Upload
destiny-espinoza
View
24
Download
0
Embed Size (px)
DESCRIPTION
Draft Mod 0337: Introduction of an Inter-day Linepack Product – Progress Timetable. Review Group 029111 August 2010. Transmission Workgroup 03 February 2011. Modification Proposal 0337 - progress timetable. Open Letter - for industry consultation issued 11 Jan 11 - PowerPoint PPT Presentation
Citation preview
Draft Mod 0337: Introduction of an Inter-day Linepack Product – Progress Timetable
Review Group 0291 11 August 2010
Transmission Workgroup 03 February 2011
Modification Proposal 0337 - progress timetable
Open Letter - for industry consultation issued 11 Jan 11
Issue Inter-day Linepack Methodology Paper 21 Jan 11
Open Letter – close out of representations 01 Feb 11
Transmission Workgroup 03 Feb 11
Feedback from Open Letter
Transmission Workgroup 11 Feb 11
Finalise Business Rules
Review draft Suggested Legal Text
Include relevant feedback from Open Letter
Provide examples of NGG ILP decision making within day
Transmission Workgroup 03 Mar 11
Agree workgroup report
MP0337 Workgroup Report to Panel 17 Mar 11
If recommended to consultation
FMR to April Panel 21 Apr 11
FMR issued to Ofgem for decision 22 Apr 11