expenditures identified in this asset management plan are incorporated into the organisation’s long term financial plan, 

The degree to which 1‐5 year detailed works programs, budgets, business plans and organisational structures take into account the ‘global’ works program trends provided by the asset management plan, 

The degree to which the existing and projected service levels and service consequences (what we cannot do), risks and residual risks are incorporated into the organisation’s Strategic Plan and associated plans, 

The Asset Renewal Funding Ratio achieving the target of 1.0. 

Page 132: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 51 ‐ 

DRAFT Road Asset Management Plan 2014 

8.  REFERENCES 

 

IPWEA, 2006, ‘International Infrastructure Management Manual’, Institute of Public Works Engineering Australia, Sydney, www.ipwea.org.au/IIMM 

IPWEA, 2008, ‘NAMS.PLUS Asset Management’, Institute of Public Works Engineering Australia, Sydney, www.ipwea.org.au/namsplus. 

IPWEA, 2009, ‘Australian Infrastructure Financial Management Guidelines’, Institute of Public Works Engineering Australia, Sydney, www.ipwea.org.au/AIFMG. 

IPWEA, 2011, ‘International Infrastructure Management Manual’, Institute of Public Works Engineering Australia, Sydney, www.ipwea.org.au/IIMM 

Oberon Community Engagement Strategy May 2013 

Oberon Community Strategic Plan 2013 

Oberon Council Draft Road Response Risk Management Policy  

 

9.  APPENDICES 

 

Appendix A  Maintenance Response Levels of Service 

 

Appendix B  Projected 10 year Capital Renewal and Replacement Works Program  

 

Appendix C  Projected 10 year Capital Upgrade/New Works Program  

 

Appendix D  Budgeted Expenditures Accommodated in LTFP 

 

Appendix E  Abbreviations 

 

Appendix F  Glossary 

 

Appendix A   Maintenance Response Levels of Service 

Refer to Council’s Draft Road Response Risk Management Policy for Maintenance Response Levels of Service.  

Page 133: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 52 ‐ 

DRAFT Road Asset Management Plan 2014 

Appendix B   Projected 10 year Capital Renewal and Replacement Works Program  

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

FP46R  FOOTPATHS  QUEEN 0 132 ‐22 1992  $46,793 20

Subtotal    $46,793    

FP35R  FOOTPATHS  NORTH 341 458 ‐21 1993  $34,786 20

Subtotal    $34,786    

  

KG42  KERB AND GUTTER 

HAWKES 0 382 ‐14 2000  $17,083 20

Subtotal    $17,083    

R187‐0230 

SURFACE  ABERCROMBIE RD. 11000 11500 ‐7 2007  $22,500 12

R187‐0510 

SURFACE  ABERCROMBIE RD. 25000 25500 ‐7 2007  $17,500 12

R187‐0080 

SURFACE  ABERCROMBIE RD. 3500 4000 ‐7 2007  $20,000 12

R187‐0710 

SURFACE  ABERCROMBIE RD. 35000 35500 ‐7 2007  $15,000 12

R187‐0760 

SURFACE  ABERCROMBIE RD. 37500 38000 ‐7 2007  $18,750 12

R187‐0810 

SURFACE  ABERCROMBIE RD. 40000 40500 ‐7 2007  $20,000 12

R187‐0130 

SURFACE  ABERCROMBIE RD. 6000 6500 ‐7 2007  $20,000 12

R187‐1400 

SURFACE  ABERCROMBIE RD. 69500 70000 ‐7 2007  $16,250 12

R084‐020 

SURFACE  ALBION ST. 950 1275 ‐7 2007  $27,625 12

R040‐440 

SURFACE  ARKSTONE RD. 21500 22000 ‐7 2007  $13,750 12

R040‐490 

SURFACE  ARKSTONE RD. 24000 24500 ‐7 2007  $15,000 12

R040‐560 

SURFACE  ARKSTONE RD. 27500 28000 ‐7 2007  $13,750 12

R040‐610 

SURFACE  ARKSTONE RD. 30000 30500 ‐7 2007  $13,750 12

R040‐660 

SURFACE  ARKSTONE RD. 32500 33000 ‐7 2007  $13,750 12

R004‐360 

SURFACE  BEACONSFIELD RD. 17500 18000 ‐7 2007  $13,750 12

R004‐410 

SURFACE  BEACONSFIELD RD. 20000 20500 ‐7 2007  $12,500 12

R004‐480 

SURFACE  BEACONSFIELD RD. 23500 24000 ‐7 2007  $15,000 12

R004‐530 

SURFACE  BEACONSFIELD RD. 26000 26500 ‐7 2007  $16,250 12

R004‐690 

SURFACE  BEACONSFIELD RD. 34000 34500 ‐7 2007  $17,500 12

Page 134: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 53 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R087‐010 

SURFACE  BELL ST. 0 100 ‐7 2007  $4,000 12

R224‐230 

SURFACE  BURRAGA RD. 11000 11500 ‐7 2007  $18,750 12

R224‐280 

SURFACE  BURRAGA RD. 13500 14000 ‐7 2007  $17,500 12

R224‐040 

SURFACE  BURRAGA RD. 1500 2000 ‐7 2007  $21,250 12

R224‐330 

SURFACE  BURRAGA RD. 16000 16500 ‐7 2007  $17,500 12

R224‐400 

SURFACE  BURRAGA RD. 19500 20000 ‐7 2007  $16,250 12

R224‐450 

SURFACE  BURRAGA RD. 22000 22500 ‐7 2007  $16,250 12

R224‐500 

SURFACE  BURRAGA RD. 24500 25000 ‐7 2007  $16,250 12

R224‐180 

SURFACE  BURRAGA RD. 8500 9000 ‐7 2007  $20,000 12

R238‐010 

SURFACE  BURRAGA ST. 0 100 ‐7 2007  $2,000 12

R045‐030 

SURFACE  CAMPBELLS RIVER RD. 1000 1500 ‐7 2007  $16,250 12

R045‐250 

SURFACE  CAMPBELLS RIVER RD. 12000 12500 ‐7 2007  $20,000 12

R045‐300 

SURFACE  CAMPBELLS RIVER RD. 14500 15000 ‐7 2007  $16,250 12

R045‐350 

SURFACE  CAMPBELLS RIVER RD. 17000 17500 ‐7 2007  $20,000 12

R045‐400 

SURFACE  CAMPBELLS RIVER RD. 19500 20000 ‐7 2007  $17,500 12

R045‐450 

SURFACE  CAMPBELLS RIVER RD. 22000 22500 ‐7 2007  $18,750 12

R045‐080 

SURFACE  CAMPBELLS RIVER RD. 3500 4000 ‐7 2007  $18,750 12

R045‐170 

SURFACE  CAMPBELLS RIVER RD. 8000 8500 ‐7 2007  $22,500 12

R092‐030 

SURFACE  CARRINGTON AVE. 375 750 ‐7 2007  $22,500 12

R096‐020 

SURFACE  DART ST. 150 375 ‐7 2007  $19,125 12

R015‐240 

SURFACE  DOG ROCKS RD. 11500 12000 ‐7 2007  $22,500 12

R015‐290 

SURFACE  DOG ROCKS RD. 14000 14500 ‐7 2007  $22,500 12

R015‐340 

SURFACE  DOG ROCKS RD. 16500 17000 ‐7 2007  $22,500 12

R015‐390 

SURFACE  DOG ROCKS RD. 19000 19500 ‐7 2007  $22,500 12

R015‐050 

SURFACE  DOG ROCKS RD. 2000 2500 ‐7 2007  $17,500 12

R015‐100 

SURFACE  DOG ROCKS RD. 4500 5000 ‐7 2007  $20,000 12

Page 135: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 54 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R015‐190 

SURFACE  DOG ROCKS RD. 9000 9500 ‐7 2007  $22,500 12

R098‐010 

SURFACE  DR. PERKINS CR. 0 200 ‐7 2007  $7,000 12

R158‐020 

SURFACE  DUCKMALOI RD. 325 875 ‐7 2007  $5,500 12

R100‐050 

SURFACE  DULCE DR 300 350 ‐7 2007  $3,000 12

R163‐010 

SURFACE  FAIRVIEW DR. 0 725 ‐7 2007  $21,750 12

R259‐010 

SURFACE  FERNDALE RD. 0 500 ‐7 2007  $15,000 12

R104‐040 

SURFACE  FLEMING ST. 405 540 ‐7 2007  $4,725 12

R205‐020 

SURFACE  FOREST ST. 125 225 ‐7 2007  $1,750 12

R141‐010 

SURFACE  HARRIS RD. 0 500 ‐7 2007  $12,500 12

R257‐020 

SURFACE  HAWKEN ST. 125 450 ‐7 2007  $138,125 12

R188‐020 

SURFACE  HAZELGROVE RD. 500 1000 ‐7 2007  $15,000 12

R108‐020 

SURFACE  HERBORN ST. 50 300 ‐7 2007  $7,500 12

R112‐030 

SURFACE  JENOLAN ST. 350 1050 ‐7 2007  $35,000 12

R023‐230 

SURFACE  LOWES MOUNT RD. 11000 11500 ‐7 2007  $15,000 12

R023‐280 

SURFACE  LOWES MOUNT RD. 13500 14000 ‐7 2007  $13,750 12

R023‐330 

SURFACE  LOWES MOUNT RD. 16000 16500 ‐7 2007  $17,500 12

R023‐380 

SURFACE  LOWES MOUNT RD. 18500 19000 ‐7 2007  $16,250 12

R023‐020 

SURFACE  LOWES MOUNT RD. 500 1000 ‐7 2007  $17,500 12

R023‐130 

SURFACE  LOWES MOUNT RD. 6000 6500 ‐7 2007  $15,000 12

R023‐180 

SURFACE  LOWES MOUNT RD. 8500 9000 ‐7 2007  $15,000 12

R027‐090 

SURFACE  MEADOWS RD. 4000 4500 ‐7 2007  $10,000 12

R248‐210 

SURFACE  MT. DAVID RD. 10000 10500 ‐7 2007  $13,750 12

R248‐020 

SURFACE  MT. DAVID RD. 500 1000 ‐7 2007  $13,750 12

R248‐110 

SURFACE  MT. DAVID RD. 5000 5500 ‐7 2007  $13,750 12

R248‐160 

SURFACE  MT. DAVID RD. 7500 8000 ‐7 2007  $13,750 12

R001‐030 

SURFACE  MUTTON FALLS RD. 1000 1500 ‐7 2007  $15,000 12

Page 136: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 55 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R001‐080 

SURFACE  MUTTON FALLS RD. 3500 4000 ‐7 2007  $15,000 12

R117‐080 

SURFACE  NORTH ST. 1110 1245 ‐7 2007  $10,800 12

R117‐030 

SURFACE  NORTH ST. 435 570 ‐7 2007  $14,850 12

R005‐100 

SURFACE  O'CONNELL PLAINS RD. 4500 5000 ‐7 2007  $13,750 12

R005‐150 

SURFACE  O'CONNELL PLAINS RD. 7000 7500 ‐7 2007  $15,000 12

R005‐200 

SURFACE  O'CONNELL PLAINS RD. 9500 10000 ‐7 2007  $15,000 12

R204‐020 

SURFACE  O'CONNELL RD. (TOWN STREET) 

325 475 ‐7 2007  $3,000 12

R145‐010 

SURFACE  PILARCIK LN. 0 350 ‐7 2007  $8,750 12

R121‐020 

SURFACE  PRINCE ST. 100 200 ‐7 2007  $1,500 12

R125‐010 

SURFACE  ROSS ST. 0 200 ‐7 2007  $17,000 12

R126‐020 

SURFACE  RUPERT ST. 125 550 ‐7 2007  $17,000 12

R139‐020 

SURFACE  RUTTERS RIDGE RD. 500 1000 ‐7 2007  $13,750 12

R011‐080 

SURFACE  SEWELLS CREEK RD. 3500 4000 ‐7 2007  $23,750 12

R011‐130 

SURFACE  SEWELLS CREEK RD. 6000 6500 ‐7 2007  $17,500 12

R011‐180 

SURFACE  SEWELLS CREEK RD. 8500 9000 ‐7 2007  $15,000 12

R017‐570 

SURFACE  SHOOTERS HILL RD. 28000 28500 ‐7 2007  $15,000 12

R017‐120 

SURFACE  SHOOTERS HILL RD. 5500 6000 ‐7 2007  $15,000 12

R132‐010 

SURFACE  STRATHROY AVE. 0 200 ‐7 2007  $10,500 12

R136‐030 

SURFACE  TASMAN ST. 450 600 ‐7 2007  $8,250 12

R154‐020 

SURFACE  WHITELEY RD. 500 1000 ‐7 2007  $15,000 12

Subtotal    $1,536,250    

R187‐0240 

SURFACE  ABERCROMBIE RD. 11500 12000 ‐6 2008  $22,500 12

R187‐0520 

SURFACE  ABERCROMBIE RD. 25500 26000 ‐6 2008  $17,500 12

R187‐0720 

SURFACE  ABERCROMBIE RD. 35500 36000 ‐6 2008  $16,250 12

R187‐0770 

SURFACE  ABERCROMBIE RD. 38000 38500 ‐6 2008  $18,750 12

R187‐0090 

SURFACE  ABERCROMBIE RD. 4000 4500 ‐6 2008  $20,000 12

Page 137: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 56 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R187‐0820 

SURFACE  ABERCROMBIE RD. 40500 41000 ‐6 2008  $20,000 12

R187‐1410 

SURFACE  ABERCROMBIE RD. 70000 70500 ‐6 2008  $17,500 12

R187‐0190 

SURFACE  ABERCROMBIE RD. 9000 9500 ‐6 2008  $20,000 12

R084‐030 

SURFACE  ALBION ST. 1275 1500 ‐6 2008  $16,875 12

R040‐450 

SURFACE  ARKSTONE RD. 22000 22500 ‐6 2008  $15,000 12

R040‐500 

SURFACE  ARKSTONE RD. 24500 25000 ‐6 2008  $13,750 12

R040‐570 

SURFACE  ARKSTONE RD. 28000 28500 ‐6 2008  $13,750 12

R040‐620 

SURFACE  ARKSTONE RD. 30500 31000 ‐6 2008  $15,000 12

R040‐670 

SURFACE  ARKSTONE RD. 33000 33500 ‐6 2008  $13,750 12

R004‐370 

SURFACE  BEACONSFIELD RD. 18000 18500 ‐6 2008  $12,500 12

R004‐420 

SURFACE  BEACONSFIELD RD. 20500 21000 ‐6 2008  $13,750 12

R004‐490 

SURFACE  BEACONSFIELD RD. 24000 24500 ‐6 2008  $15,000 12

R004‐540 

SURFACE  BEACONSFIELD RD. 26500 27000 ‐6 2008  $15,000 12

R004‐760 

SURFACE  BEACONSFIELD RD. 37500 38000 ‐6 2008  $15,000 12

R089‐010 

SURFACE  BLIGH ST. 0 375 ‐6 2008  $15,000 12

R166‐010 

SURFACE  BRENNAN CR. 0 400 ‐6 2008  $24,000 12

R160‐010 

SURFACE  BRIENS RD. 0 350 ‐6 2008  $12,250 12

R224‐240 

SURFACE  BURRAGA RD. 11500 12000 ‐6 2008  $17,500 12

R224‐290 

SURFACE  BURRAGA RD. 14000 14500 ‐6 2008  $17,500 12

R224‐360 

SURFACE  BURRAGA RD. 17500 18000 ‐6 2008  $16,250 12

R224‐050 

SURFACE  BURRAGA RD. 2000 2500 ‐6 2008  $18,750 12

R224‐410 

SURFACE  BURRAGA RD. 20000 20500 ‐6 2008  $16,250 12

R224‐460 

SURFACE  BURRAGA RD. 22500 23000 ‐6 2008  $16,250 12

R224‐190 

SURFACE  BURRAGA RD. 9000 9500 ‐6 2008  $18,750 12

R045‐260 

SURFACE  CAMPBELLS RIVER RD. 12500 13000 ‐6 2008  $20,000 12

R045‐040 

SURFACE  CAMPBELLS RIVER RD. 1500 2000 ‐6 2008  $18,750 12

Page 138: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 57 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R045‐310 

SURFACE  CAMPBELLS RIVER RD. 15000 15500 ‐6 2008  $18,750 12

R045‐360 

SURFACE  CAMPBELLS RIVER RD. 17500 18000 ‐6 2008  $18,750 12

R045‐410 

SURFACE  CAMPBELLS RIVER RD. 20000 20500 ‐6 2008  $17,500 12

R045‐090 

SURFACE  CAMPBELLS RIVER RD. 4000 4500 ‐6 2008  $18,750 12

R045‐180 

SURFACE  CAMPBELLS RIVER RD. 8500 9000 ‐6 2008  $17,500 12

R002‐050 

SURFACE  CARLWOOD RD. 2000 2500 ‐6 2008  $11,250 12

R093‐010 

SURFACE  COOK ST. 0 125 ‐6 2008  $6,250 12

R096‐030 

SURFACE  DART ST. 375 600 ‐6 2008  $19,125 12

R015‐250 

SURFACE  DOG ROCKS RD. 12000 12500 ‐6 2008  $22,500 12

R015‐300 

SURFACE  DOG ROCKS RD. 14500 15000 ‐6 2008  $22,500 12

R015‐350 

SURFACE  DOG ROCKS RD. 17000 17500 ‐6 2008  $22,500 12

R015‐400 

SURFACE  DOG ROCKS RD. 19500 20000 ‐6 2008  $22,500 12

R015‐060 

SURFACE  DOG ROCKS RD. 2500 3000 ‐6 2008  $18,750 12

R015‐110 

SURFACE  DOG ROCKS RD. 5000 5500 ‐6 2008  $20,000 12

R015‐200 

SURFACE  DOG ROCKS RD. 9500 10000 ‐6 2008  $22,500 12

R099‐110 

SURFACE  DUDLEY ST. 1380 1455 ‐6 2008  $6,750 12

R102‐020 

SURFACE  ENDEAVOUR ST. 75 425 ‐6 2008  $105,000 12

R259‐020 

SURFACE  FERNDALE RD. 500 1000 ‐6 2008  $12,500 12

R104‐050 

SURFACE  FLEMING ST. 540 675 ‐6 2008  $8,100 12

R147‐010 

SURFACE  FOX LN. 0 250 ‐6 2008  $6,250 12

R141‐020 

SURFACE  HARRIS RD. 500 925 ‐6 2008  $13,813 12

R188‐030 

SURFACE  HAZELGROVE RD. 1000 1500 ‐6 2008  $15,000 12

R109‐010 

SURFACE  HORACE ST. 0 275 ‐6 2008  $16,500 12

R239‐020 

SURFACE  ISABELLA ST. 125 275 ‐6 2008  $3,000 12

R112‐040 

SURFACE  JENOLAN ST. 1050 1600 ‐6 2008  $15,125 12

R235‐030 

SURFACE  LLOYD ST. 275 425 ‐6 2008  $3,750 12

Page 139: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 58 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R023‐030 

SURFACE  LOWES MOUNT RD. 1000 1500 ‐6 2008  $15,000 12

R023‐240 

SURFACE  LOWES MOUNT RD. 11500 12000 ‐6 2008  $15,000 12

R023‐290 

SURFACE  LOWES MOUNT RD. 14000 14500 ‐6 2008  $17,500 12

R023‐340 

SURFACE  LOWES MOUNT RD. 16500 17000 ‐6 2008  $16,250 12

R023‐390 

SURFACE  LOWES MOUNT RD. 19000 19300 ‐6 2008  $8,250 12

R023‐140 

SURFACE  LOWES MOUNT RD. 6500 7000 ‐6 2008  $15,000 12

R023‐190 

SURFACE  LOWES MOUNT RD. 9000 9500 ‐6 2008  $15,000 12

R027‐100 

SURFACE  MEADOWS RD. 4500 4800 ‐6 2008  $5,250 12

R168‐010 

SURFACE  MOUNT NORWAY RD. 0 500 ‐6 2008  $12,500 12

R248‐030 

SURFACE  MT. DAVID RD. 1000 1500 ‐6 2008  $18,750 12

R248‐220 

SURFACE  MT. DAVID RD. 10500 11000 ‐6 2008  $13,750 12

R248‐120 

SURFACE  MT. DAVID RD. 5500 6000 ‐6 2008  $13,750 12

R248‐170 

SURFACE  MT. DAVID RD. 8000 8500 ‐6 2008  $13,750 12

R001‐040 

SURFACE  MUTTON FALLS RD. 1500 2000 ‐6 2008  $15,000 12

R117‐090 

SURFACE  NORTH ST. 1245 1380 ‐6 2008  $10,800 12

R117‐040 

SURFACE  NORTH ST. 570 705 ‐6 2008  $14,513 12

R005‐210 

SURFACE  O'CONNELL PLAINS RD. 10000 10500 ‐6 2008  $15,000 12

R005‐110 

SURFACE  O'CONNELL PLAINS RD. 5000 5500 ‐6 2008  $13,750 12

R005‐160 

SURFACE  O'CONNELL PLAINS RD. 7500 8000 ‐6 2008  $17,500 12

R204‐030 

SURFACE  O'CONNELL RD. (TOWN STREET) 

475 575 ‐6 2008  $2,000 12

R137‐010 

SURFACE  ON AVON AVE. 0 275 ‐6 2008  $8,250 12

R123‐010 

SURFACE  RALEIGH ST. 0 135 ‐6 2008  $6,750 12

R054‐010 

SURFACE  REEF RD. 0 500 ‐6 2008  $12,500 12

R222‐010 

SURFACE  ROCKLEY ST. 0 175 ‐6 2008  $3,063 12

R125‐040 

SURFACE  ROSS ST. 470 605 ‐6 2008  $12,150 12

R139‐030 

SURFACE  RUTTERS RIDGE RD. 1000 1500 ‐6 2008  $13,750 12

Page 140: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 59 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R127‐030 

SURFACE  SCOTIA AVE. 700 800 ‐6 2008  $5,750 12

R011‐090 

SURFACE  SEWELLS CREEK RD. 4000 4500 ‐6 2008  $23,750 12

R011‐140 

SURFACE  SEWELLS CREEK RD. 6500 7000 ‐6 2008  $17,500 12

R011‐190 

SURFACE  SEWELLS CREEK RD. 9000 9500 ‐6 2008  $15,000 12

R017‐580 

SURFACE  SHOOTERS HILL RD. 28500 29000 ‐6 2008  $15,000 12

R017‐130 

SURFACE  SHOOTERS HILL RD. 6000 6500 ‐6 2008  $13,750 12

R261‐010 

SURFACE  STEVENSON CL. 0 150 ‐6 2008  $6,000 12

R133‐030 

SURFACE  TALLYS LN. 375 600 ‐6 2008  $3,375 12

Subtotal    $1,432,938    

R187‐0460 

SURFACE  ABERCROMBIE RD. 22500 23000 ‐5 2009  $16,250 12

R187‐0530 

SURFACE  ABERCROMBIE RD. 26000 26500 ‐5 2009  $16,250 12

R187‐0730 

SURFACE  ABERCROMBIE RD. 36000 36500 ‐5 2009  $18,750 12

R187‐0780 

SURFACE  ABERCROMBIE RD. 38500 39000 ‐5 2009  $16,250 12

R187‐0100 

SURFACE  ABERCROMBIE RD. 4500 5000 ‐5 2009  $22,500 12

R187‐1370 

SURFACE  ABERCROMBIE RD. 68000 68500 ‐5 2009  $23,750 12

R187‐1420 

SURFACE  ABERCROMBIE RD. 70500 71000 ‐5 2009  $16,250 12

R187‐0200 

SURFACE  ABERCROMBIE RD. 9500 10000 ‐5 2009  $22,500 12

R040‐410 

SURFACE  ARKSTONE RD. 20000 20500 ‐5 2009  $16,250 12

R040‐460 

SURFACE  ARKSTONE RD. 22500 23000 ‐5 2009  $13,750 12

R040‐530 

SURFACE  ARKSTONE RD. 26000 26500 ‐5 2009  $15,000 12

R040‐580 

SURFACE  ARKSTONE RD. 28500 29000 ‐5 2009  $13,750 12

R040‐630 

SURFACE  ARKSTONE RD. 31000 31500 ‐5 2009  $16,250 12

R040‐680 

SURFACE  ARKSTONE RD. 33500 34000 ‐5 2009  $12,500 12

R085‐010 

SURFACE  ARMSTRONG PL. 0 75 ‐5 2009  $2,438 12

R161‐010 

SURFACE  AVOCA ST. 0 100 ‐5 2009  $2,250 12

R004‐380 

SURFACE  BEACONSFIELD RD. 18500 19000 ‐5 2009  $15,000 12

Page 141: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 60 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R004‐430 

SURFACE  BEACONSFIELD RD. 21000 21500 ‐5 2009  $15,000 12

R004‐500 

SURFACE  BEACONSFIELD RD. 24500 25000 ‐5 2009  $15,000 12

R004‐550 

SURFACE  BEACONSFIELD RD. 27000 27500 ‐5 2009  $15,000 12

R004‐770 

SURFACE  BEACONSFIELD RD. 38000 38500 ‐5 2009  $15,000 12

R090‐010 

SURFACE  BOUNTY ST. 0 75 ‐5 2009  $18,750 12

R224‐010 

SURFACE  BURRAGA RD. 0 500 ‐5 2009  $18,750 12

R224‐250 

SURFACE  BURRAGA RD. 12000 12500 ‐5 2009  $17,500 12

R224‐300 

SURFACE  BURRAGA RD. 14500 15000 ‐5 2009  $17,500 12

R224‐370 

SURFACE  BURRAGA RD. 18000 18500 ‐5 2009  $16,250 12

R224‐420 

SURFACE  BURRAGA RD. 20500 21000 ‐5 2009  $16,250 12

R224‐470 

SURFACE  BURRAGA RD. 23000 23500 ‐5 2009  $15,000 12

R224‐060 

SURFACE  BURRAGA RD. 2500 3000 ‐5 2009  $21,250 12

R224‐200 

SURFACE  BURRAGA RD. 9500 10000 ‐5 2009  $17,500 12

R045‐270 

SURFACE  CAMPBELLS RIVER RD. 13000 13500 ‐5 2009  $16,250 12

R045‐320 

SURFACE  CAMPBELLS RIVER RD. 15500 16000 ‐5 2009  $18,750 12

R045‐370 

SURFACE  CAMPBELLS RIVER RD. 18000 18500 ‐5 2009  $18,750 12

R045‐050 

SURFACE  CAMPBELLS RIVER RD. 2000 2500 ‐5 2009  $18,750 12

R045‐420 

SURFACE  CAMPBELLS RIVER RD. 20500 21000 ‐5 2009  $18,750 12

R045‐100 

SURFACE  CAMPBELLS RIVER RD. 4500 5000 ‐5 2009  $18,750 12

R045‐190 

SURFACE  CAMPBELLS RIVER RD. 9000 9500 ‐5 2009  $21,250 12

R002‐060 

SURFACE  CARLWOOD RD. 2500 3000 ‐5 2009  $11,250 12

R148‐010 

SURFACE  CLOVER LN. 0 200 ‐5 2009  $5,500 12

R094‐010 

SURFACE  CUNYNGHAME ST. 0 150 ‐5 2009  $12,750 12

R096‐040 

SURFACE  DART ST. 600 825 ‐5 2009  $19,125 12

R015‐210 

SURFACE  DOG ROCKS RD. 10000 10500 ‐5 2009  $22,500 12

R015‐260 

SURFACE  DOG ROCKS RD. 12500 13000 ‐5 2009  $22,500 12

Page 142: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 61 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R015‐310 

SURFACE  DOG ROCKS RD. 15000 15500 ‐5 2009  $22,500 12

R015‐360 

SURFACE  DOG ROCKS RD. 17500 18000 ‐5 2009  $22,500 12

R015‐410 

SURFACE  DOG ROCKS RD. 20000 20500 ‐5 2009  $22,500 12

R015‐070 

SURFACE  DOG ROCKS RD. 3000 3500 ‐5 2009  $20,000 12

R015‐120 

SURFACE  DOG ROCKS RD. 5500 6000 ‐5 2009  $20,000 12

R100‐010 

SURFACE  DULCE DR 0 150 ‐5 2009  $6,000 12

R104‐010 

SURFACE  FLEMING ST. 0 135 ‐5 2009  $11,475 12

R105‐010 

SURFACE  GLYNDWR AVE. 0 375 ‐5 2009  $22,500 12

R188‐240 

SURFACE  HAZELGROVE RD. 11500 12000 ‐5 2009  $16,250 12

R111‐010 

SURFACE  HUNTER ST. 0 75 ‐5 2009  $6,750 12

R239‐030 

SURFACE  ISABELLA ST. 275 350 ‐5 2009  $1,500 12

R113‐010 

SURFACE  KELLY PL. 0 75 ‐5 2009  $2,438 12

R179‐010 

SURFACE  LEE LN. 0 100 ‐5 2009  $1,750 12

R235‐040 

SURFACE  LLOYD ST. 425 575 ‐5 2009  $3,750 12

R023‐250 

SURFACE  LOWES MOUNT RD. 12000 12500 ‐5 2009  $15,000 12

R023‐300 

SURFACE  LOWES MOUNT RD. 14500 15000 ‐5 2009  $15,000 12

R023‐350 

SURFACE  LOWES MOUNT RD. 17000 17500 ‐5 2009  $16,250 12

R023‐060 

SURFACE  LOWES MOUNT RD. 2500 3000 ‐5 2009  $15,000 12

R023‐150 

SURFACE  LOWES MOUNT RD. 7000 7500 ‐5 2009  $15,000 12

R023‐200 

SURFACE  LOWES MOUNT RD. 9500 10000 ‐5 2009  $15,000 12

R256‐010 

SURFACE  MAHER DR. 0 100 ‐5 2009  $33,750 12

R027‐060 

SURFACE  MEADOWS RD. 2500 3000 ‐5 2009  $10,000 12

R168‐020 

SURFACE  MOUNT NORWAY RD. 500 1225 ‐5 2009  $18,125 12

R248‐230 

SURFACE  MT. DAVID RD. 11000 11500 ‐5 2009  $13,750 12

R248‐060 

SURFACE  MT. DAVID RD. 2500 3000 ‐5 2009  $13,750 12

R248‐130 

SURFACE  MT. DAVID RD. 6000 6500 ‐5 2009  $13,750 12

Page 143: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 62 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R248‐180 

SURFACE  MT. DAVID RD. 8500 9000 ‐5 2009  $13,750 12

R001‐050 

SURFACE  MUTTON FALLS RD. 2000 2500 ‐5 2009  $15,000 12

R117‐100 

SURFACE  NORTH ST. 1380 1430 ‐5 2009  $2,500 12

R117‐050 

SURFACE  NORTH ST. 705 840 ‐5 2009  $10,463 12

R008‐010 

SURFACE  OBERON ST. (O'CONNELL RD.) 

0 135 ‐5 2009  $6,750 12

R005‐220 

SURFACE  O'CONNELL PLAINS RD. 10500 11000 ‐5 2009  $15,000 12

R005‐120 

SURFACE  O'CONNELL PLAINS RD. 5500 6000 ‐5 2009  $12,500 12

R005‐170 

SURFACE  O'CONNELL PLAINS RD. 8000 8500 ‐5 2009  $15,000 12

R144‐010 

SURFACE  PARKES ST. 0 150 ‐5 2009  $9,000 12

R123‐020 

SURFACE  RALEIGH ST. 135 270 ‐5 2009  $12,825 12

R054‐020 

SURFACE  REEF RD. 500 1000 ‐5 2009  $12,500 12

R125‐050 

SURFACE  ROSS ST. 605 740 ‐5 2009  $12,825 12

R139‐040 

SURFACE  RUTTERS RIDGE RD. 1500 2000 ‐5 2009  $13,750 12

R011‐100 

SURFACE  SEWELLS CREEK RD. 4500 5000 ‐5 2009  $17,500 12

R011‐150 

SURFACE  SEWELLS CREEK RD. 7000 7500 ‐5 2009  $15,000 12

R011‐200 

SURFACE  SEWELLS CREEK RD. 9500 10000 ‐5 2009  $15,000 12

R017‐540 

SURFACE  SHOOTERS HILL RD. 26500 27000 ‐5 2009  $20,000 12

R017‐590 

SURFACE  SHOOTERS HILL RD. 29000 29500 ‐5 2009  $13,750 12

R129‐010 

SURFACE  SIRIUS ST. 0 200 ‐5 2009  $55,000 12

R133‐040 

SURFACE  TALLYS LN. 600 825 ‐5 2009  $3,375 12

R142‐010 

SURFACE  WILSON DR. 0 500 ‐5 2009  $15,000 12

Subtotal    $1,384,088    

  

R187‐0210 

SURFACE  ABERCROMBIE RD. 10000 10500 ‐4 2010  $22,500 12

R187‐0470 

SURFACE  ABERCROMBIE RD. 23000 23500 ‐4 2010  $16,250 12

R187‐0690 

SURFACE  ABERCROMBIE RD. 34000 34500 ‐4 2010  $17,500 12

R187‐0740 

SURFACE  ABERCROMBIE RD. 36500 37000 ‐4 2010  $17,500 12

Page 144: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 63 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R187‐0790 

SURFACE  ABERCROMBIE RD. 39000 39500 ‐4 2010  $18,750 12

R187‐0110 

SURFACE  ABERCROMBIE RD. 5000 5500 ‐4 2010  $22,500 12

R187‐1380 

SURFACE  ABERCROMBIE RD. 68500 69000 ‐4 2010  $13,750 12

R040‐420 

SURFACE  ARKSTONE RD. 20500 21000 ‐4 2010  $13,750 12

R040‐470 

SURFACE  ARKSTONE RD. 23000 23500 ‐4 2010  $13,750 12

R040‐540 

SURFACE  ARKSTONE RD. 26500 27000 ‐4 2010  $16,250 12

R040‐590 

SURFACE  ARKSTONE RD. 29000 29500 ‐4 2010  $13,750 12

R040‐640 

SURFACE  ARKSTONE RD. 31500 32000 ‐4 2010  $16,250 12

R161‐020 

SURFACE  AVOCA ST. 100 250 ‐4 2010  $3,375 12

R086‐010 

SURFACE  BALFOUR ST. 0 280 ‐4 2010  $16,800 12

R004‐390 

SURFACE  BEACONSFIELD RD. 19000 19500 ‐4 2010  $12,500 12

R004‐440 

SURFACE  BEACONSFIELD RD. 21500 22000 ‐4 2010  $13,750 12

R004‐510 

SURFACE  BEACONSFIELD RD. 25000 25500 ‐4 2010  $15,000 12

R004‐560 

SURFACE  BEACONSFIELD RD. 27500 28000 ‐4 2010  $15,000 12

R224‐210 

SURFACE  BURRAGA RD. 10000 10500 ‐4 2010  $18,750 12

R224‐260 

SURFACE  BURRAGA RD. 12500 13000 ‐4 2010  $18,750 12

R224‐310 

SURFACE  BURRAGA RD. 15000 15500 ‐4 2010  $18,750 12

R224‐380 

SURFACE  BURRAGA RD. 18500 19000 ‐4 2010  $16,250 12

R224‐430 

SURFACE  BURRAGA RD. 21000 21500 ‐4 2010  $16,250 12

R224‐480 

SURFACE  BURRAGA RD. 23500 24000 ‐4 2010  $16,250 12

R224‐070 

SURFACE  BURRAGA RD. 3000 3500 ‐4 2010  $15,000 12

R224‐020 

SURFACE  BURRAGA RD. 500 1000 ‐4 2010  $15,000 12

R045‐010 

SURFACE  CAMPBELLS RIVER RD. 0 500 ‐4 2010  $16,250 12

R045‐230 

SURFACE  CAMPBELLS RIVER RD. 11000 11500 ‐4 2010  $20,000 12

R045‐280 

SURFACE  CAMPBELLS RIVER RD. 13500 14000 ‐4 2010  $17,500 12

R045‐330 

SURFACE  CAMPBELLS RIVER RD. 16000 16500 ‐4 2010  $18,750 12

Page 145: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 64 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R045‐380 

SURFACE  CAMPBELLS RIVER RD. 18500 19000 ‐4 2010  $20,000 12

R045‐430 

SURFACE  CAMPBELLS RIVER RD. 21000 21500 ‐4 2010  $20,000 12

R045‐060 

SURFACE  CAMPBELLS RIVER RD. 2500 3000 ‐4 2010  $18,750 12

R045‐150 

SURFACE  CAMPBELLS RIVER RD. 7000 7500 ‐4 2010  $17,500 12

R002‐070 

SURFACE  CARLWOOD RD. 3000 3500 ‐4 2010  $13,750 12

R092‐010 

SURFACE  CARRINGTON AVE. 0 200 ‐4 2010  $12,000 12

R146‐010 

SURFACE  COLE CR. 0 75 ‐4 2010  $2,063 12

R094‐020 

SURFACE  CUNYNGHAME ST. 150 375 ‐4 2010  $19,125 12

R096‐060 

SURFACE  DART ST. 1050 1200 ‐4 2010  $5,250 12

R015‐220 

SURFACE  DOG ROCKS RD. 10500 11000 ‐4 2010  $22,500 12

R015‐270 

SURFACE  DOG ROCKS RD. 13000 13500 ‐4 2010  $22,500 12

R015‐320 

SURFACE  DOG ROCKS RD. 15500 16000 ‐4 2010  $22,500 12

R015‐370 

SURFACE  DOG ROCKS RD. 18000 18500 ‐4 2010  $22,500 12

R015‐080 

SURFACE  DOG ROCKS RD. 3500 4000 ‐4 2010  $20,000 12

R015‐130 

SURFACE  DOG ROCKS RD. 6000 6500 ‐4 2010  $20,000 12

R100‐030 

SURFACE  DULCE DR 200 250 ‐4 2010  $3,000 12

R104‐020 

SURFACE  FLEMING ST. 135 270 ‐4 2010  $11,475 12

R107‐010 

SURFACE  HAWKES DR. 0 375 ‐4 2010  $15,000 12

R188‐250 

SURFACE  HAZELGROVE RD. 12000 12500 ‐4 2010  $20,000 12

R112‐010 

SURFACE  JENOLAN ST. 0 175 ‐4 2010  $12,250 12

R114‐010 

SURFACE  KING ST. 0 75 ‐4 2010  $6,375 12

R235‐050 

SURFACE  LLOYD ST. 575 825 ‐4 2010  $6,250 12

R023‐210 

SURFACE  LOWES MOUNT RD. 10000 10500 ‐4 2010  $15,000 12

R023‐260 

SURFACE  LOWES MOUNT RD. 12500 13000 ‐4 2010  $15,000 12

R023‐310 

SURFACE  LOWES MOUNT RD. 15000 15500 ‐4 2010  $16,250 12

R023‐360 

SURFACE  LOWES MOUNT RD. 17500 18000 ‐4 2010  $16,250 12

Page 146: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 65 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R023‐070 

SURFACE  LOWES MOUNT RD. 3000 3500 ‐4 2010  $15,000 12

R023‐160 

SURFACE  LOWES MOUNT RD. 7500 8000 ‐4 2010  $15,000 12

R256‐020 

SURFACE  MAHER DR. 100 200 ‐4 2010  $27,500 12

R027‐070 

SURFACE  MEADOWS RD. 3000 3500 ‐4 2010  $10,000 12

R240‐010 

SURFACE  MINE ST. 0 125 ‐4 2010  $5,000 12

R248‐240 

SURFACE  MT. DAVID RD. 11500 12000 ‐4 2010  $13,750 12

R248‐070 

SURFACE  MT. DAVID RD. 3000 3500 ‐4 2010  $12,500 12

R248‐140 

SURFACE  MT. DAVID RD. 6500 7000 ‐4 2010  $13,750 12

R248‐190 

SURFACE  MT. DAVID RD. 9000 9500 ‐4 2010  $13,750 12

R001‐010 

SURFACE  MUTTON FALLS RD. ‐4 2010  $15,000 12

R001‐060 

SURFACE  MUTTON FALLS RD. 2500 3000 ‐4 2010  $16,250 12

R117‐060 

SURFACE  NORTH ST. 840 975 ‐4 2010  $12,150 12

R118‐010 

SURFACE  NURSE FOX CL. 0 40 ‐4 2010  $1,600 12

R008‐020 

SURFACE  OBERON ST. (O'CONNELL RD.) 

135 270 ‐4 2010  $6,750 12

R005‐230 

SURFACE  O'CONNELL PLAINS RD. 11000 11500 ‐4 2010  $12,500 12

R005‐080 

SURFACE  O'CONNELL PLAINS RD. 3500 4000 ‐4 2010  $13,750 12

R005‐130 

SURFACE  O'CONNELL PLAINS RD. 6000 6500 ‐4 2010  $15,000 12

R005‐180 

SURFACE  O'CONNELL PLAINS RD. 8500 9000 ‐4 2010  $15,000 12

R123‐030 

SURFACE  RALEIGH ST. 270 405 ‐4 2010  $4,050 12

R054‐030 

SURFACE  REEF RD. 1000 1500 ‐4 2010  $12,500 12

R153‐040 

SURFACE  RESERVE AVE. 1000 1200 ‐4 2010  $4,500 12

R125‐060 

SURFACE  ROSS ST. 740 875 ‐4 2010  $11,475 12

R139‐050 

SURFACE  RUTTERS RIDGE RD. 2000 2500 ‐4 2010  $13,750 12

R011‐210 

SURFACE  SEWELLS CREEK RD. 10000 10500 ‐4 2010  $15,000 12

R011‐110 

SURFACE  SEWELLS CREEK RD. 5000 5500 ‐4 2010  $17,500 12

R011‐160 

SURFACE  SEWELLS CREEK RD. 7500 8000 ‐4 2010  $15,000 12

Page 147: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 66 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R128‐010 

SURFACE  SHAKESPEARE CL. 0 400 ‐4 2010  $12,000 12

R017‐030 

SURFACE  SHOOTERS HILL RD. 1000 1500 ‐4 2010  $13,750 12

R017‐550 

SURFACE  SHOOTERS HILL RD. 27000 27500 ‐4 2010  $13,750 12

R017‐600 

SURFACE  SHOOTERS HILL RD. 29500 30000 ‐4 2010  $20,000 12

R169‐010 

SURFACE  SPRING VALLEY RD. 0 400 ‐4 2010  $8,000 12

R131‐010 

SURFACE  SPRINGFIELD ST. 0 75 ‐4 2010  $4,313 12

R135‐010 

SURFACE  TARANA RD. 0 225 ‐4 2010  $13,500 12

R180‐010 

SURFACE  WATER PLANT LN. 0 225 ‐4 2010  $3,938 12

R142‐020 

SURFACE  WILSON DR. 500 1000 ‐4 2010  $15,000 12

Subtotal    $1,313,988    

  

R187‐0220 

SURFACE  ABERCROMBIE RD. 10500 11000 ‐3 2011  $22,500 12

R187‐0500 

SURFACE  ABERCROMBIE RD. 24500 25000 ‐3 2011  $17,500 12

R187‐0700 

SURFACE  ABERCROMBIE RD. 34500 35000 ‐3 2011  $16,250 12

R187‐0750 

SURFACE  ABERCROMBIE RD. 37000 37500 ‐3 2011  $17,500 12

R187‐0800 

SURFACE  ABERCROMBIE RD. 39500 40000 ‐3 2011  $18,750 12

R187‐0120 

SURFACE  ABERCROMBIE RD. 5500 6000 ‐3 2011  $20,000 12

R187‐1390 

SURFACE  ABERCROMBIE RD. 69000 69500 ‐3 2011  $18,750 12

R084‐010 

SURFACE  ALBION ST. 0 950 ‐3 2011  $61,750 12

R040‐430 

SURFACE  ARKSTONE RD. 21000 21500 ‐3 2011  $12,500 12

R040‐480 

SURFACE  ARKSTONE RD. 23500 24000 ‐3 2011  $13,750 12

R040‐550 

SURFACE  ARKSTONE RD. 27000 27500 ‐3 2011  $15,000 12

R040‐600 

SURFACE  ARKSTONE RD. 29500 30000 ‐3 2011  $15,000 12

R040‐650 

SURFACE  ARKSTONE RD. 32000 32500 ‐3 2011  $13,750 12

R086‐020 

SURFACE  BALFOUR ST. 280 560 ‐3 2011  $16,800 12

R004‐350 

SURFACE  BEACONSFIELD RD. 17000 17500 ‐3 2011  $13,750 12

R004‐400 

SURFACE  BEACONSFIELD RD. 19500 20000 ‐3 2011  $12,500 12

Page 148: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 67 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R004‐450 

SURFACE  BEACONSFIELD RD. 22000 22500 ‐3 2011  $12,500 12

R004‐520 

SURFACE  BEACONSFIELD RD. 25500 26000 ‐3 2011  $13,750 12

R004‐680 

SURFACE  BEACONSFIELD RD. 33500 34000 ‐3 2011  $17,500 12

R224‐030 

SURFACE  BURRAGA RD. 1000 1500 ‐3 2011  $20,000 12

R224‐220 

SURFACE  BURRAGA RD. 10500 11000 ‐3 2011  $18,750 12

R224‐270 

SURFACE  BURRAGA RD. 13000 13500 ‐3 2011  $17,500 12

R224‐320 

SURFACE  BURRAGA RD. 15500 16000 ‐3 2011  $17,500 12

R224‐390 

SURFACE  BURRAGA RD. 19000 19500 ‐3 2011  $16,250 12

R224‐440 

SURFACE  BURRAGA RD. 21500 22000 ‐3 2011  $16,250 12

R224‐490 

SURFACE  BURRAGA RD. 24000 24500 ‐3 2011  $16,250 12

R224‐080 

SURFACE  BURRAGA RD. 3500 4000 ‐3 2011  $18,750 12

R045‐240 

SURFACE  CAMPBELLS RIVER RD. 11500 12000 ‐3 2011  $20,000 12

R045‐290 

SURFACE  CAMPBELLS RIVER RD. 14000 14500 ‐3 2011  $17,500 12

R045‐340 

SURFACE  CAMPBELLS RIVER RD. 16500 17000 ‐3 2011  $18,750 12

R045‐390 

SURFACE  CAMPBELLS RIVER RD. 19000 19500 ‐3 2011  $20,000 12

R045‐440 

SURFACE  CAMPBELLS RIVER RD. 21500 22000 ‐3 2011  $18,750 12

R045‐070 

SURFACE  CAMPBELLS RIVER RD. 3000 3500 ‐3 2011  $18,750 12

R045‐020 

SURFACE  CAMPBELLS RIVER RD. 500 1000 ‐3 2011  $17,500 12

R045‐160 

SURFACE  CAMPBELLS RIVER RD. 7500 8000 ‐3 2011  $17,500 12

R092‐020 

SURFACE  CARRINGTON AVE. 200 375 ‐3 2011  $10,500 12

R096‐010 

SURFACE  DART ST. 0 150 ‐3 2011  $12,750 12

R097‐030 

SURFACE  DILLON ST. (EAST) 0 150 ‐3 2011  $5,625 12

R015‐230 

SURFACE  DOG ROCKS RD. 11000 11500 ‐3 2011  $22,500 12

R015‐280 

SURFACE  DOG ROCKS RD. 13500 14000 ‐3 2011  $22,500 12

R015‐330 

SURFACE  DOG ROCKS RD. 16000 16500 ‐3 2011  $23,750 12

R015‐380 

SURFACE  DOG ROCKS RD. 18500 19000 ‐3 2011  $22,500 12

Page 149: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 68 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R015‐090 

SURFACE  DOG ROCKS RD. 4000 4500 ‐3 2011  $20,000 12

R015‐180 

SURFACE  DOG ROCKS RD. 8500 9000 ‐3 2011  $22,500 12

R158‐010 

SURFACE  DUCKMALOI RD. 0 325 ‐3 2011  $3,250 12

R100‐040 

SURFACE  DULCE DR 250 300 ‐3 2011  $3,000 12

R103‐010 

SURFACE  FAIRFAX ST. 0 135 ‐3 2011  $8,100 12

R162‐010 

SURFACE  FAWCETT RD. 0 300 ‐3 2011  $9,000 12

R104‐030 

SURFACE  FLEMING ST. 270 405 ‐3 2011  $11,475 12

R205‐010 

SURFACE  FOREST ST. 0 125 ‐3 2011  $2,188 12

R257‐010 

SURFACE  HAWKEN ST. 0 125 ‐3 2011  $53,125 12

R188‐010 

SURFACE  HAZELGROVE RD. 0 500 ‐3 2011  $20,000 12

R108‐010 

SURFACE  HERBORN ST. 0 50 ‐3 2011  $1,000 12

R112‐020 

SURFACE  JENOLAN ST. 175 350 ‐3 2011  $12,250 12

R023‐010 

SURFACE  LOWES MOUNT RD. 0 500 ‐3 2011  $26,250 12

R023‐220 

SURFACE  LOWES MOUNT RD. 10500 11000 ‐3 2011  $15,000 12

R023‐270 

SURFACE  LOWES MOUNT RD. 13000 13500 ‐3 2011  $15,000 12

R023‐320 

SURFACE  LOWES MOUNT RD. 15500 16000 ‐3 2011  $16,250 12

R023‐370 

SURFACE  LOWES MOUNT RD. 18000 18500 ‐3 2011  $16,250 12

R023‐080 

SURFACE  LOWES MOUNT RD. 3500 4000 ‐3 2011  $15,000 12

R023‐170 

SURFACE  LOWES MOUNT RD. 8000 8500 ‐3 2011  $15,000 12

R116‐010 

SURFACE  LUCHETTI PL. 0 75 ‐3 2011  $2,625 12

R143‐010 

SURFACE  MARKS CR. 0 500 ‐3 2011  $15,000 12

R027‐080 

SURFACE  MEADOWS RD. 3500 4000 ‐3 2011  $10,000 12

R248‐010 

SURFACE  MT. DAVID RD. 0 500 ‐3 2011  $17,500 12

R248‐250 

SURFACE  MT. DAVID RD. 12000 12675 ‐3 2011  $18,563 12

R248‐100 

SURFACE  MT. DAVID RD. 4500 5000 ‐3 2011  $12,500 12

R248‐150 

SURFACE  MT. DAVID RD. 7000 7500 ‐3 2011  $13,750 12

Page 150: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 69 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R248‐200 

SURFACE  MT. DAVID RD. 9500 10000 ‐3 2011  $13,750 12

R001‐070 

SURFACE  MUTTON FALLS RD. 3000 3500 ‐3 2011  $13,750 12

R001‐020 

SURFACE  MUTTON FALLS RD. 500 1000 ‐3 2011  $15,000 12

R117‐070 

SURFACE  NORTH ST. 975 1110 ‐3 2011  $10,800 12

R005‐090 

SURFACE  O'CONNELL PLAINS RD. 4000 4500 ‐3 2011  $15,000 12

R005‐140 

SURFACE  O'CONNELL PLAINS RD. 6500 7000 ‐3 2011  $15,000 12

R005‐190 

SURFACE  O'CONNELL PLAINS RD. 9000 9500 ‐3 2011  $15,000 12

R204‐010 

SURFACE  O'CONNELL RD. (TOWN STREET) 

0 325 ‐3 2011  $6,500 12

R121‐010 

SURFACE  PRINCE ST. 0 100 ‐3 2011  $1,500 12

R124‐020 

SURFACE  RAMSGATE LN. 150 375 ‐3 2011  $3,375 12

R125‐090 

SURFACE  ROSS ST. 1145 1195 ‐3 2011  $1,250 12

R139‐010 

SURFACE  RUTTERS RIDGE RD. 0 500 ‐3 2011  $15,000 12

R011‐310 

SURFACE  SEWELLS CREEK RD. 15000 15500 ‐3 2011  $15,000 12

R011‐070 

SURFACE  SEWELLS CREEK RD. 3000 3500 ‐3 2011  $25,000 12

R011‐120 

SURFACE  SEWELLS CREEK RD. 5500 6000 ‐3 2011  $17,500 12

R011‐170 

SURFACE  SEWELLS CREEK RD. 8000 8500 ‐3 2011  $15,000 12

R017‐040 

SURFACE  SHOOTERS HILL RD. 1500 2000 ‐3 2011  $13,750 12

R017‐560 

SURFACE  SHOOTERS HILL RD. 27500 28000 ‐3 2011  $15,000 12

R131‐020 

SURFACE  SPRINGFIELD ST. 75 275 ‐3 2011  $10,500 12

R136‐020 

SURFACE  TASMAN ST. 225 425 ‐3 2011  $13,000 12

R237‐010 

SURFACE  TUENA ST. 0 100 ‐3 2011  $2,250 12

R140‐010 

SURFACE  VULCAN ST. 0 100 ‐3 2011  $1,500 12

R154‐010 

SURFACE  WHITELEY RD. 0 500 ‐3 2011  $15,000 12

Subtotal    $1,403,925    

  

R017‐530 

SURFACE  SHOOTERS HILL RD. 26000 26500 ‐2 2012  $18,750 12

Subtotal    $18,750    

Page 151: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 70 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

  

R187‐0620 

SURFACE  ABERCROMBIE RD. 30500 31000 ‐1 2013  $16,250 12

R187‐0630 

SURFACE  ABERCROMBIE RD. 31000 31500 ‐1 2013  $16,250 12

R187‐0640 

SURFACE  ABERCROMBIE RD. 31500 32000 ‐1 2013  $17,500 12

R004‐570 

SURFACE  BEACONSFIELD RD. 28000 28500 ‐1 2013  $15,000 12

R004‐580 

SURFACE  BEACONSFIELD RD. 28500 29000 ‐1 2013  $15,000 12

R004‐590 

SURFACE  BEACONSFIELD RD. 29000 29500 ‐1 2013  $12,500 12

R096‐050 

SURFACE  DART ST. 825 1050 ‐1 2013  $19,125 12

R191‐060 

SURFACE  EDITH RD. 2500 3000 ‐1 2013  $17,500 12

R191‐070 

SURFACE  EDITH RD. 3000 3500 ‐1 2013  $17,500 12

R191‐080 

SURFACE  EDITH RD. 3500 4000 ‐1 2013  $15,000 12

R191‐090 

SURFACE  EDITH RD. 4000 4500 ‐1 2013  $20,000 12

R023‐040 

SURFACE  LOWES MOUNT RD. 1500 2000 ‐1 2013  $17,500 12

R023‐050 

SURFACE  LOWES MOUNT RD. 2000 2500 ‐1 2013  $15,000 12

R001‐090 

SURFACE  MUTTON FALLS RD. 4000 4500 ‐1 2013  $15,000 12

R001‐100 

SURFACE  MUTTON FALLS RD. 4500 5000 ‐1 2013  $15,000 12

R001‐110 

SURFACE  MUTTON FALLS RD. 5000 5500 ‐1 2013  $15,000 12

R005‐050 

SURFACE  O'CONNELL PLAINS RD. 2000 2500 ‐1 2013  $15,000 12

R005‐060 

SURFACE  O'CONNELL PLAINS RD. 2500 3000 ‐1 2013  $13,750 12

R005‐070 

SURFACE  O'CONNELL PLAINS RD. 3000 3500 ‐1 2013  $13,750 12

R127‐010 

SURFACE  SCOTIA AVE. 0 450 ‐1 2013  $25,875 12

R127‐020 

SURFACE  SCOTIA AVE. 450 700 ‐1 2013  $14,375 12

Subtotal    $341,875    

  

B036  BRIDGE  THE COMMON BRIDGE 0 2014  $98,265 24.31232877

R187‐0780 

PAVEMENT  ABERCROMBIE RD. 38500 39000 0 2014  $191,250 25

R191‐110 

PAVEMENT  EDITH RD. 5000 5500 0 2014  $168,750 25

R187‐ SURFACE  ABERCROMBIE RD. 32000 32500 0 2014  $17,500 12

Page 152: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 71 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

0650 

R187‐0660 

SURFACE  ABERCROMBIE RD. 32500 33000 0 2014  $17,500 12

R187‐0670 

SURFACE  ABERCROMBIE RD. 33000 33500 0 2014  $18,750 12

R187‐0680 

SURFACE  ABERCROMBIE RD. 33500 34000 0 2014  $16,250 12

R004‐470 

SURFACE  BEACONSFIELD RD. 23000 23500 0 2014  $16,250 12

R099‐010 

SURFACE  DUDLEY ST. 0 100 0 2014  $3,000 12

R101‐010 

SURFACE  EARL ST. 0 135 0 2014  $4,050 12

R101‐020 

SURFACE  EARL ST. 135 270 0 2014  $6,750 12

R191‐100 

SURFACE  EDITH RD. 4500 5000 0 2014  $17,500 12

R191‐110 

SURFACE  EDITH RD. 5000 5500 0 2014  $16,250 12

R191‐120 

SURFACE  EDITH RD. 5500 6000 0 2014  $17,500 12

R191‐130 

SURFACE  EDITH RD. 6000 6500 0 2014  $27,500 12

R001‐120 

SURFACE  MUTTON FALLS RD. 5500 6000 0 2014  $15,000 12

R001‐130 

SURFACE  MUTTON FALLS RD. 6000 6500 0 2014  $15,000 12

R001‐140 

SURFACE  MUTTON FALLS RD. 6500 7000 0 2014  $15,000 12

R125‐080 

SURFACE  ROSS ST. 1010 1145 0 2014  $11,475 12

R125‐070 

SURFACE  ROSS ST. 875 1010 0 2014  $11,475 12

Subtotal    $705,015    

R187‐0760 

PAVEMENT  ABERCROMBIE RD. 37500 38000 1 2015  $213,750 25

R187‐0860 

PAVEMENT  ABERCROMBIE RD. 42500 43000 1 2015  $247,500 25

R187‐0010 

SURFACE  ABERCROMBIE RD. 0 500 1 2015  $32,500 12

R187‐0330 

SURFACE  ABERCROMBIE RD. 16000 16500 1 2015  $20,000 12

R187‐0450 

SURFACE  ABERCROMBIE RD. 22000 22500 1 2015  $16,250 12

R187‐0830 

SURFACE  ABERCROMBIE RD. 41000 41500 1 2015  $22,500 12

R187‐0020 

SURFACE  ABERCROMBIE RD. 500 1000 1 2015  $30,000 12

R004‐010 

SURFACE  BEACONSFIELD RD. 0 500 1 2015  $15,000 12

Page 153: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 72 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R004‐460 

SURFACE  BEACONSFIELD RD. 22500 23000 1 2015  $15,000 12

R004‐020 

SURFACE  BEACONSFIELD RD. 500 1000 1 2015  $16,250 12

R045‐110 

SURFACE  CAMPBELLS RIVER RD. 5000 5500 1 2015  $17,500 12

R045‐120 

SURFACE  CAMPBELLS RIVER RD. 5500 6000 1 2015  $18,750 12

R045‐130 

SURFACE  CAMPBELLS RIVER RD. 6000 6500 1 2015  $18,750 12

R045‐140 

SURFACE  CAMPBELLS RIVER RD. 6500 7000 1 2015  $20,000 12

R097‐010 

SURFACE  DILLON ST. (WEST) 0 150 1 2015  $9,750 12

R097‐020 

SURFACE  DILLON ST. (WEST) 150 375 1 2015  $7,875 12

R101‐030 

SURFACE  EARL ST. 270 405 1 2015  $4,050 12

R191‐270 

SURFACE  EDITH RD. 13000 13500 1 2015  $16,250 12

R191‐280 

SURFACE  EDITH RD. 13500 14000 1 2015  $17,500 12

R191‐150 

SURFACE  EDITH RD. 7000 7500 1 2015  $22,500 12

R103‐020 

SURFACE  FAIRFAX ST. 135 270 1 2015  $3,375 12

R013‐080 

SURFACE  FOLEYS CREEK RD. 3500 4000 1 2015  $12,500 12

R013‐090 

SURFACE  FOLEYS CREEK RD. 4000 4500 1 2015  $13,750 12

R110‐010 

SURFACE  HUME ST. 0 200 1 2015  $5,000 12

R030‐010 

SURFACE  JUNCTION RD. 0 500 1 2015  $12,500 12

R030‐020 

SURFACE  JUNCTION RD. 500 1000 1 2015  $12,500 12

R018‐170 

SURFACE  MOZART RD. 8000 8500 1 2015  $15,000 12

R018‐180 

SURFACE  MOZART RD. 8500 9200 1 2015  $21,000 12

R001‐150 

SURFACE  MUTTON FALLS RD. 7000 7500 1 2015  $15,000 12

R001‐160 

SURFACE  MUTTON FALLS RD. 7500 8000 1 2015  $15,000 12

R001‐170 

SURFACE  MUTTON FALLS RD. 8000 8500 1 2015  $15,000 12

R001‐180 

SURFACE  MUTTON FALLS RD. 8500 9000 1 2015  $15,000 12

R117‐010 

SURFACE  NORTH ST. 0 300 1 2015  $16,500 12

R117‐020 

SURFACE  NORTH ST. 300 435 1 2015  $14,175 12

Page 154: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 73 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R122‐070 

SURFACE  QUEEN ST. 1500 1600 1 2015  $2,750 12

R122‐050 

SURFACE  QUEEN ST. 825 1050 1 2015  $7,313 12

R124‐010 

SURFACE  RAMSGATE LN. 0 150 1 2015  $2,250 12

R126‐010 

SURFACE  RUPERT ST. 0 125 1 2015  $6,875 12

R016‐010 

SURFACE  SLOGGETTS RD. 0 500 1 2015  $15,000 12

R016‐030 

SURFACE  SLOGGETTS RD. 1000 1500 1 2015  $15,000 12

R016‐020 

SURFACE  SLOGGETTS RD. 500 1000 1 2015  $15,000 12

R178‐010 

SURFACE  TOOHILLS LN. 0 150 1 2015  $2,625 12

R178‐020 

SURFACE  TOOHILLS LN. 150 375 1 2015  $3,938 12

Subtotal    $1,038,725    

  

R187‐0330 

PAVEMENT  ABERCROMBIE RD. 16000 16500 2 2016  $225,000 25

R187‐0850 

PAVEMENT  ABERCROMBIE RD. 42000 42500 2 2016  $247,500 25

R187‐0480 

SURFACE  ABERCROMBIE RD. 23500 24000 2 2016  $17,500 12

R187‐0490 

SURFACE  ABERCROMBIE RD. 24000 24500 2 2016  $16,250 12

R187‐0840 

SURFACE  ABERCROMBIE RD. 41500 42000 2 2016  $22,500 12

R187‐0850 

SURFACE  ABERCROMBIE RD. 42000 42500 2 2016  $22,500 12

R187‐0860 

SURFACE  ABERCROMBIE RD. 42500 43000 2 2016  $22,500 12

R187‐0870 

SURFACE  ABERCROMBIE RD. 43000 43500 2 2016  $22,500 12

R187‐0880 

SURFACE  ABERCROMBIE RD. 43500 44000 2 2016  $22,500 12

R187‐0890 

SURFACE  ABERCROMBIE RD. 44000 44500 2 2016  $22,500 12

R187‐0900 

SURFACE  ABERCROMBIE RD. 44500 45000 2 2016  $22,500 12

R187‐0910 

SURFACE  ABERCROMBIE RD. 45000 45500 2 2016  $22,500 12

R187‐0920 

SURFACE  ABERCROMBIE RD. 45500 46000 2 2016  $23,750 12

R187‐0930 

SURFACE  ABERCROMBIE RD. 46000 46500 2 2016  $23,750 12

R187‐0940 

SURFACE  ABERCROMBIE RD. 46500 47000 2 2016  $23,750 12

R187‐0950 

SURFACE  ABERCROMBIE RD. 47000 47500 2 2016  $23,750 12

Page 155: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 74 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R187‐0960 

SURFACE  ABERCROMBIE RD. 47500 48000 2 2016  $24,000 12

R187‐0970 

SURFACE  ABERCROMBIE RD. 48000 48500 2 2016  $23,750 12

R187‐0980 

SURFACE  ABERCROMBIE RD. 48500 49000 2 2016  $23,750 12

R187‐0990 

SURFACE  ABERCROMBIE RD. 49000 49500 2 2016  $23,750 12

R187‐1000 

SURFACE  ABERCROMBIE RD. 49500 50000 2 2016  $23,750 12

R187‐1010 

SURFACE  ABERCROMBIE RD. 50000 50500 2 2016  $23,750 12

R187‐1020 

SURFACE  ABERCROMBIE RD. 50500 51000 2 2016  $23,750 12

R187‐1030 

SURFACE  ABERCROMBIE RD. 51000 51500 2 2016  $23,750 12

R187‐1040 

SURFACE  ABERCROMBIE RD. 51500 52000 2 2016  $23,750 12

R187‐1050 

SURFACE  ABERCROMBIE RD. 52000 52500 2 2016  $23,750 12

R187‐1060 

SURFACE  ABERCROMBIE RD. 52500 53000 2 2016  $23,750 12

R187‐1070 

SURFACE  ABERCROMBIE RD. 53000 53500 2 2016  $23,750 12

R187‐1080 

SURFACE  ABERCROMBIE RD. 53500 54000 2 2016  $23,750 12

R187‐1090 

SURFACE  ABERCROMBIE RD. 54000 54500 2 2016  $23,750 12

R191‐030 

SURFACE  EDITH RD. 1000 1500 2 2016  $16,250 12

R191‐210 

SURFACE  EDITH RD. 10000 10500 2 2016  $16,250 12

R191‐220 

SURFACE  EDITH RD. 10500 11000 2 2016  $16,250 12

R191‐040 

SURFACE  EDITH RD. 1500 2000 2 2016  $18,750 12

R191‐140 

SURFACE  EDITH RD. 6500 7000 2 2016  $20,000 12

R191‐160 

SURFACE  EDITH RD. 7500 8000 2 2016  $20,000 12

R191‐180 

SURFACE  EDITH RD. 8500 9000 2 2016  $16,250 12

R191‐190 

SURFACE  EDITH RD. 9000 9500 2 2016  $16,250 12

R191‐200 

SURFACE  EDITH RD. 9500 10000 2 2016  $17,500 12

R188‐080 

SURFACE  HAZELGROVE RD. 3500 4000 2 2016  $16,250 12

R143‐020 

SURFACE  MARKS CR. 500 1175 2 2016  $20,250 12

R017‐140 

SURFACE  SHOOTERS HILL RD. 6500 7000 2 2016  $22,500 12

Page 156: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 75 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R017‐150 

SURFACE  SHOOTERS HILL RD. 7000 7500 2 2016  $20,000 12

R017‐160 

SURFACE  SHOOTERS HILL RD. 7500 8000 2 2016  $23,750 12

R017‐170 

SURFACE  SHOOTERS HILL RD. 8000 8500 2 2016  $23,750 12

R017‐180 

SURFACE  SHOOTERS HILL RD. 8500 9000 2 2016  $23,750 12

R022‐010 

SURFACE  TITANIA RD. 0 500 2 2016  $22,500 12

R022‐030 

SURFACE  TITANIA RD. 1000 1500 2 2016  $22,500 12

R022‐040 

SURFACE  TITANIA RD. 1500 2000 2 2016  $22,500 12

R022‐050 

SURFACE  TITANIA RD. 2000 2500 2 2016  $22,500 12

R022‐020 

SURFACE  TITANIA RD. 500 1000 2 2016  $22,500 12

R171‐010 

SURFACE  WHITELEY LN. 0 125 2 2016  $2,500 12

R142‐030 

SURFACE  WILSON DR. 1000 1350 2 2016  $10,500 12

Subtotal    $1,547,250    

  

R187‐0830 

PAVEMENT  ABERCROMBIE RD. 41000 41500 3 2017  $247,500 25

R187‐0200 

PAVEMENT  ABERCROMBIE RD. 9500 10000 3 2017  $247,500 25

R187‐0030 

SURFACE  ABERCROMBIE RD. 1000 1500 3 2017  $30,000 12

R187‐0250 

SURFACE  ABERCROMBIE RD. 12000 12500 3 2017  $22,500 12

R187‐0260 

SURFACE  ABERCROMBIE RD. 12500 13000 3 2017  $22,500 12

R187‐0270 

SURFACE  ABERCROMBIE RD. 13000 13500 3 2017  $21,250 12

R187‐0280 

SURFACE  ABERCROMBIE RD. 13500 14000 3 2017  $17,500 12

R187‐0290 

SURFACE  ABERCROMBIE RD. 14000 14500 3 2017  $17,500 12

R187‐0040 

SURFACE  ABERCROMBIE RD. 1500 2000 3 2017  $18,750 12

R187‐1100 

SURFACE  ABERCROMBIE RD. 54500 55000 3 2017  $23,750 12

R187‐1110 

SURFACE  ABERCROMBIE RD. 55000 55500 3 2017  $23,750 12

R187‐1120 

SURFACE  ABERCROMBIE RD. 55500 56000 3 2017  $23,750 12

R187‐1130 

SURFACE  ABERCROMBIE RD. 56000 56500 3 2017  $23,750 12

R187‐1140 

SURFACE  ABERCROMBIE RD. 56500 57000 3 2017  $23,750 12

Page 157: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 76 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R187‐1150 

SURFACE  ABERCROMBIE RD. 57000 57500 3 2017  $23,750 12

R187‐1160 

SURFACE  ABERCROMBIE RD. 57500 58000 3 2017  $23,750 12

R187‐1170 

SURFACE  ABERCROMBIE RD. 58000 58500 3 2017  $23,750 12

R187‐1180 

SURFACE  ABERCROMBIE RD. 58500 59000 3 2017  $23,750 12

R084‐040 

SURFACE  ALBION ST. 1500 1625 3 2017  $11,250 12

R084‐050 

SURFACE  ALBION ST. 1625 1850 3 2017  $20,250 12

R084‐060 

SURFACE  ALBION ST. 1850 2625 3 2017  $38,750 12

R084‐070 

SURFACE  ALBION ST. 2625 2925 3 2017  $15,000 12

R084‐080 

SURFACE  ALBION ST. 2925 3300 3 2017  $18,750 12

R084‐090 

SURFACE  ALBION ST. 3300 3475 3 2017  $8,750 12

R084‐100 

SURFACE  ALBION ST. 3475 4000 3 2017  $26,250 12

R004‐030 

SURFACE  BEACONSFIELD RD. 1000 1500 3 2017  $15,000 12

R004‐040 

SURFACE  BEACONSFIELD RD. 1500 2000 3 2017  $17,500 12

R004‐050 

SURFACE  BEACONSFIELD RD. 2000 2500 3 2017  $17,500 12

R004‐060 

SURFACE  BEACONSFIELD RD. 2500 3000 3 2017  $15,000 12

R004‐070 

SURFACE  BEACONSFIELD RD. 3000 3500 3 2017  $15,000 12

R004‐080 

SURFACE  BEACONSFIELD RD. 3500 4000 3 2017  $15,000 12

R004‐090 

SURFACE  BEACONSFIELD RD. 4000 4500 3 2017  $16,250 12

R004‐100 

SURFACE  BEACONSFIELD RD. 4500 5000 3 2017  $16,250 12

R028‐070 

SURFACE  BLACK BULLOCK RD. 3000 3500 3 2017  $15,000 12

R028‐080 

SURFACE  BLACK BULLOCK RD. 3500 4100 3 2017  $18,000 12

R009‐010 

SURFACE  BLOOM HILL RD. 0 500 3 2017  $15,000 12

R009‐030 

SURFACE  BLOOM HILL RD. 1000 1500 3 2017  $15,000 12

R009‐040 

SURFACE  BLOOM HILL RD. 1500 2000 3 2017  $15,000 12

R009‐050 

SURFACE  BLOOM HILL RD. 2000 2500 3 2017  $13,750 12

R009‐060 

SURFACE  BLOOM HILL RD. 2500 3000 3 2017  $15,000 12

Page 158: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 77 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R009‐070 

SURFACE  BLOOM HILL RD. 3000 3500 3 2017  $15,000 12

R009‐080 

SURFACE  BLOOM HILL RD. 3500 4000 3 2017  $13,750 12

R009‐020 

SURFACE  BLOOM HILL RD. 500 1000 3 2017  $15,000 12

R217‐010 

SURFACE  CANTWELL LN. 0 175 3 2017  $3,063 12

R002‐280 

SURFACE  CARLWOOD RD. 13500 14000 3 2017  $15,000 12

R002‐290 

SURFACE  CARLWOOD RD. 14000 14500 3 2017  $15,000 12

R002‐300 

SURFACE  CARLWOOD RD. 14500 15000 3 2017  $15,000 12

R002‐310 

SURFACE  CARLWOOD RD. 15000 15600 3 2017  $21,000 12

R074‐010 

SURFACE  CLAYTONS LN. 0 500 3 2017  $7,500 12

R015‐140 

SURFACE  DOG ROCKS RD. 6500 7000 3 2017  $20,000 12

R015‐150 

SURFACE  DOG ROCKS RD. 7000 7500 3 2017  $23,750 12

R015‐160 

SURFACE  DOG ROCKS RD. 7500 8000 3 2017  $22,500 12

R015‐170 

SURFACE  DOG ROCKS RD. 8000 8500 3 2017  $22,500 12

R233‐010 

SURFACE  EDGAR HANRAHAN DR. 0 250 3 2017  $6,250 12

R233‐020 

SURFACE  EDGAR HANRAHAN DR. 250 475 3 2017  $5,625 12

R233‐030 

SURFACE  EDGAR HANRAHAN DR. 475 800 3 2017  $8,125 12

R191‐290 

SURFACE  EDITH RD. 14000 14500 3 2017  $16,250 12

R191‐300 

SURFACE  EDITH RD. 14500 15000 3 2017  $20,000 12

R191‐310 

SURFACE  EDITH RD. 15000 15500 3 2017  $17,500 12

R191‐320 

SURFACE  EDITH RD. 15500 16000 3 2017  $17,500 12

R191‐330 

SURFACE  EDITH RD. 16000 16500 3 2017  $17,500 12

R191‐340 

SURFACE  EDITH RD. 16500 17000 3 2017  $17,500 12

R191‐350 

SURFACE  EDITH RD. 17000 17500 3 2017  $17,500 12

R191‐360 

SURFACE  EDITH RD. 17500 18000 3 2017  $17,500 12

R191‐370 

SURFACE  EDITH RD. 18000 18500 3 2017  $17,500 12

R191‐380 

SURFACE  EDITH RD. 18500 19000 3 2017  $17,500 12

Page 159: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 78 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R191‐390 

SURFACE  EDITH RD. 19000 19500 3 2017  $17,500 12

R191‐400 

SURFACE  EDITH RD. 19500 20000 3 2017  $17,500 12

R013‐040 

SURFACE  FOLEYS CREEK RD. 1500 2000 3 2017  $15,000 12

R013‐050 

SURFACE  FOLEYS CREEK RD. 2000 2500 3 2017  $15,000 12

R013‐060 

SURFACE  FOLEYS CREEK RD. 2500 3000 3 2017  $13,750 12

R013‐070 

SURFACE  FOLEYS CREEK RD. 3000 3500 3 2017  $13,750 12

R021‐050 

SURFACE  GINGKIN RD. 2000 2500 3 2017  $15,000 12

R021‐060 

SURFACE  GINGKIN RD. 2500 3000 3 2017  $15,000 12

R021‐070 

SURFACE  GINGKIN RD. 3000 3500 3 2017  $15,000 12

R021‐080 

SURFACE  GINGKIN RD. 3500 4000 3 2017  $16,250 12

R021‐090 

SURFACE  GINGKIN RD. 4000 4500 3 2017  $16,250 12

R188‐110 

SURFACE  HAZELGROVE RD. 5000 5500 3 2017  $18,750 12

R188‐120 

SURFACE  HAZELGROVE RD. 5500 6000 3 2017  $18,750 12

R188‐130 

SURFACE  HAZELGROVE RD. 6000 6500 3 2017  $17,500 12

R188‐140 

SURFACE  HAZELGROVE RD. 6500 7000 3 2017  $16,250 12

R188‐150 

SURFACE  HAZELGROVE RD. 7000 7500 3 2017  $16,250 12

R174‐010 

SURFACE  MCARTHURS LN. 0 175 3 2017  $3,063 12

R248‐080 

SURFACE  MT. DAVID RD. 3500 4000 3 2017  $13,750 12

R248‐090 

SURFACE  MT. DAVID RD. 4000 4500 3 2017  $13,750 12

R001‐260 

SURFACE  MUTTON FALLS RD. 12500 13000 3 2017  $15,000 12

R001‐270 

SURFACE  MUTTON FALLS RD. 13000 13500 3 2017  $17,500 12

R001‐280 

SURFACE  MUTTON FALLS RD. 13500 14000 3 2017  $17,500 12

R001‐290 

SURFACE  MUTTON FALLS RD. 14000 14500 3 2017  $16,250 12

R001‐300 

SURFACE  MUTTON FALLS RD. 14500 14900 3 2017  $13,000 12

R001‐190 

SURFACE  MUTTON FALLS RD. 9000 9500 3 2017  $15,000 12

R001‐200 

SURFACE  MUTTON FALLS RD. 9500 10000 3 2017  $15,000 12

Page 160: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 79 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R007‐010 

SURFACE  PURDONS LN. 0 500 3 2017  $12,500 12

R153‐010 

SURFACE  RESERVE AVE. 0 500 3 2017  $11,250 12

R153‐020 

SURFACE  RESERVE AVE. 500 900 3 2017  $9,000 12

R247‐010 

SURFACE  ROBSON RD. 0 275 3 2017  $4,125 12

R247‐020 

SURFACE  ROBSON RD. 275 400 3 2017  $1,875 12

R125‐030 

SURFACE  ROSS ST. 335 470 3 2017  $13,500 12

R011‐010 

SURFACE  SEWELLS CREEK RD. 0 500 3 2017  $16,250 12

R011‐030 

SURFACE  SEWELLS CREEK RD. 1000 1500 3 2017  $17,500 12

R011‐040 

SURFACE  SEWELLS CREEK RD. 1500 2000 3 2017  $17,500 12

R011‐050 

SURFACE  SEWELLS CREEK RD. 2000 2500 3 2017  $17,500 12

R011‐060 

SURFACE  SEWELLS CREEK RD. 2500 3000 3 2017  $22,500 12

R011‐020 

SURFACE  SEWELLS CREEK RD. 500 1000 3 2017  $17,500 12

R134‐010 

SURFACE  TARANA CR. 0 175 3 2017  $10,938 12

R134‐020 

SURFACE  TARANA CR. 175 350 3 2017  $9,188 12

R173‐020 

SURFACE  WHITTAKERS LN. 225 450 3 2017  $3,938 12

R173‐030 

SURFACE  WHITTAKERS LN. 450 675 3 2017  $3,938 12

Subtotal    $2,223,625    

  

R187‐0820 

PAVEMENT  ABERCROMBIE RD. 40500 41000 4 2018  $225,000 25

R187‐0130 

PAVEMENT  ABERCROMBIE RD. 6000 6500 4 2018  $225,000 25

R040‐740 

PAVEMENT  ARKSTONE RD. 36500 37000 4 2018  $105,000 35

R191‐120 

PAVEMENT  EDITH RD. 5500 6000 4 2018  $180,000 25

R187‐0170 

SURFACE  ABERCROMBIE RD. 8000 8500 4 2018  $22,500 12

R187‐0180 

SURFACE  ABERCROMBIE RD. 8500 9000 4 2018  $20,000 12

R083‐010 

SURFACE  ALBERT ST. 0 100 4 2018  $5,500 12

R083‐020 

SURFACE  ALBERT ST. 100 200 4 2018  $5,500 12

R083‐030 

SURFACE  ALBERT ST. 200 425 4 2018  $12,375 12

Page 161: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 80 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R182‐010 

SURFACE  ARTERY LN. 0 75 4 2018  $1,313 12

R004‐120 

SURFACE  BEACONSFIELD RD. 5500 6000 4 2018  $15,000 12

R088‐010 

SURFACE  BLENHEIM AVE. 0 550 4 2018  $24,750 12

R091‐010 

SURFACE  BUCKLEY CR. 0 525 4 2018  $21,000 12

R052‐010 

SURFACE  BUTTERFACTORY LN. 0 500 4 2018  $21,250 12

R045‐210 

SURFACE  CAMPBELLS RIVER RD. 10000 10500 4 2018  $17,500 12

R045‐220 

SURFACE  CAMPBELLS RIVER RD. 10500 11000 4 2018  $17,500 12

R045‐200 

SURFACE  CAMPBELLS RIVER RD. 9500 10000 4 2018  $17,500 12

R093‐020 

SURFACE  COOK ST. 125 200 4 2018  $3,750 12

R191‐170 

SURFACE  EDITH RD. 8000 8500 4 2018  $17,500 12

R102‐010 

SURFACE  ENDEAVOUR ST. 0 75 4 2018  $22,500 12

R013‐010 

SURFACE  FOLEYS CREEK RD. 0 500 4 2018  $15,000 12

R013‐030 

SURFACE  FOLEYS CREEK RD. 1000 1500 4 2018  $16,250 12

R013‐020 

SURFACE  FOLEYS CREEK RD. 500 1000 4 2018  $15,000 12

R021‐100 

SURFACE  GINGKIN RD. 4500 5000 4 2018  $16,250 12

R021‐110 

SURFACE  GINGKIN RD. 5000 5500 4 2018  $16,250 12

R021‐120 

SURFACE  GINGKIN RD. 5500 6000 4 2018  $17,500 12

R258‐010 

SURFACE  HARGRAVES QUARRY RD. 0 500 4 2018  $15,000 12

R258‐020 

SURFACE  HARGRAVES QUARRY RD. 500 800 4 2018  $9,000 12

R188‐160 

SURFACE  HAZELGROVE RD. 7500 8000 4 2018  $16,250 12

R188‐170 

SURFACE  HAZELGROVE RD. 8000 8500 4 2018  $17,500 12

R188‐180 

SURFACE  HAZELGROVE RD. 8500 9000 4 2018  $15,000 12

R188‐190 

SURFACE  HAZELGROVE RD. 9000 9500 4 2018  $17,500 12

R220‐010 

SURFACE  HOLLIS LN. 0 75 4 2018  $1,313 12

R115‐010 

SURFACE  LINKS CL. 0 125 4 2018  $4,688 12

R159‐010 

SURFACE  LUNEY PL. 0 275 4 2018  $4,813 12

Page 162: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 81 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R120‐010 

SURFACE  PINE ST. 0 135 4 2018  $4,050 12

R017‐210 

SURFACE  SHOOTERS HILL RD. 10000 10500 4 2018  $23,750 12

R017‐220 

SURFACE  SHOOTERS HILL RD. 10500 11000 4 2018  $23,750 12

R017‐230 

SURFACE  SHOOTERS HILL RD. 11000 11500 4 2018  $23,750 12

R017‐640 

SURFACE  SHOOTERS HILL RD. 31500 32000 4 2018  $18,750 12

R017‐650 

SURFACE  SHOOTERS HILL RD. 32000 32500 4 2018  $18,750 12

R017‐660 

SURFACE  SHOOTERS HILL RD. 32500 33000 4 2018  $18,750 12

R017‐670 

SURFACE  SHOOTERS HILL RD. 33000 33500 4 2018  $18,750 12

R017‐190 

SURFACE  SHOOTERS HILL RD. 9000 9500 4 2018  $23,750 12

R017‐200 

SURFACE  SHOOTERS HILL RD. 9500 10000 4 2018  $23,750 12

R022‐060 

SURFACE  TITANIA RD. 2500 3000 4 2018  $22,500 12

R022‐070 

SURFACE  TITANIA RD. 3000 3500 4 2018  $22,500 12

R022‐080 

SURFACE  TITANIA RD. 3500 4000 4 2018  $22,500 12

R022‐090 

SURFACE  TITANIA RD. 4000 4300 4 2018  $13,500 12

R173‐010 

SURFACE  WHITTAKERS LN. 0 225 4 2018  $3,938 12

R173‐040 

SURFACE  WHITTAKERS LN. 675 900 4 2018  $3,938 12

R149‐010 

SURFACE  ZITA RD. 0 200 4 2018  $3,500 12

Subtotal    $1,467,925    

  

R187‐0770 

PAVEMENT  ABERCROMBIE RD. 38000 38500 5 2019  $213,750 25

R004‐120 

PAVEMENT  BEACONSFIELD RD. 5500 6000 5 2019  $98,000 35

R187‐0540 

SURFACE  ABERCROMBIE RD. 26500 27000 5 2019  $17,500 12

R187‐0550 

SURFACE  ABERCROMBIE RD. 27000 27500 5 2019  $16,250 12

R187‐1240 

SURFACE  ABERCROMBIE RD. 61500 62000 5 2019  $23,750 12

R187‐1250 

SURFACE  ABERCROMBIE RD. 62000 62500 5 2019  $23,750 12

R187‐1260 

SURFACE  ABERCROMBIE RD. 62500 63000 5 2019  $23,750 12

R187‐1270 

SURFACE  ABERCROMBIE RD. 63000 63500 5 2019  $23,750 12

Page 163: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 82 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R187‐1280 

SURFACE  ABERCROMBIE RD. 63500 64000 5 2019  $23,750 12

R187‐1290 

SURFACE  ABERCROMBIE RD. 64000 64500 5 2019  $23,750 12

R187‐1300 

SURFACE  ABERCROMBIE RD. 64500 65000 5 2019  $23,750 12

R187‐1310 

SURFACE  ABERCROMBIE RD. 65000 65500 5 2019  $23,750 12

R187‐1320 

SURFACE  ABERCROMBIE RD. 65500 66000 5 2019  $23,750 12

R187‐1330 

SURFACE  ABERCROMBIE RD. 66000 66500 5 2019  $23,750 12

R187‐1340 

SURFACE  ABERCROMBIE RD. 66500 67000 5 2019  $23,750 12

R187‐1350 

SURFACE  ABERCROMBIE RD. 67000 67500 5 2019  $23,750 12

R187‐1360 

SURFACE  ABERCROMBIE RD. 67500 68000 5 2019  $23,750 12

R040‐510 

SURFACE  ARKSTONE RD. 25000 25500 5 2019  $13,750 12

R040‐520 

SURFACE  ARKSTONE RD. 25500 26000 5 2019  $15,000 12

R040‐690 

SURFACE  ARKSTONE RD. 34000 34500 5 2019  $16,250 12

R040‐700 

SURFACE  ARKSTONE RD. 34500 35000 5 2019  $15,000 12

R040‐710 

SURFACE  ARKSTONE RD. 35000 35500 5 2019  $16,250 12

R004‐700 

SURFACE  BEACONSFIELD RD. 34500 35000 5 2019  $15,000 12

R004‐710 

SURFACE  BEACONSFIELD RD. 35000 35500 5 2019  $15,000 12

R004‐720 

SURFACE  BEACONSFIELD RD. 35500 36000 5 2019  $15,000 12

R004‐730 

SURFACE  BEACONSFIELD RD. 36000 36500 5 2019  $15,000 12

R089‐020 

SURFACE  BLIGH ST. 375 625 5 2019  $5,625 12

R089‐030 

SURFACE  BLIGH ST. 625 825 5 2019  $10,500 12

R224‐090 

SURFACE  BURRAGA RD. 4000 4500 5 2019  $18,750 12

R224‐100 

SURFACE  BURRAGA RD. 4500 5000 5 2019  $20,000 12

R224‐110 

SURFACE  BURRAGA RD. 5000 5500 5 2019  $20,000 12

R224‐120 

SURFACE  BURRAGA RD. 5500 6000 5 2019  $20,000 12

R224‐130 

SURFACE  BURRAGA RD. 6000 6500 5 2019  $20,000 12

R218‐010 

SURFACE  CAMPBELLS LN. 0 150 5 2019  $2,625 12

Page 164: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 83 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R045‐460 

SURFACE  CAMPBELLS RIVER RD. 22500 22800 5 2019  $12,000 12

R015‐030 

SURFACE  DOG ROCKS RD. 1000 1500 5 2019  $16,250 12

R015‐040 

SURFACE  DOG ROCKS RD. 1500 2000 5 2019  $15,000 12

R015‐020 

SURFACE  DOG ROCKS RD. 500 1000 5 2019  $16,250 12

R191‐240 

SURFACE  EDITH RD. 11500 12000 5 2019  $15,000 12

R191‐250 

SURFACE  EDITH RD. 12000 12500 5 2019  $16,250 12

R191‐260 

SURFACE  EDITH RD. 12500 13000 5 2019  $20,000 12

R188‐210 

SURFACE  HAZELGROVE RD. 10000 10500 5 2019  $17,500 12

R188‐090 

SURFACE  HAZELGROVE RD. 4000 4500 5 2019  $16,250 12

R188‐100 

SURFACE  HAZELGROVE RD. 4500 5000 5 2019  $17,500 12

R188‐200 

SURFACE  HAZELGROVE RD. 9500 10000 5 2019  $18,750 12

R037‐010 

SURFACE  MT. WERONG RD. 0 500 5 2019  $22,500 12

R037‐030 

SURFACE  MT. WERONG RD. 1000 1500 5 2019  $22,500 12

R037‐040 

SURFACE  MT. WERONG RD. 1500 2000 5 2019  $22,500 12

R037‐050 

SURFACE  MT. WERONG RD. 2000 2500 5 2019  $22,500 12

R037‐060 

SURFACE  MT. WERONG RD. 2500 3000 5 2019  $22,500 12

R037‐070 

SURFACE  MT. WERONG RD. 3000 3500 5 2019  $23,750 12

R037‐080 

SURFACE  MT. WERONG RD. 3500 4000 5 2019  $22,500 12

R037‐090 

SURFACE  MT. WERONG RD. 4000 4500 5 2019  $22,500 12

R037‐020 

SURFACE  MT. WERONG RD. 500 1000 5 2019  $22,500 12

R080‐010 

SURFACE  OBERON ST. (DUCKMALOI RD.) 

0 230 5 2019  $11,500 12

R017‐610 

SURFACE  SHOOTERS HILL RD. 30000 30500 5 2019  $20,000 12

R017‐620 

SURFACE  SHOOTERS HILL RD. 30500 31000 5 2019  $20,000 12

R017‐630 

SURFACE  SHOOTERS HILL RD. 31000 31500 5 2019  $18,750 12

Subtotal    $1,362,750    

  

B014  BRIDGE  BALD RIDGE RD. BRIDGE 6 2020  $185,581 69.53972603

Page 165: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 84 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

B025  BRIDGE  SNAKES VALLEY BRIDGE 6 2020  $287,651 64.5369863

R187‐0560 

PAVEMENT  ABERCROMBIE RD. 27500 28000 6 2020  $225,000 25

R045‐460 

PAVEMENT  CAMPBELLS RIVER RD. 22500 22800 6 2020  $75,600 35

R015‐050 

PAVEMENT  DOG ROCKS RD. 2000 2500 6 2020  $112,000 35

R187‐0410 

SURFACE  ABERCROMBIE RD. 20000 20500 6 2020  $22,500 12

R187‐0420 

SURFACE  ABERCROMBIE RD. 20500 21000 6 2020  $23,750 12

R187‐0430 

SURFACE  ABERCROMBIE RD. 21000 21500 6 2020  $22,500 12

R187‐0440 

SURFACE  ABERCROMBIE RD. 21500 22000 6 2020  $23,750 12

R187‐1190 

SURFACE  ABERCROMBIE RD. 59000 59500 6 2020  $23,750 12

R187‐1200 

SURFACE  ABERCROMBIE RD. 59500 60000 6 2020  $23,750 12

R187‐1210 

SURFACE  ABERCROMBIE RD. 60000 60500 6 2020  $23,750 12

R187‐1220 

SURFACE  ABERCROMBIE RD. 60500 61000 6 2020  $23,750 12

R187‐1230 

SURFACE  ABERCROMBIE RD. 61000 61500 6 2020  $23,750 12

R187‐0140 

SURFACE  ABERCROMBIE RD. 6500 7000 6 2020  $20,000 12

R187‐0150 

SURFACE  ABERCROMBIE RD. 7000 7500 6 2020  $22,500 12

R187‐0160 

SURFACE  ABERCROMBIE RD. 7500 8000 6 2020  $22,500 12

R224‐340 

SURFACE  BURRAGA RD. 16500 17000 6 2020  $16,250 12

R224‐350 

SURFACE  BURRAGA RD. 17000 17500 6 2020  $16,250 12

R191‐010 

SURFACE  EDITH RD. 0 500 6 2020  $16,250 12

R191‐430 

SURFACE  EDITH RD. 21000 21500 6 2020  $17,500 12

R191‐440 

SURFACE  EDITH RD. 21500 22000 6 2020  $17,250 12

R191‐450 

SURFACE  EDITH RD. 22000 22500 6 2020  $17,500 12

R191‐460 

SURFACE  EDITH RD. 22500 23000 6 2020  $16,250 12

R191‐020 

SURFACE  EDITH RD. 500 1000 6 2020  $16,250 12

R176‐010 

SURFACE  HOWARDS LN. 0 125 6 2020  $2,188 12

R176‐020 

SURFACE  HOWARDS LN. 125 375 6 2020  $4,375 12

R012‐ SURFACE  MAYFIELD RD. 10000 10500 6 2020  $20,000 12

Page 166: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 85 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

210 

R012‐220 

SURFACE  MAYFIELD RD. 10500 11100 6 2020  $24,000 12

R012‐190 

SURFACE  MAYFIELD RD. 9000 9500 6 2020  $20,000 12

R012‐200 

SURFACE  MAYFIELD RD. 9500 10000 6 2020  $17,500 12

R027‐010 

SURFACE  MEADOWS RD. 0 500 6 2020  $12,500 12

R027‐030 

SURFACE  MEADOWS RD. 1000 1500 6 2020  $12,500 12

R027‐020 

SURFACE  MEADOWS RD. 500 1000 6 2020  $12,500 12

R248‐040 

SURFACE  MT. DAVID RD. 1500 2000 6 2020  $16,250 12

R248‐050 

SURFACE  MT. DAVID RD. 2000 2500 6 2020  $13,750 12

R017‐240 

SURFACE  SHOOTERS HILL RD. 11500 12000 6 2020  $23,750 12

R017‐250 

SURFACE  SHOOTERS HILL RD. 12000 12500 6 2020  $20,000 12

R017‐260 

SURFACE  SHOOTERS HILL RD. 12500 13000 6 2020  $23,750 12

R017‐270 

SURFACE  SHOOTERS HILL RD. 13000 13500 6 2020  $23,750 12

R017‐280 

SURFACE  SHOOTERS HILL RD. 13500 14000 6 2020  $23,750 12

R017‐290 

SURFACE  SHOOTERS HILL RD. 14000 14500 6 2020  $23,750 12

R017‐300 

SURFACE  SHOOTERS HILL RD. 14500 15000 6 2020  $23,750 12

R017‐310 

SURFACE  SHOOTERS HILL RD. 15000 15500 6 2020  $23,750 12

R017‐320 

SURFACE  SHOOTERS HILL RD. 15500 16000 6 2020  $23,750 12

R017‐330 

SURFACE  SHOOTERS HILL RD. 16000 16500 6 2020  $23,750 12

R017‐090 

SURFACE  SHOOTERS HILL RD. 4000 4500 6 2020  $13,750 12

R017‐100 

SURFACE  SHOOTERS HILL RD. 4500 5000 6 2020  $13,750 12

R017‐110 

SURFACE  SHOOTERS HILL RD. 5000 5500 6 2020  $13,750 12

R130‐010 

SURFACE  SPICER PL. 0 50 6 2020  $1,750 12

R175‐010 

SURFACE  WALKER LN. 0 125 6 2020  $2,188 12

R165‐010 

SURFACE  WARRINA AVE. 0 125 6 2020  $2,813 12

Subtotal    $1,732,894    

  

Page 167: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 86 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R187‐0340 

PAVEMENT  ABERCROMBIE RD. 16500 17000 7 2021  $202,500 25

R187‐0380 

SURFACE  ABERCROMBIE RD. 18500 19000 7 2021  $25,000 12

R187‐0390 

SURFACE  ABERCROMBIE RD. 19000 19500 7 2021  $22,500 12

R187‐0400 

SURFACE  ABERCROMBIE RD. 19500 20000 7 2021  $25,000 12

R187‐0050 

SURFACE  ABERCROMBIE RD. 2000 2500 7 2021  $20,000 12

R187‐0060 

SURFACE  ABERCROMBIE RD. 2500 3000 7 2021  $23,750 12

R187‐0560 

SURFACE  ABERCROMBIE RD. 27500 28000 7 2021  $20,000 12

R187‐0570 

SURFACE  ABERCROMBIE RD. 28000 28500 7 2021  $21,250 12

R187‐0580 

SURFACE  ABERCROMBIE RD. 28500 29000 7 2021  $16,250 12

R187‐0590 

SURFACE  ABERCROMBIE RD. 29000 29500 7 2021  $16,250 12

R187‐0600 

SURFACE  ABERCROMBIE RD. 29500 30000 7 2021  $16,250 12

R187‐0070 

SURFACE  ABERCROMBIE RD. 3000 3500 7 2021  $23,750 12

R187‐0610 

SURFACE  ABERCROMBIE RD. 30000 30500 7 2021  $16,250 12

R040‐720 

SURFACE  ARKSTONE RD. 35500 36000 7 2021  $17,500 12

R040‐730 

SURFACE  ARKSTONE RD. 36000 36500 7 2021  $16,250 12

R040‐740 

SURFACE  ARKSTONE RD. 36500 37000 7 2021  $16,250 12

R004‐640 

SURFACE  BEACONSFIELD RD. 31500 32000 7 2021  $15,000 12

R004‐650 

SURFACE  BEACONSFIELD RD. 32000 32500 7 2021  $15,000 12

R004‐660 

SURFACE  BEACONSFIELD RD. 32500 33000 7 2021  $15,000 12

R004‐670 

SURFACE  BEACONSFIELD RD. 33000 33500 7 2021  $16,250 12

R015‐010 

SURFACE  DOG ROCKS RD. 0 500 7 2021  $16,250 12

R191‐230 

SURFACE  EDITH RD. 11000 11500 7 2021  $17,500 12

R191‐410 

SURFACE  EDITH RD. 20000 20500 7 2021  $17,500 12

R191‐420 

SURFACE  EDITH RD. 20500 21000 7 2021  $16,250 12

R021‐130 

SURFACE  GINGKIN RD. 6000 6500 7 2021  $17,500 12

R021‐140 

SURFACE  GINGKIN RD. 6500 7000 7 2021  $17,500 12

Page 168: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 87 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R067‐010 

SURFACE  HARVEYS RD. 0 500 7 2021  $15,000 12

R067‐020 

SURFACE  HARVEYS RD. 500 900 7 2021  $12,000 12

R188‐220 

SURFACE  HAZELGROVE RD. 10500 11000 7 2021  $17,500 12

R188‐230 

SURFACE  HAZELGROVE RD. 11000 11500 7 2021  $16,250 12

R181‐010 

SURFACE  HILLS LN. 0 100 7 2021  $1,750 12

R249‐010 

SURFACE  HOLDSHIP RD. 0 175 7 2021  $3,500 12

R249‐020 

SURFACE  HOLDSHIP RD. 175 225 7 2021  $1,000 12

R235‐010 

SURFACE  LLOYD ST. 0 150 7 2021  $3,750 12

R235‐020 

SURFACE  LLOYD ST. 150 275 7 2021  $3,125 12

R012‐110 

SURFACE  MAYFIELD RD. 5000 5500 7 2021  $20,000 12

R012‐120 

SURFACE  MAYFIELD RD. 5500 6000 7 2021  $20,000 12

R012‐130 

SURFACE  MAYFIELD RD. 6000 6500 7 2021  $17,500 12

R012‐140 

SURFACE  MAYFIELD RD. 6500 7000 7 2021  $17,500 12

R012‐150 

SURFACE  MAYFIELD RD. 7000 7500 7 2021  $17,500 12

R012‐160 

SURFACE  MAYFIELD RD. 7500 8000 7 2021  $17,500 12

R012‐170 

SURFACE  MAYFIELD RD. 8000 8500 7 2021  $17,500 12

R012‐180 

SURFACE  MAYFIELD RD. 8500 9000 7 2021  $20,000 12

R027‐040 

SURFACE  MEADOWS RD. 1500 2000 7 2021  $12,500 12

R027‐050 

SURFACE  MEADOWS RD. 2000 2500 7 2021  $12,500 12

R037‐100 

SURFACE  MT. WERONG RD. 4500 5000 7 2021  $22,500 12

R037‐110 

SURFACE  MT. WERONG RD. 5000 5500 7 2021  $23,750 12

R122‐030 

SURFACE  QUEEN ST. 375 600 7 2021  $18,000 12

R122‐040 

SURFACE  QUEEN ST. 600 825 7 2021  $14,063 12

R017‐080 

SURFACE  SHOOTERS HILL RD. 3500 4000 7 2021  $13,750 12

R133‐010 

SURFACE  TALLYS LN. 0 150 7 2021  $2,250 12

R133‐020 

SURFACE  TALLYS LN. 150 375 7 2021  $3,375 12

Page 169: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 88 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R135‐020 

SURFACE  TARANA RD. 225 550 7 2021  $19,500 12

Subtotal    $1,026,063    

  

R187‐0120 

PAVEMENT  ABERCROMBIE RD. 5500 6000 8 2022  $225,000 25

R191‐030 

PAVEMENT  EDITH RD. 1000 1500 8 2022  $168,750 25

R004‐600 

SURFACE  BEACONSFIELD RD. 29500 30000 8 2022  $15,000 12

R004‐610 

SURFACE  BEACONSFIELD RD. 30000 30500 8 2022  $15,000 12

R004‐620 

SURFACE  BEACONSFIELD RD. 30500 31000 8 2022  $15,000 12

R004‐630 

SURFACE  BEACONSFIELD RD. 31000 31500 8 2022  $15,000 12

R224‐140 

SURFACE  BURRAGA RD. 6500 7000 8 2022  $17,500 12

R224‐150 

SURFACE  BURRAGA RD. 7000 7500 8 2022  $21,250 12

R224‐160 

SURFACE  BURRAGA RD. 7500 8000 8 2022  $21,250 12

R224‐170 

SURFACE  BURRAGA RD. 8000 8500 8 2022  $20,000 12

R002‐270 

SURFACE  CARLWOOD RD. 13000 13500 8 2022  $15,000 12

R099‐030 

SURFACE  DUDLEY ST. 300 435 8 2022  $9,450 12

R259‐030 

SURFACE  FERNDALE RD. 1000 1500 8 2022  $12,500 12

R259‐040 

SURFACE  FERNDALE RD. 1500 2000 8 2022  $12,500 12

R259‐050 

SURFACE  FERNDALE RD. 2000 2500 8 2022  $12,500 12

R259‐060 

SURFACE  FERNDALE RD. 2500 3000 8 2022  $12,500 12

R021‐150 

SURFACE  GINGKIN RD. 7000 7500 8 2022  $17,500 12

R021‐160 

SURFACE  GINGKIN RD. 7500 8000 8 2022  $18,750 12

R030‐030 

SURFACE  JUNCTION RD. 1000 1500 8 2022  $12,500 12

R030‐040 

SURFACE  JUNCTION RD. 1500 2000 8 2022  $12,500 12

R012‐010 

SURFACE  MAYFIELD RD. 0 500 8 2022  $21,250 12

R012‐020 

SURFACE  MAYFIELD RD. 500 1000 8 2022  $20,000 12

R037‐120 

SURFACE  MT. WERONG RD. 5500 6000 8 2022  $25,000 12

R037‐130 

SURFACE  MT. WERONG RD. 6000 6500 8 2022  $23,750 12

Page 170: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 89 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R037‐140 

SURFACE  MT. WERONG RD. 6500 7000 8 2022  $23,750 12

R037‐150 

SURFACE  MT. WERONG RD. 7000 7500 8 2022  $22,500 12

R037‐160 

SURFACE  MT. WERONG RD. 7500 8000 8 2022  $22,500 12

R001‐210 

SURFACE  MUTTON FALLS RD. 10000 10500 8 2022  $15,000 12

R001‐220 

SURFACE  MUTTON FALLS RD. 10500 11000 8 2022  $15,000 12

R001‐230 

SURFACE  MUTTON FALLS RD. 11000 11500 8 2022  $15,000 12

R001‐240 

SURFACE  MUTTON FALLS RD. 11500 12000 8 2022  $15,000 12

R001‐250 

SURFACE  MUTTON FALLS RD. 12000 12500 8 2022  $15,000 12

R080‐050 

SURFACE  OBERON ST. (DUCKMALOI RD.) 

1150 1275 8 2022  $3,125 12

R080‐020 

SURFACE  OBERON ST. (DUCKMALOI RD.) 

230 460 8 2022  $11,500 12

R080‐030 

SURFACE  OBERON ST. (DUCKMALOI RD.) 

460 690 8 2022  $5,750 12

R080‐040 

SURFACE  OBERON ST. (DUCKMALOI RD.) 

690 1150 8 2022  $11,500 12

R007‐030 

SURFACE  PURDONS LN. 1000 1500 8 2022  $15,000 12

R007‐040 

SURFACE  PURDONS LN. 1500 2000 8 2022  $15,000 12

R007‐020 

SURFACE  PURDONS LN. 500 1000 8 2022  $15,000 12

R122‐010 

SURFACE  QUEEN ST. 0 150 8 2022  $13,125 12

R122‐020 

SURFACE  QUEEN ST. 150 375 8 2022  $21,375 12

R017‐340 

SURFACE  SHOOTERS HILL RD. 16500 17000 8 2022  $23,750 12

R017‐350 

SURFACE  SHOOTERS HILL RD. 17000 17500 8 2022  $23,750 12

R017‐360 

SURFACE  SHOOTERS HILL RD. 17500 18000 8 2022  $23,750 12

R017‐370 

SURFACE  SHOOTERS HILL RD. 18000 18500 8 2022  $23,750 12

R017‐380 

SURFACE  SHOOTERS HILL RD. 18500 19000 8 2022  $23,750 12

R017‐390 

SURFACE  SHOOTERS HILL RD. 19000 19500 8 2022  $23,750 12

R017‐400 

SURFACE  SHOOTERS HILL RD. 19500 20000 8 2022  $23,750 12

R017‐050 

SURFACE  SHOOTERS HILL RD. 2000 2500 8 2022  $13,750 12

R017‐410 

SURFACE  SHOOTERS HILL RD. 20000 20500 8 2022  $23,750 12

Page 171: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 90 ‐ 

DRAFT Road Asset Management Plan 2014 

Asset ID  Sub Category   Asset Name  From  To Remaining  Life in Years 

Planned Renewal Year 

Renewal Cost ($) 

Useful Life  

R017‐420 

SURFACE  SHOOTERS HILL RD. 20500 21000 8 2022  $23,750 12

R017‐430 

SURFACE  SHOOTERS HILL RD. 21000 21500 8 2022  $23,750 12

R017‐440 

SURFACE  SHOOTERS HILL RD. 21500 22000 8 2022  $25,000 12

R017‐450 

SURFACE  SHOOTERS HILL RD. 22000 22500 8 2022  $23,750 12

R017‐460 

SURFACE  SHOOTERS HILL RD. 22500 23000 8 2022  $23,750 12

R017‐470 

SURFACE  SHOOTERS HILL RD. 23000 23500 8 2022  $25,000 12

R017‐060 

SURFACE  SHOOTERS HILL RD. 2500 3000 8 2022  $13,750 12

R017‐070 

SURFACE  SHOOTERS HILL RD. 3000 3500 8 2022  $13,750 12

R136‐010 

SURFACE  TASMAN ST. 0 225 8 2022  $7,875 12

Subtotal    $1,398,700    

  

R187‐1390 

PAVEMENT  ABERCROMBIE RD. 69000 69500 9 2023  $213,750 25

R022‐020 

PAVEMENT  TITANIA RD. 500 1000 9 2023  $247,500 25

R187‐0300 

SURFACE  ABERCROMBIE RD. 14500 15000 9 2023  $25,000 12

R187‐0310 

SURFACE  ABERCROMBIE RD. 15000 15500 9 2023  $25,000 12

R187‐0320 

SURFACE  ABERCROMBIE RD. 15500 16000 9 2023  $25,000 12

R187‐0340 

SURFACE  ABERCROMBIE RD. 16500 17000 9 2023  $17,500 12

R187‐0350 

SURFACE  ABERCROMBIE RD. 17000 17500 9 2023  $25,000 12

R187‐0360 

SURFACE  ABERCROMBIE RD. 17500 18000 9 2023  $25,000 12

R187‐0370 

SURFACE  ABERCROMBIE RD. 18000 18500 9 2023  $25,000 12

Subtotal    $628,750    

  

Program Total    $20,662,172  

Page 172: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 91 ‐ 

DRAFT Road Asset Management Plan 2014 

Appendix C   Projected Upgrade/Exp/New 10 year Capital Works Program  

To be developed 

Page 173: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 92 ‐ 

DRAFT Road Asset Management Plan 2014 

Appendix D   Budgeted Expenditures Accommodated in LTFP 

 

Projected Expenditure 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Capital Expenditure on Renewal/Replacement of existing asets

$8,235 $1,039 $1,547 $2,224 $1,468 $1,363 $1,733 $1,026 $1,399 $629

Capital Expenditure on Upgrade/New assets

$833 $833 $833 $833 $833 $833 $833 $833 $833 $833

Operational cost of existing assets

$126 $126 $126 $126 $126 $126 $126 $126 $126 $126

Maintenance cost of existing assets

$1,603 $1,603 $1,603 $1,603 $1,603 $1,603 $1,603 $1,603 $1,603 $1,603

Operational cost of New assets

$0 $1 $1 $2 $2 $3 $4 $4 $5 $5

Maintenance cost of New assets

$0 $13 $26 $39 $53 $66 $79 $92 $105 $118

Disposal of Surplus Assets $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

All dollar values in ($'000)'s

     

 

 

Page 174: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 93 ‐ 

DRAFT Road Asset Management Plan 2014 

Appendix E   Abbreviations 

 

AAAC  Average annual asset consumption

AM  Asset management 

AM Plan  Asset management plan 

ARI  Average recurrence interval 

ASC  Annual service cost 

BOD  Biochemical (biological) oxygen demand

CRC  Current replacement cost 

CWMS  Community wastewater management systems

DA  Depreciable amount 

DRC  Depreciated replacement cost

EF  Earthworks/formation 

IRMP  Infrastructure risk management plan

LCC  Life Cycle cost 

LCE  Life cycle expenditure 

LTFP  Long term financial plan 

MMS  Maintenance management system

PCI  Pavement condition index 

RV  Residual value 

SoA  State of the Assets 

SS  Suspended solids 

vph  Vehicles per hour 

WDCRD  Written down current replacement cost

 

 

Page 175: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 94 ‐ 

DRAFT Road Asset Management Plan 2014 

Appendix F   Glossary

Annual service cost (ASC) 1)     Reporting actual cost         The  annual  (accrual)  cost  of  providing  a  service 

including  operations, maintenance,  depreciation, finance/opportunity  and  disposal  costs  less revenue.  

2)    For investment analysis and budgeting         An estimate of  the cost  that would be  tendered, 

per annum,  if  tenders were  called  for  the  supply of  a  service  to a performance  specification  for  a fixed  term.    The  Annual  Service  Cost  includes operations,  maintenance,  depreciation,  finance/ opportunity and disposal costs, less revenue. 

Asset A  resource  controlled by an entity as a  result of past  events  and  from  which  future  economic benefits  are  expected  to  flow  to  the  entity. Infrastructure assets are a  sub‐class of property, plant  and  equipment  which  are  non‐current assets  with  a  life  greater  than  12  months  and enable services to be provided. 

Asset category Sub‐group  of  assets within  a  class  hierarchy  for financial reporting and management purposes. 

Asset class A  group  of  assets  having  a  similar  nature  or function  in  the  operations  of  an  entity,  and which,  for purposes of disclosure,  is  shown as a single item without supplementary disclosure. 

Asset condition assessment The process of continuous or periodic inspection, assessment, measurement  and  interpretation  of the  resultant data  to  indicate  the  condition of a specific  asset  so  as  to  determine  the  need  for some preventative or remedial action. 

Asset hierarchy A  framework  for  segmenting  an  asset  base  into appropriate  classifications.  The  asset  hierarchy can be based on asset function or asset type or a combination of the two. 

Asset management (AM) The  combination  of  management,  financial, economic,  engineering  and  other  practices applied  to  physical  assets with  the  objective  of providing the required level of service in the most cost effective manner. 

Asset renewal funding ratio The  ratio  of  the  net  present  value  of  asset renewal  funding  accommodated  over  a  10  year period in a long term financial plan relative to the net  present  value  of  projected  capital  renewal expenditures  identified  in an asset management plan  for  the  same  period  [AIFMG  Financial Sustainability Indicator No 8]. 

Average annual asset consumption (AAAC)* The  amount  of  an  organisation’s  asset  base consumed during a  reporting period  (generally a year).    This  may  be  calculated  by  dividing  the depreciable  amount  by  the  useful  life  (or  total future  economic  benefits/service  potential)  and totalled  for each and every asset OR by dividing the  carrying  amount  (depreciated  replacement cost)  by  the  remaining  useful  life  (or  remaining future  economic  benefits/service  potential)  and totalled  for  each  and  every  asset  in  an  asset category or class. 

Borrowings A borrowing or loan is a contractual obligation of the  borrowing  entity  to  deliver  cash  or  another financial  asset  to  the  lending  entity  over  a specified period of time or at a specified point  in time,  to  cover  both  the  initial  capital  provided and the cost of the interest incurred for providing this  capital.  A  borrowing  or  loan  provides  the means for the borrowing entity to finance outlays (typically physical assets) when  it has  insufficient funds  of  its  own  to  do  so,  and  for  the  lending entity to make a financial return, normally  in the form  of  interest  revenue,  on  the  funding provided. 

Capital expenditure Relatively large (material) expenditure, which has benefits,  expected  to  last  for  more  than  12 months.  Capital  expenditure  includes  renewal, expansion  and  upgrade. Where  capital  projects involve  a  combination  of  renewal,  expansion and/or  upgrade  expenditures,  the  total  project cost needs to be allocated accordingly. 

Capital expenditure ‐ expansion Expenditure  that  extends  the  capacity  of  an existing  asset  to  provide  benefits,  at  the  same standard  as  is  currently  enjoyed  by  existing beneficiaries,  to  a  new  group  of  users.  It  is 

Page 176: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 95 ‐ 

DRAFT Road Asset Management Plan 2014 

discretionary expenditure, which increases future operations  and  maintenance  costs,  because  it increases  the organisation’s asset base, but may be  associated with  additional  revenue  from  the new user group, eg. extending a drainage or road network, the provision of an oval or park in a new suburb for new residents. 

Capital expenditure ‐ new Expenditure which creates a new asset providing a  new  service/output  that  did  not  exist beforehand.  As  it  increases  service  potential  it may  impact  revenue  and  will  increase  future operations and maintenance expenditure. 

Capital expenditure ‐ renewal Expenditure on an existing asset or on  replacing an  existing  asset,  which  returns  the  service capability  of  the  asset  up  to  that  which  it  had originally.  It  is periodically  required expenditure, relatively large (material) in value compared with the value of the components or sub‐components of  the  asset  being  renewed.  As  it  reinstates existing  service  potential,  it  generally  has  no impact  on  revenue,  but  may  reduce  future operations  and  maintenance  expenditure  if completed at  the optimum  time, eg.  resurfacing or  resheeting a material part of a  road network, replacing  a  material  section  of  a  drainage network  with  pipes  of  the  same  capacity, resurfacing an oval. 

Capital expenditure ‐ upgrade Expenditure, which enhances an existing asset to provide  a  higher  level  of  service or  expenditure that will increase the life of the asset beyond that which  it  had  originally.  Upgrade  expenditure  is discretionary  and  often  does  not  result  in additional  revenue  unless  direct  user  charges apply.  It  will  increase  operations  and maintenance  expenditure  in  the  future  because of  the  increase  in  the organisation’s  asset base, eg. widening the sealed area of an existing road, replacing drainage pipes with pipes of  a  greater capacity,  enlarging  a  grandstand  at  a  sporting facility.  

Capital funding Funding to pay for capital expenditure. 

Capital grants Monies  received  generally  tied  to  the  specific projects  for  which  they  are  granted,  which  are 

often  upgrade  and/or  expansion  or  new investment proposals. 

Capital investment expenditure See capital expenditure definition. 

Capitalisation threshold The  value  of  expenditure  on  non‐current  assets above  which  the  expenditure  is  recognised  as capital  expenditure  and  below  which  the expenditure  is charged as an expense in the year of acquisition. 

Carrying amount The amount at which an asset is recognised after deducting  any  accumulated  depreciation  / amortisation and accumulated impairment losses thereon. 

Class of assets See asset class definition 

Component Specific  parts  of  an  asset  having  independent physical or functional identity and having specific attributes  such  as  different  life  expectancy, maintenance regimes, risk or criticality.  

Core asset management  Asset management which  relies primarily on  the use  of  an  asset  register,  maintenance management  systems,  job  resource management,  inventory  control,  condition assessment,  simple  risk  assessment  and defined levels of service,  in order to establish alternative treatment  options  and  long‐term  cashflow predictions.  Priorities  are  usually  established  on the  basis  of  financial  return  gained  by  carrying out  the work  (rather  than  detailed  risk  analysis and optimised decision‐ making).  

Cost of an asset The  amount of  cash or  cash equivalents paid or the  fair  value  of  the  consideration  given  to acquire an asset at  the  time of  its acquisition or construction,  including  any  costs  necessary  to place the asset into service.  This includes one‐off design and project management costs. 

Critical assets Assets for which the financial, business or service level  consequences  of  failure  are  sufficiently severe  to  justify  proactive  inspection  and 

Page 177: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 96 ‐ 

DRAFT Road Asset Management Plan 2014 

rehabilitation.  Critical  assets  have  a  lower threshold for action than noncritical assets.  

Current replacement cost (CRC) The  cost  the  entity  would  incur  to  acquire  the asset  on  the  reporting  date.    The  cost  is measured  by  reference  to  the  lowest  cost  at which  the  gross  future  economic  benefits  could be obtained  in  the normal course of business or the  minimum  it  would  cost,  to  replace  the existing  asset  with  a  technologically  modern equivalent  new  asset  (not  a  second  hand  one) with  the  same  economic  benefits  (gross  service potential)  allowing  for  any  differences  in  the quantity  and  quality  of  output  and  in  operating costs. 

Deferred maintenance  The  shortfall  in  rehabilitation  work  undertaken relative  to  that  required  to maintain  the  service potential of an asset.  

Depreciable amount The cost of an asset, or other amount substituted for its cost, less its residual value. 

Depreciated replacement cost (DRC) The  current  replacement  cost  (CRC)  of  an  asset less, where applicable, accumulated depreciation calculated on the basis of such cost to reflect the already  consumed  or  expired  future  economic benefits of the asset. 

Depreciation / amortisation The  systematic  allocation  of  the  depreciable amount  (service  potential)  of  an  asset  over  its useful life. 

Economic life See useful life definition. 

Expenditure The  spending  of money  on  goods  and  services. Expenditure  includes  recurrent  and  capital outlays. 

Expenses Decreases  in  economic  benefits  during  the accounting  period  in  the  form  of  outflows  or depletions of assets or increases in liabilities that result  in  decreases  in  equity,  other  than  those relating to distributions to equity participants. 

Fair value 

The  amount  for  which  an  asset  could  be exchanged,  or  a  liability  settled,  between knowledgeable, willing parties,  in an arms  length transaction. 

Financing gap A  financing  gap  exists  whenever  an  entity  has insufficient capacity to finance asset renewal and other  expenditure  necessary  to  be  able  to appropriately  maintain  the  range  and  level  of services  its  existing  asset  stock  was  originally designed  and  intended  to  deliver.  The  service capability  of  the  existing  asset  stock  should  be determined  assuming  no  additional  operating revenue,  productivity  improvements,  or  net financial  liabilities above  levels currently planned or  projected.  A  current  financing  gap  means service levels have already or are currently falling. A  projected  financing  gap  if  not  addressed  will result  in  a  future  diminution  of  existing  service levels. 

Heritage asset An  asset  with  historic,  artistic,  scientific, technological,  geographical  or  environmental qualities  that  is  held  and maintained  principally for its contribution to knowledge and culture and this  purpose  is  central  to  the  objectives  of  the entity holding it. 

Impairment Loss The amount by which the carrying amount of an asset exceeds its recoverable amount. 

Infrastructure assets Physical  assets  that  contribute  to  meeting  the needs of organisations or  the need  for access to major economic and social facilities and services, eg.  roads,  drainage,  footpaths  and  cycleways. These  are  typically  large,  interconnected networks or portfolios of composite assets.   The components  of  these  assets may  be  separately maintained,  renewed or  replaced  individually  so that  the  required  level  and  standard  of  service from  the  network  of  assets  is  continuously sustained. Generally  the  components and hence the assets have long lives. They are fixed in place and are often have no separate market value. 

Investment property Property  held  to  earn  rentals  or  for  capital appreciation or both, rather than for: (a) use in the production or supply of goods or services 

or for administrative purposes; or 

Page 178: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 97 ‐ 

DRAFT Road Asset Management Plan 2014 

(b) sale in the ordinary course of business. 

Key performance indicator  A qualitative or quantitative measure of a service or  activity used  to  compare  actual  performance against  a  standard or other  target. Performance indicators  commonly  relate  to  statutory  limits, safety,  responsiveness,  cost,  comfort,  asset performance,  reliability,  efficiency, environmental  protection  and  customer satisfaction. 

Level of service The  defined  service  quality  for  a  particular service/activity  against  which  service performance may  be measured.    Service  levels usually  relate  to  quality,  quantity,  reliability, responsiveness,  environmental  impact, acceptability and cost. 

Life Cycle Cost * 1. Total LCC The total cost of an asset throughout its 

life  including  planning,  design,  construction, acquisition,  operation,  maintenance, rehabilitation and disposal costs.   

2. Average  LCC  The  life  cycle  cost  (LCC)  is  average cost to provide the service over the  longest asset life  cycle.  It  comprises  average  operations, maintenance expenditure plus asset consumption expense,  represented  by  depreciation  expense projected over 10 years. The Life Cycle Cost does not  indicate  the  funds  required  to  provide  the service in a particular year. 

Life Cycle Expenditure The  Life  Cycle  Expenditure  (LCE)  is  the  average operations,  maintenance  and  capital  renewal expenditure  accommodated  in  the  long  term financial  plan  over  10  years.    Life  Cycle Expenditure  may  be  compared  to  average  Life Cycle  Cost  to  give  an  initial  indicator  of affordability  of  projected  service  levels  when considered with asset age profiles. 

Loans / borrowings See borrowings. 

Maintenance  All actions necessary  for retaining an asset as near as practicable  to  an  appropriate  service  condition, including  regular  ongoing  day‐to‐day work  necessary to  keep  assets  operating,  eg  road  patching  but excluding  rehabilitation  or  renewal.  It  is  operating expenditure required to ensure that the asset reaches its expected useful life. 

• Planned maintenance Repair  work  that  is  identified  and  managed through  a  maintenance  management  system (MMS).    MMS  activities  include  inspection, assessing the condition against failure/breakdown criteria/experience,  prioritising  scheduling, actioning  the work and  reporting what was done to  develop  a  maintenance  history  and  improve maintenance and service delivery performance.  

•  Reactive maintenance Unplanned  repair  work  that  is  carried  out  in response  to  service  requests  and management/ supervisory directions. 

•  Specific maintenance Maintenance  work  to  repair  components  or replace  sub‐components  that  needs  to  be identified  as  a  specific maintenance  item  in  the maintenance budget.  

•  Unplanned maintenance  Corrective  work  required  in  the  short‐term  to restore  an  asset  to  working  condition  so  it  can continue  to  deliver  the  required  service  or  to maintain its level of security and integrity. 

Maintenance expenditure * Recurrent  expenditure,  which  is  periodically  or regularly  required  as  part  of  the  anticipated schedule  of  works  required  to  ensure  that  the asset  achieves  its  useful  life  and  provides  the required  level of service.  It  is expenditure, which was anticipated  in determining the asset’s useful life. 

Materiality The  notion  of materiality  guides  the margin  of error  acceptable,  the  degree  of  precision required  and  the  extent  of  the  disclosure required  when  preparing  general  purpose financial  reports.  Information  is  material  if  its omission, misstatement or non‐disclosure has the potential,  individually or collectively, to  influence the  economic  decisions  of  users  taken  on  the basis  of  the  financial  report  or  affect  the discharge  of  accountability  by  the management or governing body of the entity. 

Modern equivalent asset Assets that replicate what is in existence with the most  cost‐effective  asset  performing  the  same level  of  service.  It  is  the  most  cost  efficient, currently  available  asset  which will  provide  the same  stream  of  services  as  the  existing  asset  is capable  of  producing.    It  allows  for  technology 

Page 179: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 98 ‐ 

DRAFT Road Asset Management Plan 2014 

changes  and,  improvements  and  efficiencies  in production and installation techniques 

Net present value (NPV)  The  value  to  the  organisation  of  the  cash  flows associated  with  an  asset,  liability,  activity  or event  calculated using  a discount  rate  to  reflect the time value of money.  It  is the net amount of discounted total cash  inflows after deducting the value  of  the  discounted  total  cash  outflows arising  from  eg  the  continued  use  and subsequent disposal of the asset after deducting the value of the discounted total cash outflows. 

Non‐revenue generating investments Investments  for  the  provision  of  goods  and services  to  sustain  or  improve  services  to  the community that are not expected to generate any savings or revenue to the organisation, eg. parks and  playgrounds,  footpaths,  roads  and  bridges, libraries, etc. 

Operations Regular  activities  to  provide  services  such  as public  health,  safety  and  amenity,  eg  street sweeping, grass mowing and street lighting. 

Operating expenditure Recurrent  expenditure,  which  is  continuously required to provide a service. In common use the term  typically  includes,  eg  power,  fuel,  staff, plant  equipment,  on‐costs  and  overheads  but excludes  maintenance  and  depreciation. Maintenance  and  depreciation  is  on  the  other hand included in operating expenses.  

Operating expense The  gross  outflow  of  economic  benefits,  being cash  and  non  cash  items,  during  the  period arising  in  the  course  of  ordinary  activities  of  an entity when those outflows result in decreases in equity,  other  than  decreases  relating  to distributions to equity participants. 

Operating expenses Recurrent  expenses  continuously  required  to provide  a  service,  including  power,  fuel,  staff, plant equipment, maintenance, depreciation, on‐costs and overheads. 

Operations, maintenance and renewal financing ratio Ratio  of  estimated  budget  to  projected expenditure  for  operations,  maintenance  and 

renewal of  assets over  a defined  time  (eg 5,  10 and 15 years). 

Operations, maintenance and renewal gap Difference  between  budgeted  expenditures  in  a long  term  financial  plan  (or  estimated  future budgets  in absence of a  long term financial plan) and  projected  expenditures  for  operations, maintenance  and  renewal  of  assets  to achieve/maintain specified service levels, totalled over a defined time (e.g. 5, 10 and 15 years). 

Pavement management system (PMS) A  systematic  process  for  measuring  and predicting  the  condition of  road pavements  and wearing  surfaces  over  time  and  recommending corrective actions. 

PMS Score A  measure  of  condition  of  a  road  segment determined  from  a  Pavement  Management System. 

Rate of annual asset consumption * The ratio of annual asset consumption relative to the  depreciable  amount  of  the  assets.  It measures the amount of the consumable parts of assets  that  are  consumed  in  a  period (depreciation)  expressed  as  a percentage of  the depreciable amount.  

Rate of annual asset renewal * The  ratio  of  asset  renewal  and  replacement expenditure relative to depreciable amount for a period.  It  measures  whether  assets  are  being replaced  at  the  rate  they  are wearing  out with capital  renewal  expenditure  expressed  as  a percentage  of  depreciable  amount  (capital renewal expenditure/DA).  

Rate of annual asset upgrade/new * A measure of  the  rate at which assets are being upgraded and expanded per annum with  capital upgrade/new  expenditure  expressed  as  a percentage  of  depreciable  amount  (capital upgrade/expansion expenditure/DA). 

Recoverable amount The higher of  an  asset's  fair  value,  less  costs  to sell and its value in use. 

Recurrent expenditure Relatively small  (immaterial) expenditure or  that which has benefits expected  to  last  less  than 12 

Page 180: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 99 ‐ 

DRAFT Road Asset Management Plan 2014 

months.  Recurrent  expenditure  includes operations and maintenance expenditure. 

Recurrent funding Funding to pay for recurrent expenditure. 

Rehabilitation See capital renewal expenditure definition above. 

Remaining useful life The  time  remaining  until  an  asset  ceases  to provide  the  required  service  level  or  economic usefulness.    Age  plus  remaining  useful  life  is useful life. 

Renewal See capital renewal expenditure definition above. 

Residual value The  estimated  amount  that  an  entity  would currently obtain  from disposal of the asset, after deducting  the estimated  costs of disposal,  if  the asset  were  already  of  the  age  and  in  the condition expected at the end of its useful life. 

Revenue generating investments Investments  for  the  provision  of  goods  and services  to  sustain  or  improve  services  to  the community  that  are expected  to  generate  some savings or  revenue  to offset operating  costs,  eg public  halls  and  theatres,  childcare  centres, sporting  and  recreation  facilities,  tourist information centres, etc. 

Risk management  The application of a  formal process to the range of  possible  values  relating  to  key  factors associated with a  risk  in order  to determine  the resultant  ranges  of  outcomes  and  their probability of occurrence. 

Section or segment A self‐contained part or piece of an infrastructure asset.  

Service potential The total future service capacity of an asset.  It  is normally  determined  by  reference  to  the operating capacity and economic  life of an asset. A measure of service potential is used in the not‐for‐profit  sector/public  sector  to  value  assets, particularly those not producing a cash flow. 

Service potential remaining 

A  measure  of  the  future  economic  benefits remaining in assets.  It may be expressed in dollar values  (Fair  Value)  or  as  a  percentage  of  total anticipated future economic benefits.   It  is also a measure  of  the  percentage  of  the  asset’s potential to provide services that  is still available for  use  in  providing  services  (Depreciated Replacement Cost/Depreciable Amount). 

Specific Maintenance Replacement  of  higher  value  components/sub‐components  of  assets  that  is  undertaken  on  a regular cycle including repainting, replacement of air  conditioning  equipment,  etc.    This  work generally  falls  below  the  capital/  maintenance threshold and needs to be  identified  in a specific maintenance budget allocation.  

Strategic Longer‐Term Plan  A plan covering  the  term of office of councillors (4  years minimum)  reflecting  the  needs  of  the community  for  the  foreseeable  future.  It  brings together  the  detailed  requirements  in  the Council’s  longer‐term  plans  such  as  the  asset management  plan  and  the  long‐term  financial plan.  The  plan  is  prepared  in  consultation with the  community and details where  the Council  is at that point in time, where it wants to go, how it is going to get there, mechanisms for monitoring the  achievement  of  the  outcomes  and  how  the plan will be resourced. 

Sub‐component Smaller  individual  parts  that  make  up  a component part. 

Useful life Either: (a)  the period over which an asset  is expected  to be 

available for use by an entity, or (b) the number of production or similar units expected 

to be obtained from the asset by the entity. It is estimated or expected time between placing the  asset  into  service  and  removing  it  from service,  or  the  estimated  period  of  time  over which the future economic benefits embodied  in a  depreciable  asset,  are  expected  to  be consumed by the organisation. 

Value in Use The present value of  future cash  flows expected to  be  derived  from  an  asset  or  cash  generating unit.  It is deemed to be depreciated replacement cost  (DRC)  for  those  assets  whose  future 

Page 181: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

‐ 100 ‐ 

DRAFT Road Asset Management Plan 2014 

economic  benefits  are  not  primarily  dependent on the asset's ability to generate net cash inflows, where the entity would,  if deprived of the asset, replace its remaining future economic benefits. 

 

Source:  IPWEA, 2009, AIFMG Glossary 

Additional and modified glossary items shown * 

Page 182: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

1

DRAFT DELIVERY PROGRAM 2014/2015

CONTENTS page

VISION STATEMENT ..................................................................................................................................................... 2

VALUES STATEMENT ................................................................................................................................................... 2

FUTURE DIRECTIONS, STRATEGIC OUTCOMES AND ACTIONS ............................................................................ 3

EXAMPLE – Directions, Outcomes, Programs and Projects .......................................................................................... 4

FUTURE DIRECTION 1 – OUR COMMUNITY ............................................................................................................... 5

FUTURE DIRECTION 2 – BASIC SERVICES ................................................................................................................ 8

FUTURE DIRECTION 3 – ECONOMIC PROSPERITY ................................................................................................ 12

FUTURE DIRECTION 4 – RESPONSIVE AND CARING ............................................................................................. 14

FUTURE DIRECTION 5 - OPEN COMMUNICATION .................................................................................................. 17

FUTURE DIRECTION 6 - NATURAL ENVIRONMENT ................................................................................................ 20

Page 183: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

2

VISION STATEMENT A prosperous town, villages and rural communities set amongst the rolling hills, rivers, forests, mountains and caves of the Great Divide. A breath of fresh air in a landscape of light, colour and seasonal beauty. Life as it should be! The town, villages and rural communities throughout the Shire thrive and prosper. Each area has it’s own identity and together make up ‘Oberon’; a place for all ages and aspirations; the place we call home. Our physical attributes define us. We are inspired by the natural landscape. Here the big rivers of the area have their beginnings; the rolling hills are rich and productive; the forests add to the wealth of our community both economically and culturally. We are home to the iconic Jenolan Caves and Kanangra Walls. People from all over the world come to visit. You can come up here to Oberon for a breath of fresh air in a clean and healthy environment. Four distinct seasons provide the backdrop for life and living here. Each offering its own colour range, temperatures, spoils of the land and calendar of events. Here in Oberon we enjoy. A pace of living that is both relaxed and invigorating; A welcome that is warm and genuine; Community life that is caring, full and active. Rural living in a beautiful landscape.

VALUES STATEMENT To guide our choice and behavior - As a community, in all we do, we will: We respect the past, the future and position of others. We take pride in community achievement. We work together in an open and co-operative manner The knowledge and wisdom of the past guides our present and future. We do for today with tomorrow in mind, aiming to leave a better place for those to come. We seek to understand the thoughts, ideas and ways of others so our own lives are enriched. We are proud of what our community achieves, the skill and creativity of our people. We take the initiative and don’t wait for someone else to do what we can do ourselves. Working together is the way we approach our challenges and opportunities. We seek to be open to new ideas and ways and to co-operate with each other.

Page 184: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

3

FUTURE DIRECTIONS, STRATEGIC OUTCOMES AND ACTIONS There are six Future Directions with 36 Strategic Outcomes and 137 Actions in the Delivery Program to be addressed over the next four years.

6 FUTURE DIRECTIONS

Some changes to the placement of Strategic Outcomes and Actions

36

STRATEGIC OUTCOMES

137

ACTIONS

OUR COMMUNITY 6 31

BASIC SERVICES 8 37

ECONOMIC PROSPERITY 5 15

RESPONSIVE AND CARING 7 23

OPEN COMMUNICATION 5 22

NATURAL ENVIRONMENT 5 9

The tables on the following pages show the ACTIONS to help achieve the STRATEGIC OUTCOMES within each FUTURE DIRECTION. The “responsibility” area identifies the responsible staff member, or community group (see KEY/LEGEND below) for implementing these ACTIONS. The Delivery Program identifies the year in which it is planned to commence ACTIONS. Ongoing Programs are shown in each year whilst Projects are shown in the years they begin and end. If NO Action is planned an X is placed in that year and the area IS NOT colour coded. KEY/LEGEND X NO PLANNED ACTION IN NOMINATED YEAR GM GENERAL MANAGER CSC CUSTOMER SERVICES COORDINATOR EMT EXECUTIVE MANAGEMENT TEAM FCSD FINANCE and COMMUNITY SERVICES DIRECTOR OAC OBERON ARTS COUNCIL PDD PLANNING and DEVELOPMENT DIRECTOR OBA OBERON BUSINESS ASSOCIATION WED WORKS and ENGINEERING DIRECTOR OC OBERON COUNCIL EC EXECUTIVE COORDINATOR OPTA OBERON PLATEAU TOURISM ASSOCIATION HRC HUMAN RESOURCES COORDINATOR COM OBERON LGA COMMUNITY WH&SC WORK HEALTH and SAFETY COORDINATOR OVIC OBERON VISITOR INFORMATION CENTRE CENTROC CENTRAL WEST REGIONAL ORGANISATION OF COUNCILS

Page 185: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

4

EXAMPLE – Directions, Outcomes, Programs and Projects Previous Years Budgets (NO COLOUR) 4 Year Delivery Program (IN COLOUR) Current Year Highlighted FUTURE DIRECTION 1 – OUR COMMUNITY

OPERATIONS BUDGET – OUR COMMUNITY   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  851,013  878,137   876,724 897,788 925,414 

Income  511,991  485,125   497,701 510,654 523,996 

Result  (339,021) (393,012)  (379,023) (387,133) (401,417)

CAPITAL EXPENDITURE – OUR COMMUNITY   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  495,500  898,195   474,401  495,868 440,104 

STRATEGIC OUTCOMES 1.1 HEALTHY ACTIVE COMMUNITY MEMBERS

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

1.1.1 Develop a program to promote healthy lifestyle to decrease obesity (facilitate Lean Yoga programs)

X X Facilitator CSC

1.1.2 Provide access to the Community Centre for community groups

Provider CSC

PROJECT – 2012/13 to 2013/14 STRATEGIC OUTCOME ACTIONS ONGOING PROGRAM In the example above the Strategic Outcome is “Healthy Active Community Members” where Council is a Facilitator with the responsible Staff Member nominated as the CSC (Community Services Coordinator) for Actions 1.1.1 and 1.1.2 Action 1.1.1 is a Project which commenced in 2012/13, whilst Action 1.1.2 is an Ongoing Program.

Page 186: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

5

FUTURE DIRECTION 1 – OUR COMMUNITY

OPERATIONS BUDGET – OUR COMMUNITY   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  851,013  878,137   876,724 897,788 925,414

Income  511,991  485,125   497,701 510,654 523,996

Result  (339,021) (393,012)  (379,023) (387,133) (401,417)

CAPITAL EXPENDITURE – OUR COMMUNITY   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  495,500  898,195   474,401  495,868 440,104 

STRATEGIC OUTCOMES 1.1 HEALTHY ACTIVE COMMUNITY MEMBERS

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

1.1.1 Develop a program to promote healthy lifestyle to decrease obesity (facilitate Lean Yoga programs)

X X X Facilitator CSC Project did not commence in 2012/13 low impact fitness equipment grant in 2013/14

1.1.2 Provide access to the Community Centre for community groups

Provider CSC Booking system in place and Council policy provides for free use for non profit community groups

1.1.3 Organise and coordinate community events

Provider CSC Events budget provides for: Australia Day Community Christmas Celebrations - community group International Women’s Day (IWD) Youth Week Seniors Week / Seniors Expo Local Government Golf Day 150th Anniversary Celebrations – 2012/13 funding

1.1.4 Seek grant funding to provide appropriate programs

Facilitator CSC Grant funding applications submitted IWD & Burraga (include in Program 2014 onwards) Youth Week Seniors Week & Burraga (as above)

1.1.5 Support community health initiatives

Facilitator CSC F&CS Director now involved with this / health liaison

1.1.6 Organise RUN the Swim School Provider PDD Swim School held in 2012/13, 2013/14 1.1.7 Develop a program to increase level of volunteering

Provider or Facilitator

CSC CTC volunteers increased involvement in 2012/13 also active Community Transport volunteers

Page 187: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

6

1.2 INTEGRATED WELL UTILISED AND APPROPRIATE FACILITIES FOR SPORTING, ARTS AND COMMUNITY ACTIVITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

1.2.1 Investigate the feasibility of covering the pool

X X Provider PDD for consideration 2013/14 – see CSP 2013

1.2.2 Seek grant funding to provide gym facilities at the Indoor Multi Purpose Sports Complex

X X X Facilitator CSC / WED Project did not commence in 2012/13 to actively seek grants in 2014/15

1.2.3 Own and maintain the Indoor Multi Purpose Sports Complex

Provider WED Operated by community group Council does some maintenance

1.2.4 Implement the Sports field maintenance program and lease to user groups

Provider WED maintenance of parks, gardens & sporting fields

1.2.5 Own and maintain the Community Centre

Provider CSC / FCSD operation & maintenance of Community Centre Capital expenditure for 2012/13

1.2.6 Implement the pool operations and maintenance program

Provider PDD operation and maintenance of complex

1.2.7 Assist the golf course with plant maintenance and irrigation water

Facilitator WED assistance provided during 2012/13, including water

1.2.8 Lease building facilities to the Leagues Club

Provider WED/GM funds also provided for insurance, depreciation

1.3 YOUNG PEOPLE PREPARED FOR AND INVOLVED IN COMMUNITY LIFE

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

1.3.1 Organise the Life Skills program for young people

X X Provider CSC FCSD

Project did not commence in 2012/13 to review actions on 2014/15

1.3.2 Seek grant funding for youth programs e.g. Science week, Youth week, Bike week (Encourage Men’s Shed to provide bicycle maintenance courses for young people)

Facilitator And Provider

CSC applications lodged for Youth Week. GM and CSC regularly attends Men’s Shed OYC now active

1.3.3 Seek funding to facilitate the extension of PCYC Services to Oberon

X X Facilitator CSC FCSD

Project did not commence in 2012/13 PCYC assisted with 2 Discos at the RSL in 2012/13 to review in 2014/15

1.3.4 Organise Youth Week Provider CSC again held in 2012/13 at the Common 1.3.5 Seek funding for a Traffic Educational Bike Centre for youth

X X X Facilitator CSC, WED Project did not commence in 2012/13 possible role for OYC

Page 188: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

7

1.4 WELL MAINTAINED AND UTILISED PARKS AND PASSIVE RECREATION OPPORTUNITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

1.4.1 Implement the Parks, walkways and playgrounds maintenance program

Provider WED being done

1.4.2 Promote the use of walkways and cycle ways for recreation

Facilitator WED being done

1.4.3 Prepare a future development plan for The Common

X X X Provider WED not fully completed – liaising with OAC and the community seek community input in 2014/15 for MASTER PLAN

1.4.4 Encourage State Govt. Agencies to improve the maintenance and appearance of their parks and reserves

Advocate WED, GM being done in conjunction with OPTA and also with Blue Mountains Lithgow Oberon Tourism (BMLOT)

1.4.5 Implement footpath & cycle ways development & maintenance program

Provider WED being done, less successfully than planned

1.5 LAKE OBERON A RECREATIONAL ASSET – see also ACTION 3.5.7

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

1.5.1 Negotiate with State Water for increased recreational use and development of Lake Oberon

Advocate Facilitator

GM has been done, awaiting final approvals successful grant $70k for $120k Project

1.6 STRONG COMMUNITY PARTICIPATION IN ARTS & CULTURAL ACTIVITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

1.6.1 Seek grant funding to provide arts and cultural opportunities

Facilitator GM, CSC, EMT in conjunction with OAC

1.6.2 Provide a financial contribution to Arts OutWest

Facilitator GM, CSC annual funding paid, also liaison with OAC

1.6.3 Provide craft program opportunities through the Library & CC

Facilitator CSC being done with weekly craft activities also a task for Community Precinct Working Group

1.6.4 Use Council buildings and facilities to assist with art exhibitions

Facilitator Provider

GM, CSC being done, successful Waste 2 Art and Photographic Competition held in 2012/13

1.6.5 Conduct Photo competition Provider GM, CSC, EMT see above / IS THIS ECONOMIC PROSPERITY?

PERFORMANCE INDICATORS Attendance at community events Number of volunteers (young particularly) Usage of facilities – Indoor Sports Centre, Soccer Oval, Recreation Ground, Rugby League Grounds, Cunynghame Oval AND number of Sporting Teams Grant Funding Success, and number of Arts & Cultural Events Library usage, Community Centre usage

Page 189: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

8

FUTURE DIRECTION 2 – BASIC SERVICES

 OPERATIONAL BUDGET – BASIC SERVICES  2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  8,309,833  8,519,253   8,914,804 9,079,474 9,260,844

Income  8,581,996  7,611,034   7,774,214 7,941,380 8,119,711

Result  272,163  (908,219)  (1,140,590) (1,138,094) (1,141,133)

CAPITAL EXPENDITURE – BASIC SERVICES   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  4,622,864  5,417,256   3,933,979 3,716,101 3,670,733

STRATEGIC OUTCOMES

2.1 ONGOING AND SECURE WATER SUPPLY FOR DOMESTIC AND INDUSTRIAL USE

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.1.1 Provide potable water to Oberon residents, business and industry

Provider WED Potable Water Supply provided

2.1.2 Manage and maintain the water treatment plant

Provider WED Well managed facility

2.1.3 Maintain the water reticulation system

Provider WED Well maintained

2.1.4 Negotiate with State Water for a secure and reliable supply of raw water

Advocate WED in progress

2.1.5 Implement measures to manage the long term demand for water

Provider Facilitator

WED being done, in progress – water demand management

2.1.6 Investigate and cost the use of carbon to mitigate the effects of algal bloom in water storages

X X X Provider WED No resources provided or are available internally. Algal blooms have not been a problem in 2012/13

2.2 EFFECTIVE COLLECTION AND TREATMENT OF SEWAGE

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.2.1 Provide sewage treatment at Oberon township

Provider WED being done

2.2.2 Maintain the sewerage reticulation system in Oberon township

WED being done

2.2.3 Approve the installation of onsite sewage treatment systems

Provider Regulator

PDD being done – some resourcing issues

Page 190: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

9

2.2.4 Investigate uses for treated waste water

X Provider Facilitator

WED some investigation - resources not allocated

2.2.5 Comply with State Government licence requirements for the discharge of treated waste water

Provider WED Ongoing with test results monitored and action taken as appropriate.

2.2.6 Investigate and cost the upgrades needed for the sewage treatment plant to continue to meet more demanding licence requirements

X X X Provider WED Internal expertise not available – have sought initial assistance from Public Works.

2.3 CONTINUE COUNCIL MANAGEMENT AND CONTROL OF WATER AND SEWERAGE SYSTEMS

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.3.1 Lobby for continued Council ownership and management of water and sewerage services

Advocate GM, WED and OC noted

2.3.2 Maintain the sewerage rising mains, pumping stations and reticulation systems in Oberon township

Provider WED being done

2.4 A USEFUL AND SAFE LOCAL, REGIONAL AND STATE ROAD NETWORK THAT CONNECTS COMMUNITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.4.1 Implement the maintenance program for roads, bridges and walkways in the Oberon LGA.

Provider WED being done

2.4.2 Implement the road drainage maintenance program

Provider WED being done

2.4.3 Implement the road reseal and re-sheeting program

Provider WED being done

2.4.4 Develop and implement the road capital works program

Provider WED being done

2.4.5 Complete the flood and storm damage restoration works (2012)

X X X Provider WED completed in 2012/13 – in vicinity of $950k received

2.4.6 Continually seek grant funding opportunities for road works

Facilitator WED noted – priority to be determined by OC

2.4.7 Maintain road signage, line marking and associated road furniture

Provider WED being done

2.4.8 Undertake road works for the State Government under RMCC contracts and compliance with Quality and other contract requirements

Provider WED being done – seeking to increase work under RMCC

Page 191: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

10

2.4.9 Seek contributions from the forest industry to assist local road maint.

Advocate Facilitator

WED noted, maintain relationships with Forests NSW

2.4.10 Manage & operate quarries, for road base material within legislation

Provider WED being done, new quarries may be needed in future

2.4.11 Seek opportunities to undertake private works roads contracts to offset costs and augment Council revenue

Provider WED, EMT limited success in 2012/13, need to be more pro-active in future

2.4.12 Purchasing, procurement and contract management to facilitate implementation of construction and maintenance programs

Provider WED, GM being done

2.5 FULL COVERAGE AND ACCESS TO WIRELESS, NBN AND MOBILE COMMUNICATION TECHNOLOGIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.5.1 Lobby to gain access to current technologies and full coverage across the Local Government Area

Advocate GM, OC noted

2.5.2 Provide community access to the internet &computer education through the Community Technology Centre

Provider Facilitator

CSC noted, additional resourcing provided at CTC in 2012/13

2.6 AN EFFECTIVE PUBLIC TRANSPORT SYSTEM BETWEEN COMMUNITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.6.1 Liaise with public and private transport providers to improve services to meet community needs

Advocate GM, CSC, WED being done, also with Transport NSW

2.6.2 Through HAAC funding provide community transport

Provider CSC Community Transport Program in place.

2.7 EFFECTIVE COMMERCIAL AND DOMESTIC WASTE MANAGEMENT

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.7.1 Introduce waste recycling service X X Provider Facilitator

WED / PDD limited success, need to be more pro-active in this area

2.7.2 Manage and future development of landfill sites, waste transfer stations

Provider WED / PDD being done – new Licence expected in 2013/14

2.7.3 Upgrade the landfill site to meet environmental licence requirement

X X Provider WED / PDD as above

2.7.4 Undertake a feasibility study into the future extension or replacement of the current land fill site

X X Provider WED / PDD as above

2.7.5 Manage the garbage collection contract and associated policies

Provider WED / PDD being done

Page 192: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

11

2.8 EFFECTIVE PLANT AND FLEET MANAGEMENT

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

2.8.1 Develop plant and fleet management programs to enable effective use of plant and fleet vehicle including optimum replacement strategies

WED No specific resources allocated however will manage within current resources

2.8.2 Undertake scheduled and unscheduled plant and fleet management activity

WED Resources Allocated

PERFORMANCE INDICATORS Funding levels needed to maintain infrastructureAsset management plan data Benchmarked service provision costs Water supply failures and Non compliance eventsRoad usage data and Traffic Accidents Community satisfaction data Water consumption and Water System Losses Mobile phone coverage Public transport availability and usage Recycling volumes Waste to landfill Quality of waste water Benchmark plant hire rates against industry and external contractors Benchmark plant and fleet maintenance costs against industry figures

Page 193: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

12

FUTURE DIRECTION 3 – ECONOMIC PROSPERITY

OPERATIONAL BUDGET – ECONOMIC PROSPERITY   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  340,966  355,377   372,612 381,031 394,979

Income  168,439  162,901   163,948 165,026 166,137

Result  (172,527) (192,477)  (208,664) (216,005) (228,842)

CAPITAL EXPENDITURE – ECONOMIC PROSPERITY   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  11,798  313,507   14,047 14,609 15,193

STRATEGIC OUTCOMES

3.1 A DIVERSE ECONOMIC BASE

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

3.1.1 Prepare an economic development strategy for Oberon LGA

X X X Provider Facilitator

GM, EMT have reviewed existing document – more work required See Team Oberon outcomes

3.1.2 Support operations of the Econ. Development Sec 355 Committee

Provider GM, EMT 355 Committee Structure reviewed – not held proposal to re-establish this

3.1.3 Maintain regular communication with local business and industry to understand local issues

Facilitator GM, EMT Delegates appointed to OBA, OPTA GM attends Community Consultative Committee for Oberon Timber Complex

3.1.4 Prepare a register of land with development potential

X X Provider Facilitator

GM, FCSD not completed Land Development / Land Bank – key issue for EMT in 2014/15

3.2 A DIVERSE AND VIABLE AGRICULTURAL INDUSTRY WITH A STRONG BRAND

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

3.2.1 Encourage the development of an Oberon brand for local produce

Advocate Facilitator

GM, EMT not completed possible with Tablelands Way / Team Oberon

3.3 CUSTOMER RESPONSIVE BUSINESSES AND SERVICES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

3.3.1 Customer service initiatives Facilitator GM, EMT not completed, liaising with OBA 3.3.2 Review customer service policies and systems to ensure a consistent , acceptable level of service is provided

X X X Provider GM, EMT not completed, focus on this in 2013/14 potential merger of OBA & OPTA as a new single entity

Page 194: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

13

3.4 A VALUE ADDING TIMBER INDUSTRY

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

3.4.1 Support and help facilitate development and value adding in the timber industry

Facilitator Advocate

GM, EMT not completed possibly through our involvement with the OTC CCC effectiveness to be reviewed (Team Oberon)

3.5 A THRIVING TOURISM SECTOR

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

3.5.1 Provide visitor information Provider GM, EC, OVIC being done, EC is responsible for day to day OVIC issues 3.5.2 Assist with the organisation and promotion of community events

Facilitator GM, OVIC, OPTA, EC and CSC

being done, more liaison with OPTA is required Team Oberon outcome

3.5.3 Contribute to the Blue Mountains / Lithgow / Oberon Tourism Association

Facilitator GM, OVIC & OPTA

financial member of BMLOT with GM a Board Member noted, new directions for Board in 2014/15

3.5.4 Assist with the development of local tourism product

Facilitator GM, OVIC & OPTA

being done, more liaison with OPTA is required Team Oberon outcome

3.5.5 Liaise with local tourism operators to understand current issues

Facilitator GM, OVIC & OPTA

being done along with OPTA review effectiveness / also OBA & OPTA merger

3.5.6 Lease the caravan park and assist with maintenance

Facilitator GM, FCSD facility is leased noted / some improvements may be required

3.5.7 Investigate development of camping area at Lake Oberon

Provider or Facilitator

GM, EMT Possible Primitive Camping at the REEF RESERVE adjacent to the access to Lake Oberon

PERFORMANCE INDICATORS Visitor numbers and yield Employment statistics, and new businesses Business failures local production and output data Customer service satisfaction Brand recognition No of New Development Applications – new businesses

Page 195: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

14

FUTURE DIRECTION 4 – RESPONSIVE AND CARING

OPERATIONAL BUDGET – RESPONSIVE and CARING   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  1,093,711  1,127,191   1,139,464 1,158,708 1,183,791

Income  970,677  894,163   810,479 811,909 815,957

Result  (123,035) (233,028)  (328,985) (346,799) (367,833)

CAPITAL EXPENDITURE – RESPONSIVE and CARING   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  608,060  490,683   431,738 432,422 444,384

STRATEGIC OUTCOMES 4.1 RESPONSIVE LOCAL AND WELL TRAINED EMERGENCY SERVICES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

4.1.1 Actively lobby to provide competent emergency services

Advocate WED, OC noted, no specific resources allocated maybe list in OUR COMMUNITY / BASIC SERVICES

4.1.2 Provide financial contributions to the RFS and SES

Provider WED, FCSD financial contributions made as levied by NSW Emergency Services maybe OUR COMMUNITY / BASIC SERVICES

4.2 LOCAL SCHOOLS PROVIDING QUALITY EDUCATION SERVICES AND FACILITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

4.2.1 Support schools to improve services and facilities

Facilitator Advocate

GM, CSC, EMT noted noted

4.2.2 Coordinate the provision of library services with schools

Facilitator CSC regular visits to Burraga and Black Springs Public Schools and also O’Connell Public School. noted

4.3 LOCALLY AVAILABLE VOCATIONAL AND ADULT LEARNING FACILITIES AND OPPORTUNITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

4.3.1 Utilise the CTC as a facility for vocational and adult learning

Provider Facilitator

CSC being done, usage is improving now a successful Program what about the Community Newsletter as a project?

4.3.2 Volunteers for computer classes Facilitator CSC volunteers now assisting continuing 4.3.3 Provide library services and utilise the facility for programs

Provider CSC being done for several community programs.Significant involvement of FOOLs with Library

4.3.4 Lobby State Govt. agencies to provide adult education opportunities and quality distance education locally

Advocate CSC noted, need to be more pro-active in this area has been some recent examples of lobbying

Page 196: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

15

4.4 LOCALLY AVAILABLE CORE HEALTH AND MEDICAL SERVICES

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

4.4.1 Provide building and equipment for a dental practice

Provider Facilitator

GM, FCSD building and equipment leased to Waratah Dental – service has expanded to two days per week now operated by Bathurst Dental Clinic / alternate uses

4.4.2 Lobby for the retention of existing medical services and additional allied heath services

Advocate GM, CSC lobbying through the Seniors Welfare Committee and the Community Services Committee F&CSD plus Councillor involvement with local health initiatives and Centroc.

4.5 AGEING WELL IN OBERON

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

4.5.1 Facilitate the provision of aged care facilities and services across the Oberon LGA

X X Advocate Facilitate

GM, CSC also through the Seniors Welfare and Community Services Committees. also Hathaway Cottages and Self Care Units

4.5.2 Support the work of the Section 355 Seniors Welfare committee

Facilitator CSC being done SWC meets every 2 to 3 months

4.5.3 Organise Seniors Week and the Adopt a Grand Parent Program

Provider Facilitator

CSC being done, not quite so successful for the Adopt a Grandparent. Aim to increase involvement for SW 2015

4.6 UTILISED AFTER SCHOOL AND HOLIDAY PROGRAMS FOR YOUNG PEOPLE

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

4.6.1 Conduct holiday craft programs Provider CSC being done at the Oberon Library and the Schools 4.6.2 Use Library facilities to provide after school study spaces

Provider CSC being done, some improvement to work / study area also through Community Precinct Working Group

4.6.3 Lobby for increased after school activities

Advocate CSC noted to review activity in 2014/15

4.7 A SAFE COMMUNITY WITH A HIGH STANDARD OF PUBLIC HEALTH

ACTION Year (1)

Year (2)

Year (3)

Year (4)

Council role

Responsibility COMMENT

4.7.1 Provide environmental health services

Provider Regulator

PDD noted. Consider listing as NATURAL ENVIRONMENT

4.7.2 Maintain public cemeteries Provider WED being done . / change to BASIC SERVICE? 4.7.3 Provide & maintain public toilets Provider WED being done / change to BASIC SERVICE 4.7.4 Provide animal control services Provider

Regulator PDD being done / aim to operate to achieve community

expectations 4.7.5 Provide CCTV security system Provider WED being done in Oberon Street / review effectiveness 4.7.6 Participate in road safety programs

Facilitator WED noted / effectiveness of Traffic Advisory Local Committee to be reviewed

4.7.7 Facilitate provision of street lighting Energy Provided

Facilitator WED being done / participating in Centroc initiatives also

Page 197: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

16

PERFORMANCE INDICATORS Emergency Service response times and Emergency Service coverage hoursEffective Disaster & Emergency Management Strategy to respond to bushfire, flood, storms, and other disasters and threats to the community School Retention rates Health Services usage statistics Enrolment in Adult Learning courses Local availability of trade training Participation in and availability of after school programsLevel of Community satisfaction (% of persons by survey) in living with a safe and friendly communityLibrary statistics recorded – Loans, Users, New Members, Attendance at Storytime etc, Purchases

Page 198: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

17

FUTURE DIRECTION 5 - OPEN COMMUNICATION

OPERATIONAL BUDGET – OPEN COMMUNICATION   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  1,363,945  1,401,565   1,382,181 1,432,317 1,497,259

Income  4,395,410  4,234,326   4,447,356 4,700,575 4,971,339

Result  3,031,465  2,832,761   3,065,175 3,268,258 3,474,081

CAPITAL EXPENDITURE – OPEN COMMUNICATION   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  157,894  129,559   123,301 128,233 142,659

STRATEGIC OUTCOMES

5.1 VIBRANT CONNECTED AND ENGAGED VILLAGES

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

5.1 1 Provide opportunities for communities in all parts of the LGA area to participate in Civic and community events

Facilitator GM, OC noted, OC promotes Civic activities. Community meetings / presentations are listed in the Community Engagement Strategy

5.1.2 Provide additional opportunity for individuals to participate in activities as members of working parties and volunteers

Facilitator GM, OC & EMT OC has high level of community involvement in Committees / Sec 355 Advisory Committees appear to be operating effectively

5.2 CONSERVED AND VALUED HERITAGE

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

5.2.1 Provide grant funding from the local heritage fund for the enhancement and protection of built heritage ?

Provider PDD OC funds a Heritage Advisor

5.2.2 Provide heritage advice in collaboration with Council’s Heritage Advisor and Section 355 Committee

Facilitator PDD being done

5.2.3 Control the management of built and natural heritage items

Provider Regulator

PDD through Heritage Advisor

Any of these ACTIONS might be also listed in NATURAL ENVIRONMENT

Page 199: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

18

5.3 WELL PLANNED, PRESENTED AND MAINTAINED TOWNS, VILLAGES AND RURAL LOCALITIES

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

5.3.1 Complete the Land Use Strategy, Local Environmental Plans (LEP) and Development Control Plans (DCP)

X X Provider Regulator

PDD resources allocated through state agencies Oberon LEP2013 approved in late Dec 2013 DCP is a priority for 2014/15

5.3.2 Complete a Main Street strategy for Oberon Township

X X Provider EMT funds allocated in 2012/13, not completed review in 2014/15

5.3.3 Along with local communities undertake village beautification plans and local improvements

Provider Facilitator

EMT funds allocated annually, more work required. review - community consultations 2014/15

5.3.4 Participate in Tidy Town Programs Facilitator GM, FCSD, EMT noted, more work required with community groups determine community buy-in for 2014/15

5.3.5 Provide building approval service Provider Regulator

PDD being done

5.3.6 Develop, maintain Council property Provider PDD, EMT work done as required

5.4 WELL INFORMED COMMUNITIES WHOSE VIEWS ARE HEARD

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

5.4.1 Keep the community informed about matters that affect them

Provider GM, EMT noted, regular promotions Communications & Social Media Guidelines to be developed in 2014/15

5.4.2 Seek input from the community on the provision of services and future planning

Facilitator GM, EMT

noted, large part of CSP process is consultation revised Community Engagement Strategy

5.4.3 Operate Section 355 Committees as a conduit with the community

Provider GM, EMT noted, being reviewed in June 2013 revised Community Engagement Strategy

5.4.4 Develop use of social media to provide information in a timely manner

Provider Facilitator

GM, EMT noted, take-up on this is improving Communications & Social Media Guidelines to be developed in 2014/

5.4.5 Build community awareness and understanding of environmental issues

Facilitator PDD noted, to be improved maybe list as NATURAL ENVIRONMENT

5.4.6 Communications & Social Media Guidelines

Provider Facilitator

Guidelines to include details about: COUNCIL MEETINGS / CES COMMUNITY NEWSLETTER NOTICEBOARDS / FORUMS

Page 200: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

19

5.5 A COMMUNITY WITH CONTEMPORARY GOVERNANCE AND LEADERSHIP

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

5.5.1 Provide resources to enable Elected Members to better represent community

Provider GM iPads provided and regular “Informal Briefing Sessions” held and weekly information issued new focus on IT & Communications in 2014/15

5.5.2 Provide effective meeting structures and procedures

Provider GM noted, attention been given to this area. Addressed at Informal Briefing Sessions etc

5.5.3 Engage community in planning for Civic events

Provider Facilitator

GM, EMT being done, Council Meetings held in Villages. Plus community events

5.5.4 Provide effective systems for complaint management, information systems, work health & safety, risk management and procurement

Provider GM, FCSD, EMT noted, work is needed to improve in this area review of Complaints Management processes and compliance issues for Risk Management in 2014/15

5.5.5 Provide sound financial management - creditor & debtor, investments ,internal audit

Provider GM, FCSD being done, further attention to this in 2013/14 F&CS Director is reviewing internal practices and in conjunction with GM issues from External Audit processes etc

PERFORMANCE INDICATORS Articles and media coverage Website statistics Population statistics Compliance with planning requirements Heritage projects completed Number of development approvals Attendance at community events Community Engagement, and attendance at Community Consultation (and Community Engagement Strategy)

Page 201: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

20

FUTURE DIRECTION 6 - NATURAL ENVIRONMENT

OPERATIONS BUDGET – NATURAL ENVIRONMENT   2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  949,977  990,259   1,022,455 1,057,206 1,089,952

Income  183,000  183,000   183,000 183,000 183,000

Result  (766,977) (807,259)  (839,455) (874,206) (906,952)

 CAPITAL EXPENDITURE – NATURAL ENVIRONMENT  2012/13  2013/14  2014/15  2015/16  2016/17 

Expenditure  0  42,166   0 0 0

STRATEGIC OUTCOMES

6.1 COMPLIANCE WITH ENVIRONMENTAL LEGISLATION AND GUIDELINES

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

6.1.1 Provide regulatory services required by the Environmental Planning and Assessment Act 1979 and legislation

Provider Regulator

PDD being done there is a significant number of activities where OC is a regulator

6.2 SCENIC BEAUTY AND LANDSCAPES ARE PROTECTED

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

6.2.1 Implement the scenic protection provisions of the planning scheme

Provider Regulator

PDD will be completed as part of strategic planning processes / included in the Oberon LEP 2013

6.3 AN ENVIRONMENT FREE OF WEEDS AND FERAL ANIMALS

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

6.3.1 Control weed growth on road verges Provider WED being done / OC also contributes as a member of the Upper Macquarie County Council (Weeds Authority for Bathurst, Blayney, Lithgow also)

6.3.2 Contribute to the weed and pest control activities of Upper Macquarie CC

Facilitator WED, OC being done, active member of UMCC OC is participating in discussions with other member Councils as a result of final report by the Independent Local Government Review Panel.

6.3.3 Advocate for more resources to be applied to weed and pest management

Advocate WED, OC being done, OC members lobby UMCC further lobbing to be considered

Page 202: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Delivery Program 2014/2015

21

6.4 RESPONSIBLE MANAGEMENT OF NATURAL RESOURCES

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

6.4.1 Provide regulatory services to protect natural resources

Provider Regulator

PDD being done as part of strategic planning processes and with approval of Oberon LEP 2013

6.4.2 Advocate for the responsible management of natural resources

Advocate PDD being done as part of strategic planning processes and with approval of Oberon LEP 2013

consider adding further ACTIONS relating to Native Vegetation Control Waste – Environmental Concerns Climate Change & Resilience Solar Power – long term viability

6.5 DIVERSIFIED ENERGY SOURCES AND USAGE

ACTION Year (1)

Year (2)

Year (3)

Year (4) Council role Responsibility COMMENT

6.5.1 Investigate the use of alternative energy in Council operations

Provider WED, PDD some work done with CENTROC this work is continuing

6.5.2 Reduce Councils carbon footprint Provider EMT noted

PERFORMANCE INDICATORS Breaches of environmental regulations Loss of scenic areas Removal of pest species Loss of agricultural land Alternative energy usage Reduction in carbon footprint Community involvement in Natural Resource management projects

Page 203: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

OBERON COMMUNITY STRATEGIC PLAN 2014

Operational Plan 2014/15

Page 204: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

$

Rates & Annual Charges 4,385,102User Charges & Fees 4,236,774Interest & Investment Revenue 175,789Other Revenues 293,144Operating Grants 3,351,420Capital Grants 1,413,496Gain from Disposal of Assets 100,000TOTAL INCOME $13,955,725

Employee Benefits & Oncosts 4,962,427Borrowing Costs 81,881Materials & Contracts 3,506,505Depreciation & Amortisation 3,487,157Impairment 0Other Expenses 2,048,230Interest & Investment Losses 0Loss from Disposal of Assets 0TOTAL EXPENSES $14,086,200

($130,475)(Deficit)

3,487,157$3,356,682

Net Transfers (to)/from Reserves 900,958Net Capital Income/(Expenditure) (5,243,397)

($985,757)

Cash Surplus/(Deficit) from Operations

Non‐Operational Cash Movements:

Increase/(Decrease) in Unrestricted Cash

Operational Plan 2014/15

Income from Continuing Operations

Expenses from Continuing Operations

Operating Result ‐ Surplus/(Deficit)

LESS Non‐Cash Operating Expenses

Page 205: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

REPORTING STAFF Income Expenditure

Surplus (Deficit)

CAPITAL ITEMS PROPOSED BORROWINGS

NON CASH EXPENDITURE

OUR COMMUNITY

Arts and Culture FCSD/GM 0 9,555 (9,555) 0 0 0 0 (9,555)

Community Centre FCSD 3,395 46,974 (43,579) 0 0 0 21,985 (21,594)

Community Events FCSD/EC 6,730 76,350 (69,620) 0 0 0 0 (69,620)

Parks and Reserves WED 9,200 387,548 (378,348) 0 0 1,000 88,395 (290,953)

Social/Community Planning FCSD 3,000 0 3,000 0 0 0 0 3,000

Swimming Pool PDD 51,523 282,155 (230,632) 2,000 0 (2,000) 26,137 (204,495)

Town Improvement WED 400,149 102,953 297,196 370,401 0 (73,205) 0 0

Total for Our Community 473,997 905,535 (431,538) 372,401 0 (74,205) 136,517 (593,216)

BASIC SERVICES

Engineering Services WED 0 522,778 (522,778) 0 0 0 3,766 (519,012)

Roads Bridges Footpaths WED 2,582,746 4,352,124 (1,769,378) 4,749,828 2,000,000 (457,500) 2,256,000 (1,805,706)

Drainage WED 3,183 215,985 (212,802) 0 0 3,090 115,503 (100,389)

Quarry Operations WED 8,960 8,376 584 0 0 0 3,497 4,081

Plant WED 28,286 (925,248) 953,534 1,558,000 0 (313,804) 413,015 122,353

Works Section WED 27,731 (304,241) 331,972 0 0 0 0 331,972

Private Works WED/FCSD 2,370,193 1,885,154 485,039 0 0 0 0 485,039

Store/Depot FCSD 0 46,418 (46,418) 30,000 0 0 42,044 (34,374)Communications Technologies FCSD/WED 7,214 17,365 (10,151) 0 0 0 3,000 (7,151)

Community Transport FCSD 93,280 104,097 (10,817) 0 0 0 12,000 1,183

Water Supply WED 1,339,868 1,478,038 (138,170) 237,837 160,000 4,000 172,458 (47,549)

Waste Water (Sewerage) Service WED 799,427 854,541 (55,114) 799,417 792,000 33,461 88,575 (7,417)

Waste Management WED/PDD 604,483 556,412 48,070 5,305 0 0 6,685 49,450

Total for Basic Services 7,865,371 8,811,799 (946,428) 7,380,387 2,952,000 (730,753) 3,116,543 (1,527,519)

ECONOMIC PROSPERITYDental Surgery FCSD 6,153 14,134 (7,981) 0 0 0 8,666 685

Tourism and Events GM/EC 3,000 71,851 (68,851) 0 0 0 0 (68,851)

Visitor Information Centre EC 17,123 351,093 (333,970) 0 0 0 328 (333,642)Caravan Park GM 19,461 8,769 10,692 0 0 0 3,952 14,644

Economic Development Activity GM 0 6,476 (6,476) 0 0 0 0 (6,476)

Land Development GM 100,000 22,492 77,508 0 0 (99,000) 0 176,508

Total for Economic Prosperity 145,737 474,815 (329,078) 0 0 (99,000) 12,946 (217,132)

Operational Plan 2014/15 - FUTURE DIRECTIONSOPERATING RESULT TRANSFERS

TO(FROM) RESERVES

NET CASH MOVEMENTFUTURE DIRECTIONS

Page 206: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

REPORTING STAFF Income Expenditure

Surplus (Deficit)

CAPITAL ITEMS PROPOSED BORROWINGS

NON CASH EXPENDITURE

Operational Plan 2014/15 - FUTURE DIRECTIONSOPERATING RESULT TRANSFERS

TO(FROM) RESERVES

NET CASH MOVEMENTFUTURE DIRECTIONS

RESPONSIVE and CARING

Public Toilets WED 0 152,286 (152,286) 0 0 0 35,604 (116,682)

Cemeteries WED 45,130 105,157 (60,027) 0 0 0 303 (59,724)

Library FCSD 30,350 214,354 (184,004) 10,609 0 0 25,876 (168,737)

Hathaway Cottage FCSD 8,949 22,271 (13,322) 0 0 0 3,680 (9,642)

Aged Care Units FCSD 71,510 44,134 27,376 0 0 0 7,173 34,549

Community Technology Centre FCSD 7,025 33,248 (26,223) 2,000 0 0 289 (27,934)

Main Street Security WED 0 14,451 (14,451) 20,000 0 0 7,965 (26,486)

Rural Fire Service WED/FCSD 710,745 519,881 190,864 410,000 0 0 102,967 (116,169)

Emergency Services WED 7,041 49,920 (42,879) 0 0 3,000 1,502 (44,377)

Total for Responsive and Caring 880,750 1,155,702 (274,952) 442,609 0 3,000 185,359 (535,203)

OPEN COMMUNICATION

General Purpose Revenues FCSD 4,361,099 29,883 4,331,216 0 0 0 0 4,331,216

Council Chambers & Office GM/EC 0 102,397 (102,397) 0 0 0 23,231 (79,166)

Governance-Elected Members GM/EC 0 390,952 (390,952) 0 0 0 0 (390,952)

Finance and Administration FCSD/GM 30,703 1,137,943 (1,107,240) 0 0 0 3,788 (1,103,452)

Council Properties GM/FCSD 11,569 15,208 (3,639) 0 0 0 5,695 2,056

Heritage PDD 3,500 11,474 (7,974) 0 0 0 0 (7,974)

Total for Open Communication 4,406,871 1,687,857 2,719,015 0 0 0 32,714 2,751,729

NATURAL ENVIRONMENT

Development Control PDD 99,000 733,407 (634,407) 0 0 0 1,476 (632,931)

Building Control PDD 69,000 110,038 (41,038) 0 0 0 0 (41,038)

Animal Control PDD 9,500 81,982 (72,482) 0 0 0 1,602 (70,880)

Environmental & Public Health PDD 5,500 18,743 (13,243) 0 0 0 0 (13,243)

Weeds Management WED 0 106,324 (106,324) 0 0 0 0 (106,324)

Total for Natural Environment 183,000 1,050,493 (867,493) 0 0 0 3,078 (864,415)

13,955,725 14,086,200 (130,475) 8,195,397 2,952,000 (900,958) 3,487,157 (985,757)TOTAL

Page 207: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

DRAFT Schedule of FEES and CHARGES

Oberon Community Strategic Plan 2014

2014/2015

Page 208: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

PageAPPLICATION FEES (PLANNING and DEVELOPMENT DEPARTMENT)Development Applications 1Subdivision Applications 2Long Service Levy 2Combined Development Application and Construction Certificate 2Modification of Development Consent 3Review of Determination Fees 3-4Development Contributions 4-5Construction Certificates 5-6Complying Development Certificates 6-7Notification Fees 7Bonds 7Critical Stage Inspections and Occupation Certificates 8Other Occupation Approval Matters 8Food Act 9Copies of Plans 9Public Health Act - Skin Penetrations etc 9Local Government Act Approvals 9-10Swimming Pool Act 10Sewerage Works / Drainage Plans 10Miscellaneous 11Certificates 11

IMPOUNDING and ANIMAL CONTROLCompanion Animal Control 12Stock Control 12Animal Registration Fees 12

RECREATIONSwimming Pool Entry Fees 14-15

WORKS & ENGINEERINGPrivate Works & Other Charges 16-19Waste Management Charges 20Cemetery Charges 21

GENERAL ADMINISTRATION and COMMUNITY SERVICESLibrary Charges 22Self-Care Units 22Community Centre Fees 23Administration Charges 23-24Access to Public Information 25Hire of Sound Equipment 25Visitor Information & Community Technology Centre Charges 26-27Film Central NSW 28Community Transport Program 28

OBERON COUNCIL DRAFT Schedule of FEES and CHARGES 2014/2015

Page 209: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

S $285.00 $285.00 - $285.00

Up to $5,000 (No Plan First Levy) S $110.00 $110.00 - $110.00

$5,001 - $50,000 (No Plan First Levy) Base Fee S $170.00 $170.00 - $170.00 Plus per $1,000 $3.00 $3.00 - $3.00

New single dwelling with a cost of $100,000 or less Maximum Fee (including Plan First Levy) S $455.00 $455.00 - $455.00

$50,001 - $250,000 Base Fee S $320.00 $320.00 - $320.00Plus per $1,000 in excess of $50,000 $3.00 $3.00 - $3.00Plus per $1,000 (Plan First Levy) in excess of $50,000 $0.64 $0.64 - $0.64

$250,001 - $500,000 Base Fee S $1,000.00 $1,000.00 - $1,000.00Plus per $1,000 in excess of $250,000 $1.70 $1.70 - $1.70Plus per $1,000 (Plan First Levy) $0.64 $0.64 - $0.64

$500,001 - $1,000,000 Base Fee S $1,425.00 $1,425.00 - $1,425.00Plus per $1,000 in excess of $500,000 $1.00 $1.00 - $1.00Plus per $1,000 (Plan First Levy) $0.64 $0.64 - $0.64

$1,000,001 - $10,000,000 Base Fee S $1,975.00 $1,975.00 - $1,975.00Plus per $1,000 in excess of $1,000,000 $0.80 $0.80 - $0.80Plus per $1,000 (Plan First Levy) $0.64 $0.64 - $0.64

More than $10,000,001 Base Fee S $9,475.00 $9,475.00 - $9,475.00Plus per $1,000 in excess of $10,000,000 $0.55 $0.55 - $0.55

Plus per $1,000 (Plan First Levy) $0.64 $0.64 - $0.64

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Development not involving subdivision, nor the erection/demolition of a building or work (including Boundary Adjustments) - (CI.250 EPA Reg)

Minor Structures and/or Minor Building Additions

DEVELOPMENT APPLICATIONS

Development Applications

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

Fee payable for costs and expenses of studies, etc by relevant planning authority. Fees for planning proposals will be carried out in accordance with Part 2 Clause 11 of the Environmental Planning and Assessment Regulation 2000. Please contact Council for relevant details

PricingPrinciple

2013/2014Fee/Charge

DETAILS

PLANNING and DEVELOPMENT DEPARTMENT

Page 210: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

SUBDIVISION APPLICATIONS

Base Fee S $330.00 $330.00 - $330.00Plus per additional lot created $65.00 $65.00 - $65.00

Base Fee S $665.00 $665.00 - $665.00Plus per additional lot created $65.00 $65.00 - $65.00

Base Fee S $330.00 $330.00 - $330.00Plus per additional lot created $53.00 $53.00 - $53.00

Base Fee P $200.00 $200.00 - $200.00Plus per lot as numbered in the plan $50.00 $50.00 - $50.00

Designated Development - CI.251 EPA REG Scheduled Fee S $920.00 $920.00 - $920.00Plus Notification Fees

Integrated Development - CI.253(1) EPA REG Processing Fee S $140.00 $140.00 - $140.00Additional for Each Approval Body $320.00 $320.00 - $320.00

LONG SERVICE LEVY

For all works (building, subdivision) over $25,000 % of Value of Work S 0.35% 0.35%NOTE: Payable at Construction Certificate stage

COMBINED DEVELOPMENT APPLICATION AND CONSTRUCTION CERTIFICATE & INSPECTIONS

For building works up to a value of $1,000 Flat Fee P $126.00 $114.55 11.45 $126.00For building works between $1,001 to $5,000 Flat Fee P $315.00 $286.36 28.64 $315.00For building works between $5,001 to $12,000 Flat Fee P $472.50 $429.55 42.95 $472.50

Subdivision Application (Strata and Community Title) - CI.249(b) EPA REG

Subdivision Application with a new Public Road - CI.249(a)(i) EPA REG

Subdivision Application without a New Public Road CI.249(a)(ii) EPA REG

Subdivision and/or Strata Certificate (Release of Linen Plan)

(See Page 8 for Applicable Notification Fees)

Page 211: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

MODIFICATION OF DEVELOPMENT CONSENT FEES

Section 96(1) of the Act (CI.258 EPA REG) - Minor S $71.00 $71.00 - $71.00Section 96(1A) of the Act (CI.258(1A) EPA REG) - involving minim% of original fee OR S 50% 50%

Flat Fee $645.00 $645.00 - $645.00(whichever is the lesser)

- if original fee less than $100.00 % of original fee S 50% 50%

- if original fee was $100.00 or more

% of original fee S 50% 50%

(ii) if the DA is for the erection of a dwelling with a cost of $100,000 or lessFlat Fee S $190.00 $190.00 - $190.00

Plus an additional amount if notice of the application is required to be given under Section 96(2) or 96AA(1) of the ActNot Exceeding S $665.00 $665.00 - $665.00

REVIEW OF DETERMINATION FEES (Clause 257 EPA REG)

(iii) where (i) and (ii) above don't apply, the fee is based on the estimated cost as followsEstimated Cost up to $5,000 S $55.00 $55.00 - $55.00

Estimated Cost $5,001 - $250,000 Base Fee S $85.00 $85.00 - $85.00Plus per $1,000 $1.50 $1.50 - $1.50

Estimated Cost $250,001 - $500,000 Base Fee S $500.00 $500.00 - $500.00Plus per $1,000 in excess of $250,000 $0.85 $0.85 - $0.85

Estimated Cost $500,001 - $1,000,000 Base Fee S $712.00 $712.00 - $712.00Plus per $1,000 in excess of $500,000 $0.50 $0.50 - $0.50

Estimated Cost $1,000,001 - $10,000,000 Base Fee S $987.00 $987.00 - $987.00Plus per $1,000 in excess of $1,000,000 $0.40 $0.40 - $0.40

Estimated Cost more than $10,000,000 Base Fee S $4,737.00 $4,737.00 - $4,737.00Plus per $1,000 in excess of $10,000,000 $0.27 $0.27 - $0.27

(Continued next Page)

Section 96(2) or Section 96AA(1) of the Act (CI.258(2) EPA REG) - Major

(i) if the DA does not involve the erection of a building, the carrying out of a work, or the demolition

Page 212: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

REVIEW OF DETERMINATION FEES (Clause 257 EPA REG) (Continued)

SEPP 1 Application Fee % of original DA Fee S 50% 50%

Amendment to Local Environmental Plan (Application Fee) % of the cost to Council OR S 50% 50%Flat Fee S $500.00 $ 500.00 - $500.00(whichever is the greater)

Rezoning Application Fee As per DA Schedule PLUS S $1,000.00 $1,000.00 - $1,000.00

Fee for Concurrence Body S $320.00 $320.00 - $320.00PLUS Processing Fee S $140.00 $140.00 - $140.00

Fee for Concurrence Body S $320.00 $320.00 - $320.00PLUS Processing Fee S $140.00 $140.00 - $140.00

URBAN/VILLAGE DEVELOPMENT

Sewer Supply Headworks per ET C $1,663.50 $1,713.41 - $1,713.41Water Supply Headworks per ET C $1,306.00 $1,345.18 - $1,345.18Public Open Space per Lot C $228.70 $235.56 - $235.56Community Facilities per Lot C $228.70 $235.56 - $235.56Emergency Services per Lot C $274.00 $282.22 - $282.22Storm Water Drainage per ET C $752.90 $775.49 - $775.49Urban Roads per Lot C $2,927.30 $3,015.12 - $3,015.12

$7,381.10 $7,602.53 $0.00 $7,602.53(Continued Next Page)

DEVELOPMENT CONTRIBUTIONS (CPI increase)

Concurrence Fee (Clause 252A of EPA REG) for DA's that require concurrence under the Act or an EPI

Integrated Fee (Clause 253 of EPA REG) for DA's

Page 213: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

RURAL DEVELOPMENT

Water Supply Headworks (if applicable) per ET C $1,306.00 $1,345.18 - $1,345.18Public Open Space per Lot C $228.70 $235.56 - $235.56Community Facilites per Lot C $228.70 $235.56 - $235.56Emergency Services per Lot C $274.00 $282.22 - $282.22Rural Roads per Lot C $4,463.00 $4,596.89 - $4,596.89

TOTAL without water supply $5,194.40 $5,350.23 $0.00 $5,350.23

TOTAL with water supply $6,500.40 $6,695.41 $0.00 $6,695.41

Car Parking Contribution (in lieu of off-street parking) per/space C $4,486.00 $4,486.00 - $4,486.00

CONSTRUCTION CERTIFICATES - Fully Contestable Services

Fee for Construction Certificate (including inspections) for the construction of access/es in a subdivision not constructing a new road

per access F $100.00 $90.91 9.09$ $100.00

Up to $5,000 F $55.00 $50.00 5.00$ $55.00

$5,001 - $100,000 Base Fee F $105.00 $95.45 9.55$ $105.00Plus for each $1000 (or part of $1000) by which the value exceeds $5,001

F $4.20 $3.82 0.38$ $4.20

$100,001 - $250,000 Base Fee F $514.00 $467.27 46.73$ $514.00Plus for each $1000 (or part of $1000) by which the value exceeds $100,000

F $2.57 $2.34 0.23$ $2.57

(Continued Next Page)

DEVELOPMENT CONTRIBUTIONS (Continued) (CPI increase)

(a) for "deemed to satisfy" approval under the Building Code of Australia. Note: "cost" is the completed value of all necessary work to complete the development including design, construction costs, and all set up costs as determined by Council for the purpose of setting the fee

Page 214: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

CONSTRUCTION CERTIFICATES - Fully Contestable Services (Continued)Greater than $250,000 $898.00 $816.36 81.64$ $898.00

Plus for each $1000 (or part of $1000) by which the value exceeds $250,000

F $1.29 $1.17 0.12$ $1.29

Standard Application Fee F As Above As Above As Above As AbovePlus F $118.00 $107.27 10.73$ $118.00Plus cost to Council for additional work in determining compliance F Actual Cost Actual Cost 10% Actual Cost

Amended Construction CertificateMinor Change F $80.00 $72.73 7.27$ $80.00Major Change % of original fee F 50% 50% 50%

Lodgement of Construction Certificate from Private Certifier (CL.263 of EPA REG) S $36.00 $36.00 - $36.00

COMPLYING DEVELOPMENT CERTIFICATES (Fully Contestable Services)

CostUp to $12,000 F $150.00 $136.36 13.64$ $150.00

$12,001 - $50,000 Base Fee F $185.00 $168.18 16.82$ $185.00Plus for each $1000 (or part of $1000) by which the cost exceeds $12,000

F $3.20 $2.91 0.29$ $3.20

$50,001 - $250,000 Base Fee F $514.00 $467.27 46.73$ $514.00Plus for each $1000 (or part of $1000) by which the cost exceeds $50,000

$2.52 $2.29 0.23$ $2.52

(Continued Next Page)

(b) for "performance based approval" under the Building Code of Australia - where applicant proposes analternative solution to the "deemed to satisfy" conditions

To be collected where Council is nominated as the Principal Certifying Authority by the Applicant, at the time of submission of the application. Note: "Cost" is the completed value of all necessary work to complete the development, including design, construction costs, and all set up costs as determined by Council for the purpose of setting the fee.

Page 215: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

COMPLYING DEVELOPMENT CERTIFICATES (Fully Contestable Services) (Continued)Greater than $250,000 Base Fee F $898.00 $816.36 81.64$ $898.00

Plus for each $1000 (or part of $1000) by which the cost exceeds $250,000

$1.24 $1.13 0.11$ $1.24

Amended Complying Development Certificate Application F Fee based on value of work

Fee based on value of

work

10% Fee based on value of

work

Lodgement of Complying Development Certificate from Private Certifier (CI.263 EPA REG) S $36.00 $36.00 - $36.00

Bushfire Attack Level Assessment F $340.00 $309.09 30.91$ $340.00

NOTIFICATION FEES

(a) Designated development - CI.252(1)(a) EPA REG S $2,250.00 $2,250.00 -$ $2,250.00

BONDS

Building CostUp to $10,000 D $119.00 $119.00 -$ $119.00$10,001 - $50,000 D $290.00 $290.00 -$ $290.00$50,001 - $100,000 D $405.00 $405.00 -$ $405.00Greater than $100,000 D $580.00 $580.00 -$ $580.00

Resiting of dwellings or other buildings (anywhere in the Council area) D $5,150.00 $5,150.00 -$ $5,150.00

(Note: refundable on issue of Occupation Certificate)

Where a development is to be "notified, under the provision of an environment planning instrument or Development Control Plan, an additional fee of:

Payable on Commercial work only. For damage to Council roads, footpaths, kerbing and guttering etc. (Village of Oberon) as per the schedule below:

Page 216: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

To be collected where Council is nominated as the Principal Certifying Authority by the applicant, at the time of submission.Either for each inspection Per Hour (including travelling and reporting time) F $120.00 $109.09 10.91$ $120.00OR as per the schedule below:

Building Cost as valued by Council Building SurveyorUp to $5,000 F $100.00 $90.91 9.09$ $100.00$5,001 - $50,000 F $250.00 $227.27 22.73$ $250.00$50,001 - $100,000 F $400.00 $363.64 36.36$ $400.00$100,001 - $250,000 F $500.00 $454.55 45.45$ $500.00$250,001 - $500,000 F $670.00 $609.09 60.91$ $670.00

Greater than $500,000 Base fee F $800.00 $727.27 72.73$ $800.00Plus 0.10% of value by which cost exceeds $500,000 F 0.10% 0.10% 10% 0.10%

Notes

Lodgement of Part 4A Certificate from Private Certifier (CI.263 EPA REG) S $36.00 $36.00 - $36.00

Re-Inspection Fee F $129.80 $118.00 11.80$ $129.80Stamping of additional specification/plans at applicant's request per sheet F $2.60 $2.60 -$ $2.60Application for approval of temporary building F

Search of approval records - excluding owners Minimum F $55.00 $55.00 -$ $55.00(Refer Section 608 of the Local Government Act 1993) Then per hour or part thereof F $55.00 $55.00 -$ $55.00Copy of approval records Search Fee plus photocopy costs F - - - -Access to approval registers No Charge (Section 12 of the Local Govt Act) N - - - -

- Application Fee N Nil Nil - Rental (per annum) N Nil Nil

Hoarding Fee (Rental and Application Fee) Per lineal metre per month F $26.00 $26.00 -$ $26.00(To be paid in advance)

OCCUPATION CERTIFICATES

OTHER OCCUPATION APPROVAL MATTERS

Street Furniture or other temporary structures on Footpath

Duplex, dual occupancy to be assessed on a per occupancy basis. (ie. Duplex valued at $150,000 would be treated as 2 separate dwellings at $75,000 each. The fee would therefore be 2 x $494.00 = $988.00)Class 2 units as above on a per unit basis. (ie. If 5 units were proposed with a value of $350,000, the fee would be 5 x $659.00 = $3,295.00

CRITICAL STAGE INSPECTIONS AND OCCUPATION CERTIFICATES (Inspections) (Fully Contestable Services)

Page 217: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Annual Administration Fee's - High Risk Food Premises P $157.50 $157.50 - $157.50 - Low Risk Food Premises P $78.75 $78.75 - $78.75Additional Inspections - High Risk Food Premises P $126.00 $126.00 - $126.00 - Low Risk Food Premises P $63.00 $63.00 - $63.00Improvement Notice Fee (when required) S $346.50 $330.00 - $330.00

Copy of Development Control Plan 2001 - each section F $15.00 $15.00 -$ $15.00Copy of Development Control Plan 2001 - all parts F $30.00 $30.00 -$ $30.00Copy of Oberon Local Environmental Plan 1998 F $30.00 $30.00 -$ $30.00Copy of Contributions Plan 2000 F $15.00 $15.00 -$ $15.00State of the Environment Report N/A $30.00 $30.00 -$ $30.00

PUBLIC HEALTH ACT Inspections (Skin Penetration and alike) $100.00 $100.00 -$ $100.00

LOCAL GOVERNMENT ACT APPROVALSP $210.00 $210.00 -$ $210.00

Annual approval for existing systems P $68.25 $68.25 - $68.25Annual or other re-inspection (where required) P $68.25 $68.25 - $68.25Amended application requiring inspection P $131.25 $131.25 - $131.25Amended application P $105.00 $105.00 - $105.00Install Manufactured Home on Land F $420.00 $420.00 - $420.00Install a Moveable Dwelling (caravan) on site (whilst building main home) $262.50 $262.50 - $262.50Other Section 68 Approvals - minimum fee per submission P $157.50 $157.50 - $157.50

FOOD ACT (increase is a Statutory requirement)

COPIES OF PLANS

(Continued Next Page)

Application to install septic tank and/or onsite wastewater system (includes site and installation inspection and initial annual approval)

Page 218: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Application for New Caravan Park or Camping Ground (Section 68 (F.2) of Local Government Act)

Per site P $5.25 $5.25 - $5.25Minimum Fee P $525.00 $525.00 - $525.00

Application for Primitive Camping Ground

Per site P $5.25 $5.25 - $5.25Minimum Fee P $577.50 $577.50 - $577.50

Manufactured Home Estates

Per site P $5.25 $5.25 - $5.25Minimum Fee P $577.50 $577.50 - $577.50

Annual inspections of Caravan Parks, Camping Grounds and Manufactured Home Estates

Per site P $7.35 $7.35 - $7.35Minimum Fee P $94.50 $94.50 - $94.50

$60.00 $60.00 - $60.00

$120.00 $120.00 - $120.00

SEWERAGE WORKS/DRAINAGE PLANS New dwellings; additions and alterations

F $131.25 $131.25 - $131.25

Other buildings (Commercial/Industrial, etc)First closet F $131.25 $131.25 - $131.25Each additional closet, urinal or sanitary fitting F $26.25 $26.25 - $26.25

Search of Drainage Plans and copy of Drainage Diagram F $31.50 $31.50 $31.50MISCELLANEOUS

Per hour P $128.10 $128.10 - $128.10Plus travelling - per kilometre P $0.78 $0.78 - $0.78

Administration staff - includes reporting time Per hour P $58.80 $53.45 5.35$ $58.80

LOCAL GOVERNMENT ACT APPROVALS (Continued)

SWIMMING POOLS ACT

Approval to operate caravan park, camping ground or manufactured home estate (does not include State Government levy of $2.70 per site)

Approval to operate primitive camping ground (does not include State Government Levy of $2.70 per site)

Application for approval to operate a manufactured home estate

Application for renewal of an approval or for annual inspection of caravan park, camping ground ormanufactured home estate

Swimming Pools Act - Private Inspections (Fences & alike)

Swimming Pools Act - Public Inspections (Fences & alike)

Application to carry out sewerage and/or drainage work per dwelling (includes inspections)

Professional Officer - includes reporting time

Page 219: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Plus travelling - per kilometre P $0.78 $0.71 0.07$ $0.78Copy of Deposited Plan P $16.80 $16.80 - $16.80

Certified Copy of Document - CI.262 of EPA REG S $53.00 $53.00 - $53.00

Building Specification F $12.60 $11.45 1.15$ $12.60

Written confirmation that Development Consent has commenced (inspection required) F $157.50 $143.18 14.32$ $157.50

Written confirmation that Development Consent has commenced (no inspection required) F $63.00 $57.27 5.73$ $63.00

CERTIFICATESSection 121ZP Certificates as to Orders - EP & A Act 1979 P $65.00 $65.00 - $65.00

Section 735A Certificates as to Notices - Local Government Act 1993 P $55.00 $55.00 - $55.00

Section 149A Building Certificates (dwellings only) - CI.260(1)(a) EPA REG S $250.00 $250.00 - $250.00

Building Certificates (Dwellings - re-inspection) - CI.260(2) EPA REG S $90.00 $90.00 - $90.00

Building Certificates (other than Dwellings) - CI.260(1)(b) EPA REGUp to 200m² S $250.00 $250.00 - $250.00Greater than 200m² S

S

Copy of Building Certificate - CI.261 EPA REG S $13.00 $13.00 - $13.00

Section 149 Planning Certificates:(a) Section 149(2) - CI.259(1) EPA REG S $53.00 $53.00 - $53.00(b) Section 149(2) & (5) - CI.259(2) EPA REG S $133.00 $133.00 - $133.00(c) Urgent fee Additional P $134.00 $134.00 - $134.00

Building Certificates (buildings where applicant for the certificate, or person on whose behalf the application is made, is the person who erected the building or on whose behalf the building was erected - Clause 260(3A) EPA EG)

See Clause 260 (3A)

See Clause 260 (1) (b)

Page 220: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Impounding Fee (conveying and storing impounded animal) D $55.00 $60.00 - $60.00

Sustenance (per animal per day, or part thereof) F $25.00 $27.00 - $27.00

Euthanase Animal and Disposal F $70.00 $75.00 - $75.00

Microchipping and Vaccination fee when done on Council's behalf by local vet F Cost + 10% Cost + 10% Cost + 10%Minimum fee $70.00 $70.00 $70.00

Sale of companion animal (includes vaccination, microchipping but not registration)Dogs F $102.90 $93.55 9.35 $102.90

Cats F Cost of vaccination & micro chipping

+ 15%

10% Cost of vaccination

& micro chipping + 15%

Impounding Fee:- cattle, horses, goats, sheep and pigs First animal D $60.00 $65.00 - $65.00

Per animal therafter D $20.00 $25.00 - $25.00Plus transport costs See below See below - See below

- transport/driving/walking cost D Cost + 10% Cost + 10%Minimum fee D $36.75 $40.00 - $40.00

Sustenance (per head per day or part thereof)- cattle and horses P $36.75 $40.00 - $40.00

- goats, sheep and pigs P $26.25 $30.00 - $30.00

- other animals P Cost + 10% Cost + 10% Cost + 10%Minimum fee $26.25 $26.25 - $26.25

COMPANION ANIMAL CONTROL (CPI increase)IMPOUNDING AND ANIMAL CONTROL

STOCK CONTROL (CPI increase)

Page 221: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Animal not desexed S $150.00 $182.00 - $182.00

Desexed Animals Permanent S $40.00 $49.00 - $49.00Owned by Pensioner S $15.00 $19.00 - $19.00

Animal not desexed and kept by a recognised breeder for breeding purposes S $40.00 $49.00 - $49.00

N Exempt Exempt

N Exempt Exempt

Boarding Kennels - per dog, per day F $26.25 $26.25 - $26.25

ANIMAL REGISTRATION FEE (increase is a Statutory requirement)

Working dogs. Note: a working dog is a dog used primarily for the purpose of droving, tending, working or protecting stock, and includes a dog being trained as a working dog. (Companion Animals Regulations definition - Clause 3)

A cat born before 1st July 1999, other than a cat sold after that date (Companion Animals Regulations definition - Clause 17)

Page 222: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

SWIMMING POOL ENTRY FEESGeneral Entry

Children under three (3) years of age N No Charge No ChargeNon-Swimming Patron/Observers - excluding Swimming Lessons and Carnivals N $1.50 $1.36 0.14 $1.50Pension or Disability Card Holders and their Carers N No Charge No ChargeGeneral Admission Charge/All Swimmers P $3.00 $2.73 0.27 $3.00Family (family only - includes parents/guardians & children - maximum 5 members) P $8.00 $7.27 0.73 $8.00

Single P $65.00 $59.09 5.91 $65.00Family (family only - includes parents/guardians & children - maximum 5 members) P $200.00 $181.82 18.18 $200.00

Hire of Lifeguards/Instructors (which are not included as part of the group booking hire rate) P $35.00 $31.82 3.18 $35.00

Courses (plus applicable admission charge)Bronze Medallion Training and Examination (9 hours and 6 per group) - Manuals Not Included F $110.00 $100.00 10.00 $110.00Bronze Medallion Update - Resuscitation (1.5hours/1 person) - Manuals Not Included F $105.00 $95.45 9.55 $105.00Resuscitation Reaccreditation (1 hour/1 person) - Manuals Not Included F $38.00 $34.55 3.45 $38.00Senior First Aid - Flexible - 8 hours and 6 per group F $125.00 $113.64 11.36 $125.00Senior First Aid Updated - 4 hours and 6 per group F $70.00 $63.64 6.36 $70.00

School Programs (operating between 9.30am and 2.30pm) NOTE: Fee also REDUCED for School GroupsP $350.00 $318.18 31.82 $350.00

P No Charge No Charge

10 day, 30 minute School Lesson (8 per group) P $66.00 $60.00 6.00 $66.00

10 day, 60 minute School Lesson (10 per group) P $81.00 $73.64 7.36 $81.00

RECREATION

Season Tickets

Venue Fee for School Group Pool Bookings/Picnic Days (5 hours - 50 per group) excludes entry fee - plus applicable admission charge for all patrons

Venue Fee for School Competitive Carnivals - applicable admission charge to be added for all swimmers (Spectator entry exemption applies during the carnival only)

Page 223: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

SWIMMING POOL ENTRY FEES (Continued)Group Bookings (other than schools) - NOTE: Fee also REDUCED for Groups

Group Pool Bookings - Venue Fee 2 hours - up to 50 patrons - plus applicable admission charge F $150.00 $136.36 13.64 $150.00Group Pool Bookings with Pool Inflatables - Venue Fee 2 hours - plus applicable admission charge F $200.00 $181.82 18.18 $200.00

Swimming Lessons - 10% discount for second/third sibling - plus applicable admission charge10 day, 30 minute Group Lesson (Groups of 3) P $110.00 $110.00 - $110.0010 day, 30 minute Private Lesson P $248.00 $248.00 - $248.0010 day, 20 minute Private Lesson P $182.00 $182.00 - $182.0010 day, 30 minute shared (2 participants) Private Lesson P $286.00 $286.00 - $286.0010 day, 60 minute Program - (6 per group) P $110.00 $110.00 - $110.0010 day, 45 minute Program - (6 per group) P $94.00 $94.00 - $94.0010 day, 45 minute Junior Lifeguard - (6 per group) P $120.00 $120.00 - $120.00

Page 224: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Wages F+ Award Rate plus 55%

10% Award Rate plus 55%

Section 44 Rural Fire Service Incidents Private Plant Hire Rate Plus per hour: F $42.00 $40.00 4.00$ $44.00

Materials F+ Cost plus 25% 10% Cost plus 25%

Gravel (delivered) per m³ F+ $32.60 $30.55 3.05$ $33.60

Trucks (other than gravel haulage) including driver:2 tonne dry per hour F+ $41.00 $38.18 3.82$ $42.002 tonne with driver per hour F+ $79.00 $73.64 7.36$ $81.00

3 tonne dry per hour F+ $42.00 $39.09 3.91$ $43.003 tonne with driver per hour F+ $80.00 $74.55 7.45$ $82.00

8 tonne dry per hour F+ $49.40 $46.36 4.64$ $51.008 tonne with driver per hour F+ $89.00 $81.82 8.18$ $90.00

12 tonne dry per hour F+ $87.00 $81.82 8.18$ $90.0012 tonne with driver per hour F+ $128.00 $118.18 11.82$ $130.00

Truck & Dog dry per hour F+ $102.00 $95.45 9.55$ $105.00Truck & Dog with driver per hour F+ $144.00 $132.73 13.27$ $146.00

Paveliner - with 2 Traffic Controllers per hour F+ $390.00 $368.18 36.82$ $405.00Paveliner - with 1 Traffic Controllers per hour F+ $341.00 $322.73 32.27$ $355.00Paveliner - without Traffic Controllers per hour F+ $292.00 $277.27 27.73$ $305.00

per m² F+ $4.00 $3.82 0.38$ $4.20

(Continued Next Page)

PRIVATE WORKS and OTHER CHARGES (CPI increase)

Minimum charge for all plant = half (½) hour at appropriate rate

WORKS and ENGINEERING DEPARTMENT

Page 225: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

PRIVATE WORKS & OTHER CHARGES (Continued) (CPI increase)Water Tanker dry per hour F+ $63.00 $59.09 5.91$ $65.00Water Tanker with driver per hour F+ $103.00 $95.45 9.55$ $105.00

Low Loader with driver per hour F+ $198.00 $186.36 18.64$ $205.00Delivery plus per kilometre F+ - - - -

minimum charge F+ $198.00 $186.36 18.64$ $205.00

Grader with operator per hour F+ $146.00 $136.36 13.64$ $150.00

Loader with operator per hour F+ $121.00 $113.64 11.36$ $125.00

Mini Excavator dry per hour F+ $40.00 $45.45 4.55$ $50.00Mini Excavator with operator per hour F+ $113.00 $81.82 8.18$ $90.00

Excavator dry per hour F+ $106.00 $99.09 9.91$ $109.00Excavator with operator per hour F+ $146.00 $136.36 13.64$ $150.00

Dozer dry per hour F+ $71.00 $90.91 9.09$ $100.00Dozer with operator per hour F+ $108.15 $127.27 12.73$ $140.00

Utilities per kilometre F+ $0.84 $0.79 0.08$ $0.87

Plumber (with vehicle) per hour F+ $79.00 $74.55 7.45$ $82.00

Plumber & Assistant (with vehicle) per hour F+ $114.00 $110.91 11.09$ $122.00

Water Snorter with ute & operator per hour F+ $143.00 $134.55 13.45$ $148.00

Sewerage Mains Camera & Operator per hour F+ $143.00 $134.55 13.45$ $148.00

Self-Propelled Roller dry per hour F+ $75.60 $70.91 7.09$ $78.00Self-Propelled Roller with operator per hour F+ $113.00 $107.27 10.73$ $118.00

Tractor with Broom and operator per hour F+ $117.00 $110.00 11.00$ $121.00

(Continued Next Page)

Page 226: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

PRIVATE WORKS & OTHER CHARGES (Continued) (CPI increase)Fork Lift with operator per hour F+ $68.25 $64.55 6.45$ $71.00

Ditch Witch with operator per hour F+ $75.60 $70.91 7.09$ $78.00

Traffic Lights per hour per set F+ $86.00 $80.91 8.09$ $89.00

Back Hoe (4WD) dry per hour F+ $71.00 $66.36 6.64$ $73.00Back Hoe (4WD) with operator per hour $113.00 $102.73 10.27$ $113.00

Minor Plant dry per hour F+ $32.60 $30.91 3.09$ $34.00Minor Plant with operator per hour $64.00 $67.27 6.73$ $74.00

Road Restoration & ReinstatementBitumen F+ Cost plus 25% 10% Cost plus

25%Gravel F+ Cost plus 25% 10% Cost plus

25%

Standpipe Sales (sale of water from Depot) per kl F $5.25 $5.50 - $5.50Minimum charge F $25.73 $27.00 - $27.00

F $118.00 $120.00 - $120.00

Water Meter Connection Fee (includes meter cover)20mm Service F $1,050.00 $1,080.00 - $1,080.0025mm Service F $1,386.00 $1,430.00 - $1,430.0040mm Service F $2,047.50 $2,110.00 - $2,110.0050mm Service F $2,898.00 $3,000.00 - $3,000.00

Water Meter Disconnection Fee F $107.10 $110.00 - $110.00

Water Service Restriction Fee F $104.00 $110.00 - $110.00

(Continued Next Page)

Water Meter Test Fee

Page 227: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Water Meter CoversSmall F $75.60 $70.91 7.09$ $78.00Large F $121.80 $114.55 11.45$ $126.00

Provision of New Sewer Junction in Lieu of Existing Junction F $1,157.10 $1,090.91 109.09$ $1,200.00

Kerb & Gutter - owner's contribution - for properties with one frontage to public road % of actual cost P 50% 10% 50%

Maximum charge per metre $82.95 $77.73 7.77$ $85.50

- for properties with more than one frontage to public road % of actual cost for the frontage with street address P 50% 10% 50%Maximum charge per metre $82.95 $77.73 7.77$ $85.50

% of actual cost for the other frontage to public roads P 25% 10% 25%Maximum charge per metre $82.95 $77.73 7.77$ $85.50

Kerb & Gutter per metre F $80.85 $77.73 7.77$ $85.50

Footpath - owner's contribution N No Charge No Charge

Driveway Crossing:Where not provided in existing kerb P $466.20 $436.36 43.64$ $480.00Re-location in existing kerb F $880.95 $836.36 83.64$ $920.00

Hire of Council Signs & Equipment per item per day F $5.40 $5.45 0.55$ $6.00Minimum charge F $26.25 $27.27 2.73$ $30.00

Use of Truck Wash per half hour F $22.05 $22.73 2.27$ $25.00Minimum charge (1/2 hour) F $22.05 $22.73 2.27$ $25.00

Restricted Access Vehicle Route Assessment Per Km F $0.00 $500.00Plus external costs F $0.00 Cost Plus

(e.g. bridge structural assessment) 25%

PRIVATE WORKS & OTHER CHARGES (Continued) (CPI increase and new charge in accordance with new RMS Guidelines)

Page 228: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Annual ChargesVacant Land Per Annum R $31.50 $33.00 - $33.00Occupied Land - 240 Litre Bin Collection Service Per Bin Per Annum R $184.80 $195.00 - $195.00

Garbage Bins (240 litre) purchase or replacement P $122.85 $127.00 - $127.00

Oberon Rubbish TipStandard Garbage Bag F $4.00 $4.55 0.45$ $5.00Car Boot Load F $10.00 $10.00 1.00$ $11.00Box Trailer F $13.00 $13.64 1.36$ $15.00Utility type vehicle F $13.00 $13.64 1.36$ $15.00Trucks /m³ F $13.00 $13.64 1.36$ $15.00Tyre Components /m³ F $78.00 $80.00 8.00$ $88.00

Opening Fee With notice given by 4.00pm on previous working day D $76.00 $72.73 7.27$ $80.00Without notice D $160.00 $154.55 15.45$ $170.00

Animal Carcasses - sheeps/pigs F $22.00 $24.55 2.45$ $27.00Animal - offal /m³ F $40.00 $36.36 3.64$ $40.00

Animal Carcasses - large animals F $43.00 $48.18 4.82$ $53.00

Vehicle Wrecks F No Charge No Charge

Recyclable Clean Metal No Charge No Charge

Bulk Timber Waste /m³ F $28.00 $30.91 3.09$ $34.00

Boiler Ash /m³ F $108.00 $100.00 10.00$ $110.00

Asbestos Waste /tonne F $140.00 $136.36 13.64$ $150.00

SEWERAGE TREATMENT PLANTTrade Waste per k/l D $2.00 $1.91 0.19$ $2.10(Large Dischargers with Trade Waste Agreements)

Septic Effluent per k/l F $54.00 $50.91 5.09$ $56.00

(Discounted by Trade Waste Factor -TWF)

WASTE MANAGEMENT CHARGES (Additional costs are due to environmental monitoring as part of licensing requirements)

(separate quotes provided in m3 depending on density of asbestos)

Page 229: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

CEMETERY CHARGESLand for grave (1.1m x 2.4m) under Right of Burial F $533.40 $500.00 50.00$ $550.00

Burial Permit- includes memorial burial (under 20 weeks gestation) F $102.90 $106.00 - $106.00

Receipt of ashes at lawn cemetery for burial - not including burial permit (includes plaque) F $135.45 $127.27 12.73$ $140.00

Interment of corpseWeekdays F $646.80 $609.09 60.91$ $670.00Saturdays & Public Holidays F $953.40 $895.45 89.55$ $985.00

Interment of infant in children's section of cemeteryUnder 6 months (including stillborn) P $113.40 $109.09 10.91$ $120.00Over 6 months (casket less than 1.1metre in length) P $193.20 $181.82 18.18$ $200.00

Plaque for Lawn CemeteryStandard F $953.40 $895.45 89.55$ $985.00Enhancements on Standard (e.g. second plaque for double depth, ceramic photographs) F Cost plus 25% 10% Cost plus

25%

Additional Charges for GraveExtra Depth F $238.35 $222.73 22.27$ $245.00Confined Site (existing monumental works) F $238.35 $222.73 22.27$ $245.00

Exhumation of corpse F $7,872.90 $7,454.55 745.45$ $8,200.00

Other Fees and ChargesProvision of a plaque on all interments in the general cemetery area F $130.20 $122.73 12.27$ $135.00

Page 230: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

N $0.00 $0.00 - $0.00P $3.00 $3.00 - $3.00

Lost/Damaged Items F Cost of Item - Cost of Item

A4: Per Page P $0.30 $0.36 0.04$ $0.40A4: Double Sided P $0.45 $0.45 0.05$ $0.50A4: Colour Per Page P $1.00 $1.00 0.10$ $1.10A3: Per Page P $0.60 $0.64 0.06$ $0.70A3: Double Sided P $0.90 $0.91 0.09$ $1.00A3: Colour Per Page P $2.00 $2.00 0.20$ $2.20

Microfilm Per Page P $0.00 $0.36 0.04$ $0.40Per Hour P $0.00 $9.09 0.91$ $10.00

Per Page P $1.00 $1.00 0.10$ $1.10

Public Fax Charges ( Limit 15 pages per transmission)(a) Outgoing Faxes

Local F $2.40 $2.27 0.23$ $2.50STD F $3.60 $3.36 0.34$ $3.70International F $6.40 $5.91 0.59$ $6.50

(b) Incoming Faxes per page $2.40 $2.27 0.23$ $2.50

Internet Access and General Computer Use First Hour N No Charge No ChargePer hour thereafter P $0.00 $4.55 0.45$ $5.00

Rent per week (Linked to the Single Pensioner Rental Assistance) F $80.25 $75.14 7.51$ $82.65Rental of Lockup Garage per week F $6.40 $6.00 0.60$ $6.60

GENERAL ADMINISTRATION and COMMUNITY SERVICES

SELF-CARE UNITS (CPI increase)

LIBRARY CHARGES (mainly CPI increases, as well as new Microfilm and printer acquired by Library, and introduction of internet usage after first hour to enhance computer use)

Inter-Library Loans from Libraries other than BRLInter-Library Loans from Bathurst Regional Library (BRL)

Laminating

Photocoping/Printing

Page 231: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Oberon Not for profit Organisations Per annum P $0.00 $136.36 13.64$ $150.00Per day P $0.00 $80.00 8.00$ $88.00

Self Help Community Groups Per annum P $22.00 $20.00 2.00$ $22.00Non-Oberon LGA Not for Profit Organisations Per hour P $0.00 $10.00 1.00$ $11.00

Per day P $88.00 $80.00 8.00$ $88.00Community Centre Function Room Per hour P $11.00 $20.00 2.00$ $22.00

Per day P $88.00 $118.18 11.82$ $130.00

Community Centre Meeting and Activity Rooms Per hour P $11.00 $10.91 1.09$ $12.00Per day P $176.00 $118.18 11.82$ $130.00

Cleaning Deposit (refundable upon satisfactory cleaning after use) $110.00 $110.00 - $110.00

Wall Space - Removal & Rehang of Artworks (up to 3 months) $150.00 $136.36 13.64 $150.00

Section 603 Certificate S $70.00 $70.00 - $70.00

Section 603 Certificate - Urgent Fee Additional P $138.00 $138.00 - $138.00

Water Meter Reading Fee P $40.00 $40.00 - $40.00

Administration Fee for Refund of Certificate Fees P $16.80 $15.27 1.53$ $16.80

Council Business Papers - Postage for 12 months P $42.00 $38.18 3.82$ $42.00

Supply Rural Address Numbers P $21.60 $19.64 1.96$ $21.60

Provision of written information of a commercial nature (including property information)Information that is readily available or already extracted P $21.60 $21.60 - $21.60

Information that requires research Professional Staff Per hour F $139.00 $139.00 - $139.00

Minimum charge F $67.00 $67.00 - $67.00

Administrative Staff Per hour F $57.00 $57.00 - $57.00Minimum charge F $29.00 $29.00 - $29.00

(Continued Next Page)

ADMINISTRATION CHARGES

ROBERT HOOPER COMMUNITY CENTRE (new NFP contributions and reduced daily rate for CC rooms)

Page 232: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

ADMINISTRATION CHARGES (continued) (CPI increase)Supply of MapInfo Map F $15.70 $15.70 - $15.70

Cheque Dishonour Fee F $31.00 $28.18 2.82$ $31.00

Debt RecoveryLodgement of Statement of Liquidated Claim F Actual Cost Actual CostService of Statement of Liquidated Claim F Actual Cost 10% Actual CostLodgement of Writ/Garnishee F Actual Cost Actual CostAdvertising F Actual Cost 10% Actual Cost

A4: Per Page P $0.30 $0.36 0.04$ $0.40A4: Double Sided P $0.45 $0.45 0.05$ $0.50A4: Colour Per Page P $1.00 $1.00 0.10$ $1.10A3: Per Page P $0.60 $0.64 0.06$ $0.70A3: Double Sided P $0.90 $0.91 0.09$ $1.00A3: Colour Per Page P $2.00 $2.00 0.20$ $2.20

Tiger Territory - The History of Oberon Rugby League F $41.00 $37.27 3.73$ $41.00

Thematic History of Oberon by Phillip Gammel-Smith 2013/14 F $30.00 $13.64 1.36$ $15.00

Fall Hill Lookout - Transmitter Shed Useage Annual Fee F $1,518.18 151.82$ $1,670.00Electricity Useage F Actual Cost Actual Cost

Photocoping/Printing

(Plus Bank Fees)

Page 233: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

ACCESS TO PUBLIC INFORMATIONAccess to records (GIPA Act)

Application Fee S $30.00 $30.00 - $30.00Processing Charge per hour or part thereof S $30.00 $30.00 - $30.00

Application for Internal Review (GIPA Act) S $40.00 $40.00 - $40.00

All Other RequestsApplication Fee F $39.00 $39.00 - $39.00Processing Charge per hour or part thereof F $39.00 $39.00 - $39.00

HIRE OF SOUND EQUIPMENT Bond - for all Users D $210.00 $210.00 - $210.00

Hire ChargesCommunity & Not For Profit P $0.00 $45.45 4.55$ $50.00Commercial - ½ Day P $69.00 $62.73 6.27$ $69.00

Commercial - Full Day P $139.00 $126.36 12.64$ $139.00

Hire of Lecturn $25.00 $22.73 2.27$ $25.00

NOTE: The GIPA Act provides that applicants are entitled to a 50% reduction of processing charges on financial hardship grounds or if the information required is of special benefit to the public generally.

Page 234: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

Usage of ComputersCTC Clubs Per person/session P $5.40 $5.05 0.50$ $5.55

Internet access and General Computer Usage First hour No ChargePer hour thereafter P $2.70 $4.55 0.45$ $5.00

Communications/Printing

A4: Per Page P $0.30 $0.36 0.04$ $0.40A4: Double Sided P $0.45 $0.45 0.05$ $0.50A4: Colour Per Page P $1.00 $1.00 0.10$ $1.10A3: Per Page P $0.60 $0.64 0.06$ $0.70A3: Double Sided P $0.90 $0.91 0.09$ $1.00A3: Colour Per Page P $2.00 $2.00 0.20$ $2.20

Scanning to email Per item F $2.10 $2.00 0.20$ $2.20

Public Fax Charges ( Limit 15 pages per transmission)(a) Outgoing Faxes

Local F $2.40 $2.27 0.23$ $2.50STD F $3.60 $3.36 0.34$ $3.70International F $6.40 $5.91 0.59$ $6.50

(b) Incoming Faxes Per page $2.40 $2.27 0.23$ $2.50

(Continued Next Page)

Photocoping/Printing

VISITOR INFORMATION AND COMMUNITY TECHNOLOGY CENTRE (CPI increase and introduction of internet usage after first hour to enhance computer use)

Page 235: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

TrainingBy External Trainers per hour F $70.00 $63.64 6.36$ $70.00By CTC Staff per hour F $36.00 $32.73 3.27$ $36.00One to One Computer Tutoring per hour P $0.00 $13.64 1.36$ $15.00Computer Trouble Shooting per hour P $0.00 $4.55 0.45$ $5.00Updating operating systems & software on computers, tablets, phones and other devices

per hour P $0.00 $20.00 2.00$ $22.00

Venue HireNon-Oberon LGA Not for Profit Organisations Per hour P $0.00 $10.00 1.00$ $11.00

Per day P $88.00 $80.00 8.00$ $88.00Oberon Not for profit Organisations Per annum P $0.00 $136.36 13.64$ $150.00

Per day P $0.00 $80.00 8.00$ $88.00Self Help Community Groups Per annum P $22.00 $20.00 2.00$ $22.00

Training Room with Computers Per hour P $39.00 $22.73 2.27$ $25.00Per day P $170.00 $136.36 13.64$ $150.00

Training Room without Computers Per hour P $32.00 $20.00 2.00$ $22.00Per day P $142.00 $118.18 11.82$ $130.00

Meeting Room with Computers Per hour P $29.00 $22.73 2.27$ $25.00Per day P $120.00 $136.36 13.64$ $150.00

Meeting Room without Computers Per hour P $22.00 $20.00 2.00$ $22.00Per day P $90.00 $118.18 11.82$ $130.00

Conference Room with Computers Per hour P $32.00 $22.73 2.27$ $25.00Per day P $142.00 $136.36 13.64$ $150.00

Conference Room without Computers Per hour P $25.00 $20.00 2.00$ $22.00Per day P $113.00 $118.18 11.82$ $130.00

Small Office Per hour P $22.00 $20.00 2.00$ $22.00Per day P $90.00 $118.18 11.82$ $130.00

Brochure DisplaysOPTA and OBA Financial Members No charge $0.00 $0.00 - $0.00Within the LGA Per Annum $110.00 $100.00 10.00$ $110.00Outside the LGA Per Annum $165.00 $150.00 15.00$ $165.00

VISITOR INFORMATION AND COMMUNITY TECHNOLOGY CENTRE (Continued) (CPI increase, new NFP contributions, and introduction of computer repairs and tutoring)

Page 236: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

Amount GST Total

Oberon CouncilDRAFT Schedule of FEES & CHARGES 2014/2015

2014/2015 Fee/Charge

Pricing Principles: F = Full Cost Recovery, F+ = Full Cost Recovery + Margin, P = Partial Cost Recovery, M = Market Pricing, S = Statutory, D = Demand Management, C = Contribution Pricing, R = Rates & Annual Charges, N = No Cost Recovery

PricingPrinciple

2013/2014Fee/Charge

DETAILS

In accordance with Office of Local Government guidelines. P - - - -

Letter of approval Per application P $0.00 $90.91 9.09$ $100.00

Road closures Per negotiation F - - - -

DISADVANTAGED TRANSPORT PROGRAM (Transport funding requirements used to guide increases)Subsidy (Client pays any amount exceeding $5.00 voucher) $5.00 fare P $1.10 $0.00 -$ $0.00

Community Transport Vehicle (Subsidised Eligible Care Car Clients)- Bathurst P $14.00 $16.36 1.64$ $18.00- Orange P $25.00 $27.27 2.73$ $30.00- Lithgow P $14.00 $16.36 1.64$ $18.00- Penrith/Westmead P $30.00 $36.36 3.64$ $40.00- Sydney/Other P $0.00 $45.45 4.55$ $50.00

Bus Hire - 57 Seat - Local (Orange to Katoomba) per bus P $5.00 (pp) $363.64 36.36$ $400.00- 57 Seat - Outside Region per bus P $5.00 (pp) $545.45 54.55$ $600.00- 24 Seat - Local (Orange to Katoomba) per bus P $5.00 (pp) $181.82 18.18$ $200.00- 24 Seat - Outside Region per bus P $5.00 (pp) $318.18 31.82$ $350.00- 21 Seat - Local (Orange to Katoomba) per bus P $5.00 (pp) $181.82 18.18$ $200.00- 21 Seat - Outside Region per bus P $5.00 (pp) $318.18 31.82$ $350.00

FILM CENTRAL NSW CHARGES

Page 237: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

FEEDBACK SHEET – DRAFT Oberon Community Strategic Plan 2014

Public Exhibition - Submissions The DRAFT Oberon Community Strategic Plan 2014 (CSP) will be on Public Exhibition from 26 May to 23 June 2014. WRITTEN SUBMISSIONS are to be addressed to General Manager Oberon Council PO Box 84 OBERON NSW 2787 You mail email your comments to [email protected] OR Send to PO Box 84, Oberon NSW 2787 OR drop off this FEEDBACK SHEET at Oberon Library, Corner Dart St & Fleming St, Oberon Oberon Visitor Information Centre, Corner Ross St and Edith Rd, Oberon Oberon Council Administration Office at 137-139 Oberon Street, Oberon. Want to provide further comments? You can contact the Mayor or General Manager on (02) 6329 8151

Please provide your comments here NAME

Contact details

Page 1 – please complete Page 2

Page 238: DRAFT Oberon CSP 2014€¦ · Draft Workforce Management Plan May 2014 51 – 76 6. Draft Road Asset Management Plan May 2014 77 – 180 7. Draft Delivery Program 2014/2015 181 –

FEEDBACK SHEET – DRAFT Oberon Community Strategic Plan 2014

2NAME

Contact details

The DRAFT Oberon Community Strategic Plan 2014 (CSP) will be on Public Exhibition from 26 May to 23 June 2014. Have more comments? Please attach additional pages