Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Embed Size (px)

Citation preview

Page 1: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

1

Simplified Voltage Optimization M&V ProtocolsGetting to Delta V

Regional Technical Forum PresentationApril 6, 2010

Page 2: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

Why We Are Here

• Strengthen BPA Energy Conservation program offers

• Develop simplified process (based on Utility feedback)

• Address recommendations from the 6th Power Plan

2

Page 3: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

3

BPA’s Overarching Goals

1. Develop a method of simplifying the delta V calculation for VO

2. Simplify /standardize utility participation process

Key requirements:

• Develop a work group to collaboratively work out the details of the Delta V calculation

• Comply with Federal Energy Management Program M&V Guidelines

• Develop a reasonable approach to ensure voltage optimization settings and operating practices are maintained

• Build on consistent historical findings

Page 4: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

4

Distribution Efficiency Technical Workgroup (TWG)

BPA formed a collaborative group to work out the details of the method of simplifying the delta V calculation for VO.

This group is made up of distribution engineering, energy efficiency, operations and GM staff. Their expertise and guidance has been critical to the development of the proposed method.

The TWG collaboration site currently has

42 utility members.

Page 5: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

5

Distribution Efficiency Technical Workgroup (TWG)

Current TWG site members include:Avista Douglas Electric Cooperative Missoula Electric Coop

Benton PUD Emerald PUD Northern Lights

Blachly-Lane Electric Cooperative Eugene Water & Electric Board Okanogan County Electric Coop

Central Electric Cooperative Fall River Rural Electric Cooperative Oregon Trail Electric Coop

Central Lincoln Flathead Electric Portland General Electric

Chelan County PUD Forest Grove Light & Power Puget Sound Energy

City of Port Angeles Grant County PUD Raft River Rural Electric Cooperative

Clallam County PUD Douglas Electric Cooperative Rivallie Electric

Clark County PUD Idaho Power Salmon River Electric Cooperative

Clearwater Power Company Lakeview Light & Power Seattle City Light

Consumers Power Inc Lane Electric Cooperative Snohomish PUD

Coos-Curry Electric Cooperative Lewis County PUD Tacoma Power

Cowlitz County PUD Lincoln Electric Cooperative, Inc Tillamook PUD

Douglas County PUD Lost River Electric Cooperative Umatilla Electric Cooperative

Page 6: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

6

What we seek from the RTF Committee

From the April meeting

• We want the RTF to form a sub-committee to review and comment on the proposed method of simplifying the delta V calculation for VO.

• We want the committee to provide comments to Adam Hadley by mid April. This will allow the TWG to prepare a response to your questions in time for the May meeting.

From the May meeting• During the meeting we will respond to comments received

from the RTF and at the conclusion of the meeting we want the RTF to approve the simplified method of calculating VO Delta V as expressed in the protocols.

Page 7: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

7

What This Presentation Covers

• Energy conservation measure known as Voltage Optimization

• Previous work performed by the RTF regarding this measure

• Delta V (ΔV) calculation method

• VO Factor (VOf)

• Highlight consistent findings

• Four stages of simplified VO calculation method

• Copy of VO calculation document final drafts to provide the committee time to review and comment so that a May decision is possible

Page 8: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

8

CVR / VO Clarification

The measure known as Conservation Voltage Reduction or Regulation (CVR) has evolved over the last 30+ years and is widely known throughout the utility industry.

The Simplified Protocols are different in that they ensure a certain level of distribution system stability prior to operating the system at a lower voltage.

Thus we feel that Voltage Optimization (VO) is a more accurate description of this effort and will be using VO throughout this presentation.

Page 9: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

126Volts

120

114

121126 125 124 122123 117124 123 121 118120

Nor

mal

Vol

tage

O

pera

tion

Average VoltageStandard Practice

Normal Voltage Operating Range in Current Practice by Utilities

Feeder Length

What Is Voltage Optimization?

9

Page 10: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

126Volts

120

114

121126 125 124 122123 115120 119 118 116117

Vol

tage

O

ptim

izat

ion

Average VoltageStandard Practice

Average VoltageVO Practice

ΔV

• Mitigate/prevent risk of low voltage and customer power quality issues

!Feeder LengthSystem improvements

• Flattens voltage profile and allows additional voltage reduction

What Is Voltage Optimization?

10

Page 11: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

11

Timeline of VO Related Events•February 2004 – Presentation of Automated CVR Protocol No. 1

•July 2004 – NEEA Distribution Efficiency Initiative begins

•October 2005 – NEEA team presents and gains approval of statistical method to analyze results of NEEA Study

•February 2008 – NEEA team presents NEEA Study results and general overview of calculator

•March 2008 – BPA hires Program Design Contractor to design VO Program

•April 2008 – NEEA team presents CVR calculator in detail to RTF

•May 2008 – RTF discusses calculator

•July 2008 – RTF approves statement of works and budget to revise the calculator. BPA offers funding.

Page 12: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

12

• September 2008 – BPA opts to delay calculator enhancements until a simplified process can be built to support the use of the calculator

• April 2009 – Contractor delivers first draft of Simplified VO M&V Protocols to BPA

• July / Sept 2009 – BPA holds seven VO education & training workshops throughout the region

• July 2009 – BPA formed a group to collaboratively develop a method to simplify the delta V calculation. This group is known as the Distribution Efficiency Technical Workgroup (TWG).

• August to Present – Draft Program Design & Simplified VO M&V Protocols completed

Timeline of VO Related Events continued

Page 13: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

13

Energy Saved = Change in voltage x Voltage Optimization Factor x Annual Energy +

Energy Saved from System Improvements

E Saved = ΔV x VOf x E Annual + ΔE SI

• ΔV - determined from this program

• VOf - derived from NEEA load research study and confirmed by EPRI studies, and other industry pilots and research

• E Annual – Metered Data from Utility• ΔE - Energy Saved from System Improvements

From NEEA’s DEI research and pilot

VO calculation method already “approved” by RTF

Method of Calculating Energy Savings (Delta V)

From proposed protocols

Page 14: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

14

Northwest VO FactorNEEA DEI End-Use Load Research Study

Overall VOf of End-Use Load by Heating and Cooling Types

Weighted to Northwest

Electric Hot Water Heating & Electric Space HeatingElectric Hot Water Heating OR Electric Space HeatingNon-Electric Hot Water Heating & Non-Electric Space Heating

Elec_E

lec_E

lec(6

0)

Elec_E

lec_N

one(5

7)

Elec_H

eatP

ump(

61)

Elec_N

on_E

lec(1

7)

Elec_N

on_N

one(2

2)

Non_E

lec_N

one(9

)

Non_H

eatP

ump(

10)

Non_N

on_E

lec(1

02)

Non_N

on_N

one(4

3)

1.00.80.60.40.20.0

HotWater_SpaceHeating_Airconditioning (Qty)

VO

f

Page 15: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

15

NEEA DEI Study VOf SensitivityMinor impacts due to AC End-Use Load

VOf with Heating Zone = 2 Cooling Zone = 2Each Curve Represents % of Homes with Airconditioning

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0 10 20 30 40 50 60 70 80 90 100

% Non-Electric

VO

f R

es

ide

nta

l H

om

es

0

10

20

30

40

50

60

70

80

90

100

16% Variation

Page 16: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

16

Previous Studies & Pilot Projects: Consistent Findings

• California PUC 1976: Utilities were directed to modify service voltages to 120-114V where cost effective. [SDG&E – 8 feeders average CVRf of 0.7 to 1.0, Others reported CVRf as high as 1.3]

• EPRI 1981-1984: An evaluation of the Conservation Voltage Reduction was performed (Project # 1419-1) and concluded “In the interest of energy conservation, it is recommended that the utility industry consider operating their distribution circuits such that the upper 5% of the permissible voltage band be eliminated.” [CVRf

~1.1 for Texas utilities]

• BPA Study 1987: Assessment of Conservation Voltage Reduction Applicable in the BPA Service Area

Page 17: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

17

Previous Studies & Pilot Projects: Consistent Findings

• Northwest Utilities conduct CVR tests in late 1980’s: Some utilities adopted CVR practices [SnoPUD CVRf ~0.8]

• NEEA – Distribution Efficiency Initiative (2003-2007):

Established the VO factors based on heating and AC end-use loads for

the Pacific Northwest. Confirmed and validated costs, benefits, and

implementation options and tools. [ CVRf averaged 0.7 and up to 1.1]

• EPRI Green Grid Initiative: Confirms the NEEA DEI Study results of 1 to 3 percent energy savings. Feb 2010, Public Utilities Fortnightly

• Dominion Utility: Reported VO study findings of 0.8 VOf to PUC

Page 18: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

18

Simplified VO M&V Protocols

Outlining a New Approach

Concentrating on Pre/Post Voltage Levels in

order to determine Delta V

Page 19: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

19

Four Stages to Simplified VO M&V Protocols

Existing Performance Assessment and

VO Implementation Plan

Positive Results ?

Move to the next project

YesSystem Improvements

Baseline Pre-VO measurements

VO Implementation Post-VO Measurements

and Verification

Persistence of Energy Savings

No1.

2.

3.

4.

Page 20: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

20

Stage 1Existing Performance Assessment and VO

Implementation Plan

• Gather actual or estimated distribution system historical data that is readily available.

• Perform preliminary assessment of distribution system existing level of performance.

• Develop a preliminary improvement plan describing the system improvements needed to meet minimum operating performance thresholds for VO.

Page 21: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

21

• Develop preliminary plan for implementation of VO.

• Estimate costs and propose preliminary schedules.

• Calculate VO Factor using VO calculator.

• Estimate potential savings of combined system improvements and VO.

• Document all activities and results.

Stage 1: continuedExisting Performance Assessment and VO

Implementation Plan

Page 22: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

22

Stage 2: System Improvements and Baseline

Pre-VO measurement

• Implement system improvements necessary to meet minimum operating performance thresholds.

• Install equipment necessary to measure and/or operate VO with voltage control set for non-VO operation.

• Perform pre-VO baseline measurements for 7-day period for each voltage control zone (VCZ). The detailed measurements are averaged over each hour (system must meet minimum performance thresholds during this 7-day period).

Page 23: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

23

Why Performance Thresholds are Critical

Establishing thresholds helps to resolve key issue found in pilot NEEA projects that did not perform well.

•Reduces voltage fluctuation due to changing loads/conditions

•More predictable voltage levels

•Less likely to have have rogue lateral taps

•Makes utility staff more aware of the feeder performance

•Improves power quality

•Reduces losses in the distribution system

•Allows recording periods to be minimized (1 week to establish daily load shapes and weekend/weekday load shapes)

•This is possible due to the linear nature of voltage drop and system loading and allows accurate calculations to determine

annual average voltage levels.

Page 24: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

24

Voltage Control Zones

Load Tap Changer (LTC)

Transformer

Feeder Breaker

Feeder

VCZ for LTC

Secondary Voltage Zone

Primary Voltage Zone

Page 25: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

25

Voltage Control Zones

Load Tap Changer (LTC)

Transformer

Feeder Breaker

Feeder

VCZ for V-RegVCZ for LTC

V-Reg

Secondary Voltage

Zone

Primary Voltage Zone

Primary Voltage Zone

Secondary Voltage

Zone

Page 26: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

26

• Identify final installation cost of system improvements including VO equipment. (if applicable).

• Determine baseline pre-VO overall annual average voltage for all VO voltage-control-zones (VCZ) with voltage control set for non-VO operation. VCZ consist of all distribution lines that are controlled by a tap changing voltage regulator. Several VCZ may exist within one substation area.

• Calculate savings from system improvements.

• Document all activities and results.

Stage 2: continuedSystem Improvements and Baseline Pre-VO

Measurement

Page 27: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

27

Stage 3: VO Implementation and Post-VOMeasurements and Verification

• Prepare an initial estimate of energy savings resulting from VO using distribution system known or estimated customer load characteristics.

• Initiate VO operational voltage control.

• Perform post-VO measurements for 7-day period. The detailed measurements are averaged over each hour (system must meet minimum performance thresholds during this 7-day period).

Page 28: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

28

• Determine post-VO overall annual average voltage for all VO voltage-control-zones (VCZ) with voltage control set for VO operation. VCZ consist of all distribution lines that are controlled by a tap changing voltage regulator. Several VCZ may exist within one substation area.

• Prepare a final post-VO verified estimate of energy savings resulting from VO.

• Document all activities and results.

Stage 3: continued VO Implementation and Post-VOMeasurements and Verification

Page 29: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

29

Stage 4: Persistence of Energy Savings

•For a three year period, complete annual self-certification checklist to ensure:

Voltage settings are still operating as prescribed within the prescribed VO voltage control zones.

Voltage control zone continues to meet minimum performance thresholds. The annual self-certification of system minimum operating performance is measured over a 12 month period.

NOTE: TWG feels a process that’s been in practice for 3 years becomes a standard operating procedure and is highly likely to continue.

Page 30: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

30

Project Team

• Bonneville Power Administration

• Distribution Efficiency Technical Workgroup

• GOALmind Consulting - Jillianne Welker

• RMH Consulting - Bob Helm

• RW Beck - KC Fagen

• Utility Planning Solutions - Robert Fletcher

Page 31: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

31

Questions?

Page 32: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

32

Call for Dedicated Sub- Committee

Need review, comments and recommendations on the document Simplified VO M&V Protocols (approx. 10 pages) which describes the method for simplifying the delta V calculation for VO.

All comments must be sent to Adam Hadley

by April 19, 2010.

Page 33: Draft 3/18/2010 1 Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010

Draft 3/18/2010

33

Thank you very much for taking the time to share

your knowledge & experience.