DQM Status and Plans Y. Foka (GSI) ALICE Offline week 8.03.12. DQM ToDo Lists followup. Last DQM meeting 8 Feb 2012; see minutes and ToDo Lists https://indico.cern.ch/conferenceDisplay.py?confId=170615 Main points discussed on 8 Feb with the aim to make DQM more efficient - PowerPoint PPT Presentation
Citation preview
DQM Status and Plans
Y. Foka(GSI)
ALICE Offline week8.03.12
Last DQM meeting 8 Feb 2012; see minutes and ToDo Lists https://indico.cern.ch/conferenceDisplay.py?confId=170615
Main points discussed on 8 Feb with the aim to make DQM more efficient- Preparation for 2012 run-DQM plot review-Merging DQM/Offline shiftsDetailed ToDo Lists, strategies on implementation, timelines
Work has advanced Detectors were followed up individuallyRunning in ACR, debugging and testing going on as detectors are ready to participateTest the stability of the system before collisions
Merging of DQM/Offline shifts is reality in ACR
Today, updates on status; where we are
At the end of the meeting clear ToDo Lists and deadlinesWe need to be super-ready for collisions
DQM ToDo Lists followup
Provide information to judge the quality of data online, in ACR-Basic detector signals (current status)-Reconstructed quantities (vertex, via online event display)
Identify, collect, find best way to present such info (aim of review)
Based on this information the run could be stopped or other needed immediate actions are to be taken (detector issues)
Use this information to mark the quality of data
Facilitate DQM shifter spotting problems and Shift Leader taking decisions
Components needed to achieve it in ACR1.Provide the data2.Process the data and produce the information3.Publish/visualise the information
Synergy of many different systems is neededThe complexity is reflected in the actual architecture in ACR
DQM Tasks
CR1
ACR
GenericGUI
GenericGUI
DetectorShifterDQM/QA Shifter
eLogBookeLogBookOn-CallExperts
DetectorGUI
DetectorGUI
DetectorShifterDQM/QA Shifter
Detector Team
Offline Core & ROOT Teams
ACRProjectorAliEveAliEve
CR2HLT nodes
Detectorcode
Detectorcode
DA/DQM nodes
AMOREDB
AMOREDBDetector
QAs (expert & shifter)
DetectorQAs (expert
& shifter)
Detectoragents
Detectoragents
DA’sDA’s
Histo, objects
Obj.
Histograms
DAQ Team
Images
Code within AliRoot
Prompt offline recoOffline QA run onlinewith AMORE
AMORE
DQM between online and offline world
Shifter with 2 heads
Input Data DAQ
Data processing and visualisation AMORE: Bart Von Haller (100%) and Adriana Telesca (10%) QA: offline team OCDB: thanks to Chiara Event Display: Mihai Niculescu
Users interface: Francesca Bellini (20%)
DQM support: [email protected], FB, BVH, AT, MN
DQM support
DQM/Offline shifts merging (FB, FC)
DQM plots review, status of implementation and To Do Lists (FB)
Software status- AMORE (BVH)- Offline-DQM interface (BVH)- Online Event Display (MN)
Subsystems updates•Vertex: SPD/DA reconstructed vertex•SSD: number of problems understood, status•TPC: example on implementing QAchecker, macro etc•TRD: new developments (coming to standard)•V0: status, QAchecker
•Trigger: related to aliases•HLT: DQM plots (access reconstructed quantities)
DQM today’s agenda
7
Requirement for all detectors to provide thresholds and quality flag in synch with what is displayed on the plot
DQM thresholds and quality flag
Essential for “judging automatically” the quality of data
Thresholds on the plots have to mark “good” or “bad” statusThis status has to be correctly reflected to the quality flag of the AMORE/GUI tree
Plots that do not conform to this will not be displayed for pp
The values of thresholds have to be reliable in different conditions (pp, PbPb…)-have to be fine-tuned in ACR with collisions- need to change according to real life conditions in ACR lumi, rates, background, detector configuration
The tools to set them and change them in ACR have to be ready
DQM thresholds and quality flag
Need to change thresholds online in ACR despite the AliRoot weekly releases
Work-around (see i.e. presentation of TPC) 1. use macro if post-processing is needed (does not pass thresholds to offline)
2. new procedure (config file) to replace the macro was developed (pass thresholds to offline; thanks to Chiara and Barth!)
For startup detectors were asked to have proper implementation ofQAchecker and use macro (to set thresholds and calculate quality flag)
For status of implementation see FB summary and reports from detectors
Details and status of new developments by Barth
DQM thresholds and quality flag
The framework is ready and was tested during 2011 PbPb runthanks to Ruben!!
In 2011 FB prepared the config files with the trigger classes aliases definitionsand requests for splitting detector-by-detectorsee 8 Feb FB presentation
In 2012 the detector experts are responsible to provide individual config files with the triggers split definitions
Only one config file with the trigger classes aliases will be handled either by trigger coordination or DQM supportEvgeny Kryshen (deputy TC) offered to take care; see his presentation
Trigger aliases details to be decided by PB/Offline/Trigger Coordinations
DQM plots by trigger classes
Identify “top level – Run Conditions” plots give info on run/beam conditions that would trigger end of run
Identify “2nd level – Detector Main Plots” plots (summary plots) give red/green status, easy and fast to spot
Identify “backup” monitoring plots give extra information to detectors on-call if a problem is spotted
Identify “logbook” plots give extra info for experts in the logbook, not displayed on the shifters layout available via the trees upon request if needed
DQM plots reviewIndividual meetings with all subsystems to accommodate multiple requirements-Make system “automatic” (red/green status)-Provide all necessary info (detectors are living objects!)
Only high level plots on layout for shifter
For each available (or future) plot we asked details about:
- content of the histograms- priority level- if meaningful in technical runs- which event species it can be populated for- if it has to be splitted by trigger classes- if and what kind of thresholds are set- which criteria to be used to state the quality- what kind of check can be performed automatically on the plot- implementation status: - is it in QADatamakerRec? - is the check implemented in QAchecker or macro?- is the splitting by trigger classes defined in the right config file?
Reviewed topics
DQM Implementation Status 8 Feb
DQM Implementation Status 8 March
Resumed weekly installations of DQM software at P2
15 March: deadline for code delivery14 March: start machine commissioning
30 March: documentation readyEnd March: special runs
Beginning April: collisions
Easter at P2…..
Roughly 3 weeks left till collisions
Implementation and Deadlines
Merging DQM/Offline shifts is reality in ACR
Common policy for accepting/validating shifters
More details in presentations by Francesca and Frank
DQM/Offline shifts
Next meetings
DQM/offline shifters training 19 March at 14:00see details by Francesca and Frank
DQM Forumwe propose 30 March or 4 April6 April black Friday
Call for DQM on-call
DQM on-call!
Subsystem responsibles good candidates!Contact us for special training
DQM shifts are merged with Offline shifts•Make system easy, provide automatic checks• Detectors are living objects, conditions depend on lumi, background… provide way to adjust automatic checks online
Preparation for 2012 run after review of last year’s experience•DQM/AMORE system•DQM plots and thresholds•Online event display
Shifters training and shift booking
Deadlines and planning
DQM in 2012