6
12 18 Added off-street bike/ped path Added bike/ped overpass Two additional travel lanes in each direction Four through lanes in each direction from Beltline to Buckeye Rd Relocated frontage road intersections Diverging Diamond Interchange below Beltline overpass Bike/ped connection through interchange New frontage road connections Restricted access to right-in/right-out Added through lane on Terminal Dr and shared through/left turn lane on Voges Rd at intersection Added second left turn lane by City of Madison 2013 Bike/ped overpass Added bike/ped accommodations on frontage road Echelon Interchange for westbound Broadway Ave left turns and southbound Stoughton Rd traffic connecting to westbound Beltline ramp Extended turn lanes and additional left turn lanes on all approaches Edna Taylor Conservation Park Ahuska Park BELTLINE BROADWAY AVE FEMRITE DR TOMPKINS DR PFLAUM RD TERMINAL DR VOGES RD SOUTH DUTCH MILL RD HELGESON DR FEMRITE DR LINDA VISTA RD CANDEM R D S EIFERTH R D S ERVICE L N F RONTAGE R D F RONTAGE R D G ALLEON R D TRIANGLE ST HOB ST BROADWAY FRONTAGE RD BROADWAY AVE FEMRITE DR TOMPKINS DR CITY OF MONONA CITY OF MADISON VILLAGE OF M C FARLAND SEE SHEET 2 PROJECT LIMITS Stoughton Road Roadway Improvement One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other Roadway Improvement Signalized Intersection for Stoughton Road Traffic Existing Signalized Intersection for Stoughton Road Traffic Removed Bike/Ped Improvement Existing Bike/Ped Facility Full Parcel Impacted (may include structure) Partial Parcel Impacted Access Proximity Impacted Access Removed Public Parks and Public Stormwater Areas X X DRAFT Map 2: Project Alts Alt A - 1 (Sheet 1 of 6) 0' 350' 700' DRAFT: 3.19.13

DRAFT H S H SEE SHEET 2 D Map 2: Project Alts Alt A - 1 ......One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other ... DRAFT: 3.19.13. B E R D C E

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DRAFT H S H SEE SHEET 2 D Map 2: Project Alts Alt A - 1 ......One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other ... DRAFT: 3.19.13. B E R D C E

12 18

Added off-street bike/ped path

Added bike/ped overpass

Two additional travel lanesin each direction

Four through lanes in each directionfrom Beltline to Buckeye Rd

Relocated frontage road intersections

Diverging Diamond Interchangebelow Beltline overpass

Bike/ped connection through interchange

New frontage road connections

Restricted access to right-in/right-out

Added through lane on Terminal Drand shared through/left turn lane

on Voges Rd at intersection

Added second left turn laneby City of Madison 2013

Bike/ped overpass

Added bike/ped accommodationson frontage road

Echelon Interchange for westbound Broadway Ave left turns and

southbound Stoughton Rd traffic connecting to westbound Beltline ramp

Extended turn lanes and additionalleft turn lanes on all approaches

Edna TaylorConservation Park

Ahuska Park

BELTLINE

BROADWAY AVE

FEMRITE DR

TOMPKINS DR

PFLAUM RD

TERM

INA

L DR

VOGES RD

SO

UTH D

UTCH M

ILL RD

HELGESON DR

FEMRITE DR

LINDA VISTA RD

CAN

DEM

RD

SEIF

ERTH

RD

SERV

ICE L

N

FRO

NTA

GE R

D

FRO

NTA

GE R

D

GA

LLEO

N R

D

TRIAN

GLE S

T

HOB ST

BROADWAYFRONTAGE RD

BROADWAY AVE

FEMRITE DR

TOMPKINS DR

CIT Y OF MONONA

CIT Y OF MADISON

VILLAGE OFM CFARLAND

SEE SHEET 2

PROJECT LIMITS

Stoughton Road Roadway ImprovementOne Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other Roadway ImprovementSignalized Intersection for Stoughton Road TrafficExisting Signalized Intersection for Stoughton Road Traffic RemovedBike/Ped ImprovementExisting Bike/Ped FacilityFull Parcel Impacted (may include structure)

Partial Parcel Impacted Access Proximity ImpactedAccess RemovedPublic Parks and Public Stormwater Areas

X

X

DRAFT Map 2: Project AltsAlt A - 1 (Sheet 1 of 6)

0' 350' 700'

DRAFT: 3.19.13

Page 2: DRAFT H S H SEE SHEET 2 D Map 2: Project Alts Alt A - 1 ......One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other ... DRAFT: 3.19.13. B E R D C E

BUCKEYE RD

COTTAGE GROVE RD

DEM

PSEY

RD

PFLAUM RD

HELGESON DR

ALLIS AVE

CAM

DEN

RD

BLO

SSO

M L

N

HOB ST

FRO

NTA

GE R

D

FRO

NTA

GE R

D

FRO

NTA

GE R

D

COTTAGE GROVE RD

PFLAUM RD

BUCKEYE RD

LINDA VISTA RD

AcewoodConcervancy

Monona Golf Course

CIT Y OF MADISON

CIT Y OF MADISON

Added bike/ped overpass

Added on-road bikeaccommodations and sidewalks

Relocated frontage road intersection

Added second northbound right turnlane for westbound Buckeye Rd traffic

Additional travel lane in each direction

Relocated frontage road intersection

Reconstruct/expand structure to extend southbound acceleration and

deceleration lanes project planned for 2015 by WisDOT

Extended turn lanes and additionalleft turn lanes on all approaches

Three through lanes in each direction

Four through lanes in each directionfrom Beltline to Buckeye Rd

Reconstruct/expand structure to extend northbound accelerationand deceleration lanes

SEE SHEET 1

SEE SHEET 3

DRAFT

0' 350' 700'

Map 2: Project AltsAlt A - 2 (Sheet 2 of 6)

DRAFT: 3.19.13

X

Stoughton Road Roadway ImprovementOne Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other Roadway ImprovementSignalized Intersection for Stoughton Road TrafficExisting Signalized Intersection for Stoughton Road Traffic RemovedBike/Ped ImprovementExisting Bike/Ped FacilityFull Parcel Impacted (may include structure)

Partial Parcel Impacted Access Proximity ImpactedAccess RemovedPublic Parks and Public Stormwater Areas

X

X

Page 3: DRAFT H S H SEE SHEET 2 D Map 2: Project Alts Alt A - 1 ......One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other ... DRAFT: 3.19.13. B E R D C E

MILWAUKEE ST

PORTLAND PARKWAY

STATE HIGHWAY 30

EAST WASH

ING

TON A

VE

SYCAMORE AVE

LEXINGTON AVE

CO

MM

ER

CIA

L AV

E

RO

WLA

ND A

VE

ALBERT CT

SCH

MED

EMA

N AV

E

WA

LS

H R

D

LARSON CT

LIEN RD

ANDERSON ST

MEN

DO

TA ST

MEN

DO

TA ST

MACA

RTHUR RD

C IT Y OF MADISON

CIT Y OF MADISON

Hiestand Park

Diverging Diamond Interchangebelow WIS 30 overpass with

bike/ped accommodations

Reconstructed eastbound off ramp toeliminate free flow right-turn movement

and added second right turn lane

Reconstructed westbound off rampwith added third left turn lane

Increased length of off rampsAdded bike/ped

overpass

Extended turn lanes and additionalsecond westbound left turn lane

Added bike/ped underpass

Added bike/ped crossing

Connect MacArthur Rd to Mendota St

Echelon Intersection with northbound Stoughton Rd and westbound East Washington Ave above southbound Stoughton Rd and eastbound East Washington Ave

Reconstruct existing bike/pedoverpass

Three through lanes in each direction

SEE SHEET 2

SEE SHEET 4

ANDERSDRAFT

0' 350' 700'

Map 2: Project AltsAlt A - 3 (Sheet 3 of 6)

DRAFT: 3.19.13

Stoughton Road Roadway ImprovementOne Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other Roadway ImprovementSignalized Intersection for Stoughton Road TrafficExisting Signalized Intersection for Stoughton Road Traffic RemovedBike/Ped ImprovementExisting Bike/Ped FacilityFull Parcel Impacted (may include structure)

Partial Parcel Impacted Access Proximity ImpactedAccess RemovedPublic Parks and Public Stormwater Areas

X

X

Page 4: DRAFT H S H SEE SHEET 2 D Map 2: Project Alts Alt A - 1 ......One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other ... DRAFT: 3.19.13. B E R D C E

EAST W

ASH

ING

TON A

VE

LIEN RD

ANDERSON ST

KINSMAN BLVD

PIERSTORFF ST

LEE C

IR

BART

ILLO

N D

R

RIEDER RD

BARTILLON DR

AMELIA EARHART DR

PORT

AG

E RD

MEN

DO

TA ST

CIT Y OFMADISON

CIT Y OF MADISON

Amund Reindahl Park

Added bike/ped path

Additional travel lane in each direction

Removed direct access for businesses east of Stoughton Rd betweenEast Washington and Anderson St

No left from eastbound East WashingtonAve to Mendota St

Additional and extendedturn lanes

Added second northbound left turn laneand extended northbound right turn lane

Three through lanes in each direction

No right turn to Mendota St for eastbound East Washington Ave traffic from northboundStoughton Road echelon off ramp

Dane CountyRegional Airport

SEE SHEET 3

SEE SHEET 5

Stoughton Road Roadway ImprovementOne Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other Roadway ImprovementSignalized Intersection for Stoughton Road TrafficExisting Signalized Intersection for Stoughton Road Traffic RemovedBike/Ped ImprovementExisting Bike/Ped FacilityFull Parcel Impacted (may include structure)

Partial Parcel Impacted Access Proximity ImpactedAccess RemovedPublic Parks and Public Stormwater Areas

X

X

DRAFT Map 2: Project AltsAlt A - 4 (Sheet 4 of 6)

0' 350' 700'

DRAFT: 3.19.13

Page 5: DRAFT H S H SEE SHEET 2 D Map 2: Project Alts Alt A - 1 ......One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other ... DRAFT: 3.19.13. B E R D C E

HANSON RD

HOEPKER RD

ANDERSON RD ANDERSON RD

COUNTY HIG

HWAY C

V

ACKER RD

INT

ER

STA

TE 3

9/9

0/9

4

SEE SHEET 4

SEE SHEET 6

Added bike/ped path

Additional second right turn lanefor westbound Hoepker Rd

Additional travel lane in each direction

Converted to right-in/right-out

Three through lanes in each direction

Added vehicular andbike/ped overpass

Restricted access to right-in/right-outand left-in only

CIT Y OFMADISON

TOWN OF BURKE

Stoughton Road Roadway ImprovementOne Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other Roadway ImprovementSignalized Intersection for Stoughton Road TrafficExisting Signalized Intersection for Stoughton Road Traffic RemovedBike/Ped ImprovementExisting Bike/Ped FacilityFull Parcel Impacted (may include structure)

Partial Parcel Impacted Access Proximity ImpactedAccess RemovedPublic Parks and Public Stormwater Areas

X

X

DRAFT Map 2: Project AltsAlt A - 5 (Sheet 5 of 6)

0' 350' 700'

DRAFT: 3.19.13

Page 6: DRAFT H S H SEE SHEET 2 D Map 2: Project Alts Alt A - 1 ......One Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other ... DRAFT: 3.19.13. B E R D C E

Token Creek County Park

ANDERSON RD

INTERSTATE 39/90/94

TOKEN CREEK LN

DAENTL RD

NO

RT

H T

OW

N R

D

NORTH

AMERICAN LN

ANDERSON RD

STATE HIGHWAY 19

PEPSI W

AY

EAST METRO DR

X

X

X

TOWN OF BURKE

TOWN OF BURKE

TOWN OF BURKE

VILLAGE OFD EFOREST

Constructed auxiliary lane on westboundI-39/90/94 between US 51 and WIS 19

Additional travel lane in each direction

Access removed

Second northbound Stoughton Roadand eastbound WIS 19 left turn lanes

Access removed

Access removed

Three through lanes in each direction

Restricted access to right-in/right-out only

Pepsi Way connected toEast Metro Dr

SEE SHEET 5

PROJECT LIMITS

Stoughton Road Roadway ImprovementOne Additional Travel Lane in each Direction on Stoughton Road Frontage Road and Other Roadway ImprovementSignalized Intersection for Stoughton Road TrafficExisting Signalized Intersection for Stoughton Road Traffic RemovedBike/Ped ImprovementExisting Bike/Ped FacilityFull Parcel Impacted (may include structure)

Partial Parcel Impacted Access Proximity ImpactedAccess RemovedPublic Parks and Public Stormwater Areas

X

X

DRAFT Map 2: Project AltsAlt A - 6 (Sheet 6 of 6)

0' 350' 700'

DRAFT: 3.19.13