"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 6, 2020 City County Fiscal Year Initially Proposed Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est Useful Life Assembly Districts Senate Districts Alameda Alameda 20/21 New Road Maintenance & Rehabilitation 2020 Pavement Repair Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | Improvements to gutter/flowlines. The project area is east of High Street towards the eastern limits of Alameda. The full project list exceeds the limit for amount of characters in this field. Please see attached City Council Resolution NO. 15646 for detailed list. Construction 07/2020 03/2021 6-20 18 9 Albany Alameda 20/21 New Road Maintenance & Rehabilitation Marin Avenue Pavement Restoration Project This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Marin Ave between Masonic Avenue and Tulare Avenue. Albany, CA Construction 05/2021 09/2021 10-10 15 9 Berkeley Alameda 19/20 In Progress Road Maintenance & Rehabilitation FY 2020 Street Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Cedar St. from 6th St. to San Pablo Ave.; Center St. from Martin Luther King Jr. Way to Milvia St.; Center St. from Milvia St. to Shattuck Ave.; Rose St. from Le Roy Ave. to La Loma Ave.; Santa Fe Ave. from Gilman St. to Cornell Ave./Page St.; Shasta Rd. from Grizzly Peak Blvd. to Park Gate.; Shasta Rd. from Park Gate to east City limit (Golf Course).; Spinnaker Way from Breakwater Dr. to Marina Blvd. Construction 06/2020 12/2020 10-20 15 9 Berkeley Alameda 19/20 In Progress Complete Streets Components Shattuck Avenue Reconfiguration This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconfiguration of a three-block segment of Shattuck Avenue from Allston Way to University Avenue to improve pedestrian and bicycle safety, northbound circulation for motorists and transit vehicles, and the quality of public spaces in the Downtown core. Shattuck Avenue from Allston Way to University Avenue Construction 01/2019 09/2020 20-20 15 9 Berkeley Alameda 20/21 New Road Maintenance & Rehabilitation FY 2021 Street Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Bancroft Way from 6th Street to San Pablo Avenue Channing Way from Martin Luther King Jr. Way to Shattuck Avenue; Creston Road from Grizzly Peak Boulevard to Grizzly Peak Boulevard; Durant Avenue from Milvia Street to Fulton Street; Emerson Street from Adeline Street to Shattuck Avenue; Essex Street from Adeline Sreet to Shattuck Avenue; Latham Lane from Miller Avenue to Grizzly Peak Boulevard ; Miller Avenue from Hilldale Avenue to Shasta Rd; Spruce Street from Arch Street to Eunice Street Construction 06/2021 12/2021 10-20 15 9 Berkeley Alameda 20/21 New Road Maintenance & Rehabilitation University Avenue/Marina Boulevard Renovation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) University Avenue from Marina Boulevard to West Frontage Road Marina Boulevard from University Avenue to Spinnaker Way Construction 06/2020 11/2020 20-20 15 9 Dublin Alameda 20/21 New Traffic Control Devices Citywide Signal Communications Upgrade This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Maintenance Program Plan Development | Upgrade of the traffic signal communication system, expansion of the traffic communication network, improve traffic signal operations and safety Principally along Dublin Blvd., Fallon Rd., Tassajara Rd. Pre-Construction & Construction 12/2019 09/2020 08/2020 06/2021 10-10 16 7 Dublin Alameda 20/21 New Road Maintenance & Rehabilitation Annual Street Resurfacing Project This project will include: Project Scope Development, Maintenance Program Plan Development Regional St from Amador Valley Blvd to Cul De Sac, Amador Valley Blvd from San Ramon Rd to Dougherty Rd, Wildwood Rd from AVB and Dougherty Rd, Spot repair locations at following locations: Fallon Rd from Bent Tree Dr to Central Pkwy, Fallon Rd from Bent Tree Dr to Gleason Dr, Redwood Ave from Linden to Aspen St, Persimmon St from Aspen St to Central Pkwy, Winterbrook Ave from Walnut St to Asterwood Dr, Dublin Blvd from Myrtle Dr to John Monego Court. Pre-Construction 07/2020 06/2021 7-20 16 7 *This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Alameda Alameda 20/21 New Road Maintenance & Rehabilitation 2020 Pavement Repair Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | Improvements to gutter/flowlines.

The project area is east of High Street towards the eastern limits of Alameda. The full project list exceeds the limit for amount of characters in this field. Please see attached City Council Resolution NO. 15646 for detailed list.

Construction 07/2020 03/2021 6-20 18 9

Albany Alameda 20/21 New Road Maintenance & Rehabilitation

Marin Avenue Pavement Restoration Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Marin Ave between Masonic Avenue and Tulare Avenue. Albany, CA Construction 05/2021 09/2021 10-10 15 9

Berkeley Alameda 19/20 In Progress Road Maintenance & Rehabilitation FY 2020 Street Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Cedar St. from 6th St. to San Pablo Ave.; Center St. from Martin Luther King Jr. Way to Milvia St.; Center St. from Milvia St. to Shattuck Ave.; Rose St. from Le Roy Ave. to La Loma Ave.; Santa Fe Ave. from Gilman St. to Cornell Ave./Page St.; Shasta Rd. from Grizzly Peak Blvd. to Park Gate.; Shasta Rd. from Park Gate to east City limit (Golf Course).; Spinnaker Way from Breakwater Dr. to Marina Blvd.

Construction 06/2020 12/2020 10-20 15 9

Berkeley Alameda 19/20 In Progress Complete Streets Components Shattuck Avenue Reconfiguration

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconfiguration of a three-block segment of Shattuck Avenue from Allston Way to University Avenue to improve pedestrian and bicycle safety, northbound circulation for motorists and transit vehicles, and the quality of public spaces in the Downtown core.

Shattuck Avenue from Allston Way to University Avenue Construction 01/2019 09/2020 20-20 15 9

Berkeley Alameda 20/21 New Road Maintenance & Rehabilitation FY 2021 Street Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Bancroft Way from 6th Street to San Pablo Avenue Channing Way from Martin Luther King Jr. Way to Shattuck Avenue; Creston Road from Grizzly Peak Boulevard to Grizzly Peak Boulevard; Durant Avenue from Milvia Street to Fulton Street; Emerson Street from Adeline Street to Shattuck Avenue; Essex Street from Adeline Sreet to Shattuck Avenue; Latham Lane from Miller Avenue to Grizzly Peak Boulevard ; Miller Avenue from Hilldale Avenue to Shasta Rd; Spruce Street from Arch Street to Eunice Street

Construction 06/2021 12/2021 10-20 15 9

Berkeley Alameda 20/21 New Road Maintenance & Rehabilitation

University Avenue/Marina Boulevard Renovation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

University Avenue from Marina Boulevard to West Frontage Road Marina Boulevard from University Avenue to Spinnaker Way

Construction 06/2020 11/2020 20-20 15 9

Dublin Alameda 20/21 New Traffic Control Devices Citywide Signal Communications Upgrade

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Maintenance Program Plan Development | Upgrade of the traffic signal communication system, expansion of the traffic communication network, improve traffic signal operations and safety

Principally along Dublin Blvd., Fallon Rd., Tassajara Rd. Pre-Construction & Construction

12/2019 09/2020

08/2020 06/2021 10-10 16 7

Dublin Alameda 20/21 New Road Maintenance & Rehabilitation Annual Street Resurfacing Project This project will include: Project Scope Development, Maintenance Program Plan

Development

Regional St from Amador Valley Blvd to Cul De Sac, Amador Valley Blvd from San Ramon Rd to Dougherty Rd, Wildwood Rd from AVB and Dougherty Rd, Spot repair locations at following locations: Fallon Rd from Bent Tree Dr to Central Pkwy, Fallon Rd from Bent Tree Dr to Gleason Dr, Redwood Ave from Linden to Aspen St, Persimmon St from Aspen St to Central Pkwy, Winterbrook Ave from Walnut St to Asterwood Dr, Dublin Blvd from Myrtle Dr to John Monego Court.

Pre-Construction 07/2020 06/2021 7-20 16 7

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 2: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Dublin Alameda 18/19 In Progress Other Dublin Boulevard Extension

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Feasibility Study, Preliminary Design | Design and construction of a 1.5-mile extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in Livermore. This is a new proposed project for FY 18/19 report.

Between Fallon Road in the City of Dublin and North Canyons Parkway in City of Livermore Pre-Construction 11/2016 12/2023 30-50 16 7

Dublin Alameda 18/19 In Progress Other Tassajara Road Realignment & Widening

This project will include: Environmental Study/Documents, Right of Way, Preliminary Design | Preliminary engineering including a feasibility analysis to define new roadway alignment, design cross-section, right of way, and environmental clearance. Add one automobile lane and a bike lane in each direction and also add new sidewalks and upgrade all existing and future traffic signals to accommodate the street widening, and construct a new center raised concrete median with street lighting and new curb and gutter. Each intersection will be designed to adhere to Complete Street Policy. | In FY17/18 Dublin City Council reduced RMRA funding for this project from $300,000 to $100,000 in order to add RMRA funds to another City project, Iron Horse Trail Bridge at Dublin Blvd (ST0118).

Tassajara Road, from North Dublin Ranch Drive to northern City Limit. Pre-Construction 09/2016 12/2022 20-50 16 7

Dublin Alameda 18/19 In Progress Safety Iron Horse Trail Bridge at Dublin Boulevard

This project will include: Environmental Study/Documents, Preliminary Design | Design and Environmental review of the Iron Horse Trail bike and ped Bridge Crossing at Dublin Blvd. | RMRA funding ($200,000) for this project was added mid-year through a budget change, which reduced RMRA funding from $300,000 to $100,000 for another project, Tassajara Road Realignment & Widening (ST0116).

On Iron Horse Trail crossing at Dublin Blvd intersection with Scarlet Drive Pre-Construction 02/2018 01/2021 30-50 16 7

Dublin Alameda 18/19 Carried Over Safety Iron Horse Trail Bridge at Dublin Boulevard

This project will include: Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New)

On Iron Horse Trail crossing at Dublin Blvd intersection with Scarlet Drive Construction 05/2021 02/2023 30-50 16 7

Emeryville Alameda 18/19 Carried Over Safety San Pablo Mid-Block Cross Walk

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety) | The work will include new construction of ADA pedestrian ramps, large pedestrian refuge area in the median, and highly-visible pedestrian/vehicular traffic control devices (RRFBs) | The San Pablo Avenue Mid-Block Crosswalk Project is currently under design using local funding sources. It is expected that the City will put the project out to bid in early 2020 and construct in Summer 2020.

San Pablo Avenue between 40th Street and Adeline Street Construction 07/2020 10/2020 10-10 15 9

Emeryville Alameda 20/21 New Road Maintenance & Rehabilitation

2021 Annual Street Rehabilitation and Preventive Maintenance

Project

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

48th Street(San Pablo Avenue - City Limits ); Salem Street(48th Street - 47th Street ); 47th Street(San Pablo Avenue - Adeline Street) ; 45th Street(San Pablo Avenue - Adeline Street); Salem Street(45th Street - 43rd Street); Essex Street(45th Street - 43rd Street); 43rd Street(San Pablo Avenue - Adeline Street) ; 41st Street(San Pablo Avenue - Adeline Street) ; Doyle Street(47th Street - 45th Street); 45th Street(Horton Street - San Pablo Avenue); 53rd Street(Horton Street - San Pablo Avenue)

Construction 04/2021 07/2021 5-10 15 9

Emeryville Alameda 19/20 Carried Over Road Maintenance & Rehabilitation

2020 Annual Street Rehabilitation and Preventive Maintenance

Project

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

37th St(San Pablo Ave-City Limits); 47th St(Doyle St-San Pablo Ave); 53rd St(Hollis-San Pablo Ave); 59th St(Horton St-Peladeau St); 62nd St(Overland Ave-Vallejo St); 63rd St(Overland Ave-Vallejo St); Doyle St(Ocean Ave-Powell St); Halleck St(Sherwin Ave-City Limits); Horton St(59th St-Stanford Ave); Horton St(59th St-62nd St); Overland Ave(62nd St-65th St); Peladeau St(59th St-Powell St); Vallejo St(Peabody Lane-Ocean Ave); Yerba Buena Ave(Adeline St-City Limits)

Construction 06/2020 10/2020 5-10 15 9

Fremont Alameda 20/21 New Complete Streets Components Citywide Intersection Ramps This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp

Rehab/Repair (Existing) The Districts of Ardenwood, Centerville, Niles, Irvington, Mission San Jose, and Warm Springs. Construction 06/2020 03/2021 20-30 20, 25 10

Fremont Alameda 20/21 New Safety Nursery Avenue Quiet Zone This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety)

Nursery Avenue between Niles Blvd and Mission Blvd. Construction 07/2020 12/2020 20-30 20 10

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 3: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fremont Alameda 20/21 New Complete Streets Components

Complete Streets Upgrade of SR 84 This project will include: Preliminary Design

Thornton Avenue from I-880 to Fremont Blvd., Fremont Blvd. from Alder Ave to Eggers Dr. and Peralta Blvd. from Fremont Blvd. to Sequoia Rd.

Pre-Construction 07/2020 07/2021 20-30 20 10

Fremont Alameda 20/21 New Road Grade Separation Pacific Commons

Bicycle/Pedestrian Bridge and Trail over I-880

This project will include: Preliminary Design I-880 south of Auto Mall Parkway between Christy Street and South Grimmer Blvd. Pre-Construction 07/2020 07/2023 50-50 25 10

Fremont Alameda 20/21 New Safety I-680 Interchange Modernization This project will include: Preliminary Design I-680 overpasses at Mission Blvd, Washington Blvd, and Auto Mall Parkway Pre-Construction 07/2020 07/2023 20-30 25 10

Fremont Alameda 20/21 New Safety I-880 Decoto Road Interchange Modernization This project will include: Preliminary Design Decoto Rd. from I-880 to Cabrillo Ct Pre-Construction 07/2020 07/2023 20-30 20 10

Fremont Alameda 20/21 New Complete Streets Components Decoto Road Complete Streets This project will include: Preliminary Design Decoto Rd. from I-880 to Mission Blvd Pre-Construction 07/2020 07/2022 20-30 20 10

Fremont Alameda 20/21 New Complete Streets Components

Dumbarton Bridge to Quarry Lakes Trail This project will include: Preliminary Design

Proposed trail starting from Marshlands Road, going through Ardenwood Historic Farm and Decoto Road, and leading to Quarry Lakes.

Pre-Construction 07/2020 07/2023 20-30 20 10

Fremont Alameda 20/21 New Road Maintenance & Rehabilitation 2020 Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing)

Fremont Blvd (northbound); Deep Creek Rd; Cabrillo Dr; Farwell Dr; Mission View Dr; Grimmer Blvd (eastbound); Carol Ave; Las Palmas Ave; Palm Ave; Olive Ave; Mission Blvd (northbound); Warm Springs Blvd (northbound)

Construction 05/2020 08/2020 10-15 20, 25 10

Hayward Alameda 20/21 New Road Maintenance & Rehabilitation

FY21 Pavement Improvement Project This project will include: Road maintenance and rehabilitation. Within limits of Mission Boulevard, Whipple Road, Industrial

Parkway Southwest, & Industrial Parkway West. Pre-Construction 05/2021 09/2021 5-15 20 10

Livermore Alameda 20/21 New Road Maintenance & Rehabilitation 2021 Street Resurfacing Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | Curb and Gutter Repair Adjust Utility Boxes to finished grade

Project locations are estimates not yet final. The following list of preliminary street locations are subject to change and will be selected based on priority need and resources. Fourth St (S Livermore Ave to Maple St); S Vasco Rd (Naylor Ave to Preston Rd); N Greenville Rd (580 Overpass to Southfront Rd); N Livermore Ave (RR Underpass to Railroad Ave); N Murrieta Blvd (450' S/O Northwood Cmmn to Olivina Ave); N Murrieta Blvd (Olivina Ave to Cedar Dr); First St (S Q St to S M St)

Construction 07/2021 12/2021 20-30 16 7

Livermore Alameda 20/21 New Road Maintenance & Rehabilitation 2021 Slurry Seal

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Adjust Utility Box to Finished Grade

All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the year. All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the year. Arlene Wy (Daphne Dr to Patterson Pass Rd); S Vasco Rd (East Ave to Mesquite Wy); First St (S M St to S L St); First St (S L St to S Livermore Ave); Springtown Blvd (1578' N/O Oleander St to Oleander St)

Construction 07/2021 12/2021 7-10 16 7

Newark Alameda 20/21 New Road Maintenance & Rehabilitation

2020-21 Asphalt Concrete Overlay Program

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Bicycle Lane (New)

Dumbarton Ct – Jarvis Ave to End; Ebbetts St – Bececia Ave to Truckee Ct; Lido Blvd – Jarvis Ave to Cedar Blvd; Normandy Dr – Lido Blvd to Mirabeau Dr; Oleander Dr – entire length; Smith Ave – Cherry St to Cedar Blvd; Thornton Ave – Hickory St to Marshlands Rd; Truckee Ct – Ebbetts St to end

Construction 08/2020 10/2020 15-20 25 10

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 4: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Newark Alameda 20/21 New Road Maintenance & Rehabilitation

2020-21 Street Slurry Seal Program

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Bicycle Lane (New)

Cornwall Place; Derby Place ; Forbes Drive; Fowler Street; Ingraham Street; Lido Court ; Maidstone Court; Mayhews Landing Rd – Willow St to Spruce St; Mayhews Landing Rd – Newark Blvd to Thornton Ave; Peppertree Court Rockport Court; Stevenson Blvd – Balentine Dr to Cherry St; Swindon Place; Thornton Ave – Marshlands Rd to SR 84

Construction 09/2020 10/2020 5-10 25 10

Oakland Alameda 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Local Street Maintenance

This project will include: Maintenance Program Plan Development | Other checked to explain that City's maintenance staff perform the following activities with RMRA funding: filling potholes, performing major and minor base repair, crack sealing, sidewalk repairs, curb and gutter repairs, and cross culvert repairs. Citywide, according to a prioritized comprehensive maintenance program. Oakland maintains a work management system that inventories, catalogues and geolocates assets; assets are placed on a cyclical maintenance program.

City Wide. West Oakland, Eastlake/San Antonio, Fruitvale and Elmhurst/East Oakland. Locations listed are estimates and subject to change. Additional factors for prioritizations include locations near schools, community facilities and transit, as well as locations in "communities of concern".

Pre-Construction 07/2020 06/2021 5-5 18 9

Piedmont Alameda 20/21 New Road Maintenance & Rehabilitation 2021 Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

Grand Avenue - Wildwood to Fairview; Hampton Rd. - Glen Alpine to St. James; Hill Lane - Jerome to end; Wildwood -Grand to Nova; and Prospect to Highland; Requa Rd. - Hazel to Wildwood

Construction 06/2021 08/2021 15-25 15 9

Pleasanton Alameda 20/21 New Road Maintenance & Rehabilitation

Annual Resurfacing and Reconstruction of Various Streets

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), Bicycle Lane (New)

The project will resurface 1.4 million square feet of various streets throughout the City during the summer of 2021, including: Arbor Drive from Mataro Court to Red Feather Road; Angela Street from First Street to Mirador Drive; Crellin Road from Tourgia Drive to Grey Eagle; Hearst Drive from Bernal Avenue to Concord Street; Cabernet Court; Mirador Drive from Abbie Street to Bernal Avenue; Linda Way from Neal Street to Bonita Avenue; Del Sol Avenue from Entrada Drive to end.

Construction 07/2021 10/2021 10-15 16 7

San Leandro Alameda 19/20 Carried Over Road Maintenance & Rehabilitation West Ave. 134th This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing) Between Menlo Street to western terminus Construction 07/2020 08/2020 10-20 18 9

San Leandro Alameda 18/19 Carried Over Road Maintenance & Rehabilitation West Ave. 136th This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing) Between Aurora Drive and Menlo Street Construction 08/2020 09/2020 10-20 18 9

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Thornton Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing) Thornton Street, from San Leandro Blvd. west to dead end. Construction 09/2020 10/2020 10-20 18 9

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Williams Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing) Williams Street, from San Leandro Blvd. west to UPRR tracks. Construction 09/2020 10/2020 10-20 18 9

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Marina Blvd. This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Marina Blvd., from San Leandro Blvd. west to UPRR tracks. Construction 10/2020 11/2020 10-20 18 9

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Harlan Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing) Harlan Street, from San Leandro Blvd., west to dead end. Construction 10/2020 11/2020 10-20 18 9

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Estabrook Street This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Estabrook Street, from San Leandro Blvd., west to dead end. Construction 11/2020 12/2020 10-20 18 9

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Cypress Street This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Cypress Street, from Cedar Ave. to Willow Ave. Construction 05/2021 06/2021 10-20 18 9

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 5: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Wicks Blvd. This project will include: Pavement Rehab/Repair (Existing) Wicks Blvd., from Merced St. to Lewelling Blvd. Construction 06/2021 07/2021 3-5 18 9

San Leandro Alameda 20/21 New Road Maintenance & Rehabilitation Lake Chabot Road This project will include: Pavement Rehab/Repair (Existing) Lake Chabot Road, from Estudillow to Astor Dr. Construction 06/2021 07/2021 3-5 18 9

San Leandro Alameda 19/20 Carried Over Other Rent-to-Own Cold Milling Machine This project will include: Procurement of Public Works Equipment | Rent-to-Own cold milling machine for use by staff on in-house paving operations. Citywide Procurement/Operatio

nal Needs 07/2020 09/2020 15-25 18 9

Union City Alameda 20/21 New Complete Streets Components

Union City Boulevard Pavement Rehabilitation (Union City Boulevard Bicycle Lane

Improvement)

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Union City Boulevard from Alvarado Boulevard to south city limits.

Pre-Construction & Construction

08/2020 03/2021

12/2021 12/2022 10-10 20 10

Ione Amador 20/21 New Road Maintenance & Rehabilitation

2021 Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) W. Marlette Street between Sacramento and Dave Brubeck

Road Construction 05/2021 07/2021 7-20 5 8

Jackson Amador 20/21 New Road Maintenance & Rehabilitation

Paving of Hoffman, Summit and Stasal

This project will include: Pavement Rehab/Repair (Existing) | This project is in design and will be using RMRA funding in support of construction which will include: Repaving portions of Hoffman St, Summit St and Stasal Ave.

The remaining portions of Hoffman between Hwy 49 and 300' west of Sierra View Dr.,Summit St between California St and North St and the remaining portion of Stasal Ave between North st and Church St.

Construction 06/2020 07/2021 10-15 5 8

Plymouth Amador 20/21 New Safety Community Safety Projects - Road Safety

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install high visibility markings and delineators (New)

City of Plymouth in the Downtown area and along the Eastern Main St. Includes areas that join our SR2S project and our business district.

Construction 07/2020 11/2020 5-10 5 8

Sutter Creek Amador 19/20 Carried Over Road Maintenance & Rehabilitation

Rehabilitation improvements for Eureka Street This project will include: Pavement Rehab/Repair (Existing) Eureka Street Sutter Creek, CA 95685 Construction 10/2020 06/2021 10-20 5 8

Sutter Creek Amador 20/21 New Road Maintenance & Rehabilitation

Rehabilitation improvements for Old Sutter Hill Rd This project will include: Preliminary Design Old Sutter Hill Rd, Sutter Creek CA 95685 Pre-Construction 10/2020 10/2021 10-20 5 8

Biggs Butte 19/20 Carried Over Road Maintenance & Rehabilitation B Street

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Slurry seal or Micro-surface pavement surface treatment & digout repair (Existing)

B Street from 1st Street to 7th Street Construction 05/2021 07/2021 5-5 3 4

Biggs Butte 19/20 Carried Over Road Maintenance & Rehabilitation 6th Street

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Slurry seal or Micro-surface pavement surface treatment & digout repairs (Existing)

6th Street from B street south to Hamilton Slough Construction 05/2021 07/2021 5-5 3 4

Biggs Butte 20/21 New Road Maintenance & Rehabilitation

Street Pavement Maintenance & Repairs

This project will include: Procurement of Road Maintenance and Rehab Materials | Pavement Pothole & digo ut repairs (existing) All City streets- As needed annually Procurement/Operatio

nal Needs 05/2020 07/2021 5-5 3 4

Chico Butte 20/21 New Road Maintenance & Rehabilitation

Southwest Chico Maintenance and Repair FY 20/21

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Southwest Chico (Mulberry Street, Park Avenue, Pine and Cypress)

Pre-Construction & Construction

04/2020 04/2021

12/2020 08/2021 5-20 3 4

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 6: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Gridley Butte 20/21 New Road Maintenance & Rehabilitation

Street Pavement Maintenance & Repairs This project will include: Pavement pothole & dig out repairs (existing) All city streets-as needed annually Procurement/Operatio

nal Needs 07/2020 07/2021 1-5 3 4

Gridley Butte 20/21 New Road Maintenance & Rehabilitation Vermont Street (Phase 2) This project will include: Pavement Rehab/Repair (Existing) | Repair Structural failures

and grind and overlay. Magnolia to Ash Construction 07/2020 07/2021 5-10 3 4

Gridley Butte 20/21 New Road Maintenance & Rehabilitation Magnolian Street (East) This project will include: Pavement Rehab/Repair (Existing) | Repair Structural failures

and grind and overlay. Oregon to Vermont Construction 07/2020 07/2021 5-10 3 4

Gridley Butte 20/21 New Road Maintenance & Rehabilitation Laurel Street (East) This project will include: Pavement Rehab/Repair (Existing) | Repair Structural failures

and grind and overlay. Vermont to Virginia Construction 07/2020 07/2021 5-10 3 4

Gridley Butte 20/21 New Road Maintenance & Rehabilitation Washington Street (North) This project will include: Pavement Rehab/Repair (Existing) | Repair Structural failures

and grind and overlay. Magnolia to Spruce Construction 07/2020 07/2021 5-10 3 4

Gridley Butte 20/21 New Road Maintenance & Rehabilitation Jackson Street (North) This project will include: Pavement Rehab/Repair (Existing) | Repair Structural failures

and grind and overlay. Magnolia to Hazel Construction 07/2020 07/2021 5-10 3 4

Oroville Butte 20/21 New Road Maintenance & Rehabilitation Grind Overlay This project will include: Pavement Rehab/Repair (Existing)

Pine to Veach; 5th to Feather River Blvd, Washington blvd, Montgomery St, Pine Oaks Blvd, Hilldale Avenue, Brookdale Drive, Feather River Blvd

Construction 07/2020 07/2021 5-10 3 4

Paradise Butte 19/20 In Progress Road Maintenance & Rehabilitation

Town Transportation Related Infrastructure Repair and

Rehabilitation

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | Due to the Camp Fire, the fiscal year 2019-20 revenues from SB 1 are proposed to be used for ongoing maintenance of public roadways with majority of funds to be held indefinitely due to the uncertain future of the Town’s transportation network. The recommended strategy for the Town is to hold all transportation funding revenues until the Town’s repair efforts can be properly planned.

Throughout Town Procurement/Operatio nal Needs 07/2020 06/2021 5-20 3 4

Angels Camp Calaveras 19/20 Carried Over Road Maintenance & Rehabilitation

Gardner Lane Pavement Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Gardner Lane - Murphy's Grade to Easy Street Construction 02/2021 05/2021 10-15 5 8

Angels Camp Calaveras 20/21 New Road Maintenance & Rehabilitation

Dogtown Road Pavement Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design Dogtown Road from Main Street (SR-49) to Gardner Lane Pre-Construction &

Construction 08/2020 02/2021

01/2021 05/2021 7-12 4 8

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation 5th Street Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Grind existing asphalt, install geo fab, repave with 4 inch new asphalt concrete.

Levee Rd - Market; Oak - Webster; Lafayette - South City Limits Construction 06/2020 10/2020 20-30 3 4

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation 3rd Street Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Grind existing asphalt, install geo fab, repave with 4 inch new asphalt concrete.

Jay Street - Webster Construction 06/2020 10/2020 20-30 3 4

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 7: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation Alley Ways (Various)

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Segmented reconstruction of several alley ways by grinding existing asphalt, installing geo fab, repaving with 4 inch new asphalt concrete.

Carson and Sioc; 7th - 5th, 10th - 9th. Fremont and Carson; 13th - 12th Market and Jay; 12th - 10th

Construction 06/2020 10/2020 20-30 3 4

Colusa Colusa 19/20 Carried Over Road Maintenance & Rehabilitation City Wide Cape Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Cape Seal/Chip Seal (based on need and location) overlay with micro-paving.

Clay Street Between 12th - 11th; Main Street Between 8th - 6th; Fremont Street Between 5th - 3rd; 10th - 9th, and B st. - Bridge St. ; 11th Street Between Oak and Parkhill Lafayette Street Between 7th - 6th.

Construction 06/2020 10/2020 5-10 3 4

Williams Colusa 20/21 New Road Maintenance & Rehabilitation

City Public Works Pavement Repairs

This project will include: Procurement of Road Maintenance and Rehab Materials | Procurement/operational needs for continued street Maintenance of city streets Various City street Location Procurement/Operatio

nal Needs 05/2020 07/2021 1-5 4 4

Williams Colusa 18/19 Carried Over Road Maintenance & Rehabilitation

Husted Rd South Pavement Rehab Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Husted Road (South) Pavement Repair & Overlay Husted Road (South) from I-5 to Abel Road Construction 05/2021 07/2021 7-10 4 4

Antioch Contra Costa 20/21 New Complete Streets Components L Street Improvements

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Document Preparation

L Street between SR4 and Antioch Marina Pre-Construction & Construction

04/2020 04/2021

01/2021 12/2021 10-15 11 7

Antioch Contra Costa 20/21 New Road Maintenance & Rehabilitation

Pavement Plugs and Leveling Courses 2021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Burwood Way; Wildflower; Hastings Ct; Barmouth Dr; Basalt Ct; Barmouth Ct; Myrtlewood Ct; Laurelwood Ct; Coyote Ct; Badger Way; Halite Way; Serpentine Dr; Basalt Way; Roanwood Ct; Bluejay Dr; Ridgerock; Del Favero; Selena Ct; Shale Cir; Boulder Dr; Marble Dr; Pebble Dr; Romrock; Flagstone Dr; Cobblestone Dr; Cinnabar; Agate Ct; Rockford Dr; Ridgewood Ct; Greystone; Greystone Ct; Falcon Ct; Condor Ct; Owl Ct; Eagleridge Dr; Eagleridge Ct; Eagle Ct; Alumrock; Black Oak Way; Black Oak Ct; Barkwood

Construction 04/2021 06/2021 10-15 11 7

Antioch Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation

Roadway Pavement Rehabilitation at Various Locations

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New)

Hillcrest Ave, Buchanan Road, James Donlon Blvd, Gentrytown Drive Construction 05/2020 08/2021 10-15 11 7

Antioch Contra Costa 20/21 New Road Maintenance & Rehabilitation

Pavement Surface Treatments 2022 This project will include: Pavement Improvement (New)

Various Locations: Hillcrest Ave; E 13th St; Minaker Dr; Jacobsen St; Miller St; Giovanni St; Botelho St; Simmons St; Azevedo St; Marshall St; Lipton St; Sandy Way; Sandy Ct; Hargrove St; Hargrove Ct; Jasmine Ct; Veronica Ct; Trembath Ln; Country Hills; Vista Grande; Canada Hills; Horeshoe Cir; Stallion Way; Wagon Ct; Mare Ct; Carriage Way; Woodbridge; Rodeo Cir; Bronco Ct; Rodeo Ct; Winterglen Way; Winterglen Ct; Vinewood Way; Chism; Pineview Way; along with 36 other locations

Construction 04/2022 09/2022 10-15 11 7

Brentwood Contra Costa 20/21 New Road Maintenance & Rehabilitation

Pavement Management Program -2021

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Neighborhood streets east of Fairview Avenue, west of Minnesota Avenue, north of Balfour Road, and south of Sand Creek Road.

Construction 06/2021 08/2021 7-15 11 7

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 8: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Clayton Contra Costa 20/21 New Road Maintenance & Rehabilitation

2022 Clayton Neighborhood Streets Pavement Preservation

Project

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Document Preparation Streets Selected from StreetSaver Pre-Construction &

Construction 02/2022 07/2022

05/2022 12/2022 5-15 14 7

Concord Contra Costa 19/20 In Progress Road Maintenance & Rehabilitation

Oak Grove Road Pavement Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | This project will extend the recently completed pavement rehabilitation work on Oak Grove Road from Whitman Road to Treat Boulevard, likely using cold-in-place recycling, similar to the previous phase, whereby a portion of the existing roadway asphalt is removed, treated with an asphalt recycling agent, compacted in place and then covered with a new asphalt surface layer. Work will also include the installation/upgrade of curb ramps at intersections, minor concrete repairs, replacement of traffic signal loops, adjustment of pedestrian push buttons to meet accessibility standards, and restriping the roadway.

Oak Grove Road from Whitman Road to Treat Boulevard Pre-Construction & Construction

09/2018 04/2020

10/2019 12/2020 15-20 14 7

Concord Contra Costa 20/21 New Road Maintenance & Rehabilitation Pavement Maintenance – Zone 3 This project will include: Cost Estimating, Preliminary Design, Document Preparation

Maintenance is focused on Graymount Circle, Barymore Drive, McKean Drive, San Simeon Drive, Citrus Avenue and related side streets.

Pre-Construction 10/2019 07/2020 10-15 14 7

Danville Contra Costa 20/21 New Road Maintenance & Rehabilitation

2020/21 Pavement Management Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Bicycle Lane (New)

Various residential streets in the Town of Danville including Diablo Road, Matadera Way, Orange Blossom Way, and Paraiso Drive

Construction 06/2020 10/2020 10-20 16 7

El Cerrito Contra Costa 18/19 Carried Over Safety Carlson Blvd & San Diego St

Pedestrian Crossing Improvements

This project will include: Pedestrian Crossing Improvements including flashing beacons and median modifications Carlson Boulevard at San Diego St Pre-Construction &

Construction 07/2020 01/2021

12/2020 09/2021 10-25 15 9

El Cerrito Contra Costa 18/19 Carried Over Safety Access Modifications - Streets & Sidewalks

This project will include: ADA Curb Ramp Installation (New), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Implement the City's American with Disabilities Act (ADA) Transition Plan, adopted by City Council in 2009 to remove physical barriers along the street right-of-way including mid-block sections of sidewalks, intersections and pedestrian signals

On Major Pedestrian Routes and locations requested by persons with disabilities, serving government facilities, serving important transportation such as school routes, and serving commercial zones and other Title III entities per the City ADA Transition Plan including but yet to be finalized: Moeser Ln, Pomona Av, Arlington Bl, Ashbury Av, Barrett Av, Central Av, Colusa Av, Cutting Bl, Fairmount Av, Hill St, Navellier St, Potrero Av, Richmond St, San Pabo Av, Schmidt Ln, and Stockton Av.

Pre-Construction & Construction

07/2020 01/2021

12/2020 09/2021 10-25 15 9

El Cerrito Contra Costa 18/19 Carried Over Traffic Control Devices Street Light, Traffic Signal & Street Sign Replacement and Upgrades

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Replacement, repair and upgrades of street light equipment, traffic signal equipment and street signs

On arterials & collectors: Carlson Bl, Central Av,Fairmount Av,San Pablo Av,Ashbury Av,Arlington Bl,Barrett Av,Colusa Av,Cutting Bl,Elm St,Hill St,Key Bl,Moeser Ln,Potrero Av,Richmond St,Alta Punta,Ashbury Av,Avis Dr,Buckingham Dr,Colusa Av,Edwards Av,Eureka Av,Fairview Dr,Ganges Av,Jordan Av,King Dr,Macdonald Av,Manila Av,Navellier St,San Mateo St,Sea View Dr,Shevlin Dr,S. 55th St,Terrace Dr, Tulare Ave. Locations to be finalized based on safety need, asset condition & traffic volumes.

Construction 07/2020 06/2021 10-25 15 9

El Cerrito Contra Costa 18/19 Carried Over Traffic Control Devices Street Light & Traffic Signal Maintenance

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Street light and traffic signal on-going maintenance service

Citywide for on-going maintenance of 12 traffic signalized intersections on San Pablo Ave, Moeser Ln, Fairmount Ave, Richmond St, and Key Blvd; 526 City-owned street and pedestrian lights on all city streets, and 19 flashing beacons/ in-roadway lights/ radar speed feedback signs locations on Moeser Ln, Cutting Blvd, Arlington Blvd, San Pablo Ave, Central Ave, Stockton Ave, Potrero Ave, Barrett Ave, Hill St and Fairmount Ave.

Construction 07/2020 06/2021 10-20 15 9

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 9: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

El Cerrito Contra Costa 18/19 In Progress Safety Sidewalk Infrastructure Maintenance

This project will include: Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Repair sidewalk areas uplifted by street tree roots, including tree root pruning or tree removal.

Locations are on major pedestrian routes: San Pablo Ave, Richmond St, Central Ave, Potrero Ave, and Cutting Blvd. Locations will be finalized based on a methodology that prioritizes locations on major Pedestrian Routes designated in the City’s Active Transportation Plan, and based on their proximity to schools, the severity of the sidewalk damage and repair method, and other factors (e.g. requests received).

Pre-Construction & Construction

07/2020 01/2021

12/2020 09/2021 20-25 15 9

El Cerrito Contra Costa 19/20 In Progress Complete Streets Components

Del Norte TOD Complete Streets Improvements

This project will include: Cost Estimating, Project Scope Development, Preliminary Design | Access, circulation, safety & traffic flow improvements for bicyclists, pedestrians, bus transit & automobiles to support BART and TOD development; accessibility improvements; and lighting, street tree and landscaping improvements. Major elements include new signalized crossings for pedestrians, new bicycle lanes, reduction in turning/auxiliary lanes,conversion of one-way to two-way streets, and signalization changes on San Pablo Av at Hill Street & Cutting Bl. Also may include Green Infrast. | Began Caltrans project development process for improvements on a state highway in Fiscal Year 2019-20

San Pablo Avenue from Ohlone Greenway to Potrero Avenue, Eastshore Boulevard from Potrero Avenue to San Pablo Avenue, Hill Street from San Pablo Avenue to Liberty Street, Cutting Boulevard from I-80 to Key Boulevard, and Knott Avenue from San Pablo Avenue to Key Boulevard.

Pre-Construction 12/2019 12/2021 7-25 15 9

El Cerrito Contra Costa 19/20 In Progress Complete Streets Components Active Transportation Program

This project will include: Cost Estimating, Project Scope Development, Preliminary Design | Implement Active Transportation Plan, adopted by the City Council in April 2016, which includes access, safety and other enhancements to pedestrian and bicycle infrastructure. This component is specifically for preliminary engineering and design needed to apply for and leverage various grant and external funding sources.

Major Pedestrian & Bicycle Routes as identified in the City's Active Transportation Plan (ATP) including San Pablo Ave, BART to Bay Trail connection along Fairmount Ave-Carlson Bl-Cerrito Creek path-Lassen St-San Diego St-Belmont Ave-Central Ave, Richmond St, Fairmount Ave, Key Bl and Arlington Bl. Locations have yet to be finalized and will be selected based on grant funding criteria and prioritization criteria in the City's ATP.

Pre-Construction 07/2020 12/2023 7-25 15 9

El Cerrito Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation

Central Avenue and Carlson Boulevard Street Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Work involving repair of sidewalks, installation of marked crosswalk at El Dorado, reconstruction and installation of new curb ramps, modification of drainage, removal and replacement of street trees in prior fiscal year. The Pavement Rehabilitation component of the project was awarded in FY 2019-20 and will be completed in FY 2020-21.

Central Avenue from Santa Clara Avenue to Carlson Boulevard and Carlson Boulevard from Central Avenue to the northern city limits

Construction 07/2020 12/2020 10-25 15 9

El Cerrito Contra Costa 19/20 In Progress Complete Streets Components

San Pablo Avenue Complete Streets Improvements

This project will include: Cost Estimating, Project Scope Development, Preliminary Design | Project development and preliminary engineering work for sidewalk replacement, pedestrian-level lighting, crosswalk improvements (curb bulb-outs, refuge islands, flashing lights, and enhanced signing and striping), new mid-block crosswalks, new bikeways (routes and lanes), bus islands, street tree planting, landscaping and street furniture/amenities as identified in the San Pablo Avenue Specific Plan, adopted in 2014.

San Pablo Avenue from southern City limits (just south of Carlson Boulevard) to northern City limits (just north of Ohio Street) and intersecting streets within the San Pablo Avenue Specific Plan Area.

Pre-Construction 07/2019 12/2022 7-25 15 9

El Cerrito Contra Costa 20/21 New Road Maintenance & Rehabilitation

Annual Street Improvement Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | The scope may include installation of curb ramps in compliance with the ADA for all streets that receive an any treatment within a crosswalk area, curb, gutter, and sidewalk upgrades as needed, upgrades to traffic control and safety systems that pertain to pavement work (striping, crosswalks, bike facilities, and associated signage), and upgrades to road-related storm drainage facilities. | Includes a variety of roadway treatments including slurry seal, microsurface, micropave, cape seal, asphalt inlay & overlay of various thicknesses, crack sealing and repairs of failed sections.

As identified in the PMP: Fairmount Av,Potrero Av,Ashbury Av,Richmond St,Elm St,Navellier St,View-Harvard Dr,San Mateo Av,Yolo Av,San Pablo Av,MacDonald Av,Contra Costa Dr,Everett St,El Dorado St,Gladys Ave,Lexington Ave,B St,Santa Clara Av,Zara Av,Noble Ct,Blake St,Central Av,Colusa Av,King Dr,Stockton Av,Thors Bay Rd,Moeser Ln,Rosalind Ave,Yuba St,Wildcat Dr,Belmont Av,Liberty St,Victoria St,Coronado Av,Alta Vista Dr,Alva Av,Charles Av,Kensington Rd,Nason Av,Seaview Pl,Key Bl & Peerless Av

Construction 08/2020 09/2021 7-25 15 9

El Cerrito Contra Costa 20/21 New Safety Local Roadway Safety Plan This project will include: Document Preparation | Local Roadway Safety Plan per Caltrans standard | Mostly funded by state Highway Safety Improvement Program grant. SB1 funds are leveraging these grant funds.

Citywide Pre-Construction 09/2020 06/2021 7-25 15 9

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 10: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Hercules Contra Costa 20/21 New Road Maintenance & Rehabilitation

2020 Annual Street Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Turquoise Drive from Cinnabar Way to Obsidian Way Construction 07/2020 10/2020 15-20 15 9

Lafayette Contra Costa 20/21 New Road Maintenance & Rehabilitation 2021 Street Maintenance Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project includes overlays and inlays that will provide a 12-year life, but also crack fill and pavement repairs that will only provide a useful life of 5 years, and surface seal treatment that will provide a 7-year life.

Slurry Seal and Digout Streets include portions or the totality of: El Curtola Blvd., Stanley Blvd., Dahlia Ct., Rohrer Dr., Springhill Sr., Contessa Ct., Hampton Rd., Helen Ln., St. Francis Dr., Silver Dell Rd., Silverado Dr., Castello Rd., Brown Ave., Burton Dr., Carol Ln., Happy Valley Rd., Old Tunnel Rd., Nogales St., Pleasant Hill Circle, Perales St., Rose Ln., Arrowhead Dr., Overlay streets include: Reliez Valley Rd., and Moraga Rd. Other streets will receive crack fill and digouts.

Construction 05/2021 10/2021 5-12 16 7

Martinez Contra Costa 20/21 New Road Maintenance & Rehabilitation Alhambra Avenue

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

Alhambra Avenue from 100-feet north of Blue Ridge Drive to 300-feet south of Forest Way (just under 2 miles)

Pre-Construction & Construction

01/2021 07/2021

05/2021 12/2021 15-15 12 3

Moraga Contra Costa 20/21 New Road Maintenance & Rehabilitation 2020 Pavement Overlay Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Ascot Ct-Ascot Dr to end; Ascot Dr-Ascot Ct to end; Ascot Dr-2084 Ascot Dr to Moraga Rd; Ascot Pl-Ascot Dr to end; Calle La Montana-Corte Aires to Paseo Del Rio; Calle La Mesa-Corte Pinon to Paseo del Rio; Corte Del Caballo-Calle La Montana to end; Cedarwood Dr-Rimer Dr to Whitethorne Dr; Idlewood Ct-Hardie to end.

Construction 06/2020 08/2020 25-30 16 7

Oakley Contra Costa 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Street Repoair and Resurfacing Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Wildcat Way Neighborhood south of Main Street and the Marsh Neighborhood South of Main Street between Norcross and 5th Street

Construction 04/2021 07/2021 15-18 11 7

Orinda Contra Costa 20/21 New Road Maintenance & Rehabilitation 2020 Annual Pavement Project This project will include: Pavement Rehab/Repair (Existing)

•Miner Rd. from Lombardy Ln. to Gardiner Ct. •Honey Hill Rd. from Miner Rd. to Charles Hill Rd. •E. Altarinda Dr. from Orindawoods Dr. to El Nido Ranch Rd. •Orindawoods Dr. from Altarinda Dr. to E. Altarinda Dr. •Camino Pablo from Miner Rd. to Monte Vista Rd. •Moraga Way from Bryant Way to Camino Pablo •Moraga Way from Overhill Rd. to Hall Dr. •Hall Dr. from Fleetwood Ct. to Donald Dr. •Glorietta Blvd. from Overhill Rd.to Wendy Ln. •Glorietta Blvd. from Moraga Way to Rheem Blvd.

Construction 07/2020 12/2020 10-15 16 7

Pinole Contra Costa 20/21 New Road Maintenance & Rehabilitation

Annual Residential Slurry Seal Project RO2001-SB1 This project will include: Pavement Rehab/Repair (Existing) Various residential street all listed in resolution Construction 09/2020 06/2021 3-6 15 9

Pittsburg Contra Costa 20/21 New Traffic Control Devices 2020/21 Traffic Signal Modification Project This project will include: Project Scope Development, Preliminary Design Signalized arterail streets including Loveridge, Leland, Railroad

Avenue, Bailey Road, Buchanan Road. Pre-Construction 07/2020 06/2021 1-10 14 7

Pittsburg Contra Costa 20/21 New Road Maintenance & Rehabilitation

SB-1 2020/21 Pavement Management Project This project will include: Pavement Rehab/Repair (Existing) West Leland Road between Bailey Road and Railroad Avenue Construction 07/2020 06/2021 10-20 14 7

Pittsburg Contra Costa 20/21 New Road Maintenance & Rehabilitation

STP/OBAG II Pavement Improvement Project This project will include: Preliminary Design, Document Preparation West Leland Road & Loveridge Road Pre-Construction 07/2020 06/2021 10-20 14 7

Pittsburg Contra Costa 20/21 New Road Maintenance & Rehabilitation

Stoneman Avenue Safety Improvement Project This project will include: Pavement Rehab/Repair (Existing) Stoneman Avenue between Harbor Street and Loveridge Road Construction 08/2020 06/2021 5-20 14 7

Pleasant Hill Contra Costa 20/21 New Road Maintenance & Rehabilitation

FY 2021/2022 Street Resurfacing Project This project will include: Pavement Rehab/Repair (Existing) Various streets in the City (see attached street list in Resolution).

Streets are part of the City's residential zone 7 and 19. Construction 03/2022 10/2022 8-12 14 3

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 11: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Richmond Contra Costa 20/21 New Complete Streets Components Pavement Rehab Project 7th/8th This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Bicycle Lane Rehab/Repair (Existing) 7th Street from Ripley Avenue to railroad tracks norht of Lincoln Avenue; 8th Street from OhioAvenue to Lincoln Avenue, Construction 01/2021 11/2021 20-20 15 9

Richmond Contra Costa 20/21 New Complete Streets Components

Pavement Rehab Project Marina Way

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Marina Way South from Cutting Boulevard to Ohio Avenue Construction 01/2021 11/2021 20-20 15 9

Richmond Contra Costa 20/21 New Complete Streets Components Pavement Rehab Castro Ranch

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Castro Ranch Road from Olinda Road to City Limit east of Country View Drive, Construction 08/2020 12/2020 20-20 15 9

San Pablo Contra Costa 20/21 New Road Maintenance & Rehabilitation

Citywide Slurry Seal Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

This will be a citywide slurry seal pavement rehabilitation project and it will cover street segments East of San Pablo Avenue and South of San Pablo Dam Road.

Construction 04/2021 08/2021 5-8 15 9

San Ramon Contra Costa 20/21 New Road Maintenance & Rehabilitation

Pavement Management 2021 Project

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Ascot Dr,Beaver Creek Ct,Bent Creek Cir,Burns Cir,Burns Ct,Cameron Cir,Carlisle Ct,Chaucer Ct,Craydon Ct,Dogwood Ct,Dogwood Pl,Dolores Dr,Dunbarton Cir,Dunbarton Ct,Dundee Ct,Fallen Leaf Cir,Fallview St,Fife Ct,Fryer Ct,Helix Ct,Kimball Ave,Lindell Ln,Lomond Cir,Lomond Ct,Marlboro Way,Moore Ct,Old Ranch Ct,Quincy Ct,Rush Creek Ct,Salem Ct,Sandy Way,Shetland Ct,Springfield Dr,Summerset Ct,Summerford Cir,Summer Creek Ln,Summerwood Loop,Toledo Dr,Toluca Dr,Weymouth Ct, and Winterhaven Ct

Pre-Construction & Construction

03/2020 07/2021

09/2020 12/2021 3-25 16 7

San Ramon Contra Costa 20/21 New Road Maintenance & Rehabilitation

Alcosta Blvd Pavement Rehabilitation Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This project is a Federal-aid project. CALTRANS Local Assistance process. The City of San Ramon will apply for a E-76 approval for construction.

Alcosta Boulevard, between Veracruz Drive and Olympia Fields Drive, including frontrage streets

Pre-Construction & Construction

11/2019 07/2021

12/2020 12/2021 10-25 16 7

Walnut Creek Contra Costa 18/19 Carried Over Road Maintenance & Rehabilitation

2021 OBAG2 YGNACIO VALLEY ROAD REHABILITATION

PROJECT

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | The 2021 OBAG2 Ygnacio Valley Road & Oak Grove Road Rehabilitation Project will repave Ygnacio Valley Road from Civic Drive to San Carlos Drive. This section of Ygnacio Valley Road was last repaved in 1989 and has a PCI rating of 70. The project will perform required ADA upgrades and traffic signal upgrades as needed.

The roadway area to be repaved on Ygnacio Valley Road is estimated to be 630,000 S.F.

The 2019 OBAG2 Ygnacio Valley Road will repave Ygnacio Valley Road from Civic Drive to San Carlos Drive . Construction 06/2021 10/2021 10-20 14, 16 7

Walnut Creek Contra Costa 18/19 Carried Over Road Maintenance & Rehabilitation

2020 ROADWAY REHABILITATION

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety) | The 2020 Roadway Rehabilitation project will repave Broadway from Parkside Drive to Ygnacio Valley Road and Parkside Drive from Civic Drive to San Juan Avenue. Broadway and Parkside Drive were last repaved between 1986 and 1993 perspectival and has a PCI average rating of 71. The project will perform required ADA upgrades and traffic signal upgrades as needed. The roadway area to be repaved is estimated to be 191,000 S.F. This project will be funded by SB1, Measure J/ & Gas Tax Funding. | Approximately $970,000 of RMRA funds from FY18/19 will be utilized for the construction component with the remainder coming from Measure J and Gas Tax funds.

The 2020 Roadway Rehabilitation project will repave Broadway from Parkside Drive to Ygnacio Valley Road and Parkside Drive from Civic Drive to San Juan Avenue.

Construction 06/2020 10/2020 10-20 16 7

Walnut Creek Contra Costa 20/21 New Road Maintenance & Rehabilitation

SOUTH MAIN REHABILITATION PROJECT

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The 2021 South Main Street Rehabilitation Project will repave South Main Street from Newell Avenue to Creekside Drive. This section of roadway was last repaved in 1989 and has a PCI rating of 58.

South Main Street between Newell Avenue and Creekside Drive Construction 06/2021 10/2021 10-20 16 7

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 12: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Walnut Creek Contra Costa 20/21 New Road Maintenance & Rehabilitation 2020 SLURRY SEAL PROJECT

This project will include: Pavement Rehab/Repair (Existing) | The 2020 Slurry Project will slurry seal 16 residential streets. These streets have not had any preventative maintenance performed since they were constructed in 1993.

Woodlands Neighborhood located in North East portion of Walnut Creek Construction 06/2020 07/2020 5-10 14 7

Crescent City Del Norte 18/19 In Progress Road Maintenance & Rehabilitation

Crescent City Storm Drainage Improvement and Roadway

Rehabilitation Project

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install new drainage improvements, repave / resurface a minimum of 1200 LF of Roadway, install new ADA compliant Access Ramps and pedestrian improvements

Front Street between G Street & B Street, C Street between Howe Drive & 5th Street, F Street between Front Street and 5th Street

Construction 04/2020 06/2021 20-30 2 2

Crescent City Del Norte 20/21 New Road Maintenance & Rehabilitation Harding Repair Project This project will include: Pavement Rehab/Repair (Existing) Harding Avenue from Northcrest Dr. to Truman Ct. Construction 07/2020 08/2021 3-5 2 2

Crescent City Del Norte 20/21 New Road Maintenance & Rehabilitation 5th Street Repair Project This project will include: Pavement Rehab/Repair (Existing) 5th Street between L Street and M Street Construction 07/2020 08/2021 3-5 2 2

Crescent City Del Norte 18/19 Carried Over Road Maintenance & Rehabilitation

K Street Drainage Improvement and Roadway Rehabilitation

Project

This project will include: Cost Estimating, Document Preparation | Install new drainage improvements, repave / resurface approximately 300LF of Roadway, install new ADA compliant Access Ramps and pedestrian improvements

K Street Between Front Street & 2nd Street Pre-Construction & Construction

12/2020 07/2022

12/2021 09/2022 20-30 2 2

Placerville El Dorado 20/21 New Road Maintenance & Rehabilitation Asphalt Patch Paving This project will include: Pavement Rehab/Repair (Existing) | asphalt repair

Turner St, Goyan St, Conrad St, Wentworth St, Main St, Sherman St, Grandview St, Anderson Way, James St, Carla St, Baker Rd, Dimity Ln, Wiltse Rd, Elm Ave, Locust Ave.

Construction 07/2020 06/2021 10-15 5 1

South Lake Tahoe El Dorado 20/21 New Road Maintenance & Rehabilitation 2021 Road Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing)

Lake Tahoe Boulevard (City Limit to Viking Way); Lake Tahoe Boulevard (Viking Way to Emerald Bay Road); Pioneer Trail (City Limit to Glenwood Way); Ski Run Boulevard (Pioneer Trail to Saddle Road); Johnson Boulevard (Entire length); Margaret Street (F Street to Delta Street); Dedi Avenue (F Street to Delta Street); Bonanza Avenue (F Street to B Street)

Construction 05/2021 10/2021 20-30 5 1

Clovis Fresno 19/20 In Progress Road Maintenance & Rehabilitation

Armstrong Avenue Street Improvements from Tollhouse to

Sierra

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Document Preparation Armstrong Avenue from Tollhouse Avenue to Sierra Avenue Pre-Construction &

Construction 08/2019 04/2021

12/2020 08/2021 7-20 23 8

Clovis Fresno 19/20 In Progress Road Maintenance & Rehabilitation

Gettysburg Avenue Street Improvements form Sierra Vista

Parkway to Clovis Avenue

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Document Preparation Gettysburg Avenue from Sierra Vista Parkway to Clovis Avenue Pre-Construction &

Construction 08/2019 04/2021

12/2020 08/2021 7-20 23 8

Clovis Fresno 19/20 In Progress Road Maintenance & Rehabilitation

Bullard Avenue Street Improvements form Armstrong to

Temperance

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Document Preparation Bullard Avenue from Armstrong Avenue to Temperance Avenue Pre-Construction &

Construction 08/2019 07/2020

07/2020 10/2020 7-20 23 8

Clovis Fresno 19/20 In Progress Road Maintenance & Rehabilitation

Fowler Street Improvements -Barstow to Shaw

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation | Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Minor concrete work. Stripping.

Fowler Avenue from Barstow Avenue to Shaw Avenue Pre-Construction & Construction

09/2018 06/2020

05/2020 09/2020 7-20 23 8

Clovis Fresno 19/20 In Progress Road Maintenance & Rehabilitation

Minnewawa Street Improvements-Shepherd to Teague

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation | Grind and overlay existing pavement. Traffic loop replacement. Minor concrete work. Stripping.

Minnewawa Avenue from Shepherd Avenue to Teague Avenue Pre-Construction & Construction

09/2018 06/2020

04/2020 09/2020 7-20 23 8

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 13: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Coalinga Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Sunset Street Rehabilitation Project (Phase 1 & 2)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design | Installation of curb and gutter, sidewalks, curb ramps to comply with Americans with Disabilities Act requirements, driveway approaches, alley approaches, valley gutters, A.C. pavement, aggregate base, storm drain laterals, storm drain inlets, LED street lights, electrical conduit, electrical wire, pull boxes, crosswalks, traffic striping and markings, traffic signage, bike lane striping, existing utility lid adjustment, street tree removal or trimming and construction surveying

Sunset Street from Polk Street to Washington Street Pre-Construction & Construction

12/2018 07/2020

06/2020 11/2020 15-25 31 12

Firebaugh Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Helm Canal Road Rehabilitation (north side)

This project will include: Preliminary Design, Document Preparation | Roadway rehabilitation In the City of Firebaugh between Poplar and Birch Drive Pre-Construction 07/2021 12/2021 10-20 31 12

Firebaugh Fresno 18/19 Forecasted Road Maintenance & Rehabilitation

Helm Canal Road Rehabilitation (north side) This project will include: Pavement Rehab/Repair (Existing) | Roadway rehabilitation In the City of Firebaugh between Poplar and Birch Drive Construction 01/2022 07/2022 10-20 31 12

Firebaugh Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Roadway Sealing Project This project will include: Preliminary Design, Document Preparation | Roadway crack

sealing and slurry sealing

At various locations in the City of Firebaugh: Birch Dr from Helm Canal to cul-de-sac, Dogwood Wy from Maple to cul-de-sac, Cypress Wy from Helm Canal to Maple, Alder Wy from Elm St to cul-de-sac, Poplar Wy from Helm Canal to Elm St, Willow Wy from Spruce to Elm St, Spruce St from Willow Wy to cul-de-sac, Maple Ct from Poplar to Dogwood Wy, Elm Street from Willow to Birch Drive, Ash Street from Alder to Dogwood Wy, Oak Street from Alder to Dogwood Wy

Pre-Construction 07/2020 12/2020 5-10 31 12

Firebaugh Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Roadway Sealing Project This project will include: Pavement Rehab/Repair (Existing) | Roadway crack sealing

and slurry sealing

At various locations in the City of Firebaugh: Birch Dr from Helm Canal to cul-de-sac, Dogwood Wy from Maple to cul-de-sac, Cypress Wy from Helm Canal to Maple, Alder Wy from Elm St to cul-de-sac, Poplar Wy from Helm Canal to Elm St, Willow Wy from Spruce to Elm St, Spruce St from Willow Wy to cul-de-sac, Maple Ct from Poplar to Dogwood Wy, Elm Street from Willow to Birch Drive, Ash Street from Alder to Dogwood Wy, Oak Street from Alder to Dogwood Wy

Construction 01/2021 07/2021 5-10 31 12

Fowler Fresno 20/21 New Road Maintenance & Rehabilitation

Main Street Rehabilitation from 5th Street to 7th Street

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing) Main Street from 5th Street to 7th Street Pre-Construction &

Construction 08/2020 10/2020

09/2020 11/2020 10-20 31 12

Fresno Fresno 19/20 In Progress Road Maintenance & Rehabilitation

FY 19-20 Annual Slurry Seal Program This project will include: Pavement Rehab/Repair (Existing)

Olive-San Pablo-180-Blackstone Neighborhood, Olive-Palm-Fulton-Belmont Neighborhood, Olive-Fulton-Belmont-San Pablo Neighborhood, Olive-McKinley-Winery-Helm Neighborhood, Lane-Kings Canyon-Maple Neighborhood, Gettysburg-Blackstone to Fresno

Construction 07/2020 10/2020 7-10 23, 31 8, 14

Fresno Fresno 19/20 In Progress Traffic Control Devices Maple/Shaw Class IV Cycle Track and Pedestrian Scramble

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane (New) | Class IV Cycle Track and Pedestrian Scramble Maple Avenue, Gettysburg to Shaw Avenues Construction 01/2019 03/2021 20-50 23 8

Fresno Fresno 19/20 Carried Over Traffic Control Devices Harrison and Shields Traffic Signal (18/19 Carryover)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New Traffic Signal Harrison Ave & Shields Ave Construction 01/2019 10/2020 20-50 23, 31 8

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Marks Ave Overlay, Ashlan to Dakota (18/19 carryover)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Pavement overlay

Marks Ave - Ashlan to Dakota Construction 01/2019 11/2020 10-15 23 8

Fresno Fresno 19/20 Carried Over Traffic Control Devices Barstow and Palm Traffic Signal

Left Turn Phasing (18/19 carryover)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Traffic Signal Modification Barstow Ave & Palm Ave Construction 01/2019 03/2021 20-50 23 8

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 14: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fresno Fresno 19/20 Carried Over Traffic Control Devices California and Walnut Traffic Signal (18/19 carryover)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New Traffic Signal California Ave & Walnut Ave Construction 07/2019 03/2021 20-50 31 14

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Cedar Ave Overlay, Barstow to Bullard (18/19 carryover)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Pavement overlay

Cedar Ave - Barstow to Bullard Construction 01/2019 10/2020 10-20 23 8

Fresno Fresno 19/20 Carried Over Traffic Control Devices Armstrong and Lane Traffic Signal (18/19 carryover)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New Traffic Signal Armstrong Ave & Lane Ave Construction 01/2019 03/2021 20-50 23 8

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Nees Ave Overlay, First to Millbrook (18/19 carryover)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Pavement overlay

Nees Ave - First to Millbrook Construction 01/2019 07/2020 10-20 23 8

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Chestnut Overlay, Bullard to Herndon (18/19 carryover)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Pavement overlay

Chestnut Ave - Bullard to Herndon Construction 01/2019 03/2021 10-20 23 8

Fresno Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Bullard, First to Cedar (partial grant match)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Pavement overlay

Bullard Ave - First to Cedar Construction 01/2019 05/2021 7-20 23 8

Fresno Fresno 19/20 Carried Over Other Muir Elementary School - Safe Routes to School

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) Palm-Olive-Broadway-Belmont Neighborhood Construction 07/2019 12/2022 7-20 31 14

Fresno Fresno 19/20 Carried Over Other McKinley Elementary School -Safe Routes to School

This project will include: Cost Estimating, Project Scope Development, Preliminary Design Blythe and McKinley Ave Pre-Construction 07/2019 12/2023 20-50 23 8

Fresno Fresno 20/21 New Match Funds Fresno Street Corridor Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Fresno Street from B Street to Friant Road Construction 07/2019 09/2022 15-30 23, 31 8, 14

Fresno Fresno 20/21 New Traffic Control Devices Traffic Signal Clinton and Angus This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Intersection of Clinton Ave and Angus St Construction 01/2020 02/2021 20-50 31 8

Fresno Fresno 20/21 New Match Funds Barton and Florence Sidewalks & Paving

This project will include: Cost Estimating, Right of Way, Project Scope Development, Preliminary Design Barton Ave from Florence Ave to Church Ave Pre-Construction 01/2020 12/2021 7-20 31 14

Fresno Fresno 19/20 Carried Over Traffic Control Devices Traffic Signal Left Turn Phasing Butler & Cedar

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Butler and Cedar Avenues Construction 07/2019 12/2021 20-50 31 14

Fresno Fresno 20/21 New Road Maintenance & Rehabilitation

Cedar-Fountain Way Neighborhood Paving

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Cedar-Millbrook-Shields-Robinson Neighboorhood Construction 07/2020 06/2021 7-20 23 8

Fresno Fresno 19/20 Carried Over Traffic Control Devices Traffic Signal Left Turn Phasing Tulare and "U" Street

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Intersection of Tulare Avenue and "U" Street Construction 07/2019 12/2021 20-50 31 14

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 15: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fresno Fresno 20/21 New Traffic Control Devices Traffic Signal at Tulare and "Q" Streets

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Tulare and "Q" Street crosswalk Construction 11/2020 05/2021 20-50 31 14

Fresno Fresno 19/20 Carried Over Traffic Control Devices Traffic Signal Blythe and Gates This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Intersection of Blythe Avenue and Gates Avenue Construction 07/2020 12/2021 20-50 23 8

Fresno Fresno 20/21 New Traffic Control Devices Traffic Signal Left Turn Phasing Hughes and Shields

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation Intersection of Hughes and Shields Avenues Pre-Construction 07/2020 12/2021 20-50 23 8

Fresno Fresno 20/21 New Complete Streets Components

FY 20-21 Annual Street Maintenance Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | All Project ID's starting with SB in Resolution 2020-15 are listed under the FY 20-21 Annual Street Maintenance Program. | locations continued: Cedar-Sierra-Maple-Herndon Neighborhood; Warner & Herndon Frontage Rd, First-Millbrook; Audubon, Friant-Cole; Cedar & Shepherd Aves; Bremer, Blackstone-Abby; Dakota-Moroa-FID Canal-Blackstone Neighborhood; Clark-University-Blackstone-Weldon Neighborhood; Clark, McKinley-Floradora; First, McKinley-Olive; Dakota-Ashlan-Thesta-Fresno Neighborhood; Ashlan-Gettysburg-Effie-Clark Neighborhood; Englewood & Glenn Aves

Santa Fe-Indianapolis-West-Tielman; Ashlan-Bengston-Sussex; Crystal-Hughes-Griffith-Ashlan Neighborhood; Palm & Shaw Aves; Barstow, Marks-Van Ness; Figarden Dr, Marks-Bullard; Maroa, Sierra-Herndon; Blythe, Weldon-Clinton; Atchison-Delno-California Neighborhood; Sierra Vista, Dakota to Shields; McKinley, SR168-Chestnut; Sunnyside, Shields-Clinton; Shields, Clovis-Sunnyside; Lane-Kings Canyon-Maple Neighborhood; Lane, Chestnut-Peach; Clovis, Fancher Creek-Belmont; Nees, Fresno-First;

Construction 04/2020 06/2021 7-20 23, 31 8, 14

Huron Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

M Street 2" Mill and HMA Overlay with Base Repairs

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

M St from 9th St to 11th St Pre-Construction & Construction

07/2020 07/2021

06/2021 12/2021 20-20 31 12

Kerman Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Street overlay Project 20/21

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Local Streets: 8TH from Stanislaus to Sunset; Middleton & Sunset from 6th to 8th; C Street from 9th to 11th; 10th South of C Street; 11th South of D; 12th from D to California.

Construction 06/2020 09/2020 20-35 31 12

Kingsburg Fresno 20/21 New Road Maintenance & Rehabilitation Orange Avenue Rehabilitation This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing) 6th Avenue Drive to 300’ west of 8th Ave Drive Pre-Construction & Construction

07/2020 03/2021

09/2020 06/2021 10-20 31 12

Mendota Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Kate Street Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of North Kate Street between Divisadero Street and I Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

North Kate Street between Divisadero Street and I Street Pre-Construction & Construction

07/2024 07/2025

03/2025 11/2025 15-30 31 12

Mendota Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Rio Frio Street Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of Rio Frio Street between 7th Street and 8th Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

Rio Frio Street from 7th Street to 8th Street Pre-Construction & Construction

10/2021 07/2022

03/2022 09/2022 15-30 31 12

Mendota Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Stamoules Street Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Document Preparation | In general, the project consists of reconstruction of Stamoules Street between 7th Street and 9th Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

Stamoules Street from 7th Street to 9th Street Pre-Construction & Construction

10/2024 07/2025

03/2025 09/2025 15-30 31 12

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 16: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Mendota Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Naples Street Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Document Preparation | In general, the project consists of reconstruction of Naples Street between 2nd Street and 9th Street, including demolition of existing asphalt and concrete pavements, storm drain inlets, manholes and pipes, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

Naples Street from 2nd Street to 9th Street Pre-Construction & Construction

01/2024 07/2024

03/2024 10/2024 15-30 31 12

Mendota Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Marie Street & 5th Street Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Document Preparation | In general, the project consists of reconstruction of Marie Street between Divisadero Street and 5th Street and 5th Street betwee Marie Street and Lolita Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

Marie Street from Divisadero Street to 5th Street, and 5th Street from Marie Street to Lolita Street

Pre-Construction & Construction

10/2021 07/2022

03/2022 09/2022 15-30 31 12

Mendota Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Fleming & McCabe Avenue Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Document Preparation | In general, the project consists of reconstruction of the three streets between Rowe Avenue and Sorensen Avenue, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, driveway approaches, and traffic striping and markings to add center lane lines, parking/bike lanes and high visibility school zone cross walks.

Flemming Avenue from Rowe Avenue to Sorensen Avenue, and McCabe Avenue from Rowe Avenue to Sorensen Avenue

Pre-Construction & Construction

10/2021 07/2022

03/2022 11/2022 15-30 31 12

Mendota Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

5th Street and Quince Street Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Document Preparation | In general, the project consists of reconstruction of 5th Street from Quince to Derrick Avenue (State Route 33) and Quince Street from 5th Street to 6th Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, driveway and alley approaches, and traffic striping and markings to add two way left turn lanes, parking/bike lanes and high visibility school zone cross walks.

5th Street Derrick Avenue (SR 33), and Quince Street from 5th Street to 6th Street

Pre-Construction & Construction

10/2022 06/2023

03/2023 08/2023 15-30 31 12

Mendota Fresno 19/20 Carried Over Road Maintenance & Rehabilitation 7th Street

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind and overlay of 7th Street between Stamoules Street and Rio Frio Street

7th Street from Stamoules Street to Tule Street Pre-Construction & Construction

10/2021 06/2022

03/2022 08/2022 10-20 32 12

Mendota Fresno 20/21 New Safety Lozano & Derrick Avene (SR 33) Restriping This project will include: Paving and/or Striping Installation (New Safety) Lozano and Derrick Ave (SR 33) Construction 06/2020 08/2020 5-15 31 12

Mendota Fresno 20/21 New Safety Citywide Railroad Corridor Crossing Improvements

This project will include: Environmental Study/Documents, Document Preparation | Improving the railroad corridor within the city by adding concrete panels to crossing, installing medians or channelizers, and reconstruction of the roadway adjacent to crossings at all three crossings within the City

1) SR33 between Bass Avenue and SR 180; 2) 9th Street between Marie St and Naples St; and 3) W Belmont Ave between Marie St and SR 180.

Pre-Construction & Construction

10/2020 04/2021

03/2021 11/2021 15-50 31 12

Orange Cove Fresno 19/20 In Progress Road Maintenance & Rehabilitation

City Hall Parking Lot and Sixth Street Sidwalk Replacement

Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

633 Sixth Street Orange Cove, CA 93646 and East side of Sixth Street.

Pre-Construction & Construction

07/2019 06/2020

05/2020 09/2020 20-25 31 14

Parlier Fresno 20/21 New Road Maintenance & Rehabilitation

Independencia and Progresso Avenue Reconstruction

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design

Independencia Avenue, between J and H Street, Progresso Avenue between Independencia Ave and H Street, H Street between Independencia and Progresso Avenues

Pre-Construction & Construction

12/2020 05/2021

03/2021 08/2021 25-30 31 14

Reedley Fresno 19/20 Carried Over Road Maintenance & Rehabilitation I Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Replacement of traffic loops

In the City of Reedley on I Street between Reed Avenue and Dinuba Avenue Construction 03/2021 05/2021 10-15 31 14

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 17: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Joaquin Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Idaho Avenue Reconstruction This project will include: Preliminary Design, Document Preparation | Roadway

reconstruction In the City of San Joaquin between 9th Street and Main Street. Pre-Construction 08/2021 12/2021 10-20 31 12

San Joaquin Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Idaho Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin between 9th Street and Main Street. Construction 01/2022 08/2022 10-20 31 12

San Joaquin Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Roadway Sealing Project This project will include: Preliminary Design, Document Preparation | Roadway crack

sealing and slurry sealing.

At various locations in the City of San Joaquin; First St from Colorado to Annabella; Annabella from Helm to 4th St Helm from Colorado to California; 2nd St from Annabella to Helm; 3rd St from Annabella to Helm; 1st St Court; 2nd St Court; 4th St from Annabella to West Nevada; West Nevada from 3rd St to 5th St; White St from 3rd St to 5th St

Pre-Construction 08/2021 12/2021 5-10 31 12

San Joaquin Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Roadway Sealing Project This project will include: Pavement Rehab/Repair (Existing) | Roadway crack sealing

and slurry sealing.

At various locations in the City of San Joaquin; First St from Colorado to Annabella; Annabella from Helm to 4th St Helm from Colorado to California; 2nd St from Annabella to Helm; 3rd St from Annabella to Helm; 1st St Court; 2nd St Court; 4th St from Annabella to West Nevada; West Nevada from 3rd St to 5th St; White St from 3rd St to 5th St

Construction 01/2022 08/2022 5-10 31 12

San Joaquin Fresno 18/19 Carried Over Road Maintenance & Rehabilitation 6th Street Repairs Project This project will include: Preliminary Design, Document Preparation | Roadway

reconstruction In the City of San Joaquin Between Colorado Avenue and Nevada Avenue. Pre-Construction 08/2020 12/2020 10-20 31 12

San Joaquin Fresno 18/19 Carried Over Road Maintenance & Rehabilitation 6th Street Repairs Project This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin Between Colorado Avenue and

Nevada Avenue. Construction 01/2021 08/2021 10-20 31 12

San Joaquin Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Oregon Avenue Reconstruction This project will include: Preliminary Design, Document Preparation | Roadway

reconstruction In the City of San Joaquin Between 9th Street and Pine Street. Pre-Construction 08/2025 12/2025 10-20 31 12

San Joaquin Fresno 18/19 Forecasted Road Maintenance & Rehabilitation Oregon Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing) | Roadway reconstruction In the City of San Joaquin Between 9th Street and Pine Street. Construction 01/2026 08/2026 10-20 31 12

San Joaquin Fresno 20/21 New Road Maintenance & Rehabilitation Nevada Avenue Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Preliminary Design, Document Preparation | Roadway overlay In the City of San Joaquin between 9th Street and Main Street.

Pre-Construction & Construction

08/2020 01/2021

12/2020 08/2021 10-20 31 12

San Joaquin Fresno 20/21 New Road Maintenance & Rehabilitation Nevada Avenue Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Preliminary Design, Document Preparation In the City of San Joaquin between 5th Street and 8th Street.

Pre-Construction & Construction

08/2020 01/2021

12/2020 08/2021 10-20 31 12

Sanger Fresno 19/20 Carried Over Road Maintenance & Rehabilitation

Lyon Ave Reconstruction - 9th St to Webster Ave This project will include: Pavement Rehab/Repair (Existing) 9th Street to Webster Ave. Construction 09/2020 01/2021 25-30 31 14

Sanger Fresno 20/21 New Road Maintenance & Rehabilitation 2021 Street Sealing Project This project will include: Cost Estimating, Preliminary Design, Document Preparation

Various locations which will be determined during the engineering design phase which is what is being funded by RMRA . Only certain streets qualify for this type of preventative maintenance, and the City will expend its typical allocation of street revenues for this project.

Pre-Construction 07/2020 05/2021 10-15 31 14

Sanger Fresno 20/21 New Road Maintenance & Rehabilitation

Cherry Avenue Reconstruction -Bethel to Greenwood This project will include: Cost Estimating, Preliminary Design, Document Preparation Cherry Avenue between Bethel and Greenwood Pre-Construction 07/2020 05/2021 25-30 31 14

Sanger Fresno 20/21 New Road Maintenance & Rehabilitation

North Avenue Reconstruction -Academy to Faller

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Document Preparation North Avenue between Academy and Faller Avenues Pre-Construction 07/2020 05/2021 25-30 31 14

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 18: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Sanger Fresno 20/21 New Road Maintenance & Rehabilitation

O Street Reconstruction - 10th Street to North Avenue

This project will include: Environmental Study/Documents, Cost Estimating, Document Preparation O Street between 10th Street and North Avenue Pre-Construction 07/2020 05/2021 25-30 31 14

Selma Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

1. Nebraska Avenue Improvement Project

This project will include: Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Located in Selma on Nebraska Avenue from Highway 43 to Mitchell Avenue, reconstruct the existing 2-lane rural roadway including widening the westbound roadway to the ultimate width, providing enhanced access in and out of downtown Selma and congestion relief at the Thompson/Highland intersection.

Nebraska Avenue from Hwy 43 to Mitchell Avenue Pre-Construction & Construction

07/2020 10/2020

09/2020 05/2021 20-25 31 14

Selma Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Arterial Street Rehabilitation

This project will include: Patch longitudinal cracking with Hot Mix Asphalt (HMA) in 4' strips along Arterials and Major Collectors using a 4' wide paving machine (see attached photos). Crack seal all joints and cracks, place Caltrans type II slurry seal over entire road width and restripe

McCall from Floral to Dinuba, Orange from Floral to Nelson, Nelson from Highland to Thompson, Rose from McCall to Country Rose, Second from E Front to High

Construction 01/2020 05/2021 20-25 31 14

Selma Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Alphabet Streets (A & B) Reconstruction Project

This project will include: Reconstruct and rehabilitate A & B street from Floral Avenue to Rose Avenue. Upgrade ramps to current ADA standards, replace/add sidewalk where missing

Alphabet Streets (A through E) Floral Avenue to Rose Avenue in Selma, CA Construction 01/2021 06/2021 20-25 31 14

Orland Glenn 20/21 New Road Maintenance & Rehabilitation Shasta Street Improvements

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Portion of Shasta Street between Papst Avenue and Sixth Street. Construction 04/2021 09/2021 15-20 3 4

Orland Glenn 18/19 Carried Over Road Maintenance & Rehabilitation Tehama Street Improvements

This project will include: ADA Curb Ramp Installation (New), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | As part of the Tehama Street Improvement Project, Tehama Street from Woodward Avenue to East Street will be rehabilitated for roadway repairs and ADA compliance to curbs, gutters, sidewalks and pedestrian ramps. | Construction bids were received September 24, 2019. Project is anticipated to begin by 2020

Tehama Street from Woodward Avenue to East Street. Construction 04/2020 07/2020 15-20 3 4

Orland Glenn 19/20 Carried Over Road Maintenance & Rehabilitation

Repair commercial routes in the downtown area

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Downtown area bordered by Walker Street to the north, Colusa Street to the south, Sixth Street to the west and Third Street to the east

Construction 06/2020 07/2020 15-20 3 4

Willows Glenn 19/20 Carried Over Safety Birch Street/Tehama Street Sidewalk renovation

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Remove and replace broken and uneven sidewalks that are trip and fall hazards or force pedestrian traffic to leave the sidewalk and travel in the street. Repair or replace curb and gutter where needed. Connect sections to encourage pedestrian travel and bring sidewalk system into ADA compliance.

South side of Birch St. from Butte St. to Tehama St. West side of Tehama St. from Birch ST. to Cedar St. Construction 08/2020 09/2020 20-50 3 4

Willows Glenn 19/20 Carried Over Safety Walnut Street/Butte Street Sidewalk renovation

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Remove and replace broken and uneven sidewalks that are trip and fall hazards or force pedestrian traffic to leave the sidewalk and travel in the street. Repair or replace curb and gutter where needed. Connect sections to encourage pedestrian travel and bring sidewalk system into ADA compliance.

South side of Walnut St. from Shasta St. to Butte St. West side of Butte St. from Walnut St. to Sycamore St. Construction 10/2020 11/2020 20-50 3 4

Willows Glenn 19/20 Carried Over Road Maintenance & Rehabilitation Sycamore Street Cape Seal This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project

Scope Development, Preliminary Design, Document Preparation Sycamore Street from Lassen Street to Villa Avenue Pre-Construction & Construction

08/2020 03/2021

10/2020 04/2021 8-15 3 4

Willows Glenn 20/21 New Road Maintenance & Rehabilitation

North Lassen Street Rehabilitation Project

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Lassen Street from Sycamore Street to Wood Street Construction 07/2020 11/2020 10-30 3 4

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 19: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Arcata Humboldt 20/21 New Safety Road Safety Improvements This project will include: Procurement of Public Works Equipment | Purchase of radar feedback signs and rapid flashing crossing. | Will be installed by City staff Alliance Road and Foster Avenue Procurement/Operatio

nal Needs 07/2020 12/2021 8-10 2 2

Arcata Humboldt 20/21 New Road Maintenance & Rehabilitation Paving Shirley Blvd.

This project will include: Pavement Rehab/Repair (Existing) | Thin AC Overlay to existing pavement. RMRA funds will only provide partial payment. Estimated RMRA funds for this project are $250,000.00.

Portion of Shirley Blvd. between Beverly Drive and Patrick Court Construction 02/2021 10/2021 18-20 2 2

Arcata Humboldt 20/21 New Road Maintenance & Rehabilitation Paving Old Arcata Road

This project will include: Pavement Rehab/Repair (Existing) | Thin AC Overlay of existing pavement. RMRA funds will only provide partial funds for this project. Estimated RMRA funds are $61,436.00

Portion of Old Arcata Road between Buttermilk Lane and Jacoby Creek Road Construction 02/2021 10/2021 18-20 2 2

Blue Lake Humboldt 20/21 New Road Maintenance & Rehabilitation Pothole Repair and Restriping This project will include: Preliminary Design, Document Preparation | Road

Maintenance Activities

Hatchery Road, Greenwood Road, 1st-4th Avenue, G-J Street, Evergreen, Raymar, Railroad, South Railroad, Gely, Broderick, Wahl, Chartin Park, Acacia and Broad Street

Pre-Construction 07/2020 06/2021 2-5 2 2

Blue Lake Humboldt 20/21 New Traffic Control Devices Traffic Calming Maintenance and Installation

This project will include: Preliminary Design, Document Preparation | Replacement of traffic calming devices and installation of new devices

Broderick, South Railroad, Railroad, 2nd Avenue, Third Street, G Street, Vance Lake Lane Pre-Construction 07/2020 07/2021 7-10 2 2

Blue Lake Humboldt 20/21 New Road Maintenance & Rehabilitation Drainage Repair and Maintenance This project will include: Cost Estimating, Preliminary Design | Drainage maintenance

and repair Railroad Avenue, 1st Avenue, Redwood Avenue Pre-Construction 07/2020 07/2021 2-10 2 2

Eureka Humboldt 20/21 New Road Maintenance & Rehabilitation

14th Street Improvements/Maintenance

Paving 2021

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) 14th Street between M Street and Broadway Construction 05/2021 10/2021 15-20 2 2

Ferndale Humboldt 18/19 Carried Over Road Maintenance & Rehabilitation Shaw Avenue Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Street surface is severely cracked. 200 feet of re-pavement. | Lower priority project.

Shaw Avenue Construction 07/2020 07/2021 20-100 2 2

Ferndale Humboldt 19/20 Carried Over Road Maintenance & Rehabilitation Washington Street Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or

Culvert Rehab/Repair (Existing) Washington Street Construction 07/2020 07/2021 20-100 2 2

Ferndale Humboldt 19/20 Carried Over Road Maintenance & Rehabilitation Arlington Avenue Improvements This project will include: Environmental Study/Documents, Cost Estimating,

Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing)

Arlington Street, in underground storm drain system, 1000 feet west to 5th Street. North along Fairgrounds Access Road, Van Ness Street, Port Kenyon Road and Salt River, in improved drainage swales.

Pre-Construction & Construction

07/2020 06/2021

12/2020 07/2021 20-100 2 2

Ferndale Humboldt 20/21 New Road Maintenance & Rehabilitation

4th and Shaw Street Improvements

This project will include: Cost Estimating, Project Scope Development, Preliminary Design Intersection of 4th and Shaw Streets Pre-Construction 07/2020 09/2020 20-100 2 2

Fortuna Humboldt 20/21 New Road Maintenance & Rehabilitation

Newburg Road Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development Newburg Road between 12th Street to Fortuna Boulevard Pre-Construction &

Construction 07/2020 09/2020

08/2020 06/2021 10-20 2 2

Rio Dell Humboldt 19/20 Carried Over Road Maintenance & Rehabilitation General Maintenance and Repairs

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | Procurement of maintenance equipment

City-Wide Mainenance needs are the areas of Eeloa to Riverside, Including Fern St., Northwestern Ave., Ogle and Belleview Ave., Wildwood Ave., Davis St., Painter St., First, Second, Third, and Fourth Ave. including side streets of Elko, Dixie, and Columbus

Procurement/Operatio nal Needs 07/2020 06/2021 1-5 2 2

Trinidad Humboldt 19/20 Carried Over Road Maintenance & Rehabilitation

Trinidad Pavement Rehabilitation -Accelerated Cure Slurry Project

2020

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) Parker Street, Hector Street, Edwards Street, Galindo Street Construction 07/2020 11/2020 5-15 2 2

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 20: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Trinidad Humboldt 20/21 New Road Maintenance & Rehabilitation Scenic Drive Striping Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Scenic Drive within City Limits Construction 07/2020 08/2020 5-10 2 2

Brawley Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Rehabilitation of 2nd St

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface approximately 0.4 miles of roads utilizing recycled materials

2nd Street from Malan Street to K Street, and H Street from Rio Vista Avenue to Las Flores Drive Construction 03/2021 06/2021 10-15 56 40

Calexico Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Scaroni Road Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project will consist of grinding of existing asphalt concrete pavement, installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control

Scaroni Road between Highway 98 and Cole Blvd. Construction 10/2020 09/2021 10-20 56 40

Calexico Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Second Street Bridge Widening This project will include: Pavement Rehab/Repair (Existing) | The project will consist of

widening and improving Second Street bridge Second Street Bridge Construction 10/2020 06/2022 10-20 56 40

Calexico Imperial 20/21 New Road Maintenance & Rehabilitation Weakley Road Improvements This project will include: Preliminary Design Weakley Road between Scaroni Road and Portico Boulevard Pre-Construction 10/2020 06/2021 10-20 56 40

Calipatria Imperial 20/21 New Road Maintenance & Rehabilitation

Freeman Street and Commercial Avenue Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Freeman Street between Industrial Avenue and East Street Commercial Avenue between Freeman Street and California Street

Construction 01/2020 12/2020 20-35 56 40

El Centro Imperial 20/21 New Complete Streets Components

Imperial Avenue Extension -Phase I

This project will include: Pavement Improvement (New) | Construction of a new south Imperial Avenue roadway from the Interstate-8/Imperial Ave. Exchange to Wake Avenue and Construction of a new roadway intersection and extension of Wake Avenue from the newly constructed intersection of Wake and Imperial Avene to the existing Cypress Dr. - Phase I

Construction of a new south Imperial Avenue roadway from the Interstate-8/Imperial Ave. Exchange to Wake Avenue and Construction of a new roadway intersection and extension of Wake Avenue from the newly constructed intersection of Wake and Imperial Avene to the existing Cypress Dr. - Phase I

Construction 03/2021 09/2021 15-25 56 40

Holtville Imperial 20/21 New Road Maintenance & Rehabilitation Cedar Avenue Sidewalk Project

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Cedar Avenue between Fourth and Fifth Streets Construction 09/2020 09/2021 25-50 56 40

Holtville Imperial 20/21 New Road Maintenance & Rehabilitation

Ninth Street Widening & Sidewalk Improvements

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety)

Ninth Street between Beale & Ash Avenues Construction 09/2020 09/2021 25-50 56 40

Imperial Imperial 20/21 New Road Maintenance & Rehabilitation

La Brucherie Road Widening Project

This project will include: ADA Curb Ramp Installation (New), Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

La Brucherie Road from Aten Boulevard to Treshill Road Construction 10/2021 01/2022 25-30 56 40

Imperial Imperial 19/20 In Progress Road Maintenance & Rehabilitation

Street Improvement Project Phase IV

This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

West 11th Street from North D Street to Old SR 86 Construction 01/2020 04/2020 15-25 56 40

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 21: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Westmorland Imperial 18/19 Completed Road Maintenance & Rehabilitation

Streets Rehabilitation Program Phase 2

This project will include: City of Westmorland is proceeding with a project for the design and installation of conventional asphalt with an asphaltic rubberized aggregate membrane. The selected streets have been in conjunction with the Pavement Management Study. Using FY 20/21 RMRA funds for reimbursement.

C Street from Main Street to 7th Street, D Street from 5th St to 6th St and J Street from 7th St to 8th St. Construction 10/2018 11/2018 12-15 56 40

Bishop Inyo 20/21 New Safety Park Avenue Sidewalk This project will include: Sidewalk and/or Crosswalk Installation (New) Park Avenue along ball field 1 Construction 10/2020 11/2020 50-100 26 8

Bishop Inyo 20/21 New Other Hanby, Spruce and Yaney Sidewalks Improvement Project

This project will include: ADA Curb Ramp Installation (New), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

On Hanby, Spuce and Yaney Streets Construction 07/2020 11/2020 50-100 26 8

Arvin Kern 19/20 Carried Over Road Maintenance & Rehabilitation S. Hill Street Microsurfacing

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Microsurfacing pavement rehabilitation between SR-223 and Haven Drive. | Project is on hold until funds are available.

S. Hill Street between SR-223 and Haven Drive. Construction 01/2021 04/2021 5-10 32 14

Arvin Kern 18/19 Carried Over Road Maintenance & Rehabilitation Walnut Drive Microsurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Microsurfacing pavement rehabilitation between Walnut Drive and SR-223. | Project is on hold until funds are available.

Walnut Drive between Walnut Drive and SR-223. Construction 01/2021 04/2021 5-10 32 14

Arvin Kern 18/19 Carried Over Road Maintenance & Rehabilitation Pothole filling throughout city

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | Filling potholes throughout the city, where needed. | Project is on hold until funds are available.

Throughout the city. Procurement/Operatio nal Needs 08/2020 08/2021 1-3 32 14

Arvin Kern 18/19 Carried Over Complete Streets Components Varsity Road widening

This project will include: Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Maintenance Program Plan Development | Widen Varsity Road in front of high school to fully orginally planned 60 foot width by installing an additional 10 feet of pavement atop of the current shoulder, and install new curb, gutter, and sidewalk. | Project is on hold until funds are available.

Varsity Road between Campus Drive and Mahin Drive. Pre-Construction & Construction

04/2021 06/2021

05/2021 08/2021 20-30 32 14

Arvin Kern 18/19 Carried Over Other FUTURE PROJECTS PENDING FUNDS

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Microsurfacing pavement rehabilitation, overlay pavement rehabilitation, full depth pavement rehabilitation, reclamite pavement rehabilitation throughout the city, where needed. Add or replace bike lane striping throughout the city to improve the safety of bicyclists. Widen to 40 feet or 70 feet and install curb, gutter, and sidewalk. | FUTURE PROJECTS ON HOLD PENDING FUNDS. OTHER PROJECTS PRIORITY.

Langford Ave, Sycamore Rd, S. Comanche Dr, El Camino Real, Santa Rosa St, S. Acala St, N. Acala St, Arvin Ave, Stuart St, Meyer St, Sycamore Rd, El Camino Real, Packard Dr, N. Derby St, Wilson St, Meyer St, Plumtree St, Haven Dr, Comanche Dr, S. Derby St, A St, Hood St, Durham St, Derby St, Langford St, Franklin St, S. Hill St

Construction 01/2020 04/2020 10-20 32 14

Arvin Kern 19/20 Carried Over Road Maintenance & Rehabilitation Meyer Street Resurfacing This project will include: Pavement Rehab/Repair (Existing) Meyer Street between SR-223 and Franklin Construction 02/2021 08/2021 5-10 32 14

Arvin Kern 19/20 Carried Over Road Maintenance & Rehabilitation Hood Street Micro surfacing This project will include: Pavement Rehab/Repair (Existing) Hood Street between Commanche Drive and Meyer Construction 02/2021 08/2021 5-10 32 14

Arvin Kern 20/21 New Road Maintenance & Rehabilitation

Franklin Street Rehabilitation -Engineering and Construction

Management

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Cost Estimating, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Landscape Safety Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Professional Services for Full Depth Reclamation for project located on Franklin Street Between Walnut and Derby

Pre-Construction & Construction

06/2020 01/2021

12/2020 06/2021 20-30 32 14

Arvin Kern 20/21 New Road Maintenance & Rehabilitation Haven Drive Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Storm Drain/Culvert Installation (New), Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Cost Estimating, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation

Haven Drive Between Comanche and Derby Pre-Construction & Construction

01/2020 09/2020

05/2020 02/2021 20-30 32 14

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 22: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Arvin Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Microsurfacing various streets throughout the City

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Microsurfacing pavement rehabilitation between A Street and Butte Avenue. S Hill Street between SR223 and Haven. Walnut drive between Franklin and 223. | Project is on hold until funds are available.

Franklin Avenue between A Street and Butte Avenue. S Hill Street between SR223 and Haven. Walnut drive between Franklin and 223.

Construction 08/2020 08/2021 5-10 32 14

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Truxtun Ave

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing)

Truxtun Avenue from Elm Street to Chester Avenue (Ward 2) Construction 09/2020 11/2020 20-25 34 16

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Wilson Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Wilson Road from South H Street to P Street (Ward 7) Construction 03/2021 06/2021 20-25 32 14

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation New Stine Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

New Stine Road from Ming Avenue to Stockdale Highway (Ward 6) Construction 04/2021 06/2021 20-25 34 16

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation South H Street

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) South H Street from Panama Lane to Pacheco Road (Ward 7) Construction 04/2021 06/2021 20-25 32, 34 14, 16

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Hahn Avenue

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

Hahn Avenue from Planz Road and Stine Road to Akers Road (Ward 5) Construction 10/2020 12/2020 10-15 34 16

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation in the area from South H Street to South Chester and Wilson Road to Planz

Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Pavement Rehabilitation in the area from South H Street to South Chester and Wilson Road to Planz Road (Ward 1, 7) Construction 11/2020 01/2021 10-15 32 14

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation in the area from Oleander Avenue to H Street and California Avenue to

Forrest Street

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

Pavement Rehabilitation in the area from Oleander Avenue to H Street and California Avenue to Forrest Street (Ward 7) Construction 08/2020 10/2020 10-15 34 16

Bakersfield Kern 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Morning Drive from Panorama Drive to

Paladino Drive

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Pavement Rehabilitation Morning Drive from Panorama Drive to Paladino Drive (Ward 3) Construction 12/2020 02/2021 10-15 34 16

Bakersfield Kern 20/21 New Other Patch Truck This project will include: Procurement of Public Works Equipment Patch truck to facilitate pavement rehabilitation Procurement/Operatio nal Needs 07/2020 12/2020 10-15 32, 34 14, 16

Bakersfield Kern 20/21 New Other Mini excavator and Trailer This project will include: Procurement of Public Works Equipment City of Bakersfield Procurement/Operatio nal Needs 07/2020 12/2020 10-15 32, 34 14, 16

Bakersfield Kern 20/21 New Other Trailer mounted compressor This project will include: Procurement of Public Works Equipment City of Bakersfield Procurement/Operatio nal Needs 07/2020 12/2020 7-10 32, 34 14, 16

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 23: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Delano Kern 20/21 New Complete Streets Components

2020 -21 SB1 LSR Pavement Repair Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Albany Street - Between 11th Ave and 14th Ave.; Albany St. between 11th Ave and Garces Highway; Garces Highway between Clark St and Albany St.

Construction 07/2020 11/2021 10-10 32 14

McFarland Kern 20/21 New Road Maintenance & Rehabilitation

2nd Street from W. Kern Avenue to California Avenue

This project will include: Street improvments including, curb, gutter, sidewalk, curb ramps, drive approaches, street lights, benches, and trash recepticales 2nd Street from W. Kern Avenue to California Avenuw Construction 02/2021 04/2021 10-20 32 18

McFarland Kern 20/21 New Road Maintenance & Rehabilitation

W. Kern Avenue from 5th Street to Garzoli Road

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Road Repavement and Pedestrian Improvements.

W. Kern Avenue from 5th Street to Garzoli Road Pre-Construction & Construction

10/2020 01/2021

11/2020 03/2021 10-20 32 18

McFarland Kern 20/21 New Road Maintenance & Rehabilitation

Davis Road from Elmo Hwy to W. Perkins Avenue

This project will include: Pavement Rehab/Repair (Existing), Project Scope Development, Preliminary Design | Road Repavement and Pedestriam Improvements Davis Road from Elmo Hwy to W. Perkins Avenue Pre-Construction &

Construction 11/2020 04/2021

01/2021 07/2021 10-20 32 18

Ridgecrest Kern 20/21 New Road Maintenance & Rehabilitation

2020 - 2021 City of Ridgecrest Slurry Program This project will include: Pavement Improvement (New) | Slurry of various City Streets

Locations bordered by the following neighborhoods: China Lake Blvd, Las Flores, Down Street and Drummond Ave. Commercial Ave, Rancho St, Greenlawn St, Forest Knoll, Upjohn, Sunland St.

Construction 09/2020 12/2020 6-6 23 16

Shafter Kern 20/21 New Road Maintenance & Rehabilitation

Zerker Rd. Reconstruction - Phase II This project will include: Pavement Rehab/Repair (Existing) Zerker Rd. - Friant Kern Canal to Calloway Canal Construction 08/2020 02/2021 20-30 32 14

Taft Kern 19/20 Carried Over Safety ADA and Sidewalk Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Repair or replace broken sidewalks, curbs/ gutter, and install pedestrian ramps at various locations

10th Street between Kern Street and Front Street Construction 08/2020 06/2021 20-30 34 16

Tehachapi Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Surface Treatment of Local Street Phase I This project will include: Preliminary Design | Various surface treatments

3 different areas in City limits:; Boundaries are Pinon Street south to; Highline and Curry Street east to Ponderosa: 10 streets ; Boundaries are Georgia Street south to E. Abajo Ave and Dennison Road east to city limit: 10 streets 3. Valley Blvd north to Fir Street and Curry Street east to Clearview: 10 streets

Pre-Construction 05/2021 12/2021 3-5 34 16

Tehachapi Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Surface Treatment of Local Street Phase I

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Various surface treatments

3 different areas in City limits: Boundaries are Pinon Street south to Highline and Curry Street east to Ponderosa: 10 streets; Boundaries are Georgia Street south to E. Abajo Ave and Dennison Road east to city limit: 10 streets;Valley Blvd north to Fir Street and Curry Street east to Clearview: 10 streets

Construction 12/2021 12/2022 3-5 34 16

Tehachapi Kern 20/21 New Road Maintenance & Rehabilitation

Snyder Avenue Gap Closure Project

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New)

On Snyder Avenue between Tehachapi Boulevard and Valley Boulevard

Pre-Construction & Construction

07/2020 05/2021

04/2021 05/2022 15-20 34 16

Tehachapi Kern 19/20 Carried Over Road Maintenance & Rehabilitation

Surface Treatment of Local Street Phase II This project will include: Pavement Rehab/Repair (Existing), Preliminary Design Boundaries: C Street north to Tehachapi Blvd, Mill Street east to

Robinson Street; 9 streets Pre-Construction &

Construction 07/2020 01/2021

12/2020 12/2021 3-5 34 16

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 24: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Wasco Kern 19/20 Carried Over Complete Streets Components

19/20 SB1 Street Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Birch Avenue between Hwy. 46 & 6th Street and 2nd, 3rd Street & 4th Street between Poplar Ave. & Birch Avenue. Construction 05/2021 07/2021 15-20 32 16

Corcoran Kings 19/20 Carried Over Road Maintenance & Rehabilitation

2019/2020 City of Corcoran SB1 Road Maintenance Project

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | Chip and Slurry seal listed out in Resolution per their location but are under the same contract.

Letts Avenue: Sherman to Oregon; Sherman Avenue: Dairy Avenue to 7th Avenue ; Sherman Avenue: Flory Avenue to Dairy Avenue ; Dairy Avenue:; Whitley Avenue to Oregon Avenue ; Oregon Avenue: King Avenue to Dairy Avenue ; Whitley Avenue: Dairy Avenue to 6 1/2 Avenue ; Otis Avenue:; Orange Avenue to Sherman Avenue; Whitley Avenue: Otis Avenue to City Limits

Pre-Construction & Construction

02/2020 07/2020

06/2020 06/2021 5-10 32 14

Hanford Kings 20/21 New Road Maintenance & Rehabilitation

E. Lacey Blvd. Widening / Reconstruction from 10th Ave. –

Sierra Dr. Phase 1

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New) E. Lacey Blvd. from 10th Ave. – Sierra Dr. in the City of Hanford Construction 04/2021 06/2021 15-20 32 14

Hanford Kings 20/21 New Road Maintenance & Rehabilitation

FY 20/21 Reclamite Seal Treatment This project will include: Cost Estimating, Preliminary Design, Document Preparation City of Hanford on various local streets Pre-Construction 04/2021 05/2021 3-5 32 14

Hanford Kings 20/21 New Road Maintenance & Rehabilitation

Campus Drive Resurfacing, Lacey Boulevard to Greenfield Avenue This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Campus Drive from Lacey Boulevard to Greenfield Avenue in

the City of Hanford Construction 06/2021 08/2021 15-20 32 14

Hanford Kings 20/21 New Road Maintenance & Rehabilitation

FY 20/21 Pavement Resurfacing Treatment This project will include: Cost Estimating, Preliminary Design, Document Preparation City of Hanford on various local streets Pre-Construction 05/2021 06/2021 5-10 32 14

Lemoore Kings 20/21 New Road Maintenance & Rehabilitation FY 2020-21 Slurry Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Bicycle Lane (New), Document Preparation | Type II Slurry seal, update striping and signing

Multiple Locations - Hanford-Armona Road from Hwy 41 to Fox Street; Hanford-Armona Road from Belinda Drive to the Canal; Silverado Drive from 19 1/2 Avenue to 19th Avenue; 19 1/2 Avenue from Silverado Drive to Bush Avenue

Pre-Construction & Construction

07/2020 12/2020

12/2020 10/2021 8-10 32 14

Clearlake Lake 18/19 Carried Over Safety Dam Road/Dam Road Extension Roundabout Project

This project will include: Environmental Study/Documents, Right of Way, Document Preparation | Installation of a roundabout with multi-lane entries at all intersection approaches with a 10-foot shared use pathway and crosswalk.

Dam Road at Dam Road Extension at the intersection near Walmart.

Pre-Construction & Construction

07/2020 04/2022

04/2021 09/2023 20-25 4 2

Clearlake Lake 18/19 Carried Over Complete Streets Components

Highlands Park Frontage Improvements

This project will include: This project has been designed using RMRA funding in support of the Construction: Frontage/parking lot and pedestrian sidewalk improvements, approximately 515 linear feet. | Project is being completed with City funds.

14335 Lakeshore Drive - Highlands Park Construction 04/2021 08/2021 20-25 4 2

Clearlake Lake 19/20 Carried Over Complete Streets Components Airport Road Improvements This project will include: Pavement Improvement (New), Preliminary Design | Regional

shopping center connector road from 18th Avenue east to west. 18th Avenue at State Road 53 Pre-Construction & Construction

04/2021 04/2022

09/2021 09/2023 20-25 4 2

Clearlake Lake 19/20 Carried Over Road Maintenance & Rehabilitation

San Joaquin Drainage Improvements and Pavement

Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing)

This project is located on San Joaquin Drive, which is located off of Lakeshore Drive in Clearlake. Construction 05/2021 08/2021 15-20 4 2

Clearlake Lake 20/21 New Road Maintenance & Rehabilitation

Modoc St. and 2nd St. Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Modoc St. and 2nd St. Pre-Construction &

Construction 04/2021 04/2021

07/2021 07/2021 20-25 4 2

Lakeport Lake 18/19 Carried Over Road Maintenance & Rehabilitation Second Street Reconstruction This project will include: Reconstruct existing roadway and replace curb, gutter &

sidewalk to meet current ADA standards Second Street between Main Street and Park Street Construction 08/2020 10/2020 8-15 4 2

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 25: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Lakeport Lake 19/20 Carried Over Road Maintenance & Rehabilitation

Miscelleneous roadway maintenance activities

This project will include: Public Works Staffing | Mill and Fill, dig-outs, pot-hole repairs and thin lift overlays

Project boundaries will be Lakeport Blvd. to 20th Street. This area has approximately 52 City maintained Streets within it.

Procurement/Operatio nal Needs 07/2020 06/2021 4-8 4 2

Susanville Lassen 20/21 New Road Maintenance & Rehabilitation SC & SC1 Fog Seal Coats This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing) | Maintenance STIP Project SC & SC1. Fifth, Union, Carroll, Cook, Hill, etc. Construction 05/2021 06/2021 15-20 3 1

Agoura Hills Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020/21 Kanan Road Concrete Approaches Project This project will include: Cost Estimating, Preliminary Design, Document Preparation Kanan Rd (at Thousand Oaks Blvd.) and Kanan Rd. (at

Canwood St.) Pre-Construction 05/2021 06/2021 30-40 50 27

Alhambra Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 RMRA Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation

Various streets in the City of Alhambra Campbell Ave, Elm St., Palm Ave., Norwood Pl., Campbell Ave., Glendon Way, Primrose Ave., Marengo Ave., Alive Ave., Date Ave., Palm Ave., Raymond Ave., Ramona Road., Curtis Ave.

Pre-Construction & Construction

09/2020 03/2021

12/2020 09/2021 10-30 49 22

Arcadia Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Pavement Rehabilitation Program This project will include: Pavement Rehab/Repair (Existing)

Lemon Avenue (from West City Limits to Baldwin Avenue); Lemon Avenue (from El Monte Avenue to Santa Anita Avenue); Camino Real Avenue (from 8th Avenue to 10th Avenue); Arbolada Street (from San Carlos Road to Rancho Road); Wilson Avenue (from Grandview Avenue to Virginia Road)

Construction 06/2021 10/2021 15-20 49 22

Artesia Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Residential Street Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing and striping

Hibbing St., Ely Ave. to Norwalk Blvd.; Meadow Dr., Ely Ave. to Norwalk Blvd.; 181st St., Roseton Ave.; 188th St., Jersey Ave. to Pioneer Blvd.

Construction 09/2020 06/2021 25-30 58 32

Avalon Los Angeles 18/19 In Progress Complete Streets Components

Five Corner Complete Street Project

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Roundabout Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | Reconstruct a 5-way intersection utilizing complete streets concepts by installing two mini roundabouts, new sidewalks, lighting, improved transit facilities and shared bicycle facilities.

Intersection of Tremont, Avalon Canyon, Country Club and Sumner roadways

Pre-Construction & Construction

07/2018 06/2020

06/2020 06/2022 20-30 70 26

Azusa Los Angeles 20/21 New Road Maintenance & Rehabilitation

Residential Roadway Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Project will included Cape and slurry seal treatment

Citywide.Full list of locations are in Resolution No. 2020-C26. Cape seal list begins at number 1. Aspan Ave from Gladstone St. to Paramount St. and ends at 15. Gladstone St from Fairvale Ave to Cerritos Ave. Slurry seal begins at number 1. Gaillard St from Ranger Dr to End and ends at number 7. Grandview Dr. from Enid Ave to End.

Construction 04/2021 07/2021 10-15 48 22

Baldwin Park Los Angeles 20/21 New Road Maintenance & Rehabilitation

Foster Avenue Drainage Improvements

This project will include: Right of Way, Project Scope Development, Preliminary Design | Storm Drain Design and Construction

Foster Avenue Between Metrolink Rail Crossing and Baldwin Park Blvd Pre-Construction 08/2020 12/2021 50-50 48 22

Baldwin Park Los Angeles 20/21 New Complete Streets Components

Maine Avenue and Olive Street Intersection Improvements

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | This project will consist of complete street improvements at the intersection of Maine Ave. and Olive St. The improvements include construction of bulb- outs, catch basin relocations, reconstruction of portions of the street structural section including sub-surface preparation, subgrade and constructing aggregate base and AC pavement sections, construction of sidewalk, construction of accessible ramps and major curb/gutter repairs. The project also includes installation of new traffic signal.

Maine Avenue at Olive Street Construction 09/2020 05/2021 25-25 48 22

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 26: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Baldwin Park Los Angeles 20/21 New Complete Streets Components

Downtown Beautification Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Active Transportation Plan, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | First Mile/Last Mile safety improvements and connections to the City of Baldwin Park Transit Center. Improvements include installation of high-visible crosswalks, accessible curb ramps, bike lanes, traffic signal improvements, wayfinding signage and site furniture.

City of Baldwin Park Downtown Specific Area – Ramona Avenue, Bogart Avenue, Maine Avenue and Downing Avenue

Pre-Construction & Construction

07/2020 03/2021

12/2020 06/2021 20-20 48 22

Bell Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Street Improvements Project FY 19-20

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | For FY 20/21, additional locations have been added to this project under the same contract

Woodlawn Avenue-Gage Ave. to Randolph St.; California Avenue-Gage Ave. to Randolph Pl.; River Drive-Gage Ave frontage road to Florence Ave frontage road; Weik Ave-Bear Ave to Anita Drive

Construction 09/2020 11/2020 15-20 63 33

Bell Gardens Los Angeles 20/21 New Road Maintenance & Rehabilitation

Sidewalks, Curb and Gutter Replacement, Citywide

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Citywide Construction 07/2020 06/2021 10-15 40 33

Bell Gardens Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 20-21 Various Street Improvement Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Priory St- Cul-de-sac to Jaboneria Rd; Purdy Ave-Priory to Live Oak; Pudry Ave-Ludell to Lubec; El Selinda Ave- Florence to Lubec; Adamson Ave-Ludell to Lubec; Colmar Ave-Ludell to Lubec; Live Oak Street-Eastern to Purdy; Ajax Ave-Florence to Lubec

Construction 07/2020 06/2021 10-15 40 33

Bellflower Los Angeles 20/21 New Road Maintenance & Rehabilitation

Resurfacing of Alondra Boulevard from Lakewood Boulevard to

Bellflower Boulevard This project will include: Cost Estimating, Preliminary Design, Document Preparation Alondra Boulevard from Lakewood Boulevard to Bellflower

Boulevard Pre-Construction 04/2021 06/2021 10-15 58 32

Beverly Hills Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Beverly Hills - Road Repair Improvements

This project will include: Pavement Rehab/Repair (Existing) | This project is slated for Design and may be using RMRA funding in support of the Construction. The design and construction related rehabilitation of roadway paving for multiple locations throughout the City that will include the use of recycled rubberized asphalt, whenever feasible. All project details are an estimate and are subject to change throughout the year based on priority need and resources available to the City.

Linden Drive between Whittier Drive and North Santa Monica Blvd; Burton Way (North side) between Rexford Drive and Oakhurst Drive; Rexford Dr. bet. Whitworth & Pico Bl; Crescent Dr bet. Sunset Blvd. and Lexington Rd.; Copley Place near Sunset Blvd.; Linden Drive between S. Santa Monica Blvd and Charleville Blvd.; Rexford Dr. between Olympic Blvd. and Wilshire Blvd.; Almont Dr. between Charleville Blvd. and Olympic Blvd.; Burton Way (South side) between N. Rexford Drive and N. Robertson Blvd.

Construction 01/2021 06/2023 15-20 50 26

Burbank Los Angeles 20/21 New Road Maintenance & Rehabilitation

Street Restoration Zones 9, 10, 11, and 12

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Zones 9, 10, 11, and 12. Please see Exhibit 1 in the FY 20/21 Resolution for the full street listing. Construction 06/2021 09/2021 20-20 43 25

Calabasas Los Angeles 19/20 Carried Over Complete Streets Components Mulholland Hwy Gap Closure

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The improvements on Mulholland Hwy adjacent to the Calabasas High School include sidewalk connecting between the eastern high school driveway on Mulholland Highway and an access road to the high school on Old Topanga Canyon Road. It will also include extending the existing Class II bike facility to Old Topanga Canyon Road. The pedestrian and bicycle facilities will end on Mulholland Highway, in front of Calabasas High School, approximately 770 feet east of the intersection. On Old Topanga

Mulholland Hwy between Old Topanga Cyn Rd and 770 feet east of Old Topanga Cyn Rd and Old Topanga Cyn Rd between Mulholland Hwy and 810 feet north of Mulholland Hwy

Construction 05/2021 12/2021 20-25 45 27

Calabasas Los Angeles 20/21 New Road Maintenance & Rehabilitation

Annual Street Resurfacing Program This project will include: Pavement Rehab/Repair (Existing)

Old Topanga Canyon Rd and various other city streets including but not limited to Malibu Hills Rd, Marigold Ct, Sunflower Ct, Lupine Lane, Ludgate Dr, Meadow Lark Dr

Construction 06/2021 08/2021 10-15 45 27

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 27: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Calabasas Los Angeles 20/21 New Traffic Control Devices Traffic Control Devices -Advanced

Traffic Controllers at traffic signalized intersections

This project will include: Repair and Servicing of Public Works Systems/Databases | Advanced traffic controllers allow the City to preset various green intervals and cycle lengths in response to traffic demand. Replacement of the controllers will occur primarily at the signals on Parkway Calabasas, Lost Hills Rd and Calabasas Rd. These are the major thoroughfares in the City.

Ten Locations - Parkway Calabasas @Park Entrada, @Paseo Primario; Calabasas Rd @ Parkway Calabasas, @Civic Center Way, @Common Ways, @Park Granada; Park Granada @Park Sorrento, @Park Capri; Lost Hills Rd @Agoura Rd, @Canwood St.

Procurement/Operatio nal Needs 06/2021 09/2021 12-16 45 27

Carson Los Angeles 19/20 Carried Over Complete Streets Components 223rd STREET REHABILITATION

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

223rd Street FROM WILMINGTON AVE. to EAST CITY LIMIT -is an East -West Main Arterial street (approx. length 3,650 L.F.) within Maintenance Zone #6 N/O Sepulveda Blvd. at the Eastern/Southern section of the City of Carson

Pre-Construction & Construction

07/2020 11/2020

09/2020 03/2021 15-20 64 35

Carson Los Angeles 20/21 New Complete Streets Components

East Carson Street Rehabilitation from recreation RD. to East city

Limit

This project will include: Cost Estimating, Maintenance Program Plan Development, Preliminary Design, Document Preparation Recreation RD. to East City Limit Pre-Construction 09/2020 12/2020 15-20 64 35

Cerritos Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construct asphalt removals and replacements as needed, and apply a Bituminous Slurry Coat over residential streets. Project will also include the replacement of deficient sidewalks, curbs, gutters and disabled accessible ramps, and thermoplastic striping.

The following streets will be affected: Bahia Drive, Bigelow Street, Brazil Street, Briarwood Street, Dussen Lane, Espinheira Drive, Fiske Lane, Itapetinga Lane, Jeffrey Avenue, Jeffrey Circle, Leal Circle, Madeira Court, Norah Avenue, Sabrina Avenue, Sabrina Court, San Salvador Place, and Vickie Avenue.

Construction 07/2020 08/2020 5-5 58 32

Cerritos Los Angeles 20/21 New Road Maintenance & Rehabilitation

Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construct asphalt removals and replacements as needed, and apply a Bituminous Slurry Coat over residential streets. Project will also include the replacement of deficient sidewalks, curbs, gutters and disabled accessible ramps, thermoplastic striping, and any necessary parkway tree removal and replacement.

The following streets will be affected: Bigelow Street, Cecelia Place, Kay Avenue, Martha Avenue, Owen Way, Pires Avenue, Ridge Crest Lane.

Construction 03/2021 04/2021 5-5 58 32

Cerritos Los Angeles 20/21 New Road Maintenance & Rehabilitation 166th Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface the top 3 inches of asphalt, replacement of deficient sidewalks, curbs, gutters, and disabled accessible ramps, replacement of traffic loops, adjustment of manholes and water valves to grade, thermoplastic striping, and any necessary parkway and median tree removal and replacement.

166th Street from Bloomfield Avenue to Carmenita Road. Construction 08/2020 09/2020 10-10 58 32

Cerritos Los Angeles 20/21 New Road Maintenance & Rehabilitation

Intersection Improvements at Norwalk Boulevard and 166th

Street

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Construct asphalt removals and replacements as needed, and replace traffic loops and traffic striping.

Intersection of Norwalk Boulevard and 166th Street Construction 07/2020 08/2020 7-7 58 32

Claremont Los Angeles 20/21 New Road Maintenance & Rehabilitation

Claremont Boulevard Street Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Project will utilize FY 20/21 RMRA funds on construction in future FY.

Claremont Boulevard from Monte Vista Avenue to Foothill Boulevard. Construction 06/2021 12/2022 10-20 41 25

Commerce Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2020/21 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Landscape Safety Rehab/Repair (Existing) | The project involves removal of AC and PCC pavement, construction of raised median, PCC curb ramps, bus shelters, traffic signal upgrades, install street lights, landscape, irrigation, and striping.

Atlantic Blvd from Washington Blvd to Como St Construction 03/2019 12/2020 15-25 58 32

Commerce Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2020/21 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | The project will provide for the pavement rehabilitation of selected streets throughout the City. The selected streets were based on the recommendations identified within the City's Pavement Management System (PMS).

Sheila St. from West End to East End Construction 03/2020 12/2020 5-15 58 32

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 28: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Commerce Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2020/21 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | The project will provide for the pavement rehabilitation of selected streets throughout the City. The selected streets were based on the recommendations identified within the City's Pavement Management System (PMS).

Gage Ave. from Stauson Ave to Greenwood Ave. Construction 03/2020 12/2020 20-25 58 32

Commerce Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020/21 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | Project will provide for the pavement rehabilitation based on the recommendation identified within the City’s Pavement Management System (PMS).

Slauson Ave from West of Gage Ave to Telegraph Rd Construction 01/2020 12/2020 5-15 58 32

Commerce Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2020/21 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected streets were based on the recommendations identified within the City's Pavement Management System (PMS).

Garfield Ave from Telegraph Rd to S City limit Construction 01/2020 12/2020 15-25 58 32

Commerce Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2020/21 Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | The project will provide for the pavement rehabilitation of selected streets throughout the City. The selected streets were based on the recommendations identified within the City's Pavement Management System (PMS).

Triggs Street from Eastern Ave. to Telegraph/Atlantic Construction 03/2020 12/2020 5-15 58 32

Compton Los Angeles 20/21 New Road Maintenance & Rehabilitation

Annual Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

1. Myrrh Street - Santa Fe Avenue to East City Limits 2. Tajauta Avenue - Rosecrans Avenue to Compton Boulevard 3. Bradfield Avenue - Pixley Street to Compton Boulevard 4. Elva Avenue - Parmelee Avenue to 138th Street 5. Grandee Avenue - El Segundo Boulevard to 138th Street 6. Caldwell Street - Oleander Street to West City Limits 7. Alondra Boulevard - Lime Street to East City Limits

Construction 07/2020 10/2020 10-20 64 35

Compton Los Angeles 20/21 New Road Maintenance & Rehabilitation

Annual Residential Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Slater Avenue; Parmelee Avenue; Oris Street; 135th Street/Stockwell Street; Compton Avenue; Tucker Street; Roscrans Avenue; Palmer Street; Bullis Road; Walnut Street; Walnut Park Drive; Walnut Park Way; Greenleaf Boulevard ;Greenleaf Boulevard; Santa Fe Avenue; Alameda Street West; Alameda Street East; Alondra Boulevard; Bradfield Avenue

Construction 05/2021 06/2026 10-20 64 35

Compton Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Residential Streets Resurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Remove and replace ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic markings, linework. | project is currently in design

Myrrh St - City Limit East to Oleander Ave. Walnut St - City Limit to City Limit. Walnut Park Dr - City Limit to City Limit. Greenleaf Dr - City Limit to Center St. Alondra Blvd - City Limit to City Limit. Bullis Rd - Compton Blvd to City Limit South. Greenleaf Blvd -City Limit East to Alameda St. Alondra Blvd Bridge Deck - City Limit East to Lime Street. Santa Fe Ave - City Limit north to City Limit south

Construction 07/2020 10/2020 10-15 64 35

Compton Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Compton Boulevard Project - East

This project will include: Installation of raised medians and Class II bicycle lanes. Remove and replace locations for ADA ramps, curb gutters, sidewalk; grind/overlay asphalt; replace all traffic markings, linework, traffic loops

Compton Boulevard from Willowbrook Avenue to eastern city limits Construction 03/2021 06/2023 10-20 64 35

Compton Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Compton Boulevard Project - West

This project will include: install bike lanes and lighting along the corridor; enhance pedestrian crossings at 15 intersections. Remove and replace locations for ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic markings, linework, traffic detector loops.

Compton Boulevard from Willowbrook Avenue to western city limits Construction 03/2021 06/2023 10-20 64 35

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 29: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Compton Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Residential Street Rehabilitation This project will include: Remove and replace locations of ADA ramps, curb, gutter,

sidewalk; grind/overlay asphalt; replace all traffic markings, and linework.

Tajuata Avenue- Rosecrans Avenue to Compton Boulevard Elva Avenue- 138th Street to Parmelee Avenue Slater Avenue - 133rd Street to Wilmington Avenue Grandee Avenue - City Limit North to 138th Street Parmelee Avenue - City Limit North to 138th Street Oris Street - Grandee Avenue to City Limit East 135th Street - Parmelee Avenue to Elva Avenue Compton Avenue - 130th Street 134th Place Slater Avenue - 133rd Street to Wilmington Avenue Tucker Street - Crane Avenue to Van Ness Avenue Rosecrans Avenue- City Limit East to Alameda Street Palmer Street - Alameda Street to Bowen Avenue Bullis Road - City Limit North to Compton Boulevard

Construction 03/2021 06/2023 10-15 64 35

Covina Los Angeles 20/21 New Road Maintenance & Rehabilitation

West Badillo Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

West Badillo Street, from Citrus Avenue to Azusa Avenue Construction 07/2020 12/2020 15-15 48 22

Cudahy Los Angeles 20/21 New Road Maintenance & Rehabilitation

Santa Ana Street Improvement Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | construction of concrete medians | The project scope of work consists of the street rehabilitation, which may include one or more of the following items: asphalt concrete restoration (grind & cap and/or surface treatment application such as microsurfacing or slurry seal); construction of concrete medians and pedestrian crosswalks; removal and replacement of damaged sidewalks, driveways, curb & gutters, as well as ADA and traffic safety improvements; and traffic striping.

Santa Ana Street from Atlantic Avenue to Salt Lake Avenue Construction 01/2021 12/2021 10-20 63 33

Culver City Los Angeles 20/21 New Safety La Ballona Elementary School Safe Routes Project

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New), Bicycle Lane (New)

Elenda Street between Washington Boulevard and Culver Boulevard; Venice Bl and Tilden Ave; Venice Bl. and Huron Ave; Venice and Girard Ave; Tilden Ave and Matteson Ave; Huron Ave and Matteson Ave; Prospect Ave and Matteson Ave; College Ave and Matteson Ave; Matteson Ave and Girard Ave; Sepulveda Bl. and Washington Pl; Washington Pl and Bentley Ave; Tilden Ave and Washington Pl; Tilden Ave and Harter Ave; Washington Boulevard and Huron Ave; Washington Bl. and Prospect Ave;

Construction 07/2020 06/2021 20-30 54 30

Diamond Bar Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Arterial Street Rehab (Diamond Bar Blvd from Pathfinder Road to

Mountain Laurel Way)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | As part of the City's ongoing pavement rehabilitation program, the entire width of the major arterial roadway, Diamond Bar Blvd., will be rehabilitated and ADA curb ramp improvements. This project consists of 1.09 center line miles. Pre-Construction is scheduled for March 2020 for one day and construction to follow right after.

Diamond Bar Blvd. between Mountain Laurel Way and Pathfinder Road Construction 07/2020 08/2020 10-20 55 29

Diamond Bar Los Angeles 18/19 In Progress Other Grand Ave/Golden Springs Drive Intersection Enhancement

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | As a result of the widening of the Grand/Golden Springs Drive intersection being performed by the City of Industry, pedestrian hardscape and landscape enhancements associated with crosswalks, sidewalks and parkways are being implemented.

Intersection of Grand Ave. and Golden Springs Drive Construction 07/2019 12/2020 10-20 55 29

Downey Los Angeles 19/20 Carried Over Safety FY 2019/2020 Miscellaneous Concrete Repairs and ADA

Improvements

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Annual miscellaneous concrete construction and repairs of concrete surfaces in Council District 4 and construction of ADA-compliant curb access ramps, drive approaches and sidewalks Citywide.

Northeast Quadrant of the City. Exact locations to be determined and updated in expenditure report. Construction 06/2020 12/2020 20-50 58 32

Downey Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2019/2020 Residential Streets Pavement Rehabilitation

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation of pavement on various residential streets in Council Districts 1 & 2 and replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.

Southeast and Southwest Quadrants of the City. Exact locations to be determined and identified in expenditure report Construction 06/2020 12/2020 15-20 58 32

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 30: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Downey Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation 3rd Street Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation of asphalt pavement on 3rd Street from Old River School Road to Rives Avenue. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.

3rd Street from Old River School Road to Rives Avenue Construction 06/2020 12/2020 15-20 58 32

Downey Los Angeles 19/20 Carried Over Other Lakewood/Rosemead Corridor Study

This project will include: Feasibility Study | Multijurisdictional complete street study of the Lakewood Blvd. - Rosemead corridor within the Gateway Cities sub-region. Study will analyze multiple travel modes (I.e., transit, cycling, walking, vehicles, etc.) and enhancing connectivity among said modes.

Lakewood Blvd from North City Limit to South City Limit Pre-Construction 06/2020 06/2021 30-50 58 32

Downey Los Angeles 19/20 In Progress Safety South Downey Safe Routes to School Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Active Transportation Plan | Construction of sidewalks and curb ramps, signage, replacement of striping, pavement markings, install vehicle speed feedback signs along the project limit and school safety education program | The project was in the design phase during throughout 2017-2019. The project is expected to start construction in July 2020.

Blodgett Ave: Adoree St., Airport Ave., Lankin St., Quoit St., Nada St., Julius St., Pomering Rd. & Laura St.

Pre-Construction & Construction

08/2019 09/2020

06/2020 06/2021 25-50 58 32

Downey Los Angeles 20/21 New Safety FY 2020/2021 Miscellaneous

Concrete Repairs (Council District 1) and ADA Improvements

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) | Annual miscellaneous concrete construction and repairs of concrete surfaces in Council District 1 (Southeast Quadrant) and construction of ADA-compliant curb access ramps, drive approaches and sidewalks citywide.

Council District 1 (Southeast Quadrant). Exact locations to be determined. Construction 01/2021 06/2021 20-50 58 32

Downey Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020/2021 Annual Slurry Seal Program (Council District 1)

This project will include: Pavement Rehab/Repair (Existing) | Slurry Seal of aged asphalt concrete pavement on residential streets in Council District 1 (Southeast Quadrant). The application of slurry seal on aged pavement is an effective means of preserving asphalt pavement surfaces and extending its life an average of 5 to 7 years.

Council District 1 (Southeast Quadrant) of City. Exact locations to be determined. Construction 10/2020 02/2021 5-7 58 32

Downey Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020/2021 Residential Streets Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation of pavement on various residential streets in Council Districts 3 and 4 (Northwest and Northeast Quadrants) and replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.

Council Districts 3 and 4 (Northwest and Northeast Quadrants). Exact locations to be determined. Construction 10/2020 04/2021 15-20 58 32

Downey Los Angeles 20/21 New Road Maintenance & Rehabilitation 3rd Street Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation of asphalt pavement on 3rd Street from Rives Avenue to Paramount Boulevard. The work includes replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.

3rd Street from Rives Avenue to Paramount Boulevard. Construction 10/2020 03/2021 15-20 58 32

Duarte Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 20/21 Street Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing)

FY 20/21 Street Rehabilitation Project 1.Miltonwood Ave. from Royal Oaks Dr. to Chesson St. 2.2nd St. from Highland Ave. to Miltonwood Ave. 3.Chesson St. from Miltonwood Ave. to Bradbourne Ave. 4.Dresden Ave. from Chesson St. to end of street 5.Chimes Ave. from Royal Oaks Dr. to Chesson St. 6.Atlin St. from Chimes Ave. to Bradbourne Ave. 7.Baylor St. from Chimes Ave. to Bradbourne Ave. Bradbourne Ave. from Royal Oaks to end of street

Construction 01/2021 03/2021 20-25 48 25

El Monte Los Angeles 19/20 Carried Over Complete Streets Components

Merced Ave - Garvey Ave to Rio Hondo Parkway Road Diet (Traffic

Calming)

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Bicycle Lane (New), Document Preparation | traffic calming and road diet Merced Ave from Garvey Ave to Rio Hondo Parkway Pre-Construction &

Construction 06/2020 07/2021

06/2021 12/2021 10-20 48, 49 22

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 31: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

El Monte Los Angeles 20/21 New Road Maintenance & Rehabilitation

Slurry Seal/Overlay Project Zone 2 - Lower Azusa Rd, Cedar Ave, City

Limits

This project will include: Pavement Rehab/Repair (Existing) | Roadway slurry seal and AC overlay projects

Area encompassing Lower Azusa Road, Cedar Avenue, and City limits Construction 03/2021 06/2021 10-20 48, 49 22

El Monte Los Angeles 20/21 New Complete Streets Components

Parkway Drive - Denholm to south City limits - Class IV bike lanes

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Bicycle Lane (New), Document Preparation | Traffic calming and bike lanes

Parkway Dr from Denholm to south City limits Pre-Construction & Construction

06/2020 07/2021

06/2021 12/2021 10-20 48, 49 22

El Monte Los Angeles 20/21 New Road Maintenance & Rehabilitation

Baldwin Ave Street Improvement Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Roadway slurry seal, AC overlay, PCC diamond grind project

Baldwin Avenue from I-10 fwy to north City limits Pre-Construction & Construction

06/2020 03/2021

03/2021 06/2021 10-20 48, 49 22

El Segundo Los Angeles 20/21 New Road Maintenance & Rehabilitation

Annual Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Pine Avenue – between Arena St. and Hillcrest St. Construction 04/2021 06/2021 5-10 62 26

Gardena Los Angeles 20/21 New Road Maintenance & Rehabilitation

Local Streets Improvement 2020-2021 This project will include: Pavement Rehab/Repair (Existing) Various Pre-Construction &

Construction 07/2020 11/2021

10/2021 05/2022 5-20 66 35

Glendale Los Angeles 20/21 New Road Maintenance & Rehabilitation

Maintenance District 6 Pavement Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project will provide a wide range of pavement rehabilitation and preventive maintenance on various streets within the City’s Maintenance District 6.

City of Glendale Maintenance District 6 various streets located between Canada Boulevard and Verdugo Mountains, north of Sunshine Drive and south of Country Club drive.

Pre-Construction & Construction

09/2020 06/2021

06/2021 12/2022 5-10 43 25

Glendora Los Angeles 20/21 New Road Maintenance & Rehabilitation

W. Bennett Avenue Street Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Bennett Avenue from Barrance Avenue to Pennsylvania Avenue Construction 01/2021 07/2021 20-30 48 25

Glendora Los Angeles 20/21 New Road Maintenance & Rehabilitation

N. Washington Avenue Street Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Washington Avenue from Bennett Avenue to north cul-de-sac Construction 01/2021 07/2021 15-30 48 25

Glendora Los Angeles 20/21 New Road Maintenance & Rehabilitation

N. Westridge Avenue Street Improvement

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Westridge Ave from Bennett Ave to north cul-de-sac Construction 01/2021 07/2021 15-30 48 25

Hawaiian Gardens Los Angeles 20/21 New Road Maintenance & Rehabilitation

Street Improvement Project - FY 2020-2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | This project will include cold mill existing AC pavement; ARHM overlay; remove and replace damaged curb and gutters, sidewalks, driveway approaches; upgrade curb ramps to ADA; Install high visibility striping, pavement markings, crosswalks.

Horst Ave from Tilbury St to 214th St/ Seine Ave from Civic Center Dr to Carson St/ 224th St from Norwalk Blvd to Belshire Ave/ Devlin Ave from Carson St to Civic Center Dr/ 216th St from Norwalk Blvd to Horst Ave/ Juan Avenue from Carson St to 214th St/ Belshire Ave from 221st St to 224th St/223rd St from Juan Ave to Norwalk Blvd

Construction 07/2020 12/2020 10-15 63 32

Hawthorne Los Angeles 20/21 New Road Maintenance & Rehabilitation

Prairie Ave Improvement Project Phase II

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Document Preparation | This project includes rehabilitation of streets using asphalt rubber hot mix over asphalt concrete leveling course to improve safety and driveability. This will include full depth reconstruction of specific failed areas as well as grinding, excavation and removal of existing pavement, new paving, and traffic striping and marking along Prairie Ave from 118th St to Marine Ave.

Prairie Ave from 118th St to Marine Ave Pre-Construction & Construction

07/2020 10/2020

09/2020 06/2021 10-15 62 35

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 32: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Hawthorne Los Angeles 20/21 New Road Maintenance & Rehabilitation Local Steeet Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Contractor will replace asphalt pavement on streets currently in poor conditions. In addition, city staff will conduct street repair, pothole repair, sidewalk grinding, inspecting, traffic lane painting and signage.

Certain streets in the Northeast, Bodger Park, Burleigh, Del Aire, Holly Glen, Moneta Garden, and Northwest areas of Hawthorne. All locations are located in Exhibit A of Resolution No. 8180.

Construction 07/2020 06/2022 3-3 62 35

Hermosa Beach Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

CIP 186 Street Improvements -Various Locations

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | This project proposes pavement rehabilitation of streets at various locations. The project will also address limited quantities of deteriorated concrete sidewalk, curb and gutter, curb ramps and drainage deficiencies.

24th St from Hermosa Ave to Park Ave Streets in northern Hermosa Beach, west of Valley Dr Prospect Ave from Artesia Blvd to 18th St Streets around Prospect Ave from Artesia Blvd to 18th St

Pre-Construction & Construction

10/2020 01/2021

12/2020 06/2021 10-20 66 26

Hermosa Beach Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

CIP 190 Annual Street Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated portions of sidewalk, curb & gutter and curb ramps.

Montgomery Dr. from Aubrey Park Ct. to Ocean Dr. ; Aubrey Park Ct. from Aviation Blvd to Cul-de-sac; Aubrey Ct. from Aubrey Park Ct. to Cul-de-sac; Ocean Dr. from Aviation Blvd to 14th St.; 11th Place from PCH to Cul-de-sac.; Palm Dr. from 1st St. to 2nd St.; Gould Terrace from Gould Ave. to Cul-de-Sac.; Ardmore from 8th St. to 10th St.; Ardmore from 10th St. to Pier Avenue; 15th Court from Hermosa Ave. to Cu. All locations listed are an estimate and have yet to be finalized.

Pre-Construction & Construction

08/2020 01/2021

12/2020 10/2021 10-20 66 26

Hermosa Beach Los Angeles 19/20 In Progress Safety CIP 173 8th Street Improvements

This project will include: ADA Curb Ramp Installation (New), Cost Estimating, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of improvements that will improve walkability and provide safe pedestrian access on 8th Street from Valley Drive to Hermosa Avenue. Improvements include continuous sidewalk; ADA curb access ramps on 8th Street; drainage improvements; installing crosswalks on both sides of 8th Street at intersections of: Manhattan Avenue, Monterey Blvd, Loma Drive, Cypress Avenue, Bard Street and Valley Drive.

On 8th Street between Valley Drive and Hermosa Avenue. Pre-Construction & Construction

04/2019 08/2019

07/2019 11/2019 15-30 66 26

Hidden Hills Los Angeles 18/19 Carried Over Complete Streets Components

Long Valley Road/Valley Circle/US-101 On-Ramp Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Document Preparation | The improvement and construction of a right turn pocket on Valley Circle Boulevard; an additional traffic lane on the Long Valley Corridor ramp from Valley Circle Boulevard to Long Valley Road Intersection; ADA compliant sidewalk from Long Valley Road security gate in the City of Hidden Hills to the Valley Circle Boulevard/Ventura Boulevard intersection; the purchase and improvement of a parking/staging area on Long Valley Road in the City of Hidden Hills to alleviate traffic congestion; and the reconfiguration of the security gatehouse.

Long Valley Road in between Valley Circle Boulevard, US-101 on-ramp and City of Hidden Hills gatehouse

Pre-Construction & Construction

04/2016 10/2020

09/2020 07/2021 40-50 45 27

Hidden Hills Los Angeles 20/21 New Road Maintenance & Rehabilitation

Round Meadow Road/Mureau Road Entry Intersection

Improvements

This project will include: Renovation to existing landscaping & irrigation, pedestrian and bicycle rest area pathways and furniture at the Round Meadow Road and Mureau Road intersection. Proposed improvements will provide better traffic site distances and will improve and enhance the existing bicycle and pedestrian pathways and rest area. Major portions of the improvements will increase safety by improving site distances and protecting street shoulders and parkways while providing complete street components.

Round Meadow Road and Mureau Road intersection Pre-Construction & Construction

10/2020 01/2021

12/2020 02/2021 15-25 45 27

Huntington Park Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 2019-20 Various Street Improvement Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Albany St-Gage Ave to Laura Ave, Hill St-East City Limits to Salt Lake Ave, Mortimer Ave-West City limits to Santa Fe Ave, Santa Ana St-West City limits to California Ave, Walnut St-State St to Mountain View Ave, Mountain View Ave-Walnut St to Florence Ave

Pre-Construction & Construction

01/2020 08/2020

07/2020 11/2020 10-20 53, 59 33

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 33: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Huntington Park Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 SB 1 Street Enhancement Projects

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design

Miles Ave from 57th St to Florence Ave, Santa Fe Ave from 58th St to Florence Ave, Malabar St from Zoe Ave to Gage Ave, Gentry St from Gage Ave to Clarendon Ave, Otis St from Santa Ana St to Salt Lake Ave, Marbrisa Ave from Florence Ave to Mortimer Ave, Cedar St from Florence Ave to Saturn Ave, Regent St from Gage Ave to Zoe Ave

Pre-Construction & Construction

01/2021 08/2021

07/2021 11/2021 10-20 53, 59 33

Industry Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Arenth Avenue Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | Cold Mill Overlay, driveway approaches, improved hydrology pattern, ADA improvements, striping, streetlights

Arenth Avenue from Puente Road to Nogales Street Construction 05/2020 12/2020 15-25 48, 55, 57 22, 29

Inglewood Los Angeles 20/21 New Road Maintenance & Rehabilitation

Crenshaw Boulevard Improvement Project This project will include: Cost Estimating, Preliminary Design, Document Preparation Crenshaw Boulevard I-105 to Manchester Boulevard Pre-Construction 10/2020 06/2021 10-20 62 35

Inglewood Los Angeles 20/21 New Road Maintenance & Rehabilitation Manchester Boulevard This project will include: Cost Estimating, Preliminary Design, Document Preparation Manchester Boulevard From Aviation Boulevard to Van Ness

Avenue Pre-Construction 07/2020 06/2021 10-20 62 35

Inglewood Los Angeles 20/21 New Road Maintenance & Rehabilitation Aviation Boulevard Improvements This project will include: Cost Estimating, Preliminary Design, Document Preparation Aviation Boulevard from Arbor Vitae to Manchester Boulevard Pre-Construction 07/2020 06/2021 10-20 62 35

Inglewood Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation South Prairie Improvement Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | 1 Mile of Design and Construction of street resurfacing and associated improvements including curb, gutter and sidewalk repairs and curb ramp construction

S. Prairie Ave from Century Blvd to I-105 fwy Construction 02/2020 09/2020 10-20 62 35

Inglewood Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Centinela Avenue Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | 1.5 miles of design of street resurfacing, curb, gutter and sidewalk repairs, ADA ramp upgrades and related activates

Centinela from La Cienega to Florence Construction 07/2020 10/2020 10-20 62 35

Irwindale Los Angeles 20/21 New Road Maintenance & Rehabilitation 2020/2021 Resurfacing Program

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurfacing: 2" grind and overlay of AC pavement, re-striping, structural repairs where needed

Meridian Street, Bateman Avenue, Alpha Street, Los Angeles Street, Peck Road, Myrtle Avenue and portions of Arrow Highway and Live Oak Avenue; in the City of Irwindale.

Construction 11/2020 06/2021 10-15 48 22

La Canada Flintridge Los Angeles 20/21 New Road Maintenance &

Rehabilitation FY 2020-21 Street Resurfacing

Program This project will include: Pavement Rehab/Repair (Existing)

Cross St from Ocean View to Castle Rd, La Granada Way from Foothill Blvd. to Oak Grove, Alcorn Dr from Foothill Blvd. to end, Lone Pine Ln from Lombardy Dr to Lyans Dr, Lombardy Dr from Palm Dr to end, Orchard Ln from Rosebank Dr to Palm Dr, Ravista from Palm Dr to Cul-De-Sac, La Forest Dr from Los Amigos St to North Cul-De-Sac, Castle Knoll Rd from Los Amigos to Cul-De-Sac, Donna Maria Ln From El Vago St. to Cul-De-Sac, Fairlawn Dr from Olive Ln to Cul-De-Sac, Houseman St from Oakwood-Hampton

Construction 11/2020 04/2021 15-20 43 25

La Habra Heights Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

FY 19/20 Street Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing)

Bonita Dr, Cypress St, Darlene Dr, Dorothea Rd, Ganter Rd, Mayapan Rd, Nabal Rd, Popenoe Rd, Rincon Dr, Citrus St, Hiatt St, Kashlan Rd, La Cresta Dr, Nabal Rd, Popenoe Rd, Sierra Vista Dr

Construction 09/2019 07/2020 10-20 57 32

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 34: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

La Habra Heights Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 20/21 Street Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing)

Amate Dr.(Solejar Dr to End), Angola Ave.(West Rd to End), Cancho Dr.(West Rd to End), El Terraza D.(1,335' W/O Le Flore Dr. to Le Flore Dr.), La Riata Dr.(End to West Rd), Solejar Dr.(Vista Del Llano Dr. to Le Flore Dr.), Solejar Dr. (Avocado Crest Rd to Corella Ave), West Rd.(Arbela Dr to Las Palomas Dr), Arbela Dr. (West Rd to City Limit), Calle Juca Rd(West Rd to End), Las Palomas Dr(West Rd to El Cajonita Dr), Vista Del Llano Dr(Solejar Dr to End)

Pre-Construction & Construction

09/2020 05/2021

02/2021 07/2021 6-20 57 32

La Mirada Los Angeles 20/21 New Road Maintenance & Rehabilitation

Residential Street Rehabilitation Phase VI

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Valley View Avenue, Imperial Highway, Milan Creek and Biola Avenue, Imperial Highway, Ocaso Avenue, Foster Road and Calpella Street.

Construction 08/2020 01/2021 20-25 57 32

La Verne Los Angeles 20/21 New Road Maintenance & Rehabilitation

CANYON VIEW ET AL GRIND AND OVERLAY IMPROVEMENT

PROJECT

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New)

Project limits shall be the entire roadway width of Canyon View, Bonner Court, Ashford Drive, Eastglean Drive, Romola Avenue, Brent Court, Cooper Court, La Rue Avenue, Westside Drive, Mildred Street, Rosemary Lane, Foxglen Avenue, Carmen Court, Dogwood Drive, Argo Circle, Blackrock Avenue, Lake Avenue and Coral Way.

Construction 08/2020 10/2020 15-25 41 25

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Del Amo Blvd Rehab This project will include: Overlay with ARHM Del Amo Blvd between Paramount Blvd and Cherry Ave

Del Amo Blvd between Paramount Blvd and Downey Ave Pre-Construction 07/2020 06/2021 12-15 63 32, 33

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Pavement Rehab Phase I This project will include: Project Scope Development | Candlewood St. overlay with

ARMH

Candlewood St between Fidler Ave and 400 feet west of Lakewood Blvd Harvey Way between Bellflower and Woodruff

Pre-Construction 07/2020 06/2021 12-15 63 32, 33

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Harvey Way Rehab This project will include: Project Scope Development | Overlay with ARHM Harvey Way between Bellflower Blvd and Woodruff Ave Pre-Construction 07/2020 06/2021 12-15 63 32, 33

Lakewood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Alley West of Lakewood Blvd Reconstruction

This project will include: Project Scope Development | Remove existing asphalt and base. Reconstruct with new base and Portland Cement Concrete (PCC)

Alley west of Lakewood Blvd between Candlewood St and Hardwick Ave Pre-Construction 07/2020 06/2021 25-30 63 32, 33

Lakewood Los Angeles 20/21 New Road Maintenance & Rehabilitation Sidewalk Repairs This project will include: Procurement of Road Maintenance and Rehab Materials,

Public Works Staffing

Approximately 2,400 documented locations within 22 grid sections in the city, the following is a list of streets of which multiple segments were improved throughout: Andy, Bonfair, Castana, Faculty, Hayter, Oliva, South, Whitewood, Adenmoor, Amos, Ashworth, Autry, Bellflower, Briercrest, Clark, Dunrubin, Eastbrook, Fidler, Lorelei, Pearce, Premiere, Rocket, Allington, Carpintero, Charlwood, Droxford, Edgefield, Fanwood, Faust, Reva, Snowden, Woodruff, Camerino, Candlewood, Clark @ South, Eckelso

Procurement/Operatio nal Needs 01/2021 07/2021 25-50 63 32, 33

Lakewood Los Angeles 20/21 New Road Maintenance & Rehabilitation Street Pavement Maintenance This project will include: Procurement of Road Maintenance and Rehab Materials,

Public Works Staffing Various Locations City-Wide Procurement/Operatio nal Needs 01/2021 07/2021 25-30 63 32, 33

Lakewood Los Angeles 20/21 New Traffic Control Devices Traffic Control This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing Various Locations City-Wide Procurement/Operatio

nal Needs 01/2021 07/2021 10-20 63 32, 33

Lakewood Los Angeles 20/21 New Road Maintenance & Rehabilitation Carson St. ARHM Overlay This project will include: Pavement Rehab/Repair (Existing) 1,300 LF west of Paramount to 3,050 LF east of Paramount Construction 01/2021 06/2021 10-15 63 32, 33

Lancaster Los Angeles 20/21 New Road Maintenance & Rehabilitation

Pedestrian Gap Closure Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design

37 Locations in the City of Lancaster between 25th Street West to 20th Street East and Avenue H to Avenue L Pre-Construction 03/2021 08/2021 10-30 36 21

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 35: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Lancaster Los Angeles 20/21 New Road Maintenance & Rehabilitation

10th Street West and Avenue J Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design

10th Street West from Lancaster Boulevard to Avenue J, Avenue J from 10th Street West to Challenger Way Pre-Construction 05/2021 08/2021 7-30 36 21

Lancaster Los Angeles 20/21 New Safety 2020 Safe Routes to School (SRTS) Pedestrian Improvements

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Avenue H-8 from 10th to 20th Street West, Saigon Avenue from W Avenue H-8 to H-12, Thornwood from West Avenues H-10 to H-11, 15th Street West from West Avenues H-4 to H-6 and H-12 to H-14, Fig Avenue at West Avenues H-4 and H-6, Pennyroyal Street from Desert Calico Drive to West Avenue H-4, Kingtree Avenue from Lancaster Blvd to West Jackman Street, Kettering Street from 15th Street West to Kingtree Avenue, 12th Street West from Lancaster Blvd to Kettering Street, Jackman Street West from 10th

Construction 05/2019 07/2020 7-20 36 21

Lancaster Los Angeles 20/21 New Road Maintenance & Rehabilitation

Lancaster Health District (formerly Medical Main Street)

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design

The project area is bounded by 12th Street West on the east, Avenue J on the north, 20th Street West on the west, and SR-14 and Avenue J-8 on the south.

Pre-Construction 06/2021 02/2022 20-50 36 21

Lancaster Los Angeles 20/21 New Safety 10th Street West Road Diet and Bikeway Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design 10th Street West to Avenue J to Lancaster Boulevard Pre-Construction 07/2020 11/2020 7-10 36 21

Lawndale Los Angeles 20/21 New Road Maintenance & Rehabilitation

Annual SB1-Street Improvement Project FY 20-21

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

161st Street between Inglewood Ave. and Cul De Sac. 167th Street Hawthorne Blvd. to Freeman Avenue Construction 11/2020 02/2021 20-28 62 35

Lomita Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Slurry Seal This project will include: Pavement Rehab/Repair (Existing), Cost Estimating,

Preliminary Design

Streets throughout the northern portion of the City that calls for Cape Seal, Type II Slurry and Slurry Seal. These includes portions of 240th St., 242nd St., 243rd St, 246th St., 246th Pl., 247th St., 248th St, 249th St., 251st St., 252nd St., April Ct., Benhill Ave., Carlene Ln., Comal Ct., Dawn St., Doria Ave., Eleanor Pl, Eshelman Ave, Eshelman Way, Leola St., Olson Ln., Padron Pl., Pennsylvania Ave., Stanhurst, Walnut St., and Woodward Ave.

Pre-Construction & Construction

02/2020 08/2020

07/2020 12/2020 5-20 66 26

Lomita Los Angeles 20/21 New Road Maintenance & Rehabilitation Street Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Zones C (north of 250th St to Lomita Blvd.) and F (NW corner of the City) (streets and portions of streets not included in slurry seal project: 240th, 245th St., 247th St., 248th St., Aldona Dr., Allbrook St., Alliene Ave, Bani Ave., Benhill Ave., Cadiz Dr., Cypress St., Eshelman Ave. cul-de-sac, Hendricks Ave., Lomita Park Pl., Lucille Ave., and Moon Ave.)

Pre-Construction & Construction

07/2020 01/2021

12/2020 08/2021 10-20 66 26

Long Beach Los Angeles 20/21 New Road Maintenance & Rehabilitation

Major Street Rehabilitation for FY21

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Cherry Avenue (Carson to Bixby) Harding Street (Atlantic to Orange) Construction 01/2021 12/2021 10-15 70 33

Long Beach Los Angeles 20/21 New Road Maintenance & Rehabilitation

Residential Street Rehabilitation for FY21

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Cedar Ave (7th to Anaheim), Channel Dr (PCH to 7th), Outer Traffic Circle (PCH to Ximeno), Dawson Ave (14th to 15th), Hill St (Atlantic to Martin Luther King Jr), Myrtle Ave (Market to South)

Construction 10/2020 09/2021 10-15 70 33, 34

Los Angeles Los Angeles 20/21 New Other Board of Public Works Support This project will include: Public Works Staffing | Board of Public Works' staff for the processing of project invoices. 200 N. Spring St, Los Angeles 90012 Procurement/Operatio

nal Needs 07/2020 06/2021 1-1 53 24

Los Angeles Los Angeles 20/21 New Safety 2nd St. Tunnel Tile Removal and Drainage Control

This project will include: Cost Estimating, Project Scope Development, Preliminary Design | Funding will be provided for design of the project. The project will remove the existing tiles and install new drainage to remediate the 2nd street tunnel deficiencies that cause loose and falling ceramic tiles throughout and poses a threat to public safety.

2nd St. Tunnel between Hill St. and Figueroa St., in Council District 14 Pre-Construction 07/2020 06/2021 1-1 53 24

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 36: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles Los Angeles 20/21 New Safety 2nd Street Tunnel Safety Maintenance and Cleaning

This project will include: Maintenance Program Plan Development | Tunnel and roadway safety: The scope of work includes cleaning of the existing tunnel walls (remove graffiti and accumulated grime) and maintain various safety mechanisms and equipment within the tunnel in order to ensure its safe, reliable, and efficient operation. Additionally,

2nd Street between Hill Street and Figueroa Street, in Council District 14 Pre-Construction 07/2020 06/2021 1-5 53 24

Los Angeles Los Angeles 20/21 New Safety 3rd Street Tunnel Safety Maintenance and Cleaning

This project will include: Maintenance Program Plan Development | Tunnel and roadway safety: The scope of work includes cleaning of the existing tunnel walls (remove graffiti and accumulated grime) and maintain various safety mechanisms and equipment within the tunnel in order to ensure its safe, reliable, and efficient operation.

3rd St Tunnel between Hill St and Flower St, in Council District 14 Pre-Construction 07/2020 06/2021 1-5 53 24

Los Angeles Los Angeles 20/21 New Safety Bridge and Tunnel Maintenance Program

This project will include: Maintenance Program Plan Development | Annual on-going program to repair and maintain miscellaneous Citywide bridges and tunnels as identified by the City and Caltrans bridge inspectors. The scope of work may include the repair of concrete sidewalk, curb and gutter, pavement, approach, railing, and general clean up and maintenance of bridges and tunnels.

Citywide - in the Valley, West LA, South LA, East LA and the Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority need and resources throughout the year.

Pre-Construction 07/2020 06/2021 1-5

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Century Blvd and Gramercy Place Storm Drain

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design | Design of a 2400 linear feet of 24-inch diameter storm drain along Century Blvd, from Van Ness Ave and Gramercy Place to alleviate flooding and improve safety of vehicle and pedestrian traffic.

Century Blvd, between Van Ness Ave and Ruthelen Street and in Ruthelen Street and Gramercy Place Pre-Construction 01/2021 05/2022 20-30 62 30

Los Angeles Los Angeles 20/21 New Safety Fletcher Dr. and La Clede Ave. This project will include: This project will install handrails along Fletcher Dr. through the underpass on both sides of the roadway to safely separate pedestrian and vehicular traffic.

Fletcher Dr. and La Clede Ave. underpass, in Council District 13 Construction 07/2020 08/2021 15-30 43 24

Los Angeles Los Angeles 20/21 New Safety Guardrail Construction Program This project will include: Maintenance Program Plan Development | This project will provide guardrails as warranted to enhance the safety of vehicular, cyclist, and pedestrian traffic.

Specific location(s) has(have) yet to be finalized. Location(s) will be selected based upon priority needs and resources throughout the year.

Pre-Construction 07/2020 06/2021 30-50

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Inwood Drive (13375) Bulkhead This project will include: This safety related project installs a new steel pile and concrete lagging bulkhead to restore lateral support and safety to the roadway. 13375 Inwood Drive, Los Angeles 91423, in Council District 4 Construction 01/2021 12/2021 30-50 46 18

Los Angeles Los Angeles 20/21 New Safety La Brea Median Project This project will include: This project will demolish and reconstruct an existing median on La Brea Ave.

La Brea, between Coliseum St and Adams Blvd in Council District 10 Construction 06/2021 06/2022 15-30 54 30

Los Angeles Los Angeles 20/21 New Safety Mannix Dr (8265-8275 and 8230) Bulkhead Replacement

This project will include: This project will remove and replace deteriorating timber bulkheads with new steel pile and concrete lagging bulkheads at two locations to restore lateral support and safety to the roadway.

Mannix Drive e/o Kirkwood Drive, Los Angeles 90046, in Council District 4 Construction 05/2021 12/2021 30-50 50 26

Los Angeles Los Angeles 20/21 New Safety Montana St and Allesandro St.

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Preliminary Design | This project will construct new sidewalk, curb ramps, and retaining walls on the north side of Montana St to safely separate pedestrian and vehicular traffic.

Montana St. and Allesandro St, in Council District 13 Pre-Construction & Construction

12/2020 01/2022

12/2021 11/2022 20-30 51 24

Los Angeles Los Angeles 20/21 New Safety Mulholland Drive (7382) Bulkhead Replacement

This project will include: This project will replace a deteriorating timber bulkhead with a new bulkhead consisting of steel piles and precast concrete lagging to restore lateral support and safety to the roadway.

7382 Mulholland Drive, Los Angeles 90068 Construction 01/2021 12/2021 30-50 46 26

Los Angeles Los Angeles 20/21 New Safety Nordica Drive (930-934) Bulkhead This project will include: This project will construct a steel pile and precast concrete lagging bulkhead to restore lateral support and safety to the roadway. 930-934 Nordica Drive, Los Angeles 90065, in Council District 1 Construction 06/2021 12/2021 30-50 51 24

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 37: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles Los Angeles 20/21 New Safety Oakdell Road (3180) Bulkhead This project will include: This project will construct a new concrete bulkhead to restore lateral support and safety to the roadway and to avoid a collapse of the public right of way onto a private residential property.18

3180 Oakdell Road, Los Angeles, 91604, in Council District 2 Construction 07/2020 04/2021 30-50 46 18

Los Angeles Los Angeles 20/21 New Safety Olympic Blvd and Mateo Street Phase II Street Improvements

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety) | The project will widen an intersection and install ADA compliant curb ramps, traffic signals, street lighting, and striping to improve traffic flow and increases safety.

Intersection of Olympic Boulevard and Mateo Street, in Council District 14 Construction 12/2020 03/2022 20-30 53 24

Los Angeles Los Angeles 20/21 New Safety Pacific View Trail (2849) Retaining Wall Replacement

This project will include: This project will remove and replace a failing timber retaining wall with a new steel beam and concrete lagging debris structure to provide safe passage for pedestrians and vehicles.

2849 Pacific View Trail, Los Angeles 90068, in Council District 4 Construction 06/2021 12/2021 30-50 46 26

Los Angeles Los Angeles 20/21 New Safety Safe Routes to School Street Safety Improvements, Phase I

This project will include: Preliminary Design | Design and install programmatic Phase I improvements culled from the unfunded Safe Routes to School Plans for the Top 50 School with Most Need. Potential treatments may include, but are not limited, to: flashing beacon stop signs, speed humps, pedestrian activated flashing beacons, speed feedback signs, one way street redesign, temporary curb extensions, school valet lanes, and new crosswalks.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

01/2021 07/2021

06/2021 12/2021 1-5

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Safety Related Drainage Projects

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | The project will correct drainage problems in City streets primarily caused by aged and worn gutters, cross-gutters, and curbs. Activities may include slope erosion repair, street reconstruction, installation of asphalt concrete (AC) berm or concrete berm, AC pavement, and any street remedial work to resolve or eliminate street related problems caused by improper drainage or slope sloughage.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 01/2021 12/2021 20-30

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Sepulveda Blvd – 89 St to La Tijera Blvd

This project will include: Storm Drain/Culvert Installation (New), Preliminary Design | This project will construct 550 linear feet of 36-inch diameter storm drain, catch basins, and laterals along Sepulveda from 89th St to Tijera Blvd. This project will alleviate flooding and improve safety of vehicle and pedestrian traffic.

On Sepulveda Blvd from 80th St to Tijera Blvd, in Council District 11

Pre-Construction & Construction

01/2021 06/2022

05/2022 06/2023 20-30 62 26

Los Angeles Los Angeles 20/21 New Safety Sepulveda Blvd (LAX) Tunnel Fire Detection System Upgrade

This project will include: Repair and Servicing of Public Works Systems/Databases | This project will upgrade the Fire Detection System in the Sepulveda Blvd Tunnel to maximize public safety.

Sepulveda Blvd beneath and adjacent to the runways at LAX between the 105 Freeway and Century Blvd (3100 Sepulveda Blvd, Los Angeles, 91436), in Council District 11

Procurement/Operatio nal Needs 07/2020 06/2021 1-5 62 26

Los Angeles Los Angeles 20/21 New Safety Sepulveda Blvd. (LAX) Tunnel Safety Maintenance and Cleaning

This project will include: Maintenance Program Plan Development | This project will maintain various safety mechanisms within the tunnel in order to ensure its safe, reliable, and efficient operation.

Sepulveda Blvd beneath and adjacent to the runways at LAX between the 105 Freeway and Century Blvd (3100 Sepulveda Blvd, Los Angeles, 91436), in Council District 11

Pre-Construction 07/2020 06/2021 1-5 62 26

Los Angeles Los Angeles 20/21 New Safety Sherman Way Tunnel Safety Maintenance and Cleaning

This project will include: Maintenance Program Plan Development | This project will maintain various safety mechanisms within the tunnel in order to ensure its safe, reliable, and efficient operation.

Sherman Way between Woodley Avenue and Havenhurst Avenue (beneath Van Nuys Airport), in Council District 6 Pre-Construction 07/2020 06/2021 1-5 46 18

Los Angeles Los Angeles 20/21 New Safety Sunset Blvd at Allenford Ave Slope Mitigation

This project will include: Procurement of Public Works Safety Materials and Gear | This project will install approximately 200 linear feet of K-rail to protect the roadway and stormdrain from slough, sediment, and debris that causes flooding and to provide safe passage for vehicular traffic.

Sunset Blvd at Allenford Ave, Los Angeles 90049, in Council District 11

Procurement/Operatio nal Needs 01/2021 06/2021 1-5 50 26

Los Angeles Los Angeles 20/21 New Safety Sunset Blvd Phase 2 and 3 -

Coronado Terrace to Waterloo St, Class 3 Remedial Slope Mitigation

This project will include: Preliminary Design | This project will fund the design of a shotcrete and soil nail wall to mitigate the over-steepened slope and to eliminate continuing erosion that creates unsafe conditions on the sidewalk and curbside traffic lane.

Sunset Blvd betw Coronado Terrace and Waterloo St, Los Angeles, 90026 Pre-Construction 01/2021 12/2021 1-5 50 26

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 38: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles Los Angeles 20/21 New Safety Valley Blvd (3900 East) Remedial Slope Mitigation

This project will include: Procurement of Public Works Safety Materials and Gear | The project will installs K-rail with wire mesh fencing against the slope, including near street lights, to restore the width of the sidewalk for pedestrian safety due to erosion of the adjacent slope.

3900 East Valley Blvd., Los Angeles 90033, in Council District 1 Procurement/Operatio nal Needs 04/2021 12/2021 1-5 51 24

Los Angeles Los Angeles 20/21 New Road Maintenance & Rehabilitation Ventura Canyon and Strathern Ave

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project will reconstruct Strathern Street, including roadway, sidewalk, new streetlights, trees, and landscape elements.

7960 Ventura Canyon Ave: Strathern Street between Ventura Canyon Ave and 280ft west of Greenbush Ave

Pre-Construction & Construction

01/2021 01/2022

12/2021 12/2022 20-30 46 18

Los Angeles Los Angeles 20/21 New Safety Victory and Encino Intersection

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design | This project will increase safety by repairing an unsafe dip in the roadway which can cause vehicles at high speed to become airborne and installing a traffic beacon.

Victory Blvd and Encino Ave, in Council District 6 Pre-Construction & Construction

01/2021 01/2022

12/2021 01/2023 20-30 46 27

Los Angeles Los Angeles 20/21 New Safety Woodlawn Ave. Triangle Median Safety Improvements

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Supplemental project funding for curb extensions, curb ramps, sidewalks, continental crosswalks, landscaping, and additional traffic control devices including a solar-powered Rectangular Rapid Flash Beacon (RRFB) along Woodlawn Ave and Maple Ave.

In vicinity of y-intersection of Woodlawn and Maple Avenues, in Council District 9 Construction 01/2021 08/2021 20-30 59 30

Los Angeles Los Angeles 20/21 New Safety Olympic Blvd. - Lake St. to Western Ave. CIP/STP

This project will include: Preliminary Design | Funding is provided for design of the project. The project will replace the existing high voltage series street lighting system to a low voltage system to improve safety.

Olympic Blvd. from Lake St. to Western Ave. Pre-Construction 01/2021 12/2021 15-20 53 24

Los Angeles Los Angeles 20/21 New Safety Wilshire Blvd. - Grand Ave. to Hoover St. STM/STP

This project will include: Preliminary Design | Funding is provided for design of the project. The project will replace the existing high voltage series street lighting system to a low voltage system to improve safety.

Olympic Blvd. from Lake St. to Western Ave., in Council Districts 1, 10, 14 Pre-Construction 01/2021 12/2021 15-20 53 30

Los Angeles Los Angeles 20/21 New Road Maintenance & Rehabilitation Concrete Streets

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | The project will repair failed concrete streets throughout the City.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 01/2021 06/2021 35-40

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Road Maintenance & Rehabilitation Failed Street Reconstruction

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | The project will repair the most severely damaged streets throughout the City.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 01/2021 06/2021 20-40

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Sidewalk Repair Contractual Services

This project will include: Public Works Staffing | Procurement of contractors to perform sidewalk repair activities and improvements as needed. Locations will be selected based on priority need.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 20-30

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Sidewalk Repair Engineering Consulting Services

This project will include: Procurement of Public Works Systems/Databases, Public Works Staffing | Procurement of as-needed engineering consulting services to provide design services on sidewalk repair.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 1-5

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Sidewalk Repair Incentive Program

This project will include: Maintenance Program Plan Development | The funding will allow the City to leverage sidewalk repair costs by sharing costs with property owners. This helps to safely separate vehicular and pedestrian traffic in compliance with the ADA.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction 07/2020 06/2021 20-30

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 39: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles Los Angeles 20/21 New Safety Vision Zero Corridor Projects

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design | The project will provide for street safety projects along Vision Zero High Injury Network (HIN) corridors, including speed feedback sign installation and maintenance and pedestrian refuge island implementation as needed.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 5-10

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Vision Zero Traffic Signal This project will include: Procurement of Public Works Equipment | Procurement of materials to install safety improvements at various traffic signal locations Citywide, especially along Vision Zero High Injury Network (HIN) corridors.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 5-10

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Vision Zero Traffic Signal Support: Bureau of Street Lighting

This project will include: Public Works Staffing | Public Works-Street Lighting staff for traffic signal design work and street lighting elements of the Complete Streets and Vision Zero Programs.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Project locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 1-1 53 30

Los Angeles Los Angeles 20/21 New Road Maintenance & Rehabilitation Pavement Preservation Program

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | This Program includes activities such as resurfacing, slurry sealing, and asphalt repairs to prevent deterioration in the overall condition of the City street system.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 5-30

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Road Maintenance & Rehabilitation Cool Slurry

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | The funding will allow the application of Cool Slurry treatments to prevent further deterioration of the roadway.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 5-20

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Los Angeles Los Angeles 20/21 New Safety Erosion Control

This project will include: Procurement of Public Works Safety Materials and Gear | Funding is provided for emergency erosion control mitigation measures to protect streets and the public right-of-way from critical damage and/or closure as a result of the impact of fire and flood damage, as needed.

Citywide - in the Valley, West LA, South LA, East LA, and Central City. Specific locations have yet to be finalized. Locations will be selected based upon priority needs and resources throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 1-5

29, 38, 43, 45, 46, 50, 51, 53, 54, 59, 62, 64,

66, 70

18, 24, 25, 26, 27, 30, 33, 35

Lynwood Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Wright Road Street Improvement

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation of street pavement. Removal and reconstruction of PCC concrete driveway, PCC sidewalk, PCC curb ramp, and 6" PCC curb and gutter. Includes traffic striping and markings, adjustment of manhole cover to grade, etc. | Design and Pre-Construction during FY18 to FY20. Construction anticipated to start in FY20.

Design delayed because of complex drainage issue.

Wright Road from Fernwood Avenue to Duncan Avenue. Pre-Construction & Construction

07/2018 11/2020

08/2020 06/2021 20-30 63 33

Lynwood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Gertrude Drive, Stoneacre Avenue, Virginia Avenue Street

Improvement (Continued Project) This project will include: Pavement Rehab/Repair (Existing)

Gertrude Drive from cul-de-sac to Woodlawn Avenue; Gertrude Drive from Agnes Avenue to Magnolia Avenue, Stoneacre Avenue from Olanda Street to McMillan Street; and Virginia Avenue from Cortland Street to Fernwood Avenue

Pre-Construction & Construction

07/2019 01/2020

12/2019 12/2021 20-30 63 33

Lynwood Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation

Duncan Avenue, Edgebrook Avenue, Elmwood Avenue,

Fernwood Avenue, Harris Avenue and Lavinia Avenue Street

Improvement

This project will include: Pavement Rehab/Repair (Existing)

Duncan Avenue from Clark Street to Lavinia Avenue, Edgebrook Avenue from Rayborn Street to Clark Street, Elmwood Avenue from Atlantic Avenue to Duncan Avenue, Fernwood Avenue from Vieta Avenue to Wright Road, Harris Avenue from Walnut Avenue to Platt Avenue, and Lavinia Avenue from Thorson Avenue to Harris Avenue.

Pre-Construction & Construction

03/2020 05/2020

04/2020 12/2020 20-30 63 33

Malibu Los Angeles 20/21 New Road Maintenance & Rehabilitation Annual Street Maintenance This project will include: Cost Estimating, Project Scope Development, Preliminary

Design, Document Preparation

Maintenance to be performed on the following streets: Malibu Crest Dr, Harbor Vista Dr, Malibu Knolls Rd, De Ville Way, Vantage Point Terrace, John Tyler Dr, Laurel Ridge Dr, Bayberry Ln, Skyline View Dr, Blue Dane Ln, Plover Way, Malibu Country Dr, Colony View Cir, Coast View Dr, Carbon Mesa Rd

Pre-Construction 09/2020 11/2020 10-20 50 27

Manhattan Beach Los Angeles 20/21 New Road Maintenance & Rehabilitation

Street Resurfacing Project - Cycle 2

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

27th Street from Laurel Avenue - Pacific Avenue; Flournoy Road from Ardmore Avenue - 19th Street; Flournoy Roadfrom Valley Drive – 33rd Street; Agnes Road from 29th Street - Marine Avenue; Marine Avenue from Blanche Road – Valley Drive

Construction 02/2021 06/2021 15-29 66 26

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 40: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Maywood Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Pavement Rehabilitation Project FY 2019-20

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

57th St ,58th St, Alamo Ave, Atlantic Blvd, Fruitland Ave, Palm Ave, Fruitland Ave, Randolph St, Slauson Ave, 52nd Pl, 53rd St, 55th St, 56th St, 60th St, Everett Ave, Heliotrope Circle, Pine Ave, Walker Ave

Construction 04/2020 08/2020 10-20 63 33

Maywood Los Angeles 20/21 New Road Maintenance & Rehabilitation

Slurry Seal Project FY 2019/2020 on Various Streets

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety)

52nd Pl, 52nd St, 53rd St, 55th St, 56th St, 57th St, 58th St, 60th St, Everett Ave, Heliotrope Cir, Pine Ave, Randolph St, Walker Ave

Construction 09/2020 12/2020 5-10 63 33

Monrovia Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Huntington Drive Phase II Project

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Huntington Drive Phase II is a pavement rehabilitation and traffic signal improvement project funded through STPL Funds. This specific expense is for the City's share of inspection and project management costs. Total Project Estimate is $2,000,000

The project location is Huntington Drive between Magnolia Ave. and Shamrock Ave. Pre-Construction 09/2020 06/2021 5-15 41 25

Monrovia Los Angeles 19/20 Carried Over Safety HSIP Project - Huntington/5th

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The Highway Safety Improvement Program (HSIP) is a project that aims at adding additional traffic signals, roadway striping, and traffic signage to enhance pedestrian safety. This specific expense is for the City's share of inspection and project management costs. Project estimate is $750,000.

The project impacts three identified intersections within the City: (1) Foothill/California; (2) Foothill/Sunset; and (3) Huntington/5th.

Pre-Construction 09/2020 06/2021 5-25 41 25

Monrovia Los Angeles 19/20 Carried Over Safety Bradoaks/Santa Fe - Safe Routes to School (SRTS)

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Pedestrian improvements adjacent to two schools within the City. The project includes installation of new signage, raised crosswalks, and new striping.

Lemon Avenue adjacent to Bradoaks Elementary School and El Norte/Peck Road adjacent to Santa Fe Middle School. Pre-Construction 09/2020 06/2021 5-10 41 25

Monrovia Los Angeles 20/21 New Road Maintenance & Rehabilitation

Mountain Avenue Road Resurfacing Project

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This project involves conducting an asphalt overlay on Mountain Avenue to rehabilitate the roadway surface and extend the useful life of the road.

Mountain Avenue from Foothill Boulevard to Duarte Road Pre-Construction 09/2020 03/2021 5-15 41 25

Monrovia Los Angeles 20/21 New Road Maintenance & Rehabilitation

Monrovia Renewal North East Phase

This project will include: Pavement Rehab/Repair (Existing) | This project involves a number of road maintenance activities, ranging from slurry seal, micro surfacing, and asphalt overlay to rehabilitate and preserve the roadway network throughout the Northeast section of the City.

Roadways in the area of the City bound by Myrtle Ave to the West, City Limit to the East, Greystone/Hillcrest to the North, and Colorado/Royal Oaks to the South

Construction 07/2020 11/2020 5-15 41 25

Montebello Los Angeles 18/19 In Progress Complete Streets Components Montebello Blvd ATP Project

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The City will conduct the preliminary engineering, design, construction management and inspection services for Montebello Blvd ATP Project (Lincoln to Paramount) which will include dedicated bike lanes and pedestrian improvements (sidewalks, crosswalks and lighting), pavement repairs, new drought-tolerant landscaped median and trees that will allow for storm water capturing, bus stop improvements, and many other complete and green street features.

The project is located in northerly Montebello. Montebello Blvd is a major arterial street. Montebello Blvd from Lincoln Ave to Paramount Blvd.

Construction 10/2017 06/2020 15-20 58 32

Montebello Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Beach Street (Street Improvements)

This project will include: Preliminary Design | Preliminary engineering/design, construction management, inspection services related to this street improvement project (street pavement, sidewalks, etc).; Construction and repairs of deteriorated asphalt pavement, damaged concrete (sidewalks, driveways, ADA ramps, curb & gutter, pavement markings, signage, traffic signal improvements, parkway trees, etc.

Beach Street from 3rd Street to Vail Avenue (City of Montebello); Beach Street from 3rd Street to Vail Avenue (City of Montebello)

Pre-Construction 07/2019 08/2020 10-20 58 32

Montebello Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Beach Street (Street Improvements)

This project will include: Preliminary engineering/design, construction management, inspection services related to this street improvement project (street pavement, sidewalks, etc).; Construction and repairs of deteriorated asphalt pavement, damaged concrete (sidewalks, driveways, ADA ramps, curb & gutter, pavement markings, signage, traffic signal improvements, parkway trees, etc.

Beach Street from 3rd Street to Vail Avenue (City of Montebello); Beach Street from 3rd Street to Vail Avenue (City of Montebello)

Construction 09/2020 06/2021 10-20 58 32

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 41: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Montebello Los Angeles 20/21 New Road Maintenance & Rehabilitation Vail Street Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project includes: pavement resurfacing, repairs to sidewalks, curb & gutter, ADA ramp installations; traffic signal loop repairs, tree planting, storm drain improvements, pavement striping, etc.

Vail Avenue from Washington Blvd. to Mines Avenue. Pre-Construction & Construction

09/2020 01/2021

12/2020 06/2021 15-20 38 32

Monterey Park Los Angeles 20/21 New Road Maintenance & Rehabilitation Various Street Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Various streets in the Southeast City quadrant as listed in the City Council approved SB 1 Project List Resolution (Res. No. 12150) and recommended in the City's Pavement Management Program

Construction 03/2021 09/2021 15-20 49 22

Norwalk Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation

City Project No. 7920 Local Streets Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Gutter drainage survey, drawings, specifications

Residential streets southeast of Cerritos College, bounded by Alondra Blvd to the north, 166th St to the south, Alora Ave to the west, and Horst Ave to the east.

Pre-Construction & Construction

04/2019 04/2021

07/2020 06/2021 10-15 58 32

Palmdale Los Angeles 20/21 New Traffic Control Devices Rancho Vista Boulevard and Division Street Traffic Signal

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Preliminary Design, Document Preparation

Intersection at Rancho Vista Boulevard and Division Street Pre-Construction & Construction

08/2020 04/2021

12/2020 12/2021 5-25 36 21

Palmdale Los Angeles 20/21 New Road Maintenance & Rehabilitation

2020-2021 Overlay and Grinding Pavement Resurfacing Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Resolution 2020-047 shows the project locations along 25th West from P-12 to Rancho Vista Blvd; Avenue S @ 47th East; 30th Street West O-12 to Rancho Vista Blvd. ) We would like to extend the 25th West from P-12 to Elizabeth Lake Road. This section will be paid for by gas tax.

25th Street West from Rancho Vista Blvd to Elizabeth Lake Road; Avenue S @ 47th East; 30th Street West O-12 to Rancho Vista Blvd; Palmdale, CA

Pre-Construction & Construction

09/2020 01/2021

12/2020 05/2021 5-10 36 21

Palos Verdes Estates Los Angeles 20/21 New Road Maintenance &

Rehabilitation Via Campesina Street Improvements Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | construction of curb and gutter and AC Berm Via Campesina between Via La Cuesta and Paseo Del Campo. Construction 01/2021 03/2021 10-20 66 26

Paramount Los Angeles 20/21 New Road Maintenance & Rehabilitation

Neighborhood Street Resurfacing -FY 2020-2021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

1st St from Indiana Ave to end of cul-de-sac; 2nd St from Paramount Blvd to Downey Ave; Century Blvd from Ruther Ave to Barlin Ave; Colorado Ave from Rose Ave to end of cul-de-sac; Howe St from Paramount Blvd Arthur Ave; Pearle St from Paramount Blvd to Arthur Ave; Orange Ave from Rosecrans Ave to end of cul-de-sac

Construction 04/2021 06/2021 20-20 63 33

Pasadena Los Angeles 20/21 New Road Maintenance & Rehabilitation

Annual Citywide Street Resurfacing and ADA

Improvement Program - FY 2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

various locations (six miles) Pre-Construction & Construction

07/2020 04/2021

12/2020 07/2021 15-15 41 25

Pico Rivera Los Angeles 20/21 New Road Maintenance & Rehabilitation Whittier Boulevard Overlay Project

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Along Whittier Boulevard, from Paramount Boulevard to East City Limits

Pre-Construction & Construction

07/2020 12/2020

11/2020 06/2021 10-20 58 32

Pico Rivera Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Procurement/Operational Needs for Annual Road Resurfacing Work

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Systems/Databases, Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment

Citywide Procurement/Operatio nal Needs 07/2020 06/2021 1-10 58 32

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 42: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Pico Rivera Los Angeles 20/21 New Road Maintenance & Rehabilitation

Rosemead Boulevard (North of Whittier Boulevard) Overlay

Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Bicycle Lane Rehab/Repair (Existing), Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design

Rosemead Boulevard, north of Whittier Boulevard to north city limit

Pre-Construction & Construction

09/2020 01/2021

12/2020 06/2021 10-20 58 32

Pomona Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Landscape Median Maintenance This project will include: Public Works Staffing | Provide for landscape maintenance to

medians and tree wells to increase visibility for motorist and the safety of pedestrians. Garey Avenue from Aliso Street to Foothill Boulevard Procurement/Operatio nal Needs 07/2020 06/2021 1-1 52 20

Pomona Los Angeles 19/20 Carried Over Traffic Control Devices Traffic Signal and Street Light -Asset Managment System

This project will include: Public Works Staffing | Secure consultant to provide inventory to feed into Work Order System. Inventory compilation of all city-owned lights, traffic signals, street signs and posts to integrate into a Geographic Information System.

Citywide Procurement/Operatio nal Needs 12/2020 06/2021 1-10 52 20

Pomona Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Street Maintenance On-Call Street and Sidewalk Repair

This project will include: Contracted Asphalt and Concrete Repair Services to supplement existing field crews and provide asphalt repairs to include potholes, patchwork repairs where broken asphalt and other areas require service and repair on an as-needed basis. Typical locations for repair services consist of residential and arterial roadways. This will also supplement services for repairs to sidewalks, curbs and gutters. | Construction of new median expanding an existing median as a safety improvement to prevent vehicular crossing of an unsafe intersection.

Towne Avenue and Pasadena Street Construction 07/2020 06/2021 1-10 52 20

Pomona Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Street Preservation-Local Citywide (FY20-21) Project No. 428-XXXXX

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Street Preservation of local streets Citywide, according to pavement management program, focused primary on slurry seals, cape seals, and thin overlays. Carry Over from FY 17/18.

Laurel Ave, Erie St, Currier St, Arthur Av, Gilbert St, W. Orange Av, Arroyo Av, Saed St, Densmore St, Edgehill Dr, Baywood Av, Cantara St, Chelsea Dr, San Bern Av, Baldwin Av, Ross St, Sheridan Av, Belfort Av, Delany st, Lincoln Av, Deerbrook St, Brookside Ln, Elm Brook Ln, Fulton Rd, Dawn View Av, W Grove St, Old Settl Ln, Preciado St, Hacienda Pl, Preciado Pl, White Av, Alameda, McKinley Av

Pre-Construction & Construction

07/2020 09/2020

09/2020 06/2021 2-12 52 20

Rancho Palos Verdes Los Angeles 19/20 In Progress Road Maintenance &

Rehabilitation Hawthorne Boulevard Median

Beautification Project

This project will include: Cost Estimating, Project Scope Development, Preliminary Design | The project will remove colored asphalt and replace median with drought-tolerant landscaping, with curb and gutter repairs

Hawthorne Boulevard - Crest Road to Palos Verdes Drive West (PVDW)

Pre-Construction & Construction

01/2019 05/2020

04/2020 06/2021 18-22 66 26

Redondo Beach Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation

Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

The Residential Resurfacing Project is citywide but these funds will be used to resurface the residential streets south of 190th Street in the City.

Construction 01/2020 09/2020 15-25 66 26

Redondo Beach Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation

Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The Residential Street Rehabilitation Project will resurface residential streets in Redondo Beach.

The project is citywide but these funds will be used to resurface the residential streets north of 190th Street in the City. Construction 03/2020 09/2020 15-25 66 26

Redondo Beach Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

Manhattan Beach Boulevard Resurfacing - Aviation Boulevard

to Inglewood Avenue

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This section of Manhattan Beach Boulevard is approximately 1 mile long with a roadway width of 100 feet. This section is classified as a major arterial, carries approximately 38,000 vehicles daily, and includes a transit route between Aviation Boulevard and Redondo Beach Avenue.

Manhattan Beach Boulevard runs east-west and is located in north Redondo Beach. The project limits are Aviation Boulevard on the west and Inglewood Avenue on the east.

Pre-Construction & Construction

07/2020 03/2021

02/2021 09/2021 20-30 66 26

Rolling Hills Estates Los Angeles 20/21 New Road Maintenance &

Rehabilitation 2020-21 Resurfacing Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Palos Verdes Drive North between Palos Verdes Drive East and East City Limits including including pedestrian walk path on north side of Palos Verdes Drive North ;

Highridge Rd between Armaga Spring Road and North City Limits and ADA Ramps on Moccasin Lane crosswalk

Construction 07/2020 08/2020 15-25 66 26

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 43: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Rosemead Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Walnut Grove Resurfacing Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The Project consists in ARHM pavement overlay, sidewalk replacement, striping, curb ramp installation, tree planting and appurtenances.

From Northerly City Limit to Valley Boulevard. Construction 07/2020 12/2020 30-40 49 22

Rosemead Los Angeles 20/21 New Traffic Control Devices Maintenance of Traffic Control Signs, Stripings, and Markings

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment | The project involves the maintenance of City-owned traffic control signs, striping, and markings to be performed by City Maintenance staff.

City-wide. Phase I of the project will maintenance Garvey Avenue East to West to the southerly City limit. Phase II of the project will maintenance north of Garvey Avenue East to West to the northerly City limit.

Procurement/Operatio nal Needs 07/2020 06/2021 2-5 49 22

San Dimas Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Lone Hill Ave (Cienega to Covina Blvd)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Project will use Full Depth Reclamation technology up to 15" deep and overlay asphalt concrete . Repair and reconstruction of work will include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and sidewalk panels, and striping.

Lone Hill Ave (Cienega to Covina Blvd) Construction 04/2021 06/2021 20-30 41 25

San Dimas Los Angeles 18/19 Forecasted Road Maintenance & Rehabilitation Eaton Road Et Al Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation, resurfacing and restoration of existing street. The repair work will also include upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping.

Southwest corner of Arrow Hwy and Lone Hill Construction 04/2022 06/2022 15-20 41 25

San Dimas Los Angeles 18/19 Forecasted Road Maintenance & Rehabilitation Bonita Ave Corridor

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate existing street by use of Full Depth Reclamation technology up to 15" deep and overlay asphalt concrete base and cap. Will also include upgrade/replacement of ADA accessible ramps, minor curbs, gutter, sidewalk panels and striping. Project will include grind and overlay of short adjacent cul-de-sac.

Bonita Ave from San Dimas Ave to eastern City Limits Construction 04/2023 06/2023 15-20 41 25

San Dimas Los Angeles 18/19 Forecasted Road Maintenance & Rehabilitation Arrow Highway Rehab

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation, resurfacing and restoration of existing street. The repair work will also include upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping.

Arrow Highway, City Limit to City Limit Construction 04/2024 06/2024 15-20 41 25

San Dimas Los Angeles 18/19 Forecasted Road Maintenance & Rehabilitation Gladstone Street (East of Amelia)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation, resurfacing, and restoration of existing street. The repair work will also include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and sidewalk panels, and striping.

Gladstone Street (East of Amelia) Construction 04/2025 06/2025 15-20 41 25

San Fernando Los Angeles 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Annual Street Resurfacing Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Repairs will also be made to drive approaches and curb and gutter.

Project is made up of the following six locations: •Workman Street between Second Street and Fourth Street •Fermoore Street between Alley n/o First Street and Fourth Street •N Huntington Street between First Street and Fourth Street •Orange Grove Ave between First Street And Second Street •Meyer Street between Fourth Street and Fifth Street •Macneil Street between Fourth Street and Morningside Court

Pre-Construction & Construction

08/2020 02/2021

01/2021 06/2021 10-20 39 18

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 44: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Gabriel Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation 2019-20 Street Paving Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Lafayette Street (Grand to Fairview) ; California Street (Grand to Chestnut); Pine Street (Mission Road to Chestnut); Palm Avenue (Valley to Wells) ; Leslie Drive (Milton to the Alley); Adelyn Drive (N. Doyle to Rosemont) ; Duane Avenue (W. Sycamore to Roses) ; Franklin Avenue (Las Tunas Dr. to Sycamore Dr.); Daroca Avenue (Leslie Drive to Longden Drive); E. Leslie Drive (San Gabriel Boulevard to Del Loma Avenue); Country Club Drive (Las Tunas Drive to Roses Road); West side of Duane Avenue

Pre-Construction & Construction

10/2019 09/2021

01/2020 11/2021 10-15 49 22

San Marino Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Huntington Drive Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing) | Huntington Drive Street Rehabilitation; Deep mill & fill with spot reconstruction Huntington Drive, San Marino, CA 91108 Construction 02/2021 06/2021 20-20 49 25

San Marino Los Angeles 20/21 New Road Maintenance & Rehabilitation Local Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Crack sealing, slurry sealing and reconstruction of local streets and roads in the Locations area.

Rose Avenue from the city limits to San Gabriel Boulevard. Warwick and Windsor Roads. Del Mar Boulevard from the city limits to Lorain Road.

Construction 01/2021 06/2021 20-20 49 25

Santa Clarita Los Angeles 20/21 New Road Maintenance & Rehabilitation

2020-2021 Overlay & Slurry Seal Program

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The annual Overlay & Slurry Seal Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention.

Copper Hill Drive from Newhall Ranch Road to Smyth Drive, McBean Parkway from 5 fwy to Singing Hills Drive, Soledad Canyon Road from Ruether Avenue to Langside Avenue, Magic Mountain Parkway from Railroad Avenue to Tourney Road, and Valencia Blvd from Magic Mountain Pkwy to Citrus Street

Pre-Construction & Construction

12/2020 07/2021

06/2021 11/2021 3-15 38 21, 27

Santa Clarita Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation

2019-2020 Overlay and Slurry Seal Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The annual Overlay & Slurry Seal Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention.

Plum Canyon Road, Railroad Avenue, Lost Canyon Road, and Soledad Canyon Road

Pre-Construction & Construction

11/2019 07/2020

06/2020 11/2020 3-15 38 21, 27

Santa Fe Springs Los Angeles 20/21 New Road Maintenance & Rehabilitation

Los Nietos Road Street Improvements (Pioneer Boulevard

to Painter Avenue)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Los Nietos Road Street Improvements (Pioneer Boulevard to Painter Avenue) Construction 10/2020 01/2021 15-20 57 32

Santa Monica Los Angeles 20/21 New Road Maintenance & Rehabilitation

Annual Paving & Sidewalk Repair Program (SP2592)

This project will include: Project Scope Development, Maintenance Program Plan Development Citywide Pre-Construction 10/2020 10/2021 20-27 50 26

Sierra Madre Los Angeles 20/21 New Road Maintenance & Rehabilitation

2020-21 Street Rehibilitation Project

This project will include: Pavement Rehab/Repair (Existing) | Locations listed will have Chip Seal or Grind and Cap performed.

Acacia St.; Foothill to Valle Vista; Valle Vista; Acacia-Acacia; Santa Anita Ct.; Oak Meadow – Mt. Trail; Oak Meadow Cul-de-sac; South Canon Cul-de-sac

Construction 02/2021 05/2021 10-20 41 27

Signal Hill Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation SB-1 RMRA 2019/20 This project will include: Pavement Rehab/Repair (Existing) | Repair City Streets

"Myrtle Avenue (1/2 Street"; "Lewis Avenue; "; Lemon Avenue; Cerritos; "; "Lemon Ave; Brayton Ave ;Gundry Avenue; "Falcon Avenue; "; "Walnut Avenue; 33rd St "; "32nd St.; "29th St.; W. City Limits To Olive Avenue; "; "Columbia St"; Paterson; Walton St;"Vernon St; "25th St.; W. City Limits To California Avenue; "; "Lewis Avenue ; "23rd St; "Dawson Avenue; Willow To 28th St.; " 21st St.; "Alliance St.; "Burnett St.;"; "Creston Avenue; Jesse Nelson cir; Gaviota Ave; Crescent St; 20th St.

Construction 09/2020 06/2021 8-12 70 33

Signal Hill Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Spring Street Overlay Carryover This project will include: Restore paved road surfaces to add structural capacity, riding

comfort and skid resistance which add to the road's safety. Spring Street Pre-Construction & Construction

09/2020 07/2021

03/2021 06/2022 25-30 70 33

South El Monte Los Angeles 20/21 New Road Maintenance & Rehabilitation

Fern St (from 300 ft west of Seaman Ave to Continental Ave) This project will include: Procurement of Road Maintenance and Rehab Materials City of South El Monte Procurement/Operatio

nal Needs 10/2020 02/2021 10-20 57 22

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 45: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

South El Monte Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Lashbrook Ave. This project will include: Procurement of Road Maintenance and Rehab Materials | AC

deep Coldmill and overlay (4") and install new striping

Strozier Avenue (Lerma Road to Rush Street and Klingerman Street to north City limits). Lashbrook Avenue (Garvey Avenue to south terminus of Lashbrook Avenue, and Garvey Avenue to north City limits)

Procurement/Operatio nal Needs 09/2020 08/2021 10-15 49, 57 22

South Gate Los Angeles 20/21 New Other Citywide Sidewalk Improvements Project Phase VII This project will include: Preliminary Design The project will address locations City wide, within boundaries. Pre-Construction 10/2020 07/2021 30-30 63 33

South Gate Los Angeles 20/21 New Complete Streets Components Alameda Street Complete Streets

This project will include: Sidewalk and/or Crosswalk Installation (New), Preliminary Design | The project will add sidewalk to the east side of Alameda in order to improve student safety when traveling to school.

Alameda Street, from Tweedy Boulevard ad Seminole Avenue Pre-Construction & Construction

07/2020 10/2020

09/2020 07/2021 10-30 63 33

South Gate Los Angeles 20/21 New Road Maintenance & Rehabilitation

Citywide Residential Resurfacing Program Phase II

This project will include: Pavement Rehab/Repair (Existing), Project Scope Development, Maintenance Program Plan Development | Citywide residential street rehabilitation and improvements to extend the life of aging roadway pavement

Citywide, within boundaries Pre-Construction & Construction

06/2020 03/2021

02/2021 03/2022 5-10 63 33

South Gate Los Angeles 18/19 Carried Over Complete Streets Components

Garfield Avenue and Imperial Highway Street Rehabilitaition

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation of pavement, reconstruction of damaged curb and gutter, drive approaches, sidewalks, on Garfield Avenue from Jefferson Avenue to South City Limits.

Garfield Avenue from Jefferson Avenue to South City Limits. Construction 09/2020 09/2021 30-30 63 33

South Pasadena Los Angeles 20/21 New Road Maintenance & Rehabilitation

2020-21 FY South Pasadena Street Improvement Project List

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Pine Street, Maple Street, Mill Road, Oneonta Knoll Street, Milan Avenue, Edgewood Drive, Mission Street, Glendon Way, Arroyo Verde Road

Construction 08/2020 12/2021 15-17 41 25

Temple City Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation Street Resurfacing Phase 5A

This project will include: Pavement Rehab/Repair (Existing), Project Scope Development, Maintenance Program Plan Development | Resurfacing of about three miles of collector and local streets with methods appropriate for the pavement condition

Alessandro Ave.;Golden West Ave.;Kauffman Ave. from Garibaldi Ave. to Longden Ave.;Lemon Ave. (N/S) Livia Ave. from Longden Ave. to Woolley St.;Longden Ave. from Oak Ave. to Eastern City Limit;Noel Dr.;Primrose Ave. from Garibaldi Ave. to Flaherty St.;Rowland Ave. from Flaherty St. to Wendon Ave.;Trelawny Ave. from South End to Lemon Ave.;Workman Ave. from Oak Ave. to Cloverly Ave.

Pre-Construction & Construction

06/2020 10/2020

09/2020 06/2021 5-20 49 22

Temple City Los Angeles 19/20 Carried Over Road Maintenance & Rehabilitation Las Tunas Drive Resurfacing This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing) Las Tunas Drive from western City boundary at Muscatel Avenue to eastern City boundary east of Rowland Avenue Construction 10/2020 06/2021 10-20 49 22

Temple City Los Angeles 20/21 New Road Maintenance & Rehabilitation Street Resurfacing Phase 6A This project will include: Pavement Rehab/Repair (Existing), Active Transportation

Plan, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Various residential streets according to 2020 updated pavement management plan. Streets can be found on the City website: http://www.ci.temple-city.ca.us/972/Public-Works-Infrastructure Pavement

Pre-Construction & Construction

06/2020 10/2020

09/2020 06/2021 5-20 49 22

Vernon Los Angeles 20/21 New Safety Sign Replacement Program This project will include: Procurement of Public Works Equipment

Section 7 of the Sign Replacement Program. Downey Road on the West side, Bonnie Beach Place on the east side, Washington Boulevard on the North and Exchange Avenue on the South. The streets included within those limits are: Portion of Washington Boulevard, 26th Street, Bandini Boulevard, Portion of Downey Road and Indiana Avenue.

Procurement/Operatio nal Needs 07/2020 06/2021 10-15 53 33

Walnut Los Angeles 20/21 New Road Maintenance & Rehabilitation Slurry Seal Area 1

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Valley Blvd, Lemon Ave, La Puente Rd, and Westerly City Limits Pre-Construction & Construction

01/2021 02/2021

02/2021 07/2021 5-7 55 29

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 46: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

West Covina Los Angeles 20/21 New Road Maintenance & Rehabilitation

Residential Streets Rehabilitation (FY 20/21)

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Various residential streets as identified on City's Pavement Management Program for FY 20/21 Residential Street Rehabilitation Improvements. The street segments are listed on the approved resolution as Exhibit A. List begins at Cambridge Ct and ends at Wolsey Ln.

Pre-Construction & Construction

08/2020 03/2021

12/2020 08/2021 10-10 48, 55 22, 29

West Covina Los Angeles 20/21 New Road Maintenance & Rehabilitation

Azusa Avenue AC Roadway Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Azusa Avenue between Vine Avenue to North City Limit Pre-Construction & Construction

08/2020 03/2021

12/2020 08/2021 10-15 48, 55 22, 29

West Hollywood Los Angeles 20/21 New Road Maintenance & Rehabilitation Annual Paving Project FY 20-21 This project will include: Pavement Rehab/Repair (Existing)

Flores St between Fountain Ave and Santa Monica Blvd Kings Rd between Fountain Ave and Santa Monica Blvd Olive Dr between Fountain Ave and Santa Monica Blvd La Cienega Blvd between Holloway Dr and Santa Monica Blvd Holloway Dr between La Cienega Blvd and Santa Monica Blvd Hacienda St between Fountain Ave and Santa Monica Blvd West Knoll Dr Between Hancock Ave and Westmount Dr Westbourne Dr Between West Knoll Dr and Santa Monica Blvd Hancock Ave between Santa Monica Blvd and Holloway Dr

Construction 09/2020 12/2020 15-20 50 26

Westlake Village Los Angeles 20/21 New Road Maintenance & Rehabilitation

Lindero Canyon Road Overlay -TOB to N City Limit This project will include: Pavement Rehab/Repair (Existing) Lindero Canyon Road from Thousand Oaks Blvd. to North City

Limit Construction 04/2021 06/2021 20-20 44 27

Whittier Los Angeles 20/21 New Road Maintenance & Rehabilitation Colima Road Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

Colima Road within the City of Whittier from Lambert Road to Mar Vista Street.

Pre-Construction & Construction

07/2020 01/2021

12/2020 01/2022 10-25 57 32

Chowchilla Madera 20/21 New Road Maintenance & Rehabilitation

Humboldt Storm Drainage and Street Reconstruction Project This project will include: Storm Drain/Culvert Installation (New) Humboldt Ave from 3rd St to 5th St Construction 06/2021 09/2021 25-25 5 12

Madera Madera 20/21 New Road Maintenance & Rehabilitation RMRA Seals/Overlays 2020/21

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

Colombard Dr from Pecan to Gary Lane Colombard from Gary Lane to Madrid Seneca Dr from Pecan to Gary Lane Seneca Dr from Gary Lane to Madrid Concord from Helena to Gary Lane Helena from Monterey to Seneca Drive Madrid from Monterey to Colombard Drive Concord from Pecan to End Oakridge Drive from Almond to Quady Lane Quady Lane to Cosentino and Goosecross

Pre-Construction & Construction

10/2020 05/2021

03/2021 07/2021 3-15 5 12

Belvedere Marin 20/21 New Road Maintenance & Rehabilitation 2020 Pavement Rehab Project This project will include: Pavement Rehab/Repair (Existing) Bella Vista Avenue (Oak Ave to Toyon Ave), Cove Road (Beach

Rd to Lagoon Rd), Belvedere Ave (Belvedere Way to Pine Ave) Construction 07/2020 06/2021 5-7 10 2

Corte Madera Marin 20/21 New Road Maintenance & Rehabilitation Tamal Vista Complete Streets

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Grind and Overlay of Tamal Vista Bl and improve/consolidate pedestrian crossings, add bike lanes, create ADA bus stops, sidewalks, curb cuts/ramps | Construction phase

Tamal Vista Blvd between Madera Blvd and Fifer Ave Construction 06/2020 12/2020 15-20 10 2

Corte Madera Marin 19/20 Carried Over Road Maintenance & Rehabilitation 2020 Road Sealant Project This project will include: Pavement Rehab/Repair (Existing)

Various roads in Corte Madera including but not limited to San Clemente Dr., Redwood Hwy., Madera Del Presidio Blvd., and Koch Rd.

Construction 08/2020 12/2020 5-10 10 2

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 47: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Corte Madera Marin 20/21 New Road Maintenance & Rehabilitation 2021 Road Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Flying Cloud Course, Pacific Queen Passage, Echo Dr, Yolo St, Harbor Dr, Edgemar Way, Channel Dr, Baha Ct, Meadow Ridge Dr, Ridge Ct

Construction 06/2021 12/2021 15-20 10 2

Corte Madera Marin 20/21 New Complete Streets Components

Casa Buena Complete Streets Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Casa Buena Drive Construction 08/2020 12/2020 15-20 10 2

Fairfax Marin 19/20 Carried Over Safety Parkade Pedestrian Improvements

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Provide matching funds for ADA improvements in Parkade parking lot in downtown.

Parkade parking lot between Sir Francis Drake Blvd. and Broadway in downtown Construction 02/2019 09/2019 15-25 10 2

Fairfax Marin 19/20 In Progress Safety Sidewalk replacement in downtown This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) various locations on Bolinas Rd and Broadway in downtown Construction 06/2018 12/2020 20-30 10 2

Fairfax Marin 19/20 Carried Over Road Maintenance & Rehabilitation Scenic Road Repavement

This project will include: Pavement Rehab/Repair (Existing) | We have completed repave of Scenic Rd between Shapiro and Bay; we completed the repaving of the upper scenic from Scenic/Ridge to 1,000 linear ft north on Upper Scenic

Scenic Rd between Shapiro Ln and Bay Rd. between Tamalpais to Upper Scenic Construction 07/2018 12/2019 15-25 10 2

Fairfax Marin 19/20 In Progress Road Maintenance & Rehabilitation

Canyon Rd Stablization and Reconstruction

This project will include: Environmental Study/Documents, Preliminary Design | retaining wall to support road; obtaining federal agency permitting portion of road at appox. 145 Canyon Pre-Construction 07/2019 06/2021 20-30 10 2

Larkspur Marin 20/21 New Road Maintenance & Rehabilitation

Measure B Group 3 Pavement Rehabliitation This project will include: Pavement Rehab/Repair (Existing)

Doherty Drive; College Court; Bayo Vista Avenue; Briar Road; College Avenue; Estelle Avenue; Hillcrest Avenue; Magnolia Avenue; Post Street; East Ward Street; Rice Lane; Barry Way; Corte Encanto;Corte Ortega; Corte Solano; Del Monte; Drakes Landing Road; Lower Via Casitas; Upper Via Casitas; Via Belardo; Via Casitas

Construction 06/2021 09/2021 15-20 10 2

Mill Valley Marin 20/21 New Road Maintenance & Rehabilitation 2020 Streets Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

East Blithedale, Ashford Ave, Sycamore Ave, Eton Way, Forrest Ave, Hill Street, Corte Madera Ave, West Blithedale, and Cottage Ave

Construction 06/2020 09/2020 7-30 10 2

Novato Marin 19/20 In Progress Road Maintenance & Rehabilitation

MTC Pavement Management Phase IV

This project will include: Citywide pavement condition assessment, rehabilitation project determination, and reporting All city owned/maintained streets Procurement/Operatio

nal Needs 07/2017 06/2022 4-4 10 2

Novato Marin 19/20 In Progress Complete Streets Components

19-009 Novato Blvd at San Marin-Sutro Intersection Improvements

This project will include: Environmental Study/Documents, Project Scope Development, Feasibility Study, Document Preparation | Consider intersection improvements to mitigate traffic operations deficiencies and provide continuous pedestrian and bicycle facilities to and through the intersection

Intersection of Novato Blvd. and San Marin Drive and Sutro Avenue Pre-Construction 07/2019 06/2022 15-40 10 2

Novato Marin 19/20 In Progress Road Maintenance & Rehabilitation

Measure A Group 11 (2019 Annual Paving Project)

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design | Pavement preservation, maintenance and rehabilitation. Exact locations TBD pending pavement condition assessment Pre-Construction 07/2019 12/2020 10-20 10 2

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 48: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Novato Marin 19/20 In Progress Complete Streets Components

Traffic, Bicycle, & Ped Improvements FY 14/15-18/19

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | Enhance safety, provide equal access, and reduce congestion as issues are identified

All city streets & sidewalks Pre-Construction & Construction

07/2014 01/2021

12/2020 12/2021 10-20 10 2

Novato Marin 19/20 In Progress Traffic Control Devices Traffic Signal Upgrade Program This project will include: Traffic signal equipment replacement and timing/phasing modifications to improve efficiency. All City-owned traffic signals (32 total) at various locations Procurement/Operatio

nal Needs 07/2019 06/2021 5-20 10 2

Novato Marin 19/20 In Progress Road Maintenance & Rehabilitation

Olive Phase III (Redwood to Railroad)

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Enhance safety of the RR crossing, pavement rehabilitation, replace failing drainage facilities

Olive Ave. between Redwood Blvd. and Railroad Ave. Pre-Construction 01/2017 12/2021 15-30 10 2

Novato Marin 19/20 In Progress Road Maintenance & Rehabilitation Grant Ave. Bridge Rehabilitation

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Bridge Structure Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Right of Way, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Right of Way Acquisition, Pavement Rehab/Repair (Existing), Preliminary Design, Bicycle Lane (New) | Bridge widening/rehabilitation, construct bicycle lanes, enhance crosswalks, and pavement maintenance/rehabilitation.

Grant Ave. between 8th St. and Virginia Ave. Pre-Construction & Construction

07/2009 01/2021

06/2020 12/2022 20-30 10 2

Novato Marin 20/21 New Other EV Charging Stations - City Hall This project will include: Install EV Charging Infrastructure in Public Parking Lot at City Hall 922 Machin Avenue, Novato, CA 94954 Construction 07/2020 12/2020 5-10 10 2

Ross Marin 19/20 Carried Over Road Maintenance & Rehabilitation

Bolinas Avenue Pavement Rehab Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Full Depth Reclamation of existing street Bolinas Avenue from Sir Francis Drake to Glenwood Construction 07/2020 10/2020 15-25 10 2

Ross Marin 20/21 New Road Maintenance & Rehabilitation Thomas Court grind and 2" overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Thomas Court from Lagunitas Rd. to End. Construction 07/2020 08/2020 15-20 10 2

Ross Marin 20/21 New Road Maintenance & Rehabilitation Slurry Seal Program: Shady Lane This project will include: Pavement Rehab/Repair (Existing) Shady Lane from Bolinas Ave to Ross Creek bridge Construction 07/2020 08/2020 3-5 10 2

San Anselmo Marin 19/20 Carried Over Road Maintenance & Rehabilitation

Bolinas Avenue Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

Bolinas Avenue between San Anselmo Avenue and Waverly Road Construction 07/2020 09/2021 15-20 10 2

San Rafael Marin 20/21 New Road Maintenance & Rehabilitation Bungalow Avenue Resurfacing

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Bungalow Ave, San Rafael CA. Bungalow Avenue from Woodland Avenue and Picnic Avenue. Construction 08/2020 11/2020 15-20 10 2

San Rafael Marin 18/19 Carried Over Road Maintenance & Rehabilitation Smith Ranch Road Resurfacing

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurfacing, grind, and overlay of new asphalt on Smith Ranch Road in the area underneath the freeway and short stretch of Smith Ranch Road east and west. While the roadway directly under Highway 101 is Caltrans jurisdiction, per the agreement in place, the City is responsible for the maintenance of Smith Ranch road.

Lucas Valley/Smith Ranch Roads from Los Gamos Dr on the west to Redwood Highway on the east, including the roadway under Highway 101.

Construction 08/2020 11/2020 5-20 10 2

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 49: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Rafael Marin 20/21 New Road Maintenance & Rehabilitation Francisco Blvd East Resurfacing

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Document Preparation

Francisco Blvd East from Vivian Street to Grand Avenue Pre-Construction & Construction

06/2020 06/2021

05/2021 07/2021 15-20 10 2

Sausalito Marin 18/19 Carried Over Road Maintenance & Rehabilitation

2021 Streets Resurfacing Project (17/18 Carryover)

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Remove exiting concrete surfacing and replace with new asphalt surface. AC overlay with attendant grinding and base repair. Elimination of exposed road base material material from entering the bay during wet weather. Six new curb ramps. Elimination of potential trip hazards, drainage improvements and repair of sanitary sewer main and laterals as may be required. | Project consists of the previously individually proposed Locust St., Excelsior Ln., Easterby St., and Girard Ave. projects first listed in FY 2017-18

Excelsior Ln, between Bulkley Ave. and Steps to Bridgeway Easterby St. between Bridgeway/Filbert and Pearl St. Locust St. between Bridgeway and the bay Girard Ave. between Johnson St. and Turney St.

Construction 06/2021 10/2021 10-20 10 2

Tiburon Marin 19/20 Carried Over Road Maintenance & Rehabilitation

2020 Various Streets Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | Pavement Rehabilitation and Maintenance construction

Town of Tiburon Roads List: Barn Road, Corte Las Casas, Indian Rock Court, Karen Way, Steward Drive, Steward Drive, Baccharis Place, Benton Court, Blackfield Drive, Buckwheat Court, Corte Palos Verdes, Rancho Drive, Turtle Rock Court, Via Capistrano, Vista Tiburon

Construction 06/2020 09/2020 15-25 10 2

Tiburon Marin 20/21 New Road Maintenance & Rehabilitation

2022 Pavement Maintenance and Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing) | Pavement Rehabilitation and Maintenance Construction.

Roads List: Avenida Mira Flores,Bartel Ct,Blackfield,Bond Ln,Cibrian,Cecilia Wy,Centro East,Circle Dr,Claire Wy,Corte San Fernando,Cypcress Hollow,Greenwood Beach,Harbor Oak,Harriet Wy,Hilary,Howard Dr,Leland Wy,Lyford, Mar East,Marinero Cir,Meadowhill,Monterey Dr,Mount Tiburon Ct,Pamela Ct,Paseo Mirasol,Rancho Dr, Reserva Ln,Santa Ana Ct,San Rafael,Solano St, Stewart,St Gabrial Ct,Stony Hill Rd,Sugarloaf Dr,Tyler Rd,Venado Dr,Via Capistrano,Via Los Altos,Vistazo East, Via Paraiso,Warrent Ct

Construction 06/2021 09/2021 15-20 10 2

Tiburon Marin 18/19 Carried Over Road Maintenance & Rehabilitation

Hawthorne Undergrounding Road Resurfacing

This project will include: Restoration of streets following the undergrounding of overhead utilities.

Town of Tiburon, CA, Hawthorne Drive from East End to Rock Hill Hawthorne Drive from Wend End to Rock Hill Rock Hill from Tiburon Blvd to Del Mar Rock Hill from Del Mar to Cul De Sac

Construction 06/2020 08/2020 15-25 10 2

Fort Bragg Mendocino 18/19 Carried Over Traffic Control Devices Crosswalk and Street Marking

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Centerline, fog line, bicycle lane, and crosswalk markings provide cost-effective roadway guidance that helps reduce crashes and supplement other traffic control devices such as sign and signals. The city’s existing pavement markings need replacing in many locations; these will be replaced by thermoplastic and raised pavement markers. This year nine streets have been identified for such work. The street striping project will replace all white and yellow line markings, decals, raised markers, and word pavement markings on approximately 3.5 miles of streets. The selected streets include arterials, collectors, and safe routes to school. The standards for the application of markings and delineation are set forth in the California Manual on Uniform Traffic Control Devices (MUTCD). The unfunded balance for this project will be covered with local street sales tax dollars.

Chestnut Street, East Oak Street, East Pine Street, Redwood Avenue, Manzanita Street, North Franklin Street, South Harold Street, South Lincoln Street, and Willow Street

Construction 08/2020 12/2020 3-4 2 2

Fort Bragg Mendocino 20/21 New Road Maintenance & Rehabilitation

Street and Alley Pavement Maintenance

This project will include: Procurement of Road Maintenance and Rehab Materials, Repair and Servicing of Public Works Equipment | When small localized areas of pavement are found to be in poor condition they are treated with small scale pavement repair. Small scale pavement repair must be done in a timely fashion; as potholes grow and allow water intrusion which leads to more large scale deterioration of the pavement. Surface patching and crack sealing are the two primary intermediary actions taken to conserve the existing conditions of pavement. Pothole patching is the most common local technique, done by milling a portion of the pavement to a depth that removes all deteriorated material and then the pothole is filled with asphalt and compacted. The goal of this project is to prevent the local/residential streets and alleys with low PCI’s from deteriorating into an un-usable state as these street categories often go unselected for full treatment due to the algorithm used to by the Pavement Management Program. | No Additional Information

City Wide Procurement/Operatio nal Needs 07/2020 06/2021 2-10 2 2

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 50: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fort Bragg Mendocino 20/21 New Road Maintenance & Rehabilitation

Sub-Surface Storm Drain Repairs Operation and Procurement

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment | Procurement of RMRA Eligible Public Works Equipment, Stormdrain Maintenance and Rehab Materials, and Public Works Staffing to perform sub-surface drainage facilities and repair overlying pavement. The goal of this project is to repair structural damage caused by storms or failures or damaged drainage facilities including curb and gutter, valley gutters, pipes, inlets, and outlets, which convey stormwater off and away from the roadways. | No Additional Information

City wide Procurement/Operatio nal Needs 07/2020 06/2021 10-30 2 2

Point Arena Mendocino 20/21 New Road Maintenance & Rehabilitation

Riverside Drive & Center Street Renovation This project will include: Procurement of Public Works Systems/Databases In Point Arena, on Riverside Drive and Center Streets Procurement/Operatio

nal Needs 09/2020 12/2020 10-15 2 2

Ukiah Mendocino 20/21 New Road Maintenance & Rehabilitation 2020-21 Pavement Reconstruction This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) North Sate Street from Mill Street to Henry Street Construction 07/2020 06/2021 20-20 2 2

Willits Mendocino 19/20 Carried Over Road Maintenance & Rehabilitation Annual Striping Program This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Various local streets throughout the City. Most streets in our city of 2.8 square miles are on a four-year rotation, with approximately 20-22 miles of paved roadway in total. All project locations are within 1.5 miles of Lat 39.400528, Lon -123.349698.

Construction 07/2020 10/2020 2-4 2 2

Willits Mendocino 18/19 Carried Over Road Maintenance & Rehabilitation

Creekside Drive Stabilization Project

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Through this project we will repair drainage structures, regrade the roadway, replace approximately 80' of curb, gutter, and asphalt. | Project carried forward from previous year.

Creekside Drive, between Boscabell and South Lenore Streets Construction 04/2021 06/2021 10-15 2 2

Atwater Merced 19/20 Carried Over Road Maintenance & Rehabilitation City Wide Pavement Maintenance

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety)

The area within the City Limits, north of State Route 99, west of Shaffer Road, south of Fruitland Ave, all inclusive, together with the area north of Juniper Ave, west of Rancho del Rey Drive, south of Terri Drive, and east of Mary Lane, all inclusive. All locations listed are an estimate and have yet to be finalized.

Construction 08/2020 08/2021 10-15 21 12

Atwater Merced 18/19 Carried Over Traffic Control Devices Traffic Light Installation (Atwater/First)

This project will include: The City of Atwater will install a traffic light at Atwater Blvd and First St to provide safe controls for drivers and pedestrians Atwater Blvd and First Street Construction 07/2020 06/2021 15-30 21 12

Atwater Merced 20/21 New Road Maintenance & Rehabilitation Broadway Seal and Stripe Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Paving and/or Striping Installation (New Safety) | Seal and Striping Broadway & Broadway/Third Street Construction 07/2020 06/2021 8-10 21 12

Atwater Merced 20/21 New Match Funds Pedestrian Improvements 1 This project will include: Environmental Study/Documents, Cost Estimating, Sidewalk and/or Crosswalk Installation (New), Preliminary Design | Will also include construction of curb & Gutter

Grove Avenue, Fir Avenue, Elm Avenue, Drakeley Avenue, Cedar Avenue, Broadway Avenue, Sixth Street & Seventh Street

Pre-Construction & Construction

08/2020 08/2021

06/2021 06/2022 20-25 21 12

Atwater Merced 18/19 Carried Over Other Active Transportation Plan

This project will include: Active Transportation Plan | The Active Transportation Plan will slowly adapt current transportation infrastructure to encourage the use of public transportation, bicycle paths and walking through the development of new mass transit options, protected bicycle lanes, and improved sidewalks.

Bell Dr., Olive Ave., Applegate Rd., N Winton Way., Bellevue Rd., East Bellevue Rd., Juniper Ave., East Juniper Ave., First St., Shaffer Rd., Ave One, Ave Two, N Buhach Rd., Santa Fe Dr., Green Sands Ave. and Gertrude Ave. All locations have yet to be finalized and are subject to change.

Pre-Construction 09/2020 09/2021 20-30 21 12

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 51: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Atwater Merced 18/19 Carried Over Complete Streets Components

Fruitland Avenue Road Improvement

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Roundabout Rehab/Repair (Existing), Roundabout Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Fruitland Avenue will undergo a long-term pavement upgrade with new traffic circles to encourage the flow of traffic while reducing emissions and increasing pedestrian safety.

Fruitland Avenue between Orchard Park and Shaffer Road Construction 07/2021 08/2021 20-30 21 12

Dos Palos Merced 19/20 Carried Over Road Maintenance & Rehabilitation

Center Avenue North in the City of Dos Palos

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehab Streets, Sidewalks, Replace Storm Drainage, Create Bike Path & Pedestrian Walkway, Improve Safety at 7 Intersections, link to parks, multimodal transit center, senior center.

In the City of Dos Palos: Center Avenue between Marguerite Street and Loraine Street; Loraine Street between Center Avenue and Dos Palos Avenue.

Construction 11/2019 12/2020 30-40 21 12

Gustine Merced 18/19 In Progress Complete Streets Components Greenacres Project This project will include: Eliminate high curbs and install ADA-compliant ramps. Sidewalks and public street near the entrance of mobile-home

located in the 1400 block of Meredith Avenue. Construction 05/2019 12/2020 10-20 21 12

Livingston Merced 18/19 Forecasted Road Maintenance & Rehabilitation Stefani Avenue Rehabilitation This project will include: Preliminary Design, Document Preparation | Reconstruction

of the roadway structural section. In the City of Livingston between Davis Street and Campbell Boulevard. Pre-Construction 08/2023 12/2023 10-20 21 12

Livingston Merced 18/19 Forecasted Road Maintenance & Rehabilitation Stefani Avenue Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New) | Reconstruction of the roadway structural section.

In the City of Livingston between Davis Street and Campbell Boulevard. Construction 01/2024 08/2024 10-20 21 12

Livingston Merced 19/20 Carried Over Road Maintenance & Rehabilitation Winton Parkway Rehabilitation This project will include: Pavement Rehab/Repair (Existing) In the City of Livingston between Joseph Gallo Drive and State

Route 99 Construction 08/2020 08/2021 10-20 21 12

Livingston Merced 19/20 Carried Over Road Maintenance & Rehabilitation Hammatt Avenue Rehabilitation This project will include: Pavement Rehab/Repair (Existing) In the City of Livingston between Campbell Boulevard and State

Route 99 Construction 08/2020 08/2021 10-20 21 12

Los Banos Merced 20/21 New Road Maintenance & Rehabilitation Crack Seal This project will include: Pavement Rehab/Repair (Existing)

Vineyards, Snowgoose, Skylark, College Greens, Ranchwood, and City Center areas of the city. Please refer to Attachment A in Resolution No. 6193 for a full list of streets.

Construction 07/2020 06/2021 5-7 21 12

Los Banos Merced 20/21 New Road Maintenance & Rehabilitation Hot Mix Overlays This project will include: Pavement Rehab/Repair (Existing)

Overland Ave from Mercey Springs Rd to Fairmont Dr. Miller Lane from Pacheco Blvd to San Luis St. Second St from West I St to H St. F St from Seventh St to Mercey Springs Rd.

Construction 07/2020 11/2020 10-20 21 12

Merced Merced 20/21 New Safety FY 20-21 Sidewalk Remove & Replace Projects This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Various locations: Loughborough Area (Denver, Juneau, Austin); E 11th St, E 13th St, D St; Parsons Ave; Main St (O St Side); Kernland, Nancy, Stevens Ct, Shamrock; Shadowbrook and Bear Creek

Pre-Construction & Construction

09/2020 11/2020

10/2020 06/2021 10-20 21 12

Merced Merced 20/21 New Safety FY 20-21 Curb & Gutter Remove & Replace Projects This project will include: Curb and gutter replacement project. Various Locations: Loughborough Area (Austin, SW Corner); SE

Corner of Childs and Parsons; 1900 Block Shadowbrook Drive Pre-Construction &

Construction 09/2020 11/2020

10/2020 06/2021 10-20 21 12

Merced Merced 19/20 Carried Over Road Maintenance & Rehabilitation Crack Filling Projects This project will include: Pavement Rehab/Repair (Existing) Olive Avenue (Highway 59 to G Street); G Street (16th to 22nd);

16th Street (V to G Street); Yosemite (West of R Street) Pre-Construction &

Construction 09/2020 12/2020

10/2020 03/2021 5-7 21 12

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 52: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Merced Merced 19/20 Carried Over Road Maintenance & Rehabilitation

Grind and Overlay (Yosemite Avenue) This project will include: Pavement Rehab/Repair (Existing) Yosemite Avenue (Parsons to Masionette) Pre-Construction &

Construction 10/2020 05/2021

01/2021 06/2021 8-12 21 12

Merced Merced 19/20 In Progress Road Maintenance & Rehabilitation

Grind and Overlay (M Street, Childs to 8th) This project will include: Pavement Rehab/Repair (Existing) M Street (Childs to 8th Street) Construction 04/2020 07/2020 8-12 21 12

Merced Merced 20/21 New Road Maintenance & Rehabilitation

Grind and Overlay (M Street, 8th to 13th St) This project will include: Pavement Rehab/Repair (Existing) M Street ( 8th to 13th Street) Pre-Construction &

Construction 05/2020 09/2020

07/2020 12/2020 8-12 21 12

Merced Merced 20/21 New Road Maintenance & Rehabilitation

Grind and Overlay (R Street, Buena Vista to Yosemite Ave) This project will include: Pavement Rehab/Repair (Existing) R Street (Buena Vista to Yosemite Avenue) Pre-Construction &

Construction 08/2020 01/2021

11/2020 05/2021 8-12 21 12

Merced Merced 20/21 New Road Maintenance & Rehabilitation

Grind and Overlay (Canal St, 19th to 23rd St) This project will include: Pavement Rehab/Repair (Existing) Canal Street (19th to 23rd Street) Pre-Construction &

Construction 12/2020 05/2021

03/2021 08/2021 8-12 21 12

Merced Merced 20/21 New Road Maintenance & Rehabilitation

Grind and Overlay (Alpine, G St to Wainwright) This project will include: Pavement Rehab/Repair (Existing) Alpine Drive (G Street to Wainwright) Pre-Construction &

Construction 07/2020 11/2020

09/2020 03/2021 8-12 21 12

Merced Merced 20/21 New Safety Railroad Street Crossing

Improvements (HWY 59 and BNSF Railroad Crossing)

This project will include: Railroad Street Crossing Improvements project. Highway 59 and BNSF Railroad Crossing Pre-Construction & Construction

10/2020 01/2021

12/2020 06/2021 20-25 21 12

Merced Merced 20/21 New Safety Railroad Street Crossing

Improvements (Glen Ave and BNSF Railroad Crossing)

This project will include: Railroad Street Crossing Improvements project. Glen Avenue and BNSF Railroad Crossing Pre-Construction & Construction

10/2020 01/2021

12/2020 06/2021 20-25 21 12

Merced Merced 19/20 Carried Over Road Maintenance & Rehabilitation Road Improvement - 18th Street This project will include: Pavement Rehab/Repair (Existing) 18th Street (R Street to V Street) Pre-Construction &

Construction 10/2020 03/2021

01/2021 06/2021 20-25 21 12

Merced Merced 20/21 New Road Maintenance & Rehabilitation

Road Improvement - R Street (Loughborough to Buena Vista;

Phase 1) This project will include: Pavement Rehab/Repair (Existing) R Street (Loughborough Drive to Buena Vista Avenue) Pre-Construction &

Construction 08/2020 01/2021

11/2020 05/2021 20-25 21 12

Merced Merced 19/20 Carried Over Road Maintenance & Rehabilitation Road Improvement - Glen Avenue This project will include: Pavement Rehab/Repair (Existing) Glen Avenue (Santa Fe to Bear Creek) Pre-Construction &

Construction 12/2020 05/2021

03/2021 08/2021 20-25 21 12

Merced Merced 19/20 Carried Over Road Maintenance & Rehabilitation Road Improvement - R Street This project will include: Pavement Rehab/Repair (Existing) R Street (Olive Avenue to Northwood Drive) Pre-Construction &

Construction 11/2020 04/2021

02/2021 06/2021 20-25 21 12

Merced Merced 19/20 Carried Over Road Maintenance & Rehabilitation Road Improvement - 26th Street This project will include: Pavement Rehab/Repair (Existing) 26th Street (Glen to 7th) Pre-Construction &

Construction 02/2021 06/2021

04/2021 09/2021 20-25 21 12

Merced Merced 19/20 Carried Over Other Road Improvement - Childs Avenue This project will include: Road widening, sidewalk, curb and gutter. Childs Avenue (Parsons Avenue to Campus Parkway) Pre-Construction 02/2021 07/2021 20-25 21 12

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 53: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Merced Merced 20/21 New Road Maintenance & Rehabilitation

FY 20/21 Road Maintenance & Rehabilitation Programs and

Materials Purchases

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing

Various locations throughout the City of Merced. Area 1 generally bounded by south of Santa Fe Avenue, north of Highway 99, east of Highway 59, and west of Yosemite Parkway. Area 2 generally bounded by south of Highway 99, north of Dickenson Ferry Road, east of Thornton Road, and west of Highway 59.

Procurement/Operatio nal Needs 07/2020 06/2021 5-7 21 12

Merced Merced 19/20 Carried Over Safety Sidewalk, Curb and Gutter Replacement Project

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Includes curb and gutter replacement.

Various Locations Throughout the City of Merced. (K, Canal, & 8th Streets; Seville Way; East Donna Drive; Q & 4th Streets; Q & 10th Streets; R & 10th Streets; Evelyn & Julie Drive; East 22nd St & Cherry Ave)

Construction 02/2021 07/2021 10-20 21 12

Merced Merced 19/20 Completed Road Maintenance & Rehabilitation Roadway Slurry Seal Projects This project will include: Pavement Rehab/Repair (Existing)

Canal Street (Childs to 16th); East El Portal Avenue (G St to Joerg); West 26th Street (G to M Street); Merced Avenue (Parsons to Motel Drive)

Construction 10/2019 11/2019 7-10 21 12

Mammoth Lakes Mono 19/20 Carried Over Road Maintenance & Rehabilitation

Meridian Blvd Curb and Gutter replacement project Phase 3 This project will include: Curb and gutter replacement Meridian Blvd west of Minaret Rd Construction 07/2020 08/2020 20-30 25 1

Mammoth Lakes Mono 20/21 New Safety 1.Lake Mary Sidewalk Project This project will include: Sidewalk and/or Crosswalk Installation (New) Town of Mammoth Lakes - north side of Lake Mary RD between Canyon Blvd and Minaret Rd Construction 05/2020 07/2020 20-30 25 1

Mammoth Lakes Mono 20/21 New Other 2.Transit Shelter Replacement Project This project will include: ADA compliant transit shelters Two of the shelters are located along SR203, the third on Old

Mammoth Road near the intersection of Meridian Blvd. Construction 07/2020 08/2020 20-30 25 1

Mammoth Lakes Mono 20/21 New Road Maintenance & Rehabilitation

Main Street South Frontage Rd Curb Replacement This project will include: Curb and gutter replacement Town of Mammoth Lakes south frontage road, parallel to SR203

between Laurel Mountain and Center Street Construction 07/2021 08/2021 20-30 25 1

Carmel-by-the-Sea Monterey 20/21 New Road Maintenance & Rehabilitation

FY 2020/2021 Streets and Roads Projects

This project will include: Pavement Rehab/Repair (Existing) | Repair cracked concrete areas and pave a new, 2-inch asphalt overlay. Reconstruct concrete.

Ocean Ave. bet. Monte Verde Street and San Antonio Avenue, The intersection of Ocean Ave. and San Antonio Avenue, Intersection of San Carlos St. and 5th Avenue, San Carlos bet. 5th and 6th

Construction 04/2021 07/2021 30-40 29 17

Del Rey Oaks Monterey 19/20 Carried Over Road Maintenance & Rehabilitation

Street Reconstruction and Overlay Package

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating | Design and construct street reconstruction and overlay package, Del Rey Oaks residential streets, estimated useful life 15-20 years. Estimated completion June 2021.

Area of Portola Drive. Pre-Construction & Construction

07/2020 10/2020

09/2020 06/2021 15-20 29 17

Del Rey Oaks Monterey 20/21 New Road Maintenance & Rehabilitation Street Slurry Package This project will include: Cost Estimating, Maintenance Program Plan Development |

Slurry seal maintenance of streets around the City. Del Rey Gardens and Calle Del Oaks Pre-Construction 04/2021 06/2021 15-20 29 17

Greenfield Monterey 19/20 Carried Over Road Maintenance & Rehabilitation Administrative Costs

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Systems/Databases, Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | Salaries, wages, fringe benefits, and related costs of Public Works employees assigned to the Streets Division and providing local street and road maintenance and repair services. Included are equipment, material and program related costs. This contribution will enhance the ability of the City to perform a greater amount of its own pothole repairs, concrete repairs, striping and other maintenance functions.

City of Greenfield Procurement/Operatio nal Needs 07/2020 06/2021 1-1 30 12

Greenfield Monterey 19/20 In Progress Road Maintenance & Rehabilitation

Pedestrian safety and accessibility improvements This project will include: Repair and Servicing of Public Works Equipment City Wide

Downtown and surrounding areas will be assessed. Procurement/Operatio

nal Needs 07/2020 11/2020 1-1 30 12

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 54: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Marina Monterey 19/20 Carried Over Road Maintenance & Rehabilitation

Annual Street Resurfacing (Phase 1-New Installation and Repair of

ADA Curb Ramps and HMA Overlay)

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Maintenance Program Plan Development, Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Bostick Ave, Kona Cir, Westwood Ct, Phillip Cir, Huntington Pl, Max Cir, McCulloch Cir, Melanie R, Philip Cir, Westwood Ct

Pre-Construction & Construction

08/2020 04/2021

01/2021 06/2021 10-15 29 17

Marina Monterey 19/20 Carried Over Road Maintenance & Rehabilitation

Annual Resurfacing Project (Phase 2-Microsurfacing and Slurry Seal)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation

Nine street segments will be treated with microsurfacing, including segments on Beach Road, Hillcrest Avenue and Seacrest Avenue. 32 streets segments will be treated with a slurry seal, including segments on Abdy Way, Michael Drive and Zanetta Drive.

Pre-Construction & Construction

08/2020 04/2021

01/2021 06/2021 5-10 29 17

Marina Monterey 20/21 New Road Maintenance & Rehabilitation

Annual Street Resurfacing (Phase 3-Reconstruction of Roadway)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation

Flower Circle Pre-Construction & Construction

08/2020 03/2021

01/2021 06/2021 15-20 29 17

Monterey Monterey 20/21 New Road Maintenance & Rehabilitation Reconstruction of Franklin

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach) and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction and hot mix asphalt pavement.

Franklin Street Pre-Construction & Construction

08/2020 01/2021

12/2020 12/2021 20-20 29 17

Pacific Grove Monterey 20/21 New Road Maintenance & Rehabilitation

Street Rehabilitation on Lower Lighthouse Avenue and Funston

Avenue

This project will include: Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), Pavement Improvement (New)

-Lower Lighthouse Avenue from Eardley Ave to 13th St -Funston Avenue from Presidio Ave to Montecito Construction 02/2021 06/2021 15-20 29 20

Salinas Monterey 20/21 New Road Maintenance & Rehabilitation

Preventative Maintenance for Asphalt Pavement

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), Maintenance Program Plan Development, Preliminary Design, Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Andover Cir; New Castle Dr; Decunha Ct; Park Row; Alvarado Dr; Sherman Dr; Lexington Dr; Essez Cir; Kent St; Garner Ave; Penwick cir; Yucatan Way; Rosarita Dr; Boyle Ct; Christensen Ave; Arcadia Way; Oxford Ct; Williams Rd; La Honda Ct; Pickford Way; Harkins Rd; St. Albans Ct; Polk St; Hancock St; Chelsea Ct; Stratford Ct; Mimbrera Way; Rockhaven Ct; W Blanco Rd; St. George Dr; N. Main St; Harden Pkwy; Emerald Dr; Kent Cir

Pre-Construction & Construction

11/2020 06/2021

04/2021 10/2021 5-7 30 12

Salinas Monterey 20/21 New Road Maintenance & Rehabilitation

Patch and Repair Program on City Streets

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Alisal Street and East Alvin Drive; Andover Cir; New Castle Dr; Decunha Ct; Park Row; Alvarado Dr; Sherman Dr; Lexington Dr; Essez Cir; Kent St; Garner Ave; Penwick cir; Yucatan Way; Rosarita Dr; Boyle Ct; Christensen Ave; Arcadia Way; Oxford Ct; Williams Rd; La Honda Ct; Pickford Way; Harkins Rd; St. Albans Ct; Polk St; Hancock St; Chelsea Ct; Stratford Ct; Mimbrera Way; Rockhaven Ct; W Blanco Rd; St. George Dr; N. Main St; Harden Pkwy; Emerald Dr; Kent Cir

Construction 07/2020 06/2021 10-12 30 12

Sand City Monterey 19/20 Carried Over Road Maintenance & Rehabilitation

Contra Costa Street and Sidewalk Improvement Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New) | Curb, gutter, and sidewalk improvements; and adjacent street rehabilitation with new crosswalk. (funds to be banked and combined with other funding sources).

Contra Costa Street between Elder Avenue and Shasta Avenue in Sand City, California Construction 04/2022 09/2022 20-30 29 17

Seaside Monterey 19/20 In Progress Road Maintenance & Rehabilitation

Arterial and Collector Resurfacing Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Bicycle Lane (New), Document Preparation

Arterial and Collector Roadways throughout the City, including but not limited to Freemont Blvd., Wheeler St., Noche Buena Ave., La Salle Ave., San Pablo Ave., and Del Monte Ave. The following link reflects project locations in which work will be performed and will be updated by the City as work takes place. http://www.ci.seaside.ca.us/687/Road-Closures-Detours

Pre-Construction & Construction

11/2018 06/2020

05/2020 12/2021 5-30 29 17

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 55: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Soledad Monterey 20/21 New Road Maintenance & Rehabilitation

City of Soledad FY 20/21 Street Maintenance Project This project will include: Pavement Rehab/Repair (Existing) North of Gabilan Rd between San Vicente and Orchard Construction 08/2020 01/2021 5-10 30 12

Calistoga Napa 20/21 New Road Maintenance & Rehabilitation

Lake Street Pavement Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Lake Street between Grant Street and Lincoln Avenue Construction 06/2020 12/2020 20-30 4 3

Calistoga Napa 20/21 New Road Maintenance & Rehabilitation

Silverado Trail Pavement Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) Silverado Trail Within the City limits Construction 06/2020 12/2020 20-30 4 3

Calistoga Napa 20/21 New Road Maintenance & Rehabilitation Harley Street Pavement Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Harley Street between Fair Way and Grant Street Construction 06/2020 12/2020 3-5 4 3

Calistoga Napa 20/21 New Road Maintenance & Rehabilitation FY 21/22 Project Design

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Active Transportation Plan, Document Preparation

Design services for FY21/22 road projects at various locations citywide. Pre-Construction 06/2020 06/2021 15-20 4 3

Napa Napa 20/21 New Complete Streets Components

Complete Streets Concrete Repair , Monarch, Franklin and Grandview

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Monarch Street and Paulson Streets, South Franklin Streets, Grandview and Foster Streets

Pre-Construction & Construction

07/2020 02/2021

12/2020 06/2021 50-50 4 3

St. Helena Napa 18/19 Carried Over Complete Streets Components

Downtown Sidewalk and Pedestrian Project

This project will include: Preliminary Design | Currently designing the downtown sidewalk and pedestrian improvements: sidewalk, curb ramps, bulb outs, landscape, furnishing, utilities. OBAG II Grant (2 year design with construction in FY20/21

Main Street (Highway 29) from Mitchell Drive to Pine Street Pre-Construction 04/2019 02/2021 15-30 4 3

Yountville Napa 20/21 New Road Maintenance & Rehabilitation

Sidewalk, Curb, Gutter, ADA replacement and Tree Removals

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Cross Valley Gutter remove and replace. This will also include Tree Removal at 2008 Holly Street, Vinyard (Southeast Corner), Vineyard Cir (East of Vista), and 145 Vinyard Cir.

Toyon terrace, Heritage and Vista Subdivisions in the Town of Yountville Construction 03/2020 04/2021 20-40 4 3

Grass Valley Nevada 20/21 New Road Maintenance & Rehabilitation

2020/21 Annual Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing)

Freeman Ln, Taylorville Rd, McKnight Way, La Barr Meadows Rd Construction 05/2021 07/2021 15-20 1 1

Nevada City Nevada 19/20 Carried Over Road Maintenance & Rehabilitation Broad Street Y

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Sidewalk will be widened and enhanced at intersections to provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement improvements include replacement of deteriorated pavement and improvements to cross-slope for drainage. This project will help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. | Completed Topographic Survey, Completed design for Utility Relocates, Bids were too high for Utility Work. Rebidding in 2019. No costs incurred in 2017-2018 other than staff time.

Broad Street from Commerical Street to (and including) the intersection of West Broad Street and East Broad Street. Construction 10/2020 12/2020 10-20 1 1

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 56: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Nevada City Nevada 19/20 Carried Over Road Maintenance & Rehabilitation Commercial Street

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Sidewalk will be widened and enhanced at intersections to provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement improvements include replacement of deteriorated pavement and improvements to cross-slope for drainage. This project will help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. | Completed Topographic Survey, Conducted Community Workshops, City Council directed staff to prepare traffic study and proceed with design. No costs incurred in 2017-18 other than staff time.

Commercial Street from Union Street to Broad Street Construction 08/2020 11/2021 10-20 1 1

Truckee Nevada 20/21 New Road Maintenance & Rehabilitation

2020 PAVING AND DRAINAGE PROJECT This project will include: Pavement Rehab/Repair (Existing)

Portions of Bridge Street, Church Street, and Jibboom Street in downtown Truckee, but the project scope may be expanded to other roadways in town depending on available funding for the project.

Construction 09/2020 10/2021 20-30 1 1

Truckee Nevada 20/21 New Road Maintenance & Rehabilitation

COLDSTREAM ROAD/DONNER CREEK CROSSING STRUCTURE

REPLACEMENT This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Coldstream Road over Donner Creek in Truckee, CA Construction 06/2020 11/2020 50-100 1 1

Truckee Nevada 20/21 New Complete Streets Components

West River Street Site Redevelopment This project will include: Sidewalk and/or Crosswalk Installation (New) West River Street adjacent to Truckee River immediately west of

Mill Street in downtown Truckee. Construction 06/2021 10/2022 30-30 1 1

Truckee Nevada 20/21 New Complete Streets Components

West River Street Streetscape Improvement Project

This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New)

West River Street between Bridge Street and Mill Street Construction 06/2022 10/2023 30-30 1 1

Aliso Viejo Orange 19/20 Carried Over Road Maintenance & Rehabilitation Pacific Park Drive Rehabilitation

This project will include: Sidewalk and curb ramp repairs/upgrades; patching failed pavement areas; grinding existing asphalt surface; installing new, fiber reinforced, asphalt rubber surface. Design work only in FY 19-20, construction in FY 20-21.

Pacific Park Drive - Aliso Viejo Parkway to Aliso Creek Road Construction 06/2020 10/2020 10-20 73 36

Aliso Viejo Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Slurry Seal Program FY 19-20 & 20-21

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Document Preparation | Repair of failed areas, crack filling, installation of slurry seal. Combined FY 19-20 and 20-21 into one project.

Association areas: Pacific Ridge, Altisse, CA Renaissance, Moulton Parkway 1, 2, 3

Pre-Construction & Construction

04/2020 06/2020

06/2020 10/2020 5-7 73 36

Aliso Viejo Orange 20/21 New Road Maintenance & Rehabilitation

Deerhurst/Wolverine/Foxborough Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation Deerhurst, Wolverine, Foxborough Pre-Construction &

Construction 07/2020 07/2021

06/2021 10/2021 10-20 73 36

Aliso Viejo Orange 20/21 New Road Maintenance & Rehabilitation

Cedarbrook/Park/Windsong Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Cedarbrook (Creekside to end), Windsong Construction 07/2020 10/2020 10-20 73 36

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Acacia Neighborhood Rehabilitation (Phase 2)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 5) - Acacia Neighborhood bordered by La Palma Avenue to the north, State College Boulevard to the east, Lincoln Avenue to the south, and East Street to the west

Construction 01/2020 08/2020 7-20 69 29

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Orangewood Avenue Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

(District 4) - Orangewood Avenue from Harbor Boulevard to Lewis Street Construction 06/2020 08/2020 10-15 69 34

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Lindacita Neighborhood Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 1) - Lindacita Neighborhood bordered by Lincoln Avenue to the north, Beach Boulevard to the east, Orange Avenue to the south, and Knott Avenue to the west

Construction 07/2019 10/2020 7-20 65 29

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 57: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Valdina Neighborhood Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 1) - Valdina Neighborhood bordered by La Palma Avenue to the north, Brookhurst Street to the east, Crescent Avenue to the south, and Gilbert Street to the west

Construction 08/2019 10/2020 7-20 65 29

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation Ball Road Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(Districts 3 & 4) - Ball Road from West Place to Claremont Street Construction 05/2020 08/2020 10-15 65, 69 29, 34

Anaheim Orange 20/21 New Road Maintenance & Rehabilitation Torry Neighborhood Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 5) - Torry Neighborhood bordered by South Street to the north, SR-57 Freeway to the east, Ball Road/Carl Street End of Cul-De-Sac to the south, and State College Boulevard/Sunkist Street to the west

Construction 10/2020 06/2021 7-20 69 34

Anaheim Orange 20/21 New Road Maintenance & Rehabilitation

Avenida Bernardo Neighborhood Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 6) - Avenida Bernardo Neighborhood bordered by Santa Ana Canyon Road to the north, Imperial Highway to the east, Nantucket Lane/Tisbury Court to the south, and Andover Drive/Fairlee Court to the west

Construction 10/2020 06/2021 7-20 68 37

Anaheim Orange 20/21 New Road Maintenance & Rehabilitation

Riverdale Neighborhood Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 6) - Riverdale Neighborhood bordered by Alderdale Avenue to the north, Lakeview Avenue to the east, Santa Ana Canyon Road to the south, and SR-91 Freeway to the west.

Construction 10/2020 06/2021 7-20 68 37

Anaheim Orange 20/21 New Road Maintenance & Rehabilitation Lotus Neighborhood Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 2) - Lotus Neighborhood bordered by Coronet Avenue to the north, Holly Street to the east, La Palma Avenue to the south, and Brookhurst Street to the west

Construction 10/2020 06/2021 7-20 65 29

Anaheim Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Crescent Neighborhood Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

(District 2) - Crescent Neighborhood bordered by Catalpa Avenue to the north, Euclid Street to the east, I-5 Freeway to the south, and Chippewa Avenue to the west

Construction 09/2019 10/2020 7-20 65 29

Anaheim Orange 18/19 Carried Over Road Maintenance & Rehabilitation

Northeast Anaheim Colony (Sabina) Neighborhood

Rehabilitation (Project - C)

This project will include: ADA Curb Ramp Installation (New), Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project will address poor drainage areas throughout the community by constructing new concrete curb and gutter. The project improvements will also include cold planing and resurfacing the road with an asphalt concrete overlay, the replacement and construction of new ADA access ramps, and the replacement of uneven and broken sidewalks.

(District 3) - Sabina Neighborhood (Project - C) - bordered by La Palma Avenue to the north, East Street to the east, Sycamore Street to the south, and Pauline Street to the west

Construction 06/2020 02/2021 7-20 69 29

Anaheim Orange 18/19 Carried Over Road Maintenance & Rehabilitation Weir Canyon Road Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Landscape Safety Rehab/Repair (Existing) | The road rehabilitation work consists of cold planing and resurfacing the road with an asphalt concrete overlay, AC berms, and replacement of traffic striping, traffic signal loops, and pavement markings.

(District 6) - Weir Canyon Road from Serrano Avenue to Parkglen Place Construction 04/2020 07/2020 10-15 68 37

Brea Orange 20/21 New Road Maintenance & Rehabilitation

Brea Boulevard Street Repaving from Imperial Highway to Juniper

Street

This project will include: Preliminary Design, Document Preparation | This project will rehabilitate Brea Boulevard pursuant to the City's Pavement Management Plan. The improvements will also include updating curbs, gutters and ADA ramps.

Brea Boulevard between Imperial Hwy & Juniper Street. Pre-Construction 06/2021 08/2021 20-30 55 29

Buena Park Orange 20/21 New Road Maintenance & Rehabilitation

2020-2021 Annual Pavement Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation and replacement of curb & gutter, sidewalk, accessible ramps, driveway approaches, signing & striping, and other incidentals for various residential streets.

Monroe Ave from Knott Ave to Jefferson Dr Monroe Cir from Monroe Ave to end Jefferson Dr from Monroe Ave to end Knott Ave Frontage Rd from Crescent Ave Frontage Rd to Santa Isabel Cir Crescent Ave Frontage Rd from Knott Ave Frontage Rd to Pierce Dr Santa Isabel Cir, Santa Rita Cir, Santa Paula Cir, Santa Marta Cir, Santa Ana Cir, Santa Anita Cir, Santa Cruz Dr, Santa Clara St, Santa Catalina Cir, Santa Lucia Cir, Santa Teresa Cir

Construction 03/2021 05/2021 10-15 65 32

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 58: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Buena Park Orange 20/21 New Road Maintenance & Rehabilitation 2020-2021 Annual Slurry Seal This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) |

Applying slurry to preserve the pavement for various residential streets.

8th St from Fullerton Ave to Cul-de-sac 9th St from Western Ave to beach Blvd 10th St from Western Av to Beach Blvd 11th St from Western Ave to Beach Blvd Melrose St from Western Ave to Beach Blvd Sullivan Pl from Western Ave to Melrose St Fullerton Ave from 8th St to 9th St

Construction 04/2021 06/2021 7-10 65 32

Buena Park Orange 20/21 New Road Maintenance & Rehabilitation Dodds Street Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | 0.1 mile AC arterial roadway rehabilitation and replacement of curb & gutter, sidewalk, accessible ramps, driveway approaches, signing & striping, and other incidentals.

Dodds Street from Stage Road to Cul-de-sac Construction 03/2021 05/2021 10-15 65 32

Costa Mesa Orange 20/21 New Road Maintenance & Rehabilitation

Northbound Newport Blvd. Improvements (from 22nd St. to

Bristol St.)

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Right of Way, Bicycle Lane Rehab/Repair (Existing), Landscape Safety Installation (New), Maintenance Program Plan Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Feasibility Study, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New), Active Transportation Plan

Northbound Newport Blvd. (from 22nd St. to Bristol St.) and Southbound Newport Blvd. (from Bristol St. to Mesa Dr.)

Pre-Construction & Construction

07/2020 02/2021

10/2021 05/2021 20-40 74 37

Costa Mesa Orange 20/21 New Road Maintenance & Rehabilitation

Southbound Newport Blvd. Improvements (from Bristol St. to

Mesa Dr.)

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Right of Way, Bicycle Lane Rehab/Repair (Existing), Landscape Safety Installation (New), Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Feasibility Study, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New), Active Transportation Plan

Southbound Newport Blvd. (from Bristol St. to Mesa Dr.) Pre-Construction & Construction

02/2021 05/2021

04/2021 08/2021 20-40 74 37

Cypress Orange 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Residential Street Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The scope of work consists of slurry sealing over 1,900,000 SF of residential roadway and resurfacing approximately 162,000 SF of pavement using rubberized asphalt concrete (RAC). The proposed project also includes incidental items of work, such as traffic striping, traffic loops, manhole adjustments, etc.

Various arterial/residential streets located throughout the City of Cypress, primarily located within Districts 1, 13, 46, 47, and 48. Construction 10/2020 05/2021 7-20 65 29

Dana Point Orange 20/21 New Road Maintenance & Rehabilitation

Annual Residential Resurfacing Project FY20/21 This project will include: Pavement Rehab/Repair (Existing)

The project location includes residential, residential collector and collector streets within the Capistrano Beach area and specific streets within the Lantern District and the Lantern Village areas

Construction 06/2021 12/2021 20-25 73 36

Fountain Valley Orange 20/21 New Road Maintenance & Rehabilitation

Residential Roadway Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

City Quadrants D7, E1, and F1 are bound by Bushard Street, Ellis Avenue, Brookhurst Street, Garfield Avenue, and those bound by Edinger Avenue, Ward Street and Euclid Street

Construction 07/2020 08/2020 10-15 72 34

Fullerton Orange 20/21 New Road Maintenance & Rehabilitation

Euclid Street Rehabilitation Project - Phase 2

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing) | Euclid Street is functionally classified as an arterial street and mostly consists of four lanes in each direction with an additional median lane. The work includes pavement rehabilitation/reconstruction to extend the roadway service life and to reconstruct curb and gutter, access ramps, cross gutter, traffic striping and signing and all related work.

Euclid Street - Fern Drive to Bastanchury Road and Valley View Place – Euclid Street to Cul-de-sac

Pre-Construction & Construction

09/2020 04/2021

02/2021 03/2022 10-20 65 29

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 59: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fullerton Orange 20/21 New Road Maintenance & Rehabilitation

Orangethorpe Avenue Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing) | Orangethrope Avenue is functionally classified as an arterial street mostly consists of six lanes with three lanes in each direction with an additional median lane. The work includes pavement rehabilitation to extend the roadway service life and to reconstruction curb and gutter, access ramps, cross gutter; traffic striping and signing and all related work.

Orangethorpe Avenue – Woods Avenue to Highland Avenue Pre-Construction & Construction

09/2020 04/2021

02/2021 10/2021 10-20 65 29

Garden Grove Orange 20/21 New Road Maintenance & Rehabilitation Magnolia St. Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) On Magnolia St., from Shelly St. to Katella Ave. in the City of

Garden Grove Construction 06/2020 07/2020 20-25 72 34

Garden Grove Orange 20/21 New Road Maintenance & Rehabilitation Lampson Avenue Rehabilitation This project will include: Pavement Rehab/Repair (Existing) On Lampson Avenue, from Brookhurst St. to Nelson St. in the

City of Garden Grove Construction 06/2020 08/2020 20-25 72 34

Garden Grove Orange 20/21 New Road Maintenance & Rehabilitation Brookhurst St. Slurry Seal This project will include: Pavement Rehab/Repair (Existing) On Brookhurst St., from Westminster St. to Trask Ave. in the City

of Garden Grove Construction 08/2020 09/2020 8-15 72 34

Garden Grove Orange 20/21 New Road Maintenance & Rehabilitation

Acacia Storm Drain Local St. Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

All local streets surrounded by: Lampson Ave (north), Magnolia Street (east), Garden Grove Blvd (south), and Dale St. (west), all located in the City of Garden Grove.

Pre-Construction 08/2021 12/2021 20-25 72 34

Garden Grove Orange 20/21 New Other Acacia Storm Drain This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Storm Drain line along Acacia Ave and Josephine Street; starting from Woolley Ave to Dale Street, located in the City of Garden Grove

Pre-Construction 04/2021 08/2021 20-50 72 34

Garden Grove Orange 20/21 New Road Maintenance & Rehabilitation

Brookhurst St. Rehabilitation (Lampson - Chapman) This project will include: Pavement Rehab/Repair (Existing) On Brookhurst Street, from Lampson Avenue to Chapman

Avenue. Construction 07/2020 09/2020 20-25 72 34

Garden Grove Orange 20/21 New Road Maintenance & Rehabilitation

Euclid St. Rehabilitation (Lampson - Chapman) This project will include: Pavement Rehab/Repair (Existing) On Euclid Street, from Lampson Avenue to Chapman Avenue. Construction 09/2020 11/2020 20-25 72 34

Garden Grove Orange 20/21 New Other Cannery Imperial Storm Drain This project will include: The Project includes drainage improvements, in addition to water and sewer main improvements.

Imperial - Magnolia to Gilbert, Magnolia - Imperial to north of Cannery, Cannery - Magnolia to Garden Grove Construction 08/2019 04/2020 20-50 72 34

Huntington Beach Orange 19/20 Carried Over Road Maintenance & Rehabilitation

FY 19/20 Arterial Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Various street segments will be rehabilitated with SB-1 and local funds as budget allows. These segments include: Slater Avenue (Goldenwest to Beach) Newland Street (Yorktown to Garfield) Atlanta Avenue (Bushard to Brookhurst) Graham Street (Warner to Springdale) Atlanta (Delaware to Beach) Garfield (Main-Delaware) Newland (Ellis to Talbert) Talbert (Springdale to Edwards)

Construction 04/2020 07/2020 15-25 74 37

Irvine Orange 18/19 Carried Over Road Maintenance & Rehabilitation

Jamboree Pavement Rehabilitation - Michelle to Railroad Tracks

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation and replacement of deteriorated asphalt pavement, concrete curbs, gutters, access ramps, and sidewalks. Expand scope to include removing and replacing unsuitable subgrade material discovered during analysis of the existing pavement. The added scope will increase the life of the roadway surface. | Additional funding to be allocated to address unsuitable subgrade material discovered.

Jamboree Road between Michelle Drive and the OCTA railroad overcrossing bridge. Construction 12/2020 06/2021 17-35 68 37

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 60: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Irvine Orange 20/21 New Road Maintenance & Rehabilitation

Culver Drive Rehabilitation (I-5 to Walnut)

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Culver Drive Rehabilitation (I-5 to Walnut) Construction 06/2021 12/2021 17-35 68 37

Irvine Orange 20/21 New Road Maintenance & Rehabilitation

Irvine Center Drive Pavement Rehab (Jeffrey to Sand Canyon)

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Irvine Center Drive Pavement Rehab (Jeffrey to Sand Canyon) Construction 01/2021 06/2021 17-35 74 37

Irvine Orange 20/21 New Road Maintenance & Rehabilitation

Local Street Rehabilitation (Irvine Business Complex)

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Streets located within the Irvine Business Complex Construction 02/2021 06/2021 17-35 74 37

Irvine Orange 20/21 New Road Maintenance & Rehabilitation

Irvine Center Drive Pavement Rehab - Design (Pacifica to Lake

Forest) This project will include: Cost Estimating, Right of Way, Document Preparation Irvine Center Drive Pavement Rehab - Design (Pacifica to Lake

Forest) Pre-Construction 11/2020 03/2021 17-35 74 37

Irvine Orange 18/19 Carried Over Road Maintenance & Rehabilitation

Alton Pavement Rehabilitation - I-5 Freeway to Technology Drive East

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation and replacement of deteriorated asphalt pavement, concrete curbs, gutters, access ramps, and sidewalks.

Alton Pavement Rehabilitation - I-5 Freeway to Technology Drive East Construction 05/2020 10/2020 17-35 68 37

Irvine Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Barranca Parkway Pavement Rehabilitation - I-5 to Alton

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Barranca Parkway Pavement Rehabilitation - I-5 to Alton Construction 08/2020 12/2020 17-35 68 37

Irvine Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Campus Drive Rehabilitation -University to Carlson

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Campus Drive: University to Carlson Construction 03/2020 09/2020 17-35 74 37

La Habra Orange 19/20 Carried Over Road Maintenance & Rehabilitation

La Habra Boulevard Pavement from Beach Boulevard to Idaho

Street

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of grinding and overlaying the full width of the street, reconstruction of damaged curb ramps, sidewalk, curb and gutter, and traffic signal detection loops.

La Habra Boulevard from Beach Boulevard to Idaho Street in the City of La Habra, CA Construction 01/2020 08/2020 15-15 55 29

La Habra Orange 19/20 Carried Over Road Maintenance & Rehabilitation

La Habra Blvd. from Valley Home Ave. to Beach Blvd.; Cypress St. from La Habra Blvd. to Whittier Blvd. & Palm St. from La Habra

Blvd. to North City Limits

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | La Habra Boulevard from Valley Home to Beach Boulevard consists of slurry sealing the full width of the street, reconstruction of full depth pavement, damaged curb ramps, sidewalk, and curb and gutter. Cypress Street from La Habra Boulevard to Whittier Boulevard and Palm Street from La Habra Blvd. to North City Limits consisting of grind and overlay the full width of the street, reconstruction of damaged curb ramps, sidewalk, and curb and gutter. | This project is re-listed as projects a. b. and c. in Resolution No. 5941.

La Habra Boulevard from Valley Home to Beach Boulevard; Cypress Street from La Habra Boulevard to Whittier Boulevard & Palm Street from La Habra Boulevard to North City Limits

Construction 10/2019 03/2021 5-15 55 29

La Habra Orange 20/21 New Road Maintenance & Rehabilitation

Euclid Street Pavement from Whittier Boulevard to North City

Limits

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of grind and overlay the full width of the street, construct concrete curb barriers, dikes, cross gutters, reconstruction of the full depth pavement, damaged curb ramps, sidewalk, curb and gutter, and pavement striping.

Euclid Street from Whittier Boulevard to North City Limits in the City of La Habra, CA Construction 10/2020 10/2021 15-15 55 29

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 61: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

La Palma Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Orangethorpe Avenue Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitation including grinding, paving, and thermal striping (PW Contract). | The bid opening and award of contract are scheduled for May/June 2020. Construction begins July/August 2020 and completed in October 2020.

Walker Street to Valley View street Construction 07/2020 09/2020 7-10 65 29

La Palma Orange 18/19 Carried Over Road Maintenance & Rehabilitation Walker Street Rehabilitation This project will include: Rehabilitation including crack sealing, dig-outs, and slurry

seal La Palma Avenue to 183rd Street Construction 06/2020 08/2020 7-10 65 29

La Palma Orange 18/19 Carried Over Road Maintenance & Rehabilitation Arterial Street Medians (Phase 1) This project will include: Rehabilitationincluding curb repairs, tree and landscape

removal, irrigation, hard and soft scape installation

Citywide Project - All locations will be selected and addressed based on priority need and resources throughout the year, locations may be subject to change prior to work commencing.

Construction 06/2020 12/2020 15-20 65 29

La Palma Orange 19/20 In Progress Road Maintenance & Rehabilitation Moody Street Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Bicycle Lane Rehab/Repair (Existing) The south city limits to the north city limits Construction 06/2020 12/2020 7-10 65 29

Laguna Beach Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Portions of Zone 1, 10 & 11 Street Slurry Seal and Rehabilitation This project will include: Pavement Rehab/Repair (Existing) All public streets in the Hobo Canyon, Woods Cove and

Diamond/Crestview areas. Construction 09/2020 12/2020 8-12 74 37

Laguna Beach Orange 20/21 New Road Maintenance & Rehabilitation

Zone 2 Street Slurry Seal and Rehabilitation This project will include: Cost Estimating, Preliminary Design, Document Preparation Top of the World neighborhood Pre-Construction 05/2022 10/2022 8-12 74 37

Laguna Beach Orange 20/21 New Road Maintenance & Rehabilitation

Zone 4 Street Concrete Rehabilitation This project will include: Cost Estimating, Preliminary Design, Document Preparation Downtown area bounded by Cliff Drive, Third Street, Park

Avenue and Coast Highway Pre-Construction 09/2023 02/2024 20-30 74 37

Laguna Hills Orange 20/21 New Road Maintenance & Rehabilitation

Street Maintenance in Zones B and F

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Document Preparation

APPALOOSA: LA PAZ TO MUSTANG, BOOTSTRAP: GALLUP TO END, BUCKSKIN: NELLIE GAIL TO BUCKBOARD, BUCKSKIN: NELLIE GAIL TO 235' NORTH, BUCKBOARD: BUCKSKIN TO NELLIE GAIL, BUCKLESTONE: NELLIE GAIL TO END, BROKEN BIT: BUCKSKIN TO END, BRIDLEWOOD:OSO TO SADDLEROCK, BRIDLEWOOD: SADDLEROCK TO FLINTLOCK, BRIDLEWOOD:FLINTLOCK TO NELLIE GAIL, CHAPARRAL: NELLIE GAIL TO END, DAPPLE GRAY: NELLIE GAIL TO END, DESERT TRAIL:NELLIE GAIL TO END, FLINTLOCK: BRIDLEWOOD TO END, GALLUP: 500' E/O LA PAZ TO LA PAZ,

Pre-Construction & Construction

07/2020 10/2021

06/2021 06/2022 10-10 74 36

Laguna Niguel Orange 18/19 Carried Over Road Maintenance & Rehabilitation

Niguel Road Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Roadway maintenance and repair including the repair of isolated areas of pavement, pavement grinding and removal, asphalt pavement overlay, associated concrete improvements including bus pads and access ramps, adjustment of surface utilities to final pavement grade, and roadway marking and striping.

Niguel Road from Marina Hills Drive to Highlands Avenue Construction 10/2019 05/2021 12-15 73 36

Laguna Woods Orange 20/21 New Road Maintenance & Rehabilitation

Pavement Management Plan Project (Eastbound El Toro Road between Church Intersection and Moulton Parkway, Westbound El Toro Road between Willow Tree Center and Moulton Parkway)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation | This project involves the rehabilitation of approximately 1,550 linear feet of pavement on Eastbound El Toro Road between Church Intersection and Moulton Parkway, and westbound El Toro Road between Willow Tree Center and Moulton Parkway, including asphalt concrete pavement cold milling and repaving.

Eastbound El Toro Road between Church Intersection and Moulton Parkway, Westbound El Toro Road between Willow Tree Center and Moulton Parkway

Pre-Construction & Construction

07/2020 02/2021

11/2020 06/2021 15-15 74 37

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 62: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Lake Forest Orange 20/21 New Road Maintenance & Rehabilitation

Road Rehabilitation Glenn Ranch Road (PW 2020-05B)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Glenn Ranch Road from Portola Pkwy to Saddleback Rd Construction 10/2020 12/2020 15-20 68 37

Lake Forest Orange 20/21 New Road Maintenance & Rehabilitation

Annual Slurry Seal, Zone G (PW 2020-05A) This project will include: Pavement Rehab/Repair (Existing)

Non-arterial streets located in Zone G, known as Portola Hills, the neighborhoods surrounding Glenn Ranch Road, Saddleback Ranch Road, and Ridgeline Road.

Construction 05/2021 08/2021 7-10 68 37

Los Alamitos Orange 20/21 New Road Maintenance & Rehabilitation

Suburbia Neighborhood Street Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design

Suburbia Neighborhood, which includes Rochelle Street, Linda Way, Barbi Lane, Maple Street, Kelly Lane and Denwood Avenue, in the City of Los Alamitos.

Pre-Construction & Construction

07/2020 01/2021

11/2020 06/2021 10-20 72 34

Mission Viejo Orange 20/21 New Road Maintenance & Rehabilitation Residential Resurfacing This project will include: Pavement Rehab/Repair (Existing)

Public residential streets in the area bounded by Oso Parkway to the north, the City boundary to the south and east, and the City boundary, Crown Valley Parkway, Marguerite Parkway and Felipe Road to the west, in the City of Mission Viejo.

Construction 07/2020 10/2020 7-20 73 36

Mission Viejo Orange 20/21 New Road Maintenance & Rehabilitation Arterial Highway Resurfacing

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Santa Margarita Parkway, and the portions of Marguerite Parkway and Los Alisos Boulevard north of Santa Margarita Parkway, in the City of Mission Viejo.

Construction 04/2021 06/2021 15-20 73 36

Newport Beach Orange 19/20 In Progress Road Maintenance & Rehabilitation

Cameo Highlands Street Pavement Reconstruction

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project involves removing the deteriorated asphalt concrete pavement, reconstructing new asphalt concrete pavement, and reconstructing isolated failed concrete improvements such as curbs, sidewalks, driveway approaches, and access ramps. Impacted utilities will be adjusted to grade. The new pavement will also be restriped. Final design is scheduled to be completed by Spring 2020 and construction will be completed by Winter 2020. The estimated useful life of this project is 15 years minimum.

This project is located in the residential neighborhood of Cameo Highlands off Cameo Highlands Drive and East Coast Highway. Construction 06/2020 12/2020 15-20 74 37

Newport Beach Orange 19/20 Carried Over Road Maintenance & Rehabilitation

Bison Avenue, San Joaquin Hills Road and San Nicolas Drive

Pavement Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project involves cold milling and overlaying the existing asphalt concrete pavement with rubberized asphalt concrete. Deteriorated concrete improvements will also be reconstructed. Impacted utilities will be adjusted to grade. The new pavement will also be restriped. Final design was completed in November 2019. Construction will be completed by Spring 2020. The estimated useful life of this project is 15 years minimum.

This project is located on Bison Avenue from Jamboree Road to State Route 73, San Joaquin Hills Road from Jamboree Road to MacArthur Boulevard, and San Nicolas Drive from Newport Center Drive to Avocado Avenue.

Construction 01/2020 05/2020 15-20 74 37

Newport Beach Orange 20/21 New Road Maintenance & Rehabilitation

Bonita Canyon and Ford Road Pavement Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project is located on Bonita Canyon Drive and Ford Road and involves cold milling and overlaying the existing asphalt concrete pavement with rubberized asphalt concrete. Deteriorated concrete improvements will also be reconstructed. Impacted utilities will be adjusted to grade. The new pavement will also be restriped. Final design is scheduled to be completed by April 2020 and construction will be completed by winter 2020. The estimated useful life of this project is 15 years minimum.

Bonita Canyon Drive from MacArthur Blvd to SR 73 and Ford Road from Jamboree Rd to MacArthur Blvd. Construction 05/2020 12/2020 15-20 74 37

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 63: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Orange Orange 20/21 New Road Maintenance & Rehabilitation

Annual Pavement Maintenance FY21

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Struck Ave from Katella Av to Batavia St; State College; Blvd from Orangewood Ave to Chapman Ave; Cannon St from Via Escola to Serrano Ave; Orange-Olive Rd from; Lincoln Ave to Fellows Dr; Serrano Ave from Orange Park; Blvd to San Lorenzo Crt; Tustin St from Santa Ana Canyon to Lincoln Ave; Batavia from Struck Ave to Walnut Ave.

Construction 04/2021 09/2021 10-15 68 37

Placentia Orange 19/20 In Progress Road Maintenance & Rehabilitation

FY 2019-20 Residential Slurry Seal Project This project will include: Pavement Rehab/Repair (Existing)

Seven residential neighborhoods located in the norther section of the City. The project limits are north of Bastanchury running west from Gilman Circle and east to McCormack Lane and south of Golden Avenue. Please see Attachment 4 for a map of the project.

Pre-Construction & Construction

07/2019 05/2020

03/2020 07/2020 5-7 55 29

Placentia Orange 19/20 In Progress Other Metrolink Station & Parking Structure

This project will include: Right of Way, Maintenance Program Plan Development, Document Preparation | In partnership with the Orange County Transportation Authority, the City is constructing a 246 space parking structure and the newest Metrolink Train Station to be built in Orange County in 15 years. The parking structure will support the Metrolink station along with two existing public parking lots. Construction of the underground utilities started in January 2020. The construction of the train station and parking structure is anticipated to begin in January 2021.

321 S. Main Street, Placentia, CA 92870 - See Attachment 3 for a project site map.

Pre-Construction & Construction

11/2017 01/2020

01/2020 06/2022 50-75 55 29

Placentia Orange 20/21 New Road Maintenance & Rehabilitation

FY 19-20 Arterial Road Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing)

This project will repave approximately 800,000 square feet of roadway along the following arterial streets: • Golden Avenue - Full limits • Bastanchury Road - East City Limits to Kraemer and West City Limits to • Placentia Avenue • Kraemer Boulevard - Golden Avenue to Bastanchury Road

Construction 07/2020 09/2020 15-20 39 29

Placentia Orange 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Arterial Roadway Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing)

This project will rehab 2.2 million square feet of roadway in he southern portion of the City including the following arterial streets: • Madison Avenue - Full Limits • Melrose Street - South City Limits to Orangethorpe Avenue • Orangethorpe Avenue - Van Buren Street to Lakeview Avenue

Pre-Construction & Construction

07/2020 06/2021

04/2021 09/2021 15-20 39 29

Rancho Santa Margarita Orange 19/20 In Progress Road Maintenance &

Rehabilitation Antonio Parkway Pavement

Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Antonio Parkway from Via Ladera to Avenida De Las Banderas in Rancho Santa Margarita Construction 04/2020 08/2020 10-15 73 36

Rancho Santa Margarita Orange 20/21 New Road Maintenance &

Rehabilitation Arroyo Vista Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Arroyo Vista between Avendia De Las Banderas and the cul de

sac at the Tijeras Creek Golf Club entrance. Construction 03/2021 05/2021 10-15 73 36

San Clemente Orange 18/19 Carried Over Road Maintenance & Rehabilitation

Camino De Los Mares Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate pavement on Camino De Los Mares, a six-lane divided arterial street, from the I-5 freeway east to Avenida Vaquero (a distance of about 0.75 miles). The project will include repair of damaged curb, gutter and sidewalk, and upgrade of curb ramps as required by ADA. | Project will use estimated funds of $1.5 million from FY19, $1 million from FY20, and $1 million from FY21.

Camino De Los Mares, from the I-5 freeway to Avenida Vaquero, in the City of San Clemente. Construction 07/2020 12/2020 20-25 73 36

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 64: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Juan Capistrano Orange 18/19 Carried Over Road Maintenance &

Rehabilitation

Meredith Canyon Neighborhood Local Streets Pavement

Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The Meredith Canyon Neighborhood Local Streets Project is a multi-year project that is currently in the design phase and will complete construction by December 2020. The project includes pavement rehabilitation by overlay or complete reconstruction of 3 miles of roadway, construction of 42 ADA compliant curb ramps, repair and reconstruction of damaged curbs and gutters, reconstruction of 12 speed humps and new roadway signing and striping.

The Meredith Canyon Neighborhood Local Streets Pavement Rehabilitation Project includes the following streets within the City - Via De Agua, Avenida Calita, Avenida La Mirada, Calle Esparanza, Calle Miramar, Avenida Pescador, Paseo De Este and Calle Don Carlo.

Construction 07/2020 11/2020 15-30 73 36

Santa Ana Orange 20/21 New Road Maintenance & Rehabilitation

17th Street Rehabilitation: Bristol Street to Flower Street

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | City's Pavement Management System has identified 17th Street from Bristol Street to Flower Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.48 miles of 17th Street; replace damaged curbs, gutters, and sidewalks; and reconstruct approximately 10 curb ramps to conform to the latest ADA standards.

17th Street from Bristol Street to Flower Street Pre-Construction 09/2020 12/2021 20-20 72 34

Santa Ana Orange 20/21 New Road Maintenance & Rehabilitation

17th Street Preventative Maintenance: Fairview Street to

Bristol Street

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | City's Pavement Management System has identified 17th Street from Fairview Street to Bristol Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 1.01 miles of 17th Street; replace damaged curbs, gutters, and sidewalks; and reconstruct approximately 2 curb ramps to conform to the latest ADA standards.

17th Street from Fairview Street to Bristol STreet Pre-Construction 09/2020 12/2021 10-10 72 34

Santa Ana Orange 20/21 New Road Maintenance & Rehabilitation

Alton Avenue Rehabilitation: Main Street to Standard Avenue

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | City's Pavement Management System has identified Alton Avenue from Main Street to Standard Avenue as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.56 miles of Alton Avenue; replace damaged curbs, gutters, and sidewalks; and reconstruct approximately 12 curb ramps to conform to the latest ADA standards.

Alton Avenue from Main Street to Standard Avenue Pre-Construction 09/2020 12/2021 20-20 72 34

Santa Ana Orange 20/21 New Road Maintenance & Rehabilitation

Fairview Avenue Rehabilitation: City Limit to Segerstrom Avenue

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | City's Pavement Management System has identified Fairview Avenue from South City Limit to Segerstrom as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.95 miles of Fairview Avenue; and replace damaged curbs, gutters, and sidewalks.

Fairview Avenue from City Limit to Segerstrom Pre-Construction 09/2020 12/2021 20-20 72 34

Santa Ana Orange 20/21 New Road Maintenance & Rehabilitation

Flower Street Rehabilitation: McFadden Avenue to 1st Street

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | City's Pavement Management System has identified Flower Street from McFadden Avenue to 1st Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.75 miles of Flower Street; replace damaged curbs, gutters, and sidewalks; and reconstruct approximately 4 curb ramps to conform to the latest ADA standards;.

Flower Street from McFadden Avenue to 1st Street Pre-Construction 09/2020 12/2021 20-20 72 34

Santa Ana Orange 20/21 New Road Maintenance & Rehabilitation

MacArthur Boulevard Rehabilitation: Fairview Street to

Raitt Street

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | City's Pavement Management System has identified MacArthur Boulevard from Fairview Street to Raitt Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.60 miles of MacArthur Boulevard; replace damaged curbs, gutters, and sidewalks; and reconstruct approximately 7 curb ramps to conform to the latest ADA standards.

MacArthur Boulevard from Fairview Street to Raitt Street Pre-Construction 09/2020 12/2021 20-20 72 34

Seal Beach Orange 19/20 In Progress Road Maintenance & Rehabilitation

FY2019-20 Local Street Paving Program This project will include: Pavement Rehab/Repair (Existing) College Park East Neighborhood - Daily Street, Violet Street

Oleander Street, Fir Avenue Construction 12/2019 06/2020 7-10 72 34

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 65: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Seal Beach Orange 20/21 New Road Maintenance & Rehabilitation

FY2020-21 Local Street Paving Program This project will include: Pavement Rehab/Repair (Existing) City of Seal Beach - College Park East and Old Town

neighborhoods Construction 10/2020 05/2021 7-10 72 34

Stanton Orange 20/21 New Road Maintenance & Rehabilitation

FY 20/21 Slurry and Reconstruction Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Improvements will take place in Districts 1-11, 14, 15, 17, 20, 21, 22, 24, and 28. Please refer to the Resolution 2020/21 submitted for exact street name locations

Construction 10/2020 04/2021 5-10 65 29

Tustin Orange 18/19 In Progress Road Maintenance & Rehabilitation Newport Avenue Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Repave/resurface 0.80 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

Intersate 5 Freeway to Holt Ave. Pre-Construction & Construction

03/2019 08/2020

07/2020 02/2021 20-30 68 37

Tustin Orange 18/19 In Progress Road Maintenance & Rehabilitation Newport Avenue Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Repave/resurface 0.63 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

Sycamore Ave. to Interstate 5 Freeway Pre-Construction & Construction

03/2019 08/2020

07/2020 02/2021 20-30 68 37

Tustin Orange 18/19 Carried Over Road Maintenance & Rehabilitation Red Hill Avenue Rehabilitation

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Repave/resurface 0.24 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, traffic striping, and median reconstruction to lengthen the northbound left turn pocket at Bryan Ave.

San Juan St. to Bryan Ave. Pre-Construction & Construction

07/2021 01/2022

12/2021 12/2022 20-30 68 37

Tustin Orange 18/19 Forecasted Road Maintenance & Rehabilitation Red Hill Avenue Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Repave/resurface 0.47 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

Walnut Ave. to Interstate 5 Freeway Pre-Construction & Construction

01/2022 07/2022

06/2022 06/2023 20-30 68 37

Tustin Orange 18/19 Forecasted Road Maintenance & Rehabilitation Jamboree Road Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Repave/resurface 1.6 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

Barranca Pkwy. to SCRRA Railroad Pre-Construction & Construction

07/2023 01/2024

12/2023 12/2024 20-30 68 37

Villa Park Orange 20/21 New Road Maintenance & Rehabilitation

Santiago Boulevard Rehab. Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Installation (New)

Avenida Santiago from Sycamore Street (City Limits) to Wanda. Construction 08/2020 05/2021 15-15 68 37

Westminster Orange 20/21 New Road Maintenance & Rehabilitation Ward Street Improvement Project

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | The scope of work includes the removal of existing pavement and placement of new asphalt concrete overlay; removal and replacement of damaged curbs, gutters, cross gutters, spandrels, sidewalks, ADA ramps, driveway approaches, bus pads; adjustment of manholes and water valves to grade; and installation of signing and striping.

Ward Street from South City Limits to Hazard Avenue Construction 02/2021 06/2021 15-20 72 34

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 66: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Westminster Orange 20/21 New Road Maintenance & Rehabilitation

McFadden Street Improvement Project

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | The scope of work includes the removal of existing pavement and placement of new asphalt concrete overlay; removal and replacement of damaged curbs, gutters, cross gutters, spandrels, sidewalks, ADA ramps; driveway approaches; bus pads; adjustment of manholes and water valves to grade; and installation of signing and striping.

McFadden Avenue from Magnolia Street to Bushard Street Construction 04/2021 08/2021 15-20 72 34

Yorba Linda Orange 20/21 New Road Maintenance & Rehabilitation

On Going Street Maintenance Program/Annual Pavement

Preservation Program (APPP) Zone 4

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Zone 4 is located on the southwesterly side of the City generally bounded by Kellogg Drive to the West, Yorba Linda Boulevard to the North, Village Center Dr./Fairmont Blvd. towards the East and the City boundary to the South. The zone consists of 71 lane miles of pavement which include a combination of arterials, collectors, and local streets.

Construction 08/2020 10/2021 5-7 55 29

Auburn Placer 19/20 Carried Over Road Maintenance & Rehabilitation

City of Auburn 2019 Street Overlay Project

This project will include: Pavement Rehab/Repair (Existing) | Staff identified the proposed FY 18/19 project based on the FY 13/14 to FY 22/23 Road Overlay Report Management System. Pavement will consist of 2-inch overlays.

Auburn Folsom Rd. from Indian Hill Rd. to Lincoln Way; Hale St. from High St. to Orange St.; Marguerite Mine Rd. from Auburn Ravine to Hwy 49; Auburn Ravine Rd. from Palm Ave. to Elm Ave; Epperle Ln. from Auburn Ravine Rd. to End; Palm Ave. from Hwy 49 to Auburn Ravine Rd; College Way from Knoll St. to High St; Knoll St. from Pleasant Ave to College Way; Landis Cir. from end to end; Los Altos Ave. from end to end; Hoffman Ave. from High St. to Landis Cir; Pleasant Ave. from Knoll st to High st

Construction 09/2020 06/2021 20-20 5 1

Colfax Placer 20/21 New Road Maintenance & Rehabilitation

Culver Street Reconstruction (Phase III)

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation | This project will reconstruct up to 350 linear feet of Culver St. from Church St. to W. Grass Valley St.

Culver St. from Church St. to W. Grass Valley St. Pre-Construction & Construction

07/2020 03/2021

10/2020 06/2021 20-20 1 1

Colfax Placer 20/21 New Road Maintenance & Rehabilitation Pleasant Street Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation | This project will reconstruct approximately 1,600 feet of Pleasant St.

Pleasant St. from Depot St. to Park hill Dr. Pre-Construction & Construction

07/2020 03/2021

11/2020 06/2021 20-20 1 1

Colfax Placer 20/21 New Road Maintenance & Rehabilitation Depot Street Project This project will include: Environmental Study/Documents, Pavement Rehab/Repair

(Existing), Cost Estimating, Preliminary Design, Document Preparation Depot St. from N. Main St. to Kneeland St. Pre-Construction & Construction

07/2020 03/2021

11/2020 07/2021 20-20 1 1

Colfax Placer 20/21 New Road Maintenance & Rehabilitation School Street Project This project will include: Environmental Study/Documents, Pavement Rehab/Repair

(Existing), Cost Estimating, Preliminary Design, Document Preparation School Street from N. Main St. to Pleasant St. Pre-Construction & Construction

07/2020 03/2021

11/2020 06/2021 20-20 1 1

Colfax Placer 20/21 New Road Maintenance & Rehabilitation Forest Hill Street Project (All) This project will include: Environmental Study/Documents, Pavement Rehab/Repair

(Existing), Cost Estimating, Preliminary Design, Document Preparation Forest Hill Street from Highway 174 to Dinky Ave. Pre-Construction & Construction

07/2020 04/2021

12/2020 12/2021 20-20 1 1

Lincoln Placer 19/20 Carried Over Other Auburn Ravine Bridge

Replacement at McBean Park Drive

This project will include: Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New) | The bridge reconstruction will not only provide 100-year flood protection but will also be widened to provide sidewalks, bike and NEV lanes. The bridge is approximately 200 feet in length. The intersections on both sides of the bridge will also include improvements and rehabilitation to existing asphalt.

McBean Park Drive between Ferrari Ranch Road and East Avenue at Auburn Ravine Construction 06/2021 12/2022 30-40 6 1

Lincoln Placer 19/20 Carried Over Other Bridge Maintenance Project

This project will include: Bridge Structure Rehab/Repair (Existing) | Backfill of eroded areas between roadway and abutment, repair spalled and delaminated areas. Remove unsound concrete, blast clean rebard and patch spalls. Clean joints at bents and replace pourable joint seals. Treat deck with methacrylate.

Four different locations: Lincoln Blvd Bridge over Auburn Ravine Twelve Bridges Drive Bridge over Orchard Creek; Joiner Parkway Bridge over Auburn Ravine; Brentford Circle Bridge over Ingram Slough

Construction 08/2020 11/2020 8-10 6 1

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 67: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Lincoln Placer 19/20 Carried Over Complete Streets Components

Ferrari Ranch Road UPRR Crossing

This project will include: ADA Curb Ramp Installation (New), Railroad Grade Separation Rehab/Repair, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Lincoln Blvd. and Ferrari Ranch Road Construction 09/2020 08/2021 30-40 6 1

Lincoln Placer 19/20 Carried Over Road Maintenance & Rehabilitation Joiner Parkway Rehab Ph2 This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing) Joiner Parkway from Moore Road to Nicolaus Road. Construction 06/2021 12/2021 15-20 6 1

Lincoln Placer 19/20 Carried Over Complete Streets Components Lincoln Blvd Phase 3 This project will include: Railroad Grade Separation Rehab/Repair, ADA Curb Ramp

Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Lincoln Boulevard at 1st, 3rd, 5th, 6th and 7th Street Construction 10/2020 12/2021 30-40 6 1

Lincoln Placer 19/20 Carried Over Road Maintenance & Rehabilitation Moore Road Repaving Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Feasibility Study, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | The current PCI is 49 (Poor Condition). The Pavement Management Plan states the roadway's lifespan has about 5 years remaining. Full roadway reconstruction is anticipated to be necessary to rehabilitate the roadway.

Moore Road between Fiddyment Road and Sorrento Parkway Pre-Construction & Construction

07/2020 06/2021

02/2021 12/2022 15-20 6 1

Lincoln Placer 20/21 New Safety City Hall ADA Parking This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation City Hall 600 6th Street and F Street Pre-Construction &

Construction 07/2020 03/2021

11/2020 06/2021 20-20 6 1

Lincoln Placer 20/21 New Safety City Hall ADA Downtown Curb Ramps

This project will include: Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

Downtown: -Intersection 5th and E Street; 5th and F Street; -Intersection 6th and E Street; 6th and F Street

Pre-Construction & Construction

07/2020 03/2021

12/2020 09/2021 20-20 6 1

Lincoln Placer 20/21 New Road Maintenance & Rehabilitation

East Side Water & Sewer Replacement Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

East 6th, 7th, 8th and 9th Street from East Avenue to eastern termination of roads and North from E.9th south to E.6th Street. Construction 05/2020 08/2020 20-20 6 1

Lincoln Placer 20/21 New Road Maintenance & Rehabilitation Pothole Repair - Various Locations This project will include: Project Scope Development, Preliminary Design Various locations around the City. Final locations to be

determined during preliminary design. Pre-Construction 07/2020 08/2020 20-20 6 1

Lincoln Placer 19/20 Carried Over Road Maintenance & Rehabilitation First Street Resurfacing Phase 1

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

First Street between O Street to Alley east of L Street. Construction 04/2020 08/2020 15-20 6 1

Lincoln Placer 19/20 In Progress Road Maintenance & Rehabilitation Lincoln Boulevard Repaving This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing) Lincoln Boulevard between Auburn Ravine Bridge to Sterling Parkway. Construction 04/2020 06/2020 15-20 6 1

Loomis Placer 20/21 New Safety Sierra College Boulevard Third Lane from Brace Road to Taylor

Road

This project will include: Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

Sierra College Boulevard from Brace Road to Taylor Road Construction 10/2020 06/2021 25-35 6 1

Rocklin Placer 19/20 Carried Over Road Maintenance & Rehabilitation Mission Hills Reconstruction

This project will include: Pavement Improvement (New) | The removing and replacing of degraded asphalt needs to be done as part of general repairs and is necessary to preserve the roadways and prevent major rehabilitation in the coming years.

Argonaut Avenue ;Mountain View Drive, Mission Way, Capistrano Way, Verano Way, Roble Way, Mesa Court, Piedra Court, Rio Court, Antelope Argonaut Avenue to Antelope Way, Antelope Way from La Paloma Lane to Mountain View Drive, Sweetwater Drive, Sweetwater Court, Hillside Drive, Pecan Court, Baltic Circle, Chelsea Place, Chelsea Court, Lemon Hill Drive, David Court, Adam Court

Construction 07/2020 06/2021 17-20 4 1

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 68: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Rocklin Placer 19/20 Carried Over Road Maintenance & Rehabilitation Annual Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) Stanford Ranch, Stanford Foothills, Sierra Meadows, Granite

Lake Estates, Quarry Ridge Estates. Sunset West Lot 48. Construction 07/2020 06/2021 5-7 4 1

Rocklin Placer 19/20 Carried Over Road Maintenance & Rehabilitation Citywide Dig Outs

This project will include: Pavement Rehab/Repair (Existing) | The removing and replacing of degraded asphalt needs to be done as part of general repairs and is necessary to preserve the roadways and prevent major rehabilitation in the coming years.

Granite Drive Lonetree Blvd. (City Limit with Roseville to Sunset Blvd.); Blue Oaks Blvd.Wildcat Blvd. (West Stanford Ranch Road to City Limit with Lincoln);½ Park Drive(Stanford Ranch Road to Crest Drive); ½Sunset Blvd. (Stanford Ranch Road to Fairway Drive);½ Sunset Blvd. (Stanford Ranch Road to HWY 65);½ Sierra College Blvd. (Rocklin Road to Southside Ranch Road);½ Sierra College Blvd. (City Limit with Loomis to City Limit with Placer County) Sunset Blvd. to Stanford Ranch Road.

Construction 07/2020 06/2021 17-20 4 1

Roseville Placer 20/21 New Road Maintenance & Rehabilitation 2021 Residential Resurfacing This project will include: Pavement Rehab/Repair (Existing) Automall Drive, South Kirby and Hillcrest neighborhoods Construction 06/2020 11/2021 7-10 6 4

Portola Plumas 20/21 New Road Maintenance & Rehabilitation South Gulling Street Patching This project will include: Project Scope Development South Gulling Street Pre-Construction 08/2020 10/2021 1-2 1 1

Portola Plumas 20/21 New Road Maintenance & Rehabilitation Commercial Street Patching This project will include: Pavement Rehab/Repair (Existing) Commercial Street Construction 08/2020 10/2021 1-2 1 1

Banning Riverside 20/21 New Road Maintenance & Rehabilitation 2nd Street AC Overlay

This project will include: Grind and construct 2" asphalt concrete; adjust water valve and sewer manhole covers; repair concrete curb and gutter, sidewalk, access ramps and cross gutter; and reinstall all existing striping and pavement markers.

2nd Street from Nicolet Street to George Street Construction 06/2021 10/2021 10-15 42 23

Banning Riverside 20/21 New Road Maintenance & Rehabilitation 3rd Street AC Overlay

This project will include: Grind and construct 2" asphalt concrete; adjust water valve and sewer manhole covers; repair concrete curb and gutter, sidewalk, access ramps and cross gutter; and reinstall all existing striping and pavement markers.

3rd Street from Hays Street to Williams Street Construction 06/2021 10/2021 10-15 42 23

Banning Riverside 20/21 New Road Maintenance & Rehabilitation 4th Street AC Overlay

This project will include: Grind and construct 2" asphalt concrete; adjust water valve and sewer manhole covers; repair concrete curb and gutter, sidewalk, access ramps and cross gutter; and reinstall all existing striping and pavement markers.

4th Street from Ramsey Street to Nicolet Street Construction 06/2021 10/2021 10-15 42 23

Banning Riverside 20/21 New Road Maintenance & Rehabilitation Morongo Street AC Overlay

This project will include: Grind and construct 2" asphalt concrete; adjust water valve and sewer manhole covers; repair concrete curb and gutter, sidewalk, access ramps and cross gutter; and reinstall all existing striping and pavement markers.

Morongo Street from Ramsey Street to Williams Street Construction 06/2021 10/2021 10-15 42 23

Banning Riverside 20/21 New Road Maintenance & Rehabilitation George Street AC Overlay

This project will include: Grind and construct 2" asphalt concrete; adjust water valve and sewer manhole covers; repair concrete curb and gutter, sidewalk, access ramps and cross gutter; and reinstall all existing striping and pavement markers.

George Street from Woodland to Sunset Ave Construction 06/2021 10/2021 10-15 42 23

Banning Riverside 20/21 New Road Maintenance & Rehabilitation 22nd Street AC Overlay

This project will include: Grind and construct 2" asphalt concrete; adjust water valve and sewer manhole covers; repair concrete curb and gutter, sidewalk, access ramps and cross gutter; and reinstall all existing striping and pavement markers.

22nd Street from Ramsey St to Railroad Tracks Construction 06/2021 10/2021 10-15 42 23

Banning Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Hathaway Street AC Overlay This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Hathaway Street from Williams Street to George Street Construction 08/2020 10/2020 10-15 42 23

Banning Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Florida Street AC Overlay This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Florida Street from Theodore Street to North End Construction 08/2020 10/2020 10-15 42 23

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 69: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Banning Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Hargrave Avenue AC Overlay This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Hargrave Avenue from Williams Street to Hoffer Street Construction 08/2020 10/2020 10-15 42 23

Banning Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Murray Street Slurry Seal This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Murray Street from Hays Street to Nicolet Street Construction 08/2020 10/2020 5-7 42 23

Beaumont Riverside 20/21 New Road Maintenance & Rehabilitation Annual Slurry Seal FY20/21 This project will include: Slurry seal application on various streets in the City of

Beaumont.

Agnes Alexe Anna Ash Avalone Beech Bryce California Cherry Valley Acres Citrus

Pre-Construction 04/2021 09/2021 5-7 42 23

Beaumont Riverside 20/21 New Road Maintenance & Rehabilitation Annual Street Rehab FY 20/21 This project will include: Repaving existing street segments at various locations in the

City

Antonell California Commerce Cougar Eleventh First Oak Valley

Pre-Construction 04/2021 09/2021 15-30 42 23

Calimesa Riverside 18/19 In Progress Safety County Line Road Corridor Improvements Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New), Bicycle Lane (New) | Joint improvement project with the City of Yucaipa to construct improvements on County Line Road from Calimesa Blvd to Bryant St including 4 intersections, sidewalk, ADA ramps, bike lanes, utility relocations and street widening. | The total cost is design through construction. Costs are split between Cities of Yucaipa and Calimesa, by funding agreement.

County Line Road from Calimesa Blvd to Bryant St. Construction 01/2019 06/2021 25-40 42 23

Canyon Lake Riverside 19/20 Carried Over Safety Sound Wall Repairs This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Repair various areas of the Railroad Canyon Road sound wall.

Railroad Canyon Road - westbound from Sorrel Lane to Towne Center Drive South

Pre-Construction & Construction

07/2020 11/2020

10/2020 02/2021 10-15 67 28

Canyon Lake Riverside 20/21 New Traffic Control Devices Pedestrian Crosswalk Enhancements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Railroad Canyon Road (all traffic signals between Sorrel Lane and Skylink Drive)

Pre-Construction & Construction

01/2021 03/2021

02/2021 05/2021 15-20 67 31

Canyon Lake Riverside 20/21 New Safety Striping Improvements Railroad Canyon Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation Along Railroad Canyon Road within City limits Pre-Construction &

Construction 03/2021 05/2021

04/2021 06/2021 5-10 67 31

Cathedral City Riverside 20/21 New Road Maintenance & Rehabilitation

Landau Boulevard and McCallum Way Intersection Traffic Signal

Construction

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

The Project is an alleyway located between Vista Chino to the north and McCallum Way to the south, parallel to Landau Blvd.

Pre-Construction & Construction

11/2020 12/2020

12/2020 02/2021 15-20 56 28

Cathedral City Riverside 20/21 New Road Maintenance & Rehabilitation

Whispering Palms Neighborhood Street Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation

Residential blocks/sections of Candlewood Drive, Shifting Sands Trail, Sky Blue Water Trail, Whispering Palms Trail, Navajo Trail, and Pueblo Trail between Ramon Road and Avenue 33.

Pre-Construction & Construction

06/2021 08/2021

07/2021 11/2021 15-20 56 28

Coachella Riverside 19/20 Carried Over Road Maintenance & Rehabilitation La Ponderosa Homes This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing) La Ponderosa Dr, Naomi Ct, Perez St, Romualda Ct, Ortiz St, and Hernandez St Construction 10/2020 12/2020 20-20 56 28

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 70: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Coachella Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Phase II Slurry REAS This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Various streets throughout the City of Coachella North of Ave 52 and East of Cesar Chavez St Construction 12/2020 02/2021 20-20 56 28

Coachella Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

Peacock Palms Neighborhood Pavement Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Calle Leon, Paseo Laredo, Via Durango, Via Hermosa, Vera Cruz, Calle De Vega, Avenida Cortez, Pavon Palma Construction 02/2021 04/2021 20-20 56 28

Coachella Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

Avenida Del Oro Neighborhood Pavement Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Avenida Del Oro, Avenida Del Parque, Corte Del Parque Construction 02/2021 04/2021 20-20 56 28

Coachella Riverside 20/21 New Road Maintenance & Rehabilitation Avenue 52 and Calhoun This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Avenue 52 and Calhoun Construction 07/2020 11/2020 20-20 56 28

Corona Riverside 20/21 New Road Maintenance & Rehabilitation

2021 Major and Local Street Pavement Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing)

See attached project location map. Construction 06/2021 10/2021 15-20 60 31

Desert Hot Springs Riverside 18/19 Carried Over Safety Palm Drive Traffic Signal and Street Light Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Project will include the installation of new traffic signals, street lights, bike lanes, traffic signal synchronization facilities, grind and overlay of asphalt material, and striping and markings and addition of bike lanes marking at various segments. | Project is forecasted to start in FY 2019-2020

Palm Drive from Two Bunch Palms Trail to Pierson Blvd Construction 01/2020 07/2020 5-10 56 28

Desert Hot Springs Riverside 20/21 New Safety Hacienda Ave Street Improvement Project

This project will include: Environmental Study/Documents, Right of Way, Project Scope Development, Feasibility Study, Document Preparation | Engineering Design Hacienda Ave - West Dr to Foxdale Ave Pre-Construction 08/2020 06/2021 5-10 56 28

Desert Hot Springs Riverside 20/21 New Road Maintenance & Rehabilitation Palm Drive Bike Lane Project This project will include: Right of Way, Project Scope Development, Preliminary

Design | Engineering Design Palm Drive - Pierson Blvd to 8th St Pre-Construction 07/2020 06/2021 5-10 56 28

Desert Hot Springs Riverside 20/21 New Road Maintenance & Rehabilitation

Citywide asphalt slurry seal -various streets FY20-21

This project will include: Project Scope Development, Preliminary Design, Maintenance Program Plan Development | Project will include grind and overlay of asphalt material, and crack seal and slurry seal. Replacement of striping and markings and addition of Bike lanes marking at various segments.

Various Street City Waide Pre-Construction 07/2020 06/2021 5-10 56 28

Eastvale Riverside 20/21 New Road Maintenance & Rehabilitation 2020 Annual Overlay Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

Springvale, Woodshire Glen, Grand Prairie, River Downs, Belynn, Bluefield, Stillbrook, Annebury, Avenly Glen, Havenhurst, Bay, Emmerglen, Blue Ribbon, Heathgrove, Huntervale, Whispering Hills, Walnut Grove, Fairchild, Apple Grove, Coffeeberry, Knowlwood, Alderwood, Tiger Lily and Almond Grove. Exact limits of the above mentioned streets can be found on Exhibit A of the approved resolution.

Construction 08/2020 06/2021 13-15 60 31

Hemet Riverside 20/21 New Road Maintenance & Rehabilitation Latham Street Improvements

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

Latham Ave. - Gilmore to Palm Pre-Construction & Construction

07/2020 11/2020

08/2020 12/2020 10-20 42 23

Hemet Riverside 20/21 New Road Maintenance & Rehabilitation

2020-2021 SB1 Pavement Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

Buena Vista St. - Stetson to Johnston Devonshire Ave - Sanderson to Kirby, State to Harvard

Pre-Construction & Construction

09/2020 01/2021

10/2020 02/2021 10-20 42 23

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 71: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Indian Wells Riverside 20/21 New Road Maintenance & Rehabilitation Stardust Ln Overlay This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement

(New) Stardust Ln to Montecito Dr Construction 03/2021 05/2021 5-15 42 28

Indian Wells Riverside 20/21 New Road Maintenance & Rehabilitation Washington Street Overlay This project will include: Pavement Rehab/Repair (Existing) Washington St from Fred Waring Dr. to Miles Ave. Construction 07/2020 05/2021 5-15 42 28

Indian Wells Riverside 20/21 New Road Maintenance & Rehabilitation Montecito Dr. Overlay This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement

(New) Montecito Ln- local street Construction 04/2021 05/2021 5-15 42 28

Indio Riverside 20/21 New Road Maintenance & Rehabilitation

Fiscal Year 2020/2021 Citywide General Pavement Rehabilitation

and Slurry This project will include: Pavement Rehab/Repair (Existing)

1. Fred Waring Drive from Hoover Street to Monroe Street 2. Monroe Street from Fred Waring Drive to Highway 111 3. Monroe Street from John Nobles Ave to Avenue 48 4. Jackson Street from Avenue 50 to Avenue 52 5. Jackson Street from I-10 to Avenue 42 6. Avenue 38 from Dune Palms Road to Madison Street 7. Dune Palms Road from Avenue 38 to Avenue 37 8. Avenue 37 full limits 9. Indio Boulevard from Jefferson Street to Madison Street

Construction 07/2020 06/2021 5-10 56 28

Jurupa Valley Riverside 20/21 New Road Maintenance & Rehabilitation

Mission Boulevard Pavement Rehabilitation - Ph. 1

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Mission Blvd. - Pyrite to Valley Way Pre-Construction & Construction

07/2020 01/2021

10/2020 03/2021 10-20 60 31

Jurupa Valley Riverside 20/21 New Road Maintenance & Rehabilitation

Lucretia Avenue Pavement Rehabilitation

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Lucretia Ave. - Limonite to Etiwanda Pre-Construction & Construction

12/2020 04/2020

02/2021 06/2021 10-20 60 31

Jurupa Valley Riverside 20/21 New Road Maintenance & Rehabilitation

2020-21 Citywide Pavement Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

58th St. - Beach to Cedar, Cedar St. - Tumbleweed to 58th, Tumbleweed St. - S Cul de Sac to 58th, Marlatt St. - Limonite to 58th, Old Limonite Ave. - Marlatt to E End

Pre-Construction & Construction

08/2020 12/2020

10/2020 01/2021 10-20 60 31

La Quinta Riverside 20/21 New Road Maintenance & Rehabilitation

Monroe Street Pavement Rehabilitation ( Avenue 52 to

Avenue 53, and near Avenue 61)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Monroe Street from Avenue 52 to Avenue 53, and near Avenue 61

Pre-Construction & Construction

07/2020 05/2021

04/2021 06/2021 20-20 42 28

La Quinta Riverside 18/19 In Progress Complete Streets Components

La Quinta Village Complete Streets - A Road Diet Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Roundabout Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Create a Complete Streets atmosphere throughout the Village by installing pedestrian and bicycle facilities by reducing the number of traveled lanes from four lanes to two. Install round abouts at intersections including shared use paths.Install pronounced pedestrian midblock crossingsincluding median refuges and rapid rectangular flashing |FY 17/18 RMRA Funds were expended

The three major streets affected include: Calle Tampico, from Eisenhower Dr. to Washington St.; Eisenhower Dr., from Calle Tampico to Calle Sinaloa; and Calle Sinaloa/Ave 52, from Eisenhower Dr. to Washington St.

Construction 06/2019 10/2020 20-20 42 28

Lake Elsinore Riverside 20/21 New Road Maintenance & Rehabilitation

Downtown Pavement Rehabilitation - Phase II This project will include: Pavement Rehab/Repair (Existing) Parkway to Mill Street; Mill Street to Franklin; Country Club Blvd. Pre-Construction &

Construction 10/2020 04/2020

12/2020 06/2021 10-12 67 28

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 72: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Menifee Riverside 18/19 Carried Over Road Maintenance & Rehabilitation Murrieta Road Resurfacing

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | repave/resurface 2.0 miles of local arterial road. Restripe bike/Neighborhood Electric Vehicle (NEV) lanes. Install additional signs. | The project length was reduced in scope due to a large project from the local water department that will install a large transmission line taht will affect a section of the project (approximately half). A future project will be added to rehabilitate the remainder road after the local water department has finfished its work.

Murrieta Road from McCall Boulevard to Salt Creek Construction 09/2020 11/2020 15-20 67 23

Menifee Riverside 20/21 New Road Maintenance & Rehabilitation

McCall Boulevard Road Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

McCall Boulevard (from Encato Road to Woodside Road) Construction 03/2021 06/2021 15-20 67 23

Moreno Valley Riverside 20/21 New Road Maintenance & Rehabilitation

Citywide Pavement Rehabilitation Program FY20/21

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

15 segments of arterial/collector sts and 66 segments of residential sts; Arterial/collector sts Alessandro Blvd, Cottonwood Ave, Eucalyptus Ave, John F. Kennedy Dr, Kalmia Ave, Morton Rd, Lasselle St, Ironwood Ave, Kitching St, Delphinium Ave; Residential sts within Tract 20220 of Hidden Springs, Tracts 20072 & 19393 n/e of Perris Blvd & Ironwood Ave, Tract 19685 n/e of Kitching St & Gentian Ave, Tracts 20859 & 21806 s/e of Perris Blvd & Krameria Ave , Tract 8044 s/e of Heacock St & Cactus Ave

Pre-Construction & Construction

07/2020 06/2021

05/2021 10/2021 5-10 61 31

Moreno Valley Riverside 19/20 In Progress Road Maintenance & Rehabilitation

Citywide Pavement Rehabilitation Program FY 19/20

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Document Preparation

Alessandro: Nason-Oliver, Bay: Moreno Beach-Peyton, Bay: Lasselle-Regis, Cactus: Moreno Beach-1970 ft east, Cactus: 1980 ft west-Redlands, Chippewa: Davis-Quapaw, Clark: Tennyson-Box Springs, Cottonwood: Heacock-Indian, Cottonwood: Graham-Heacock, Cottonwood: Oliver-Moreno Beach, Dracaea: Kitching-Morrison, Frederick: Brodiaea-Cactus, Gentian: Canyonstone-Indian, Graham: Ironwood-David, Heacock: Cottonwood-Alessandro, Heacock: Sandbow-Ironwood, Hidden Springs: Pigeon Pass-County Gate

Pre-Construction & Construction

07/2019 07/2020

06/2020 10/2020 5-10 61 31

Murrieta Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

Pavement Resurfacing of Murrieta Hot Springs Road from Madison

Avenue to Alta Murrieta Drive

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Murrieta Hot Springs Road from Madison Avenue to Alta Murrieta Drive Construction 09/2020 11/2020 10-10 67 28

Murrieta Riverside 20/21 New Road Maintenance & Rehabilitation

Nutmeg Street from Jefferson Avenue to Jackson Avenue and Hancock Avenue from California Oaks Road to Las Brisas Road

This project will include: Pavement Rehab/Repair (Existing) Nutmeg Street from Jefferson Avenue to Jackson Avenue and Hancock Road from California Oaks Road to Las Brisas Road (South).

Construction 09/2020 11/2020 10-10 67 28

Norco Riverside 18/19 Carried Over Road Maintenance & Rehabilitation

Second St Widening for Dedicated Right Turn Lane onto Southbound I-

15 FWY

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Street widening and improvement project on Second Street (between Hamner Avenue and I-15 Freeway) to add dedicated right turn lane onto the I-15 southbound Freeway

The street improvements will be located on Second St between Hamner Ave and the I-15 Freeway Construction 07/2020 06/2021 15-25 60 31

Norco Riverside 18/19 In Progress Road Maintenance & Rehabilitation

Sixth St Widening for Dedicated Right Turn Lane onto Southbound I-

15 FWY

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Street widening and improvement project on Sixth Street (between Hamner Avenue and I-15 Freeway) to add dedicated right turn lane onto the I-15 southbound Freeway

The street improvements will be located on Sixth St between Hamner Ave and the I-15 Freeway Construction 07/2020 06/2021 15-25 60 31

Palm Desert Riverside 18/19 Carried Over Road Maintenance & Rehabilitation

Cook Street Resurfacing - Gerald Ford Drive to Frank Sinatra Drive This project will include: Cold-in-place recycling with a warm mix cap Approximately 3,300 linear feet of Cook Street, from Gerald Ford

Drive to Frank Sinatra Drive. Construction 07/2021 09/2021 20-30 42 28

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 73: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Palm Desert Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

Portola Avenue - Highway 111 to Fred Waring Drive

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development | Regrade street to reduce crossfall. A survey will be conducted to establish the limits of repair. The asphalt will be milled down and cross gutters will be removed and replaced at the correct grade. The street will be capped with warm mix asphalt.

Portola Avenue between Highway 111 and Fred Waring Drive Pre-Construction & Construction

04/2021 05/2021

05/2021 07/2021 25-30 42 28

Palm Desert Riverside 20/21 New Road Maintenance & Rehabilitation

Citywide Pavement Conditions Evaluation

This project will include: Contract with a consultant to perform a pavement condition survey, assessment, and inventory services on the entire City street network. Citywide Pre-Construction 01/2021 03/2021 3-5 42 28

Palm Springs Riverside 20/21 New Traffic Control Devices Traffic Signal at San Rafael Drive and Avenida Caballeros

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation

Intersection of San Rafael Drive and Avenida Caballeros in the City of Palm Springs

Pre-Construction & Construction

08/2020 01/2021

10/2020 06/2021 40-50 42 28

Palm Springs Riverside 20/21 New Traffic Control Devices Traffic Signal at Rosa Parks Road and Indian Canyon Drive

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation

Intersection of Rosa Parks Road and Indian Canyon Drive in the City of Palm Springs

Pre-Construction & Construction

08/2020 01/2021

10/2020 06/2021 40-50 42 28

Perris Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

2020 Citywide Street Improvements

This project will include: Cost Estimating, Project Scope Development, Preliminary Design Various City roadways where pavement rehabilitation is needed. Pre-Construction 10/2020 02/2021 5-10 61 31

Perris Riverside 20/21 New Road Maintenance & Rehabilitation

2021 Citywide Street Improvements

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation Various City roadways where pavement rehabilitation is needed. Pre-Construction 04/2021 06/2021 5-10 61 31

Rancho Mirage Riverside 19/20 Carried Over Road Maintenance & Rehabilitation

Monterey Avenue Street Pavement Rehabilitation

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design | This project will include a full rehabilitation of existing pavement for ¾ of a mile on the southbound lanes of Monterey Avenue between Hovley Lane and the north edge of the bridge at the Whitewater Channel. The existing pavement has deteriorated over numerous years and is in poor condition over the entire length of the subject area. The City plans to utilize a cold in-place recycling method with a hot mix top course to reconstruct the ¾ mile stretch of roadway.

Monterey Avenue, west side, from Hovley Lane to the north edge of the bridge at the Whitewater Channel (Total distance: 1.0 miles)

Pre-Construction & Construction

04/2020 05/2020

05/2020 08/2020 10-20 42 28

San Jacinto Riverside 18/19 Carried Over Road Maintenance & Rehabilitation

Mountain Avenue Pavement Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Document Preparation | Pavement rehabilitation.

Mountain Road from Seventh to Esplanade. Pre-Construction & Construction

06/2020 08/2020

07/2020 11/2020 7-10 42 23

San Jacinto Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Citywide Slurry Seal Program

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Project Scope Development, Right of Way, Feasibility Study, Preliminary Design, Document Preparation

Downtown streets - various locations to be identified by city staff as distress pavement.

Pre-Construction & Construction

07/2020 04/2021

03/2021 06/2021 5-8 42 23

San Jacinto Riverside 19/20 Carried Over Other Pavement Management System This project will include: Cost Estimating, Project Scope Development | To evaluate the streets in San Jacinto for pavement condition indexes. Citywide. Pre-Construction 06/2020 06/2021 10-10 42 23

San Jacinto Riverside 20/21 New Road Maintenance & Rehabilitation

State Street Pavement Rehabilitation

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Document Preparation South City Limits to Ramona Expressway Pre-Construction 10/2020 04/2021 7-10 42 23

San Jacinto Riverside 20/21 New Road Maintenance & Rehabilitation

Ramona Expressway Rehabilitation

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Document Preparation West of Warren Road to Sanderson Avenue Pre-Construction 07/2020 03/2021 7-10 42 23

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 74: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Jacinto Riverside 20/21 New Road Maintenance & Rehabilitation

Artesia Avenue Rehabilitation and Sidewalk Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Document Preparation

This project consists of the following streets: North Jordan Avenue, Artesia Street, North Algona Avenue, North Alessandro Avenue, North Mistletoe Avenue, Alpha Court, Beta Court, Cypress Avenue, Peppertree Way, North Vernon Avenue, and East Peach Street.

Pre-Construction 10/2020 03/2021 7-10 42 23

San Jacinto Riverside 20/21 New Other Americans with Disabilities Act

(ADA) Self Assessment and Transition Plan

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation | Preparation of plan to complete ADA improvements City wide.

Citywide Pre-Construction 07/2020 06/2021 10-10 42 23

Temecula Riverside 18/19 Carried Over Road Maintenance & Rehabilitation

Pavement Rehabilitation Program -Winchester Road, Nicolas to

Eastern City Limits

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Winchester Road, From Nicolas Road to Eastern City Limits Construction 09/2020 12/2020 10-10 75 28

Temecula Riverside 18/19 Carried Over Road Maintenance & Rehabilitation

Pavement Rehabilitation Program -Ynez Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Ynez Road, from Winchester Road to Date Street Construction 09/2020 12/2020 10-20 75 28

Temecula Riverside 18/19 Carried Over Road Maintenance & Rehabilitation

Pavement Rehabilitation Program -Equity Drive and County Center

Drive Loop

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Equity from Ynez to County Center and County Center from Ynez to Equity Construction 09/2020 12/2020 10-20 75 28

Temecula Riverside 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Program -Rancho California Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Rancho California Road, Humber Drive to Margarita Road Construction 07/2020 08/2020 10-20 75 28

Temecula Riverside 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Program -De Portola Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

De Portola Road, Jedediah Smith Road to Margarita Road Construction 07/2020 08/2020 10-20 75 28

Temecula Riverside 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Program -West Side Business Park Area

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

Entire lengths of Avenida Alvarado/ Rio Nedo/ Aqua Vista Way/ Tierra Alta Way/ Zevo Drive/Business Park Drive Loop/ Via Dos Picos/ Del Rio Road/ Las Haciendas Street/ Calle Cortez/ Enterprise Circle North and Via Montezuma (Jefferson to Del Rio Road)

Construction 09/2020 04/2021 10-20 75 28

Temecula Riverside 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation Program -Butterfield Stage Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Butterfield Stage Road, Pauba Road to Rancho California Road Construction 04/2021 08/2021 10-20 75 28

Wildomar Riverside 20/21 New Road Maintenance & Rehabilitation

Clinton Keith Rd. Widening (Phase 1)

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Project includes multiple components. However, only those components for which RMRA Funds are expected to contribute have been identified in the project description.

Clinton Keith Rd. from I-15 to Eastern City Limits Construction 11/2020 02/2021 10-10 67 28

Wildomar Riverside 20/21 New Road Maintenance & Rehabilitation

Street Rehabilitation Project (FY 2020-21)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Grand Ave. (from Jane Ct. to Clinton Keith Rd.), Wildomar Trail/Baxter Rd./Central St. (from I-15 to 1500' southwest) Construction 04/2021 06/2021 20-25 67 28

Wildomar Riverside 20/21 New Road Maintenance & Rehabilitation Slurry Seal This project will include: Preliminary Design

Citywide Streets (to be determined) from residential, local, circulation plan streets, etc... Visit the City Circulation Plan available on the City's website.

Pre-Construction 04/2021 06/2021 8-8 67 28

Citrus Heights Sacramento 20/21 New Complete Streets Components

Greenback Lane Complete Streets Project - Sunrise Blvd to Fair Oaks

Blvd

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Greenback Lane from Sunrise Boulevard to Fair Oaks Blvd Pre-Construction & Construction

08/2020 03/2021

12/2020 10/2021 20-30 8 4

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 75: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Citrus Heights Sacramento 20/21 New Road Maintenance & Rehabilitation

2021 Residential Resurfacing Project This project will include: Pavement Rehab/Repair (Existing)

Sloop Court; Acaro Court; Peony Court; Three Sister Court; Begonia Court; Wild Oak Drive; Whalter Court; Noreen Way; Hill Drive; Beta Court; Verbena Court.

Construction 06/2021 10/2021 20-30 8 4

Elk Grove Sacramento 18/19 In Progress Road Maintenance & Rehabilitation

Bond Road Median Improvements and Resurfacing

This project will include: The project will provide a cape seal treatment for the entire roadway from East Stockton Blvd. to the bridge at Laguna Creek (~4300 feet) including new striping, markings and traffic loops. The project will also construct about 2100 feet of raised center median on Bond Road, between E. Stockton Blvd. and Egret Dr. and provide an EB left turn pocket into the shopping center's eastern driveway.

Bond Road between East Stockton Blvd. & bridge at Laguna Creek. Raised Center Median: E. Stockton Blvd. to Egret Dr. to create a physical separation between eastbound and westbound traffic.

Pre-Construction & Construction

10/2019 06/2020

10/2020 10/2020 5-10 9 6

Elk Grove Sacramento 18/19 In Progress Road Maintenance & Rehabilitation

2019 Pavement Slurry Seal and Resurfacing

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | 1.95 million SF of slurry seal 821,000 SF of cape seal 524,000 SF of micro surfacing Work completed on 112 existing street segments

Slurry & Chip Seal Streets Laguna Crest Way; Laguna Blvd to Sage Glen Way LAGUNA QUAIL WAY; RED DOG CREEK DR to RED DOG CREEK DR SITKA CT; WEEPING FIG WY to CDS-EAST END MOLINERO CT; LAGUNA QUAIL WAY to CDS-SOUTH END TEGAN RD; FRANKLIN BL to 1271 FT W/OF FRANKLIN BL WHISKEY CREEK DR; LAGUNA QUAIL WY to LAGUNA PARK DR SICKLE CT; LAGUNA QUAIL WY to CDS-EAST END

Pre-Construction & Construction

07/2019 07/2019

12/2019 12/2020 5-10 9 6

Elk Grove Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

2020 Pavement slurry seal and resurfacing project (WPR020)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project is broken down into 2 phases. Phase 1 included base as surface pavement repairs. Phase 2 will include surface treatment and striping

WPR019, WPR020 and WTC015 - All locations listed are an estimate and have yet to be finalized. For all street locations, please see the City's online map of the areas. http://www.elkgrovecity.org/city_hall/departments_divisions/publi c_works/pavement_management_program

Pre-Construction & Construction

11/2019 03/2020

03/2020 10/2020 5-10 9 6

Elk Grove Sacramento 20/21 New Road Maintenance & Rehabilitation

2021 Pavement Slurry Seal and Resurfacing (WPR021)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project is planned to be broken down into 3 phases. Phase 1 ADA improvements and sidewalk repairs. Phase 2 base and surface AC repairs. Phase 3 surface treatments and striping

Work to take place in the following Subzones 0, 14,16, 22, 24, 27, 41, 50, 58, 61 and 100. Please use this link to show all the streets included in 2021 https://elkmap.maps.arcgis.com/apps/webappviewer/index.html?i d=cfd268d6f3564ee4b1e39be7266b5034

Pre-Construction & Construction

03/2020 07/2020

12/2020 10/2021 5-10 9 6

Elk Grove Sacramento 20/21 New Road Maintenance & Rehabilitation Arterial Roads Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project will rehabilitate or resurface pavement on portions of Waterman Rd. and Elk Grove Florin Rd. and provide class II bike lanes. Also included are a mid-block pedestrian crossing along Elk Grove-Florin Rd. and a new sidewalk along one section of the west side of Waterman Rd.

This project is located at Waterman Rd. (from Bond Road to Elk Grove Blvd) Waterman Rd. (from Charolais Way to Grant Line Rd.) Elk Grove Florin Rd. (from Elk Grove Blvd to Valley Oak Ln)

Pre-Construction & Construction

05/2020 05/2021

05/2021 10/2021 5-10 9 6

Folsom Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Pavement Resurfacing Project FY 20-21

This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation of various locations

•Lexington Hills Silberhorn Drive, Wallingford Lane, Penwood Lane, Wenham Way, Fayette Way, Biscayne Way, Waterboro Square, Rockport Circle, Clemsford Square, Hingham Square, Penry Square, Fitchburg Square, Province Lane, Kempton Square, Trowbridge Lane, Chambersburg Way, Wolcot Court, Trefton Court, Allerton Court •East Bidwell Street (Blue Ravine Road to Riley Street)

Construction 07/2020 06/2021 25-40 6 1

Folsom Sacramento 20/21 New Other Natoma Street Drainage Project (Phase II) This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Natoma Street Drainage System area west of Scott Street Construction 07/2020 06/2021 25-50 6 1

Folsom Sacramento 20/21 New Other Willow Creek Estates Storm Drain Lining (Phase II) This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Various streets within the Lexington Hills neighborhood Construction 07/2020 06/2021 25-50 6 1

Galt Sacramento 20/21 New Road Maintenance & Rehabilitation

2020/21 Road Maintenance and Rehabilitation Project This project will include: Cost Estimating, Document Preparation

The project locations may include Grouse Dr., West Elm to Quail Hollow, Emerald Oaks Dr., West Elm to Quail Hollow and Quail Hollow to West A St., Ranch Rd, Lincoln to Bernal, and various dig-out repair throughout the City.

Pre-Construction 06/2020 11/2020 5-30 9 5

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 76: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Isleton Sacramento 20/21 New Safety Street Signs This project will include: Preliminary Design Citywide Pre-Construction 08/2020 05/2021 10-20 11 3

Isleton Sacramento 20/21 New Match Funds Local Road Safety Plan/Caltrans Highway Safety Project This project will include: Cost Estimating, Document Preparation Highway 160 Pre-Construction 07/2020 12/2020 10-30 11 3

Isleton Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Jackson Blvd. Ext. from 4th St to 6th St.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Right of Way, Landscape Safety Installation (New), Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New), Active Transportation Plan

Jackson Blvd. Ext. from 4th St to 6th St. Pre-Construction & Construction

08/2020 08/2021

10/2020 08/2022 15-20 11 3

Isleton Sacramento 18/19 Carried Over Road Maintenance & Rehabilitation

Everything West of Delta Avenue/Full Depth Reclamation

This project will include: Project Scope Development, Preliminary Design, Document Preparation | Slurry Seal - This is a actual quote for a slurry seal coat | Engineering in progress

Everything West of Delta Avenue Pre-Construction 06/2020 06/2022 15-20 11 3

Isleton Sacramento 18/19 Carried Over Road Maintenance & Rehabilitation

Jackson Blvd., From 2nd St to 4th St

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Maintenance Program Plan Development, Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Feasibility Study, Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New), Active Transportation Plan | Grind and Overlay - 454' x 33' Two large manholes 4 small services points gutters need rehab (cost does not include gutter rehab)

Jackson Blvd., From 2nd St to 4th St Pre-Construction & Construction

09/2020 09/2021

04/2021 09/2022 15-20 11 3

Rancho Cordova Sacramento 20/21 New Road Maintenance & Rehabilitation Mather Field Road Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New)

Mather Field Road from Folsom Blvd to International Drive Pre-Construction & Construction

10/2019 09/2020

06/2020 02/2021 15-20 8 4, 8

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Upper Land Park roadway rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Upper Land Park neighborhood bounded by McClatchy Way to the north, 10th Avenue to the south, Santa Buena Way/5th Street to the west, and Riverside Boulevard to the east.

Construction 07/2020 03/2021 15-15 7 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation Franklin Boulevard

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Franklin Boulevard from Mack Road to Cosumnes River Boulevard Construction 07/2020 03/2021 15-15 9 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Regency Park neighborhood slurry seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Regency Park neighborhood bounded by Elkhorn Boulevard to the north, Club Center Drive to the south, Natomas Boulevard to the west, and Amnest Way to the east

Construction 06/2020 03/2021 15-15 7 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Creekside Neighborhood road rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Creekside neighborhood bounded by Elkhorn Boulevard to the north, Del Paso Road to the south, E Commerce Way to the west, and Maybrook Drive/Broadwater Drive to the east.

Construction 06/2020 03/2021 15-15 7 6

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 77: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Tahoe Park Neighborhood road rehabilitation

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Tahoe Park neighborhood bounded by T Street to the north, Broadway to the south, 57th Street to the west, 65th Street to the east.

Construction 07/2020 03/2021 15-15 7 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Franklin Boulevard Class IV Bikeways

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Franklin Boulevard from Cosumnes River Boulevard to City Limits Construction 12/2020 03/2021 15-15 9 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Folsom Boulevard (former Jackson Hwy)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the life of the street and avoid major street reconstruction in the future. Project is former state highway recently relinquished to the City of Sacramento. | Includes Local Partnership Program funding

Folsom Boulevard from Power Inn Road to Florin Perkins Road Pre-Construction & Construction

01/2019 07/2020

06/2020 03/2021 30-30 7 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation Florin Road roadway rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Florin Road from Greenhaven Drive to Riverside Boulevard Construction 07/2020 03/2021 15-15 9 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

El Camino Avenue Safety Improvements This project will include: Cost Estimating, Preliminary Design, Document Preparation El Camino Avenue from Steelhead Creek bridge deck to Del

Paso Boulevard Pre-Construction 07/2020 03/2022 30-30 7 6

Sacramento Sacramento 19/20 Carried Over Road Maintenance & Rehabilitation

Del Paso Boulevard Safety Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation

Del Paso Boulevard from Marysville Boulevard to Arcade Boulevard

Pre-Construction & Construction

07/2020 03/2022

09/2021 03/2023 30-30 7 6

Sacramento Sacramento 20/21 New Road Maintenance & Rehabilitation

Northgate Neighborhood Roadway Rehabilitation This project will include: Cost Estimating, Document Preparation

Northgate Neighborhood bounded by Camarillo Drive to the north, Garden Highway to the south, Stonecreek Drive to the west, and Northgate Boulevard to the east

Pre-Construction 07/2020 03/2022 15-15 6 6

Sacramento Sacramento 20/21 New Road Maintenance & Rehabilitation

Silver Eagle Road Roadway Rehabilitation

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation Silver Eagle Road from Norwood Avenue to Northgate Boulevard Pre-Construction 07/2020 03/2022 30-30 7 6

Sacramento Sacramento 20/21 New Road Maintenance & Rehabilitation Fruitridge Road This project will include: Cost Estimating, Preliminary Design, Document Preparation Fruitridge Road from Stockton Boulevard to Power Inn Road Pre-Construction 07/2020 03/2022 30-30 7 6

Sacramento Sacramento 20/21 New Complete Streets Components

Meadowview Road Complete Streets

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Meadowview Road: Just east of Freeport Boulevard to the Meadowview LIght Rail Station/Detroit Boulevard and on 24th Street from Meadowview Road north to Florin Road

Construction 05/2020 04/2021 15-15 9 6

Sacramento Sacramento 20/21 New Safety Florin Road Safety Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design

Florin Road from 24th Street to Franklin Blvd Pre-Construction & Construction

07/2020 01/2021

01/2021 03/2022 30-30 9 6

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 78: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Sacramento Sacramento 20/21 New Safety Marysville Boulevard Safety Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation Marysville Boulevard from North Avenue to Arcade Pre-Construction 07/2020 03/2022 30-30 7 6

Sacramento Sacramento 20/21 New Road Maintenance & Rehabilitation Downtown Mobility Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Central City Sacramento - Bikeways P (15th to 21st), Q (15th to 21st), 10th (Q to Broadway), 9th (L to Q Street) Two-Way Conversions 5th Street (H Street to Broadway), I Street (16th to 21st) and I Street road diet (12th to 16th)

Construction 12/2020 03/2022 15-30 7 6

Sacramento Sacramento 20/21 New Safety Broadway/Stockton Safety Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation

Broadway and Stockton Boulevard from Martin Luther King Jr Boulevard to 13th Avenue Pre-Construction 07/2020 03/2022 30-30 6 6

Sacramento Sacramento 20/21 New Road Maintenance & Rehabilitation

Westlake Neighborhood Roadway Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Westlake neighborhood bounded by Bayou Way to the north, Sutley Circle to the south, Westlake Parkway to the west, and El Centro Road to the east.

Construction 07/2020 03/2021 15-15 7 6

Hollister San Benito 20/21 New Road Maintenance & Rehabilitation Road Rehabilitation Project 20/21

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Chappell Road – south of McCarthy to Alvarado Street, McCarthy Street – east of Alvarado Street to west of Chappell Road, Park St.-east of San Benito to west of Prune, Olive Street – east of San Benito to west of Prune Street, Line Street – south of Buena Vista to north of Fourth Street.

Pre-Construction & Construction

08/2020 03/2021

01/2021 07/2021 10-20 30 12

San Juan Bautista San Benito 20/21 New Road Maintenance & Rehabilitation

Third Street Reconstruction from Tahualami to Muckelemi St

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Third Street Reconstruction from Tahualami to Muckelemi St Construction 05/2020 12/2020 20-25 30 12

Adelanto San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation

Poppy Road and Fremont Street Pavement Repair and Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Apply ARAM System 1 over 310,000 square feet of existing asphalt pavement. Re-install all pavement markings.

- Poppy Road between Jonathan St and Pearmain St.- Fremont St, Cool Water St, Maywood St, Galewood St, Cloverlawn Ct, Broad Oak Ct, Highgrove Ct, Branch Ct. and Desert Glen St.

Construction 06/2020 06/2021 3-5 33 21

Adelanto San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase I

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Apply crack seal & type II slurry over 237,000 square feet of existing asphalt pavement. Re-install all pavement markings. Construction work anticipated to begin June 2021

-Muskrat Ave, Joshua St, Dennis St, Panther Ave. and Janine St. between Jay St. and Kay St. -Jay St. between Racoon Ave. and Muskrat Ave. -Kay St. between Janine St. and Muskrat Ave.

Construction 06/2021 07/2021 3-5 33 21

Adelanto San Bernardino 18/19 Forecasted Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase II

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Apply crack seal & type II slurry over 184,000 square feet of existing asphalt pavement. Re-install all pavement markings.

Stevens St. and Aster Rd. between Chamberlaine Way and Vintage Road. ; Vintage Rd. and Chamberlaine Wy. Between Stevens St. and Aster Rd.; The east half of Mendicino Rd. between Stevens St. and Aster Rd.; Sonoma Rd, Zinfadel Dr, Bouquet Ave. and Napa

Construction 06/2022 07/2022 3-5 33 21

Adelanto San Bernardino 18/19 Forecasted Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase III

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Apply crack seal & type II slurry over 290,000 square feet of existing asphalt pavement. Re-install all pavement markings.

-Aster Rd. between Bartlett Ave. and Inyo St. -Chevron Ct, Florence Ct, Leisure Rd, Lee Ave, Arlette Ct. and Inyo Ct. from Aster Rd. to cul-de-sac.

Construction 06/2023 07/2023 3-5 33 21

Adelanto San Bernardino 18/19 Forecasted Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Project, Phase IV

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Apply crack seal & type II slurry over 65,900 square feet of existing asphalt pavement. Re-install all pavement markings.

-Panther Ave. from Chamberlaine Wy end of pavement. -Franklin Ct from Panther Ave. to cu-de-sac. -Colonial Ave. and Payne Ct.

Construction 06/2024 07/2024 3-5 33 21

Apple Valley San Bernardino 20/21 New Road Maintenance & Rehabilitation Resurfacing 2020-01

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Primarily the neighborhoods east of Navajo Rd, South of Thunderbird Road, and west of Joshua Road. Ojai Rd is the most southerly Road in the residential neighborhood east of Central Road, and Powhatan is the most southerly Road for the remainder.

Construction 08/2020 10/2020 7-10 33 21

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 79: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Barstow San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation

West Section 7 Rehabilitation Project Phase I

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing) | This project is in Design and is using RMRA funding in support of Construction which includes: Reconstruct 23,401 center line feet of roadway.

West Section 7 is defined as North of Rimrock Road, West of Barstow Road, East of Agarita Avenue and South of Interstate 15

Pre-Construction & Construction

06/2020 06/2021

05/2021 12/2021 15-20 33 16

Barstow San Bernardino 20/21 New Road Maintenance & Rehabilitation

Pavement Maintanance Preservation Project FY20/21

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Placement of pavement preservation techniques on existing roadways.

The project location is defines as east of Avenue H, West of Barstow Road, South of Main Street, and North of I-15. and north of Interstate 15.

Construction 04/2021 10/2021 3-5 33 16

Barstow San Bernardino 20/21 New Road Maintenance & Rehabilitation Fisher Blvd Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Fisher Blvd Construction 04/2021 10/2021 3-5 33 16

Big Bear Lake San Bernardino 20/21 New Road Maintenance & Rehabilitation FY 20/21 Street Improvements This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

LagunitaLane-LakeviewDrivetoEnd;FrancisWay-LagunitaLanetoEnd;MoonridgeRoad-SheephornRoadtoEnd;SahuaroWay-MontereyStreettoVillaGroveAvenue;ConiferDrive-AltaVistaAvenue toEnd;FoxDrive-ConstellationtoAvalon;PlymouthRoad-Tehama DrivetoEnd;GarstinDrive-BigBearBoulevardtoEnd;GibralterRoad-

LakeviewDrivetoEnd;GibralterLanding-LakeviewDrivetoEnd; SiskiyouDrive-ShastaRoadtoLassenDrive;ShastaLane-ShastaRoad toEnd;ShastaCourt-ShastaRoadtoEnd

Construction 07/2020 07/2021 10-25 33 23

Chino San Bernardino 20/21 New Other Pavement Management System Software Project

This project will include: Procurement of Public Works Systems/Databases | May include staff or consultant time required to perform field review and evaluation of pavement condition and data input into software system.

Citywide Procurement/Operatio nal Needs 06/2020 07/2021 10-20 52 20

Chino San Bernardino 19/20 In Progress Road Maintenance & Rehabilitation

Street Rehabilitation and TSM FY2018-19 - Riverside Drive

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Street Grind and Overlay of Riverside Drive which also includes construction of ADA accessibility ramps, ROW acquisition, and full depth reconstruction of some areas. Project will also include traffic signal modifications for three signalized intersections. Project may be phased due to utility relocations. | ROW acquisition agreements are executed. NOE CEQA documentation recorded at SB County. Master Planned storm drain connection included in bid package (Project SD 211.)

Riverside Drive (Central Ave. to 250 LF e/o Oaks St.) and traffic signal modifications @ Riverside Dr./Benson Ave and Riverside Dr./10th St. and Riverside Dr./Oaks Ave.

Construction 07/2019 06/2021 10-10 52 20

Chino Hills San Bernardino 20/21 New Road Maintenance & Rehabilitation

Chino Avenue Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Chino Avenue from Peyton Drive to SR-71 Construction 07/2020 06/2021 10-15 55 29

Chino Hills San Bernardino 20/21 New Road Maintenance & Rehabilitation

Grand Avenue Pavement Rehabilitaion This project will include: Pavement Rehab/Repair (Existing) Grand Avenue from Peyton Drive to SR-71 Construction 07/2020 06/2021 10-15 55 29

Chino Hills San Bernardino 20/21 New Road Maintenance & Rehabilitation

Glen Ridge Drive Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Glen Ridge Drive from Pipeline Avenue to Rolling Ridge Drive Construction 07/2020 06/2021 10-15 55 29

Colton San Bernardino 20/21 New Road Maintenance & Rehabilitation Cooley Drive Street Paving Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Cooley Drive from Duron St. to Valley Way Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 10-15 47 20

Colton San Bernardino 20/21 New Road Maintenance & Rehabilitation Cooley Lane Street Paving Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Cooley Lane from Cooley Drive to Hunts Lane Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 10-15 47 20

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 80: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Colton San Bernardino 20/21 New Road Maintenance & Rehabilitation 9th Street Road Paving Project This project will include: Environmental Study/Documents, Cost Estimating, Document

Preparation 9th Street from Valley Blvd. to C St. Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 10-15 47 20

Colton San Bernardino 20/21 New Road Maintenance & Rehabilitation

Wildrosw Ave.-Indigo Ave. Street Paving Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Document Preparation

Wildrose Ave. - Indigo Ave. from Valley Blvd.to San Bernardino Ave.

Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 10-15 47 20

Colton San Bernardino 20/21 New Road Maintenance & Rehabilitation C Street Road Paving Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Document Preparation

C St. from La Cadena to Mt. Vernon Ave. Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 10-15 47 20

Colton San Bernardino 20/21 New Road Maintenance & Rehabilitation

La Cadena Drive Street Paving Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

La Cadena Drive from Mt. Vernon Ave. to 9th St. Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 10-15 47 20

Fontana San Bernardino 20/21 New Road Maintenance & Rehabilitation

Pavement Rehab SB1 RMRA 20/21 This project will include: Pavement Rehab/Repair (Existing)

Alder Avenue - Foothill Blvd. - San Bernardino San Bernardino - Sierra Ave - Alder Avenue Beech Avenue - S. Highland - Baseline Avenue Etiwanda Avenue - Slover Avenue - Philadelphia Avenue

Construction 07/2020 06/2021 10-15 47 20

Hesperia San Bernardino 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Street Improvement Project This project will include: Pavement Rehab/Repair (Existing) Main Street between C Avenue and I Avenue and Ranchero

Road between 7th Avenue and Danbury Avenue. Construction 08/2020 11/2020 10-20 59 17

Highland San Bernardino 20/21 New Road Maintenance & Rehabilitation

City-wide Minor/Pothole Street Maintenance

This project will include: Maintenance Program Plan Development | Repair and servicing of City-wide major arterial and collector streets. City-wide with emphasis on major arterial and collector streets. Pre-Construction 07/2020 06/2021 2-5 40 23

Highland San Bernardino 20/21 New Safety City-wide Pavement Striping and Marking

This project will include: Maintenance Program Plan Development | Repair and servicing of City-wide streets, on arterial and collector streets, and on streets abutting school campuses.

City-wide, on arterial and collector streets, and on streets abutting school campuses. Pre-Construction 07/2020 06/2021 3-7 40 23

Highland San Bernardino 20/21 New Safety City-wide Traffic Signal Maintenance

This project will include: Maintenance Program Plan Development | Repair and servicing of City-wide traffic signal maintenance.

City-wide, various locations as needed based on maintenance schedule Pre-Construction 07/2020 06/2021 10-30 40 23

Highland San Bernardino 20/21 New Safety City-wide Sidewalk Repairs Services

This project will include: Maintenance Program Plan Development | Repair and servicing of City-wide sidewalks.

City-wide, at locations where there's heavy pedestrian traffic, such as school campuses, shopping centers, churches, etc. These locations are mostly on the east side of the City, east of the 210 Freeway.

Pre-Construction 07/2020 06/2021 10-20 40 23

Highland San Bernardino 20/21 New Safety Purchase of Spare Traffic Signal Controllers and Video Detection

Systems This project will include: Procurement of Public Works Safety Materials and Gear

Purchase of spare traffic signal controllers and video cameras. To be stored at City's Corporate Yard located at 7935 Central Ave., Highland, CA 92346

Procurement/Operatio nal Needs 07/2020 06/2021 10-15 40 23

Highland San Bernardino 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation at 11 Street Segments

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Various street segments in Sector E of the City's Pavement Management Program. Construction 07/2020 06/2021 10-15 40 23

Loma Linda San Bernardino 20/21 New Road Maintenance & Rehabilitation Citywide This project will include: Pavement Rehab/Repair (Existing)

Lawton Avenue from Campus Street to west end Daisy Avenue from Poplar Street to west end Fern Avenue from Hillcrest Street to west end Tulip Avenue from Poplar Street to Anderson Street Aspen Street from Poplar Street to Hillcrest Street Orange Grove Street from Lawton Street to Tulip Street Acacia Street from Lawton Street to Tulip Street Richmont Road from Lawton Avenue to Aspen Street

Construction 07/2020 09/2020 7-15 40 23

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 81: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Montclair San Bernardino 20/21 New Match Funds Central Bridge Design This project will include: Environmental Study/Documents, Cost Estimating, Feasibility Study, Preliminary Design, Document Preparation Central Avenue between Holt Boulevard and mission Boulevard Pre-Construction 07/2020 07/2021 20-50 52 20

Montclair San Bernardino 20/21 New Road Maintenance & Rehabilitation Pipeline Avenue This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing) Pipeline Avenue - from Phillip Avenue to Mission Boulevard Construction 07/2020 03/2021 10-20 52 20

Montclair San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation

Holt Boulevard Street Improvement Project

This project will include: ADA Curb Ramp Rehab/Repair (Existing) | The project will repair any uplifted curb, gutter and sidewalk; replace non-compliant pedestrian ramps and resurface the asphalt pavement.

4000-4400 blk Holt Boulevard Construction 07/2020 11/2020 15-20 52 20

Needles San Bernardino 20/21 New Road Maintenance & Rehabilitation Shore Street paving rehabilitation This project will include: Right of Way Needles CA Pre-Construction 07/2020 06/2021 20-20 33 8

Needles San Bernardino 20/21 New Safety Various Sidewalk Safety Repairs This project will include: Maintenance Program Plan Development | CITY WIDE CITY WIDE Pre-Construction 07/2020 06/2021 20-20 33 8

Needles San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation

Five Mile Road Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Removed project in Expenditure Report 17/18(no longer RMRA funded). Intended to use FY 19/20 RMRA funds.

City's portion of Five Mile Road by County of San Bernardino Construction 07/2020 06/2021 20-25 33 16

Needles San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation

North Needles Highway Crack, Seal & Slurry

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) North Needles Highway (David Drive to City limits) Construction 07/2020 06/2021 10-10 33 16

Ontario San Bernardino 20/21 New Road Maintenance & Rehabilitation

FY 20/21 Pavement Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Grind & overlay asphalt street, repair fail asphalt areas, repair sidewalk, repair curb & gutter, upgrade all ramps to current ADA standards, restripe roadway.

Inland Empire Boulevard (Mercedes Avenue to Milliken Avenue)

Auto Center Drive (Jurupa Street to Jurupa Street) Bon View Avenue (Riverside Drive to SR 60) Fifth Street ( El Dorado Avenue to Baker Avenue) Baker Avenue (Fourth Street to Sixth Street)

Construction 06/2021 12/2021 15-25 52 20

Ontario San Bernardino 20/21 New Road Maintenance & Rehabilitation Alley Rehabilitation Program

This project will include: Maintenance Program Plan Development | Grind & overlay asphalt street, repair fail asphalt areas, repair sidewalk, repair curb & gutter, upgrade all ramps to current ADA standards.

Various locations Pre-Construction 06/2021 12/2021 15-25 52 20

Ontario San Bernardino 20/21 New Traffic Control Devices FY 20/21 Intersection Improvement Program

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Campus & Walnut Campus & Francis Construction 06/2021 12/2021 25-35 52 20

Ontario San Bernardino 20/21 New Complete Streets Components

ATP Cycle 4 (Construction Match Costs) This project will include: Maintenance Program Plan Development Various locations Pre-Construction 06/2021 12/2021 25-35 52 20

Rancho Cucamonga San Bernardino 20/21 New Road Maintenance &

Rehabilitation

FY20/21 SB1 Non-Local Street Pavement Rehabilitation at One

Location

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Foothill Boulevard from Milliken Avenue to Interstate 15 Freeway Construction 06/2021 07/2021 20-30 40, 41 23

Rancho Cucamonga San Bernardino 20/21 New Road Maintenance &

Rehabilitation

FY20/21 SB1 Local Street Pavement Rehabilitation at

Various Locations

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Amarillo, Beal-Drew; Amarillo, Drew-Cortland; Beal, Chapman-End; Cabrini, End-Delaware; Cameo, Turk-Thoroughbred; Chapman, Furman-Piedmont; Chapman, Piedmont-Beal; Cortland, Amarillo-End; Cortland, Lamar-Amarillo; Delaware, Fisk-Cortland; Delaware, Furman-Fisk; Drake, Delaware-Shelton; Drew, Amarillo-End; Fisk, End-Delaware; Furman, End-Delaware; Gannon, Amarillo-Walker; Gardenia, Turquoise-Rosebud; Hudson, End-Drake; Jennet, Sapphire-Turk; Lamar, End-Cortland; Nova, Amarillo-End; & 15 streets

Construction 06/2021 07/2021 10-20 40, 41 23

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 82: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Redlands San Bernardino 20/21 New Road Maintenance & Rehabilitation

PMP 2020 Street Resurfacing Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | The City of Redlands PMP 2020 Street Resurfacing Project is a citywide rehabilitation of various City streets within the City. The City will be using RMRA funding to supplement additional funding to rehabilitate City streets for this project which falls in Fiscal Year 2020-21.

Various locations in the City of Redlands determined by the Pavement Management Program. (See Resolution No. 8074 with attached Exhibit A for exact locations)

Construction 11/2020 06/2021 20-20 40 23

Rialto San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Annual Street Overlay Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Pavement rehabilitation: Cold Milling and Asphalt Concrete Surface Course, Full Depth AC removal and re-construction, Full Depth Reclamation including in-place pulverization and mixing of the existing pavement to create a stabilized base, Cold In-Place Recycling of existing pavement, followed by construction of an AC Surface Course.

Lilac Ave from Tahoe St to Walnut Ave; Linden Ave from Riverside Ave to 155' south of Candlewood Ave; Linden Ave from 374' south of Persimmon Ave to Casmalia St; Locust Ave from Riverside Ave to Casa Grande Dr; Locust Ave from Lowell St to Casmalia St; Pepper Ave from Baseline Rd to Etiwanda Ave; Pepper Ave from Foothill Blvd to 2nd St; Summit Ave from Maple Ave to Apple Ave; Willow Ave from Walnut Ave to Chaparral St

Pre-Construction & Construction

09/2020 03/2021

12/2020 09/2021 7-20 47 20

Rialto San Bernardino 19/20 Carried Over Road Maintenance & Rehabilitation Annual Street Overlay Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design

Pepper Ave. from Etiwanda Ave. to Foothill Blvd.; Pepper Ave. from 2nd St. to 680 ft. south of 2nd St.; Riverside Ave. from UPRR Bridge to South City Limit

Pre-Construction & Construction

09/2020 03/2021

12/2020 09/2021 7-20 47 20

Rialto San Bernardino 20/21 New Road Maintenance & Rehabilitation

Annual Pavement Rehabilitation Project

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New)

Bohnert Ave. from Linden Ave. to Cactus Ave.; Casmalia St. from Laurel Ave. to Locust Ave.; Riverside Ave. from Bridge (210 FWY) to Foothill Blvd.; Maple Ave. from Baseline Rd. to Etiwanda Ave.; Cedar Ave. from Baseline Rd. to Foothill Blvd.; Sycamore Ave. from Madrona St. to Foothill Blvd.; Etiwanda Ave. from Maple Ave. to Cedar Ave.; Etiwanda Ave. from Cactus Ave. to Willow Ave.; Etiwanda Ave. from Sycamore Ave. to Acacia Ave.

Pre-Construction & Construction

09/2020 03/2021

12/2020 09/2021 7-20 47 20

San Bernardino San Bernardino 20/21 New Road Maintenance & Rehabilitation 7 Street Segments

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

1- 3rd Street between Sierra Way and D Street 2- 16th Street between Sierra Way and Waterman 3- Rancho Avenue between Rialto Avenue and Foothill 4- Highland Avenue between Palm Avenue and Frontage Road 5- Northpark Blvd. between Devil Canyoan Levee Road and Little Mountain 6- Industrial Parkway - Between Palm Avenue and Lexington Way 7 - Arrowhead Avenue - Highland Avenue to 3rd Street

Construction 10/2020 04/2021 3-30 47 21

Twentynine Palms San Bernardino 20/21 New Road Maintenance & Rehabilitation

Project Phoenix Curb, Gutter, Sidewalk, and Road Improvement

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety)

Curb, Gutter, Sidewalk Cholla ave. (Hwy 62-335 feet south), Curb, Gutter, Sidewalk Smoketree ave. (Hwy 62-335 feet south), Curb, Gutter, Sidewalk Tamarisk ave. (Hwy 62-335 feet south), Curb, Gutter, Sidewalk Yucca ave. (Hwy 62-335 feet south), Reconstruct Stamped Concrete Yucca ave (Hwy 62-335 feet south).

Pre-Construction & Construction

01/2021 03/2021

02/2021 06/2021 20-25 42 16

Upland San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Mulberry Avenue Reconst.

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | 0.17 miles of water main replacement and asphalt concrete pavement reconstruction.

Foothill Blvd. to Pine Street. Construction 01/2021 09/2021 20-20 41 25

Upland San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation 14th Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing) | 0.69 miles of asphalt concrete pavement resurfacing. Campus Ave. to Grove Ave. Construction 01/2021 10/2021 10-20 41 25

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 83: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Victorville San Bernardino 20/21 New Road Maintenance & Rehabilitation

Mojave Dr. Improvement Project, I-15 Southbound Ramps to El

Evado Rd.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New) | Project scope includes pavement reconstruction, asphalt overlays, slurry seals and access ramp upgrades.

Mojave Drive from I-15 Southbound Ramp to El Evado Rd. Construction 05/2021 11/2021 7-30 33 21

Victorville San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation

Arrowhead Drive / 7th Avenue Improvement Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Bicycle Lane (New) | Pavement reconstruction, asphalt overlays, widening at certain locations, restriping, and reconstructing access ramps to meet ADA current standards.

Arrowhead/7th Avenue from Green Tree Boulevard to Bear Valley Road, a distance of approximately 2.1 miles. Construction 03/2021 10/2021 15-30 33 21

Yucaipa San Bernardino 18/19 Carried Over Complete Streets Components

Avenue E Intersection Improvements, Bryant Street to 5th

Street

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Rehabilitation of asphalt and curb/gutter at intersections as part of the construction of roundabouts.

Avenue E from Bryant Street to 5th Street Construction 07/2020 06/2021 25-25 42 23

Yucaipa San Bernardino 20/21 New Road Maintenance & Rehabilitation Pavement Management Program This project will include: Project Scope Development, Maintenance Program Plan

Development

Citywide. Please check the city website map for updated street locations at the Public Works and Development Project Updates link. http://yucaipa.org/government/departmentsservices/engineering/

Pre-Construction 01/2021 06/2021 1-25 42 23

Yucaipa San Bernardino 20/21 New Road Maintenance & Rehabilitation

Calimesa Boulevard Improvements associated with the Wildwood Canyon Road/ Interstate-10 Interchange(County Line Road

to Oak Glen Road)

This project will include: ADA Curb Ramp Installation (New), Storm Drain/Culvert Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New), Bicycle Lane (New) | TBD

Wildwood Canyon Road/I-10 Freeway Interchange for Calimesa Boulevard Improvements (County Line Road to Oak Glen Road) Construction 07/2023 06/2024 25-25 42 23

Yucca Valley San Bernardino 20/21 New Road Maintenance & Rehabilitation Town-wide Slurry Seal This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing)

Acoma Trl; Airway Ave.; Alta Vista Dr.; Amador Dr.; Anaconda Dr.; Aranza Ct.; Asio Way; Aster Ave.; Avalon Ave.; Balboa Ave.; Barberry Ave.; Bolero Dr.; Bonanza Dr.; Buena Vista; Camarilla Ave.; Carlyle; Cholla; Condalia Ave.; Crestview Dr; Del Monte Ave.; Desert Gold; Diadem Dr; Dumosa Ave.; Dumosa Ct.; El Dorado Ave.; Elata Ave.; Emerson Ave; Fortuna Ave.; Free Gold Dr.; Golden Bee; Golden Meadow ; Grand Ave.; Hanford Ave.; Hardesty Dr.; Hermosa Ave.; Imperial Rd; Indio Ave.; Joshua

Construction 07/2020 10/2020 6-9 42 16

Carlsbad San Diego 18/19 Carried Over Road Maintenance & Rehabilitation Pavement Management Program

This project will include: The Pavement Management Program is an ongoing annual program designed to extend the service life of city streets and to maintain a smooth and safe driving surface for vehicles. The City utilizes a pavement management database program to determine pavement management needs for the purpose of establishing which streets are to be slurry sealed, overlaid, or reconstructed.

The Pavement Management Program resurfaces various roadways throughout the City with hot mix asphalt, warm mix asphalt, and slurry seals.

Pre-Construction 07/2020 06/2021 5-20 76 36

Chula Vista San Diego 20/21 New Road Maintenance & Rehabilitation

RMRA Major Pavement Rehabilitation FY2020-21

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation

Various segments along: Corral Canyon Rd, E Street, F Street, East H Street, Industrial Bl, East Orange/Orange Av, Otay Lakes Rd, Second Av and Third Av.

Pre-Construction & Construction

10/2020 07/2021

07/2021 12/2021 7-10 79, 80 40

Chula Vista San Diego 19/20 In Progress Road Maintenance & Rehabilitation

RMRA Major Pavement Rehabilitation - FY2019/20

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Document Preparation

Roadway segments located the northwest, Montgomery, Rancho Del Rey, Sunbow, Otay Ranch, Rolling Hills Ranch and Eastlake areas of the City of Chula Vista.

Pre-Construction & Construction

07/2019 11/2020

11/2020 07/2021 20-25 79, 80 40

Chula Vista San Diego 19/20 In Progress Road Maintenance & Rehabilitation

RMRA Major Pavement Rehabilitation - FY2018/19

(STM396)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Document Preparation | Project includes street overlays and street reconstruction on various streets in the City. The major rehabilitation treatments are based on the recommendations of the City's Pavement Management System.

E Naples St (Crescent Dr - Medical Ctr Dr); Third Av (N Fourth Av - D St); Naples St (Fourth Av - Third Av); Oxford St (Tobias Dr - Hilltop Dr) Third Av (L St - Naples St); F St (Fourth Av - Third Av); Third Av (Orange Av - Anita St) L St (Third Av - First Av); First Av (H St- I St); Hilltop Dr (Telegraph Cyn Rd - E L St); I St (Second Av - Hilltop Dr); Bonita Rd; City Limit (@ Willow St -Allen School Rd)

Pre-Construction & Construction

07/2018 11/2019

11/2019 09/2020 20-25 79, 80 40

Coronado San Diego 19/20 Carried Over Road Maintenance & Rehabilitation

Street, Curb and Gutter Improvements Fiscal Year 2019-20

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) B Avenue, from 2nd to 8th Streets Construction 06/2020 04/2021 20-30 78 39

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 84: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Coronado San Diego 20/21 New Complete Streets Components

Ocean Boulevard Sidewalk Enhancement This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing) Ocean Boulevard from R.H. Dana Place to Ocean Drive Construction 11/2020 01/2021 20-30 78 39

Coronado San Diego 18/19 Carried Over Road Maintenance & Rehabilitation

Street, Curb and Gutter Improvements FY18/19

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Removal and replacement of 2-3" of existing asphalt surface; replacement of base material as necessary; replacement of damaged curb and gutter; required replacement of adjacent pedestrian ramps that do not meet current ADA regulations

Entire length of Adella Avenue; Jamaica Village Road; Spinnaker Way; and Flora Avenue Construction 06/2020 04/2021 20-30 78 39

Del Mar San Diego 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Citywide Roadway Improvements Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Varies: Camino del Mar and 4th St, Camino del Mar and 25th St, NOB Ave (7th St and El Amigo Rd), and Hoska Dr (8th St to 9th St)

Construction 07/2020 01/2021 50-75 78 39

El Cajon San Diego 20/21 New Road Maintenance & Rehabilitation Overlay 2021 This project will include: Cost Estimating Washington Ave-Johnson Ave to Jamacha Rd, and Jamacha Rd-

Washington Ave to City Limit/Grove Rd Pre-Construction &

Construction 07/2020 01/2021

12/2020 05/2021 13-20 71 38

El Cajon San Diego 20/21 New Road Maintenance & Rehabilitation Slurry 2021 This project will include: Project Scope Development, Preliminary Design, Document

Preparation Maintenance Zone 5 Pre-Construction & Construction

07/2020 01/2021

12/2020 04/2021 5-8 71 38

Encinitas San Diego 20/21 New Road Maintenance & Rehabilitation FY 2020-21 Annual Overlay This project will include: Pavement Rehab/Repair (Existing)

There are 8 street segments as part of the overlay portion of this project and 29 segments are part of the slurry seal. There is one concrete segment of this project. Olivenhain Rd, Cottage Grove Dr, Elva Terrance, Leucadia Scenic CT, Olive Crest Dr, Oxford Pl, Via Molena, Rossini Dr, Greentree Rd, Red Barn Rd, Birchview Dr, Avenida La Posta, Brighton Ave, Circa De Tierra, Delage CT, Delage DR, Elva CT, Garden View RD, Landquist DR. For all locations, please review uploaded Resolution.

Construction 09/2020 03/2021 5-50 76 36

Encinitas San Diego 19/20 Carried Over Road Maintenance & Rehabilitation

Street Overlay & Slurry Seal Project - FY 2019-20

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

There are 31 street segments as part of the overlay portion of this project, and 51 segments as part of the slurry seal portion of this project throughout the city. The proposed locations are attached to the resolution included with this submittal.

Construction 09/2020 03/2021 5-20 76 36

Escondido San Diego 20/21 New Road Maintenance & Rehabilitation

2020/21 Street Rehabilitation and Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Northwest maintenance zone bounded to the north by State Route 78 and west of Broadway. The list of streets includes portions of the following Collector and higher classified streets: Centre City Parkway, Country Club, El Norte Parkway, Nutmeg, Rock Springs Road, and Valley Parkway. In addition, many residential streets within this zone will be treated.

Construction 09/2020 03/2021 7-15 75 38

Imperial Beach San Diego 18/19 Carried Over Road Maintenance & Rehabilitation

Imperial Beach Boulevard Enhancement Project

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

Imperial Beach Boulevard Construction 07/2020 09/2020 10-20 78 40

Imperial Beach San Diego 20/21 New Road Maintenance & Rehabilitation

Citrus Avenue Pavement Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New)

This project includes two blocks of single family residential on Citrus Avenue totaling approximately 1,800 feet in between Alabama Street and Rainbow Drive in the Mar Vista neighborhood.

Construction 07/2020 06/2021 10-20 78 40

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 85: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Imperial Beach San Diego 20/21 New Road Maintenance & Rehabilitation

FY 21 Annual Roadway Improvements Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

5th Street, 8th Street, Calla Avenue, Carnation Avenue, Connecticut Street, Delaware Street, Elkwood Avenue, Florida Street, Imperial Beach Boulevard

Construction 07/2020 06/2021 10-20 78 40

La Mesa San Diego 20/21 New Road Maintenance & Rehabilitation Overlay Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) | All streets listed in the

Resolution FY20/21 with a description of Overlay is listed under this project.

70th Street (North Bound) from Alvarado Road to I-8. Amarillo Ave from Abilene Terrace to Clay Street. Dailey Rd/Dailey Ct from La Mesa Blvd to End. Derk Drive from Kelton Ave to Kappa St. Jackson Drive from Fletcher Parkway to Murray Dr. Spring St from Finley Ave to I-8. Waite Dr from Massachusetts Ave to West City Limit.

Construction 07/2020 06/2021 10-20 79 38

La Mesa San Diego 20/21 New Road Maintenance & Rehabilitation Zone 5 Residential Streets This project will include: Pavement Rehab/Repair (Existing) | This project is listed in

the Resolution FY20/21 with the description Digouts. Prioritized residential streets Citywide within Zone 5. Construction 07/2020 06/2021 5-20 79 38

La Mesa San Diego 19/20 Carried Over Road Maintenance & Rehabilitation

Fletcher Pkwy – between Baltimore Dr and Caltrans I-8 This project will include: Pavement Rehab/Repair (Existing) | Overlay Fletcher Pkwy – between Baltimore Dr and Caltrans I-8 Construction 07/2020 06/2021 10-20 78 39

Lemon Grove San Diego 20/21 New Road Maintenance & Rehabilitation

FY 2020-2021 Street Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing), Document Preparation

Streets may include: Alton Dr (Skyline to Morose), Beth Pl (Mt. Vernon to North End), Bonita (Mt. Vernon to Beryl), Broadway WB (Grove to LGA, Olive to LGA, Buena Vista to New Jersey, Grove to LGA), Broadway WB/EB (Olive to Buena Vista), Broadway EB (West to New Jersey, Harris to West, Mass to Harris, Buena Vista to Olive, NCDS to Cypress), College (S end to Federal), Cuyamaca (New Jersey to Buena Vista), Golden (Mt. Vernon to South end), Fairfax (Canton to Lansing), Federal Blvd....

Pre-Construction & Construction

07/2020 07/2020

06/2021 06/2021 5-10 79 38

Lemon Grove San Diego 20/21 New Other FY 2020-2021 Storm Drain Rehabilitation Project This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) The two project drainage pipes are located at West Street and

Lemon Avenue. Construction 07/2020 06/2021 5-15 79 38

National City San Diego 19/20 Carried Over Complete Streets Components

FY 2018 SRTS Pedestrian and Bicycle Enhancements - Division

Street Traffic Calming, Euclid Avenue to Harbison Avenue

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New) | Provide street resurfacing and restriping to include a "road diet" for traffic calming converting four travel lanes to two travel lanes with a two-way left-turn center lane, Class II bike lanes, and new pedestrian curb ramps for ADA compliance on Division Street between Euclid Avenue and Harbison Avenue

Division Street between Euclid Avenue and Harbison Avenue Construction 05/2020 12/2020 10-15 79, 80 40

National City San Diego 19/20 Carried Over Traffic Control Devices Citywide Radar Speed Feedback Installations

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety)

D Avenue between 24th Street and 30th Street, Harbison Avenue between Division Street and 4th Street, Plaza Bonita Center Way between Valley Road and Sweetwater Road, Valley Road between Sweetwater Road and Calle Abajo, Valley Road between PLaza Bonita Center Way and San Miguel Court, Cleveland Avenue between Bay Marina Drive and Civic Center Drive

Construction 09/2020 06/2021 10-15 79, 80 40

National City San Diego 20/21 New Road Maintenance & Rehabilitation

Roosevelt Avenue Street Resurfacing

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

Roosevelt Avenue between Main Street and W. 16th Street Construction 08/2020 06/2021 10-15 78, 80 40

Oceanside San Diego 19/20 Carried Over Road Maintenance & Rehabilitation Asphalt Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New) | Preparatory work including patching, crack sealing. Asphalt overlaying to repair mainly arterial streets as they often carry truck traffic. Replace striping and pavement markings.

Rancho Hermosa Tract Subdivision Industry Street Construction 07/2020 07/2021 8-12 76 36

Oceanside San Diego 19/20 In Progress Other Storm Drain Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing)

Neptune at Coast Highway; Lomita and Crouch; Various at Sleeping Indian Rd; Construction 06/2020 07/2024 40-50 76 36

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 86: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Oceanside San Diego 19/20 In Progress Safety ADA for Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

San Dimas Ave; San Ramon Ave; San Pablo Ave; San Lorenzo court, San Miguel Court, Arthur Avenue; Charles Dr; Parker St.

Pre-Construction & Construction

06/2019 07/2020

06/2020 06/2025 12-20 76 36

Oceanside San Diego 18/19 Carried Over Road Maintenance & Rehabilitation Street Slurry Seal Program This project will include: Slurry sealing 50 lane-miles of streets in Oceanside | Project

construction has begun. Slurry sealing of proposed streets is in progress. Streets in Oceanside; list is attached. Pre-Construction 07/2020 06/2025 5-10 76 36

Oceanside San Diego 20/21 New Road Maintenance & Rehabilitation Street & Median Maintenance This project will include: Procurement of Road Maintenance and Rehab Materials,

Public Works Staffing, Repair and Servicing of Public Works Equipment various streets Procurement/Operatio nal Needs 07/2020 06/2021 5-7 76 36

Oceanside San Diego 20/21 New Complete Streets Components Street Monument Presevation This project will include: Procurement of Public Works Systems/Databases | annual

preservation of the street monumentation throughout the City of Oceanside. various Procurement/Operatio nal Needs 06/2020 07/2021 15-25 76 36

Oceanside San Diego 20/21 New Road Maintenance & Rehabilitation Thunder Dr- Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Thunder Drive Construction 07/2020 06/2021 15-20 76 36

Poway San Diego 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Street Maintenance Project This project will include: Pavement Rehab/Repair (Existing)

The FY 2020-21 Street Maintenance Project encompasses streets within street maintenance zone 2, that is generally north and south of Twin Peaks Road, east and west of and including sections of Espola Road, north of Poway Road and south of Sand Hill Drive.

Construction 07/2020 10/2020 7-10 77 38

Poway San Diego 20/21 New Road Maintenance & Rehabilitation FY 2020-21 Street Overlay Project This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing)

The FY 2020-21 Street Overlay Project encompasses selected streets within street maintenance zone 4, that is generally north and south of Twin Peaks Road, east and west of and including Community Road, north of Poway Road and south of Twin Peaks Road.

Construction 05/2021 06/2021 20-30 77 38

San Diego San Diego 20/21 New Road Maintenance & Rehabilitation Slurry Seal Group 2121 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane

Rehab/Repair (Existing)

Black Mountain Ranch, Carmel Valley, Clairemont Mesa, La Jolla, Mira Mesa, Navajo, Rancho Bernardo, Rancho Penasquitos, San Pasqual, Serra Mesa, Tierrasanta, Torrey Pines, University

Construction 09/2020 02/2021 3-7 77, 78, 79 38, 39, 40

San Diego San Diego 20/21 New Road Maintenance & Rehabilitation Slurry Seal Group 2122 This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane

Rehab/Repair (Existing)

Barrio Logan, Centre City, City Heights, Clairemont Mesa, - -Eastern Area, Encanto, Greater North Park, -Kensington Talmadge, Normal Heights, Midway Pacific Highway, Pacific Beach, Peninsula, Skyline Paradise Hills, Southeastern San Diego, Uptown

Construction 10/2020 03/2021 3-7 77, 78, 79 38, 39, 40

San Diego San Diego 20/21 New Road Maintenance & Rehabilitation Asphalt Resurfacing Group 2010

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Ocean Beach, Peninsula Construction 09/2020 04/2021 20-20 77, 78, 79 38, 39, 40

San Diego San Diego 20/21 New Road Maintenance & Rehabilitation Asphalt Resurfacing Group 2011

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Rancho Bernardo Construction 11/2020 06/2021 20-20 77, 78, 79 38, 39, 40

San Diego San Diego 20/21 New Road Maintenance & Rehabilitation Asphalt Resurfacing Group 2012

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Mira Mesa, Rancho Penasquitos Construction 10/2020 03/2021 20-20 77, 78, 79 38, 39, 40

San Diego San Diego 20/21 New Road Maintenance & Rehabilitation Asphalt Resurfacing Group 2013

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

La Jolla, Torrey Pines Construction 11/2020 03/2021 20-20 77, 78, 79 38, 39, 40

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 87: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Marcos San Diego 20/21 New Road Maintenance & Rehabilitation

Annual Surface Seal Project FY19-FY23

This project will include: Cost Estimating, Preliminary Design, Active Transportation Plan

The project is located on regional arterial South Twin Oaks Valley Road and San Elijo Road. The proposed 5 miles project begins at the intersection of South Twin Oaks Valley Road and San Marcos Boulevard, continues 1.5 miles south where the roadway changes name to San Elijo Road. San Elijo Road continues southwest through the community of San Elijo Hills; with the project ending at the intersection with Rancho Santa Fe Road.

Pre-Construction & Construction

01/2021 05/2021

04/2021 07/2021 7-10 75 38

San Marcos San Diego 18/19 Carried Over Road Maintenance & Rehabilitation

West San Marcos Boulevard Slope Reconstruction Project

This project will include: Pavement Rehab/Repair (Existing) | Reconstruction of the embankment supporting the eastbound lanes of West San Marcos Boulevard from Acacia Drive to Viewpoint Drive. The existing embankment is moving to the south endangering the eastbound lanes, sidewalk, street lights, and fire hydrants. | The project has been advertised for construction and is currently pending award of the construction contract. Construction is scheduled to begin in June 2020 with completion in September 2020.

In the City of San Marcos, on West San Marcos Boulevard, from Acacia Drive to Viewpoint Drive Construction 05/2020 08/2020 25-50 75 38

Santee San Diego 18/19 Carried Over Road Maintenance & Rehabilitation Bridge Restorations Citywide

This project will include: Provide maintenance and repairs to City owned bridges. Including bridge joint seals, deck sealing, and minor patching | Project is carried over to begin in FY 2019-20 as funds accrue.

Magnolia Avenue Bridge, Cayamaca Street Bridge, Carlton Hills Boulevard Bridge, Mast Boulevard Bridge, and Prospect Avenye Bridge.

Construction 04/2021 12/2021 20-50 71 38

Santee San Diego 20/21 New Complete Streets Components

CMP Storm Drain Replacement Program

This project will include: Repair and Servicing of Public Works Equipment | This project will provide maintenance and repairs to aging storm drain facilities Citywide that are at the end of their useful life. This includes the replacement of failed CMP storm drains and cast in place pipe lining of storm drains within the road right of way prior to conducting pavement repairs above.

Citywide locations as identified on Santee's Assessmnet of CMP Pipeline Report, April 2012 and updated CMP Additional Report, February 2013.

Procurement/Operatio nal Needs 09/2020 12/2021 30-50 71 38

Santee San Diego 20/21 New Road Maintenance & Rehabilitation

Pavement Repair and Rehabilitation Citywide

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project will repair roads with overlays and or full reconstruction of the pavement section. It will also conduct adjacent repairs to curbs, pedestrian ramps, cross gutters, and drainage.

As identified in Santee's Pavement Management Analysis Report, May 2017, which includes zones BF, BB, AA, CG, EE, BO, EB, CB, CD, FC, CI, CE, ED, and EF.

Pre-Construction & Construction

01/2021 07/2021

03/2021 12/2021 20-25 71 38

Santee San Diego 20/21 New Road Maintenance & Rehabilitation

Pavement Roadway Maintenance Citywide

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project will conduct maintenance repairs to roads with slurry seals, cape seals, and chip seals. It will also conduct adjacent repairs to curbs, pedestrian ramps, cross gutters, and drainage.

As identified in Santee's Pavement Management Analysis Report, May 2017, which includes zones BF, BB, AA, CG, EE, BO, EB, CB, CD, FC, CI, CE, ED, and EF.

Pre-Construction & Construction

01/2021 07/2021

03/2021 12/2021 10-15 71 38

Solana Beach San Diego 20/21 New Road Maintenance & Rehabilitation

2020 Street Maintenance and Repair Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

On portions of Lomas Santa Fe Drive, Nardo Avenue, Highland Drive and various residential streets. Construction 09/2020 12/2020 15-15 78 39

Vista San Diego 20/21 New Road Maintenance & Rehabilitation

Residential Street Rehabilitation, Construction and Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety)

Jonathon StEmerald Dr Collyn St Via FelicidadAnza AvCalle Jules Calle BienvenidoVia Soledad S/SVia Felicidad N/S Durian StHill Dr N/SN End Tylee StDurian StAnns Way Via SoledadCalle JulesCalle Dulce Calle DulceVia Soledad N/SVia Felicidad N/S Calle ColoradoVia Felicidad N/SVia Soledad S/S Santa Clara DrTylee StWest Vista Way

Construction 07/2020 12/2020 5-10 76 36

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 88: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Escalon San Joaquin 20/21 New Road Maintenance & Rehabilitation 2020 Slurry Seal Various Streets This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

Various Streets within the City of Escalon; Yosemite Avenue from Mitchell Avenue to Campbell Avenue, Elisabeth Street from California to Hwy 120, Brayton Avenue from California to Hwy 120, Blossom Avenue, and Fisk Avenue between California Street and First Street. Adjustments to streets may be required when project bids are received based on funding.

Construction 07/2020 06/2021 5-10 12 5

Lathrop San Joaquin 19/20 Carried Over Road Maintenance & Rehabilitation

CIP PS 18-01 Citywide Pavement Repair Program

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Maintenance Program Plan Development, Bicycle Lane (New), Document Preparation

E. Louise Ave between Harlan Road and 5th Street Pre-Construction & Construction

03/2020 07/2020

07/2020 12/2020 15-20 13 5

Lodi San Joaquin 20/21 New Road Maintenance & Rehabilitation

2020/2021 Pavement Resurface Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Neighborhoods bound by Lockeford Street to the north, Cherokee Lane to the east, Vine Street to the South, and Virginia Avenue to the west.

Pre-Construction & Construction

07/2020 09/2020

08/2020 06/2021 5-10 9 5

Manteca San Joaquin 18/19 Forecasted Road Maintenance & Rehabilitation

2019 Annual Pavement Maintenance Project

This project will include: Pavement Rehab/Repair (Existing) | The project will include a combination of pavement maintenance methods including asphalt overlays, slurry seals, dig outs, base repair, crack seal, cape seal and/or microsurfacing at various locations throughout the region in accordance with the recommendations of the City Pavement Management Program (PMP).

Project construction is scheduled for FY 21/22. The useful life of the pavement rehabilitation is approximately 10-20 years.

Manteca Woodbridge Senior Community 1451 Americana St, Manteca, CA 95336 Construction 07/2021 12/2021 10-10 12 5

Manteca San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation

Springtime Estates Improvement Project

This project will include: Pavement Rehab/Repair (Existing) | Pavement maintenance of 65,000 square yards of road surface. This could include asphalt overlays, slurry seals, dig outs, base repair, and other pavement repairs in accordance with the recommendations of the City Pavement Management Program. | Consultant has been selected and is starting design.

This project area is East of Main Street, North of Louise Avenue, and Southwest of State Highway 99.

Construction 07/2020 12/2020 10-50 12 5

Manteca San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation

Mayor's Park Subdivision Pavement Project

This project will include: Pavement Rehab/Repair (Existing) | This project will entail pavement repair including asphalt overlays, base repairs, crack seal, cape seal, microsurfacing, Full-depth reclamation (FDR) and other pavement repairs at the Mayor’s Park Subdivision. The project is consistent with the recommendation of the City Pavement Maintenance Program (PMP).

Project construction is scheduled for FY 20/21. The useful life of the pavement rehabilitation is approximately 10-12 years.

Mayor's Park Subdivision located at 1440 Kelley Drive, Manteca, CA 95336 Construction 07/2020 12/2020 10-10 12 5

Manteca San Joaquin 18/19 In Progress Road Maintenance & Rehabilitation

Yosemite Avenue: Main Street to Cottage Avenue Improvement

Project

This project will include: Pavement Rehab/Repair (Existing) | This project will rehabilitate, replace, or restore approximately 35,000 square yards of pavement that is aging, or beginning to fail. This project also includes the installing 10,000 linear feet of bicycle lanes. | Under construction, performing the punch list tasks.

The Project is located on Yosemite Avenue, between Main Street and Cottage Drive. Construction 03/2019 12/2020 10-10 12 5

Manteca San Joaquin 18/19 In Progress Road Maintenance & Rehabilitation

Main Street: Yosemite Avenue to Atherton Drive Improvement

Project

This project will include: Pavement Rehab/Repair (Existing) | This project will rehabilitate, replace, or restore approximately 42,000 square yards of pavement that is aging, or beginning to fail. This project also includes the installing 12,000 linear feet of bicycle lanes. | Under construction, performing punch list tasks.

The Project is located on Main Street, between Yosemite Avenue to Atherton Drive. Construction 03/2019 12/2020 10-10 12 5

Manteca San Joaquin 20/21 New Road Maintenance & Rehabilitation Lathrop Road Improvement Project This project will include: Public Works Staffing

The project is located on Lathrop Road, between Airport Way and approximately 200-feet east of London Avenue, in the City of Manteca.

Procurement/Operatio nal Needs 07/2020 12/2020 10-25 12 5

Manteca San Joaquin 20/21 New Safety Local Road Safety Plan (LRSP) This project will include: The Local Road Safety Plan (LRSP) covers the entire City of Manteca. The Local Road Safety Plan (LRSP) will identify and prioritize projects for roads and streets traffic safety improvements.

The Local Road Safety Plan (LRSP) covers the entire City of Manteca. The Local Road Safety Plan (LRSP) will identify and prioritize projects for roads and streets traffic safety improvements.

Procurement/Operatio nal Needs 07/2020 12/2020 10-20 12 5

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 89: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Ripon San Joaquin 20/21 New Road Maintenance & Rehabilitation Stockton Avenue Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Stockton Ave., Ripon, CA Construction 06/2020 10/2021 25-40 12 5

Ripon San Joaquin 20/21 New Road Maintenance & Rehabilitation

River Road Overlay/Ripona Resurface Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) River Rd., Ripona Ave., Ridge Ave., Prospect Ave. in Ripon, CA

and surrounding roads. Construction 07/2020 10/2020 10-10 12 5

Stockton San Joaquin 20/21 New Road Maintenance & Rehabilitation

-

Local Street Resurfacing FY20 21 SB1

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation | Relocation of drainage inlet/lateral and relocate and or replace pedestrian push buttons as needed to comply with ADA standards for wheelchair ramps.

Street segments within City Council Districts 1, 2, 3, 4, 5, and 6 will be resurfaced. Final street segments will be reported upon completion in the expenditure report. City Council District map can be found at the following link: https://stocktonca.mapgeo.io/datasets/properties?abuttersDistan ce=100&latlng=37.973764%2C-121.284422&panel=themes&themes=%5B%22ccdistricts%22%5 D&zoom=12

Pre-Construction & Construction

10/2020 05/2021

02/2021 12/2021 5-7 13 5

Stockton San Joaquin 20/21 New Road Maintenance & Rehabilitation

-Sidewalk, Curb, & Gutter Repairs

Program FY20 21 SB1

This project will include: Environmental Study/Documents, Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Relocation of drainage inlet/lateral and relocate and or replace pedestrian push buttons as needed to comply with ADA standards for wheelchair ramps.

Segments of curb, gutter, and sidewalk (including wheelchair ramps) within City Council Districts 1, 2, 3, 4, 5, and 6 will be subject to these improvements. Final locations will be reported upon completion in the expenditure report. City Council District map can be found at the following link: https://stocktonca.mapgeo.io/datasets/properties?abuttersDistan ce=100&latlng=37.973764%2C-121.284422&panel=themes&themes=%5B%22ccdistricts%22%5 D&zoom=12

Pre-Construction & Construction

10/2020 05/2021

01/2021 12/2021 5-50 13 5

Stockton San Joaquin 20/21 New Safety -

Streetlight Pole Replacement FY20 21 SB1

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation

Project location roughly bounded by Alexandria Pl., W. Lincoln Rd., N. El Dorado St., and Robinhood Dr.

Pre-Construction & Construction

10/2020 01/2021

01/2021 12/2021 50-50 13 5

Stockton San Joaquin 20/21 New Road Maintenance & Rehabilitation

- -

City Street Re striping FY20 21 SB1

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation

Street segments within City Council Districts 1, 2, 3, 4, 5, and 6 will be re-striped. Final street segments will be reported upon completion in the expenditure report. City Council District map can be found at the following link: https://stocktonca.mapgeo.io/datasets/properties?abuttersDistan ce=100&latlng=37.973764%2C-121.284422&panel=themes&themes=%5B%22ccdistricts%22%5 D&zoom=12

Pre-Construction & Construction

10/2020 05/2021

12/2020 12/2021 5-7 13 5

Tracy San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation

Street Patch & Overlay Project (FY 2018-19) Phases 1 and 2

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Phase 1: Slurry seal and paving rehab/repair of about 2.93 lane miles of streets. Slurry seal and paving rehab/repair of about 0.93 bicycle lane miles of streets. Phase 2: Slurry seal and paving rehab/repair of about 7.35 lane miles of streets.

Phase 1: Beverly Place (from Holly Dr to Mae Ave); Beverly Place (from Bessie Ave to Parker Ave); Grant Line Road (from Lincoln Blvd to Tracy Blvd). Phase 2: Duncan Dr (from Lincoln Blvd to Chester Dr); 12th St (from Holly Dr to Adam St); El Portal St (from 11th St to North End); 12th St (from El Portal St to Holly Dr); Highland Ave (from El Portal St to Holly Dr); Meadow Glen subdivision; Forest Glen Units 2 and 3 subdivisions; American Legion Parking Lot. All locations are estimates.

Construction 07/2020 12/2020 10-15 13 5

Tracy San Joaquin 19/20 Carried Over Road Maintenance & Rehabilitation

Street Patch & Overlay Project FY 2019-2020

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Slurry seal and paving rehab/repair of about 2.78 lane miles of streets. Slurry seal and paving rehab/repair of about 1.01 bicycle lane miles of streets.

Naglee Road (from Grant Line Road to Pavillion Parkway); Naglee Road (from Larch Road to 331 feet south of Larch Road); Hollywood Avenue (from Holly Drive to Mae Avenue); Mt. Diablo Avenue (from Tracy Boulevard to C Street); All locations are estimates.

Construction 07/2020 01/2021 10-15 13 5

Tracy San Joaquin 20/21 New Road Maintenance & Rehabilitation

Street Patch & Overlay Project FY 2020-2021

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Slurry seal and paving rehab/repair of about 39.40 lane miles of streets. Slurry seal and paving rehab/repair of about 2.58 bicycle lane miles of streets.

Lowell Avenue (between Orchard Parkway and Tracy Boulevard); Subdivisions of: Sienna Park (Units 1 and 2); Hearthstone (Units 1, 2, and 3); Parkside Estates (Units 1, 2, and 3); Regency Square (Unit 1); Ironwood; Muirfield (Units 1 and 3); Harvest Glen (Units 1 and 2); Victoria Greens (Units 1, 2, and 3); Warmington Homes at Glencreek (Units 1 and 2). All locations are estimates.

Pre-Construction & Construction

07/2020 05/2021

04/2021 01/2022 10-15 13 5

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 90: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Arroyo Grande San Luis Obispo 20/21 New Road Maintenance & Rehabilitation Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane

Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) James Way Construction 07/2020 09/2020 7-15 35 17

Atascadero San Luis Obispo 19/20 Carried Over Road Maintenance & Rehabilitation

El Camino Real Resurfacing -South

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Pavement maintenance and rehabilitation of approximately 1.90 miles of arterial roadway to improve deteriorated pavement conditions and better define roadway configuration for all roadway users, including motorists, bicyclists, and pedestrians.

El Camino Real from the South City Limit of Atascadero to El Bordo Avenue.

Pre-Construction & Construction

06/2020 06/2021

06/2021 12/2021 10-20 35 17

El Paso de Robles San Luis Obispo 20/21 New Road Maintenance & Rehabilitation Zone 4D and Nicklaus

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Rambouillet--Snead to Nicklaus Snead--Rambouillet to west end Wade Drive--Snead to Drive loop Casals Drive Wade Drive-Casals to east end Moran Court Carner Court Trevino

Construction 08/2020 01/2021 5-10 33 15

Grover Beach San Luis Obispo 18/19 Carried Over Road Maintenance & Rehabilitation

CIP 2283 Major Street Maintenance Program

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Document Preparation | Rehabilitate local major streets to improve driver and pedestrian safety and meet the City's Circulation Plan.

Oak Park Blvd, West Grand Avenue, N 4th Street, El Camino Real, Farroll Rd, The Pike

Pre-Construction & Construction

07/2020 05/2021

05/2021 06/2021 15-20 35 17

Morro Bay San Luis Obispo 20/21 New Road Maintenance & Rehabilitation

Arterial and Collector Street Stop Gap Spot Repairs

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation Main Street - SR41 to SR1 OC Spot Locations Pre-Construction &

Construction 03/2021 05/2021

04/2021 06/2021 15-25 17 35

Pismo Beach San Luis Obispo 18/19 In Progress Complete Streets Components Shell Beach Streetscape

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | Streetscape project resurfacing an existing road, providing separate bike/pedestrian lane, bulbouts, landscaping, street furniture, etc. | Project in progress

Shell Beach Road, Pismo Beach, CA 93449 Construction 06/2019 07/2020 20-50 35 17

San Luis Obispo San Luis Obispo 20/21 New Complete Streets Components Anholm Greenway Phase 2

This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | This project will construct a Class I bike path between Foothill and Ramona, and a Class IV two-way protected bike-way along Ramona from the Class I path to Broad Street.

Foothill to Ramona and Ramona to Broad Street Construction 03/2021 07/2021 20-40 35 17

San Luis Obispo San Luis Obispo 20/21 New Road Maintenance & Rehabilitation Bridge Deck Maintenance This project will include: Bridge Structure Rehab/Repair (Existing), Paving and/or

Striping Rehab/Repair (Existing Safety) Three Bridge Locations: Nipomo Street near Higuera, South Broad Street near El Capitan, and Fuller Road near Broad Street Construction 07/2020 12/2020 20-30 35 17

San Luis Obispo San Luis Obispo 18/19 Carried Over Safety

Safe Routes to School Implementation: Construct Foothill

Crossing (Anholm Greenway Phase I)

This project will include: Anholm Greenway Phase II: Construct a Class I Bike Path between Foothill and Ramona, and a Class IV two-way protected bikeway along Ramona from the Class I path to Broad Street. | Pedestrian Hybrid Beacon Installation Phase 1 Funding to be reallocated to completion of Anholm Greenway Phase 2 work, which is submitted as a new project for 20/21.

Intersection of Foothill Boulevard and Ferrini Road Construction 03/2021 07/2021 18-20 35 17

Atherton San Mateo 20/21 New Road Maintenance & Rehabilitation 2021 Street Overlay Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Oakwood Boulevard - Between Selby Lane and East/West Oakwood Boulevard (North City Limit) Construction 04/2021 10/2021 7-10 24 13

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 91: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Belmont San Mateo 20/21 New Road Maintenance & Rehabilitation

2021 Pavement Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Academy Avenue Academy Court Alden Court Carlmont Drive Carmelita Avenue Casa Bonita Christian Court Ewell Road Hillcrest Drive Marine View Avenue Newlands Avenue Sherborne Drive

Construction 06/2021 09/2021 5-7 22 13

Brisbane San Mateo 20/21 New Road Maintenance & Rehabilitation Slurry Seal of Various City Streets This project will include: Slurry seal (preventative maintenance surface treatment) of

various city streets

•Alvarado St from Visitacion Ave to Mono St •Humboldt Rd from Solano St to Trinity Rd •Inyo St from Mariposa St to San Francisco Ave •Klamath St from Visitacion Ave to Sierra Point Rd •Mariposa St from Solano St to Visitacion Ave •Mono St from Klamath St to Alvarado St •Monterey St from Solano St to Visitacion Ave •Park Ln from Old County Rd to Valley Dr •Park Pl from Park Ln to Valley Dr •San Francisco Ave from Visitacion Ave to dead end (west)

Construction 04/2021 06/2021 2-7 22 13

Burlingame San Mateo 20/21 New Road Maintenance & Rehabilitation 2021 Street Resurfacing Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | .

Various streets in the City of Burlingame. Alpine Ave, Bayview Place, Bernal Ave, Cabrillo Avenue. For more streets, see City Resolution

Construction 08/2021 12/2021 15-24 22 13

Colma San Mateo 18/19 Carried Over Other Mission Road Bike/Pedestrian Improvements

This project will include: Reconstruction of the roadway and pedestrian walkways to accommodate compliant accessible sidewalks and class II bicycle lanes in each direction, various ADA accessibility enhancements and upgrades, streetscape improvements integrated with green street infrastructure, street lighting, and high visibility flashing beacon crosswalks. | The construction of the project did not start as originally intended in FY 18/19. The construction acitivity was pushed to the FY 19/20.

Mission Road, between El Camino Real and Lawndale Boulevard.

Pre-Construction & Construction

04/2020 06/2020

06/2020 10/2020 10-20 19 11

Daly City San Mateo 20/21 New Road Maintenance & Rehabilitation

SERRAMONTE STREET SLURRY SEAL

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Document Preparation

Amherst Ct., Arley Ct., Bacon Ct., Berta Cir., Beverly St., Brighton Ct., Bromley Ct., Callan Blvd., Camelot Dt., Cameo Ct., Canterbury Ave., Christen Ave., Dennis Dr., Derby St., Dover Ct., Gellert Blvd., Hampshire Ct., Heath Ct., Hickey Blvd., Hyde Ct., John Glenn Cir., John Pappan Ct., King Dr., Lycett Ct., Lycett St., Lycett Cir., Marbly Ave., Margate St., Morton Dr., Nelson Ct., Norwood Ave., Parkrose Ave., Parnell Ave., Penhurst Ct., Penhurst Ave., Plymouth Cir., Serravista Ave., Shipley A

Pre-Construction & Construction

11/2020 05/2021

02/2021 09/2021 5-8 19 11

Daly City San Mateo 20/21 New Road Maintenance & Rehabilitation 2020-21 Street Resurfacing

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Higate Dr, San Fernando Ave, Altamond Dr., Blossom Ct., Dennis Dr., Lycett Circle, North Lycett, South Lycett

Pre-Construction & Construction

11/2020 05/2021

02/2021 10/2021 20-25 19 11

East Palo Alto San Mateo 19/20 Carried Over Complete Streets Components ST-05A Bay Road Improvements

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The Bay Road project will include street repaving; bicycle and pedestrian improvements; landscaping improvements; and replacement of storm drain and water trunk lines.

0.7 miles of Bay Road from Clarke Avenue to Cooley Landing Construction 06/2020 12/2020 20-40 24 13

East Palo Alto San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

ST-08 University Ave Resurfacing & Signal Upgrade

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Improvement (New) | This project provides for pavement resurfacing, restriping, upgrading of traffic signals and various other improvements on University Avenue.

University Avenue from Woodland Avenue to Notre Dame Avenue Construction 06/2021 12/2022 5-40 24 13

East Palo Alto San Mateo 19/20 Carried Over Safety ST-09 Bicycle & Pedestrian Improvements

This project will include: Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New) | This project is for the installation of street improvements to enhance vehicular, pedestrian and bicycle safety throughout the City.

University Ave, Pulgas Ave, Clarke Ave, Cooley Ave, Bay Rd, Newbridge Ave, East Bayshore Rd, West Bayshore Rd, Woodland Avenue, Donohoe St, Weeks St

Construction 07/2020 12/2027 5-40 24 13

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 92: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

East Palo Alto San Mateo 19/20 Carried Over Complete Streets Components

ST-14 University Avenue Interchange

This project will include: Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Pavement Improvement (New) | This project will provide for the widening of the University Avenue/US 101 overpass to provide safer pedestrian and bicycle travel and more efficient vehicle travel. The project will include the widening of the overpass bridge and construction of a new diagonal off-ramp from southbound (SB) 101 onto SB University Avenue

University Avenue from Woodland Avenue to Donohoe Street Construction 12/2020 12/2021 20-40 24 13

East Palo Alto San Mateo 19/20 Carried Over Traffic Control Devices ST-19 Runnymede/ University Avenue Signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrading of traffic signals and various other improvements Runnymede/University Avenue Construction 03/2021 12/2021 10-20 24 13

East Palo Alto San Mateo 19/20 Carried Over Traffic Control Devices ST-12 Traffic Calming Program

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | This project provides for the planning and construction of speed bumps, bulb-outs and other traffic calming devices to reduce speed through residential zones and to increase safety.

Abelia Way, Addison Ave, Alberni St, Annapolis St, Aster Way, Avelar St, Azalia Dr, Baines St, Bay Rd, Baylor St, Beech St, Bell Ct, Bell St, Blue Jay Ct, Bradley Way, Brentwood Ct, Buchanan Ct, Camellia Ct, Camellia Dr, Camphor Way, Capitol Ave, Carole Ct, Circle Dr, Clarence Ct, Clarke Ave, Cypress St, Daisy Ln, Daphne Ct, Daphne Way, Demeter St, Donohoe St, Drew Ct, Dumbarton Ave, East Bayshore Rd, East O’keefe St, Emmett Way, Euclid Ave, and Euclid Pl along with 77 additional streets.

Construction 12/2020 12/2022 20-40 24 13

East Palo Alto San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

ST-13 Major Street Reconstruction - Annual Project 2018-19

This project will include: Pavement Rehab/Repair (Existing) | This project provides for the reconstruction of damaged City streets during the ten-year life of the CIP

Abelia Way, Addison Ave, Alberni St, Annapolis St, Aster Way, Avelar St, Azalia Dr, Baines St, Bay Rd, Baylor St, Beech St, Bell Ct, Bell St, Blue Jay Ct, Bradley Way, Brentwood Ct, Buchanan Ct, Camellia Ct, Camellia Dr, Camphor Way, Capitol Ave, Carole Ct, Circle Dr, Clarence Ct, Clarke Ave, Cypress St, Daisy Ln, Daphne Ct, Daphne Way, Demeter St, Donohoe St, Drew Ct, Dumbarton Ave, East Bayshore Rd, East O’keefe St, Emmett Way, Euclid Ave, and Euclid Pl along with 77 additional streets.

Construction 12/2020 12/2027 20-40 24 13

East Palo Alto San Mateo 19/20 Carried Over Complete Streets Components ST-17 New Loop Road

This project will include: Sidewalk and/or Crosswalk Installation (New), Roundabout Installation (New), Bicycle Lane (New) | This project is to develop a new loop road around the north and east of the University Village neighborhood that will connect University Avenue to the Ravenswood Business District (RBD) and include a Class I bicycle and pedestrian trail.

Loop Road (new) - north and east of the University Village neighborhood that will connect University Avenue to the Ravenswood Business District (RBD)

Construction 12/2020 12/2027 20-40 24 13

East Palo Alto San Mateo 18/19 Carried Over Road Maintenance & Rehabilitation ST-07 Street Resurfacing Program

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project provides for the resurfacing of City streets during the ten-year life of the CIP. Roughly $1,000,000 needs to be expended annually on street resurfacing.

Abelia Way; Addison Avenue; Alberni Street; Annapolis Street; Aster Way; Avelar Street; Azalia Drive; Baines Street; Bay Road; Baylor Street; Beech Street; Bell Court; Bell Street; Blue Jay Court; Bradley Way; Brentwood Court; Buchanan Court; Camellia Court; Camellia Drive; Camphor Way; Capitol Avenue; Carole Court; Circle Drive; Clarence Court; Clarke Avenue; Cypress Street; Daisy Lane; Daphne Court; Daphne Way; Demeter Street; Donohoe Street; Drew Court; Dumbarton Avenue; East Bayshore Road; East O’keefe Street; Emmett Way; Euclid Avenue; Euclid Place; Farrington Way; Fordham Street; Gaillardia Way; Garden Street; Gardenia Court; Gardenia Place; Gardenia Way; Gates Street; Georgetown Street;

Construction 07/2020 12/2027 20-40 24 13

Foster City San Mateo 18/19 Carried Over Road Maintenance & Rehabilitation

Street Rehabilitation (FY 2019-2020)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New) | The Street Rehabilitation (FY 2019-2020) Project ( Vintage Park Drive Project) timeline was moved ahead of schedule since the Street Rehabilitation OBAG2 (FY 2018-2019) Project timeline was postponed in order to take advantage of federal funding. The Vintage Park Drive project is a qualifying SB1 project, to be included in the Spring 2020 projects reporting list, with construction scheduled for FY 19/20.

Vintage Park Drive between Foster City Boulevard and Chess Drive, as well as Gull Ave, Kildeer Ct, Mallard St, Surfbird Isle, and Crane Ave between Gull Ave and Stilt Ct

Construction 07/2020 10/2020 10-20 22 13

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 93: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Foster City San Mateo 18/19 Carried Over Road Maintenance & Rehabilitation

Street Rehabilitation - OBAG2 (2018-2019)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Street rehabilitation including localized asphalt concrete repairs, surface overlays, and installation of bicycle route sharrow symbols, legends, and signage. The project also includes ADA ramp upgrades, and curb and gutter and sidewalk repairs as necessary, and pedestrian crosswalk improvements. | Street Rehabilitation project was rescheduled to take advantage of federal funding.

Edgewater Boulevard from East Hillsdale Boulevard through the intersection of Beach Park Boulevard Construction 04/2020 07/2020 10-20 22 13

Foster City San Mateo 20/21 New Road Maintenance & Rehabilitation

Street Rehabilitation (FY 2020-2021)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Neighborhoods 7 and 8 (Edgewater Boulevard from Beach Park Boulevard to Baffin Street and various side streets. Construction 04/2021 07/2021 10-20 22 13

Half Moon Bay San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Pavement Management & Traffic Safety Program

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Maintenance Program Plan Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The project will look to reconstruct and preserve pavement throughout the City. Carryover from FY 18-19, the project will look at reconstruction of approximately 1 miles of pavement, reconstruct 6 ADA ramps, and other related improvements as funding becomes available.

Belleville Boulevard, Seymour Street, based on available funding.

Pre-Construction & Construction

09/2020 03/2022

05/2021 12/2022 15-30 24 13

Half Moon Bay San Mateo 20/21 New Road Maintenance & Rehabilitation

2020-21 Pavement Restoration Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

Main Street - Highway 1 to south of Stone Pine Road Construction 09/2020 06/2021 15-30 24 13

Hillsborough San Mateo 20/21 New Road Maintenance & Rehabilitation 2021 Street Resurfacing Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety) | The 2021 Street Resurfacing Project consists of essential maintenance and rehabilitation work for approximately 15 miles of rubberized asphalt overlay, asphalt overlay, microsurfacing, and crack sealing.

Selected streets are located in various areas within the Town’s limit. A list of newly proposed projects that will be funded with Fiscal Year 2020-21 Road Maintenance and Rehabilitation Account revenues is attached (15 miles of the Town's 83 miles of roadways for this FY 2020-21)

Construction 05/2021 09/2021 3-30 22 13

Menlo Park San Mateo 20/21 New Road Maintenance & Rehabilitation

2020 Street Preventive Maintenance Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

REFER TO CITY COUNCIL RESOLUTION No. 6555 FOR FULL STREET LISTING EXHIBIT A, PARTIAL STREET NAMES PER CITY DISTRICT: DISTRICT1; Adams Ct; Almanor Av; Newbridge St; Windermere A; DISTRICT; Arnold W; Bay Rd; O’Keefe St; Van Buren Rd; DISTRICT3; Coleman Av; Encinal Av; Homewood Pl; Ryans Ln; Spruce Av; DISTRICT4; Castle Wy; Cotton St; San Mateo Dr; DISTRICT5; Anderson Wy; Branner Dr; Monte Rosa Dr; Trinity Dr; Whitney Dr; REFER ALSO TO: Approved-City-Council-Districts-map FOR STREET LOCATIONS

Construction 06/2020 10/2020 5-7 24 13

Millbrae San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Skyline Boulevard Repaving Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Overlay of Skyline Blvd from Millbrae Avenue to Riverton Drive. Work includes signage, striping, pavement legend, sidewalk and median replacement, and wheel chair curb ramps upgrade.

Skyline Blvd from Millbrae Avenue to Riverton Drive Pre-Construction & Construction

07/2020 05/2021

12/2020 09/2021 20-29 22 13

Millbrae San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Broadway, Hillcrest Blvd, and La Cruz Ave Repaving Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Overlay of Broadway from Victoria Avenue to Taylor Avenue, Hillcrest Blvd from Broadway to El Camino Real, La Cruz Avenue from Magnolia to El Camino Real. Work includes signage striping, pavement legend, sidewalk replacement, and curb ramps upgrade.

Overlay of Broadway from Victoria Avenue to Taylor Avenue, Hillcrest Blvd from Broadway to El Camino Real, La Cruz Avenue from Magnolia to El Camino Real.

Construction 07/2020 09/2021 20-29 22 13

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 94: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Millbrae San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Sequoia Avenue, Loree Lane, and La Mancha Place Repaving

Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Overlay of Sequoia Avenue from Murchison Dr to Maple Place, Loree Lane, and La Mancha Place. Work includes signage striping, pavement legend, sidewalk replacement, and wheel chair curb ramps upgrade.

Sequoia Avenue from Murchison Dr to Maple Place, Loree Lane, and La Mancha Place

Pre-Construction & Construction

07/2020 05/2021

03/2021 09/2021 20-29 22 13

Millbrae San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Crestview Drive and Clearfield Drive Repaving project 2019

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Overlay of Crestview Drive and Clearfield Drive. Work includes signage striping, pavement legend, sidewalk replacement, and wheel chair curb ramps upgrade.

Crestview Drive from Larkspur to Clearfield Drive Clearfield Drive - Tioga Drive to Berkshire Drive to End. From Crestview Drive to End

Construction 07/2020 09/2021 20-29 22 13

Millbrae San Mateo 19/20 In Progress Road Maintenance & Rehabilitation

MIllbrae Street Rehabilitation Project (STPL 5299(016))

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Larkspur Drive between Crestview Ave to Helen Drive Construction 07/2020 09/2020 20-29 22 13

Millbrae San Mateo 20/21 New Road Maintenance & Rehabilitation

2020-2021 Pavement Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Overlay of various Victoria Avenue, Corte Del Sol, Minorca Way, 300 Blocks (Hazel Avenue, Poplar Avenue, Palm Avenue, Laurel Avenue), Barclay Avenue, and El Camino Frontage Road. Work includes signage, striping, pavement legends, sidewalk replacement, and wheel chair curb ramps upgrade.

Victoria Avenue - Broadway to El Camino Real Frontage Corte Del Sol - All Minorca Way - Millbrae Avenue to End Hazel Avenue -300 Block Poplar Avenue - 300 Block Palm Avenue - 300 Block Laurel Avenue -300 Block Barclay Avenue - All El Camino Frontage Road - Taylor Boulevard to Victoria Avenue

Pre-Construction & Construction

07/2020 05/2021

02/2021 09/2021 20-29 22 13

Millbrae San Mateo 20/21 New Road Maintenance & Rehabilitation

2021 Pavement Maintenance Project This project will include: Maintenance Program Plan Development Various locations to be determined. Pre-Construction 05/2021 07/2021 7-10 22 13

Millbrae San Mateo 20/21 New Road Maintenance & Rehabilitation

Hawthorne Way and Taylor Avenue Pavement Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Hawthorne Way and Taylor Avenue Construction 07/2020 09/2021 20-29 22 13

Pacifica San Mateo 20/21 New Road Maintenance & Rehabilitation

FY 2020-2021 Pavement Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Fassler Avenue and Crespi Drive Construction 02/2021 05/2021 5-20 22 13

San Bruno San Mateo 20/21 New Road Maintenance & Rehabilitation 2020-21 Street Rehabilitation

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Projects are located as follows: Bayshore Cir WB between Huntington Ave E and Herman St, Darby Pl between Crestmoor Dr and End, Oxford Ln between North End and South End.

Pre-Construction & Construction

07/2020 06/2021

05/2021 10/2021 15-15 22 13

San Carlos San Mateo 20/21 New Road Maintenance & Rehabilitation

2020 Pavement Resurfacing Project This project will include: Document Preparation

Amber Ct, Cypress Ct, Debbie Pl, Eaton Ave, Franciscan Ct, Granite Ct, Howard Ave, Ridge Rd, Robin Wy, Terrace Rd, and Thornhill Dr. The full list is in Attachment A of Resolution No. 2020-14.

Pre-Construction 07/2020 12/2020 1-8 22 13

San Mateo San Mateo 20/21 New Road Maintenance & Rehabilitation Citywide Street Rehabilitation 1C

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Barneson Ave, from Alameda de las Pulgas to Shafter St; Fashion Island Blvd, from Fashion Island Bridge to Mariner's Island Blvd; Huron Ave, from Norfolk St to Monte Diablo Ave; Roberta Dr, from Norfolk t to Hamlet St; 2nd Ave, from Norfolk St to Quebec St; 19th Ave, from Fashion Island Blvd to end; Nash Dr, from Cottage Grove Ave to Cottage Grove Ave; Ottawa St, from Lorraine Ave to York Ave; 5th Ave, from El Camino Real to Virginia Ave; 2nd Ave, from Delaware St to Fremont St

Construction 05/2021 12/2021 10-30 22 13

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 95: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

South San Francisco San Mateo 19/20 Carried Over Complete Streets

Components

Linden Avenue/Spruce Avenue Traffic Calming Improvements

(Phase 2)

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Bicycle Lane (New) | The project will design improvements along Linden Avenue from Aspen Avenue to Miller Avenue and Spruce Avenune from Lux to Miller. Elements include new intersection bulb-outs with Low Impact Development (LID) treatments and landscaping, high visibility crosswalks, ADA curb ramps, pedestrian crossings, median pedestrian refuge islands, and installation of a Class II bike lane with signage.

Linden Avenue from Aspen Avenue to Miller Avenue and Spruce Avenune from Lux to Miller Construction 09/2020 03/2021 10-30 22 13

South San Francisco San Mateo 20/21 New Road Maintenance &

Rehabilitation Street Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

The project will cover streets in the following neighborhoods: Avalon, Baden, Orange Park, Lindenville, Sierra Highlands, Sunshine Gardens, Sign Hill, Paradise Valley and the Downtown neighborhoods.

Construction 07/2020 12/2020 5-25 22 13

South San Francisco San Mateo 18/19 Carried Over Complete Streets

Components Grand Boulevard Initiative Phase 2

(Kaiser Way to McLellan Dr.)

This project will include: The work consists of the installation of enhanced pedestrian crossings, corner bulbout and median refuges at two intersections, expand two bus stop/waiting areas, install approximately 2000 feet of new landscaped medians, and green infrastructure.

El Camino Real between Kaiser Way and McLellan Drive. Construction 06/2018 12/2020 10-30 22 13

South San Francisco San Mateo 18/19 In Progress Complete Streets

Components Grand Boulevard Project Phase 3

(Arroyo Drive to Kaiser Way)

This project will include: The Pre-Construction/Design work is in progress for this project that will Improve El Camino Real between Arroyo Drive and Kaiser Way by installing enhanced pedestrian crossings, bike lanes, corner bulbout and median refuges, expanded bus stop/waiting areas, a new landscaped median, and green infrastructure. | City received approval for federal funds to assist in funding the project. City worked with Caltrans to initiate the receipt of the federal funds for the preconstruction phase work.

El Camino Real between Arroyo Drive and Kaiser Way Pre-Construction & Construction

07/2017 05/2021

04/2021 02/2022 20-30 19, 22 13

Woodside San Mateo 20/21 New Road Maintenance & Rehabilitation 2021 Road Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing)

Blue Ridge Lane from Mountain Home Road to End. Dean Road from Canada Road to End. Godetia Drive from Canada to Jefferson Avenue. Greenways Drive from Alameda de las Pulgas to End. Manzanita Way from Mountain Home Road to Sandhill Road. Marva Oaks Drive from Raymundo Drive to End. Ridgeway Road from Woodside Drive to Cinnabar Road. Todo El Mundo from High Road to End. West California Way from Jefferson Avenue to Town Limit. Woodside Way from Southdale Way to Glencrag Way.

Construction 07/2021 10/2021 5-15 24 13

Buellton Santa Barbara 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Road Maintenance Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

McMurray Road and Industrial Way in their entirety. Locations are estimates not yet final. Construction 04/2021 06/2021 20-30 37 19

Carpinteria Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing)

Carpinteria Ave. (7th St./Santa Ynez Ave. to Sandyland Cove Rd.); Carpinteria Ave. (Sandyland Cove Rd. to US 101 Off Ramp); 8th St. (Elm Ave. to Linden Ave.); 8th St. (Linden Ave. to Maple Ave.); Sawyer Ave. (Linden Ave. to Holly Ave.); Holly Ave. (Sawyer Ave. to Carpinteria Ave.); Nipomo Dr. (Linden Ave. to Tomol Dr.)

Construction 06/2020 08/2020 5-20 37 19

Carpinteria Santa Barbara 18/19 Carried Over Road Maintenance & Rehabilitation

Parking Lot No. 2 and Cactus Lane Improvements

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Reconstruction of Roadway Structural Section, Pedestrian Facilities, Drainage Structures, and Curb and Gutter

Cactus Lane from Carpinteria Avenue to Wullbrandt Way Construction 06/2020 08/2020 5-20 37 19

Goleta Santa Barbara 20/21 New Road Maintenance & Rehabilitation

2020 Pavement Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Proposed list of projects includes road reconstruction for some of the roadways.

Cathedral Oaks from Calle Real to Winchester Canyon Road and from Glen Annie Road to Alameda Avenue, Hollister Avenue from Kinman Avenue to Kellogg Avenue, and Kellogg Avenue from Hollister Avenue to Kellogg Way

Pre-Construction & Construction

07/2020 02/2021

02/2021 06/2021 20-30 37 19

Goleta Santa Barbara 20/21 New Road Maintenance & Rehabilitation

2021 Pavement Rehabilitation Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The proposed project locations will include road reconstruction for some roadways.

Glen Annie Road from Highway 101 to Cathedral Oaks Road, Storke Road from Hollister Avenue to Bollay Drive, and Calle Real from Glen Annie Road to Sonoma Drive

Pre-Construction & Construction

07/2020 03/2021

02/2021 12/2021 20-30 37 19

Guadalupe Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

2020 Pavement Maintenance Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Crack Fill & Slurry Seal (Type B) and localized 4" removal and replacement of HMA on City roads as outlined in City's Pavement Management System document (2013) and any roads deferred from previous years.

Streets included but not limited to: West Main Street from Hwy 166 to City Limits, Sanchez Dr., Eleventh St. west of Gularte Ln., Pacheco St., Ninth St. east of Pacheco St., Obispo St. north of 10th St. North of 4th Street, West of Obispo Street, 5th Street to 7th Street, 9th Street to Hwy 1, 300 feet south of North end to 11th Street, peralta St. to Obispo Street.

Construction 09/2020 11/2020 3-5 35 19

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 96: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Lompoc Santa Barbara 20/21 New Traffic Control Devices Maintenance of Traffic Control

Devices - Signs, Striping, Markings, etc.

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear | Procurement, placement, and maintenance of traffic control devices - signs, striping, markings, etc. | Units of staffing are in hours, and units of materials are in dollars.

Citywide Procurement/Operatio nal Needs 07/2020 06/2021 2-10 35 19

Lompoc Santa Barbara 20/21 New Road Maintenance & Rehabilitation Pavement Repair

This project will include: Procurement of Road Maintenance and Rehab Materials | Procurement and construction of pavement repairs by City maintenance workers. | Units of staffing are in hours, and units of materials are in dollars.

Citywide Procurement/Operatio nal Needs 07/2020 06/2021 1-10 35 19

Santa Barbara Santa Barbara 20/21 New Road Maintenance & Rehabilitation Haley Street Overlay

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project will rehabilitate 13 blocks of Haley Street from Castillo Street to Milpas Street; replacing damaged concrete sidewalks, curbs, gutters, and cross gutters; upgrading access ramps to meet Americans with Disabilities Act requirements; and grinding and overlaying the roadway surface.

Haley Streets from Castillo Street to Milpas Street Construction 03/2021 10/2021 15-20 37 19

Santa Maria Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

North Miller Street Pavement Rehabilitation (2017/18)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | This project will place a standard 2-inch asphalt overlay over a severely distressed section of Miller Street. Work will include digging out and repairing failed pavement areas with new hot mix asphalt concrete, grinding down surface of the roadways, a glass grid will be placed followed by hot mix asphalt, installation of new striping and pavement markings. Approximately 70,000 SF of roadway, equivalent to 0.8 lane miles, will be renewed. | Drainage improvements have been added: repair of existing drop inlets, addition of new drop inlets, and addition of new storm drain.These costs were not part of the original cost and are not reflected in the estimated total project cost. The project cost just reflects the pavement rehab portion of the project.

North Miller Street from Chapel Street to Alvin Avenue Pre-Construction & Construction

06/2020 12/2020

12/2020 06/2021 15-25 35 19

Santa Maria Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

East Alvin Avenue and South College Drive Pavement

Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | This project will place a standard 2-inch asphalt overlay over two distressed street sections. Work will include digging out and repairing failed pavement areas with new hot mix asphalt concrete, grinding down surface of the roadways, a glass grid will be placed followed by the hot mix asphalt, and installation of new striping and pavement markings. | Approximately 165,000 SF of roadway, equivalent to 2 lane miles, will be renewed.

East Alvin Avenue from College Drive to Bradley Drive South College Drive from Stowell Road to Enos Drive

Pre-Construction & Construction

05/2020 07/2020

07/2020 12/2020 15-25 35 19

Santa Maria Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

2019 Thin Maintenance Overlay Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Some of the streets included in this project are Depot Street from Battles Road to Stowell Road, Pine Street from West Grant Street to West Monroe Street, Barrington Drive from West Gaylene Drive to West Creston Street, Creston Street from North Western Avenue to North Railroad Avenue, Las Flores Way from South Superior to South Railroad Avenue, Superior Street from West Camino Colegio to West Liberty Street, Pershing Street from South Superior Street to South Railroad Avenue, Mariposa Way from

Pre-Construction & Construction

02/2020 05/2020

05/2020 07/2020 10-12 35 19

Santa Maria Santa Barbara 20/21 New Road Maintenance & Rehabilitation

2020 Surface Seal Street Maintenance Project

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

Various Streets throughout the City, some of which include: Miller Street from McCoy to Stowell, Palisades Drive from Main to Suey, Seaward Drive / Canyon Drive from Magellan to Donovan, residential areas north of Donovan, Alvin Avenue from Broadway to Railroad and residential streets north up to Donovan Road, the Hancock Park development, Crossroads residential streets near Caballero, and the Harvest Glen neighborhood.

Pre-Construction & Construction

05/2020 08/2020

08/2020 11/2020 4-10 35 19

Solvang Santa Barbara 19/20 Carried Over Road Maintenance & Rehabilitation

South Alisal Rd Pavement Reconstruction Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New) | Reconstruct South Alisal Road and widen pavement from existing 23' to 26'. Replace speed limit and safety signage. Add bicycle sharrows and bicycle signage for improved safety.

South Alisal Road from the Santa Ynez River to the southerly City Limits. Construction 03/2021 06/2021 25-40 35 19

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 97: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Campbell Santa Clara 20/21 New Road Maintenance & Rehabilitation

Annual Street Maintenance FY21 -Collector & Residential Street

Resurfacing Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

Approximately 7.6 linear miles of various residential and collector streets in City of Campbell. Construction 04/2021 12/2021 5-10 28 15

Cupertino Santa Clara 20/21 New Complete Streets Components

McClellan Rd Separated Bikeways -Phase 2

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

McClellan Rd between Stelling Rd and Torree Ave. Construction 07/2020 10/2020 25-25 28 15

Gilroy Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation

FY 19 Pavement Maintenance Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Pavement maintenance project, including digouts, crack seal, and rubberized cape seal surface treatment

In the City of Gilroy, on the following street segments: Farrel Ave (from Wren to Monterey), Eight St (from Princevalle to Church), Martin St (from Monterey to Chestnut), Murray Ave (from I.O.O.F. to Leavesley), Monterey Rd (from Cohansey Ave to Leavesley Rd), Camino Arroyo (from Holloway Rd to Pacheco Pass Hwy), and Chestnut St (from 10th St to 450 ft North of Martin St).

Construction 06/2020 06/2021 6-8 30 17

Los Altos Santa Clara 20/21 New Road Maintenance & Rehabilitation

2020 Annual Street Resurfacing Project and Annual Slurry Seal

Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | 2 in. Mill and Fill. Microsurfacing.

Various Streets in Los Altos listed in attached Resolution No. 2020-14. List Starts at Askam lane and ends at Whitney Street. Construction 06/2021 09/2021 6-15 24 13

Los Altos Hills Santa Clara 19/20 In Progress Complete Streets Components

Summerhill Pathway Project (Design and Construction)

This project will include: Preliminary Design | This project is to construct a pathway connecting Summerhill Avenue between El Monte Road and Nicole Lane to City of Los Altos. The pathway connection will improve pedestrian safety from high traffic speeds due to Summerhill Avenue being used as an alternate arterial road. This project is DESIGN and CONSTRUCTION.

Summerhill Ave at Los Altos Hills side Pre-Construction & Construction

07/2020 01/2021

01/2021 05/2021 20-30 24 13

Los Altos Hills Santa Clara 20/21 New Road Maintenance & Rehabilitation

Streets Operations and Maintenance Budget

This project will include: Maintenance Program Plan Development | This budget will support the necessary work on Various street repairs and maintenance throughout town on as needed basis

This streets operation and maintenance will cover town-wide public streets (total 216 streets) in general, the approximate boundary streets are listed below: Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El Monte Road - Summerhill Avenue - Magdalena Avenue - Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

Pre-Construction 07/2020 06/2021 5-10 24 13

Los Altos Hills Santa Clara 20/21 New Road Maintenance & Rehabilitation

Storm Drain Operating and Maintenance Budget

This project will include: Maintenance Program Plan Development | This budget will support the necessary work on various storm drain (public streets road side and a few facilities) cleaning and maintenance repairs throughout town on as needed basis

The storm drain operation, repair, annd maintenance will cover town-wide storm drainage on public streets (total 216 streets) and facilities, the approximate boundary streets are listed below: Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El Monte Road - Summerhill Avenue - Magdalena Avenue - Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

Pre-Construction 07/2020 06/2021 10-15 24 13

Los Altos Hills Santa Clara 20/21 New Complete Streets Components

Pathways Operating and Maintenance Budget

This project will include: Maintenance Program Plan Development | This budget will support the necessary work on various street side pathway maintenance throughout town on as needed basis for drainage and safety purposes

The pathways operation, repair, and maintenance will cover town-wide pathways along public streets (total 216 streets) in general, the approximate boundary streets are listed below: Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El Monte Road - Summerhill Avenue - Magdalena Avenue - Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

Pre-Construction 07/2020 06/2021 5-10 24 13

Los Altos Hills Santa Clara 20/21 New Road Maintenance & Rehabilitation

2020 Pavement Rehabilitation and Storm Drainage Improvement

Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This is an annual street resurfacing project that includes 1.5” and 2” overlay with digouts, microsurfacing, microsurfacing and digouts, 4” AC deep lift patching, 4” full grind and paving, pavement markings replacement, and micro-surfacing throughout various streets within Town limits. (See attached exhibit for street names.) The selected streets were determined by the recommendation from the Metropolitan Transportation Commission’s Pavement Management Program.

Selection is ongoing, but potential roadways include: Altamont Road, Arastradero Road, Byrd Lane, Dezahara Way, Fremont Road, Ravensbury Avenue, and Springhill Drive

Construction 07/2020 10/2020 5-20 24 13

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 98: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Altos Hills Santa Clara 20/21 New Complete Streets Components

Various Pathway Construction Projects

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design | This budget will support the necessary work on various streetside pathway capital improvement capital improvement projects throughout town to work towards completing the Town's pathway network. These pathways include Altamont Plunge, La Paloma to Robleda, Redwood Grove, Page Mill Rd (Lupine to Via Feliz), Edgerton Rd, Byrne Park Plunge.

Various locations around Los Altos Hills including: Altamont Plunge, La Paloma to Robleda, Redwood Grove, Page Mill Rd (Lupine to Via Feliz), Edgerton Rd, Byrne Park Plunge.

Pre-Construction 07/2020 06/2021 20-30 24 13

Los Gatos Santa Clara 18/19 Forecasted Road Maintenance & Rehabilitation

Union Ave Street Repair & Resurfacing

This project will include: Pavement Rehab/Repair (Existing) | Placement of rubber cape seal to maintain pavement surface.

Union Avenue from Blossom Hill Road to Los Gatos-Almaden Road Construction 07/2022 11/2022 10-25 28 15

Los Gatos Santa Clara 20/21 New Road Maintenance & Rehabilitation

Winchester Street Repair & Resurfacing This project will include: Pavement Rehab/Repair (Existing) Winchester from Lark to Santa Cruz Construction 05/2021 11/2021 10-25 28 15

Milpitas Santa Clara 20/21 New Road Maintenance & Rehabilitation Street Resurfacing 2021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Landess Ave from Piedmont Rd to Dempsey Rd Milmont Dr from California Circle to Dixon Landing Rd Streets bounded by Milmont Dr, Penetencia Creek, and Dixon Landing Rd Streets bounded by railroad tracks, Milmont Dr, Penetencia Creek, and Calera Creek Piedmont Rd from Landess Ave to Yosemite Dr Streets bounded by Piedmont Rd, Yosemite Dr, Landess Ave, Ben Rodgers Park, and Hillcrest Park.

Construction 04/2021 12/2021 5-7 25 10

Monte Sereno Santa Clara 20/21 New Road Maintenance & Rehabilitation

Beck Avenue, Hernandez Ln and Withey Road Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

BECK AVE (RIDGECREST DR to HERNANDEZ LN) HERNANDEZ LN (CITY LIMIT SOUTH to BECK AVE) WITHEY ROAD (BECK AVE to END WEST)

Construction 04/2021 06/2021 10-15 28 15

Morgan Hill Santa Clara 20/21 New Road Maintenance & Rehabilitation

2020 Pavement Resurfacing Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

East Dune Ave from Monterey Rd to Condit Rd; Tennant Ave from Vineyard Blvd to Ant Court; and Robles and Encino Dr Construction 07/2020 10/2020 5-50 30 17

Mountain View Santa Clara 20/21 New Road Maintenance & Rehabilitation SB 1 Streets Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | raise utilities and monuments

Resurfacing Project Locations: Fay Way from Jane Lane to South End Fayette Dr from San Antonio Rd to Del Medio Ave Leghorn Street from Independence Avenue to Palo Alto Limits Miller Ave from San Antonio Road to Del Medio Avenue

Slurry Seal or Microsurfacing Project Locations: Ada Avenue from Minaret Avenue to Gladys Avenue Chiquita Avenue from South End to California Street Laura Lane/Lois Street from Whitney Drive to Thompson Avenue Mariposa Avenue from Villa Street to El Camino Rea

Pre-Construction & Construction

08/2021 03/2022

03/2022 07/2022 8-10 24 13

Palo Alto Santa Clara 20/21 New Road Maintenance & Rehabilitation FY2021 Asphalt Paving Project

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Acacia Avenue (El Camino Real to Angle), Bryant Street (Hamilton Avenue to Forest Avenue), Cedar Street (Parkinson Avenue to Harker Avenue), Chaucer Street (Palo Alto Avenue to City Limit), Chestnut Avenue (Ash Street to Birch Street), El Centro Street (La Jennifer Way to La Para Avenue), Emerson Street (Tennyson Avenue to N. California Avenue), Emerson Street (East Meadow Drive to End), Lane 5 East (High Street to Hamilton Avenue), Lane 6 East (High Street to Emerson Street), Lane 15 East (Hawt

Construction 04/2021 10/2021 20-30 24 13

San Jose Santa Clara 20/21 New Road Maintenance & Rehabilitation 2021 Major Streets Sealing Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Bicycle Lane (New)

Refer to attached memorandum "List of Projects" and "Description of Elements Box" for full limits. 1ST ST, 4TH ST, BERNAL RD, CAPITOL AV, EDEN AV, FARNSWORTH DR, FOXWORTHY AV, FRUITDALE AV, GRAND BL, HEATON MOOR DR, HILLSDALE, HOSTETTER RD, KIELY BL, LANDESS AV, LEAN AV, LOS ESTEROS RD, MCABEE RD, OLD TULLY RD, PEARL AVE, QUITO RD, REDMOND AV, SAN CARLOS ST, SNOW DR, THORNWOOD DR, WHITE RD, WINCHESTER BL, YERBA BUENA RD, ZANKER RD

Construction 06/2021 12/2021 5-7 25, 27, 28, 29 10, 15, 17

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 99: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Jose Santa Clara 20/21 New Road Maintenance & Rehabilitation

2021 Major Streets Resurfacing Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

4TH STHEDDING ST-OLD BAYSHORE HY) BASCOM AV S(HAMILTON AV E-FRUITDALE AV) COE AV(BIRD AV-LINCOLN AV) HOSTETTER RD(MORRILL AV-LUNDY AV) MCKEE RD(HWY 101-KING RD N) MONTEREY RD(METCALF-1875' S/O LIVE OAK AV (CITY LIMIT) ) MURPHY AV(OAKLAND RD-LUNDY AV) PEDRO ST(LINCOLN AV-RACE ST) RACE ST(FRUITDALE AV-220'N/PAULA ST) TISCH WY(S GENEVIEVE LN-WINCHESTER BL) TUERS RD(CAPITOL EX-MCLAUGHLIN AV)

Construction 06/2021 12/2021 15-20 25, 27, 28, 29 10, 15, 17

Santa Clara Santa Clara 20/21 New Road Maintenance & Rehabilitation

Annual Street Maintenance and Rehabilitation Program

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

De La Cruz Boulevard (Montague Expy to Greenwood Dr.); Monroe Street (Homestead Rd. to Bellomy St.); Monroe Street (Bellomy St. to Manchester Dr.); Monroe Street (Manchester Dr. to Newhall St.); Newhall Street (S.J. City Limit (Sunny Vista Dr.); Newhall Street (Washington St. to Alviso St.); Newhall Street (Alviso St. to Heatherdale Ave)

Pre-Construction & Construction

05/2020 04/2021

04/2021 12/2021 3-20 25 10

Saratoga Santa Clara 20/21 New Road Maintenance & Rehabilitation

Annual Roadway Improvements 2020-21

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing)

ARROYO DE ARGUELLO BEAUMONT AVE BOUNTIFUL ACRES WAY BRAEMAR CT CANYON VIEW DR CAMINO RICO CHALET CLOTILDE COMER DR CORTE DE ARGUELLO (N) CORTE DE ARGUELLO (S) EMANUEL CT GLENMONT CT KOSICH DR LJEPAVA DR LOMOND CT

Pre-Construction & Construction

07/2020 09/2020

08/2020 05/2021 5-25 27 15

Sunnyvale Santa Clara 20/21 New Road Maintenance & Rehabilitation 2020 Slurry Seal Project This project will include: Pavement Rehab/Repair (Existing)

Huckleberry Ct. from Ticonderoga Dr to West End. Bidwell Ave from S. Mary Ave to Piedra Dr. Karameos Dr from Kimberly Dr to Pendleton Ave. Karameos Ct from Pendleton Ave to South End. Picasso Dr from Crescent Ave to E. Fremont Ave. Commercial St. from E. Arques Ave to Central Expwy. Maude Ave from 237 to N. Pastoria Ave. E. Arques Ave from Commercial St. to Lawrency Expwy. Remington Dr from Mango St. to Sunnyvale-Saratoga Ave.

Construction 01/2020 12/2020 10-20 24 13

Capitola Santa Cruz 20/21 New Road Maintenance & Rehabilitation

2020/21 Road Maintenance and Rehabilitation

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design

42nd Avenue - Capitola Road to Jade Street Diamond Street - 42nd Avenue to 45th Avenue Ruby Court - entire length 41st Avenue - Highway 1 to Capitola Road Clares Street - Wharf Road to 41st Avenue Bay Avenue - Highway 1 to Monterey Avenue Capitola Avenue - Bay Avenue to Stockton Avenue

Pre-Construction & Construction

08/2020 05/2021

02/2021 11/2021 15-30 29 17

Santa Cruz Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation

Arterial and Collector Street Reconstruction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New) | Reconstruct portions of Fairmount Ave. and Delaware Ave., both arterial streets in the City of Santa Cruz. Projects includes new access ramps,CIR paving, green bike lanes, and crosswalks.

Fairmount Avenue between Morrissey Avenue and Branciforte Avenue and Delaware Avenue between Bay Street and Columbia Avenue.

Construction 02/2021 06/2021 10-20 29 17

Scotts Valley Santa Cruz 20/21 New Road Maintenance & Rehabilitation

Pavement Rehabilitation on Civic Center Drive, Tabor Way and

Lundy lane

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation Cathy Lane, Civic Center, Lundy Lane Pre-Construction &

Construction 01/2021 05/2021

04/2021 09/2021 10-15 29 17

Watsonville Santa Cruz 20/21 New Complete Streets Components Downtown Revitalization This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or

Crosswalk Installation (New), Paving and/or Striping Installation (New Safety) Rodriguez St, Union St and Brennan St. Construction 07/2020 06/2021 6-6 30 17

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 100: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Watsonville Santa Cruz 20/21 New Road Maintenance & Rehabilitation Road Repair This project will include: Pavement Rehab/Repair (Existing) West Beach St from Lee Rd to Walker St, Aurthur Rd from

Hammer Dr to Freedom Blvd Construction 07/2020 06/2021 20-20 30 17

Watsonville Santa Cruz 20/21 New Road Maintenance & Rehabilitation Maintain Roads This project will include: Pavement Rehab/Repair (Existing)

Roache Rd from Freedom Blvd to Airport Blvd, West Beach from Lee Road to Walker St, Center Street from Blackburn to Hushbeck, Loma Prieta from Green Valley Rd to Airport Blvd, Arthur Rd from Mariposa Ave to Freedom Blvd, Harvest Dr from Riverside Dr to West Beach, Airport Blvd from 600 ft west of Freedom Blvd to Hangar Way

Construction 07/2020 06/2021 10-10 30 17

Redding Shasta 18/19 In Progress Complete Streets Components Bechelli Lane ATP Improvements

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Active Transportation Plan | Project includes a road diet, sidewalk gap closure, ADA curb ramps, buffered bike lanes and enhanced pedestrian crossings

Bechelli Lane from Cypress Ave on the north to Riverview Country Club

Pre-Construction & Construction

03/2018 06/2021

05/2021 08/2022 15-30 1 1

Redding Shasta 19/20 In Progress Safety Bonnyview Safe Routes to School

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | Widen Bidwell Lane and North Bonnyview Road to add bicycle and pedestrian facilities including sidewalk and enhanced crosswalks to/from Bonnyview Elementary School.

Bidwell Lane and North Bonnyview road to East Bonnyview Road. Construction 07/2020 09/2020 15-30 1 1

Redding Shasta 19/20 In Progress Road Maintenance & Rehabilitation General Maintenance

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment | General Maintenance to include, but not limited to pothole patching, crack sealing, street signs, street striping, etc.

Citywide Procurement/Operatio nal Needs 08/2020 06/2021 1-5 1 1

Redding Shasta 18/19 In Progress Safety Hartnell Avenue Safety Improvement Project

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New) | Provide two mid-block enhanced crossing locations, buffered bike lanes, and provide accessible pedestrian facilities including tightening curb radius and completing sidewalk gaps, and pedestrian signal control equipment.

On Hartnell Avenue between Churn Creek Road and Victor Avenue Construction 05/2020 01/2021 15-30 1 1

Redding Shasta 20/21 New Road Maintenance & Rehabilitation 2020 Cape/Slurry Seal This project will include: Pavement Rehab/Repair (Existing) Ridgewood Subdivision, Shasta Pines Subdivision, and

Oakwood Manor Subdivision Pre-Construction &

Construction 03/2020 06/2020

04/2020 09/2020 5-12 1 1

Redding Shasta 20/21 New Match Funds West Street Safety Improvements This project will include: Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New) West Street Pre-Construction &

Construction 01/2019 09/2020

08/2020 01/2022 15-30 1 1

Redding Shasta 20/21 New Complete Streets Components Canby Road Sidewalk This project will include: Sidewalk and/or Crosswalk Installation (New) Canby Road Construction 07/2020 12/2020 15-30 1 1

Redding Shasta 20/21 New Match Funds Churn Creek/Maraglia Improvements

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New)

Along Churn Creek Road between Hartnell Avenue and Cypress Avenue and on Maraglia Street between Churn Creek Road and Hilltop Drive.

Construction 07/2020 12/2021 15-30 1 1

Shasta Lake Shasta 20/21 New Road Maintenance & Rehabilitation

Lake Boulevard Improvements 2021

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation

Lake Boulevard, Red Bud Lane to North City Limit Pre-Construction & Construction

07/2020 04/2021

02/2021 06/2021 10-25 1 1

Shasta Lake Shasta 18/19 Carried Over Other Moody Creek Bridge Replacement This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Document Preparation | Replace bridge. Cascade Boulevard @ Moody Creek Pre-Construction 06/2018 12/2022 50-75 1 1

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 101: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Loyalton Sierra 18/19 Carried Over Road Maintenance & Rehabilitation Rail Road and Lewis This project will include: Project Scope Development, Preliminary Design | Preparation

and plans and specification to repair curbs and roadway damaged in the flood of 2017. Railroad Ave and Lewis Ave Pre-Construction 08/2020 08/2021 3-5 1 1

Loyalton Sierra 18/19 Carried Over Road Maintenance & Rehabilitation City of Loyatlon

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Chip Seal and Slurry on all city streets New Stop Signs Fix pothole on city streets

Street Boundaries Include: Poole Ln, Beckwith Rd, White St, Jones St, Zollinger St, Meeker St, 1st St, 2nd St, 3rd St, 4th St, E 2nd St, W 3rd St, N 5th St, Church St, Court Ln, Pine St, Railroad Ave, School St, Front St, E Lewis St, Mill St, Taylor Ave, Granite Ave, Patterson Ave, Cemetery Rd, Hill St All locations have yet to be finalized and are subject to change. Each location will be selected based on priority need and resources throughout the year.

Construction 08/2020 08/2021 5-10 1 1

Dorris Siskiyou 20/21 New Road Maintenance & Rehabilitation N. PIne Street Rehab This project will include: Pavement Rehab/Repair (Existing), Project Scope

Development N. Pine Street between cross street of Sly and Hazen Pre-Construction & Construction

12/2020 04/2021

02/2021 10/2022 20-40 1 1

Dunsmuir Siskiyou 20/21 New Road Maintenance & Rehabilitation Street Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety)

Various street including; Gray, Fourth, Branstetter, Shasta View, Wood, Deer Haven, Timber, Pine, Allen, and Hill Construction 07/2020 06/2021 5-40 1 1

Etna Siskiyou 20/21 New Road Maintenance & Rehabilitation Cleveland/Bryan Street Rehab

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Overlay dilapidated road and resolve road base issues

Cleveland from Woodland Sr. South/Bryan Sr. From College St. North Construction 03/2021 10/2021 15-20 1 1

Fort Jones Siskiyou 18/19 Carried Over Road Maintenance & Rehabilitation

Town of Fort Jones Strategic Paving, Preventive and Planning

project;

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Crack sealing, surface sealing, removal and replacement of failed roadway sections and associated work on various Town streets to maintain good condition; estimated life 15 years; construction to be done in 2018 (see attached Exhibit A to Resolution for detail).

Possible locations include but are not limited to Main St, Scott River Rd, Dale Ave, Mittan Way, Mathews St, Horn St, Bowers St, Don Lane, Cowan St, Bridge St, Pine St, Oak Mill, Allison St, Newton St

Construction 07/2020 06/2021 5-15 1 1

Mount Shasta Siskiyou 20/21 New Road Maintenance & Rehabilitation 2020 Chip seal and repair project This project will include: Cost Estimating, Document Preparation Various streets within the City Limits Pre-Construction 05/2020 09/2020 5-10 1 1

Tulelake Siskiyou 20/21 New Road Maintenance & Rehabilitation FY20/21 Crack Seal This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing)

Crack Seal the following: Fifth Street- F to G streets 470'; Fourth Street- F to G streets 470'; Fourth Street- F to E streets 435'; G Street- Main to Modoc streets 1190'; F Street- Main to Modoc streets 1120'; Fourth Street- E to D streets 403'; for a total of 4,088' of 25' wide roadway.

Construction 07/2020 06/2021 15-20 1 1

Weed Siskiyou 18/19 Carried Over Road Maintenance & Rehabilitation Vista Drive Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Rehabilitation & maintenance of a local roadway. | No RMRA funds were expended in FY 17-18 or 18-19. The City is rolling those funds over to deliver projects in the 20/21 FY

Vista Drive in the South Weed commercial area. Construction 10/2020 07/2022 10-20 1 1

Weed Siskiyou 18/19 Carried Over Road Maintenance & Rehabilitation Parks Street This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Rehab of failing asphault Park Street from Main St to Tebbe St. Construction 05/2021 07/2022 10-20 1 1

Weed Siskiyou 19/20 Carried Over Road Maintenance & Rehabilitation Davis Street Rehab This project will include: Pavement Rehab/Repair (Existing) Davis Street Weed CA Construction 07/2020 08/2020 5-15 4 2

Weed Siskiyou 20/21 New Safety Public Safety Pedestrian Crossing This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

South Weed Blvd at Boles Street Construction 12/2020 08/2021 10-25 1 1

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 102: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Yreka Siskiyou 20/21 New Road Maintenance & Rehabilitation

City of Yreka 2020 Strategic Paving, Preventive and Planning

Project

This project will include: Pavement Rehab/Repair (Existing) | Strategic chipsealing and other preventive maintenance of City of Yreka streets.

Comstock Dr.; Flume Ct.; Sutter St.; Nugget Wy. Pyrite Dr.; Placer Dr.; Dove Ln.; Bluebird St. Swallow Circle; Sandpiper Ct.; Quail Ave.; Shasta Ave.; Gold St.; Meadowlark (South); S. West St. Campbell Ave.

Construction 07/2020 06/2021 5-15 1 1

Benicia Solano 20/21 New Road Maintenance & Rehabilitation

2020 Citywide Microsurfacing Project This project will include: Pavement Rehab/Repair (Existing)

East H St. (E 2nd-E 5th); East L St. (E 4th-E 5th); Park Rd. (Stone-E 2nd); Hastings Dr. (Solano-Zinna Ct); East 3rd St. (E K-E L); Panorama Dr. (Southampton-Rose); East I St. (E 2nd-E 3rd); Industrial Way (Bayshore-600’ pass Teal); Military West (Drolette-Southampton); East 2nd St. (E D-E F); East I St. (E 5th-E6th)

Construction 07/2020 09/2020 5-7 14 3

Dixon Solano 20/21 New Road Maintenance & Rehabilitation

2022 Pavement Preservation Project

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Document Preparation Various locations to be determined by Street Saver Pre-Construction &

Construction 02/2022 07/2022

05/2022 12/2022 15-15 4 3

Fairfield Solano 18/19 Carried Over Road Maintenance & Rehabilitation

Pavement Maintenance Project 2020

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane (New) | Repaving approximately 1,390,000 square feet. Revised project location, removed Fulton Fermi and Watt. Added Link Rd, Commerce Ct, Grobic Ct, Lookout Hill, Maxwell Wy N.; Watney Wy,; S. Watney Wy, Guittard Ct, Jelly belly Ln, Low Court, Meyer Wy

Commerce Ct,; Grobic Ct,; Lookout Hill,; Maxwell Wy; N. Watney Wy; S. Watney Wy,Chadbourne Beck Courage (CBC) Area, ; Link Rd (Central Wy to Cordelia Rd),; Commerce Ct (Central Wy to End), ; Grobric Ct (Central Wy to End),; Cordelia Rd (Ledgewood Creek to 970' W/O Chadbourne Rd), ; Lookout Hill Rd (Central Pl to End),; Maxwell Wy (Chadbourne Rd to End),; N. Watney Wy (Courage Dr to Courage Dr),; S. Watney Wy (Courage Dr to Courage Dr),; Guittard Ct (Chadbourne Rd to End)

Construction 06/2020 02/2021 7-16 11 3

Rio Vista Solano 19/20 In Progress Road Maintenance & Rehabilitation McCormick Road Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New) | The County of Solano will be delivering this project as they will reconstruct the entire roadway which includes about 1/2 mile within the city limits and 7 miles of roadway in the county. The City will be making annual payment of the RMRA funding to the County until the County is repaid in full. It is expected to take the annual funding from FY19/20; FY20/21; FY21/22; FY22/23 and part of FY23/24. Total costs are estimated to be $602,000. Design is near completion.

City of Rio Vista section of McCormick Road about 1/2 mile Construction 07/2020 07/2021 30-40 11 3

Suisun City Solano 19/20 In Progress Road Maintenance & Rehabilitation Civic Center Blvd Overlay Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Civic Center Blvd from Lotz Avenue to Almond Drive Pre-Construction & Construction

05/2019 08/2020

07/2020 11/2020 20-50 11 3

Suisun City Solano 19/20 In Progress Road Maintenance & Rehabilitation

Village Drive and Whispering Bay Lane - Rubberized Cape Seal, Digouts, Complete Streets, and

ADA Ramp Upgrades

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New)

Whispering Bay Ln (Driftwood Dr to Francisco Dr), Village Dr (Railroad Avenue to Hwy 12)

Pre-Construction & Construction

04/2020 06/2021

12/2020 12/2021 20-50 11 3

Suisun City Solano 19/20 In Progress Road Maintenance & Rehabilitation Crack Seal and Slurry Seal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Paving and/or Striping Installation (New Safety), Maintenance Program Plan Development, Preliminary Design, Document Preparation

Floyd Ct (Craven Ct to Cul-de-sac), Capistrano Dr (Montebello to Bella Vista), Catamaran Wy, Harbor Park Dr, Breakwater Cir, Catalina Cir, Anderson Dr (E Flood Channel to Lawler Ranch Pkwy), Hoyt Ct, Main St ( Lotz Wy to Cordelia St), Lawler Ranch Pkwy (Mayfield Cir to Potrero St), Village Dr (Leafwood Ct to Railroad Ave)

Pre-Construction & Construction

03/2020 06/2022

12/2020 12/2022 10-20 11 3

Vacaville Solano 20/21 New Road Maintenance & Rehabilitation

20/21 Vacaville Maintenance and Rehabilitation Project

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

The project includes the following Streets: Orchard Ave north of Fruitvale, Monte Vista Ave from Chandler to Orchard, Alamo Drive west of I-80, Merchant Street between I80 WB and Lovers Ln, and Mason Street between Depot St and Peabody Rd.

Construction 05/2021 11/2021 15-20 11 3

Vallejo Solano 20/21 New Road Maintenance & Rehabilitation Tennessee Street Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Tennessee Street between Rollingwood Drive and Curtis Drive Pre-Construction & Construction

07/2020 03/2021

02/2021 06/2021 15-30 14 3

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 103: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Vallejo Solano 20/21 New Road Maintenance & Rehabilitation Springs Road Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

On Springs Road between Maywood Drive and Parkwood Drive Pre-Construction & Construction

07/2020 03/2021

02/2021 06/2021 15-30 14 3

Cloverdale Sonoma 19/20 Carried Over Road Maintenance & Rehabilitation

4th Street Reconstruction - 18/19 Carryover

This project will include: Pavement Rehab/Repair (Existing) | Reconstruct 4th Street from North Jefferson Street (eastern boundary) to street end (western boundary) with new AC paving - 18/19 Carryover.

City of Cloverdale, 4th Street from North Jefferson Street (eastern boundary) to street end (western boundary). Construction 07/2020 09/2020 15-20 2 2

Cloverdale Sonoma 20/21 New Safety South Cloverdale Blvd at

Healdsburg Avenue Accessibility Improvements Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | New Low-Impact Development (LID) storm water facility and New Rectangular Rapid Flash Beacon (RRFB) system will be installed in addition to rehab/repair listed in the project description.

South Cloverdale Blvd x Healdsburg Avenue, Cloverdale CA 95425 Construction 06/2020 08/2020 20-30 2 2

Cotati Sonoma 20/21 New Road Maintenance & Rehabilitation

2020 Street Construction and Improvements Project

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

650 feet of Olof Street between West Cotati Avenue and West Sierra Avenue Construction 08/2020 10/2020 10-15 10 2

Healdsburg Sonoma 20/21 New Road Maintenance & Rehabilitation

Healdsburg Pavement Preventative Maintenance Project -

2020 This project will include: Pavement Rehab/Repair (Existing)

Various locations, including: Mason street from University to Front Street Fairway Court from Greeens Drive to end Greens Drive from South Fitch Mountain to end Tee Court from Tee Dirve to Piper Street Vine from North Street to the Roundabout Heron Drive from South Fitch Mountain to Almond Way

Construction 08/2021 09/2021 5-7 2 2

Petaluma Sonoma 19/20 In Progress Road Maintenance & Rehabilitation Pavement Restoration 19/20

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Maria Drive, from Sonoma Mountain Pkwy to Rainier Ave. Construction 06/2020 11/2020 20-30 10 3

Petaluma Sonoma 20/21 New Road Maintenance & Rehabilitation Pavement Restoration 20/21

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

The project location primarily focuses on crack seals and slurry’s on residential roads on the east side and west side of Petaluma with various degree of rehabilitation of higher volume roads on the east side of Petaluma. See attached resolution for full listing of street locations.

Pre-Construction & Construction

06/2021 06/2021

10/2021 10/2021 7-20 10 3

Rohnert Park Sonoma 20/21 New Safety Southwest/Commerce Roundabout This project will include: Roundabout Installation (New) Intersection of Southwest Boulevard and Commerce Boulevard, Rohnert Park, California Construction 07/2020 12/2022 25-25 4 3

Rohnert Park Sonoma 19/20 In Progress Road Maintenance & Rehabilitation East Cotati Avenue Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Document Preparation | Pavement rehabilitation (asphalt overlay with pavement fabric reinforcement), replacement of existing Class 2 bike lanes | This timing of this project is highly dependent on the undergrounding of PG&E utilities along the project segment.

East Cotati Avenue (Snyder Lane to City Limit at Sunflower Way, east of SMART railroad tracks)

Pre-Construction & Construction

03/2019 11/2020

10/2020 12/2021 20-30 4 3

Rohnert Park Sonoma 19/20 In Progress Road Maintenance & Rehabilitation

Country Club Drive Overylay (Asphalt Overlay)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation | Asphalt overlay, which is a new pavement section (generally 1.5″ – 2″ thick) placed over the top of an existing pavement surface. Also partial base reconstruction.

Country Club Drive between Rohnert Park Expressway and Eleanor Avenue

Pre-Construction & Construction

03/2019 08/2020

07/2020 12/2020 6-10 4 3

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 104: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Rohnert Park Sonoma 18/19 Carried Over Road Maintenance & Rehabilitation

Southwest Boulevard Rehabilitation

This project will include: Pavement preservation treatments including small areas of pavement repair (i.e. "digouts") and cape seal application (i.e. a combination of chip seal and thin slurry seal) . Cape seals are used when the pavement deterioration is greater than what a slurry seal or microsurfacing is designed to correct, yet the pavement has not deteriorated to the point of requiring an expensive asphalt overlay. A cape seal prevents water penetration, reducing subsequent damage to the road bed, along with providing a new wearing surface.

Southwest Boulevard between Commerce Boulevard and No Name Street Pre-Construction 07/2020 12/2021 6-10 4 3

Rohnert Park Sonoma 19/20 Carried Over Complete Streets Components

Rohnert Park Expressway / State Farm Traffic Improvements Project

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New)

Rohnert Park Expressway between Commerce Boulevard and SMART Pathway; State Farm Drive from Rohnert Park Expressway to Enterprise Drive; Enterprise Drive from Seed Farm Drive to State Farm Drive

Pre-Construction & Construction

07/2019 04/2021

03/2021 10/2021 12-17 4 3

Rohnert Park Sonoma 19/20 Carried Over Traffic Control Devices Traffic Signal Component Upgrades

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety)

Rohnert Park Expressway - Labath Avenue to Knight Road; Golf Course Drive - Dowdell Avenue to Hillview Way; Commerce Boulevard - Redwood Drive to Avram Avenue; Snyder Lane -Circulo Grande to East Cotati Avenue

Pre-Construction & Construction

08/2019 11/2020

10/2020 07/2022 6-9 4 3

Santa Rosa Sonoma 20/21 New Road Maintenance & Rehabilitation

Fulton Road Widening and Reconstruction - Guerneville Road

to Piner Road

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New)

City of Santa Rosa, Sonoma County - Fulton Road between Guerneville Road and Piner Road, residential neighborhoods, near Piner High School

Pre-Construction & Construction

05/2021 10/2021

09/2021 05/2023 5-20 2 2

Sebastopol Sonoma 19/20 Carried Over Complete Streets Components ADA Curb Ramps

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | Bring curb ramps at crosswalks and intersections to current ADA standards. This is a necessary first step prior to repaving then adding bicycle lanes on the same streets, which are separate but integral parts of a larger project. | Design was completed 03/2017 and submitted to Caltrans for approval. Design and encroachment permit approved by Caltrans 03/2019. Expected to go to bid 05/2019-06/2019 with construction to begin during FY 19/20

30 crosswalk locations along SR 116: Gravenstein Highway, Main Street, Healdsburg Avenue, Petaluma Avenue, all in Sebastopol, CA

Construction 09/2020 06/2021 8-20 10 2

Sonoma Sonoma 20/21 New Road Maintenance & Rehabilitation 2022 Citywide Slurry Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | | The project will provide slurry seal street surface treatment for various street segments throughout the City of Sonoma. Auxiliary work in support of the slurry seal treatment includes surface preparation; crack seal; removal and replacement of pavement striping markings; protection of existing utility structures, curb and gutter, and cross gutter; and other related work.

Various street segments throughout the City of Sonoma could include the following: Andrieux Street from Fifth Street West to Fourth Street West, Joaquin Drive from Dead end north of Mitchell Way to 100' south of Mitchell Way, Joaquin Drive from Lasuen Street to Fifth Street West, West MacArthur Street from Fifth Street West to Manor Drive, Mariano Court from Mariano Drive to Cul de Sac, Mariano Drive from Fano Lane to 705 Mariano Drive, Fifth Street West from Andrieux Street to West MacArthur St

Construction 04/2022 06/2022 3-5 3 10

Windsor Sonoma 19/20 Carried Over Safety Windsor River Road/Windsor Road Intersection Improvements

This project will include: ADA Curb Ramp Installation (New), Railroad Grade Separation Rehab/Repair, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Roundabout Installation (New), Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New)

Intersection of Windsor River Road and Windsor Road Construction 03/2021 03/2022 15-20 2 2

Windsor Sonoma 20/21 New Road Maintenance & Rehabilitation

Town-Wide Street Resurfacing -Southwest Quadrant

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Southwest Quadrant of Town - west of Old Redwood Hwy in the Vintana and Vintage Green neighborhoods and Berry Lane. Construction 03/2021 06/2021 10-10 2 2

Ceres Stanislaus 19/20 In Progress Road Maintenance & Rehabilitation

Pine/Park Street Improvements (El Camino Roundabout)

This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Roundabout Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation

Generally in Central Ceres. Pine and Park Streets between Central Ave. and 9th Street.

Pre-Construction & Construction

01/2020 08/2020

08/2020 06/2021 20-35 21 12

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 105: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Ceres Stanislaus 20/21 New Road Maintenance & Rehabilitation

2020 Pavement Preservation Project This project will include: Cost Estimating, Preliminary Design, Document Preparation Many Streets Throughout City Pre-Construction 07/2020 11/2020 6-10 21 12

Hughson Stanislaus 18/19 Carried Over Safety Whitmore Avenue Pedestrian Improvement Project and Overlay

This project will include: Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New) | Construct new pedestrian and bicycle improvements on Whitmore Avenue, including sidewalk and bicycle lane, across BSNF Rail Lines

Whitmore Avenue from east of Tully Road to Charles Street Construction 09/2020 03/2022 10-15 12 8

Hughson Stanislaus 20/21 New Road Maintenance & Rehabilitation Locust Street Improvement

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Document Preparation

Locust Street between Tully Avenue and Mariposa Drive Pre-Construction & Construction

08/2020 11/2020

10/2020 01/2021 10-15 12 8

Hughson Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation

Santa Fe Avenue 2" Overlay Project- Phase II

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) Santa Fe Avenue from Whitmore Avenue to 7th Street Construction 05/2020 07/2020 10-15 12 8

Modesto Stanislaus 20/21 New Road Maintenance & Rehabilitation Slurry Seal This project will include: Pavement Rehab/Repair (Existing)

David Ct.- from -Coffee - to -End of court Willeen Ct.- from -David Ct. - to -End of court Gordon Ave- from -Norway Ave - to -Tahoe Dr. Terrance Wy- from -Athens - to -Tokay O Farrell Ave- from -Tokay - to -Langford Ave. Potter- from -Athens - to -Norwegian Carriagan Ave- from -Potter - to -Gordon Norway- from -Halden Wy - to -Bergen Dr. Vindel Ln.- from -Halden Wy - to -Bergen Dr. Narvik Ln.- from -Halden Wy - to -Bergen Dr. South Cape Dr.- from -Halde

Construction 05/2020 09/2020 5-7 21 5

Modesto Stanislaus 20/21 New Road Maintenance & Rehabilitation Crack Seal This project will include: Pavement Rehab/Repair (Existing)

David Ct.- from -Coffee - to -End of court Willeen Ct.- from -David Ct. - to -End of court Gordon Ave- from -Norway Ave - to -Tahoe Dr. Terrance Wy- from -Athens - to -Tokay O Farrell Ave- from -Tokay - to -Langford Ave. Potter- from -Athens - to -Norwegian Carriagan Ave- from -Potter - to -Gordon Norway- from -Halden Wy - to -Bergen Dr. Vindel Ln.- from -Halden Wy - to -Bergen Dr. Narvik Ln.- from -Halden Wy - to -Bergen Dr. South Cape Dr.- from -Halden

Construction 10/2020 05/2021 5-7 21 5

Modesto Stanislaus 20/21 New Road Maintenance & Rehabilitation Asphalt Repairs This project will include: Pavement Rehab/Repair (Existing)

David Ct.- from -Coffee - to -End of court Willeen Ct.- from -David Ct. - to -End of court Gordon Ave- from -Norway Ave - to -Tahoe Dr. Terrance Wy- from -Athens - to -Tokay O Farrell Ave- from -Tokay - to -Langford Ave. Potter- from -Athens - to -Norwegian Carriagan Ave- from -Potter - to -Gordon Norway- from -Halden Wy - to -Bergen Dr. Vindel Ln.- from -Halden Wy - to -Bergen Dr. Narvik Ln.- from -Halden Wy - to -Bergen Dr. South Cape Dr.- from -Halden

Construction 10/2020 05/2021 5-7 21 5

Modesto Stanislaus 20/21 New Safety Traffic Signal & Street Light Maintenance This project will include: Public Works Staffing Multiple locations throughout Modesto Procurement/Operatio

nal Needs 07/2020 06/2021 7-10 21 5

Modesto Stanislaus 20/21 New Safety Traffic Sign & Striping Maintenance/Printer This project will include: Public Works Staffing Multiple locations throughout Modesto Procurement/Operatio

nal Needs 07/2020 06/2021 2-5 21 5

Newman Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation 2018-19 SB-1 This project will include: Pavement Rehab/Repair (Existing) | Crack seal, slurry and

stripe. Small pavement replacement (potholes).

T Street from Yolo Avenue to Inyo Avenue; Kern Street from Main Street to T Street; Fresno Street from Main Street to T Street; Tulare Street from Main Street to T Street; Mariposa Street from Main Street to T Street;

Construction 04/2021 10/2021 5-10 21 12

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 106: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Newman Stanislaus 19/20 Carried Over Complete Streets Components 2019-20 SB-1 This project will include: Pavement Rehab/Repair (Existing) | Crack seal various local

roads

The City of Newman maintains 41 miles of streets/roads all located within the city limits of the City. Street boundaries include Sherman Parkway to Great Basin Drive and Hills Ferry Road to Tamarack Court. All locations listed for crack sealing are an estimate and have yet to be finalized.

Construction 10/2020 11/2020 5-10 21 12

Oakdale Stanislaus 20/21 New Road Maintenance & Rehabilitation Slurry Seal Area 2 This project will include: Pavement Rehab/Repair (Existing)

streets bounded generally by Pontiac Street to the north, Naturewood Dr./Sugar Pine Drive to the south, Willowood Drive to the east and Crane Road to the west

Construction 07/2020 08/2020 5-7 12 8

Oakdale Stanislaus 20/21 New Road Maintenance & Rehabilitation G Street Slurry Seal This project will include: Pavement Rehab/Repair (Existing) A portion of G street located between Live Oak Drive and East

Avenue. Construction 07/2019 08/2019 5-7 12 8

Oakdale Stanislaus 20/21 New Road Maintenance & Rehabilitation A Street Slurry Seal This project will include: Pavement Rehab/Repair (Existing) West A Street between North Yosemite Avenue and Laurel

Avenue. Construction 09/2020 10/2020 5-7 12 8

Patterson Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation

FDR 2" HMA/9" AB - Streets Submitted FY 18/19

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FDR 2" HMA/9" AB

Poppy:clover to Del Puerto;Canyon: Poppy to end; Hansen: Poppy to end; Kinshire: Clover to Del Puerto; Klopping: Kinshire to end; S 9th: Kinshire to Sperry; De Lash: Kinshire to end; Agadoni: Kinshire to end; Clover: Poppy to Sperry; Del Puerto: Poppy to Sperry; Amberina CT: Ambernia to end; Ambernina Dr: Ambernia Ct to Del Puerto; Bonneau: 9th to end; *All locations subject to change, and will be selected based on priority, need and resources throughout the year.

Construction 06/2020 09/2020 15-20 21 12

Patterson Stanislaus 20/21 New Road Maintenance & Rehabilitation Las Palmas Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety),

Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

E. Las Palmas Ave: 699 East of Hartley to Hartley. E. Las Palmas: La Lynn to N. Hartley. E. Las Palmas Ave: N. 1st to Weber Ave.

Construction 06/2020 09/2020 10-15 21 12

Patterson Stanislaus 20/21 New Road Maintenance & Rehabilitation

Kinshire FDR 2" HMA/9" AB -Phase 2

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

Del Puerto Ave, Poppy Ave, Ittureria Dr, Gnesa Dr, Traina Dr, Meghan Dr, Inaudi Dr, Inaudi Ct, Sunflower Dr, NiCastro Dr, D Arpino Ct, and Marisa Dr.

Construction 03/2021 08/2021 15-20 21 12

Riverbank Stanislaus 20/21 New Road Maintenance & Rehabilitation Cape Seal Project This project will include: Pavement Rehab/Repair (Existing)

Santa Fe Street, Stanislaus Street, Sierra Street, Aspen Lane, Aspen Court, Green Oaks Drive, Green Oaks Court, South Rosebrook

Construction 07/2020 08/2020 5-7 12 5

Riverbank Stanislaus 20/21 New Road Maintenance & Rehabilitation

Santa Fe Road Road Reconstruction Project This project will include: Pavement Rehab/Repair (Existing) Santa Fe Road (Claus to 300' East of Claus) Construction 04/2020 06/2020 15-20 12 5

Riverbank Stanislaus 20/21 New Road Maintenance & Rehabilitation

Topeka Street Road Reconstruction/Overlay This project will include: Pavement Rehab/Repair (Existing) Topeka Street (Third Street to Fifth Street) Construction 07/2020 10/2020 10-15 12 5

Turlock Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Road Maintenance Worker 1 This project will include: Public Works Staffing | Labor costs for road maintenance

worker (pot hole crew).

Address potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 1-10 12 8

Turlock Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Road Maintenance Worker 2 This project will include: Public Works Staffing

Potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 1-10 12 8

Turlock Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Hot Mix Truck and Trailer This project will include: Procurement of Public Works Equipment

For potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Procurement/Operatio nal Needs 07/2020 01/2021 10-20 12 8

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 107: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Turlock Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Thermoplastic Machine This project will include: Procurement of Public Works Equipment

throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 10-20 12 8

Turlock Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Thermoplastic Material This project will include: Procurement of Road Maintenance and Rehab Materials

Throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 5-10 12 8

Turlock Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Hot Mix Asphalt This project will include: Procurement of Road Maintenance and Rehab Materials

Potholes throughout City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 1-10 12 8

Turlock Stanislaus 18/19 In Progress Traffic Control Devices Maintain Transportation Facilities -Traffic Signals This project will include: Repair and Servicing of Public Works Equipment City Wide, Taylor Rd to the north, Washington Rd to the west,

Glenwood Ave to the south and Daubenberger Rd to the east Procurement/Operatio

nal Needs 07/2020 06/2021 5-7 12 8

Turlock Stanislaus 18/19 In Progress Traffic Control Devices Maintain Transportation Facilities -Street Lights This project will include: Repair and Servicing of Public Works Equipment City Wide, Taylor Rd to the north, Washington Rd to the west,

Glenwood Ave to the south and Daubenberger Rd to the east Procurement/Operatio

nal Needs 07/2020 06/2021 5-7 12 8

Turlock Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Lander and Hawkeye Rehab

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Road rehabilitation (inlay and overlay) of Lander Avenue and Hawkeye. Install missing segments of sidewalk and reconstruct curb ramps. Install new stripping and crosswalks.

On Lander Avenue from South Ave. to Glenwood and on Hawkeye Ave. from Olive to Daubenberger. Construction 06/2020 06/2021 15-20 12 8

Turlock Stanislaus 20/21 New Safety Roadway Element Maintenance This project will include: Repair and Servicing of Public Works Equipment

Throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave and Washington Rd for a total of 984 streets. Exact locations have yet to be determined by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Procurement/Operatio nal Needs 07/2020 06/2021 5-20 12 8

Waterford Stanislaus 20/21 New Road Maintenance & Rehabilitation 2020/21 Slurry Seal Project

This project will include: Pavement Rehab/Repair (Existing) | The project includes dig out and replacement of sunken asphalt areas and the installation of a Type Two Slurry to 21 streets.

Streets East of Tim Bell Road in the eastern section of the City of Waterford. Please refer to Amended Resolution 2020-13 Attachment A for the Map of locations.

Construction 07/2020 09/2020 7-10 12 8

Live Oak Sutter 19/20 In Progress Road Maintenance & Rehabilitation Highway 99 Widening

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Utility Relocation and Repair

Highway 99 Ash Street to Ramsdell Construction 07/2018 07/2023 20-40 3 4

Live Oak Sutter 18/19 In Progress Road Maintenance & Rehabilitation

Pennington Road Complete Streets Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Reconstruct Pennington Road between Connecticut Ave and Broadway after the installation of a new water main.

Pennington Road from Connecticut Avenue to Broadway, west of SR 99 Construction 01/2020 10/2020 20-40 3 4

Live Oak Sutter 18/19 Carried Over Road Maintenance & Rehabilitation Kola Street Reconstruction

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Reconstruct and improve Kola St from Larkin Rd to N St in coordination with the Highway 99 Streetscape Project in 2020/21

Kola Street from Larkin Rd to N St Construction 07/2020 07/2023 20-20 3 4

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 108: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Yuba City Sutter 18/19 Carried Over Road Maintenance & Rehabilitation Franklin Avenue Improvements

This project will include: ADA Curb Ramp Installation (New), Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Mill and 3" AC overlay. Roadway widening to accommodate bike lanes, curb and gutter, landscaped parkway strip, sidewalk, and ADA compliant curb ramps. Storm drainage, sewer system, and water system improvements throughout corridor.

Palora Avenue to Gray Avenue Construction 06/2020 08/2020 20-30 3 4

Yuba City Sutter 20/21 New Road Maintenance & Rehabilitation Garden Highway Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Garden Highway from Bogue Road to Lincoln Road, in Yuba City, Sutter County, CA Construction 07/2020 09/2020 20-30 3 4

Yuba City Sutter 18/19 Carried Over Road Maintenance & Rehabilitation Bridge Street Widening

This project will include: ADA Curb Ramp Installation (New), Storm Drain/Culvert Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Widening and complete reconstruction, installation of curb and gutter, ADA-compliant curb ramps, shared-use sidewalk, landscaped medians, and striping improvements.

Gray Avenue to Cooper Avenue Construction 05/2021 09/2021 30-50 3 4

Corning Tehama 19/20 Carried Over Road Maintenance & Rehabilitation

Annual Maintenance/Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Hoag Street between Solano and Tehama Street,; Colusa Street between Houghton Ave. and 3rd Street,; Tommes Avenue between Solano Street and Blackburn Ave; 2nd Street between Solano Street and Fig Lane, and South Street between 2nd Street and Marguerite Ave.

Construction 10/2020 03/2021 7-18 3 4

Red Bluff Tehama 19/20 Carried Over Road Maintenance & Rehabilitation Walnut Ave. Overlay

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation | Microsurfacing of halfwidth of Walnut Street between Paskenta and David. Complete the resurfacing that has occurred as part of Courthouse project.

Walnut Street between Paskenta and David Pre-Construction & Construction

08/2020 11/2020

10/2020 12/2020 7-10 3 4

Red Bluff Tehama 19/20 Carried Over Road Maintenance & Rehabilitation

South Jackson Street Reconstruction

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation

South Jackson Street between Oak Street and Luther Road Pre-Construction & Construction

09/2020 01/2021

11/2020 03/2021 7-10 3 4

Red Bluff Tehama 19/20 Carried Over Road Maintenance & Rehabilitation South Main Street Reconstruction

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Bicycle Lane (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing)

South Main Street between Oak Street and Luther Road Pre-Construction & Construction

09/2020 01/2021

11/2020 03/2021 7-10 3 4

Tehama Tehama 20/21 New Road Maintenance & Rehabilitation Crack Sealing This project will include: Maintenance Program Plan Development Tehama Ave, E Gyle, C,D,E,F,G,H,1,2nd,3re,4th,5th Pre-Construction 08/2020 11/2020 3-5 2 4

Dinuba Tulare 20/21 New Complete Streets Components

Nebraska and Crawford Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing) Nebraska Ave and Crawford Ave Construction 10/2020 06/2021 15-20 26 14

Dinuba Tulare 20/21 New Complete Streets Components Crawford Avenue Reconstruction This project will include: Pavement Rehab/Repair (Existing) Southbound Lane on Crawford at El Monte Way Construction 05/2020 06/2021 15-20 26 14

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 109: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Dinuba Tulare 20/21 New Complete Streets Components Street Seeling Project This project will include: Pavement Rehab/Repair (Existing)

Kamm Avenue (Avenue 408),City Limits to Alta Avenue (Road 80), Alta Avenue (Road 80) to College Avenue (Road 84), Monte Vista Drive, El Monte Way (Avenue 416) to Sierra Avenue (Avenue 416) Shopping Center Access Road, Westgate Way to Monte Vista Drive, Westgate Way El Monte Way (Avenue 416) to End, Englehart Avenue Saginaw Avenue to El Monte Way (Avenue 416) Saginaw Avenue Euclid Avenue to Alta Avenue (Road 80) Viscaya Parkway Nebraska Avenue (Avenue 424) to Saginaw Avenue Rid

Construction 05/2020 06/2021 5-15 26 14

Exeter Tulare 18/19 Carried Over Road Maintenance & Rehabilitation Downtown Streets Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitation along downtown streets, including patch and repair asphalt where needed, slurry seal or similar treatment along downtown streets in the City of Exeter. This project will be done in phases depending on bid amounts and available funding.

The project is located in Exeter, CA. The extents of this project will be along Pine Street (F Street to Kaweah Ave), Rocky Hill Drive (Kaweah and C Street) and B-F Street (between Palm and Maple). These streets run through downtown Exeter, which is mostly commercial property.

Construction 07/2020 09/2020 8-10 26 16

Farmersville Tulare 18/19 In Progress Complete Streets Components

West Walnut Ave Full Depth Reconstruction Project

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New) | Will include 132,000 SF of full depth reconstruction which includes hot mix asphalt over aggregate base. 6 ADA curb returns will also be reconstructed.

The project is located in the City of Farmersville, CA along W. Walnut Ave between N. June Ave to the west and Farmersville Blvd to the east. Cross streets from west to east are N. Matthew Ave, Carolyn St., N. Ventura Ave, Franquette Ave, and Hartley Ave. This project is located in a residential zone.

Construction 06/2020 12/2020 25-30 26 14

Farmersville Tulare 18/19 Carried Over Road Maintenance & Rehabilitation CAPE Seal Project

This project will include: Cost Estimating, Preliminary Design, Document Preparation | Road maintenance to be performed using a chip seal and slurry seal known as a Cape Seal. All ramps within the area will be upgraded to ADA standards (approximately 23)

The project is located in the City of Farmersville, CA. the project is on the east side of S. Farmersville Blvd. The project is located within the boundaries of E. Oakland St. which runs east to west and S. Camelia Ave which runs north to south. The interior streets are as follows; S. Rose Ave and South Avery Ave, both North to South running streets and are to the east of S. Camelia Ave E. Fresno St, E. Kirkland St., Grove St. and E. Tulare St. are all east to west running and are located south of E. Oakland St. The location is the most southeastern part of the City and is at the City Limits. The project is located in a residential area.

Pre-Construction 01/2021 06/2021 8-10 26 14

Farmersville Tulare 19/20 Carried Over Complete Streets Components

West Walnut Repair and Improvement Project

This project will include: Right of Way Acquisition, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Bicycle Lane (New) | Street components to be added are a 5 foot wide bike lane, a 100 foot median for the pedestrian refuge area, a new drive approach, and 6 reconstructed ADA curb returns.

The project is located in the City of Farmersville on W. Walnut Ave between N. June St. and Farmersville Blvd. This project is located in a residential zone.

Construction 06/2020 12/2020 20-25 26 14

Farmersville Tulare 20/21 New Complete Streets Components

East Walnut Ave Repair and Improvement Project North Side of

Roadway

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation

The project is located in the City of Farmersville along E. Walnut Avenue just east of Farmersville Boulevard to the west and Road 168 to the east. Located across the street from Farmersville High School near residential and some commercial areas.

Pre-Construction 01/2023 12/2023 25-30 26 14

Lindsay Tulare 19/20 Carried Over Road Maintenance & Rehabilitation Burem Lane Renovation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Recycle and rehabilitate 0.1 miles and renovate concrete curbs, gutters and sidewalks

Burem Lane, west of Westwood Avenue Construction 07/2020 06/2021 15-18 26 14

Lindsay Tulare 20/21 New Safety Intersection Rehab: Foothill Av / Tulare Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Document Preparation | Addition of bollards at the rehabbed intersection to improve pedestrian safety. Rehab intersection sidewalk transition to the crosswalk.

Intersection Foothill Av / Tulare Rd Pre-Construction 07/2020 06/2021 5-15 26 14

Porterville Tulare 20/21 New Road Maintenance & Rehabilitation

Grand Avenue Reconstruction Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) Grand Avenue between Fourth Street and Leggett Street Construction 05/2021 09/2021 15-20 26 14

Tulare Tulare 20/21 New Complete Streets Components Tulare Avenue Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Tulare Avenue, between West Street and I Street Construction 04/2020 04/2021 20-25 26 16

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 110: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Tulare Tulare 20/21 New Complete Streets Components

Sequoia-Spruce Tract Improvements

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Spruce Street between Bardsley Avenue and Tulare Aveneue; Sierra Avenue between SR99 and Spruce Street; Sierra Avenue/Sequoia Avenue Alley between SR99 and Spruce Avenue; Sequoia Avenue between Dayton Street and Spruce Street; Sequoia Avenue/Kern Avenue Alley between Dayton Street and Spruce Street; Kern Avenue between Dayton Street and Spruce Street.

Pre-Construction 07/2020 02/2021 20-25 26 16

Tulare Tulare 20/21 New Complete Streets Components Pratt Street Improvements This project will include: Cost Estimating, Project Scope Development, Preliminary

Design, Document Preparation Pratt Street between Bardsley Avenue and Inyo Avenue (SR137) Pre-Construction 07/2020 02/2021 20-25 26 16

Tulare Tulare 20/21 New Complete Streets Components

Kern-Silva-Latimer-Aronian-Moraine-Sunset Improvements

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconstruction of streets within the existing Tracts 65 and 372.

Kern Avenue between Aronian Street and Silva Street; Aronian Street between Tulare Avenue and Kern Avenue; Moraine Street between Sunset Avenue and Kern Avenue; Latimer Street between Tulare Avenue and Kern Avenue; Silva Street between Tulare Avenue and Kern Avenue; Sunset Avenue between Aronian Street and Moraine Street.

Construction 05/2020 06/2021 20-25 26 16

Visalia Tulare 20/21 New Road Maintenance & Rehabilitation

FY 20-21 SB1 Street Rehabiliation -Akers & Tulare

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Bicycle Lane Rehab/Repair (Existing), Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Right of Way Acquisition, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design | Project to include video detection cameras and installation of interconnect conduit.

Akers Street from Caldwell Avenue to Visalia Parkway, Tulare Avenue from Akers Street to Demaree Street

Pre-Construction & Construction

11/2020 06/2021

05/2021 12/2021 15-20 26 16

Visalia Tulare 20/21 New Road Maintenance & Rehabilitation

Downtown Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Main Street from Willis Street to Garden Street Construction 01/2021 07/2021 15-20 26 16

Woodlake Tulare 18/19 Carried Over Complete Streets Components

North Valencia Blvd Extension Improvement Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Construct about 620 linear feet of curb, gutter, and 6 foot wide sidewalk along N. Valencia Blvd (SR 245). The improvements also include drive approaches, 5 foot wide bike lanes, 30 foot radius curb return with ADA ramps, street lights, paveout, and striping. The project will also construct about 150 feet of 4 foot wide sidewalk along W Sequoia Ave to connect to existing sidewalk.

The project is located in Woodlake, CA in a high residential area along N Valencia Blvd (SR 245) towards the northern part of town. The cross streets are Sequoia Ave which is the northern cross street and Sierra Ave which is the southern cross street. One block to the west along Palm St is Woodlake Valley Middle School and all around the project site is residential. To the east is a proposed development site for more residential homes.

Construction 05/2020 12/2020 15-20 26 14

Woodlake Tulare 20/21 New Complete Streets Components West Sequoia Avenue Project This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or

Crosswalk Installation (New), Bicycle Lane (New)

This project will be located along West Sequoia Ave from Valencia Blvd to Cypress Ave. The project will consist of the installation of curb, gutter, sidewalk, ADA ramps, drive approaches, storm drainage, street lights and pave out.

Construction 05/2021 02/2022 15-20 26 14

Sonora Tuolumne 18/19 Forecasted Road Maintenance & Rehabilitation

Centerline Striping and Street Markings

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Centerline Striping and Street Markings in thermoplastic material. Current street markings are paint and have worn away over several years. The City has not had funding to complete the project.

Multiple locations throughout City limits. Stewart Street, Lyons Street, Sanguinetti Road Construction 07/2020 06/2021 3-5 5 8

Sonora Tuolumne 18/19 Forecasted Road Maintenance & Rehabilitation FY 2019 Street Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation | Street overlay of approximately 0.5 to 0.75 miles depending on street width

Snell Street between Bonanza Road and Spring Hill Drive Pre-Construction & Construction

07/2020 03/2021

08/2020 06/2021 10-15 5 14

Camarillo Ventura 20/21 New Road Maintenance & Rehabilitation Annual Resurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Several locations throughout the City of Camarillo for project ST-5020 Annual Resurfacing as described in detail in the attached Resolution No. 2020-35 including but not limited to Ridgeview Neighborhood, Avenida Encanto Neighborhood, Via Calderon Neighborhood, Felicia Neighborhood, Camaino Deville Neighborhood, Verdugo Neighborhood, Cortez Cr from Camino Deville to Cul-de-sac, and Balboa Cr from Camino Deville to Cul-de-sac.

Construction 08/2020 05/2021 7-10 44 19

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 111: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fillmore Ventura 19/20 In Progress Complete Streets Components Mountain View Sidewalk Project

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design

Mountain View St from Ventura Street (SR126) to Santa Clara Street

Pre-Construction & Construction

07/2020 10/2020

09/2020 07/2021 30-50 37 19

Moorpark Ventura 20/21 New Road Maintenance & Rehabilitation

Construct sidewalk and resurface Arroyo Drive between the Simi Valley Boundary to the western

limit of the Villa del Arroyo Mobile Home Park

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

A portion of Arroyo Drive (relinquished SR 118) between the Simi Valley boundary and the western limit of the Villa del Arroyo Mobile Home Park

Pre-Construction 07/2020 08/2021 20-30 44 27

Moorpark Ventura 18/19 In Progress Road Maintenance & Rehabilitation Pavement Preservation

This project will include: Preliminary Design | General maintenance including but not limited to pavement maintenance and repairs and repairs to adjacent facilities due to the work.

The areas that is from Maureen Lane east to McFadden Avenue, north of Los Angeles Avenue and south of Poindexter Avenue. Downtown area between Spring Road and Moorpark Avenue, north of Los Angeles Avenue and south of Wicks Road

Pre-Construction 08/2020 10/2020 5-7 44 27

Ojai Ventura 20/21 New Road Maintenance & Rehabilitation 2021 Road Rehabilitaion Project This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or

Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

Fairview Rd., Lion St., Santa Ana St., San Antonio St., Summer St., Pleasant Ave., Crestview Dr., Daly Rd., Grand Ave., Emily St., Cuyama Rd., Topa Topa St. Full list of streets and roads can be found in Exhibit A of Resolution No. 20-13.

Construction 09/2021 01/2022 15-15 37 19

Oxnard Ventura 18/19 In Progress Road Maintenance & Rehabilitation

Rice Avenue Roadway Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) Rice Avenue from Fifth Street to Gonzales Road Construction 08/2020 11/2020 10-15 44 19

Oxnard Ventura 20/21 New Road Maintenance & Rehabilitation Thin Maintenance Overlay Phase II This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) Various Residential, Commercial, and Arterial Streets Citywide Construction 03/2020 07/2020 10-15 44 19

Oxnard Ventura 20/21 New Road Maintenance & Rehabilitation

La Colonia Thin Maintenance Overlay Phase II

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) La Colonia Neighborhood Streets Construction 02/2021 05/2021 10-15 44 19

Oxnard Ventura 20/21 New Road Maintenance & Rehabilitation Residential Street Resurfacing This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) Various Residential Streets Citywide Construction 08/2020 11/2020 10-15 44 19

Oxnard Ventura 20/21 New Road Maintenance & Rehabilitation

East Gonzales Road Street Resurfacing

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

East Gonzales Road between Oxnard Boulevard and Rice Avenue Construction 03/2021 07/2021 10-15 44 19

Oxnard Ventura 20/21 New Road Maintenance & Rehabilitation

West Gonzales Road Street Resurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

West Gonzales Road between Oxnard Boulevard and Victoria Avenue Construction 03/2021 07/2021 10-15 44 19

Port Hueneme Ventura 18/19 Carried Over Road Maintenance & Rehabilitation

Surfside Drive Resurfacing -Phases 1 and 2

This project will include: Pavement Rehab/Repair (Existing) | Phase I and Phase II consist of asphalt resurfacing and traffic striping.

Surfside Dr. between Ventura Rd. and Ocean View Dr. Phase 2 Surfside Dr. between Ventura Rd. and Market St. Surfside Dr. is a two-lane collector street with a striped median.

Construction 07/2020 10/2020 8-10 44 19

Port Hueneme Ventura 19/20 In Progress Road Maintenance & Rehabilitation

Ventura Road Resurfacing -Phases 4, 5 and 6

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Phases 4, 5, and 6 consist of asphalt resurfacing, traffic striping, traffic signage improvements, and median enhancements.

Phase 4 - Ventura Rd. between Pleasant Valley Rd. and Bard Rd. Phase 5 is Ventura Rd. between Bard Rd. and Sunkist St. Phase 6 is Ventura Rd. between Sunkist St and Channel Islands Blvd. Ventura Rd. is a major arterial with five travel lanes and a raised median.

Construction 06/2020 04/2021 10-20 44 19

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 112: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Port Hueneme Ventura 19/20 In Progress Safety Safe Street Measures

This project will include: Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install cross walks with Accessory Pedestrian Signal (APS), install speeq cushions for traffic calming, upgrade reflective traffic signage, install digital speed signs to alert drivers of their vehicle speed, install overhead street lights to improve visibility and pedestrian safety, line or repair storm drains that have structural issues that may collapse a roadway, stripe and sign bike paths, improve sidewalk grades and install ADA complaint ramps.

Bubbling Springs Area, Patterson Road, Channel Islands Blvd, Clara St, Sunkist Elementary School Neighborhood, Hueneme Elementary School Neighborhood, Park View Elementary School Neighborhood, and Richard Bard Elementary School Neighborhood, Evergreen Ln, Scott Street, and Panama St.

Construction 07/2020 06/2021 15-20 44 19

Port Hueneme Ventura 19/20 In Progress Road Maintenance & Rehabilitation Patterson Road Grind and Overlay

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Asphalt grinding, asphalt resurfacing, and traffic striping.

Patterson Road between Hemlock St. and Channel Islands Blvd Construction 09/2020 11/2020 10-20 44 19

Santa Paula Ventura 20/21 New Road Maintenance & Rehabilitation

Peck Road and Faulkner Road Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

The project is located on the west side of the City at Peck Road from Eastbound State Route 126 Off-ramp/Acacia Way Intersection to Peck Road Overpass, Peck Road from Santa Barbara Street to Santa Paula Street, and Faulkner Road from Peck Road to Westbound State Route 126 On- and Off-ramps.

Construction 08/2020 06/2021 15-20 37 19

Simi Valley Ventura 20/21 New Road Maintenance & Rehabilitation

FY 2020-21 Annual Major and Minor Streets Rehabilitation

Program

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Paving and slurry seal of the following Streets: Abraham St, Adam Rd, Bentley Pl, Covington Ave, Collier Ct, Crosby Ave, Dusan St, Enchanted Way, Eve Rd, Greenbriar Ave, Heywood St, Huntley St, Krenwinkle Ct., Lowery St, Malcolm St, Marter Ct, McCoy Pl, Mellow Lane, Morley Street, Muirfield Avenue, Ona Circle, Phipps Ave, Prather St, Rhoda St, Ysrella Ave. Covington Ave, Muirfield Ave, Maricopa Dr, Pinecrest St. Madera Road (Strathearn Pl. to Irvine Rd.) Alamo Street (Sycamore Dr. to Lemon Dr.)

Construction 09/2020 09/2021 5-20 38 27

Thousand Oaks Ventura 19/20 In Progress Road Maintenance & Rehabilitation

2020 Pavement Overlay and Resurfacing Program

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

Erbes Rd, Borchard Rd, Wendy Dr, Newbury Rd, Haigh Rd, Gainsborough Rd, Hampshire Dr, Rancho Dos Vientos, La Granda, Agoura Rd Area numbers are for each neighborhood we are proposing, a map is available on our website: Area 36, Area 82, Area 87, Area 139, Area 132, Area 168, Area 108, Area 179, Area 354, Area 203, Area 257, Area 307, Area 280, Area 329, Area 335, Area 275, Area 334, Area 286

Construction 05/2020 12/2020 7-25 37 27

Ventura Ventura 19/20 Carried Over Road Maintenance & Rehabilitation

Telephone Road (Victoria to Partridge)

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | This project consists of resurfacing Telephone Road from Victoria Avenue to Partridge Drive. The project includes cold milling, pavement repairs, manhole and valve adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay.

Along Telephone Road from Victoria Avenue to Partridge Drive Pre-Construction & Construction

01/2020 08/2020

06/2020 09/2021 15-20 37 19

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 113: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Ventura Ventura 19/20 Carried Over Road Maintenance & Rehabilitation

Telephone Road (Partridge to Ramelli)

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | This project consists of resurfacing Telephone Road from Partridge Drive to Ramelli Avenue. The project includes cold milling, pavement repairs, manhole and valve adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay.

Along Telephone Road from Partridge Drive to Ramelli Avenue Pre-Construction & Construction

01/2020 08/2020

06/2020 09/2020 15-20 37 19

Davis Yolo 20/21 New Road Maintenance & Rehabilitation

Transportation Infrastructure Rehab and Slurry Seal and

Rehabilitation Package 2020

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Rehab: D St from 5th-8th St; E St from 5th-7th St; East 8th from Pole to 2317 E. 8th; West 8th from A St to B St.

Slurry: Residential streets adjacent to Denali to the south of Covell Blvd and west of HWY 113; Glacier Dr and courts along Glacier north of Shasta Dr; residential streets north and south of Loyola dr; residential streets along 8th St, Tulip Ln, Adrian Dr and courts; residential streets around Ponteverde Ln Villaverde Ln, Prado Ln and courts. Pena Dr, Del Rio Pl, Spafford

Construction 07/2020 10/2020 7-10 4 3

Davis Yolo 20/21 New Road Maintenance & Rehabilitation

Transportation Infrastructure Rehab – Bike Path Package 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing)

Green Meadows Bike Path area, NE portion of Davis Construction 09/2020 12/2020 20-30 4 3

West Sacramento Yolo 20/21 New Traffic Control Devices Targeted Traffic Operations Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation

1) 5th/F Street intersection, 2) Harbor Boulevard & Industrial Boulevard

Pre-Construction & Construction

04/2020 04/2021

11/2020 10/2021 10-20 7 6

West Sacramento Yolo 19/20 In Progress Road Maintenance & Rehabilitation

States Streets Neighborhood Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate the local street network including storm drainage repairs, ADA accessibility upgrades and pavement rehabilitation in an Old West Sacramento Neighborhood. | Project is currently under design. Construction is planned to begin in Spring 2021

The project limits is bound by 15th Street (North), Jefferson Blvd (East), Stone Blvd (South) and Park Blvd (West). The streets within that boundary include Maryland Ave, Delaware Ave, Pennsylvania Ave, Alabama Ave, Virginia Ave Vermont Ave, Carolina Ave, Circle St, Alameda St, 16th St, 17th St, Regent St, Euclid St and 19th St.

Pre-Construction & Construction

07/2019 05/2021

12/2020 12/2021 5-20 7 6

Winters Yolo 20/21 New Road Maintenance & Rehabilitation

FY 2020-2021 ROAD REHABILITATION PROJECT LIST

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

-Second St (Grant Ave to Wolfskill St) -Abbey St (Railroad Ave to Dry Creek Ln) -E Abbey St (Railroad Ave to East St) -E Main St ( Grant Ave to E Baker St) -Morgan St (E Main St to Grant Ave) -E Main St (E Baker St to Manzanita Way) -E Main St/E Baker St Intersection -Railroad Ave (Grant Ave to Russell St)

Construction 01/2021 05/2021 5-15 4 3

Woodland Yolo 18/19 Carried Over Road Maintenance & Rehabilitation 2020 Road Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Roadway rehabilitation including asphalt roadway rehabilitation, repair damaged curb, gutter and sidewalk sections, improve ADA access at intersections, improve delineation of, and widen bike lanes. Project will improve access to shopping, school and neighborhoods within and through the project area. Project will increase pedestrian and bicycle safety. | The City plans to contract with a designer and construct the project once we have enough SB1 funding, which is estimated to be in FY 22/23.

Matmor Road from E. Main Street to Gibson E. Road and Gum Avenue from East Street to Matmor Road.

Pre-Construction & Construction

04/2018 04/2023

04/2023 10/2024 15-20 4 3

Marysville Yuba 18/19 Carried Over Road Maintenance & Rehabilitation 2020 Resurfacing Project This project will include: Slurry Seal and Striping

Yuba Street - 6th to 10th Street and 12th to 17th Street; Ramirez Street - 12th to 24th Street; East 22nd Street - Ramirez Street to Huston Street

Construction 05/2020 09/2020 15-20 3 4

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.

Page 114: DRAFT City Submitted - Fiscal Year 2020-21 Local Streets ...€¦ · Project Scope Development, Preliminary Design, Document Preparation | In general, the project consists of grind

"DRAFT" City Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1)

August 6, 2020

City County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Marysville Yuba 19/20 Carried Over Road Maintenance & Rehabilitation

Preventative Maintenance Program

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Phase 1 includes sealing and maintenance repairs on roadway segments that are the highest traffic. Slurry seal proje

F St. - 3rd to 10th St.; D St. 3rd - 5th St.; E. 17th St. - chestnut St. to SR20 Construction 07/2019 09/2019 15-20 3 4

Marysville Yuba 20/21 New Road Maintenance & Rehabilitation

2020 Resurfacing Project - 1 St - B to E St; H St. - 3rd to 14th St.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) 1 St - B to E St; H St. - 3rd to 14th St. Construction 07/2020 09/2020 20-30 3 4

Wheatland Yuba 19/20 Carried Over Other Pavement Management Program (PMP) Implementation

This project will include: Procurement of Public Works Systems/Databases, Public Works Staffing | This project is planned to implement a city-wide pavement management program based upon a widely-used software program (MTC's StreetSaver®), including the survey and condition ratinq of all the City's, maintained mileage. This program will enable full compliance with SB 1 requirements and provide the basis for efficient, cost-effective identification and delivery of pavement maintenance work for the City.

City Wide Procurement/Operatio nal Needs 11/2020 05/2021 10-20 3 4

Wheatland Yuba 19/20 In Progress Road Maintenance & Rehabilitation

Hooper Street Pavement Resurfacing

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | This project will reconfigure and resutiace Hooper Street in front of Wheatland Elementary School at State Highway 65 to improve public safety for pedestrian and vehicular traffic and repair severely failed portions of the pavement. The improvements would benefit residents as well as those who drop their children off at the, elementary school.

On Hooper Street between Hwy 65 and Olive Street. Pre-Construction & Construction

02/2019 05/2020

04/2020 08/2020 20-50 3 4

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2020 Commission Meeting.