PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
1 111 DIAMOND EAGLE
CONSTRUCTION 33328 L B MA GE
Flood Management Program -
Construction / Maintenance of
Revetment/ River Control in Binan River,
Purok 2, Barangay Sto. Tomas
Binan City,
Laguna11/7/2018 1st/Final
Laguna 2nd
DEOLF 29.40 231 13/02/2018 10/1/2018 0.00% C 0.463 0.141 0.300 - - - 90.40%
90.40%
Very SatisfactoryONS
2 22-R CONSTRUCTION AND
SUPPLY15304 L B MA GE
Widening of Camiling-Wawa-
Bayambang-Malasiqui-Sta. Barbara
Road, K0187+670 - K0188+306,
K0189+206-K0190+099
Malasiqui,
Pangasinan11/13/2018 1st
Pangasinan 4th
DEOLF 41.73 278 21/02/2018 11/25/2018 -4.35% OG 0.392 0.240 0.106 0.030 0.064 0.033 86.50% - DEL
3 3
3DIAMONDS
CONSTRUCTION
CORPORATION
35457 L B MA GERoad Widening of Daang Maharlika
Road, K0504+420 - K0506+022
Ligao City/
Guinobatan,
Albay
11/5/2018 1st Albay 3rd DEO LF 47.43 270 14/03/2018 12/8/2018 -4.07% OG 0.391 0.293 0.109 0.015 0.028 0.033 86.90% - DEL
4 4 3K ROCK ENGINEERING 27908 L A MB GE
Road Upgrading (unpaved to paved)
Based on Gravel Road Strategies, Traffic
Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project AnalysiS) -
Tertiary Roads Apayao-Ilocos Norte
Road KO623+771-KO625+810 &
KO626+019-KO626+301
kabugao, apayao 11/15/2018 1st/FinalApayao 1st
DEOLF 96.50 417 04/04/2017 5/25/2018 -0.42% C 0.461 0.134 0.287 - - - 88.20%
88.20%
SatisfactoryDEL
5 5 3-L CONSTRUCTION 16745 L B MA GBConstruction of Multi-Purpose Building,
Barangays Patag and Bagumbayan
Libmanan,Camar
ines Sur11/8/2018 1st/Final
Camarines Sur
1st DEOLF 4.70 100 01/03/2018 6/8/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
6 6 888 ACY ENTERPRISES 32898 L B MA GE
Construction/Maintenance of Flood
Mitigation Structure and Drainage
Systems/Construction of Subang Daku
Flood, Suba Section 2, Sta 5+160-Sta
5+817, Sogod, Southern Leyte (
Construction of Flood Mitigation
Structure)
Sogod, Southern
Leyte11/13/2018 1st/Final
Southern Leyte
DEOLF 23.62 265 01/02/2018 23/10/2018 0.00% C 0.468 0.134 0.300 - - - 90.20%
90.20%
Very SatisfactoryONS
7 7 8J BUILDERS & SUPPLY 37516 L D SB GB
Local Infrastructure Program-
Construction of Multi-Purpose Building
(livelihood center) Barangay Ngileb
Alfonso Lista,
Ifugao11/9/2018 1st/Final
Ifugao 2nd
DEOLF 1.91 105 22/05/2018 9/3/2018 0.00% C 0.481 0.133 0.300 - - - 91.40%
91.40%
Very SatisfactoryONS
8 8A. DE GUIA
CONSTRUCTION18228 L AA MB GE
Network Development - Road Widening -
Primary Roads along Daang Maharlika
(LZ) (S00782LZ) K0382+(-1051) -
K0382+000, K0383+450 - K0383+668,
K0383+740 - K383+830, K0386+193 -
K0386+291
Naguilian,
Isabela11/7/2018 1st/Final
Isabela 2nd
DEOLF 40.69287045 162 05/03/2018 8/13/2018 0.01% C 0.461 0.200 0.300 - - - 96.10%
96.10%
Very SatisfactoryAHD
9 9
A.C. RIVERO
DEPARTMENT
CORPORATION/EBUILDER
S CONSTRUCTION &
DEVELOPMENT CORP.
(Joint venture)
JV- 17-423 L A MB GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System,
Netwrork Development Program, Road
Widening, Tertiary Roads, Lipa - Balete
Rd. - K0086+746 - K0087+775
Balete, Batangas 11/10/2018 1stBatangas 3rd
DEOLF 39.19983034 300 06/02/2018 12/2/2018 -0.49% OG 0.392 0.240 0.145 0.030 0.061 0.033 90.10% - DEL
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 1 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
10 10
A.C. RIVERO
DEVELOPMENT
CORPORATION
5122 L A MB GE
Construction/Improvement of Access
Road Leading to Ilog-Ilog River Water
Tubing
Rizal, Palawan 11/9/2018 1stPalawan 2nd
DEOLF 19.54 188 17/06/2018 12/21/2018 10.33% OG 0.382 0.300 0.150 0.020 0.047 0.050 94.90% - AHD
11
A.C. RIVERO
DEVELOPMENT
CORPORATION
5122 L A MB GE
Asset Preservation Program,
Rehabilitation/ Reconstruction of Roads
with Slips, Slope Collpase and Landslide,
Secondary Roads, Masbate - Millagros
Road, Sec. A K0007+075 - K0007+325,
Both sides, Sec. B: K0008+120 -
K0008+318, right side, Sec. C: K0008+369
- K0008+485, right side, Sec. D:
K000+580, right side, Sec. E: K0008+922 -
K0009+584, right side; K0008+901 -
K0009+584, Left side
Masbate City 11/9/2018 1stMasbate 1st
DEOLF 57.73 275 23/07/2018 4/23/2019 20.17% OG 0.310 0.292 0.150 0.020 0.042 0.033 83.63% - AHD
12
A.C. RIVERO
DEVELOPMENT
CORPORATION
5122 L A GE
Widening of Permanent Bridge,
Lumbayao Bridge along Lanao- Pagadian-
Zamboanga City Road, Lumbayao,
Kabasalan, Zamboanga Sibugay
Lumbayao,
Kabasalan,
Zamboanga
Sibugay
11/14/2018 1st
Zamboanga
Sibugay 2nd
DEO
LF 24.69 353 02/07/2018 6/19/2019 2.18% OG 0.400 0.240 0.150 0.030 0.037 0.050 90.70% - AHD
13 11
A.D. PENDON
CONSTRUCTION &
SUPPLY, INC./ PANAY
EAST COAST
CONSTRUCTION & SUPPLY
(JOINT VENTURE)
JV-17-890 L A MB GE
Construction of Concrete Road-
Poblacion Barotac Viejo- Vista Alegre-
Nueva Invencion- Del Pilar- Gen. Luna-
San Jose-Anabo connecting Nueva Swine
Valley, NRJ Iloilo East Coast Capiz Road
and NRJ Passi-San Rafael- Lemery- Sara
Road
Barotac Viejo,
Iloilo11/10/2018 1st Iloilo 3rd DEO LF 83.76 314 16/02/2018 12/26/2018 1.02% OG 0.385 0.247 0.150 0.030 0.050 0.050 91.20% - AHD
14 12 A.I.P CONSTRUCTION 32458 L A MA GEConstruction of Road Slope Protection-
Itogon-Dalupirip-San Manuel Bdry Road,Itogon Benguet 11/6/2018 1st
Benguet 1st
DEOLF 70.47 300 15/03/2018 1/8/2019 0.12% C 0.306 0.300 0.150 - - - 88.10%
88.10%
SatisfactoryAHD
15 13
A.J. TAYLAN
CONSTRUCTION
CORPORATION
2336 L B MA GEClearing/ Cleaning of Madongan Sabo
Dam, Madongan River
Nueva Era, Ilocos
Norte12/6/2018 1st/Final
Ilocos Norte
2nd DEOLF 41.41 375 31/03/2016 4/9/2017 0.00% C 0.450 0.200 0.300 - - - 95.00%
95.00%
Very SatisfactoryONS
16 14
A.M. ONG
CONSTRUCTION &
TRADING
34373 L D SB GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems - Rehabilitation of Slope
Protection Along Porac River Mabical
Section
Floridablanca,
Pampanga 11/14/2018 1st/Final
Pampanga 2nd
DEOLF 11.62594556 120 19/06/2018 10/16/2018 0.00% C 0.438 0.133 0.300 - - - 87.10%
87.10%
SatisfactoryONS
17 15
A.M.P. CONSTRUCTION /
M.M. SERRANO
CONSTRUCTION
COMPANY
JV-17-2444 L A SB GE
Construction of By-Pass Road and
Diversion Roads, Licab - Victoria Road,
Nueva Ecija
Nueva Ecija 11/12/2018 1stNueva Ecija 1st
DEOLF 50.41 270 10/05/2018 2/3/2019 0.05% OG 0.399 0.238 0.150 0.030 0.060 0.050 92.70% - AHD
18 16 A.P.B CONSTRUCTIONS 17055 L B MA GERehabilitation/Improvement of Bakir
Flood Control Structure
Sta. 0+000 to
Sta. 0+507.10,
Bagabag, Nueva
Vizcaya
11/8/2018 1stNueva Vizcaya
1st DEOLF 18.59 158 28/08/2018 2/1/2019 8.88% OG 0.381 0.247 0.150 0.030 0.050 0.050 90.80% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 2 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
19 17A.P.O GENERAL
CONSTRUCTION7010 L B MA GE
Convergence and Special Support
Program, Construction/Improvement of
Access Roads leading to Tirad Pass View,
Fidelisan Falls,Sumaguing
Cave,Balangagan Cave,Ayyuweng di
Lambak ed Tadian Festival,Kiltepan
Sunrise,Besao Sunset,Hanging
Coffins,Echo Valley,Tadian
Besao and
Sagada,
Mountain
Province
11/8/2018 1stMt. Province
DEOLF 72.56 266 10/04/2018 12/31/2018 -3.81% OG 0.286 0.300 0.112 0.030 0.050 0.033 81.10% - DEL
20 18 A.S.T BUILDERS 34104 L B MA GEConstruction of Flood Mitigation
Structure at Butuanon River
Brgy.
Pulangbato,
Cebu City
11/17/2018 1st Cebu City DEO LF 42.91 286 07/06/2018 3/19/2019 9.44% OG 0.400 0.240 0.150 0.030 0.045 0.050 91.50% - AHD
21 19A.T. DUMLAO
CONSTRUCTION, INC.34028 L A MA GE
Widening of Wasian Bridge
(B00922MN) along Daang Maharlika
(Agusan-Davao Section) K1330+958-
K1330+984.40
Rosario, Agusan
del Sur11/12/2018 1st
Agusan del Sur
2nd DEOLF 26.75 239 3/26/2018 11/19/2018 2.86% OG 0.392 0.240 0.150 0.030 0.070 0.050 93.20% - AHD
22A.T. DUMLAO
CONSTRUCTION, INC.34028 L A MA GE
Retrofitting/Strengthening of Bayugan
Bridge 3 (B00924MN) along Daang
Maharlika Road (Agusan-Davao Section),
K1334+135 – K1334+156.95
Rosario, Agusan
del Sur11/12/2018 2nd/Final
Agusan del Sur
2nd DEOLF 6.37 84 3/19/2018 6/10/2018 0.00% C 0.494 0.185 0.300 - - - 97.90%
92.44%
Very SatisfactoryONS
23 20 AARCON BUILDERS 28336 L A MA GE
Organizational Outcome 2: Protect Lives
and Properties Against Major Floods -
Flood Management Program -
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems - Construction/ Improvement of
Flood Control Structures and Bank
Protection along Morong River
Morong, Rizal 11/11/2018 1st Rizal 2nd DEO LF 39.2 229 02/05/2018 12/16/2018 0.18% OG 0.372 0.240 0.150 0.030 0.060 0.033 88.50% - AHD
24 21
AB APONESTO
CONSTRUCTION PARTS
AND SUPPLIES, INC. /
RANGAY CONSTRUCTION
AND SUPPLY JOINT
VENTURE
JV-17-2032 L AA LA GE
Off-Carriageway Improvement Tagum
City Diversion Road Including ROW,
K1459+600-K1460+793
Tagum City,
Davao del
Nort6e
11/10/2018 1stDavao del
Norte 1st DEOLF 54.9 242 10/05/2018 1/6/2019 2.19% OG 0.400 0.240 0.150 0.030 0.051 0.033 90.40% - AHD
25 22ABADA CONSTRUCTION
AND SUPPLY37005 L D SB GB
Completion/Repair/Rehabiitation of
Multi-Purpose Building
Brgy. San
Agustin, Carmen
Agusan del
Norte 2nd L.D.
11/14/2018 1st/FinalAgusan del
Norte DEOLF 1.84 150 4/18/2018 9/14/2017 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.3%
Very SatisfactoryONS
26 23 ABU CONSTRUCTION 22313 L AA MA GE
Installation of Gabions and Matresses
along Davao River Basin, Waan-Sta.
Lucia Section
Davao City 11/15/2018 2nd/FinalDavao City 1st
DEOLF 49 203 3/8/2018 9/26/2018 0.00% C 0.483 0.134 0.300 - - - 91.70%
90.74%
Very SatisfactoryONS
27 24ACJ CONSTRUCTION
RESOURCES10635 L B MA GE
Construction of Concrete Road - Jct.
Dualing - New Panay - Midsayap Road to
Katalicanan - UK Peak
Aleosan, North
Cotabato11/10/2018 2nd/Final
Cotabato 2nd
DEOLF 34.3 161 08/03/2018 8/15/2018 0.00% C 0.492 0.133 0.300 - - - 92.50%
90.64%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 3 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
28 25 AFAJI BUILDERS 39489 L C SB GE
Local Infrastructure Program - Local
Roads and Bridges - Local Roads
Construction of Road
Barangay
Mabiga,
Hermosa, Bataan
11/8/2018 1st/FinalBataan 1st
DEOLF 4.8014849 150 21/03/2018 8/17/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%
90.40%
Very SatisfactoryONS
29 AFAJI BUILDERS 39489 L C SB GE
Asset Preservation Program - Preventive
Maintenance - Secondary Roads - Roman
Expressway, K0116+246 to K0117+000
Abucay, Bataan 11/8/2018 1st/FinalBataan 1st
DEOLF 14.82053889 90 23/04/2018 7/21/2018 2.22% C 0.444 0.133 0.300 - - - 87.70%
87.70%
SatisfactoryAHD
30 26 AGUERO CONSTRUCTION 23338 L A MA GBConstruction of Evacuation Center,
Municipality of BaroboSurigao del Sur 11/11/2018 1st
Surigao del Sur
2nd DEOLF 28.72 290 3/27/2018 1/10/2019 1.66% OG 0.400 0.239 0.150 0.030 0.070 0.033 92.20% - AHD
31 27 AL CHRIS CONSTRUCTION 12406 L B MA GE
Rehabilitation/Reconstruction/Upgradin
g of Damaged Paved Roads - Tertiary
Roads - Tagbilaran City-Corella-Sikatuna-
Loboc Road, K0015+280-K0016+130
Sikatuna, Bohol 11/6/2018 2nd/Final Bohol 1st DEO LF 20.66 176 23/04/2018 10/15/2018 0.00% C 0.472 0.133 0.300 - - - 90.50%90.92%
Very SatisfactoryONS
32 28AL HUSSEIN
CONSTRUCTION18438 L A MB GE
Road Upgrading (Unpaved to Paved)
Based on Gravel Road Strategies, Traffic
Benchmark for Upgrading to Paved Road
Standars (HDM-4 Project Analysis)
(intermittent Sections), Lanao del Norte
Interior Circumferential Road, K1612+(-
571) - K1612+(-395), K1612+(-243) -
K1612+411, K1612+531 - K1613+597,
K1614+013 - K1614+289, K1614+621 -
K1615+015, K1617+000 - K1618+000,
K1622+542 - K1624+854
Lanao del Norte
2nd11/6/2018 1st/Final
Regional Office
No. XLF 146.25 356 15/03/2016 3/5/2017 0.00% C 0.467 0.133 0.300 - - - 90.00%
90.00%
Very SatisfactoryONS
33 29 ALCEL CONSTRUCTION 15129 L A MB GEAlong Burgos - Agno Road K0303+(-962) -
K0305+690
Burgos,
Pangasinan11/14/2018 1st/Final
Pangasinan 1st
DEOLF 38.46 60 26/02/2018 4/26/2018 18.33% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryAHD
34 30
ALCEL CONSTRUCTION /
JTM CONSTRUCTION
JOINT VENTURE
JV-16-2094 L A GE
Construction of Concrete Road Bugnay
(Mangape)-Buscalan-Loccong-Butbut
Proper Leeading to Buscalan Tattoo
Village, Tinglayan, Kalinga
Tinglayan,
Kalinga11/12/2018 1st
Upper Kalinga
DEOLF 95.47 314 20/02/2018 12/30/2018 -1.96% OG 0.388 0.240 0.130 0.030 0.061 0.033 88.20% - DEL
35 31
ALCEL CONSTRUCTION/
ORIENTAL SALES CENTER
AND CONTRACTOR JOINT
VENTURE
JV-17-1917 L B MB GE
Network Development-Impvt./Widening
of National Rd. along Binalonan-Asingan-
Sta. Maria Rd. K0198+786 - K0200+405;
K0208+700 - K0208+980
Asingan,
Pangasinan11/13/2018 1st
Pangasinan 3rd
DEOLF 55.94 276 28/03/2018 12/28/2018 4.76% OG 0.390 0.240 0.150 0.030 0.052 0.033 89.50% - AHD
36 32
ALEBON GENUINE
MERCHANDISING
INCORPORATED
26300 L B MA GE
Construction / Improvement of Access
Roads Leading to Declared Tourism
Destinations, Access Road Leading to
Alibuag Park
Mangga,
Sugbongcogon,
Misamis Oriental
11/13/2018 1st/Final
Misamis
Oriental 1st
DEO
LF 19.55 178 25/03/2018 9/18/2018 0.00% C 0.488 0.133 0.300 - - - 92.10%92.10%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 4 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
37 33
ALGON ENGINEERING
CONSTRUCTION
CORPORATION
270 L AAA LB GE
Widening (2 into 4 lanes) of Davao-
Bukidnon Road Including Slope
Protection and ROW (Brgy. Marilog
Section), Davao City, K1645+906 -
K1647+680, K1647+680 - K1648+080,
K1648+080 - K1649+820
Davao City 3rd
LD11/16/2018 1st
Regional Office
No. XIIILF 137.38 269 3/12/2018 12/5/2018 -3.97% OG 0.363 0.300 0.110 0.030 0.061 0.033 89.70% - DEL
38 34
ALHADRAX
CONSTRUCTION AND
SUPPLY
38651 L B SB GBConstruction of Multi-Purpose Building
Cluster XXIII
Juban and Bulan,
Sorsogon7/11/2018 1st/Final
Sorsogon 2nd
DEOLF 7.14 120 27/02/2018 6/26/2018 0.00% C 0.494 0.131 0.300 - - - 92.50%
92.50%
Very SatisfactoryONS
39 35 ALONZO CONSTRUCTION 32145 L A MA GE
Road Widening (4 to 6 lanes) including
Drainage and RROW along Daang
Maharlika, Pasian Section
Compostela
Valley Province11/9/2018 2nd/Final
Compostela
Valley DEOLF 35.36 187 4/11/2018 10/14/2018 0.00% C 0.489 0.135 0.300 - - - 92.40%
88.62%
SatisfactoryONS
40 36
ALPHA & OMEGA GEN.
CONTRACTOR &
DEVELOPMENT CORP.
38958 L A MA GE
Asset Preservation of National Road,
Rehabilitation/ Reconstruction of
National Road With Slip, Collapse and
Landslide, Secondary Roads Calamba -
Sta. Cruz - Famy Junction Road,
K0096+450 to
Laguna 11/8/2018 1stLaguna 1st
DEOLF 93.06 287 03/09/2018 11/21/2018 0.89% OG 0.379 0.255 0.150 0.030 0.056 0.033 90.30% - AHD
41
ALPHA & OMEGA GEN.
CONTRACTOR &
DEVELOPMENT CORP.
38958 L A MA GE
Rehabilitation/Reconstruction of
National Road with Slips, Slope Collapse
and Landslide along Puerto Princesa
North Road, K0266+067 -K0266+140;
K0266+240 -K0266+290; K0255+026 -
K0255+086
El Nido and
Taytay, Palawan11/11/2018 2nd
Palawan 1st
DEOLF 94.61 260 13/05/2018 1/27/2019 17.60% OG 0.397 0.296 0.150 0.022 0.055 0.033 95.30% - AHD
42
ALPHA & OMEGA GEN.
CONTRACTOR &
DEVELOPMENT CORP.
38958 L A MA GB
Construction of Four (4) Storey, Eight (8)
Classrooms, Two (2) Science Lab. And
Two (2) ICT Building, Gen. Emilio
Aguinaldo National High School
Ramon, Isabela 11/11/2018 1stIsabela 4th
DEOLF 17.98 238 16/07/2018 3/10/2019 1.80% OG 0.364 0.277 0.150 0.030 0.041 0.033 89.50% - AHD
43 37
ALPHA RYDER
CONSTRUCTION AND
SUPPLIES
12197 L A MB GE
Flood Management Program -
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems - Construction of River Control
at Osiao Bacon
Bacon District,
Sorsogon City11/7/2018 1st/Final
Sorsogon 1st
DEOLF 47.14 240 02/03/2018 10/27/2018 0.00% C 0.390 0.156 0.300 - - - 84.60%
84.60%
SatisfactoryONS
44 38ALPHATEC CHEMICAL
CORPORATION39938 L B MA GE
Rehabilitation/Major Repair of
Permanent Bridge at Taroy Bridge along
Carmen Jct'n.- Bayambang-Manat Road
Binmaley,
Pangasinan11/13/2018 1st/Final
Pangasinan
2nd DEOLF 19.60 120 13/04/2018 8/10/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
45 39
ALRO CONSTRUCTION &
DEVELOPMENT
CORPORATION
18361 L A MB GE
FY-2018 Network Development -
Construction if Bypass/Diversion Roads,
Construction of Jct. Nato-Sabang Coastal
Road (Sagnay-Tigaon Section) ,Sta.
0+500.00 to Sta.1 + 731.60
Sagnay and
Tigaon,Camarine
s Sur
11/10/2018 1stCamarines Sur
3rd DEOLF 92.63 301 06/05/2018 3/2/2019 0.17% OG 0.393 0.283 0.150 0.030 0.047 0.050 95.30% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 5 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
46 40
ALXM CONSTRUCTION
DEVELOPMENT
CORPORATION /ZKR
JV-17-988 L B MA GE
Asset Preservation Program,
Construction/ Upgrading / Rehabilitation
of Drainage along National Roads,
Secondary Roads, Junction Tawad -
Balud Road, (K0036+675 - K0037+821)
Milagros,
Masbate11/9/2018 2nd/Final
Masbate 1st
DEOLF 27.48 241 21/02/2018 10/19/2018 0.00% C 0.352 0.174 0.300 - - - 82.60%
83.92%
SatisfactoryONS
47 41ALZAM ENTERPRISES
INCORPORATED19113 L A MA GE
Installation of Gabions and Mattresses
along Bago River, Kaliraya Section, Sta.
1+044-Sta. 1+587, Sta. 1+593-Sta. 1+702,
Left Bank
Davao City 11/15/2018 1stDavao City 1st
DEOLF 49 233 6/3/2018 1/21/2019 4.05% OG 0.371 0.240 0.150 0.030 0.061 0.050 90.20% - AHD
48 42 APD CONSTRUCTION 17467 L A MB GE
Construction/Improvement of Access
Road Leading to Quirino Tourism
Complex
Cabbarroquis,
Quirino11/9/2018 1st Quirino DEO LF 53.38 255 14/03/2018 11/23/2018 1.07% OG 0.387 0.271 0.150 0.030 0.050 0.050 93.80% - AHD
49 43AQUA DRAGON
CONSTRUCTION & SUPPLY36405 L C SB GE
Rehabilitation/Major Repair of Guimbal
Bridge (B00125PN) along Iloilo-Antique
Road (K0029+023)
Guimbal, Iloilo 11/17/2018 1st/Final Iloilo 1st DEO LF 6.72 119 19/02/2018 17/06/2018 38.27% C 0.500 0.134 0.300 - - - 93.40%93.40%
Very SatisfactoryAHD
50 44
AQUATERRA KONSTRUKT,
INC. / MCGABRIEL
CONSTRUCTION JOINT
VENTURE
JV-16-449 L A MB GE
Construction of Flood Control at Maasin
Creek (including Right of Way
Acquisition)
Zamboanga City 11/15/2018 2nd/Final Zamboanga
City DEOLF 23.59 547 3/22/2017 9/19/2018 0.00% C 0.400 0.133 0.300 - - - 83.30%
86.84%
SatisfactoryONS
51 45
AQUINO-DELA CRUZ
ENG'G & CONSTRUCTION
/ ALPHATEC CHEMICAL
CORPORATION (JOINT
VENTURE)
JV-17-1088 L A MB GE
Cluster I: 1) Rehabilitation/ Major Repair
of Alag Bridge (B00182MR) along
Calapan North Road, Baco, Oriental
Mindoro 2)Rehabilitation/ Major Repair
of Baguin I Bridge I, Baco Oriental
Mindoro 3) Rehabilitation / Major
Repair of Jasmine Bridge (B00188MR)
along Calapan North Road, Puerto
Galera, Oriental Mindoro 4)
Baco, Puerto
Galera and
Naujan, Oriental
11/8/2018 1st/FinalMindoro
Oriental DEOLF 47.41 180 15/03/2018 9/10/2018 10.00% C 0.499 0.133 0.300 - - - 93.20%
93.20%
Very SatisfactoryAHD
52 46
AQUINO-DELA CRUZ
ENGINEERING &
CONSTRUCTION
16751 L B MA GE
Retrofitting/Strengthening of Permanent
Bridges: San Francisco Bridge (B03295LZ)
along Concepcion - Capas Road
Concepcion,
Tarlac11/13/2018 1st/Final Tarlac 2nd DEO LF 73.34 240 21/02/2018 10/18/2018 71.07% C 0.500 0.170 0.300 - - - 97.00%
97.00%
OutstandingAHD
53 47
AQUINO-DELA CRUZ
ENGINEERING &
CONSTRUCTION /
ALPHATEC CHEMICAL
CORPORATION JOINT
VENTURE
JV-17-665 L A MB GE
Bridge - Retrofitting/Strengthening of
Permanent Bridges, Siffu Bridge
(B01157LZ) along Santiago - Tuguegarao
Road
Roxas, Isabela 11/7/2018 1st/FinalIsabela 2nd
DEOLF 28.86086855 159 14/02/2018 7/22/2018 18.50% C 0.500 0.134 0.300 - - - 93.40%
93.40%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 6 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
54 48
AQUINO-DELA CRUZ
ENGINEERING &
CONSTRUCTION/
ALPHATEC CHEMICAL
CORPORATION JOINT
VENTURE
JV-17-391 L A MB GE
Rehabilitation/Major Repair of
Permanent Bridges, Patapat Viaduct
Bridge (B00547LZ) along MNR
MNR, Pagudpud,
Ilocos Norte11/6/2018 2nd/Final
Ilocos Norte
1st DEOLF 4.48 240 12/02/2018 10/9/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.12%
Very SatisfactoryONS
55 49
AR LUSTRE
CONSTRUCTION
CORPORATION
7680 L AAA LA GE
Rehabilitation of Paved Road - Capitol -
Canigaran - Road, K0001+(-1006) -
K0002+000, K0002+000 -K002+037
Puerto Princesa
City, Palawan11/7/2018 1st
Palawan 3rd
DEO LF 58.57 330 21/02/2018 1/16/2019 2.93% OG 0.367 0.300 0.150 0.020 0.055 0.050 94.20% - AHD
56 50ARCINUE COMM'L
CORPORATION6746 L A MA GE
Construction of Concrete
Revetment/Dike along Digos River, Brgy.
Aplaya
Digos City, Davao
del Sur11/14/2018 1st/Final
Davao del Sur
1st DEOLF 47.58 244 3/5/2018 11/3/2018 0.00% C 0.477 0.133 0.300 - - - 91.00%
91.00%
Very SatisfactoryONS
57 51ARKY CONSTRUCTION
AND SUPPLY32692 L AAA LA GE
Rehabilitation/Reconstruction/Upgradin
g of Damaged Paved Roads with
Drainage - San Fernando North Road
San Fernando,
San Jacinto and
Monreal,
Masbate
11/13/2018 1stMasbate 3rd
DEOLF 46.03 240 19/03/2018 11/13/2018 -6.71% OG 0.353 0.289 0.083 0.022 0.028 0.033 80.80% - DEL
58 52 ARN BUILDERS, INC. 18930 L AAA LB GE
Retrofitting/Strengthening of Bridge-
Kabacan Bridge 1 (B00265MN) along
Paco-Roxas-Arakan Valley-Jct Davao-
Bukidnon Rd.
Pres. Roxas,
Cotabato11/12/2018 1st/Final
Cotabato 1st
DEOLF 36.64 173 3/1/2018 8/20/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
59 53ARN BUILDERS, INC. / JO
BUILDERS JOINT VENTUREJV-17-720 L AAA LB GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems: Construction of River Control
along Bonawon River
Brgy. Bonawon,
Siaton, Negros
Oriental
11/10/2018 1st
Negros
Oriental 3rd
DEOLF 34.30 290 2/11/2018 11/27/2018 -0.51% OG 0.363 0.239 0.145 0.030 0.045 0.033 85.50% - DEL
60 54 ARQ BUILDERS 35966 L AA MA GE
Construction of Concrete Dike along
Poblacion-Magtuyon-Talacogon (Phase
II)
Poblacion, San
Luis, Agusan del
Sur
11/13/2018 1st/FinalAgusan del Sur
1st DEOLF 21.18 195 3/19/2018 9/29/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%
91.30%
Very SatisfactoryONS
61 55ARS CONSTRUCTION AND
SUPPLY40764 L C SB GE Road Concreting of Brgy. RH X Cotabato City 11/9/2018 1st/Final
Cotabato City
DEOLF 3.43 62 6/6/2018 8/6/2018 0.00% C 0.484 0.133 0.300 - - - 91.70%
91.70%
Very SatisfactoryONS
62 56AS MACHA CONSTUCTION
AND TRADING36878 L B SB GE
Flood Management Program -
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems - Construction of Flood Control
Project in Pentor - Balsik River, Balsik
Section
Hermosa, Bataan 11/8/2018 1st/FinalBataan 1st
DEOLF 9.04440891 137 19/04/2018 9/10/2018 5.11% C 0.470 0.133 0.300 - - - 90.30%
90.30%
Very SatisfactoryAHD
63 57ASCENTIA
CONSTRUCTION, INC.35984 L A MA GB
Construction of 4 Storey 12 Classroom
School Building at Estaca ES
Compostela,
Cebu11/15/2018 1st Cebu 5th DEO LF 30.94 210 7/19/2018 2/13/2019 -2.03% OG 0.362 0.300 0.130 0.030 0.052 0.033 90.70% - DEL
64 58ATHENA CONSTRUCTION
AND DEVELOPMENT37750 L D SB GE
Rehabilitation/Resctoration of Mataas
Spillway, Barangay MataasBacacay, Albay 11/15/2018 1st/Final Albay 1st DEO LF 7.62 76 02/07/2018 9/15/2018 0.00% C 0.49 0.144 0.300 - - - 93.40%
93.40%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 7 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
65 59ATLAS GEN. CONST. &
ENTERPRISES CORP. 4953 L A MA GE
Construction of Flood Control Structures
including Desilting/Dredging along San
Miguel River, Sta. Rite Section Phase II
San Miguel,
Bulacan11/7/2018 2nd/Final
Bulacan 2nd
DEOLF 77.20 243 14/03/2018 11/11/2018 4.79% C 0.475 0.133 0.300 - - - 90.80%
87.68%
SatisfactoryAHD
66 60
B.C. CUERPO
CONSTRUCTION
CORPORATION
11898 L AAA MA GE
Construction/Extension of Flood Control
Structure along Bagongbong River
(Phase 3) Protecting Bagongbong Bridge
and Biliran Circumferential Road,
Upstream (11.6116, 124.3887,
Downstream (11.6109, 124.3524)
Almeria,
Province of
Biliran
11/6/2018 1st/Final Biliran DEO LF 27.91 150 2/18/2018 7/17/2018 0.00% C 0.463 0.134 0.300 - - - 89.70%89.70%
Very SatisfactoryONS
67 61 B.M. MARKETING 9852 L AAA MB GE
Construction/Extension of Flood Control
Structure along Busali River Protecting
Busali Bridge and Biliran Circumferential
Road, (Phase 2) (11.4915, 124.4482)
Biliran, Province
of Biliran11/7/2018 1st/Final Biliran DEO LF 18.51 140 2/18/2018 7/7/2018 0.00% C 0.464 0.133 0.300 - - - 89.70%
89.70%
Very SatisfactoryONS
68 62B-12 CONSTRUCTION AND
TRADING CORPORATION31997 L A MB GE
Rehabilitation/ Improvement of San Jose
Malino - Anao Road
Mexico,
Pampanga11/12/2018 1st/Final
Pampanga 1st
DEOLF 37.58041872 208 02/04/2018 10/26/2018 13.46% C 0.475 0.133 0.300 - - - 90.80%
90.80%
Very SatisfactoryAHD
69B-12 CONSTRUCTION AND
TRADING CORPORATION31997 L A MA GB
Construction of Four (4) Storey Twelve
(12) Classrooms at Sto. Domingo
Integrated School
Angeles City 11/13/2018 1st/FinalPampanga 3rd
DEOLF 30.71390244 210 1/15/2018 8/12/2018 0.00% C 0.500 0.135 0.300 - - - 93.50%
93.50%
Very SatisfactoryONS
70 63
B2K
LUMBER,CONSTRUCTION
SUPPLIES AND SERVICES
33069 L B MA GE
Construction /Improvement of Access
Roads Leading to Airports, Seaports and
Declared Tourism Destination-Daet-Labo-
Tulay na Lupa Road; Labo-Tulay Na Lupa
Including Calabasa-Talobatib
Road,Barangay Matanlang-Napaod-
Tulay na Lupa
Labo, Camarines
Norte11/6/2018 1st/Final
Camarines
Norte DEOLF 36.11 229 12/19/2017 4/6/2018 0.00% C 0.481 0.177 0.300 - - - 95.80%
95.80%
Very SatisfactoryONS
71 64
BADOC BUILDERS &
SUPPLY, INC. (FORMERLY:
BADOC BUILDER &
SUPPLY
31564 L A MB GE
Construction/Improvement of Access
Roads Leading to Declared Tourism
Destination, Virbira-Barbaquezo Road
Network Leading to Sabo Dam
Brgy.
Barnaquero,
Carasi, Ilocos
Norte
11/6/2018 1stIlocos Norte
1st DEOLF 29.27 223 06/06/2018 1/14/2019 -4.98 OG 0.393 0.240 0.100 0.030 0.061 0.033 85.70% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 8 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
72 65
BADSBRO CONSTRUCTION
AND GENERAL
MERCHANDISE
32876 L A MB GE
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse and Landslide
along Imelda-Bayog-Kumalarang-
Lapuyan-Margosatubig Road-K1751+211
to K1751+224 (LS), K1751+460 to
K1751+490 (LS), K1752+544 to
K1752+728 (BS), K1752+973 to
K1753+338 (LS), K1753+835 to
K1754+173 (LS), K1754+306 to
K1754+440 (BS), K1754+750 to
K1754+780 (RS), K1754+962 to
K1755+019 (LS), K1754+928 to
K1755+000 (RS), K1755+050 to
K1755+182, (RS)
Zamboanga
Sibugay11/13/2018 2nd
Zamboanga
Sibugay 1st
DEOLF 36.1 255 08/05/2018 1/17/2019 15.01% OG 0.376 0.243 0.150 0.030 0.070 0.033 90.20% - AHD
73
BADSBRO CONSTRUCTION
AND GENERAL
MERCHANDISE
32876 L A MB GE
Road Widening (2-4 Lanes including
Drainage along Liloy-Ipil Road,
K1978+860 to K1979+023, K1979+058 to
K1981+336
Tampilisan,
Zamboanga del
Norte
11/6/2018 1stZamboanga del
Norte 1st DEOLF 67.98 285 2/19/2018 11/30/2018 1.88% OG 0.333 0.293 0.150 0.030 0.047 0.033 88.60% - AHD
74 66
BAICAMAR
CONSTRUCTION AND
SUPPLIES, INC.
19248 L D SB GE
Rehabilitation/Reconstruction/Restorati
on of Crossing Luna Flood Control (Phase
II) along Bayugan-Esperanza Road
Esperanza,
Agusan del Sur11/13/2018 2nd/Final
Agusan del Sur
1st DEOLF 9.31 150 4/23/2018 9/19/2018 0.00% C 0.496 0.134 0.300 - - - 93.00%
86.46%
SatisfactoryONS
75 67 BALLIGI CONSTRUCTION 38005 L B SB GE
Concreting of Barangay Emilia-San
Antonio Farm to Market Road, Sta.
0+000 -Sta. 0+580
Pudtol, Luna,
Apayao11/16/2018 1st
Apayao 2nd
DEOLF 4.83 210 15/06/2018 1/10/2019 0.14% OG 0.382 0.254 0.150 0.030 0.065 0.050 93.10% - AHD
76 68BCT TRADING AND
CONSTRUCTION15199 L AAA LB GE
Road Widening of Puerto Princesa South
Road, K0023+650 - K0025+024;
K0040+000 -K0044+846; K0051+200 -
K0053+096
Puerto Princesa
City, Palawan11/6/2018 1st
Regional Office
No. IV-BLF 192.99 381 10/04/2018 4/25/2019 9.92% OG 0.379 0.287 0.150 0.030 0.042 0.050 93.80% - AHD
77 69BELANCE BUILDERS &
TRADING31611 L C SB GB
Construction of Multi purpose Building
(Covered Court)
Brgy.
Macabenga,
Dupax del Norte,
Nueva Vizcaya
11/6/2018 2nd/FinalNueva Vizcaya
2nd DEOLF 1.97 90 1/31/2018 4/30/2018 0.00% C 0.500 0.197 0.162 - - - 85.90%
71.41%
PoorONS
78 70
BESTECH CONSTRUCTION
& DEVELOPMENT
CORPORATION
17725 L A SB GBConstruction of Multi-Purpose Building,
Barangays Flordeliz and San Antonio
Milaor,
Camarines Sur11/8/2018 1st/Final
Camarines Sur
1st DEOLF 4.70 100 01/03/2018 6/8/2018 0.00% C 0.441 0.133 0.300 - - - 87.40%
87.40%
SatisfactoryONS
79 71BET CONSTRUCTION &
SUPPLY31764 L A MA GE
Flood Management Program,
Construction/Maintenance of Flood
Mitigation Structures and Drainage
System, Rehabilitation of Flood Control
Mitigation Facilities/Drainage System
along Crystal Cave to Asin
Baguio City 11/12/2018 1stBaguio City
DEOLF 43.18 290 15/02/2018 9/2/2018 0.00% OG 0.316 0.300 0.113 0.030 0.045 0.033 83.70% - ONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 9 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
80 72
BETTER WORK
CONSTRUCTION/ILBI
CONSTRUCTION SUPPLY &
SERVICES (JOINT
VENTURE)
JV-17-2168 L B MA GE
Construction/Upgrading/ Rehabilitation
of Drainage along Cotabato - Marbel
Road, K1720+644 - K1721+553,
K1727+080 - K1727+993
South Cotabato 11/6/2018 2nd/Final
South
Cotabato 1st
DEO
LF 28.66 160 4/17/2018 9/23/2018 0.64% C 0.494 0.133 0.300 - - - 92.70%90.96%
Very SatisfactoryAHD
81 73
BICOL GOLDROCK
CONSTRUCTION
CORPORATION
32376 L B MA GE
Off Carriageaway Improvement-
Secondary Roads-Danao-Pasacao Road,
K0420+800-K0421+180
Pamplona
Camarines Sur11/8/2018 1st/Final
Camarines Sur
1st DEOLF 9.01 80 08/02/2018 4/28/2018 0.02% C 0.451 0.201 0.300 - - - 95.20%
95.20%
Very SatisfactoryAHD
82 74
BISLIG VENTURE
CONSTRUCTION & DEV'T.
INC.
36370 L AAA MB GEWidening of Bridge at Piedad Bridge
(BO1226MN) along Bayabas-Eden Road
Torril District,
Davao City11/12/2018 1st
Davao City 2nd
DEOLF 45.49 341 5/2/2018 4/7/2019 -6.88% OG 0.393 0.257 0.081 0.030 0.061 0.033 85.50% - DEL
83 75BLACKRAM BUILDERS,
INC.33899 L D SB GE
Repair/ Improvement of Palsong -La
Purisima (Pakili) Road
Bula Camarines
Sur11/12/2018 1st/Final
Camarines Sur
4th DEOLF 13.20 69 04/05/2018 7/11/2018 0.00% C 0.464 0.133 0.300 - - - 89.70%
89.70%
Very SatisfactoryONS
84 76BLESSING BUILDERS AND
CONSTRUCTION SUPPLY36064 L B SB GE
Improvement / Concreting of Maubba-
Caglayan Farm to Market Road
Barangay
Calanan, Conner,
Apayao
11/15/2018 1stApayao 1st
DEOLF 4.92 189 12/06/2018 12/17/2018 0.47% OG 0.400 0.260 0.150 0.030 0.061 0.050 95.10% - AHD
85 77
BLUE MOUNTAIN
BUILDERS & GENERAL
MERCHANDISE
34745 L A MA GEConstructio of Flood Control along
Lamuk River, Poblacion Dumalneg
Dumalneg, Ilocos
Norte11/22/2018 1st/Final
Ilocos Norte
1st DEOLF 42.03 240 21/02/2018 10/18/2018 0.00% C 0.450 0.200 0.300 - - - 95.00%
95.00%
Very SatisfactoryONS
86 78BN BUILDERS &
CONSTRUCTION SUPPLIES28232 L B MA GB
Construction of 2 Units 2 Storey 6-CL,
Doña Rosario NHS (Tubay NHS Annex)
Tubay, Agusan
del Norte11/15/2018 1st/Final
Agusan del
Norte DEOLF 14.08 286 11/22/2017 9/3/2018 0.00% C 0.500 0.130 0.300 - - - 93.00%
93.00%
Very SatisfactoryONS
87 79
BNR CONSTRUCTION &
DEVELOPMENT CORP./
EDANNA CONSTRUCTION
(JOINT VENTURE)
JV-16-732 L AAA MB GE
Construction of River Control along Kipit
River, Brgy. Kipit, Upstream-Left Side
(K0+270-K0+785), Downstream -Right
Side (K0+000 -K0+400)
Labason,
Zamboanga del
Norte
10/26/2018 1st/FinalRegional Office
No. IXLF 91.67 357 4/24/2017 4/5/2018 0.00% C 0.487 0.156 0.300 - - - 94.30%
94.30%
Very SatisfactoryONS
88 80Boki Construction Services
and Supply43177 L C SB GE
Concreting of Dulao Farm to Market
Road, Barangay DualaoLagawe, Ifugao 11/7/2018 1st Ifugao 1st DEO LF 4.86 105 22/05/2018 9/3/2018 0.00% C 0.460 0.134 0.300 - - - 89.40% - ONS
89 81
BONIMAR
CONSTRUCTION
ENTERPRISES
23760 L B MA GEConstruction of Bank Protection at Brgy.
Pangapisan
Lingayen,
Pangasinan11/13/2018 1st/Final
Pangasinan
2nd DEOLF 21.58 150 07/03/2018 8/3/2018 1.33% C 0.485 0.133 0.300 - - - 91.80%
91.80%
Very SatisfactoryAHD
90 82BOOMETRIX
DEVELOPMENT CORP.40441 L A MB GE
Construction of Katipunan-Salvacion-
Mabuhay -Maasin Road, Brgy. Katipunan
Pilar, Siargao
Island, Surigao
del Norte
11/30/2018 1st/FinalSurigao del
Norte 2nd DEOLF 99 256 12/04/2018 12/23/2018 18.19% C 0.437 0.190 0.300 - - - 92.70%
92.70%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 10 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
91 83
BRE CONSTRUCTION /
MEGALINE BUILDERS AND
SUPPLY (JOINT VENTURE)
JV-17-2821 L A MA GB
Construction of One (1) Unit - Three (3)
Storey Nine (9) Classroom at Lake Sebu
NHS, Lake Sebu
Lake Sebu, South
Cotabato11/6/2018 1st
South
Cotabato 1st
DEO
LF 24.16 210 6/14/2018 1/9/2019 0.63% OG 0.391 0.239 0.150 0.012 0.032 0.050 87.40% - AHD
92 84
BRG CONSTRUCTION /
C.J.D. BUILDERS AND
CONSTRUCTION SUPPLIES
JV-17-952 L B MA GE
Local Program-Local Infrastructure
Program: Construction of Bintawan
Flood Control
Villaverde,
Nueva Vizcaya11/8/2018 1st/Final
Nueva Vizcaya
1st DEOLF 19.01 158 07/02/2018 7/14/2018 16.31% C 0.478 0.143 0.300 - - - 92.10%
92.10%
Very SatisfactoryAHD
93 85 BSP & COMPANY, INC. 19091 L AAA LB GE
Road Widening-Cotabato-Marbel Road,
K1726+558 (Chainage 14823- Chainage
15786), K1729+123-K1730+808
(Chainage 18361- Chainage 20051),
K1731+075-K1731+380 (Chainage 20201-
Chainage 20506), K1744+279-
K1743+500 (Chainage 30565-Chainage
32810)
Surallah, Banga
and Sto. Nino,
South Cotabato
11/6/2018 1stRegional Office
No. XIILF 130.4 263 6/11/2018 2/28/2019 -2.57% OG 0.392 0.288 0.124 0.022 0.045 0.033 90.40% - DEL
94 86
BSP & COMPANY, INC. /
GIBUILD DEVELOPMENT
CORP.
JV-17-2520 L AAA LB GE
Construction of Drainage Structure along
Marbel-Allah-Cotabato Road, K1771+000-
K1772+089
Isulan, Sultan
Kudarat11/7/2018 1st
Sultan Kudarat
1st DEOLF 49.39 221 5/2/2018 12/8/2018 -4.92% OG 0.400 0.241 0.101 0.022 0.047 0.033 84.40% - DEL
95 87
C. T. LEONCIO
CONSTRUCTION &
TRADING/ QUAD - R
BUILDING SOLUTION
JV-17-661 L AAA LA GE
Retrofitting/ Strengthening of Bridge -
Busilac Br. (B00664LZ) along Luna-
Bangar Road
Bangar, La Union 10/11/2018 2nd/FinalLa Union 1st
DEOLF 66.57 234 22/02/2018 10/13/2018 0.16% C 0.500 0.132 0.300 - - - 93.20%
93.02%
Very SatisfactoryAHD
96 88
C.B. GARAY PHILWIDE
BUILDERS / EINS HANA
CONSTRUCTION
CORPORATION (JOINT
VENTURE)
JV-17-2185 L AAA MB GE Construction of River Control
Brgy. Kabulakan,
Lambayong,
Sultan Kudarat
11/7/2018 1stSultan Kudarat
1st DEOLF 43.63 274 4/3/2018 1/1/2019 -1.53% OG 0.399 0.240 0.135 0.022 0.050 0.033 87.90% - DEL
97 89
C.B. GARAY PHILWIDE
BUILDERS / VANNIE
CONSTRUCTION AND
SUPPLY (JOINT VENTURE)
JV-16-2019 L AAA MB GE
Construction of Suage River Control
System at the Back of Federico Roman
Tirador District Memorial Hospital
Janiuay, Iloilo 11/11/2018 1st/Final Iloilo 2nd DEO LF 44.10 240 19/06/2017 2/13/2018 0.00% C 0.465 0.133 0.300 - - - 89.80%89.80%
Very SatisfactoryONS
98 90
C.B. GARAY PHILWIDE
BUILDERS/ CASTILLANES
CONSTRUCTION AND
SUPPLY (JOINT VENTURE)
JV-17-1280 L AAA MB GEConstruction of River Bank
Protection/Flood Control
Brgy. Daladap,
Esperanza,
Sultan Kudarat
11/8/2018 1st/FinalSultan Kudarat
2nd DEOLF 46.39 280 3/23/2018 1/1/2019 31.20% C 0.466 0.133 0.300 - - - 89.90%
89.90%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 11 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
99 91
C.F. TRINIDAD
CONSTRUCTION AND
SUPPLIES CORP.
9199 L B MA GE
Asset Preservation - Preventive
Maintenance - Tertiary Road - Taytay
Diversion Road, K0022+036 - K0022+056,
K0023+378 - K0023+680
Taytay, Rizal 11/5/2018 1st/Final Rizal 1st DEO LF 45.57 90 21/02/2018 5/21/2018 89.11% C 0.451 0.199 0.300 - - - 95.00%95.00%
Very SatisfactoryAHD
100 92C.J.D BUILDERS AND
CONSTRUCTION SUPPLIES30347 L B MA GE
Local Program-Local Infrastructure
Program: Construction of Barat River
Flood Control
Brgy.
Barat,Bambang.
Nueva Vizcaya
11/8/2018 1st/FinalNueva Vizcaya
1st DEOLF 23.71 194 2/11/2018 8/23/2018 0.00% C 0.445 0.187 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
101 93
C.R. DOMINGO
CONSTRUCTION AND
POWER DEVELOPMENT,
INC.
2992 L A MA GEConstruction of Cagayan River Control
Project (Phase 1), Sta. 0+000 - Sta. 0+130
Patpat,
Angadanan,
Isabela
11/15/2018 1st/FinalIsabela 3rd
DEOLF 28.51390614 211 19/04/2018 11/15/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%
90.40%
Very SatisfactoryONS
102 94
C.R. DOMINGO
CONSTRUCTION AND
POWER DEVELOPMENT,
INC. / SIFFU ROCKS
CONSTRUCTION JOINT
VENTURE
JV-17-2489 L A MA GE Concreting of San Placido - Quiling Roxas, Isabela 11/7/2018 1stIsabela 2nd
DEOLF 47.01468537 216 02/05/2018 12/3/2018 1.59% OG 0.359 0.239 0.150 0.030 0.061 0.050 88.90% - AHD
103 95
C.T. LEONCIO
CONSTRUCTION &
TRADING
17371 L AAA MB GE
Construction of Flood Control Wall along
Marilao River Poblacion I to Poblacion II
(Phase II)
Marilao, Bulacan 11/7/2018 2nd/FinalBulacan 2nd
DEOLF 47.70 200 15/02/2018 9/2/2018 0.00% C 0.433 0.133 0.300 - - - 86.60%
91.40%
Very SatisfactoryONS
104
C.T. LEONCIO
CONSTRUCTION &
TRADING
17371 L AAA MB GEConstruction of Pulot Flood Control
Structure
Sofronio
Espanola,
Palawan
11/9/2018 2ndPalawan 2nd
DEOLF 19.43 203 09/05/2018 11/27/2018 -8.00% OG 0.373 0.300 0.070 0.020 0.037 0.033 83.30% - DEL
105 96
CABILAUAN
CONSTRUCTION AND
SUPPLY
18823 L B MA GE
Preventive Maintenance of Road:
Concrete Reblocking- Cabatuan- New
Lucena- Banga Bante Road, K0034+(-496)
- K0039+197.2 (Intermittent Sections)
Iloilo 11/12/2018 1st/Final Iloilo 4th DEO LF 11.50 150 28/05/2018 10/24/2018 0.00% C 0.474 0.134 0.300 - - - 90.80%90.80%
Very SatisfactoryONS
106 97 CARTESIAN BUILDERS 35386 L B SB GB
Construction of 1 Storey, 1 Unit, Science
Lab. & 1 Unit ICT (7mx18m per Unit),
Alegria National High School (SCH. ID
304607)
Brgy Alegria, Sta.
Monica, Surigao
del Norte
11/7/2018 1st/FinalSurigao del
Norte 2nd DEOLF 8.44 115 7/8/2018 10/30/2018 0.00% C 0.497 0.134 0.300 - - - 93.10%
93.10%
Very SatisfactoryONS
107 98CASAN CONSTRUCTION
AND TRADING 36085 L C SB GE
Repair/Maintenance of Barangay II
Flood ControlJones, Isabela 11/12/2018 1st/Final
Isabela 4th
DEOLF 5.00 109 5/15/2018 8/31/2018 38.85% C 0.452 0.200 0.300 - - - 95.20%
95.20%
Very SatisfactoryAHD
108 99
CAVACON CORPORATION
(FORMERLY CAGAYAN
VALLEY CONST
2622 L AAA LB GE
Asset Preservation Program -
Construction / Upgrading /
Rehabilitation of Drainage along
National Roads - Secondary Roads,
Mindoro West Coastal Rd. - K0335+500 -
K0337+200, K0348+250 - K0349+000,
K0397+000 - K0397+635 (S0095MR)
Sablayan,
Occidental
Mindoro
11/6/2018 1st
Mindoro
Occidental
DEO
LF 47.82 310 07/05/2018 3/12/2019 0.94% OG 0.393 0.251 0.150 0.030 0.033 0.050 90.70% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 12 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
109 100
CAVAT CAPITOL
MERCHANDISING &
CONSTRUCTION
3112 L B MA GE
Construction/Improvement of Access
Roads leading to Declared Tourism
destinations - Masi - Aridowen Road
leading to Bangalao Lake and Caves,
Brgy. Masi
Sta. Teresita,
Cagayan11/10/2018 1st/Final
Cagayan 1st
DEOLF 27.92966729 143 04/03/2018 7/24/2018 0.98% C 0.462 0.200 0.300 - - - 96.20%
96.20%
Very SatisfactoryAHD
110 101
CAVDEAL-CAVITE
INTERNATIONAL
CONSTRUCTION AND
DEVELOPMENT
CORPORATION
5599 L AAA LB GE
Road Widening of Puerto Princesa North
Road (PPNR), RBIA Station: K0014+000 -
K0015+373; K0015+508 -K0020+433,
Survey Station: K0014+000 -K0015+368;
K0015+503 -K0020+420
Puerto Princesa
City, Palawan11/6/2018 1st
Regional Office
No. IV-BLF 234.30 385 10/04/2018 4/29/2019 3.56% OG 0.387 0.284 0.150 0.030 0.047 0.050 94.80% - AHD
111 102 C-BROS CONSTRUCTION 36606 L D SB GBConstruction of Unique Workshop
Building Cabarroguis NSAT Building 1
Cabbarroquis,
Quirino11/9/2018 1st/Final Quirino DEO LF 4.87 80 13/06/2018 8/31/2018 0.00% C 0.468 0.165 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
112 103CCMALUENDA
CONSTRUCTION INC.11043 L A MB GE
Construction/Improvement of Access
Roads Leading to Trades, Industries and
Economic Zones - Ubujan-Manga Coastal
Road in Support of the Agribusiness
Industry
Tagbilaran City,
Bohol11/6/2018 1st/Final Bohol 1st DEO LF 19.40 163 5/8/2018 10/17/2018 0.00% C 0.470 0.133 0.300 - - - 90.30%
90.30%
Very SatisfactoryONS
113 104 CEAN CONSTRUCTION 41086 L B SB GE
Construction/Maintenance of Flood
Mitigation Structure and Drainage
Systems/ Construction of San Roque
River Flood Control along Bdry. So. Leyte-
Maasin-Macrohon-Sogod-Daang
Maharlika (S00194LT)
San Roque,
Macrohon,
Southern Leyte
11/14/2018 1st/FinalSouthern Leyte
DEOLF 11.76 110 3/13/2018 6/30/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%
91.30%
Very SatisfactoryONS
114 105 CHARLZ CONSTRUCTION 8709 L AA A GE
Construction of Flood Mitigation
Structure at Butuanon River, Brgy. Sirao -
Pulangbato
Cebu City 11/17/2018 1st Cebu City DEO LF 36.65 256 23/04/2028 1/3/2019 8.36% OG 0.358 0.300 0.150 0.030 0.045 0.050 93.33% - AHD
115 106
CHIARA CONSTRUCTION /
DJCM CONSTRUCTION
CORPORATION JOINT
VENTURE
JV-17-1854 L AA MB GE
Road Widening-Primary Roads-Manila
North Road, K0534+000-K0535+084,
K0535+771-K0536+078, K0539+062-
K0539+342, K0544+927-K0545+734,
K0545+884-K0546+049, K0558+369-
K0561+000, K0561+174-K0562+133 and
Imprvt. Of Intersections K0486+000-
K0486+680
Pagudpud, Ilocos
Norte11/7/2018 2nd/Final
Regional Office
No. ILF 143.01 270 22/02/2018 11/18/2018 10.33% C 0.491 0.134 0.300 - - - 92.50%
92.68%
Very SatisfactoryAHD
116 107
CHIARA CONSTRUCTION/
FIRST NORTHWAY
DEVELOPMENT AND
CONSTRUCTION
CORPORATION JOINT
VENTURE
JV-17-2139 L AAA LA GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems: Construction of Salvador-
Bucong-Darapidap Flood Control
(Upstream Section)
Candon City,
Ilocos Sur11/8/2018 1st
Ilocos Sur 2nd
DEOLF 48.99 275 02/04/2018 1/1/2019 2.64% OG 0.360 0.240 0.150 0.024 0.056 0.033 86.30% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 13 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
117 108CITRON BUILDERS AND
SUPPLIES36651 L D SB GB
Construction of Two (2) Storey Six (6)
Classroom at Baseco Elementary School
Mariveles
Bataan 11/9/2018 1st
Bataan 2nd
DEOLF 11.53613547 140 7/15/2018 12/1/2018 0.33% OG 0.388 0.220 0.150 0.030 0.052 0.050 89.00% - AHD
118 109 CLY - ABC BUILDERS 39231 L B SB GE
Construction of Concrete Road- Access
Road Leading to Sitio Cabanbanan, Capiz
Leading to Mt. Panginhiraon Peak
Barangay
Dolores,
Dumalag, Capiz
11/9/2018 2nd Capiz 2nd DEO LF 14.48 153 24/04/2018 9/23/2018 -7.78% OG 0.376 0.287 0.072 0.030 0.061 0.033 85.90% - DEL
119 110
CM TAN CONSTRUCTION
(Formerly; CM Tan
Construction Supplies)
28087 L B MA GE
Construction of Dike Revetment along
Tago River Basin (Gamut Section)
Protecting Gamut Bridge
Tago, Surigao del
Sur11/9/2018 1st
Surigao del Sur
1st DEOLF 32.51 253 3/28/2018 12/5/2018 1.40% OG 0.386 0.239 0.150 0.030 0.055 0.050 91.00% - AHD
120 111 COLLERA CONSTRUCTION 13246 L A MA GEConstruction of Old Sumangga Road,
Brgy. Sumangga
Ormoc City,
Leyte11/9/2018 1st/Final Leyte 4th DEO LF 13.86 90 2/22/2018 5/22/2018 0.00% C 0.436 0.133 0.300 - - - 86.90%
86.90%
SatisfactoryONS
121 112CTC BUILDER AND
SUPPLIES INCORPORATED 12088 L A MB GE
Local Road - Const. Of Girawan - Sugian -
Bandi - Juan Adre Road Including
Drainage
Donsol,
Sorsogon11/7/2018 1st
Sorsogon 1st
DEOLF 31.52 167 23/07/2018 1/5/2019 15.97% OG 0.357 0.299 0.150 0.020 0.025 0.033 88.40% - AHD
122 113
CTC BUILDER AND
SUPPLIES INCORPORATED
/ C.T LEONCIO
CONSTRUCTION &
TRADING (JOINT
VENTURE)
JV-16-2154 L A MB GE
Asset Preservation of National Roads
Rehab./Reconst./Upgrading of Damaged
Paved National Road Including Drainage
Based on Pavement Management
System / Highway Development and
Maintenance - 4 (HDM-4) Primary roads
Daang Maharlika (LZ) - K061+127.70 -
K0644+136 with exceptions
Sorsogon 2nd LD 10/19/2018 1st/FinalRegional Office
No. VLF 144.75 283 8/15/2017 5/24/2018 0.00% C 0.448 0.200 0.300 - - - 94.80%
94.80%
Very SatisfactoryONS
123CTC BUILDERS AND
SUPPLIES INCORPORATED12088 L A MB GE
Rehabilitation/ Reconstruction of
National Roads with Slips, Slope Collpase
and Landslide, tertiary Road, Baras -
Gigmot -Viga Road, K0031+700 -
K0032+052, K0081+440- K0081+590
Province of
Catanduanes11/14/2018 1st/Final
Catanduanes
DEOLF 18.92 131 02/05/2018 9/9/2018 3.00% C 0.480 0.168 0.300 - - - 94.80%
94.80%
Very SatisfactoryAHD
124 114C'ZARLES CONSTRUCTION
& SUPPLY23426 L A MB GE
Road upgrading (Unpaved to Paved)
Based on Gravel Road Strategies, Traffic
Benchmark fr Upgrading to Paved Road
Standards (HDM-4 Project
Analysis)(Intermitent Sections) Jct.
Maradugao- Camp Kibatiran- Dominorg
Road, K1626+(-579) - K 1628+595
Bukidnon 4th LD 11/11/2018 1st/FinalRegional Office
No. XLF 85.56 648 26/02/2016 12/4/2017 0.00% C 0.475 0.133 0.300 - - - 90.80%
90.80%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 14 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
125C'ZARLES CONSTRUCTION
& SUPPLY23426 L A MB GE
Road Upgrading (Unpaved to Paved)
based on Gravel Road Strategies, Traffic
Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project
Analysis)(Intermittent Sections),
Barandias-Dominorog Road, K1603+465 -
K1605+1027
Bukidnon 4th LD 11/11/2018 1st/FinalRegional Office
No. XLF 91.31 653 26/02/2016 12/9/2017 0.00% C 0.470 0.133 0.300 - - - 90.30%
90.30%
Very SatisfactoryONS
126C'ZARLES CONSTRUCTION
& SUPPLY23426 L A MA GE
Rehabilitation/Reconstruction of
Damaged Paved Roads along Butuan City
-Malaybalay Road – K1240+(-995) –
K1240+(-535)
Butuan City 11/15/2018 2nd/FinalButuan City
DEOLF 23.12 171 4/3/2018 9/20/2018 0.00% C 0.484 0.134 0.300 - - - 91.80%
89.16%
Very SatisfactoryONS
127 115
D.C.E. CONSTRUCTION /
ISNAG BUILDERS & DEV'T.
CORPORATION JOINT
VENTURE
JV-17-1011 L A MB GE
Construction/Improvement of Access
Road Leading to Declared Tourism
Destination San Isidro Sur-Poblacion-
Lappa-Marag-Cadaclan-Salagunting
Luna, Apayao 11/16/2018 2ndApayao 2nd
DEOLF 93.08 357 19/02/2018 2/10/2019 0.55% OG 0.362 0.268 0.150 0.030 0.061 0.050 92.10% - AHD
128 116
D.L CERVANTES
CONSTRUCTION
CORPORATION /
RODEKOM GENERAL
CONSTRUCTION AND
ENTERPRISE JOINT
VENTURE
JV-17-757 L AAA LB GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System Asset
Preservation Program-
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse and Landslides
(Secondary Roads) Gurel-Bokod-
Kabayan-Abatan Road
Bokot Benguet 11/11/2018 2nd/FinalCAR Regional
OfficeLF 122.97 300 25/03/2018 1/18/2019 0.00% C 0.480 0.140 0.300 - - - 92.00%
88.76%
SatisfactoryONS
129 117
D.L. CERVANTES
CONSTRUCTION
CORPORATION / JUSTBILT
BUILDERS (JOINT
VENTURE)
JV-16-338 L AAA LA GE
MFO-2 Flood Management Service Flood
Control and River Improvement Projects
along Laguna Lake based on Metro
Manila Master Plan- Construction of
Slope Protection for Sta. Maria- Mabitac
River
Laguna 4th LD,
Laguna Province10/26/2018 1st/Final
Regional Office
No. IV-ALF 133.72 345 1/27/2017 1/6/2018 0.00% C 0.450 0.200 0.300 - - - 95.00%
95.00%
Very SatisfactoryONS
130 118
D.L. CERVANTES
CONSTRUCTION
CORPORATION / PROTECH
CONSTRUCTION &
DEVELOPMENT CORP.
(JOINT VENTURE)
JV-17-750 L AAA LA GE
Organizational Outcome 2: Protect Lives
and Properties against Major Floods-
Flood Mitigation Structures and
Drainage Systems- Construction of Slope
Protection Works along Carmona River,
Binan side
Binan City,
Laguna11/21/2018 1st
Regional Office
No. IV-ALF 142.42 330 19/02/2018 1/14/2019 3.34% OG 0.366 0.300 0.150 0.030 0.051 0.050 94.70% - AHD
131 119D.M. CATIGNAS
ENTERPRISES20149 L B SB GB
Construction of Multi-Purposed Cover
Court, Barangay Magdapio
Pangasinan,
Laguna11/7/2018 1st/Final
Laguna 1st
DEOLF 4.79 180 21/02/2018 8/19/2018 0.00% C 0.496 0.158 0.300 - - - 95.40%
95.40%
Very SatisfactoryONS
132 120DANYSONS
CONSTRUCTION25452 L A MA GE
Asset Preservation:
Rehabilitation/Reconstruction/Upgradin
g of Damaged Paved Roads - Tertiary
Road along Gamu - Roxas Road
(S00781LZ) K0401+000 - K0401+400,
K0403+700 - K0404+000, K0404+569 -
K0405+581, K0394+856 - K0395+130,
K0406+702 - K047+000, K047+000 -
K047+420
Burgos and
Gamu, Isabela11/7/2018 1st/Final
Isabela 2nd
DEOLF 46.54742078 208 14/02/2018 9/9/2018 0.05% C 0.441 0.134 0.300 - - - 87.50%
87.50%
SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 15 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
133DANYSONS
CONSTRUCTION25452 L A MA GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
System - Construction of Siffu River
Flood Control Project (Quiling Section)
Roxas, Isabela 11/7/2018 2nd/FinalIsabela 2nd
DEOLF 27.9197494 153 14/02/2018 7/16/2018 0.04% C 0.457 0.198 0.300 - - - 95.50%
86.56%
SatisfactoryAHD
134 121DATREBIL CONSTRUCTION
& SUPPLY36908 L A MA GE
Construction of Flood Control Structures
along Agusan River
Labnig,
Talacogon,
Agusan del Sur
11/13/2018 1st/FinalAgusan del Sur
1st DEOLF 27.63 210 3/19/2018 10/14/2018 11.86% C 0.486 0.133 0.300 - - - 91.90%
91.90%
Very SatisfactoryAHD
135 122DAVAO CONCRETE
PRODUCTS12090 L A MA GE
Construction / Rehabilitation /
Reconstruction of National Roads with
Slip, Slope Collapse and Landslide along
Kibawe-Kadingilan-Kalilangan Road,
K1590+500 to K1590+600
Kadingilan,
Bukidnon11/12/2018 2nd/Final
Bukidnon 2nd
DEOLF 16.56 124 08/04/2018 8/9/2018 0.00% C 0.490 0.133 0.300 - - - 92.30%
92.30%
Very SatisfactoryONS
136 123DAVAO ROCK MIXER
ENTERPRISES22465 L AA MA GE
Rechanelling and Construction of
Revetment along Batutu River, Barangay
Fatima to Camanlangan
New Bataan,
Compostela
Valley Province
11/9/2018 2ndCompostela
Valley DEOLF 48.51 216 4/1/2018 11/14/2019 1.03% OG 0.398 0.240 0.150 0.030 0.061 0.050 92.90% - AHD
137 124 DDS BUILDERS 37010 L B SB GB
Construction/Completion of Multi-
purpose Building at San Jose Central
Elementary School
Brgy. Poblacion,
San Jose,
Dinagat Islands
11/6/2018 1st/FinalDinagat Islands
DEOLF 2.94 120 5/11/2018 9/7/2018 0.31% C 0.483 0.133 0.300 - - - 91.60%
91.60%
Very SatisfactoryAHD
138 125 DEKM CONSTRUCTION 32409 L B SB GEConstruction/Improvement of Access
Road Leading to Valugan Boulder BeachBasco, Batanes 11/14/2018 1st/Final Batanes DEO LF 11.17 175 22/05/2018 11/12/2018 0.00% C 0.405 0.144 0.300 - - - 84.90%
84.90%
SatisfactoryONS
139 126
DEKM CONSTRUCTION /
E.C.T CONSTRUCTION
(JOINT VENTURE)
JV-17-3046 L B MA GBConstruction of Batanes District
Engineering Office
Brgy.
Kayvaluganan,
Basco, Batanes
12/7/2018 1st Batanes DEO LF 45.03 410 27/07/2018 9/9/2019 21.89% OG 0.400 0.240 0.150 0.022 0.029 0.050 89.10% - AHD
140 127 DIAMOND J BUILDERS 38868 L C SB GE Construction of Hanging Foot Bridge
Dibibi,
Cabarroquis,
Quirino
11/9/2018 1st/Final Quirino DEO LF 2.21 100 03/05/2018 8/10/2018 2.45% C 0.465 0.133 0.300 - - - 89.80%89.80%
Very SatisfactoryAHD
141 128 DICON BUILDERS CORP. 33181 L B MA GE
Widening of Permanent Bridge, San
Antonio Bridge (B01111) along Butuan
City - Cagayan de Oro City (Phase II)
Jasaan, Misamis
Oriental11/9/2018 1st/Final
Misamis
Oriental 2nd
DEO
LF 27.28 170 12/02/2018 7/31/2018 0.00% C 0.466 0.155 0.300 - - - 92.10%92.10%
Very SatisfactoryONS
142 129DINAH JANE
CONSTRUCTION SUPPLY33925 L A MA GB
Construction of 4-Storey 16-CL School
Building at Colawin NHSArgao, Cebu 11/12/2018 1st Cebu 4th DEO LF 36.72 210 6/12/2018 1/7/2019 15.68% OG 0.399 0.240 0.150 0.030 0.041 0.033 89.30% - AHD
143 130DJCM CONSTRUCTION
CORPORATION 27678 L AA MA GE
Repair/Maintenance of Eroded
Protection along Bongo River, Brgy.
Poblacion
Dingras, Ilocos
Norte11/7/2018 1st
Ilocos Norte
2nd DEOLF 38.60 266 16/07/2018 4/7/2019 30.46% OG 0.400 0.240 0.150 0.030 0.051 0.033 90.40% - AHD
144 131
DMDANAN
CONSTRUCTION AND
TRADING
41374 L C SB GE
Rehabilitation/Major Repair of
Permanent Bridge, Sta. Cruz Bridge 1
(B01505LZ) along Jose Abad Santos Ave.
(JASA)
Lubao,
Pampanga11/15/2018 1st/Final
Pampanga 2nd
DEOLF 13.71840138 90 27/03/2018 6/24/2018 0.00% C 0.496 0.133 0.300 - - - 92.90%
92.90%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 16 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
145 132 DMLC BUILDERS 36650 L A MA GEConstruction of River Control along
Bulihan River, Barangay Bulihan Famy, Laguna 11/8/2018 1st/Final
Laguna 1st
DEOLF 42.18 211 28/02/2018 9/26/2018 0.00% C 0.457 0.200 0.300 - - - 95.70%
95.70%
Very SatisfactoryONS
146 133DSB CONSTRUCTION AND
SUPPLY, INC.16126 L AA MB GE
Rehabilitation/Improvement of Malolos
River Control Protecting Imperial Bridge
along DM - Junction Legazpi - Sto.
Domingo - Tabaco - Camarines Sur
Boundary Road
Malolos,
Malinao, Albay11/15/2018 1st Albay 1st DEO LF 39.32 177 07/06/2018 11/30/2018 12.62% OG 0.357 0.300 0.150 0.020 0.040 0.033 90.00% - AHD
147 134DUROS DEVELOPMENT
CORP.22729 L AAA LA GE
MFO 1-National Road Network Services,
Asset Preservation of National Roads-
Rehabilitation/ Reconstruction of
National Roads with Slips/Slope
Collapse, and Landslide Cebu-Balamban
Transcentral Highway
Section 1:
K0036+790-
K0036+880;
Section 2:
K0031+910-
K0031+985.00
11/14/2018 1st/FinalRegional Office
No. VIILF 162.12 420 28/03/2017 5/21/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
148 135 E.M. CUERPO, INC. 30963 L AAA LB GE
Rehabilitation of Dike System along
Madongan River, (Breached and Eroded
Dike) Right Bank, Brgy. Baresbes
Dingras, Ilocos
Norte11/7/2018 2nd/Final
Ilocos Norte
2nd DEOLF 47.65 255 28/12/2018 9/8/2019 9.41% C 0.481 0.134 0.300 - - - 91.50%
90.18%
Very SatisfactoryAHD
149 136E.M. CUERPO, INC./ EGB
CONSTRUCTIONJV-15-1765 L AAA LB GE
MF 2: Flood Management Services:
Construction/Maintenance of Flood
Mitigation Structures and Drainage
System - Cagayan River Flood
Management Projects
Baculud, Ilagan,
Isabela11/9/2018 1st/Final
Regional Office
No. IILF 184.1710349 681 14/07/2016 5/25/2018 0.79% C 0.492 0.133 0.300 - - - 92.50%
92.50%
Very SatisfactoryAHD
150 137
E.M. CUERPO,
INC./KATHA BUILDERS &
SUPPLIES (Joint Venture)
JV-17-2369 L A MB GE
Rehabilitation/Reconstruction of
National Roads with Slips, Slope
Collapse, and Landslide-Primary Roads
Manila North Road K0578+015-
K0578+092
Pagudpud, Ilocos
Norte11/6/2018 1st/Final
Ilocos Norte
1st DEOLF 96.50 105 27/06/2018 10/9/2018 73.69% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryAHD
151 138E.M.L. CONSTRUCTION &
TRADING10151 L B MA GE
Network Development Program - Road
Widening of Angeles - Porac -
Floridablanca - Dinalupihan Road,
K0108+1260 - K0110+300; K0110+380 -
K0111+937.38; K0108+1260 -
K0110+300; K0110+434 - K0111+937.38
Floridablanca,
Pampanga 11/15/2018 1st
Pampanga 2nd
DEOLF 92.38944792 300 26/06/2018 4/21/2019 1.08% OG 0.386 0.234 0.150 0.030 0.056 0.050 90.60% - AHD
152E.M.L. CONSTRUCTION &
TRADING10151 L B MA GE
Road Widening - Tertiary Roads -
Amungan - Palauig - Banlog, Including
ROW - K0212+280 - K0213+680,
K0213+888 - K0214+100
Iba, Zambales 11/6/2018 1stZambales 1st
DEOLF 52.49013853 210 20/07/2018 2/14/2019 0.36% OG 0.363 0.240 0.150 0.030 0.056 0.033 87.20% - AHD
153 139E.R. DELA CRUZ
CONSTRUCTION & SUPPLY 32158 L B MA GE
Construction of Poctoy Flood Control
Structure along Tablas Circumferential
Road
Odiongan,
Romblon 11/15/2018 1st/Final Romblon DEO LF 40.53 292 09/02/2018 11/27/2018 10.38% C 0.428 0.200 0.300 - - - 92.80%
92.80%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 17 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
154 140E.S BIHAG
CONSTRUCTION & SUPPLY35698 L B MA GE
Concreting of Farm to Market Roads,
Barangays Bagong Sirang, Anib and
Cotmo and La Purisima
Sipocot and Lupi,
Camarines Sur11/7/2018 1st/Final
Camarines Sur
5th DEOLF 20.24 150 18/05/2018 10/14/2018 1.33% C 0.485 0.200 0.300 - - - 98.50%
98.50%
OutstandingAHD
155 141E.T LATAWAN
CONSTRUCTION13919 L B MA GE
Convergence and Special Support
Program, Construction/Improvement of
Access Roads leading to Trades,
Industries and Economic
Zones,Poblacion-Sagada-Aguid Road in
support to Coffee Weaving,Food
Processing and Tourism Industries
Sagada,Mountai
n Province11/9/2018 1st/Final
Mt. Province
DEOLF 23.76 209 23/04/2018 10/18/2018 3.83% C 0.361 0.200 0.300 - - - 86.10%
86.10%
SatisfactoryAHD
156E.T LATAWAN
CONSTRUCTION13919 L B MA GE
Asset Preservation
Program,Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads,
Secondary Roads, Baguio-Bontoc
Road(Interminnent Sections
Mountain
Province11/8/2018 1st/Final
Mt. Province
DEOLF 21.51 237 20/02/2018 8/17/2018 0.00% C 0.341 0.200 0.300 - - - 84.10%
84.10%
SatisfactoryONS
157 142EC STRUCTURAL
COMPOSITES, INC.31961 L A MA GE
Rehabilitation/Major Repair of Bridge-
Talaugis Br. (B00475PN) Along Iloilo City-
Leganes-Dumangas Coastal Road
Iloilo 11/12/2018 1st/Final Iloilo 4th DEO LF 30.88 190 27/02/2018 9/4/2018 0.19% C 0.493 0.133 0.300 - - - 92.60%92.60%
Very SatisfactoryAHD
158 143EC STRUCTURAL
COMPOSITES, INC.31961 L B MA GE
Retrofitting of Siwaragan Bridge
(B00140PN) along Iloilo-Antique Road
(K0055+725)
San Joaquin,
Iloilo11/17/2018 2nd/Final Iloilo 1st DEO LF 12.83 238 19/02/2018 10/14/2018 2.40% C 0.500 0.133 0.300 - - - 93.30%
93.00%
Very SatisfactoryAHD
159 144
EDDIE G. GUILLEN
BUILDERS / TJMT
CONSTRUCTION
JV-17-1761 L A MA GE
001: Ensure Safe and Reliable National
Road System - Network Development
Program - Road Widening - Secondary
Roads, Cagayan Valley Road (Magapit -
Jct. Aparri Airport Section) - K0567+000 -
K0570+255.80, K0570+255.80 -
K0570+295.80, K0570+295.80 - K0571+0
Camalanuigan,
Cagayan11/9/2018 1st
Cagayan 1st
DEOLF 55.893186 251 03/05/2018 1/8/2019 -0.62% OG 0.353 0.240 0.144 0.030 0.060 0.033 86.00% - DEL
160 145EDDMARI CONSTRUCTION
AND TRADING20301 L AAA LB GE
Local Infrastructure Program (LIP) -
National Roads, Construction of Apalit
Bypass Road Connecting Two Provinces
in Regional III, Bulacan and Pampanga
Apalit,
Pampanga11/13/2018 1st
Regional Office
No. IIILF 197.9999811 480 12/5/2017 3/29/2019 0.74% OG 0.359 0.273 0.150 0.030 0.047 0.033 89.20% - AHD
161 146EDISON DEVELOPMENT &
CONSTRUCTION2400 L AAA MB GE
Flood Management Program -
Construction / Maintenance of Flood
Mitigation Structures and Drainage
Systems, Construction of Revetment
along Mamburao River
Mamburao,
Occidental
Mindoro
11/7/2018 1st
Mindoro
Occidental
DEO
LF 92.44 351 12/02/2018 1/28/2019 -3.67% OG 0.389 0.300 0.113 0.030 0.050 0.033 91.50% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 18 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
162EDISON DEVELOPMENT &
CONSTRUCTION2400 L AAA LB GE
Bridge Program - Construction of New
Permanent Bridges, Lawaan - Tamayo
Br. Along Mindoro West Ocastal Rd.
(Phase II)
Abra de Ilog,
Occidental
Mindoro
11/7/2018 1st
Mindoro
Occidental
DEO
LF 18.82 254 05/02/2018 10/16/2018 -16.33% OG 0.273 0.300 0.000 0.030 0.045 0.033 68.10% - DEL
163EDISON DEVELOPMENT &
CONSTRUCTION2400 L AAA LB GE
Concreting of Sitio Tigib, Brgy. Lanipga
FMR, Brgy. Lanipga
Consolacion,
Cebu11/16/2018 1st Cebu 6th DEO LF 7.96 196 5/22/2018 12/3/2018 7.45% OG 0.370 0.240 0.150 0.030 0.042 0.050 88.20% - AHD
164 147
EDISON DEVELOPMENT &
CONSTRUCTION / A.C.
RIVERO DEVELOPMENT
CORPORATIO
JV-17-1058 L AAA LB GE
Road Widening - Ormoc-Baybay
Southern Leyte Bdry Road, K1015+612-
K1016+010; K1017+234-K1018+334;
K1018+459-K1019+422; K1024+382-
K1024+722; K1027+193.43-K1028+088;
K1028+118-K1029+409, K1032+000-
K1033+686; K1033+701.5-K1034+265;
K1034+340.3-K1034+516
Leyte 11/9/2018 1st Leyte 4th DEO LF 192.50 300 2/15/2018 12/11/2018 2.47% OG 0.362 0.239 0.150 0.030 0.056 0.050 88.70% - AHD
165EDISON DEVELOPMENT
CONSTRUCTION 2400 L AAA LB GE
Construction of Barangay Poblacion
Farm to Market Road
Barangay
Poblacion,
Guipos,
Zamboanga del
Sur
11/12/2018 1st/FinalZamboanga del
Sur 2nd DEOLF 4.83 27 7/30/2018 8/25/2018 0.00% C 0.486 0.134 0.300 - - - 92.00%
92.00%
Very SatisfactoryONS
166 148
EDISON DEVELOPMENT
CONSTRUCTION / M.M
RODRIGUEZ TRADING
AND CONSTRUCTION
(JOINT VENTURE)
JV-17-1575 L B LB GE
Construction / Maintenance of Flood
Mitigation Structure and Drainage
System, Construction of Tigaplan River
Flood Control Structure
Brookes Point,
Palawan11/9/2018 2nd
Palawan 2nd
DEOLF 71.53 336 18/03/2018 2/16/2019 10.00% OG 0.324 0.300 0.150 0.022 0.051 0.033 88.00% - AHD
167 149
EDISON DEVELOPMENT
CONSTRUCTION/ KRB
CONSTRUCTION JOINT
VENTURE
JV-17-2151 L AAA MB GE
Rehabilitation of Paved Road-Bacnotan-
Luna-Balaoan Road, K0301+194-
K0302+419,K0295+1003.20-K0297+000,
Brgy. Barrientos and Brgy. Darigayos,
Luna, Brgy. Almeida, Balaoan
Luna and
Balaoan, La
Union
11/5/2018 1stLa Union 1st
DEOLF 50.43 260 23/03/2018 12/7/2018 -0.79% OG 0.363 0.240 0.142 0.030 0.061 0.033 86.90% - DEL
168 150 EGB CONSTRUCTION 13722 L AA MB GE
Construction and Maintenance of
Bridges along National Roads Widening
of Permanent Bridges to more than Two
Lanes, Bayo Bridges along Cagayan
Valley Road
Iguig, Cagayan 11/13/2018 1st/FinalCagayan 3rd
DEOLF 47.34475952 425 20/03/2017 5/18/2018 0.00% C 0.490 0.161 0.300 - - - 95.10%
95.10%
Very SatisfactoryONS
169 EGB CONSTRUCTION 13722 L AA MA GE
Construction/Rehabilitation of Flood
Mitigation Facilities within Major River
Basins and Principal Rivers: Construction
of Abulug River Control, Lucban
Abulug, Cagayan 11/12/2018 1st/FinalCagayan 2nd
DEOLF 49 287 12/02/2018 11/25/2018 4.83% C 0.498 0.133 0.300 - - - 93.10%
93.10%
Very SatisfactoryAHD
170 151EGB CONSTRUCTION /
OCP CONSTRUCTIONJV-17-882 L AA MB GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems - Construction of Sanchez Mira
River Basin at Nangoluan
Sanchez Mira,
Cagayan11/12/2018 1st/Final
Cagayan 2nd
DEOLF 57.9 340 15/02/2018 1/20/2019 9.82% C 0.450 0.200 0.300 - - - 95.00%
95.00%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 19 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
171 152EIRISH BUILDERS &
SUPPLY INC.33656 L B MA GE
Construction of Flood Control Structures
including Desilting/Dredging along Mag-
asawang Sapa Creek
San Ildefonso,
Bulacan11/7/2018 2nd/Final
Bulacan 2nd
DEOLF 77.20 243 14/03/2018 11/11/2018 2.48% C 0.458 0.133 0.300 - - - 89.10%
86.52%
SatisfactoryAHD
172 153 EL-JAKE BUILDERS 38162 L B SB GE
Rehabilitation of Concrete Road
Including Drainage System, Hazel Street,
Barangay San Luis
Antipolo 11/6/2018 1st/Final Rizal 1st DEO LF 2.82 120 01/03/2018 6/28/2018 0.15% C 0.491 0.152 0.300 - - - 94.30%94.30%
Very SatisfactoryAHD
173 154
ELKANKONSTRAK
DEVELOPMENT
CORPORATION
26220 L AA MA GE
Construction/Improvement of Cabilogan
River Course (West Carisac Section),
(Downstream of Dam )Let side
Libon, Albay 11/5/2018 2nd/Final Albay 2nd DEO LF 18.60 225 28/02/2018 9/10/2018 14.00% C 0.479 0.133 0.300 - - - 91.20%90.12%
Very SatisfactoryAHD
174
ELKANKONSTRAK
DEVELOPMENT
CORPORATION
26220 L AA MA GE
Construction/ Improvement of Cabilogan
River Course (San Agustin Section),
Upstream of San Agustin Bridge
Libon, Albay 11/5/2018 1st/Final Albay 3rd DEO LF 16.74 180 28/02/2018 8/26/2018 0.00% C 0.493 0.134 0.300 - - - 92.70%92.70%
Very SatisfactoryONS
175 155
EQUI-PARCO
CONSTRUCTION
COMPANY
14332 L AAA LB GE
Construction of Outfall (Cagayan de Oro
River) Diversion Channel for Gumamela,
Acasia
Carmen,
Cagayan de Oro
City
11/5/2018 1st
Cagayan de
Oro City 1st
DEO
LF 45.58 179 12/07/2018 1/6/2019 4.33% OG 0.366 0.300 0.150 0.030 0.070 0.050 96.60% - AHD
176
EQUI-PARCO
CONSTRUCTION
COMPANY
14332 L AAA LB GE
Desiltation/Channel Excavation of
CARBDP Eastbank Cutoff Channel Mahay
Lemon Creek LADP Cutoff Channel to
Protect Mayor Democrito Plaza II
Avenue along Mahay and Lemon
Sections with Sand Pocket
Butuan City 11/15/2018 1stButuan City
DEOLF 39.2 285 6/20/2018 3/31/2019 58.15% OG 0.354 0.300 0.150 0.030 0.070 0.033 93.70% - AHD
177 156
ESJ AND SONS
CONSTRUCTION SUPPLY,
INC.
17162 L AAA LA GE
Road Widening- Bacood North Road
Including ROW K0058+1167-K0059+018,
K00+059-K00059+316, K0063+000-
K0063+114
Negros
Occidental11/13/2018 1st Regional DEO LF 108.00 297 26/04/2018 2/16/2019 -5.09% OG 0.387 0.236 0.099 0.030 0.056 0.050 85.80% - DEL
178 157
ESR CONSTRUCTION AND
DEVELOPMENT
CORPORATION (Formerly:
ESR Construction)
10451 L AAA LB GE
Road Widening- Primary Roads- Lanao-
Pagadian-Zamboanga City Road
K1724+110.00 to K1724+310.90,
K1724+560.00 to K1726+480.00,
K1728+885.97 to K1729+367.02,
K1734+918.00 to K1736+403.50,
K1737+500.00 to K1738+454.08
Zamboanga
Sibugay11/12/2018 1st
Regional Office
No. IXLF 163.69 225 7/4/2018 2/13/2019 42.52% OG 0.325 0.240 0.150 0.030 0.060 0.050 85.50% - AHD
179 158
ESR CONSTRUCTION AND
DEVELOPMENT
CORPORATION/ 2M
CONSTRUCTION &
ENTERPRISES (JOINT
VENTURE)
JV-17-1936 L AAA LA GE
Construction of Concrete Bridge along
Buayan Bridge II along Lanao-Pagadian-
Zamboanga City Road
Kabasalan,
Zamboanga City
Road
11/14/2018 1st
Zamboanga
Sibugay 2nd
DEO
LF 38.3 381 02/05/2018 5/17/2019 0.32% OG 0.394 0.286 0.150 0.020 0.047 0.050 94.70% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 20 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
180 159
EXCELSIUS ENGINEERING
SERVICES / DRAGON
HATCHED CONSTRUCTION
JOINT VENTURE
JV-17-3031 L B MA GB
Construction of Four-Storey (16
Classroom) School Building Ilagan East
C/S, City of Ilagan
City of Ilagan,
Isabela11/8/2018 1st
Isabela 1st
DEOLF 35.35362391 210 09/07/2018 2/3/2019 21.25% OG 0.386 0.239 0.150 0.030 0.047 0.050 90.20% - AHD
181 160EZ GOLD CONSTRUCTION
& SUPPLY39408 L C SB GB
Construction of Multi-Purpose Building
(Hall), Brgy. Hibao-an Norte
Mandurriao,
Iloilo City11/16/2018 1st/Final Iloilo City DEO LF 2.15 78 10/06/2018 9/4/2018 0.00% C 0.497 0.134 0.300 - - - 93.10%
93.10%
Very SatisfactoryONS
182 161
F. GURREA
CONSTRUCTION,
INCORPORATED
6995 L AAA MA GEConstruction of Jordan Wharf Shore
Protection
Jordan,
Guimaras11/5/2018 1st Guimaras DEO LF 37.22 230 02/07/2018 2/16/2019 1.28% OG 0.396 0.240 0.150 0.030 0.055 0.050 92.10% - AHD
183
F. GURREA
CONSTRUCTION,
INCORPORATED
6995 L AAA MA GEConstruction of Suage River Control
System Pototan, Iloilo 11/11/2018 1st Iloilo 2nd DEO LF 48.78 298 14/02/2018 12/8/2018 2.30% OG 0.394 0.237 0.150 0.030 0.043 0.033 88.70% - AHD
184 162
F.B BANTALES
ENGINEERING
CONSTRUCTIONS
31045 L A MA GEConstruction of Road Slope Protection
Structure-Benguet-Nueva Vizcaya Road,
La Trinidad and
Bokod,Benquet11/6/2018 1st/Final
Benguet 1st
DEOLF 47.90 210 29/01/2018 8/26/2018 0.00% C 0.373 0.200 0.300 - - - 87.30%
87.30%
SatisfactoryONS
185
F.B BANTALES
ENGINEERING
CONSTRUCTIONS
31405 L A MA GE
Construction of Mitigation Structure-
Construction of Flood Mitigation
Structure along Agno River Basin,
Ambalanga Section,
Itogon Benguet 11/6/2018 1stBenquet 1st
DEOLF 47.95 195 15/03/2018 9/25/2018 0.40% C 0.296 0.298 0.150 - - - 86.50%
86.50%
SatisfactoryAHD
186
F.B BANTALES
ENGINEERING
CONSTRUCTIONS
31045 L A MA GE
Off-Carriageway Improvement: Shoulder
Paving/Construction-Baguio-Bauang
Road
Sablan,Benguet 11/6/2018 2nd/FinalBenguet 1st
DEOLF 38.54 240 14/03/2018 10/9/2018 0.00% C 0.343 0.200 0.300 - - - 84.30%
85.72%
SatisfactoryONS
187
F.B. BANTALES
ENGINEERING
CONSTRUCTION
31405 L A GE
Construction Improvement of Access
Roads Leading to Trades,Industries and
Economic Zones: Acop-Kapangan-
Kibunga n-Bakun Road Jct. To Bangho-
Daclan-Basil Tublay Central Road in
support to Coffee,Bamboo,Food and
Feed Crops,Cut Flowers and Fruit Trees
Industry
Tublay Benguet 11/7/2018 1stBenguet 2nd
DEOLF 70.10 268 07/03/2018 11/29/2018 0.50% OG 0.331 0.300 0.150 0.018 0.040 0.050 88.90% - AHD
188 163
F.B. BANTALES
ENGINEERING
CONSTRUCTION /
BALINTUGAN
CONSTRUCTION JOINT
VENTURE
JV-17-2002 L B MB GE
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse and Landslide
along Kennon Road
Tuba Benguet 11/5/2018 1st/FinalBenguet 1st
DEOLF 48.86 234 4/11/2018 11/30/2018 98.72% C 0.484 0.154 0.300 - - - 93.80%
93.80%
Very SatisfactoryAHD
189 164
F.B. BANTALES
ENGINEERING
CONSTRUCTION /
BALINTUGAN
CONSTRUCTION JOINT
VENTURE
JV-17-2099 L B MB GE
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, Landslides
(secondary roads), Hingyon, Ifugao
KO329+165-KO329+300
Hingyon, Ifugao 11/7/2018 1st/Final Ifugao 1st DEO LF 46.75 150 19/03/2018 8/15/2018 0.00% C 0.473 0.133 0.300 - - - 90.60%90.60%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 21 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
190 165F.F GALANG
CONSTRUCTION26801 L B SB GE
Construction of Flood Control and
Drainage System along Puerto Princesa
North Road (Jct. PPNR - Honda Bay Road
to Inabuyan Bridge) K0012+(-117.70) -
K0012+455.70
Puerto Princesa
City, Palawan11/7/2018 1st
Palawan 3rd
DEOLF 9.45 240 19/02/2018 10/16/2018 -4.52% OG 0.389 0.300 0.105 0.020 0.051 0.000 86.50% - DEL
191 166F.F ROSALES GENERAL
CONTRACTOR8814 L B MA GB
Construction of Two (2) Storey ICT
Laboratory Building,Fabrica High School -
La Victoria Annex High School
Bula Camarines
Sur11/12/2018 1st
Camarines Sur
4th DEOLF 8.91 120 06/08/2018 12/3/2018 0.16% OG 0.368 0.241 0.150 0.030 0.054 0.050 89.30% - AHD
192F.F. ROSALES GENERAL
CONTRACTOR8814 L B MA GE
I. Operating Outcome 1: Ensure Safe and
Reliable National Road System 1. Asset
Preservation Program B. Rehabilitation /
Reconstruction of Roads with Slips, Slope
Collapse and Landslides 2. Tertiary
Roads 1. Junction MSR - Old Zigzag Road,
K0155+970 to K0156+278, K0156+844 to
K0157+000, K0157+055 to K0157+155
Pagbilao,
Quezon11/10/2018 2nd/Final
Quezon 4th
DEOLF 80.45 240 05/03/2018 10/30/2018 0.00% C 0.417 0.200 0.300 - - - 91.70%
92.18%
Very SatisfactoryONS
193 167F.H. GOPITEO
CONSTRUCTION & SUPPLY21336 L B MA GE
Construction of Bank Protection along
Siguel River (Upstream), Sta.0+000-
Sta.0+190
Brgy. Siguel,
General Santos
City, South
Cotabato
11/13/2018 1st/Final
South
Cotabato 2nd
DEO
LF 24.5 178 5/15/2018 11/8/2018 10.84% C 0.444 0.200 0.300 - - - 94.40%94.40%
Very SatisfactoryAHD
194 168
F.L. REGUYAL
CONSTRUCTION
CORPORATION
3315 L B MA GE
Network Development - Construction of
By-Pass and Diversion Roads, Guimba -
Talugtug - Umingan Road, Nueva Ecija
Nueva Ecija 11/12/2018 1stNueva Ecija 1st
DEOLF 46.55 270 18/03/2018 12/12/2018 9.17% OG 0.385 0.265 0.150 0.030 0.060 0.050 94.00% - AHD
195 169
FAIRCHILD BUILDERS AND
DEVELOPERS,
INCORPORATED
10024 L B MA GE
Network Development -Road-Widening-
Primary Road along Tacloban-Baybay-
South Road K0985+(-255)-K0985+204
Mahaplag, Leyte 11/12/2018 1st/Final Leyte 5th DEO LF 14.64 150 2/12/2018 7/11/2018 0.00% C 0.466 0.133 0.300 - - - 89.90%89.90%
Very SatisfactoryONS
196 170FAME BUILDER
PHILIPPINES8936 L A MB GE
Construction of Four (4) Storey Sixteen
(16) Classroom at Limay, BataanLimay, Bataan 11/9/2018 1st
Bataan 2nd
DEOLF 37.42098959 210 7/15/2018 2/9/2019 1.50% OG 0.400 0.180 0.150 0.022 0.056 0.050 85.80% - AHD
197 171FERDSTAR BUILDERS
CONTRACTORS4965 L A MB GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems - Construction of Slope
Protection along Sapang Maragul
Diversion Channel
Guagua,
Pampanga11/15/2018 1st/Final
Pampanga 2nd
DEOLF 48.99964304 210 28/03/2018 10/23/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
198FERDSTAR BUILDERS
CONTRACTORS4965 L A MB GE
Rehab./Reconst. of National Roads with
Slips, Slope Collapse and Landslide along
Tigbao-Pulak-Sta. Fe Road (S00039LT),
Sta. 910+360-Sta 910+830, Sta 910+830-
Sta 911+136
Sta. Fe, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 46.49 192 2/2/2018 8/12/2018 0.00% C 0.429 0.200 0.300 - - - 92.90%92.90%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 22 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
199 172
FERMIDA CONSTRUCTION
SERVICES AND SUPPLIES /
R.J. IBARRA
CONSTRUCTION (JOINT
VENTURE)
JV-17-1843 L B MA GE
Construction of Slope Protection/Flood
Control, Gabor Dike (Upstream), Sta.
1+996 to Sta. 2+700
San Filipe,
Zambales11/6/2018 1st/Final
Zambales 1st
DEOLF 47.96932529 200 09/03/2018 9/24/2018 4.50% C 0.487 0.133 0.300 - - - 92.00%
92.00%
Very SatisfactoryAHD
200 173 FFJJ CONSTRUCTION 16712 L AAA MB GE
Construction of Concrete Road- Junction-
Dipolog- Sindangan- Liloy Road
Concreting to Bago- Siari Section in
Support of Rice, Rubber, Coconut and
Abaca Industries
Sindangan,
Zamboanga del
Norte
11/7/2018 1stZamboanga del
Norte 1st DEOLF 38.75 249 4/26/2018 12/30/2018 0.53% OG 0.380 0.240 0.150 0.024 0.047 0.050 89.10% - AHD
201 FFJJ CONSTRUCTION 16712 L AAA MB GE
Surigao – Davao Coastal Road –
K1305+229 – K1306+326, K1306+341 –
K1307+980, K1308+000 – K1308+256
Tago, Surigao del
Sur11/9/2018 1st
Surigao del Sur
1st DEOLF 89.58 284 4/2/2018 1/10/2019 1.40% OG 0.399 0.240 0.150 0.030 0.060 0.050 92.90% - AHD
202 174
FFJJ CONSTRUCTION /
JMT CONSTRUCTION
JOINT VENTURE
JV-17-2107 L AAA MB GE
Construction of Flood Mitigation
Structure and Drainage System along
Surigao River, Sta. 0+000 – Sta. 0+690
Brgy. Quezon,
Surigao City,
Surigao del
Norte
11/8/2018 1st/FinalSurigao del
Norte 1st DEOLF 67.46 237 3/21/2018 11/12/2018 5.06% C 0.478 0.133 0.300 - - - 91.10%
91.10%
Very SatisfactoryAHD
203 175
FFJJ CONSTRUCTION
JOINT VENTURE /
PYRAMID CONSOLIDATED
BUILDERS & GENERAL
MERCHANDISE
JV-16-527 L AAA LB GEWidening of Lunocan Br. (B0149+MN)
along Syare Highway
Manolo fortich,
Bukidnon10/3/2018 1st/Final
Bukidnon 3rd
DEOLF 39.2 249 02/03/2017 11/5/2017 0.00% C 0.480 0.133 0.300 - - - 91.30%
91.30%
Very SatisfactoryONS
204 176FIRST MAKEEN
CONSTRUCTION32352 L A SB GB
Construction of Multi-Purpose Building
(Covered Court), Barangay Tumagabok
Boac,
Marinduque11/15/2018 2nd/Final
Marinduque
DEOLF 3.83 150 16/02/2018 7/15/2018 0.00% C 0.480 0.152 0.300 - - - 93.20%
91.59%
Very SatisfactoryONS
205 177FJ MIRANDA
CONSTRUCTION41349 L D SB GB
Contruction of Two-Storey, Four
Classroom School Building at Cabiten
National High School (RA9087)
Mankayan
Benguet11/8/2018 1st/Final
Benguet 2nd
DEOLF 10.07 120 25/06/2018 10/22/2018 0.00% C 0.432 0.201 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
206 178 FLT ENTERPRISES 23039 L A MA GE Construction of Barangay Road
Buluangan I,
Valderrama,
Antique
11/6/2018 2nd/Final Antique DEO LF 1.91 66 21/03/2018 5/25/2018 -6.46% C 0.477 0.200 0.106 - - - 78.30%78.06%
UnsatisfactoryDEL
207 179
FLYING SEVEN
CONSTRUCTION/ AL-
AMEN BUILDERS (JOINT
VENTURE)
JV-17-2207 L A MA GE
Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure
Including Local Projects: Construction of
Concrete Access Road Leading to
Topocon ES, Sta. 0+000 - Sta. 3+ 768
Sultan Naga
Dimaporo, Lanao
del Norte
11/6/2018 1st/FinalLanao del
Norte 1st DEOLF 36.11 156 02/04/2018 9/4/2018 0.00% C 0.469 0.153 0.300 - - - 91.20%
91.20%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 23 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
208 180FOOTPRINTS
CONSTRUCTION16713 L B MA GE
Road Widening along Bukidnon - Davao
City Road, K1563+(-768) - K1563+(-
702.63), K1565+713 - K1565+794,
K1567+524 - K1567+595 and K1567+621 -
K1567+684, Camp I-Buayan Section
Maramag,
Bukidnon11/12/2018 2nd/Final
Bukidnon 2nd
DEOLF 9.92 75 09/07/2018 9/21/2018 0.00% C 0.480 0.146 0.300 - - - 92.60%
92.60%
Very SatisfactoryONS
209 181 FR ESPIRITU JR BUILDERS 36719 L AAA MA GEConstruction of Flood Control Revetment
along Bolo Rover
Brgy. San
Lorenzo, Bangui,
Ilocos Norte
11/6/2018 2nd/FinalIlocos Norte
1st DEOLF 25.24 197 12/02/2018 8/27/2018 0.06% C 0.425 0.133 0.300 - - - 85.80%
85.38%
SatisfactoryAHD
210 182 FRAMECON BUILDERS 22482 L B MA GE
Construction of Mag-Asawang Tubig RC
Structure, Del Pilar - Naujan To Bucayao -
Calapan City
Naujan, Oriental
Mindoro11/9/2018 1st/Final
Mindoro
Oriental DEOLF 23.43 240 15/03/2018 11/9/2018 5.33% C 0.096 0.200 0.300 - - - 59.60%
59.6%
PoorAHD
211 183 G. UY CONSTRUCTION 27999 L B MA GEConcreting Reconstruction: Pacita-Lapaz
Drive, K0090+(-585) to K0090+915Hamtic, Antique 11/6/2018 1st/Final Antique DEO LF 22.82 152 11/04/2018 9/9/2018 0.00% C 0.488 0.134 0.300 - - - 92.20%
92.20%
Very SatisfactoryONS
212 184
G.C.I CONSTRUCTION
AND DEVELOPMENT
CORP.
11346 L AAA LA GE
Construction/Rehabilitation of Flood
Mitigation Facilities within Major River
Basin and Principal River - Construction
of Dike (Along Libmanan River) within
Bicol River Basin,Barangay Potot
Libmanan,Camar
ines Sur11/9/2018 1st/Final
Camarines Sur
1st DEO LF 37.98 198 26/02/2018 9/11/2018 0.00% C 0.462 0.200 0.300 - - - 96.20%
96.20%
Very SatisfactoryONS
213 185 GCLT CONSTRUCTION 30657 L A MA GERehabilitation of Slope Protection along
Pampanga River
Calaba, San
Isidro11/8/2018 1st/Final
Nueva Ecija
2nd DEOLF 13.69 180 12/04/2018 10/8/2018 0.26% C 0.484 0.134 0.300 - - - 91.80%
91.80%
Very SatisfactoryAHD
214 186GEMMA CONSTRUCTION
SUPPLY INC. 5044 L AAA LA GE
Repair/Rehabilitation (Asphalt Overlay
with Thermoplastic Pavement Markings)
along Daang Maharlika Road (Jct. R.
Castillo), K1503+268- K1505+859
Davao City 10/27/2018 1st/FinalDavao City 1st
DEOLF 99 160 02/10/2017 3/10/2018 0.00% C 0.473 0.200 0.300 - - - 97.30%
97.30%
OutstandingONS
215 187
GEMMA CONSTRUCTION
SUPPLY INC. / MAGAR
CONSTRUCTION AND
SUPPLY JOINT VENTURE
JV-17-2463 L AAA LA GE
Road Widening (2 into 4 lanes) along
Surigao del Sur Bdry.-Davao Oriental
including ROW K1683+764 to
K1684+431, K1684+431 to K1685+430
Tarragano,
Davao Oriental11/7/2018 1st
Davao Oriental
1st DEOLF 43.67 198 4/29/2018 11/12/2018 -0.17% OG 0.363 0.212 0.148 0.030 0.056 0.033 84.20% - DEL
216 188 GENETIAN BUILDERS 18052 L A MB GE
Construction/Improvement of Access
Roads Leading to Declared Tourism
Destination at National Road Jct. leading
to Baluran Falls, Sta. 0+000 to Sta. 1+800
Barangay Lower
Baluran, Imelda,
Zamboanga
Sibugay
11/13/2018 1st
Zamboanga
SIbugay 1st
DEO
LF 56.01 320 02/04/2018 2/15/2019 -4.85% OG 0.388 0.220 0.102 0.030 0.070 0.017 82.70% - DEL
217 GENETIAN BUILDERS 18052 L A MA GBConstruction of Classrooms, Tangub City
NHS
Tangub City,
Misamis
Occidental
11/7/2018 1st/Final
Misamis
Occidental 2nd
DEO
LF 4.1 85 12/14/2017 3/8/2018 0.00% C 0.482 0.135 0.300 - - - 91.70%91.70%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 24 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
218 189
GERRA CONSTRUCTION
INCORPORATED / JOHN
DEE B. BUSTAMANTE
CONSTRUCTION JOINT
VENTURE
29359 L A MA GE Construction of Baubo Flood ControlMaria Aurora,
Aurora11/10/2018 1st Aurora DEO LF 29.40 317 16/03/2018 1/26/2019 4.18% OG 0.374 0.238 0.150 0.030 0.060 0.050 90.20% - AHD
219 190GFJ CONSTRUCTION
SUPPLY & MERCHANDISE40789 L C SB GE
Opening and Concreting of Barangay
Midpapan II - Barangay Renibon FMR
Phase I, Barangay Midpapan II and
Barangay Renibon
Pigcawayan,
North Cotabato11/10/2018 1st/Final
Cotabato 2nd
DEOLF 4.73 36 7/5/2018 8/9/2018 0.00% C 0.492 0.134 0.300 - - - 92.60%
92.60%
Very SatisfactoryONS
220 191GICAR CONSTRUCTION,
INC.12624 L AAA MB GE
Construction of Dike/Revetment along
Agusan River, Urduja Section, Sta.
0+504.40 - Sta. 0+618.4
Butuan City,
Agusan del
Norte 1st LD
11/27/2018 1st/FinalButuan City
DEOLF 73.16 300 5/18/2017 3/13/2018 59.35% C 0.453 0.189 0.300 - - - 94.20%
94.20%
Very SatisfactoryAHD
221GICAR CONSTRUCTION,
INC.12624 L AAA LB GE
Circumferential Road Leading to Lake
Mainit/Mainit-Poblacion-Tagbuyawan
(Bridge I, Tagbuyawan Bridge)
Brgy.
Tagbuyawan,
Mainit, Surigao
del Norte
27/10/2018 1st/FinalSurigao del
Norte 1st DEOLF 77.27 455 4/6/2017 7/4/2018 0.22% C 0.483 0.135 0.300 - - - 91.80%
91.80%
Very SatisfactoryAHD
222 192 GIMPAB ENTERPRISES 34872 L C SB GBConstruction of MPB, Mahayahay , Brgy.
Cabug
Medina, Misamis
Oriental11/13/2018 1st/Final
Misamis
Oriental 1st
DEO
LF 2.35 120 01/05/2018 8/28/2018 0.00% C 0.498 0.134 0.300 - - - 93.20%93.20%
Very SatisfactoryONS
223 193GLOBAL TECH DESIGN
BUILDERS, INC. 38945 L D SB GB
Construction of Multi- Purpose Building
in Brgy. Lapasan
Cagayan de Oro
City11/15/2018 1st/Final
Cagayan de
Oro City 2nd
DEO
LF 1.88 105 20/04/2018 8/2/2018 0.00% C 0.482 0.200 0.189 - - - 87.10%87.10%
SatisfactoryONS
224 194
GOLDEN FLEECE
CONSTRUCTION AND
SUPPLY,INC
37240 L D SB GB
Construction of Multi-Purpose Building,
Barangay San Jose and Barangay Baliuag
Viejo
Milaor and
Minalabac
Camarines Sur
11/8/2018 1st/FinalCamarines Sur
1st DEOLF 4.70 100 01/03/2018 6/8/2018 0.00% C 0.483 0.133 0.300 - - - 91.60%
91.60%
Very SatisfactoryONS
225 195
GOLDRICH
CONSTRUCTION &
TRADING
16489 L AAA LA GE
Network Development Program-
Contsruction of By-Pass/Diversion Roads-
Quirino Highway(Baguio-Bauang Road to
Quezon Hill Road 1) By Pass Road
including ROW and slope protection
Baguio City 11/12/2018 1stBaguio City
DEOLF 61.41 348 18/02/2018 1/31/2019 14.30% C 0.338 0.300 0.150 - - - 91.80%
91.80%
Very SatisfactoryAHD
226
GOLDRICH
CONSTRUCTION &
TRADING
16489 L AAA LA GE
Asset Preservation Program-
Rehabilitation/Reconstruction o
National Roads with Slip, Slope Collapse
and Landslide: Kennon Road
Baguio City 11/12/2018 1st/FinalBaguio City
DEOLF 74.38 240 18/02/2018 10/15/2018 27.11% C 0.476 0.134 0.300 - - - 91.00%
91.00%
Very SatisfactoryAHD
227
GOLDRICH
CONSTRUCTION &
TRADING
16489 L AAA LA GE
Asset Preservation Program-
Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide: Quirino H-way (Baguio
Bauang Road)
Baguio City 11/12/2018 1st/FinalBaguio City
DEOLF 38.85 240 18/02/2018 10/15/2018 49.18% C 0.436 0.148 0.300 - - - 88.40%
88.40%
SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 25 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
228 196
GOLDROCK
CONSTRUCTION &
DEVELOPMENT CORP.
5389 L AA LA GE
Construction of Concrete Road -
Marufinas -Caruray - Port Barton Road
Leading to San Vicente, Sta. 0+000 - Sta.
1+550
San Vicente,
Palawan11/11/2018 2nd
Palawan 1st
DEOLF 47.17 225 10/05/2018 12/20/2018 22.54% OG 0.389 0.300 0.150 0.020 0.056 0.050 96.50% - AHD
229 197GONZALO
CONSTRUCTION1826 L A MA GE
Replacement of Permanent Weak Bridge-
Salacop Brigde (Washed out) along Acop-
Kapangan-Kibungan-Bakun Road
Kapangan,Bengu
et11/7/2018 2nd/Final
Benguet 2nd
DEOLF 28.43 162 07/03/2018 8/15/2018 1.80% C 0.442 0.176 0.300 - - - 91.80%
89.16%
Very SatisfactoryAHD
230 198GRACE CONSTRUCTION
CORPORATION3771 L AAA LB GE
Improvement/ Concreting of Road, Balas
, Potrero - Maliwalu, Potrero - Mitla, San
Antonio - Duat and Duat - Potrero
Bacolor,
Pampanga11/12/2018 1st
Pampanga 1st
DEOLF 23.86980602 195 30/05/2018 12/10/2018 1.27% OG 0.369 0.178 0.150 0.030 0.056 0.050 83.30% - AHD
231 199GRAIA CONSTRUCTION
CORPORATION30826 L AAA LB GE
Organizational Outcome: Protect Lives
and Properties Against Major Floods -
Flood Management Program -
Construction/ Maintenance of Flood
Mitigation and Drainage Systems:
Construction of Revetment along Imus
River
Brgy. Mabolo III,
Bacoor, Cavite11/14/2018 1st/Final
Cavite Sub
DEO LF 37.04981089 255 10/04/2018 12/20/2018 22.62% C 0.475 0.133 0.300 - - - 89.00%
89.00%
Very SatisfactoryAHD
232 200GREAT WALL
ENGINEERING 34573 L B SB GB
Construction of Multi-Purpose Building,
Barangay Guinacutan
Vinzons
Camarines Norte 11/6/2018 1st/Final
Camarines
Norte DEOLF 1.92 75 29/04/2018 7/12/2018 0.00% C 0.472 0.134 0.300 - - - 90.60%
90.60%
Very SatisfactoryONS
233 201GVDPM CONSTRUCTION
CORP.9052 L AA LA GE
Network Development - Construction of
Missing gaps Connecting National Roads
including ROW, Capas - Botolan Road,
(Zambales Section) Zambales 2nd
Lagislative District
Province of
Zambales11/9/2018 2nd/Final
Regional Office
No. IIILF 142.3184769 420 14/03/2017 5/7/2018 0.00% C 0.495 0.134 0.300 - - - 92.90%
88.86%
SatisfactoryONS
234GVDPM CONSTRUCTION
CORP. 9052 L AA LA GE
Rehabilitation/Improvement of Existing
Dike along Lukung River, (Brgy. Alfonso
Section, Right Bank), Sta. 02+915 to Sta.
03+375
Concepcion,
Tarlac11/13/2018 1st/Final Tarlac 2nd DEO LF 47.77 244 01/02/2018 10/2/2018 0.00% C 0.474 0.133 0.300 - - - 90.70%
90.70%
Very SatisfactoryONS
235 202H.G. LOPEZ
CONSTRUCTION17691 L A MB GE
Road Widening-Manila North Road-
K0303+811 - K0306+497Bangar, La Union 11/5/2018 1st
La Union 1st
DEOLF 71.74 255 16/03/2018 11/25/2018 9.06% OG 0.310 0.300 0.150 0.030 0.047 0.033 87.00% - AHD
236 203
HAIDEE CONSTRUCTION
AND DEVELOPMENT
CORP.
10365 L AAA LB GE
Construction and Maintenance of Bridge
along National Roads - Widening of
Permanent Bridges to more than 2 lanes -
Secondary - Friendship Bridge
(B04231LZ) along Friendship
Circumferencial Road (West
Circumderential Road)
Barangay
Anunas, Angeles
City
11/14/2018 1stRegional Office
No. IIILF 122.525114 611 5/15/2017 1/15/2019 1.53% OG 0.362 0.235 0.150 0.030 0.055 0.033 86.50% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 26 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
237 204HAUSLAND
CONSTRUCTION32378 L A MA GE
Organizational Outcome 2: Protect Lives
and Properties Against Major Floods -
Flood Management Program -
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems: Construction of Revetment
along Baluctot River, Phase II, East Side
Brgy. Sampaloc
IV, Dasmarinas,
Cavite
11/13/2018 1stCavite Sub
DEO LF 48.74982571 300 14/02/2018 12/10/2018 3.50% OG 0.388 0.240 0.150 0.030 0.061 0.050 91.90% - AHD
238 205 HENSCHA PHILS. INC. 34164 L AAA MA GEConstruction of River Control Along Brgy.
Evangelista
Naujan, Oriental
Mindoro11/6/2018 1st/Final
Mindoro
Oriental DEOLF 18.71 195 15/03/2018 9/25/2018 10.00% C 0.425 0.133 0.300 - - - 85.80%
85.80%
SatisfactoryAHD
239 206HENSCHA PHILS. INC. /
VIRLO CONSTRUCTIONJV-16-1405 L AAA MB GE
MFO 2-Flood Management Services,
Construction/Maintenace of Flood
Mitigation Structure and Drainage
Systems, Improvement/ Rehabilitation
of Flood Control Structure at Cansaga
River, Phase III
Consolacion,
Cebu Province11/17/2018 1st/Final
Regional Office
No. VIILF 96.50 560 21/04/2017 11/1/2018 19.54 C 0.495 0.133 0.300 - - - 92.80%
92.80%
Very SatisfactoryAHD
240 207 HENSO CONSTRUCTION 10720 L B MA GE
Local Roads and Bridges- Local Roads-
Local Infrastructure Program: Concreting
of Road at Camp Arturo Enrile
Malagutay,
Zamboanga City11/15/2018 1st/Final
Zamboanga
City DEOLF 9.55 112 04/04/2018 7/24/2018 0.00% C 0.405 0.187 0.300 - - - 89.20%
89.20%
Very SatisfactoryONS
241 208HEXAMINDZ
CORPORATION31666 L AA MA GE
Organizational Outcome 2: Protect Lives
and Properties Against Major Floods -
Flood Management Program -
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems: Construction of Recetment
along Amuntay River, Phase II, East Side
Brgy. San
Agustin II,
Dasmarinas,
Cavite
11/14/2018 1st/FinalCavite Sub
DEO LF 48.74991018 300 19/02/2018 12/15/2018 26.88% C 0.480 0.133 0.300 - - - 91.30%
91.30%
Very SatisfactoryAHD
242HEXAMINDZ
CORPORATION31666 L AAA MA GE
Organizational Outcome 2: Project Lives
and Properties Against Major Floods -
Flood Management Program -
Construction/ Maintenance of Flood
Control Structures and Drainage Systems
- Construction / Rehabilitation of Flood
Mitigation Facilities of Principal River
Basin along Tanay River
Tanay, Rizal 11/11/2018 1st Rizal 2nd DEO LF 48.99934168 343 26/02/2018 2/3/2019 3.73% OG 0.395 0.240 0.150 0.030 0.070 0.050 93.50% - AHD
243HEXAMINDZ
CORPORATION31666 L AAA MB GE
Const./Imprv't, of NRJ Brgy. San Luis to
Insular Leading to San Luis Beach Line,
Brgy. San Luis
Caraga, Davao
Oriental11/7/2018 1st/Final
Davao Oriental
1st DEOLF 18.96 128 4/16/2018 8/21/2018 -2.39% C 0.469 0.133 0.228 - - - 83.00%
83.00%
SatisfactoryDEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 27 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
244HEXAMINDZ
CORPORATION 31666 L AAA MA GE
Construction of Revetment, Flood
Control Structure and Flood Gate at the
Bocaue Portion of the Bulacan River
Bocaue, Bulacan 11/6/2018 1stBulacan 1st
DEOLF 91.78 210 10/08/2018 3/7/2019 24.80% OG 0.354 0.240 0.150 0.030 0.051 0.033 85.80% - AHD
245 209
HI- TONE CONSTRUCTION
AND DEVELOPMENT
CORPORATION
23385 L AAA MB GE
Asset Preservation Program-Preventive
Maintenance, Legazpi Airport Road
K0530+(-972) to K0530+(-242)
Legazpi City,
Region V11/14/2018 1st/Final Albay 2nd DEO LF 11.61 58 12/02/2018 4/10/2018 0.00% C 0.459 0.200 0.300 - - - 95.90%
95.90%
Very SatisfactoryONS
246 210HIGH STRENGTH DEV.
CORPORATION31976 L A MA GE
Construction of Slope Protection/ Flood
Control Bancal River, Barangay Parel,
Sta. 0+761 to Sta. 0+996, Botolan Side
Botolan,
Zambales11/7/2018 1st
Zambales 1st
DEOLF 37.62128687 244 23/04/2018 12/22/2018 3.84% OG 0.400 0.239 0.150 0.030 0.056 0.033 90.80% - AHD
247HIGH STRENGTH DEV.
CORPORATION31976 L A MA GE
Construction of Slope Protection/ Flood
Control , Bancal River, Barangay Parel,
Sta. 0+996 to Sta. 1+229, Botolan Side
Botolan,
Zambales11/6/2018 1st
Zambales 1st
DEOLF 37.6174186 244 02/05/2018 12/31/2018 2.24% OG 0.398 0.240 0.150 0.030 0.056 0.033 90.70% - AHD
248HIGH STRENGTH DEV.
CORPORATION31976 L A MA GE
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems, Improvement of Camachile
River
San Marcelino,
Zambales11/7/2018 1st/Final
Zambales 2nd
DEOLF 37.65111646 210 09/02/2018 9/6/2018 0.00% C 0.470 0.133 0.300 - - - 90.30%
90.30%
Very SatisfactoryONS
249HIGH STRENGTH DEV.
CORPORATION31976 L A MA GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems, Improvement of Camachile
River (Upstream)
Castillejos,
Zambales11/7/2018 1st/Final
Zambales 2nd
DEOLF 47.06122324 240 09/02/2018 10/6/2018 0.85% C 0.381 0.200 0.300 - - - 88.10%
88.10%
SatisfactoryAHD
250 211
HI-TONE CONSTRUCTION
& DEVELOPMENT CORP. /
6RM CONSTRUCTION
JOINT VENTURE
JV-17-1966 L AAA MB GE
Road Widening- Sarangani- Davao Del
Sur Coastal Road, K1658+783-
K1664+298 (Chainage 5093- Chainage
10630), K1664+630- K1666+264
(Chainage 10962- Chainage 12592),
K1666+620- K1666+680 (Chainage 12948-
Chainage 13008)
Alabel and
Malapatan,
Sarangani
11/13/2018 1stRegional Office
No. XIILF 179.01 313 4/30/2018 3/8/2019 0.13% OG 0.392 0.239 0.150 0.024 0.047 0.050 90.20% - AHD
251 212HI-TRI DEVELOPMENT
CORPORATION1758 L AAA LB GE
Asset Preservation of National Roads -
Rehabilitation/ Reconstruction /
Uprgading - Secondary - Reconstruction
from Asphalt to Concrete - Masbate -
Milagros Road (K0006+709 - K0007+075,
K0008+000 - K0008+120, K0013+518 -
K0014+000
Masbate City 11/9/2018 1st/FinalMasbate 1st
DEOLF 44.41 367 08/05/2017 5/9/2018 0.00% C 0.475 0.140 0.300 - - - 91.50%
91.50%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 28 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
252 213HMM BUILDERS AND
CONSTRUCTION SUPPLY35636 L D SB GE Construction of Road
Barangay
Esparar,
Barbaza, Antique
11/6/2018 2nd/Final Antique DEO LF 1.97 66 20/04/2018 6/24/2018 -4.92% C 0.491 0.200 0.152 - - - 84.30%79.56%
UnsatisfactoryDEL
253 214HONEYVILLE
CONSTRUCTION32160 L A MB GE
MFO-1 National Road Netwrork Services
Construction of By-Passes/ Diversion
Roads Including ROW, Malagasang -
Bucandala-Alapan Road
Cavite 3rd LD,
Cavite Province12/11/2018 1st/Final
Regional Office
No. IV-ALF 104.4638227 785 14/03/2016 5/7/2018 0.00% C 0.447 0.156 0.300 - - - 90.30%
90.30%
Very SatisfactoryONS
254HONEYVILLE
CONSTRUCTION32160 L A MB GE
Organizational Outcome 2: Protect Lives
and Properties Against Major Floods -
Flood Management Program -
Construction/ Maintenance of Flood
Mitigation Facilities within Major River
Basins River and Principal Rivers -
Construction / Improvement /
Rehabilitation of Flood Control
Structures along Upper Marikina River
and Puray River
Brgy. San Isidro,
Rodriguez,Rizal11/11/2018 1st Rizal 2nd DEO LF 28.15041325 214 18/04/2018 11/17/2018 0.83% OG 0.391 0.240 0.150 0.030 0.060 0.050 92.10% - AHD
255 215HONY TRADING AND
CONSTRUCTION26898 L B MA GE
Organizational Outcome 1: Network
Development Program, Road Widening,
Secondary Roads, Manila East Road -
K0021+357 to K0022+000, K0024+340 to
K0025+450, K0025+450 to K0025+550
Taytay, Rizal 11/5/2018 1st Rizal 1st DEO LF 57.80 360 05/03/2018 2/27/2019 1.67% OG 0.399 0.254 0.150 0.030 0.051 0.033 91.70% - AHD
256 216
HVC SAGITTARIUS
COMMERCIAL &
CONSTRUCTION
12954 L B SB GBConstruction of New Barangay Hall,
Brgy. Rotunda
Koronadal City,
South Cotabato11/5/2018 2nd/Final
South
Cotabato 1st
DEO
LF 1.38 90 4/26/2018 7/24/2018 20.00% C 0.497 0.133 0.300 - - - 93.00%86.35%
SatisfactoryAHD
257 217I & E CONSTRUCTION
CORPORATION10410 L AA GE
Road Upgrading (Unpaved to Paved)
Based on Gravel Road Strategies, Traffic
Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis) -
Tertiary Roads, Bagac - Mariveles Road,
Bataan 2nd Legislative District, Province
of Bataan
Mariveles
Bataan 11/8/2018 2nd/Final
Regional Office
No. IIILF 117.4497943 370 5/16/2017 4/20/2018 0.00% C 0.494 0.134 0.300 - - - 92.80%
91.38%
Very SatisfactoryONS
258 202I.A. BOSQUE
CONSTRUCTION CORP.12597 L A MB GE
Retroffiting/ Strengthening of Bridges -
Macalelon Bridge and Catanaunan
Bridge along Gumaca - Pitogo - Mulanay -
San Narciso Road
Macalelon and
Catanauan,
Quezon
11/12/2018 1st/FinalQuezon 3rd
DEOLF 52.75 210 09/02/2018 9/6/2018 0.00% C 0.493 0.133 0.300 - - - 92.60%
92.60%
Very SatisfactoryONS
259 203I.A. BOSQUE
CONSTRUCTION CORP.12597 L A MB GE
Off-Carriageway Improovement :
Shoulder Paving / Construction - Pitogo
Junction - Poblacion Road, K02015+(-
692) to K0207+622
Pitogo, Quezon 11/12/2018 1st/FinalQuezon 3rd
DEOLF 33.60 270 12/02/2018 11/8/2018 20.00% C 0.474 0.148 0.300 - - - 92.20%
92.20%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 29 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
260 204IBC INTERNATIONAL
BUILDERS CORPORATION8576 L AAA LB GE
Road Widening- Barotac Viejo- San
rafael Road, K0084+998-K0088+350
Barotac Viejo,
Iloilo11/11/2018 2nd Iloilo 3rd DEO LF 93.17 266 26/03/2018 12/16/2018 5.89% OG 0.380 0.216 0.150 0.030 0.051 0.050 87.70% - AHD
261 205
IBC INTERNATIONAL
BUILDERS CORPORATION
/ J.S. LAYSON & CO. , INC.
JOINT VENTURE
JV-17-1665 L AAA MA GEConstruction of Aganan Flood Control
project (Jaro-Aganan River)
Brgy. 6, San
Miguel, Iloilo11/12/2018 1st Iloilo 4th DEO LF 18.62 215 27/04/2018 11/27/2018 2.25% OG 0.394 0.240 0.150 0.030 0.051 0.050 91.50% - AHD
262 206ILBI CONSTRUCTION
SUPPLY & SERVICES32021 L B SB GB
Construction of Multi-Purpose Building
(New Gym), Yellow Bell, Barangay Sta.
Cruz
Koronadal City,
South Cotabato11/5/2018 1st/Final
South
Cotabato 1st
DEO
LF 2.44 105 4/25/2018 8/7/2018 20.00% C 0.485 0.133 0.300 - - - 91.80%91.80%
Very SatisfactoryAHD
263 207ILC SUMMIT
CONSTRUCTION INC.36862 L A SB GE
Concreting of Barangay Road, Brgy.
Quezon, Libjo, Dinagat Islands
Brgy. Quezon,
Surigao City,
Surigao del
Norte
11/6/2018 2nd/FinalDinagat Islands
DEOLF 3.96 160 18/04/2018 9/24/2018 29.35% C 0.480 0.133 0.300 - - - 91.30%
90.46%
Very SatisfactoryAHD
264 208IRC CONSTRUCTION &
SUPPLIES29943 L A MA GE
Construction of San Isidro - Diteki River
Flood Control
San Luis and
Maria Aurora,
Aurora
11/10/2018 1st Aurora DEO LF 51.40 319 12/02/2018 12/27/2018 1.32% OG 0.378 0.206 0.150 0.030 0.050 0.050 86.40% - AHD
265 209ISNAG BUILDERS & DEV'T.
CORPORATION33781 L B SB GE
Construction/Improvement of Access
Road Leading to Trades, Insdustries &
Economic Zone San Carlos-Palali-
Malekkeg Road in Support of Casava,
Corn, Rice, Mandarin, Tourism
Handicrafts, Furniture and Coconut San
Carlos-Palali-Malekkeg STA. O+000-
0+800,
sta. marcela,
apayao11/16/2018 2nd/Final
Apayao 2nd
DEOLF 18.65 210 08/02/2018 9/5/2018 0.00% C 0.490 0.133 0.300 - - - 92.30%
89.60%
Very SatisfactoryONS
266 210IVY MICHELLE
CONSTRUCTION34093 L AAA LA GE
Road Concretig-Access Roads to
Barangay Aporawan, barake,
Magbabadil,Mabini to Poblacion, In
Support of Coconut, Cacao and Oil Palm
Industry, Sta. 000+000 - Sta. 002+840
Aborlan,
Palawan11/8/2018 1st
Palawan 3rd
DEOLF 65.82 258 22/05/2018 2/3/2019 13.10% OG 0.371 0.263 0.150 0.020 0.051 0.050 90.50% - AHD
267 211J & A PIMENTEL
CONSTRUCTION7953 L A MA GE
Access Road Leading to San Isidro Busay
Falls
Brgy. San Isidro,
Tandag City,
Surigao City
11/9/2018 1st/finalSurigao del Sur
1st DEOLF 38.12 183 5/2/2018 1/31/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%
90.80%
Very SatisfactoryONS
268 212J.E. TICO CONSTRUCTION
CO., INC.7063 L A MB GE
Road Widening- Guimaras
Circumferential Road Including ROW,
K0027+209 to K0028+904
Buenavista,
Guimaras11/5/2018 1st Guimaras DEO LF 61.90 272 20/04/2018 1/16/2019 2.44% OG 0.367 0.239 0.150 0.030 0.061 0.033 88.00% - AHD
269 213
J.G GUTIERREZ
CONSTRUCTION AND
TRADING
32116 L D SB GB
Construction of Two (2) Storey Two (2)
Classroom School Building at Macabud
NHS
Rodriguez, Rizal 11/11/2018 1st/Final Rizal 2nd DEO LF 6.47511694 115 09/01/2018 5/3/2018 0.00% C 0.497 0.134 0.300 - - - 93.10%93.10%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 30 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
270 214
J.M. LUCIANO
CONSTRUCTION, INC.
(Formerly: J.M. Luciano
Construction)
2083 L AAA LB GE
Construction of By-Pass and Diversion
Roads – Tagongon – Sta. Maria – Sta.
Juana – Maputi – Dreamland –
Bingcongan – San Roque
Bincongan
Section, Surigao
del Sur
11/10/2018 1st/FinalSurigao del Sur
2nd DEOLF 9.65 209 4/10/2018 11/4/2018 8.69% C 0.443 0.134 0.300 - - - 87.70%
87.70%
SatisfactoryAHD
271
J.M. LUCIANO
CONSTRUCTION, INC.
(Formerly: J.M. Luciano
Construction)
2083 L AAA LB GE
Construction/Impovement of Access
Roads leading to Declared Tourism
Destinations NRJ-Cumawas-Tinuy-an
Falls Road,
Borboanan,
Bislig City,
Surigao del Sur
11/10/2018 1st/FinalSurigao del Sur
2nd DEOLF 49 259 3/1/2018 11/14/2018 20.82% C 0.479 0.133 0.300 - - - 91.20%
91.20%
Very SatisfactoryAHD
272 215JAIME B. CHING
ENTERPRISES4256 L A MB GE
Road Widening- Bacolod South Rd
(Kabankalan-Hinobaan Section),
K0098+575-K0100+134, K0100+270-
K0102+131
Negros
Occidental11/14/2018 1st Regional DEO LF 108.43 294 08/05/2018 2/25/2019 1.40% OG 0.395 0.239 0.150 0.030 0.051 0.033 89.80% - AHD
273 216
JAMJLE PROPERTIES
(SUBIC) AND
DEVELOPMENT
CORPORATION
35039 L AA MA GE
Flood Management Program -
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems, Construction/Extension of
Jetty, Kalaklan Mouth
Olongapo City,
Zambales11/7/2018 1st
Zambales 2nd
DEOLF 46.3068412 180 20/07/2018 1/15/2019 3.98% OG 0.400 0.240 0.150 0.030 0.050 0.050 92.00% - AHD
274 217
JANN-NORRIS
CONSTRUCTION AND
SUPPLIES INC
35880 L A MB GE
Road widening of Primary Road, Daang
Maharlika K0216+886 - K0219+092.70,
K00219+224 - K00219+899,
K0219+954.70 - K0220+490.80,
K0220+874.60 - K0222+828
Sta. Fe, Nueva
Vizacaya11/7/2018 1st/Final
Regional Office
No. IILF 157.41 354 12/04/2018 3/31/2019 56.17% C 0.48 0.134 0.300 - - - 91.40%
91.40%
Very SatisfactoryAHD
275 218
JANN-NORRIS
CONSTRUCTION AND
SUPPLIES INC. / ALPHA &
OMEGA GEN.
CONTRACTOR &
DEVELOPMENT CORP.
(JOINT VENTURE)
35880 L A MA GBConstruction of Regional Evacuation
Center
Bayombong,
Nueva Vizcaya11/7/2018 1st/Final
Regional Office
No. IILF 30.31 330 7/31/2017 6/25/2018 1.85% C 0.498 0.161 0.300 - - - 95.90%
95.90%
Very SatisfactoryAHD
276
JANN-NORRIS
CONSTRUCTION AND
SUPPLIES,INC.
35880 L A MB GE
Rehabilitation/Reconstruction/Upgradin
g of Damaged Paved Roads, Daang
Maharlika (LZ) K0233+341 to K023+020
Aritao, Nueva
Vizcaya11/6/2018 1st/Final
Nueva Vizcaya
2nd Disrict
DEO
LF 46.43 197 04/02/2018 8/19/2018 3.93% C 0.448 0.198 0.300 - - - 94.60%94.60%
Very SatisfactoryAHD
277 219
JASA BUILDER'S / CDC
CONSTRUCTION AND
SUPPLIES (JOINT
VENTURE)
JV-17-1203 L AA MA GE
Construction of Slope Protection/ Flood
Control along Pamatawan River Phase
IV, Sta. 1+369.50 to Sta. 2+044.50
San Antonio,
Zambales11/6/2018 1st/Final
Zambales 1st
DEOLF 38.195492 210 05/03/2018 9/30/2018 18.57% C 0.440 0.133 0.300 - - - 87.30%
87.30%
SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 31 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
278 220
JASMIG CONSTRUCTION
CORPORATION / JEMAK
CONSTRUCTION & SUPPLY
(JOINT VENTURE)
26069 L A MB GE
FY 2018 DPWH Infrastructure Program,
Organizational Outcome 1: Ensure Safe
and Reliable National Road System
Network Development Road Widening/
Primary Roads Manila - Batangas Rd.
K0098+739.00 - K0100+340.00,
K0101+435.00 - K0103+7373.00
Batangas
Province11/7/2018 1st
Regional Office
No. IV-ALF 137.6632547 390 19/02/2018 3/15/2019 24.24% OG 0.379 0.240 0.150 0.030 0.047 0.050 89.60% - AHD
279 221JASMIG CONSTRUCTION
SUPPLY26069 L A MB GE
Batangas - Lobo Road - K0109+932 -
K0111+253 (As Advertised -
Organizational Outcome 1: Ensure Safe
and Reliable National Road System,
Network Development, Off- Carriageway
Improvement, Secondary Road,
Batangas - Lobo Road, K0109+932 -
K011+253)
Batangas City,
Batangas11/8/2018 1st/Final
Batangas 2nd
DEOLF 41.55494 160 14/02/2018 7/23/2018 16.60% C 0.478 0.133 0.300 - - - 91.10%
91.10%
Very SatisfactoryAHD
280 222
JBERNARDO
CONSTRUCTION AND
SUPPLY
42108 L D SB GE
Construction of Brgy. Bantay Flood
Control, Construction of Brgy. Boton
Flood Control
Boac,
Marinduque11/15/2018 1st/Final
Marinduque
DEOLF 14.48 212 02/04/2018 10/30/2018 0.00% C 0.421 0.183 0.300 - - - 90.40%
90.40%
Very SatisfactoryONS
281 223
JC PALOMO
CONSTRUCTION &
CONSTRUCTION SUPPLY /
C.T. LEONCIO
CONSTRUCTION &
TRADING (JOINT
VENTURE)
JV-17-1880 L AAA LA GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System:
Network Development Program : Road
Widening - Primary Roads along Daang
Maharlika (LZ)
K0309+000 to
K0309+467 &
K0341+920 to
K0342+542.2,
Cordon, San
11/10/2018 1stRegional Office
No. IILF 166.92 359 12/04/2018 4/5/2019 0.79% OG 0.379 0.239 0.150 0.030 0.042 0.050 89.00% - AHD
282 224JEJAN CONSTRUCTION
AND SUPPLY34712 L C SB GB
Local Infrastructure Program-
Construction of Multi-Purpose Building
Barangay Ilawod East
Legazpi City,
Albay11/13/2018 1st/Final Albay 2nd DEO LF 4.94 120 17/02/2018 6/6/2018 19.27% C 0.499 0.141 0.300 - - - 94.00%
94.00%
Very SatisfactoryAHD
283 225JEJOR'S CONSTRUCTION
CORPORATION5143 L AAA LB GE
Construction / Improvement of Cross -
Country Road, Mainit, Catarman to
Mambajao
Catarman-
Mambajao,
Camiguin
11/14/2018 1st/Final Camiguin DEO LF 46.51 175 15/02/2018 8/8/2018 -1.50% C 0.458 0.200 0.255 - - - 91.30%91.30%
Very SatisfactoryDEL
284 226 JELM CONSTRUCTION 33230 L A MA GE
Rehab./Improvement of Flood Control
Wall along Binahaan River, Tanauan
Section Left Side, Sta. 10+489-Sta10+519,
Right Side: Sta 10+489-Sta 10+891
Tanauan, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 41.00 165 2/2/2018 7/16/2018 0.00% C 0.479 0.133 0.300 - - - 91.20%91.20%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 32 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
285 227JEMAK CONSTRUCTION &
SUPPLY32056 L A MA GE
Construction/ Maintenance of Flood
Mitigation Facilities along Major River
Basins and Principal Rivers -
Construction of Flood Control Structures
along Agos River
Infanta, Quezon 11/9/2018 1st/FinalQuezon 1st
DEO LF 49.00 395 13/02/2018 3/14/2019 33.92% C 0.438 0.200 0.300 - - - 93.80%
93.80%
Very SatisfactoryAHD
286 228
JERCON TRADE
CONSTRUCTION
DEVELOPMENT
8816 L B SB GE
Ensure Safe and Reliable National Road
System - Asset Preservation Program -
Preventivve Maintenance - Primary
Roads: Daang Maharlika (LZ) K0394+(-
827) - K0394+000, K0411+138 -
K0411+190, K0415+520 - K0415+900,
K0416+433 - K0417+144, K0419+152 -
K0419+305
City of Ilagan,
Isabela11/8/2018 1st/Final
Isabela 1st
DEOLF 24.63153199 82 10/05/2018 7/30/2018 3.62% C 0.467 0.133 0.300 - - - 90.00%
90.00%
Very SatisfactoryAHD
287 229JERRY R. SANTIAGO
CONSTRUCTION18453 L B MA GE
Concreting of Kasamne - Pinaltakan
Road, Palayan City, Nueva Ecija
Palayan City,
Nueva Ecija11/8/2018 1st/Final
Nueva Ecija
2nd DEOLF 32.44 120 08/05/2018 9/4/2018 0.00% C 0.464 0.146 0.300 - - - 91.00%
91.00%
Very SatisfactoryONS
288 230
JIMWEN CONSTRUCTION
& GENERAL
MERCHANDISE
33066 L B MA GB
Construction of One (1) Unit Regular
Workshop with Toilet Building at Kipit
Agro Fishery National High School
Labason,
Zamboanga del
Norte
11/6/2018 1st
Zamboanga del
Norte 2nd 1st
DEO
LF 36.03 210 7/8/2018 2/2/2019 -5.96% OG 0.396 0.240 0.090 0.030 0.054 0.017 82.70% - DEL
289
JIMWEN CONSTRUCTION
& GENERAL
MERCHANDISE
33066 L B MA GE
Construction of Drainage at Apovel,
Bulua Section, From Apovel to Bulua
Bridge along Carmen - Patag Road,
Including RROW
Bulua, Cagayan
de Oro City11/5/2018 1st
Cagayan de
Oro City 1st
DEOLF 34.88 256 28/02/2018 11/10/2018 0.31% OG 0.360 0.300 0.150 0.030 0.052 0.050 94.20% - AHD
290 231JJ &J CONSTRUCTION AND
GENERAL SUPPLY30231 L AAA MA GE
Construction of Flood Control Structure
along Mactan Circumferential Road,
K0022+000 - K0024+000
Lapu-Lapu City,
Cebu11/15/2018 1st Cebu 6th DEO LF 33.21 270 2/22/2018 11/18/2018 -3.89% OG 0.388 0.240 0.111 0.030 0.061 0.033 86.30% - DEL
291 232
JJA CONSTRUCTION &
SUPPLY / D.C.E.
CONSTRUCTION /
BLESSING BUILDERS AND
CONSTRUCTION JOINT
VENTURE
JV-17-517 L A GE
Rehabilitaion/Reconstruction of Road
with Slips, Slope Collapse, Landslides
National Roads, Mt. Province-Calanan-
Pinukpuk-Abbut Road
Pinukpuk,
Kalinga11/13/2018 1st
Lower Kalinga
DEOLF 44.14 370 23/04/2018 4/27/2019 17.01% OG 0.383 0.240 0.150 0.022 0.033 0.050 87.80% - AHD
292 233 JMD-68 BUILDERS 36943 L B SB GBConstruction of Unique Workshop
Building, Aglipay National High SchoolAglipay, Quirino 11/9/2018 1st/Final Quirino DEO LF 4.82 80 04/07/2018 9/21/2018 0.00% C 0.495 0.179 0.300 - - - 97.40%
97.40%
OutstandingONS
293 234 JMLD CONSTRUCTION 22679 L D SB GB
Construction of Two (2) Storey ICT
Laboratory Building, Haluban National
High School
Lupi Camarines
Sur11/7/2018 1st
Camarines Sur
5th DEOLF 12.03 120 05/07/2018 11/1/2018 0.26% OG 0.400 0.241 0.150 0.030 0.059 0.050 93.00% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 33 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
294 235 JMT CONSTRUCTION 14186 L AA MA GE
Construction of Flood Control Structure
along Barangays and San Isidro and
Villaflor, Sta. 0+520 to Sta. 0+679
Gigaguit, Surigao
del Norte10/27/2018 1st/Final
Surigao del
Norte 1st DEOLF 27.93 164 2/22/2018 8/4/2018 0.26% C 0.428 0.200 0.300 - - - 92.80%
92.80%
Very SatisfactoryAHD
295 JMT CONSTRUCTION 14186 L A MA GE
Construction of Dike, Revetment along
Tago River Basin (Carromata Section)
Protecting the NIA Dam
San Miguel,
Surigao del Sur11/9/2018 1st/Final
Surigao del Sur
1st DEOLF 32.55 206 3/26/2018 10/17/2018 2.49% C 0.406 0.200 0.300 - - - 90.60%
90.60%
Very SatisfactoryAHD
296 236JONIK TRADING &
CONSTRUCTION20612 L B MA GE
Asset Preservation - Preventive
Maintenance - Secondary Roads
Alaminos - Bolinao Road (K0323+199 -
K0324+634; K0339+632 - K0340+530)
Bani, Pangasinan 11/14/2018 1st/FinalPangasinan 1st
DEOLF 36.21 75 09/02/2018 4/24/2018 1.33% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryAHD
297 237JQD CONSTRUCTION AND
GENERAL SERVICES18852 L A MB GB
Buildings and Other Structures-Multi-
Purpose/Facilities-Local Infrastructure
Program/Construction of Multi-Purpose
Building - Construction of Multi-Purpose
Building (Gym and Sports Center)
Maasin City,
Southern Leyte11/12/2018 1st
Southern Leyte
DEOLF 19.80 195 5/29/2018 12/9/2018 0.00% OG 0.398 0.236 0.150 0.030 0.047 0.050 91.10% - ONS
298 238JRD CONSTRUCTION AND
SUPPLY37318 L D SB GE
Concreting of Pabalay-Potia FMR,
Barangay Potia
Alfonso Lista,
Ifugao11/9/2018 1st/Final
Ifugao 2nd
DEOLF 4.77 60 03/07/2018 8/31/2018 0.00% C 0.485 0.133 0.300 - - - 91.80%
91.80%
Very SatisfactoryONS
299 239 JTA BUILDERS 18401 L A MA GB Completion of Municipal GymVillanueva,
Misamis Oriental11/9/2018 1st/Final
Misamis
Oriental 2nd
DEOLF 18.37 238 12/02/2018 10/7/2018 0.00% C 0.500 0.131 0.300 - - - 93.10%
93.10%
Very SatisfactoryONS
300 240JTC CRUZ CONSTRUCTION
CO. INC32479 L AA MA GE
Asset Preservation Program - Preventive
Maintenance - Tertiary Roads - Lipa City -
Alaminos Road, K0076+965 to
K0078+800
Alaminos,
Laguna11/14/2018 1st/Final
Laguna 3rd
DEOLF 28.21 75 29/06/2018 9/11/2018 0.00% C 0.464 0.200 0.300 - - - 96.40%
96.40%
Very SatisfactoryONS
301 241 KALINGA BUILDERS 16046 L B MA GE
Construction/Improvement of Poblacion
Tinglayan-Tulgao East- Tulgao West in
Support of Processed Food Industry,
Blacksmith Industry and Rattan/Bamboo
Weaving Industry, Tinglayan, Kalinga
tinglayan,
kalinga11/12/2018 1st
Upper Kalinga
DEOLF 33.42 240 19/03/2018 11/13/2018 -4.63% OG 0.394 0.252 0.104 0.030 0.061 0.033 87.40% - DEL
302 KALINGA BUILDERS 16046 L B MA GE
Asset Preservation -
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse and Landslide
along Mt. Province Boundary-Calanan-
Pinukpuk-Abbut Road
tinglayan,
kalinga11/13/2018 1st
Upper Kalinga
DEOLF 25.23 247 15/03/2018 11/16/2018 -4.30% OG 0.326 0.300 0.107 0.030 0.052 0.033 84.80% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 34 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
303 242 KANE CONSTRUCTION 2888 L A MB GE
Contract Package 13: Brigde Program-
Widening of Permanent Bridges:
A.)Demonstrating Brigde along
Demonstration Road B.) Kennon Bridge
along Kennon Road
Baguio City 11/11/2018 1stBaguio City
DEOLF 15.78 240 5/17/2018 1/11/2019 -1.28% OG 0.305 0.300 0.137 0.030 0.050 0.033 85.50% - DEL
304 243
KATHA BUILDERS /
DRAGON TWELVE
BUILDERS &
CONSTRUCTION SUPPLY
JV-17-2342 L A MB GE
Rehabilitation/Major Repair of
Permanent Bridges - Abuan Br.
(BO3237LZ) along Ilagan - Bigao -
Palanan Road
Ilagan City,
Isabela11/8/2018 1st/Final
Isabela 1st
DEOLF 27.87998088 134 10/04/2018 8/21/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
305 244KAUIE BUILDERS AND
CONSTRUCTION SUPPLIES33841 L C SB GE
Construction of Flood Control Badiang
River
Badiang, Villaba,
Leyte11/8/2018 1st/Final Leyte 3rd DEO LF 9.60 150 2/6/2018 7/5/2018 0.00% C 0.447 0.133 0.300 - - - 88.00%
88.00%
SatisfactoryONS
306 245
KEASCIA CONSTRUCTION
& SUPPLY / SANSTORM
CONSTRUCTION (JOINT
VENTURE)
JV-17-535 L A MA GB
Construction of Three (3) Storey, Twelve
(12) Classroom School Building at Calaca
Central School
Calaca, Batangas 11/7/2018 1st/FinalBatangas 1st
DEOLF 28.86938 300 1/15/2018 11/10/2018 4.00% C 0.491 0.133 0.300 - - - 92.40%
92.40%
Very SatisfactoryAHD
307 246
KEILANA RESOURCE AND
DEVELOPMENT
CORPORATION
37270 L AAA LB GE
Road Upgrading (Unpaved to Paved)
Culandanum- Panalingaan Cross Country
Road, Chainage 14869- Chainage
16169/Chainage 16210- Chainage 16442/
Chainage 18680- Chainage 20009
Rizal, Palawan 11/9/2018 2ndPalawan 2nd
DEOLF 71.03 348 14/03/2018 2/24/2019 40.89% OG 0.384 0.300 0.150 0.020 0.056 0.050 96.00% - AHD
308 247
KGD BUILDERS / EL-JAKE
BUILDERS (JOINT
VENTURE)
JV-17-973 L B MA GE
Construction of Flood Mitigation
Structures along Albert Morrow Blvd.
(Western Section), (Silway-Sinawal River
Basin), Sta.0+000 to Sta.0+183
General Santos
City, South
Cotabato
11/14/2018 2nd/Final
South
Cotabato 2nd
DEO
LF 24.49 188 4/17/2018 10/21/2018 2.75% C 0.472 0.200 0.300 - - - 97.20%92.34%
Very SatisfactoryAHD
309 248 KIRSKAT VENTURE 32042 L A MB GE
Improvement/Widening National Roads-
Secondary Roads, Iloilo-East, Coast Capiz
Road, K0134+458- K0135+270,
K0137+484.45-K0138+656.45,
K0159+785- K0160+802.2-K0161+302.2,
K0162+644-K0162+894, K0162+921-
K0163+551
Pontevedra &
Pilar Capiz12/11/2018 1st/Final Capiz 1st DEO LF 96.50 327 16/03/2017 2/5/2018 0.00% C 0.468 0.153 0.300 - - - 92.10%
92.10%
Very SatisfactoryONS
310 KIRSKAT VENTURE 32042 L A MA GE
Construction of Concrete Road- Access
Road from Barangay Balaring Leading to
the Beach Area
Barangay Basiao,
Ivisan, Capiz11/8/2018 2nd/Final Capiz 2nd DEO LF 16.91 128 10/05/2018 9/14/2018 0.00% C 0.479 0.133 0.300 - - - 91.20%
84.78%
SatisfactoryONS
311 249KMD BUILDERS AND
CONSTRUCTION SUPPLY33971 L A SB GB Construction of Multi Purpose Building
Brgy. San
Ramos,
Nagtipunan,Quiri
no
11/9/2018 1st/Final Quirino DEO LF 4.45 90 08/03/2018 6/5/2018 0.00% C 0.497 0.155 0.300 - - - 95.20%95.20%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 35 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
312 250 KVC CONSTRUCTION 28959 L A MA GE
Network Development-Off-Carriageway
Improvement of Secondary Road along
Kabugao-Pudtol-Luna-Cagayan Boundary
Road- KO672+698-KO672+808-
KO672+781, KO673+012-KO672+975-
KO673+012-KO677+100-KO677+166-
KO677+596-KO677+166-KO677+448-
KO677+519-KO677+596, KO677+582 -
K0679+000, KO679+650-36, KO657+798 -
KO559+125
kabugao-pudtol-
luna-cagayan
boundary road
11/16/2018 1stApayao 2nd
DEOLF 30.43 240 06/04/2018 12/1/2018 0.46% OG 0.373 0.245 0.150 0.030 0.061 0.033 89.20% - AHD
313 251L.B LEONCIO TRADING &
CONSTRUCTION31587 L B MA GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems, Construction fo Panacan
Seawall
Narra, Palawan 11/8/2018 1st/FinalPalawan 2nd
DEOLF 19.01 150 4/11/2018 9/7/2018 0.00% C 0.400 0.200 0.300 - - - 90.00%
90.00%
Very SatisfactoryONS
314 252
L.C. TING
CONSTRUCTION/ FIVE
STAR BUILDERS (JOINT
VENTURE)
JV-17-1423 L A MB GEConstruction of Concrete Road NRJ
Leading to Aurora Wonderland
Barangay
Bayabas, Aurora,
Zamboanga del
Sur
11/10/2018 1st/finalZamboanga del
Sur 1st DEOLF 18.62 120 12/04/2018 8/9/2018 0.00% C 0.493 0.134 0.300 - - - 92.70%
92.70%
Very SatisfactoryONS
315 253 L.M.G. CONSTRUCTION 5719 L A MA GE
Construction of Concrete Slope
Protection with Steel Sheet Pile and Box
Culvert
Brgy.
Concepcion, Sto.
Domingo
11/12/2018 1st/FinalNueva Ecija 1st
DEOLF 19.14 150 29/01/2018 6/27/2018 0.00% C 0.487 0.200 0.300 - - - 98.70%
98.70%
OutstandingONS
316 254 L.R TIQUI BUILDERS, INC 13810 L AAA LB GE
Ensure Safe and Reliable National Road
System (MFO-1), Network Development -
Construction of Flyovers / Interchanges /
Underpasses / Long Span Bridges,
Construction of Underpass along MSR
Diversion Road, K0129+260 to
K0129+563.8
Lucena City 11/19/2018 1st Quezon 2nd
DEOLF 139.93 450 26/02/2018 5/21/2019 -0.08% OG 0.389 0.240 0.149 0.030 0.047 0.050 90.50% - DEL
317 255L.S.D CONSTRUCTION &
SUPPLIES8980 L AAA MB GE
Flood Management Program,
Construction/Maintenance of Flood
Mitigation Structures and Drainage
System, Rehabilitation/Restoration of
Upper Chico River Flood-Erosion Control
Projects-Magatiley Monamon Sur
Bauko,Mountain
Province11/9/2018 2nd/Final
Mt. Province
DEO,LF 88.26 273 05/03/2018 11/2/2018 0.00% C 0.325 0.200 0.300 - - - 82.50%
84.06%
SatisfactoryONS
318 256 LABB CONSTRUCTION 13524 L A MB GE
Rehabilitation/Reconstruction/Upgradin
g of Damaged Paved Road - Tagbilaran
East Road (Tagbilaran-Jagna) K0251+000-
K0252+876
Baclayon, Bohol 11/6/2018 1st Bohol 1st DEO LF 51.93 264 4/23/2018 1/11/2019 1.70% OG 0.378 0.240 0.150 0.030 0.060 0.050 90.80% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 36 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
319 LABB CONSTRUCTION 13524 L A MB GE
Network Development-
Improvement/Widening of National
Roads-Primary Roads- other Primary
Roads Ormoc- Baybay-Southern Leyte
Boundary Road-K1043+120-K1043+325,
K1043+341-K1043+809, K1043+838-
K1044+870, K1046+835-K1047+147,
K1047+824-K1048+091, K1048+105-
K1049+651, K1049+963-K1050+349,
K1038+000-K1038+254, K1038+266-
K1038+632, K1038+660-K1039+000
Baybay City,
Leyte11/10/2018 1st/Final Leyte 5th DEO LF 144.75 450 7/19/2017 10/11/2018 0.00% C 0.480 0.148 0.300 - - - 92.80%
92.80%
Very SatisfactoryONS
320 257LADY OF ASSUMPTION
ENTERPRISES25360 L AA MB GE
Construction/ Improvement of Access
Roads Leading to Seaports-Access Road
Leading to Hindang Port
Hindang, Leyte 11/12/2018 1st/Final Leyte 5th DEO LF 19.60 150 2/19/2018 7/18/2018 0.00% C 0.467 0.133 0.300 - - - 90.00%90.00%
Very SatisfactoryONS
321 258LAHDETH CONSTRUCTION
AND SUPPLY 34833 L C SB GB
Construyction of Two(2) Storey , Four (4)
Classrooms School Building, Ragay
Central School
Ragay Camarines
Sur11/7/2018 1st
Camarines Sur
5th DEO LF 9.69 120 05/07/2018 11/1/2018 1.07% OG 0.392 0.240 0.150 0.030 0.059 0.050 92.10% - AHD
322 259
LEDA CONSTRUCTION
INC. / ROCKWORLD
INDUSTRIES (JOINT
VENTURE)
17-1623 L A MA GE
Widening of Permanent Bridges,
Telegrafo I Bridges (B00039LT) along
Daang Maharlika (LT) Road Tolosa, Leyte
Tolosa, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 19.53 247 2/6/2018 10/10/2018 0.00% C 0.455 0.161 0.300 - - - 91.60%91.60%
Very SatisfactoryONS
323 260
LEGACY CONSTRUCTION /
ASHLEYKA
CONSTRUCTION AND
SUPPLIES (JOINT
VENTURE)
JV-16-1460 L A MB GE
Off-Carriage Improvement Including
Drainage of Tablas Circumferential Road,
Section 2: K0002+700 -K0002+937;
Section 3: K0018+200 -K0019+003;
Section 4: K0044+000 -K0045+129;
Section 5: K0053+000 -K0053+643;
Section 6: K0075+100 -K0076+304;
Section 7: K0092+000 -K0092+076
Tablas Island,
Romblon10/19/2018 1st/Final
Regional Office
No. IV-BLF 93.59 427 22/05/2017 7/22/2018 0.00% C 0.478 0.151 0.300 - - - 92.90%
92.90%
Very SatisfactoryONS
324 261LEGACY CONSTRUCTION
CORPORATION22465 L A MA GE
Construction of Banadero Flood Control
Structure
Calatrava,
Romblon11/15/2018 1st Romblon DEO LF 46.88 335 14/03/2018 2/11/2019 12.01% OG 0.396 0.300 0.150 0.030 0.042 0.050 96.80% - AHD
325LEGACY CONSTRUCTION
CORPORATION22465 L A LA GE
Construction/Improvement of Jct.
Manay-Taocanga Road Leading to
Diamaboc Lake
Manay, Davao
Oriental11/7/2018 2nd
Davao Oriental
1st DEOLF 93.1 228 4/1/2018 11/14/2018 1.21% OG 0.380 0.238 0.150 0.030 0.061 0.050 90.90% - AHD
326
LEGACY CONSTRUCTION
CORPORATION
(FORMERLY: LEGACY
CONSTRUCTION)
22465 L AA LA GE
Preventive Maintenance, Asphalt
Overlay of Surigao Wharf Road,
K1123+641.00 – K1125+068.00
Surigao City,
Surigao del
Norte
11/8/2018 1st/FinalSurigao del
Norte 1st DEOLF 23.9 95 4/10/2018 7/13/2018 0.00% C 0.449 0.134 0.300 - - - 88.30%
88.30%
SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 37 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
327 262
LEGACY CONSTRUCTION
CORPORATION / GROUP
UP CONSTRUCTION AND
SUPPLIES (JOINT
VENTURE)
JV-17-1777 L AA LA GE
Paving of Unpaved Roads -Tertiary
Roads, Lubi-Binoog Roads, K0065+836 -
K0068+319 (As Modified ) K0065+836 -
K0067+661.87
Tablas Island,
Romblon11/15/2018 1st Romblon DEO LF 93.55 210 30/05/2018 12/25/2018 -4.89% OG 0.368 0.300 0.101 0.030 0.040 0.017 85.60% - DEL
328 263
LEGAZPI PREMIUM
DEVELOPMENT
CORPORATION
20701 L AAA LB GE
Network Development Program - Off
Carriageway Improvement - Secondary
Roads - Junction Putiao - Pillar - Donsol
Road K0544+(-980) - K0547+074
Pillar, Sorsogon 11/7/2018 1stSorsogon 1st
DEOLF 93.09 270 18/04/2018 1/12/2019 7.00% OG 0.383 0.243 0.150 0.020 0.037 0.033 86.60% - AHD
329 264LIBRIUS CONSTRUCTION
& SUPPLY CORPORATION23580 L A SB GE
Organizational Outcome 2: Protect Lives
and Properties Against Major Floods,
Flood Management Program,
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems, Construction of Slope
Protection/Revetment at Laiya Bridge
Brgy. San Juan,
Batangas11/6/2018 1st/Final
Batangas 4th
DEOLF 9.8 259 28/02/2018 11/13/2018 4.78% C 0.489 0.133 0.300 - - - 92.20%
92.20%
Very SatisfactoryAHD
330 265LJPM BUILDERS &
CONSTRUCTION SUPPLY29981 L B SB GE
Construction/Extension of Flood Control
Structures along Bool River Protecting
Bool Bridge and Biliran Circumferential
Road, (11.550, 000.00) Culaba, Province
of Biliran
Culaba, Province
of Biliran11/7/2018 1st/Final Biliran DEO LF 11.55 114 2/18/2018 6/11/2018 1.18% C 0.478 0.133 0.300 - - - 91.10%
91.10%
Very SatisfactoryAHD
331 266LLM UNIFIED BUILDERS &
TRADING CORP.14235 L B MA GE
Improvement/Rehabilitation of Drainage
(Grouted Riprap) at Brgy. Tugbok (To
Carmelite)
Tugbok District,
Davao City11/11/2018 2nd/Final
Davao City 2nd
DEOLF 19.6 162 3/27/2018 9/4/2018 0.00% C 0.404 0.143 0.300 - - - 84.70%
84.04%
SatisfactoryONS
332 267LM CONSTRUCTION AND
GENERAL MARKETING33727 L B MA GE
Construction/Improvement of Access
Roads Leading to Declared Tourism
Destinations of NRJ Brgy. 1-Bitan-Agan-
Das-Agan Road Leading to Cave City/
Aningaw Cave K0+000 – K1+280
San Francisco,
Agusan del Sur11/12/2018 2nd/Final
Agusan del Sur
2nd DEOLF 44.1 240 3/12/2018 11/6/2018 2.50% C 0.491 0.138 0.300 - - - 92.90%
91.24%
Very SatisfactoryAHD
333 268 LMD CONSTRUCTION 9410 L B MA GBConstruction of One (1) Storey Two (2)
Classroom School Building at Lenienza ES
Pagadian City,
Zamboanga del
Sur
11/10/2018 1stZamboanga del
Sur 1st DEOLF 3.12 85 19/09/2018 12/12/2018 3.39% OG 0.399 0.230 0.150 0.015 0.047 0.050 89.10% - AHD
334 269
LUCBAN BUILDERS AND
CONSTRUCTION SUPPLY
INCORPORATED
31336 L B MA GEConstruction of Barangay Road,
Barangay AliliwLucban, Quezon 11/9/2018 1st/Final
Quezon 1st
DEO LF 4.95 180 16/03/2018 9/11/2018 0.00% C 0.441 0.186 0.300 - - - 92.70%
92.70%
Very SatisfactoryONS
335 270LUCK-WELL
CONSTRUCTION17510 L AAA MA GE
Construction of Seaport (Rock Causeway
with Stair Landing and Roro Ramp on
Fill)
Tubalan, Malita,
Davao
Occidental
11/13/2018 1st
Davao
Occidental
DEO
LF 49.35 360 4/11/2018 4/5/2019 -0.32% OG 0.392 0.240 0.147 0.030 0.051 0.033 89.30% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 38 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
336 271LUCKY A CONSTRUCTION
CORPORATION38293 L C SB GE
Concreting of Calimag FMR, Barangay
Calimag
Alfonso Lista,
Ifugao11/9/2018 1st/Final
Ifugao 2nd
DEOLF 4.65 60 03/07/2018 8/31/2018 -1.20% C 0.486 0.133 0.264 - - - 88.30%
88.30%
SatisfactoryDEL
337 272LUMEL GLENN
CONSTRUCTION26817 L B MA GE
Restoration of Alag River Control
Approach "B" Upstream
Baco, Oriental
Mindoro11/9/2018 1st/Final
Mindoro
Oriental DEOLF 8.74 234 08/03/2018 10/27/2018 0.00% C 0.426 0.134 0.300 - - - 86.00%
86.00%
SatisfactoryONS
338LUMEL GLENN
CONSTRUCTION26817 L B MA GE
Construction of Flood Mitigation with
Major River Basins and Principal Rivers,
Construction of Balite River Control
Structure
Gloria, Oriental
Mindoro11/12/2018 1st
Southern
Mindoro DEOLF 48.80 200 28/05/2018 12/13/2018 1.42% OG 0.328 0.300 0.150 0.030 0.035 0.050 89.30% - AHD
339LUMEL GLENN
CONSTRUCTION26817 L B MA GE
Construction of Flood Mitigation
Structures and Drainage Systems,
Construction of San Mariano River
Control Structure
Roxas, Oriental
Mindoro11/12/2018 1st
Southern
Mindoro DEOLF 49.00 315 25/04/2018 3/5/2019 0.60% OG 0.303 0.300 0.150 0.030 0.055 0.050 88.80% - AHD
340 273M. MONTESCLAROS
ENTERPRISES, INC. 6506 L AAA LB GE
Concreting of Jct. Sayre Highway- Mt.
View College
Valencia City,
Bukidnon11/13/2018 1st/Final
Regional Office
No. XLF 241.25 416 05/06/2017 7/25/2018 29.09% C 0.482 0.132 0.300 - - - 91.40%
91.40%
Very SatisfactoryAHD
341 274
M.A GUINTO
CONSTRUCTION (SAN
JOSE BRANCH)
26576 L B MA GB
National Building Program - Multi-
Purpose / Facilities, Construction of
DPWH Building, Mindoro Occidental
DEO
Mamburao,
Occidental
Mindoro
11/7/2018 2nd
Mindoro
Occidental
DEO
LF 16.66 249 05/02/2018 10/11/2018 -4.86% OG 0.400 0.241 0.101 0.030 0.047 0.033 85.20% - DEL
342 275
M.G. LUALHATI
CONSTRUCTION CORP./
M.V. SABALBURO CONST.
AND SUPPLY
JV-16-2042 L AA MB GE
Construction and Maintenance of
Bridges along National Roads.
Replacement of Permanent Weak
Bridges, Quinarayan Bridge along Manila
North Road
Narvacan, Ilocos
Sur11/8/2018 2nd/Final
Ilocos Sur 2nd
DEOLF 38.00 281 7/11/2017 4/17/2018 0.00% C 0.474 0.133 0.300 - - - 90.70%
87.04%
SatisfactoryONS
343 276M.S. RAMOS
CONSTRUCTION INC. 31684 L B MA GE
Construction/Rehabilitation of Flood
Control Structure along Bocaue River at
Tambubong Section
Bocaue, Bulacan 11/6/2018 1st/FinalBulacan 1st
DEOLF 23.27 180 20/03/2018 9/15/2018 16.00% C 0.442 0.133 0.300 - - - 87.50%
87.50%
SatisfactoryAHD
344 277 MAC BUILDERS 7249 L AAA LB GEConstruction of Flood Mitigation
Structure, BacanAlbuera, Leyte 11/9/2018 1st/Final Leyte 4th DEO LF 18.62 210 3/2/2018 9/27/2018 0.00% C 0.406 0.201 0.300 - - - 90.70%
90.70%
Very SatisfactoryONS
345 278MACASAET BUILDERS
AND TRADING37440 L B SB GE
Construction of Flood Control and
Mitigation Structures at Inayawan River,
Irawan - Tagburos Road, K0014+700,
Irawan - Tagburos Road
Puerto Princesa
City11/7/2018 1st
Palawan 3rd
DEOLF 9.50 150 08/03/2018 8/4/2018 -2.46% OG 0.339 0.300 0.125 0.030 0.061 0.000 85.50% - DEL
346 279MAER SUMMIT
KONSTRUKT CO.25262 L AA LA GE
Road Widening (2 into 4 lanes) along Jct.
Manikling- Governor- Generoso Road
San Isidro, Davao
del Norte11/6/2018 1st/Final
Davao Oriental
2nd DEOLF 48.75 179 23/02/2018 8/20/2018 0.00% C 0.476 0.132 0.300 - - - 90.80%
90.80%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 39 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
347 280 MAFIL BUILDERS, INC 35845 L B SB GBConstruction of Multi-purpose Building,
Brgy. Casisang
Malaybalay City,
Bukidnon11/12/2018 1st
Bukidnon 1st
DEO LF 9.9 186 28/05/2018 11/29/2018 5.08% OG 0.387 0.257 0.150 0.030 0.035 0.050 90.90% - AHD
348 281MAGNA RICH TRADING &
CONSTRUCTION29108 L B MA GE
Network Development Program - Road
Widening of Tertiary Roads Along San
Pablo - Dolores Road - K0087+(-1386) to
K0087+(-386)
San Pablo City,
Laguna11/14/2018 1st/Final
Laguna 3rd
DEOLF 28.59 225 06/02/2018 9/18/2018 0.00% C 0.480 0.134 0.300 - - - 91.40%
91.40%
Very SatisfactoryONS
349 282 MAKAPA CORPORATION 30029 L AA MB GE
Construction / Improvement of
Cabilogan River Course (Downstream),
Balangibang
Polangui, Albay 11/5/2018 1st Albay 3rd DEO LF 18.63 180 12/04/2018 10/8/2018 -3.51% OG 0.392 0.268 0.155 0.020 0.030 0.033 85.80% - DEL
350 MAKAPA CORPORATION 30029 L AA MA GEConstruction of Flood Control Structure
along Cadac-an River
Sangkayon,
Juban Sorsogon11/8/2018 1st/Final
Sorsogon 2nd
DEOLF 48.25 269 01/08/2018 4/26/2019 0.00% C 0.475 0.133 0.300 - - - 90.80%
90.80%
Very SatisfactoryONS
351 283
MAMSAR CONSTRUCTION
AND INDUSTRIAL
CORPORATION/ AEJ
HARDWARE
CONSTRUCTION &
ENTERPRISES JOINT
VENTURE
JV-16-459 L AAA MA GE
Construction of Flood Control at Labuan
River, Labuan Section, (Including Right of
Way Acquisition)
Zamboanga City
1st LD11/15/2018 2nd/Final
Zamboanga
City DEOLF 26.91 379 3/22/2017 4/4/2018 0.00% C 0.476 0.133 0.300 - - - 90.90%
90.30%
Very SatisfactoryONS
352 284MARC JILL
CONSTRUCTION39585 L B SB GE
Concreting Sitio Ilaya - Anilao FMR,
Brgy. Camansihan
Calapan City,
Oriental
Mindoro
11/10/2018 1st/FinalMindoro
Oriental DEOLF 4.77 99 27/05/2018 9/2/2018 18.00% C 0.484 0.133 0.300 - - - 91.70%
91.70%
Very SatisfactoryAHD
353MARC JILL
CONSTRUCTION39585 L B SB GE
Rehabilitation / Reconstruction of Alag
Gabions
Baco, Oriental
Mindoro11/10/2018 1st/Final
Mindoro
Oriental DEOLF 4.25 51 10/05/2018 6/29/2018 0.00% C 0.454 0.133 0.300 - - - 88.70%
88.70%
SatisfactoryONS
354MARC JILL
CONSTRUCTION39585 L B SB GB
Construction of 1-3 Storey 6 Classrooms
Reg. Workshop at San Agustin NHS,
Naujan
Naujan, Oriental
Mindoro11/10/2018 1st
Mindoro
Oriental DEO LF 13.49 210 07/06/2018 1/2/2019 1.04% OG 0.300 0.240 0.150 0.030 0.041 0.050 81.10% - AHD
355 285MARCBILT
CONSTRUCTION INC.21844 L AAA GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System,
Network Development Program, Road
Widening, Primary Roads, Daang
Maharlika (L7) - K0059+411 - K0060+003,
K0060+794 - K0060+915, K0060+988.3 -
K0061+379
Sto. Tomas,
Batangas11/10/2018 1st
Batangas 3rd
DEOLF 96.49159805 360 17/04/2018 4/11/2019 12.57% OG 0.392 0.240 0.150 0.030 0.070 0.050 93.20% - AHD
356 286MARCPHIL
CONSTRUCTION10949 L A MB GE
Rehabilitation / Reconstruction /
Upgrading of Damaged Paved Roads,
MOOECR (k0201+833 - K0202+361.50)
Bulalacao,
Oriental
Mindoro
11/13/2018 1st/FinalSouthern
Mindoro DEOLF 15.33 190 12/04/2018 10/18/2018 0.00% C 0.462 0.200 0.300 - - - 96.20%
96.20%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 40 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
357 287MAR-DEB CONSTRUCTION
& DEVELOPMENT6715 L AAA MA GE
Network Development -
Improvement/Widening of National
Roads - Cauayan - Cabatuan Road -
K0375+549 - K0377+436 - K0377+549 -
K0378+668
Luna - Cabatuan,
Isabela11/6/2018 1st/Final
Isabela 3rd
DEOLF 64.84347702 205 08/02/2018 8/31/2018 2.90% C 0.478 0.132 0.300 - - - 91.00%
91.00%
Very SatisfactoryAHD
358
MAR-DEB CONSTRUCTION
& DEVELOPMENT
CORPORATION
6715 L AAA MA GE
Rehab./ Reconstruction of Roads with
Slips, Slope Collapse and Landslide -
Secondary Roads jct. Nat'l-Potia Road
(K0342+018 - K0342+250, K0343+780 -
K0344+257)
Ramon, Isabela 11/10/2018 1st/FinalIsabela 4th
DEOLF 45.84 270 05/02/2018 11/1/2018 0.50% C 0.438 0.133 0.300 - - - 87.10%
87.10%
SatisfactoryAHD
359 288MASBATE-ILOILO CONST.
& TRADING CORP.26579 L D SB GB
Construction of Multi-Purpose Building
(Day Care)
Rizal Estanzuela,
City Proper,
Iloilo
11/16/2018 1st/Final Iloilo City DEO LF 4.66 181 02/04/2018 9/29/2018 0.00% C 0.500 0.134 0.300 - - - 93.40%93.40%
Very SatisfactoryONS
360 289MAVERICK BUILDERS
INCORPORATED14466 L AAA LB GE
Widening (2 into 4 lanes) of Pres.
Diosdado P. Macapagal National
Highway including Slope Protection and
ROW (Brgy. Badas-Brgy. Dawan Section),
K1727+572-K1729+270
Davao Oriental 11/6/2018 1st Regional DEO LF 139.83 269 5/28/2018 2/20/2019 0.08% OG 0.399 0.289 0.150 0.030 0.061 0.050 97.00% - AHD
361 290 MBM CONSTRUCTION 37891 L B SB GE
Construction of Concrete Road- Access
Road Leading to Gugma Inns and Beach
Resorts
Lanoy, Sapian,
Capiz11/8/2018 2nd/Final Capiz 2nd DEO LF 14.40 159 24/04/2018 9/29/2018 0.00% C 0.465 0.134 0.300 - - - 89.90%
88.46%
SatisfactoryONS
362 291 MEGAY CONSTRUCTION 34354 L A SB GE
Operations: Organizational Outcome 1:
Ensure Safe & Reliable National Road
System, Network Development Program,
Road Widening, Santiago - Tuguegarao
Road, K0435+144 - K0436+226
Enrile, Cagayan 11/14/2018 2nd/FinalCagayan 3rd
DEOLF 28.50265453 180 30/04/2018 10/26/2018 9.04% C 0.448 0.134 0.300 - - - 88.20%
90.54%
Very SatisfactoryAHD
363 292 META CONSTRUCTION 28882 L B SB GB
Construction of Two Storey (4
Classroom) 2 ICT Lab. Building Cagasat
National High School
Magsaysay
Annex, Cordon11/11/2018 1st
Isabela 4th
DEOLF 9.16 148 16/07/2018 12/10/2018 4.06% OG 0.384 0.242 0.150 0.030 0.047 0.050 90.30% - AHD
364 293 MFN BUILDERS 36402 L B MA GB
Construction of Elementary and
Secondary Classrooms 3 Storey 12
Classrooms Buayan National High School
General Santos
City11/14/2018 1st/Final
South
Cotabato 2nd
DEO
LF 27.88 205 1/16/2018 8/8/2018 0.00% C 0.496 0.133 0.300 - - - 92.90%92.90%
Very SatisfactoryONS
365 294MG SAMIDAN
CONSTRUCTION33234 L A MB GE
Convergence and Special Support
Program, Construction/Improvement of
Access Roads leading to Trades,
Industries and Economic Zones,Lukib-
Naigawa-Tamog-o-Suyo-Panas Road in
Support to Agribusiness Industry
Bauko,Mountain
Province11/9/2018 2nd/Final
Mt. Province
DEOLF 23.55 179 18/04/2018 10/13/2018 0.00% C 0.365 0.199 0.300 - - - 86.40%
88.62%
SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 41 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
366 295MGB CONSTRUCTION &
TRADING 32387 L AAA LB GE
Construction of Road Slope Protection
Structure, Puerto Princessa South Road,
K0033+655 -K0033+705; K0033+950 -
K0033+980; K0034+025 -K0034+115;
K0034+280 -K0034+560; K0034+580 -
K0034+760; K0034+800 -K0034+950;
K0034+950 -K0035+305
Puerto Princesa
City, Palawan11/7/2018 1st
Palawan 3rd
DEOLF 49.28 285 26/03/2018 1/4/2019 17.56% OG 0.378 0.266 0.150 0.020 0.051 0.033 89.80% - AHD
367 296
MICKAJETTE
CONSTRUCTION AND
TRADING
35239 L D SB GB
Local Infrastructure Program/ Building
and other Structure / Multi-
Purpose/Facilities;
Construction/Rehabilitation of Multi-
Purpose Building (Covered Court)
Bonifacio V. Romero
Barangay Pulung
Cacutud,
Angeles City,
Pampanga
11/13/2018 1st/FinalPampanga 3rd
DEOLF 1.92186934 90 10/04/2018 7/8/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
368
MICKAJETTE
CONSTRUCTION AND
TRADING
35239 L D SB GE
Concreting of Barangay Magsaysay FMR,
Barangay Magsaysay, Castillejos,
Zambales
Castillejos,
Zambales11/7/2018 1st/Final
Zambales 2nd
DEOLF 4.64139058 55 22/06/2018 8/15/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%
90.40%
Very SatisfactoryONS
369 297
MICLOVER GENERAL
CONSTRUCTION & IRON
WORKS
31527 L B MA GB
CY 2017 Basic Educational Facilities Fund
(Construction of Classroom) Batch 7,
Construction of 4STY8CL Tanauan School
of Fisheries
Tanauan City,
Batangas11/10/2018 2nd/Final
Batangas 3rd
DEOLF 21.6097317 285 11/21/2017 9/1/2018 0.00% C 0.453 0.134 0.300 - - - 88.70%
92.27%
Very SatisfactoryONS
370 298 MIGO CONSTRUCTION 34663 L D SB GBConstruction of New Barangay Gym, San
Antonio, Brgy. Sta. Cruz
Koronadal City,
South Cotabato11/5/2018 2nd/Final
South
Cotabato 1st
DEO
LF 2.47 105 3/1/2018 6/13/2018 0.00% C 0.500 0.134 0.300 - - - 93.40%89.20%
Very SatisfactoryONS
371 299MJMARI BUILDERS AND
ENTERPRISES36434 L A MA GB
Construction of Two (2) Storey Six (6)
Classroom School Building at Buug
Central SPED Center
Buug,
Zamboanga
Sibugay
11/13/2018 2nd
Zamboanga
Sibugay 1st
DEO
LF 11.86 170 17/06/2018 12/3/2018 -4.79% OG 0.396 0.228 0.102 0.030 0.064 0.033 85.30% - DEL
372 300
MONOLITHIC
CONSTRUCTION &
CONCRETE PRODUCTS,
INC.
5733 L AAA LB GE
Off-Carriageway Improvement of
Romblon-Cogon-Sablayan Road,
K0007+280 - K0008+708, K0011+000 -
K0013+724, K0013+915 - K0014+430,
K0015+792 - K0016+009, K0017-054 -
K0017+356, K0017+659 - K0017+861 (As
Modified) K0007+280 - K008+699.4,
K0011+000 - K0013+710.4, K0013+871.3,
K0014+430, K0015+714.5 - K0016+020,
K0017+035 - K0017+372, K0017+646.4 -
K0017+880
Romblon,
Romblon11/16/2018 1st Romblon DEO LF 48.21 208 07/05/2018 11/30/2018 -8.86% OG 0.350 0.300 0.061 0.030 0.040 0.000 78.10% - DEL
373
MONOLITHIC
CONSTRUCTION &
CONCRETE PRODUCTS,
INC.
5733 L AAA LB GE
Construction of Missing Links/ New
Roads, Dr. Damian Reyes Memorial
Road, Marinduque, K0028+056.50 -
K0030+056.50
Boac,
Marinduque11/15/2018 1st
Marinduque
DEOLF 96.50 389 01/03/2018 3/24/2019 -0.64% OG 0.400 0.300 0.144 0.022 0.056 0.017 93.90% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 42 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
374
MONOLITHIC
CONSTRUCTION &
CONCRETE PRODUCTS,
INC.
5733 L AAA GE
Construction of Lunas Flood Control
Structure Along Romblon-Cogon
Sablayan Circumferential Road
Romblon,
Romblon11/16/2018 1st Romblon DEO LF 42.62 270 27/03/2018 12/21/2018 -7.97% OG 0.396 0.300 0.070 0.030 0.047 0.000 84.30% - DEL
375 301
MONOLITHIC
CONSTRUCTION &
CONCRETE PRODUCTS,
INC. / ALBERTO UY
CONSTRUCTION &
DEVELOPMENT (JOINT
VENTURE)
JV-17-2034 L AAA LB GE
Off-Carriageway Improvement of
Secondary Roads, Bongabong - Sagana -
Roxas - San Aquilino Road, K0105+767 -
K0106+345 & K0106+368 - K0110+734
Bongabong,
Oriental
Mindoro
11/13/2018 1stSouthern
Mindoro DEOLF 92.42 690 22/04/2018 3/11/2020 45.85% OG 0.367 0.300 0.150 0.030 0.052 0.050 94.90% - AHD
376 302
MONOLITHIC
CONSTRUCTION &
CONCRETE PRODUCTS,
INC. / LUMEL GLENN
CONSTRUCTION (JOINT
VENTURE)
JV-17-2035 L AAA LB GE
Rehabilitation / Concreting of
Pinagsabangan Beach Road Including
Drainage, Sta. 2+799.00 - Sta. 6+929.76;
Sta. 7+409.87 - Sta. 8+046.49
Naujan, Oriental
Mindoro11/10/2018 1st
Regional Office
No. IV-BLF 134.43 283 28/03/2018 1/4/2019 -8.93% OG 0.392 0.300 0.061 0.030 0.055 0.000 83.80% - DEL
377 303
MONOLITHIC
CONSTRUCTION &
CONCRETE PRODUCTS,
INC. / SIXTEEN
ENTERPRISES - CALAPAN
BRANCH (JOINT VENTURE)
JV-17-1286 L AAA LB GE
Road Widening of Calapan South Road,
K0064+(-780) - K0064+ (-320); K0064+(-
200) - K0064+328; K0064+456 -
K0064+638; K0064+822 - K0066+680;
K0066+868 - K0069+053; K0069+356 -
K0071+160; K0071+273 - K0072+445;
K0072+628 - K0073+687; K0073+794 -
K0074+640
Southern
Mindoro11/10/2018 1st
Regional Office
No. IV-BLF 198.32 411 10/04/2018 5/25/2019 0.29% OG 0.393 0.236 0.150 0.030 0.052 0.033 89.40% - AHD
378 304 MONTADEL ENTERPRISES 20553 L B MA GB
Local Program - Local Infrastructure
Program, Buildings and Other Structures,
Multi-Purpose/Facilities, Construction of
Multi-Purpose Building (Covered Court),
Brgy. Pasong Buaya 2; Vallejo Place
Subdivision, Brgy. Pasong Buaya 2; La
Joya Subd., Buhay na Tubig; and
Treelane 3, Phase E, Brgy. Bayan Luma 5;
Construction of Multi-Purpose Building,
Brgy. Espeleta 2; Bloomfield Subd., Brgy.
Alapan; and Phase 2, Brgy. , Brgy. Buhay
Buhay na Tubig; Construction
(Completion) of Multi- Prupose Building,
Brgy. Espeleta 3; and Brgy. Buhay na
Tubig, Imus, Cavite
Imus, Cavite 11/12/2018 1st/Final Cavite 1st DEO LF 25.37543432 120 27/05/2018 9/23/2018 0.00% C 0.500 0.134 0.300 - - - 93.40%93.40%
Very SatisfactoryONS
379 305
MONTAÑO
CONSTRUCTION &
DEVELOPMENT
CORPORATION
19473 L AAA LB GE
Construction of New Permanent Ecuan
Bridge and Approaches along Eastern
Bobongan-Sominot-Midsalip-Dumingag
Road Zamboanga del Sur; Sta.
1669+783.85; Abutment B; Sta.
1669+874.69 (Bridge Length: 90.84 ln.m)
Zamboanga del
Sur 10/26/2018 1st/Final
Regional Office
No. IXLF 115.7 408 3/28/2016 5/9/2017 0.00% C 0.490 0.159 0.300 - - - 94.90%
94.90%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 43 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
380 306
MONTAÑO
CONSTRUCTION &
DEVELOPMENT
CORPORATION/
MONTPHIL
CONSTRUCTION
CORPORATION (JOINT
VENTURE)
JV-15-1563 L AA LA GE
Construction of New Permanent
Timbaboy Bridge and Approaches, along
Eastern Bobongan-Sominot-Midsalip-
Dumingag Road Sta. 1666+495.11-
K1666+742.74 Abutment A:
1666+536.36; Abutment B: 1666+597.2
Zamboanga del
Sur 10/26/2018 1st/Final
Regional Office
No. IXLF 56.55 291 4/11/2016 1/26/2017 0.00% C 0.473 0.200 0.300 - - - 97.30%
97.30%
OutstandingONS
381 307
MONTAÑO
CONSTRUCTION &
DEVELOPMENT
CORPORATION/WESTMIN
ENTERPRISES AND
CONSTRUCTION SERVICES
JV-17-1299 L AAA LB GE
Construction/Improvement of Access
Roads Leading to Trades, Industries and
Economic Zones-Biayon-Wilben- San
Jose Road, in Support of Biayon Corn and
Coconut Production
Sergio Osmeña,
Zamboanga del
Norte
11/9/2018 1stZamboanga del
Norte DEOLF 69.88 237 4/23/2018 12/15/2018 14.58% OG 0.396 0.235 0.150 0.030 0.047 0.050 90.80% - AHD
382 308MOTHER'S ROLE
CONSTRUCTION32781 L D SB GB
Construction of Two (2) Storey Six (6)
Classroom School Building at Talisayan
National School
Talisayan,
Zamboanga City11/15/2018 1st/Final
Zamboanga
City DEOLF 12.53 256 1/10/2018 9/22/2018 0.00% C 0.486 0.135 0.300 - - - 92.10%
92.10%
Very SatisfactoryONS
383 309MRB11 CONSTRUCTION
CORPORATION17701 L AAA MA GE
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse and Land Slide,
Basco-Mahatao - Evana- Uyugan-
Imnajbu Road
K0004+090-
K0004+200,
K0004+854.8-
K0000+900.3,
Mahatao,
Batanes
11/14/2018 1st Batanes DEO LF 36.32 314 19/06/2018 4/28/2019 19.76% OG 0.388 0.253 0.150 0.022 0.035 0.050 89.80% - AHD
384 310MS CRUZ BUILDERS &
TRADING33697 L C SB GE
Flood Management Program;
Construction/Maintenance of Flood
Mitigation Structures and Drainage
System, Construction/Rehabilitation
Slope Protection
Angeles City,
Pampanga11/13/2018 1st/Final
Pampanga 3rd
DEOLF 9.21048428 90 08/06/2018 9/5/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
385 311MT. GUITING-GUITING
CONSTRUCTION17412 L B MA GE
Rehabilitation /Reconstruction/
Upgrading of Damaged Paved of Looc
(Cogon - Tulay) - Odiongan Road,
K0103+(-303) - K0103+000, K0101+409 -
K0101+912 (As Modified) K103+ (-303) -
K0103+008.78, K0104+409 -
K0104+838.68
Tablas Island,
Romblon11/15/2018 1st Romblon DEO LF 23.77 168 07/05/2018 10/21/2018 -9.51% OG 0.339 0.300 0.055 0.030 0.041 0.000 76.50% - DEL
386 312
MUAÑA CONSTRUCTION
AND DEVELOPMENT
CORP.
9354 L B MA GE
Asset Preservation -
Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads -
Construction of Road Slope Protection
Structure-Tagbilaran East Road (Tagb. -
Jagna)
Jagna, Bohol 11/7/2018 1st Bohol 3rd DEO LF 22.97 243 6/12/2018 2/9/2019 1.97% OG 0.360 0.251 0.150 0.030 0.056 0.050 89.70% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 44 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
387 313N.B. SALBO
CONSTRUCTION6091 L A MB GE
Construction of Floof Control Structures
along Mandulog River at Dodiongan
Bridge Upstream R/S, Brgy. Bonbonon
including ROW
Brgy. Bonbonon,
Iligan City11/6/2018 2nd/Final
Lanao del
Norte 2nd DEOLF 41.65 237 20/02/2018 10/14/2018 12.66% C 0.469 0.201 0.300 - - - 97.00%
97.00%
OutstandingAHD
388 314 NANA BUILDERS 18863 L D SB GEConcreting/Rehabilitation of Brgy.
Badiangon FMR
Brgy. Badiangon,
Prsiden Roxas,
Capiz
11/9/2018 1st/Final Capiz 1st DEO LF 4.76 67 06/05/2018 7/11/2018 0.00% C 0.470 0.133 0.300 - - - 90.30%90.30%
Very SatisfactoryONS
389 315 NASCON BUILDERS 14786 L B SB GB
Construction of Two (2) Units - Two (2)
Storey Six (6) Classroom at Lugan CES,
T'boli, South Cotabato
T'boli, South
Cotabato11/14/2018 1st
South
Cotabato 1st
DEO
LF 23.28 240 6/14/2018 2/8/2019 6.37% OG 0.395 0.239 0.150 0.012 0.041 0.050 88.70% - AHD
390 316 NES-SAN BUILDERS 25142 L B MA GEConstruction/Rehabilitation of
Telabastagan Road
City of San
Fernando,
Pampanga
11/12/2018 1st/FinalPampanga 1st
DEOLF 8.24530204 101 23/04/2018 8/1/2018 0.00% C 0.486 0.134 0.300 - - - 92.00%
92.00%
Very SatisfactoryONS
391 317
NEW KANLAON
CONSTRUCTION, INC. /AL
HUSSEIN CONSTRUCTION
(JOINT VENTURE)
JV-13-815 L AAA LA GE
Reconstruction of Flood Control Dike
along Iligan River, Right Bank, Sta.
2+260.00 - Sta. 3+060
Iligan City 11/6/2018 1st/FinalRegional Office
No. XLF 137.98 772 26/01/2016 3/7/2018 0.00% C 0.496 0.132 0.300 - - - 92.80%
92.80%
Very SatisfactoryONS
392 318NEWBIG FOUR J
CONSTRUCTION INC.15104 L AAA LB GB
Local Program - Construction/ Repair/
Rehabilitation/ Improvement of Various
Infrastructure including Local Projects,
Buildings and other Structures
Multipurpose/ Facilities, Completion of
Granstand/ Stadium and Sports Facilities
Phase II
Malagasang 1-6,
Imus, Cavite11/12/2018 1st Cavite 1st DEO LF 91.52964395 300 02/05/2018 2/25/2019 19.67% OG 0.399 0.199 0.150 0.030 0.060 0.050 88.80% - AHD
393NEWBIG FOUR J
CONSTRUCTION INC.15104 L AAA LB GE
Construction/Maintenance of Flood
Mitigation Structures & Drainage
Systems -Construction of Flood
Mitigation System Along Lacag-Inarado
River
Daraga,Albay,Re
gion V-Bicol11/13/2018 1st/Final Albay 2nd DEO LF 46.29 180 07/02/2018 8/5/2018 0.04% C 0.499 0.133 0.300 - - - 93.20%
93.20%
Very SatisfactoryAHD
394 319NFH CONSTRUCTION &
SUPPLY 16055 L AAA LB GE
FY 2018 - Asset Preservation of National
Road- Rehabilitation/Reconstruction of
National Road with Slips Slope Collapse
and Landslide(Construction of Road
Slope Protection Structure) Along Pili-
Tigaon- Albay Boundary
Road,K0496+000.00 to K0497+000.00;
K0504+660.00 to
K0504=800.00;K0505=257.00 to
K0505+415.50,Bongalon-Patitinan
Section
Sagnay
Camarines Sur11/10/2018 1st
Camarines Sur
3rd DEOLF 91.69 326 04/03/2018 1/23/2019 8.15% OG 0.385 0.283 0.150 0.030 0.056 0.050 95.40% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 45 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
395 320
NFH CONSTRUCTION &
SUPPLY/ SOPHIA
CONSTRUCTION AND
SUPPLY JOINTVENTURE
JV-17-2068 L AAA LB GE
Road Widening- Dipolog-Sindangan-Liloy
Road, K1891+000 to K1892+460,
K1885+820 to K1886+800
Barangay Tamil
and Tabon, Jose
Dalman,
Zamboanga del
Norte
11/7/2018 2ndZamboanga del
Norte 1st DEOLF 62.27 244 4/26/2018 12/25/2018 1.13% OG 0.390 0.288 0.150 0.024 0.052 0.033 93.70% - AHD
396 321 NOE'S BUILDERS 37700 L D SB GE
Constyruction of Flood
Control/Drainage, San Antonio, Socorro
Subdivision
Molo, Iloilo City 11/16/2018 2nd/Final Iloilo City DEO LF 5.43 169 02/04/2018 9/17/2018 0.00% C 0.495 0.134 0.300 - - - 92.90%91.46%
Very SatisfactoryONS
397 322NORSAM BUILDERS &
CONSTRUCTION SUPPLY21184 L B AAA GE
Construction of Lane Divider and
Lightings along Iloilo-Antique Road
(Brgy. Rizal Tuguisan, Brgy. Gerona-
Gimeno, Brgy. Grijalvo)
Guimbal, Iloilo 11/17/2018 2nd/Final Iloilo 1st DEO LF 9.76 111 19/06/2018 10/7/2018 0.00% C 0.489 0.133 0.300 - - - 92.20%90.28%
Very SatisfactoryONS
398 323
NORTH TECH BUILDERS
AND CONSTRUCTION
SUPPLY
37062 L A MB GEConstruction of Flood Control along
Baclig - Margaay River
Cabugao, Ilocos
Sur11/8/2018 2nd/Final
Ilocos Sur 1st
DEOLF 20.68 201 12/02/2018 8/31/2018 6.97% C 0.484 0.134 0.300 - - - 91.80%
89.52%
Very SatisfactoryAHD
399 324
NORTH TECH BUILDERS
AND CONSTRUCTION
SUPPLY / JLP
CONSTRUCTION & SUPPLY
JOINT VENTURE
JV-17-2164 L A MB GEConstruction of Flood Control along
Bungo River
Dinalungan,
Aurora11/10/2018 1st Aurora DEO LF 24.50 309 18/05/2018 3/22/2019 -2.69% OG 0.341 0.238 0.123 0.030 0.060 0.033 82.50% - DEL
400 325
NORTH TECH BUILDERS
AND CONSTRUCTION
SUPPLY/E.E. MADAYAG
CONSTRUCTION JOINT
VENTURE
JV-17-2564 L A MB GE
Construction of Flood Control along
Naguilian-Burgos River and Naguilian-
Bagulin River Phase II
Nagulian, La
Union11/9/2018 1st
La Union 2nd
DEOLF 46.53 231 30/04/2018 12/16/2018 -3.66% OG 0.385 0.285 0.113 0.030 0.051 0.033 89.70% - DEL
401 326 NORTHERN BUILDERS 8789 L AAA LB GE
Bridges - Widening of Permanent
Bridges, Cojuangco Bridge (B01363LZ)
along Paniqui - Camiling - Wawa Road
(Phase II), Tarlac 1st Legislative District
Province of
Tarlac11/14/2018 1st
Regional Office
No. IIILF 57.83 360 15/03/2018 3/9/2019 7.21% OG 0.392 0.199 0.150 0.030 0.061 0.033 86.50% - AHD
402 Northern Builders 8789 L AAA GE
Rehabilitation/Reconstruction of Road
with Slips, Slope Collapse and Land Slide,
Nueva Vizcaya-Pangasinan Road
K0217+733-0217+783,K0218+238-
K0218+434,K0218+298-
K0218+323,K0218+354+K0218+366.8,
K0218+580-K0218+601+K0218+623-
K0218+670,K0219+129-
K0219+157,K0219+168-
K0219+191,K0219+561-
K0219+690,K0219+790-K0219+994,
K0219+957-K0219+990, K0220+033-
K020+046, K0220+144-
K0220+175.40,K0220+561-K0220+617.2,
K0220+303-
K0226+330,K0226+330,K0227+100-
K0227+274
Santa Fe, Nueva
Vizcaya11/6/2018 1st
Nueva Vizcaya
2nd Disrict
DEO
LF 46.99 187 12/04/2018 10/15/2018 3.44% OG 0.378 0.240 0.150 0.030 0.029 0.050 87.70% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 46 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
403 327NTL BUILDERS AND
DEVELOPER33450 L B MA GB
Constuction of 2 Storey 4 Classroom
School Building, Quirino General High
School
Cabbarroquis,
Quirino11/9/2018 1st/Final Quirino DEO LF 9.40 150 12/14/2017 4/12/2018 0.00% C 0.468 0.153 0.300 - - - 92.10%
92.10%
Very SatisfactoryONS
404 328
NUEDA BUILDERS
CONSTRUCTION & SUPP/
R.A. PAHATI CONST. &
SUPPLY, INC. JOINT
VENTURE
JV-17-1277 L A MA GE
Rechanneling/Construction Revetment
with Sheet Pile of Kingking River,
Balanban Section R/S
Pantukan,
Compostela
Valley
11/9/2018 1st/FinalCompostela
Valley DEOLF 34.03 156 4/13/2018 9/15/2018 0.00% C 0.446 0.200 0.300 - - - 94.60%
94.60%
Very SatisfactoryONS
405 329
NUMERICAL GATE
CONSTRUCTION & SUPPLY
CORPORATION
34122 L A SB GE
Construction /Rehabilitation of Flood
Mitigation Facilities within Major River
Basins and Principal Rivers -
Construction/Rehabilitation of Purok 3,
Quirangay
Camalig, Albay 11/14/2018 1st/Final Albay 2nd DEO LF 28.16 160 12/02/2018 7/21/2018 5.05% C 0.474 0.133 0.300 - - - 90.70%90.70%
Very SatisfactoryAHD
406 330O. G. SANTOS
CONSTRUCTION2050 L A MA GE
Construction of Concrete Road Sominot-
Mahayag Road
Sominot,
Zamboanga del
Sur
11/10/2018 1stZamboanga del
Sur 1st DEOLF 62.95 175 19/06/2018 12/10/2018 0.60% OG 0.361 0.240 0.150 0.030 0.051 0.033 86.50% - AHD
407 331O.L DE LEON
CONSTRUCTION16194 L B MA GB
Construction (Completion) of Multi
Purpose Building, Barangay Casalugan
Paracale,
Camarines Norte11/6/2018 1st/Final
Camarines
Norte DEOLF 0.97 60 20/03/2018 5/18/2018 0.00% C 0.467 0.157 0.300 - - - 92.40%
92.40%
Very SatisfactoryONS
408 332OCTAGON CONCRETE
SOLUTIONS34475 L A MB GE
Asphalt Overlay with Thermoplastic
Pavement Markings along Palo-Carigara
Ormoc Road,
K0996+335-
K0998+916
11/9/2018 1st/Final Leyte 4th DEO LF 94.45 120 5/9/2018 9/5/2018 0.00% C 0.440 0.200 0.300 - - - 94.00%94.00%
Very SatisfactoryONS
409 333OIC CONSTRUCTION &
SUPPLY23727 L A MA GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System,
Asset Preservation Program,
Rehabilitation/Reconstruction/Upgradin
g of Damage Paved Roads, Secondary
Roads, Banay - Banay - Mojon - Cuenca
Rd. K0090+(-861) - K0091+332.4,
K0092+089 - K0092+193, K0092+352 -
K0093+160, K0095+049.5 - K0095+128,
K0098+000 - K0098+850, K0099+820 -
K0100+117, K0102+434 - K0102+895
Alitagtag,
Batangas11/10/2018 1st
Batangas 3rd
DEOLF 77.19407523 300 09/02/2018 12/5/2018 -1.67% OG 0.371 0.237 0.133 0.030 0.060 0.033 86.40% - DEL
410 334
OMENGAN
CONSTRUCTION &
DEVELOPMENT
CORPORATION
5119 L AAA SB GE
Construction of Revetment,
Embankment of Dike & Channeling along
Chico River
tabuk city,
kalinga11/13/2018 1st
Lower Kalinga
DEOLF 95.44 313 25/04/2018 3/3/2019 4.31% OG 0.392 0.258 0.150 0.022 0.045 0.050 91.70% - AHD
411
OMENGAN
CONSTRUCTION &
DEVELOPMENT
CORPORATION
5119 L AAA LA GE
Network Development-Road Widening
Kalinga-Cagayan Road (calanan-enrile
section), KO504+000-KO506+846 &
KO506+905-KO507+208, KO509+270-
KO509+414
tabuk city,
kalinga11/13/2018 1st
Lower Kalinga
DEOLF 95.44 260 26/02/2018 11/12/2018 -2.86% OG 0.348 0.299 0.121 0.030 0.055 0.033 88.60% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 47 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
412 335
ONE TERRA BUILDERS
AND CONSTRUCTION
SUPPLY
40848 L D SB GE
Concreting of Junction Tagbu-an-Sitio
Libiot Libot-Sambag Farm-to-Market
Road, Sta. 0+000 to Sta. 0+500, Brgy.
Pandan
Ponteverde,
Negros
Occidental
11/15/2018 1st/Final
Negros
Occidental 4th
DEO
LF 4.83 37 07/06/2018 7/13/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%90.80%
Very SatisfactoryONS
413 336ORANI BUILDERS &
SUPPLY5349 L B MA GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems - Construction of Flood Control
Project in Colo River, Bacong Section
Barangay
Bacong,
Hermosa, Bataan
11/7/2018 1st/FinalBataan 1st
DEOLF 18.36029919 191 07/03/2018 9/13/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%
90.80%
Very SatisfactoryONS
414ORANI BUILDERS &
SUPPLY5349 L B MA GE
Asset Preservation Rehabilitation/
Reconsruction/Upgrading of Damaged
Paved Roads - Tertiary Road - Mt. Samat
Road (K0134+913 - K0135+900,
K0166+479 - K0166+169) Bataan 2nd L.D.
Pilar, Bataan 11/9/2018 2nd Bataan 2nd
DEOLF 82.54289447 294 13/02/2018 12/3/2018 11.15% OG 0.368 0.240 0.150 0.030 0.050 0.033 87.10% - AHD
415 337
P.B. OBIAL
CONSTRUCTION / FIRST
GRANDEUR BUILDERS
JV-17-2320 L A MB GE
Upgrading (Asphalt to Concrete) of
Carcar-Barili Road, K0052+000-
K0053+000, K0055+000-K0057+000
Barili, Cebu 11/11/2018 1st Cebu 3rd DEO LF 91.63 309 3/27/2018 1/29/2019 7.65% OG 0.374 0.240 0.150 0.030 0.047 0.033 87.40% - AHD
416 338P.L. SEBASTIAN
CONSTRUCTION35840 L AAA LB GE
Widening (2 into 4 lanes) of Davao-
Bukidnon Road Including Slope
Protection and ROW (Brgy. Baganihan &
Brgy. Marilog Section), K1637+876 -
K1638+1008, K1642+795 - K1645+906
Davao City 11/16/2018 1stRegional Office
No. XILF 184.12 269 3/26/2018 12/19/2018 -5.82% OG 0.348 0.300 0.092 0.030 0.061 0.033 86.40% - DEL
417 339PABLO S. LABASBAS
CONSTRUCTION6302 L B MA GE
Asset Preservation-Rehab./
Reconst./Upgrading of Damaged Paved
Roads along Tertiary Roads, along
Bagahupi-Babatngon-Sta. Cruz-Barugo-
Carigara Road (S00064LT), K0920+000-
K0921+190
Babatngon,
Leyte11/15/2018 1st/Final Leyte 1st DEO LF 36.65 150 2/2/2018 7/1/2018 3.33% C 0.481 0.091 0.300 - - - 87.20%
87.20%
SatisfactoryAHD
418 340PALMARES GENERAL
MERCHANDISE24657 L B SB GB
Construction of Multi-Purpose Building
(New Gym), Tagumpay, Barangay GPS
Koronadal City,
South Cotabato11/5/2018 1st/Final
South
Cotabato 1st
DEO
LF 2.47 105 4/25/2018 8/7/2018 0.00% C 0.483 0.135 0.300 - - - 91.80%91.80%
Very SatisfactoryONS
419 341PALMARES GENERAL
MERCHANDISE24657 L B MA GE
Road Widening - Midsayap - Marbel Rd.,
K1786+478 to K1787+574.5South Cotabato 11/5/2018 2nd/Final
South
Cotabato 1st
DEO
LF 27.63 193 2/20/2018 8/31/2018 0.00% C 0.491 0.132 0.300 - - - 92.30%88.16%
SatisfactoryONS
420 342 PASCAL CONSTRUCTION 34168 L B SB GE
Local Infrastructure Program - Local
Roads and Bridges - Local Roads
Construction of Roads
Barangay Tipo,
Hermosa, Bataan11/8/2018 1st/Final
Bataan 1st
DEOLF 1.9206 90 16/03/2018 6/13/2018 10.00% C 0.466 0.134 0.300 - - - 90.00%
90.00%
Very SatisfactoryAHD
421 343 PATRILA BUILDERS, INC. 26628 L A MA GE
Widening of Bridge- Agcawayan Br.
(B00216PN) along Iloilo East Coast-Capiz
Rd
Ajuy, Iloilo 11/10/2018 1st/Final Iloilo 3rd DEO LF 15.00 220 11/02/2018 9/18/2018 0.00% C 0.497 0.160 0.300 - - - 95.70%95.70%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 48 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
422 344 PGO CONSTRUCTION 15153 L B MA GE
Road Widening of Jct. Balintawak- Old
Escalante Road Including ROW,
K0096+000-K0097+500
Escalante,
Negros
Occidental
11/13/2018 2nd/Final
Negros
Occidental 1st
DEO
LF 41.20 258 08/02/2018 10/23/2018 0.00% C 0.477 0.132 0.300 - - - 90.90%90.54%
Very SatisfactoryONS
423 345 PHESCO, INCORPORATED 145 L AAA LB GE
Asset Preservation Program -
Rehabilitation/Reconstruction of Roads
with Slips,Slope Collapse and Landslide-
Tertiary Road Jct. Abbag-Guingin
Bdry.Rd. K0392+900-K0393+255
Nagtipunan
Quirino 11/9/2018 1st/Final Quirino DEO LF 53.07 210 21/05/2018 12/16/2018 23.72% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryAHD
424 346PHILIPPINE CHEMSTEEL
INDUSTRIES, INC.16965 L A MA GE
Asset Preservation Program - Prevention
Maintenance - Secondary Roads -
Repair/ Rehabilitation/Improvement,
Overlay with Pavement Markings along
Angeles -Porac - Floridablanca -
Dinalupihan Road, K0113+(-225) -
K0115+810, K0117+800 - K0118+1215
Dinalupihan,
Bataan11/8/2018 2nd/Final
Bataan 1st
DEOLF 64.6549998 120 04/06/2018 10/1/2018 0.83% C 0.460 0.133 0.300 - - - 89.30%
88.52%
SatisfactoryAHD
425 347
PHILSOUTH BUILDERS
(FORMERLY: LOTIFF
CONSTRUCTION)
21962 L AAA MB GE
Construction/Improvement of Access
Roads leading to Declared Tourism
Destinations: Access Road leading to
Casaroro Fall
Valencia, Negros
Oriental11/10/2018 1st
Negros
Oriental 3rd
DEO
LF 67.55 309 25/02/2018 12/30/2018 12.06% OG 0.352 0.240 0.150 0.030 0.045 0.033 85.00% - AHD
426 348PHILWORKS
CONSTRUCTION & SUPPLY32103 L AAA LB GE
Construction of Diking System with
Revetment and Appurtenant Structures
(Sluiceway and Conduit, Lined Canal),
along Aklan River
Pusiw,
Numancia,
Aklam
11/7/2018 2nd Aklan DEO LF 36.00 240 06/04/2018 12/1/2018 -10.43 OG 0.387 0.292 0.046 0.030 0.050 0.033 83.80% - DEL
427 349 PINS CONSTRUCTION 13630 L B SB GBConstruction of Multi-Purpose Building
at Dinas Community MPC
Barangay Don
Jose, Dinas,
Zambaonga del
Sur
11/12/2018 1st/FinalZamboanga del
Sur 2nd DEOLF 2.93 85 30/04/2018 7/23/2018 0.00% C 0.498 0.134 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
428 350 PLD CONSTRUCTION 1859 L AAA LA GB
Retrofitting/Strengthening of Permanent
Bridges -Marcelo Fernan Br. (B00619CB)
along Marcelo B. Fernan Br. &
Approaches
Mandaue City
and Lapu-Lapu
City, Cebu
11/15/2018 2nd/Final Cebu 6th DEO LF 27.34 240 2/22/2018 10/19/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%88.38%
SatisfactoryONS
429 PLD CONSTRUCTION 1859 L AAA MA GE
Asset Preservation Program, Preventive
Maintenance, Primary Roads, Iligan City -
Marawi City Road, K1543+000 -
K1543+773 and K1548+036 - K1548+704
Balo-I and
Pantar, Lanao
Del Norte
11/6/2018 1st/FinalLanao del
Norte 1st DEOLF 33.44 55 02/07/2018 8/25/2018 0.00% C 0.482 0.134 0.300 - - - 91.60%
91.60%
Very SatisfactoryONS
430 351
PLERM CONSTRUCTION
AND DEVELOPMENT
CORPORATION
33288 L AAA MA GE
Widening of Permanent Bridges to more
than 2 Lanes : Madugo Br. (B00062MR)
along Calapan South Road
Roxas, Oriental
Mindoro11/13/2018 1st/Final
Southern
Mindoro DEOLF 14.19 330 13/06/2017 5/8/2018 0.00% C 0.474 0.201 0.300 - - - 97.50%
97.50%
OutstandingONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 49 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
431 352POLYMER-VIC
CONSTRUCTION6157 L B MA GE
Rehabilitation/Major Repair of
Permanent Bridges Saysain Bridge,
(B03391LZ) Bagac - Mariveles Road
Bagac, Bataan 11/9/2018 1st/FinalBataan 2nd
DEOLF 14.7 90 13/02/2018 5/13/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
432 353POWER K CONSTRUCTION
SUPPLY & SERVICES31574 L B MA GB
Construction of Tiaong Convention
Center (Phase I)Tiaong, Quezon 11/13/2018 1st
Quezon 2nd
DEOLF 46.53 180 25/06/2018 12/21/2018 1.06% OG 0.331 0.259 0.150 0.030 0.051 0.050 87.10% - AHD
433 354PRECIOUS
CONSTRUCTION32995 L A MB GE
Road Upgrading/Concreting of Sta. Cruz-
Sigay Road Leading to Kagutungan Falls,
Brgy. Daligan
Sta. Cruz, Ilocos
Sur11/8/2018 2nd/Final
Ilocos Sur 2nd
DEOLF 8.46 170 14/02/2018 8/2/2018 0.00% C 0.390 0.133 0.300 - - - 82.30%
84.10%
SatisfactoryONS
434PRECIOUS
CONSTRUCTION32995 L A MB GE
001: Ensure Safe and Reliable National
Road System, Network Development
Program, Road Widening - Secondary
Roads; Iriga City San Isidro-Sagrada-San
Ramon-Hanawan Road
Camarines Sur 11/12/2018 1stRegional Office
No. VLF 74.44 246 25/07/2018 2/9/2019 14.36% OG 0.382 0.300 0.150 0.030 0.047 0.050 95.90% - AHD
435 355
PRISMODIAL
CONSTRUCTION
CORPORATION
28345 L AAA MA GE
Convergence and Special Support -
Construction/Improvement of Access
Roads leading to Declared Tourism
Destinations - Construction of Concrete
Road - Access Road leading to Bagsang
Falls
Brgy. Santa
Clara, Gonzaga,
Cagayan
11/18/2018 1st/FinalCagayan 1st
DEOLF 33.10408082 175 03/05/2018 10/24/2018 0.00% C 0.469 0.133 0.300 - - - 90.20%
90.20%
Very SatisfactoryONS
436 356PROTECH CONSTRUCTION
& DEVELOPMENT CORP.15408 L AAA MA GE
Construction and Maintenance of Bridge
along National Roads, Widening of
Permanent Bridge Including Row to
More Than Two (2) Lanes, Pangil Bridge I
Aling Calamba - Sta. Cruz - Famy
Junction Road
Pangil, Laguna 11/8/2018 1stLaguna 1st
DEOLF 36.16 323 02/05/2018 1/29/2019 4.44% OG 0.398 0.240 0.150 0.024 0.047 0.050 90.90% - AHD
437 357
PROTECH CONSTRUCTION
& DEVELOPMENT CORP. /
JOBEL ENTERPRISES
(JOINT VENTURE)
JV- 17- 1925 L AAA MA GE
Construction / Maintenance for Flood
Mitigation Structures and Drainage
System, Construction of River Control
along Sta. Cruz River, Brgy. Pagsanjan
Sta. Cruz, Laguna 11/7/2018 1st/FinalLaguna 1st
DEOLF 47.08 253 21/02/2018 10/31/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%
90.80%
Very SatisfactoryONS
438 358
PYRAMID CONSOLIDATED
BUILDERS & GEN.
MERCHANDISE
15599 L A MB GE
Construction of Concrete Road, Access
Road Leading to Dahilayan Adventure
Park, K1442+200.27 to K1446+923.27
Manolo fortich,
Bukidnon11/10/2018 2nd/Final
Bukidnon 3rd
DEOLF 96.5 256 28/02/2018 11/10/2018 0.00% C 0.487 0.134 0.300 - - - 92.10%
92.10%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 50 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
439 359 QM BUILDERS 30743 L AAA LA GE
Asset Preservation -
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse and -
Secondary Roads, Cebu-Toledo Wharf
Road (Jct. Naga-Uling)
Cebu Province 11/5/2018 1st Cebu 2nd DEO LF 93.00 333 2/13/2018 1/11/2019 -7.43% OG 0.398 0.240 0.076 0.030 0.050 0.033 82.70% - DEL
440 360QM BUILDERS/ FIRST
GRANDEUR BUILDERS JV-17-779 L AAA MA GE
Construction of Flood Control Structures
Abuno RiverMinglanila, Cebu 11/5/2018 1st/Final Cebu 2nd DEO LF 27.90 182 2/13/2018 8/13/2018 0.00% C 0.482 0.133 0.300 - - - 91.50%
91.50%
Very SatisfactoryONS
441 361
QUEZON VICTORY
LUMBER AND GENERAL
CONTRACTOR
6631 L A MA GEConstruction of Barangay Road, Brgy.
Tuhian
Catanuan,
Quezon11/12/2018 1st/Final
Quezon 3rd
DEOLF 33.27 240 22/03/2018 11/16/2018 0.45% C 0.439 0.192 0.300 - - - 93.10%
93.10%
Very SatisfactoryAHD
442 362QUIRANTE
CONSTRUCTION32827 L A MB GB
Construction of 4-Storey, 12-CL School
Building at Jugan ES
Consolacion,
Cebu11/16/2018 1st Cebu 6th DEO LF 31.13 180 05/07/2018 12/31/2018 0.00% OG 0.397 0.240 0.150 0.030 0.041 0.033 89.10% - ONS
443 363QUITUINAN WRRIORS
CONSTRUCTION42500 L D SB GE
Concreting of Sta. Rosa - Almine Farm to
Market Road, Barngay Sta. Rosa and
Barangay Almine
San Jacinto,
Masbate11/12/2018 1st/Final
Masbate 3rd
DEOLF 6.65 90 28/06/2018 9/25/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%
90.40%
Very SatisfactoryONS
444 364
R. ALLOSA
CONSTRUCTION &
TRUCKING SERVICES
12964 L A MA GE
Rehabilitation / Major Repair of
Permanent Bridge Badiang Br.
(B00164LT), along Calubian Jct.-San
Isidro-Tabango-Villaba-Palompon
Brgy. Badiang,
Villaba, Leyte11/8/2018 1st/Final Leyte 3rd DEO LF 1.93 60 2/7/2018 4/7/2018 30.00% C 0.440 0.134 0.300 - - - 87.40%
87.40%
SatisfactoryAHD
445 365
R. SEMILLA
CONSTRUCTION &
MARKETING/SOUTHERN
PHILIPPINES JRH
INDUSTRIAL
CORPORATION JOINT
VENTURE
JV-17-3065 L A MA GE
Construction/Rehabilitation of Road
Purok 1, Brgy. Linao - Purok 4, Brgy. San
Miguel
San Isidro, Davao
del Norte11/10/2018 1st
Davao del
Norte 1st DEOLF 38.02 174 25/07/2018 1/14/2019 -4.65% OG 0.379 0.117 0.104 0.030 0.061 0.033 72.40% - DEL
446 366
R.A PAHATI CONTS. &
SUPPLY INC./ AA PAHATI
CONSTRUCTION AND
SUPPLY Joint Venture
JV-17-2671 L AA MA GE
Organizational Outcome 2: Protect Lives
and Properties (Againts Major Flood
Construction/Rehabilitation/improvent
of Canaman Flood Control (Phase 2)
Canaman
,Camarines Sur11/9/2018 1st/Final
Camarines Sur
2nd DEOLF 27.92 299 27/05/2018 12/11/2018 -4.10% OG 0.372 0.300 0.109 0.030 0.056 0.033 90.00% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 51 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
447 367
R.A PAHATI CONST. &
SUPPLY, INC. / NUEDA
BUILDERS CONSTRUCTION
& SUPPLY INC. (JOINT
VENTURE)
JV-17-673 L A MA GE
Organizational Outcome 2: Protect Lives
and Properties Against Major Floods -
Flood Management Program -
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems: Construction of Retaining
Wall/Revetment/ Slope Protecting along
Carmona - Binan River (Municipal Park),
Phase I
Brgy. Lantic,
Carmona, Cavite11/13/2018 1st
Cavite Sub
DEO LF 48.74044015 300 02/03/2018 12/26/2018 5.71% OG 0.384 0.240 0.150 0.030 0.060 0.033 89.70% - AHD
448 368R.A. PAHATI CONST. &
SUPPLY, INC.35843 L AA LA GE
Construction of Road Dike leading to
Bancal Pugad
Lubao,
Pampanga11/15/2018 1st
Pampanga 2nd
DEOLF 48.65909361 210 04/07/2018 1/29/2019 0.17% OG 0.397 0.300 0.150 0.030 0.056 0.050 98.30% - AHD
449R.A. PAHATI CONST. &
SUPPLY, INC. 35843 L AA LA GE
FY 2018 DPWH Infrastructure Program,
Organizational Outcome 1: Ensure safe
and Reliable National Road System,
Bridge Program, Construction of New
Permanent Bridges Diokno Highway Br.
Along Diokno Highway (Phase II)
Batangas
Province11/6/2018 1st/Final
Regional Office
No. IV-ALF 18.76486086 150 19/02/2018 7/18/2018 0.00% C 0.493 0.133 0.300 - - - 92.60%
92.60%
Very SatisfactoryONS
450 369
R.A.G. CORONA
CONSTRUCTION AND
AGGREGATES SUPPLY
39473 L B SB GE
Concreting of Hacienda Sto. Domingo-
Hacienda Consolacion, Brgy. Granada
FMR
Bacolod City 11/15/2018 1st/FinalBacolod City
DEO LF 4.73 90 16/05/2018 8/13/2018 0.00% C 0.459 0.133 0.300 - - - 89.20%
89.20%
Very SatisfactoryONS
451 370R.D. INTERIOR JUNIOR
CONSTRUCTION6483 L AAA LB GE
Preventive Maintenance- Asset
Preservation Program-Various Roadlines
Bauk-Pinukpuk-Rizal-Tanudan, KO
509+038 - KO 509+430
kalinga 11/13/2018 1st/FinalLower Kalinga
DEOLF 91.13 150 05/03/2018 8/1/2018 0.00% C 0.476 0.200 0.300 - - - 97.60%
97.60%
OutstandingONS
452 371
R.D. INTERIOR JUNIOR
CONSTRUCTION / CREST
CONSTRUCTION
JV-17-1772 L AAA LB GEConstruction/Urgent River Bank
Protection Works, Phase 1, San VicenteIguig, Cagayan 11/13/2018 1st/Final
Cagayan 3rd
DEOLF 64.41807626 300 09/04/2018 2/2/2019 41.66% C 0.467 0.133 0.300 - - - 90.00%
90.00%
Very SatisfactoryAHD
453 372
R.D. SADSAD
CONSRTUCTION AND
TRADING
19240 L A MA GE
Flood Management Program -
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems - Construction of Flood Control
along San Juan River, Barangay
Banadero
Calamba, Laguna 11/2/2018 1st/FinalLaguna 2nd
DEOLF 19.60 222 21/02/2018 9/30/2018 28.66% C 0.412 0.200 0.300 - - - 91.20%
91.20%
Very SatisfactoryAHD
454 373
R.L. PACANA'S
CONSTRUCTION &
DEVELOPMENT
26187 L C SB GEConstruction of San Antonio Bridge aling
Radio Station RoadBasco, Batanes 11/14/2018 1st/Final Batanes DEO LF 7.59 216 20/03/2018 10/21/2018 0.00% C 0.468 0.133 0.300 - - - 90.10%
90.10%
Very SatisfactoryONS
455 374
R.R. RICAFORT
CONSTRUCTION AND
SUPPLIES
14402 L AA MA GE
Construction of Slope Protection along
Tarlac River Central Left Dike, Sembrano
Section (Phase II)
Gerona, Tarlac 11/15/2018 1st/Final Tarlac 1st DEO LF 42.34 175 12/04/2018 10/3/2018 0.00% C 0.440 0.189 0.300 - - - 92.90%92.90%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 52 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
456 375
R.S. SEPIAN
CONSTRUCTION &
TRUCKING / YUNAKIM
CONSTRUCTION JOINT
VENTURE
JV-17-600 L B MB GE
Construction of Concrete Road-Mountain
Province Boundary Cagaluan Junction
Sukiap-Tanglag-Mabongtot Road in
Support of Agri Business industry
(Coffee, Heirloom rice and other high
value crops)
Lubuangan,
Kalinga11/13/2018 1st
Upper Kalinga
DEOLF 33.09 268 22/02/2018 11/16/2018 -4.85% OG 0.366 0.291 0.102 0.030 0.055 0.033 87.70% - DEL
457 376R.T. MORABE
CONSTRUCTION11377 L B MA GE
Network Development-Road Widening-
Tertiary Roads, along Leyte-Samar-Inter
Provincial Road (S00042LT), K0905+054-
K0906+760, K0906+792-K0907+039
Babatngon,
Leyte11/15/2018 1st/Final Leyte 1st DEO LF 39.64 120 2/2/2018 6/1/2018 0.00% C 0.452 0.134 0.300 - - - 88.60%
88.60%
SatisfactoryONS
458 377 R.T.Y. CONSTRUCTION 10341 L A MB GE
Construction of MSR Junction -
Concepcion - Banahaw - Masalukot -
Pinagdanlayan Road
Dolores, Quezon 11/13/2018 1stQuezon 2nd
DEOLF 45.56 240 03/04/2018 11/28/2018 -3.87% OG 0.384 0.287 0.111 0.024 0.047 0.033 88.60% - DEL
459 378 R.V. LABORTE BUILDERS 20459 L A MB GE
I. Operations A. Organizational Outcome
1: Ensure Safe and Reliable National
Road System 1. Asset Preservation
Program B. Rehabilitation /
Reconstruction / Upgrading of Damaged
Paved Roads 1. Primary Roads 1. Quirino
Highway, K0251+(-511) to K0251+000,
K0252+000 to K0252+400, K0258+974 to
K0259+200, K0259+767 to K0260+656
Guinayangan -
Tagkawayan,
Quezon
11/10/2018 2nd/FinalQuezon 4th
DEOLF 46.95 210 21/02/2018 9/18/2018 0.00% C 0.455 0.133 0.300 - - - 88.80%
89.70%
Very SatisfactoryONS
460 379 RAM BUILDERS 10549 L B MA GE
I. Operations A. Organizational Outcome
1: Ensure Safe and Reliable National
Road System 1. Asset Preservation
Program C. Rehabilitation /
Reconstruction of Roads with Slips, Slope
Collapse and Landslide 1. Primary Roads
1. Daang Maharlika (LZ), K0186+939 to
K0187+230
Plaridel and
Gumaca, Quezon 11/10/2018 2nd/Final
Quezon 4th
DEOLF 47.29 240 19/02/2018 10/16/2018 12.50% C 0.420 0.200 0.300 - - - 92.00%
90.82%
Very SatisfactoryAHD
461 380
RAMARPLUS
INCORPORATED
(FORMERLY: RAMAR
ENTERPRISE)
8092 L A MA GERehabilitation of Boranguit River Flood
Control
Barangay Kinale,
Polangui, Albay11/5/2018 1st Albay 3rd DEO LF 28.22 195 6/11/2018 12/22/2018 8.56% OG 0.393 0.247 0.150 0.020 0.035 0.033 87.80% - AHD
462 381 RAMISES CONSTRUCTION 17351 L A MA GE
Rehabilitation/Major Repair of Subait
Bridge (B00890MN) along Butuan City –
Malaybalay Road
Butuan City 11/15/2018 1st/FinalButuan City
DEOLF 10.8 120 3/26/2018 7/23/2018 55.83% C 0.471 0.133 0.300 - - - 90.40%
90.40%
Very SatisfactoryAHD
463 382 RAVH CONSTRUCTION 41971 L C SB GE
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems Talisay River, Cupang Section
Balanga City,
Bataan11/9/2018 1st/Final
Bataan 2nd
DEOLF 9.30263818 187 13/02/2018 8/18/2018 52.50% C 0.462 0.133 0.300 - - - 89.50%
89.50%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 53 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
464 383
RCDG CONSTRUCTION
CORP. / A.T. DUMLAO
CONST. INC. (JOINT
VENTURE)
JV-17-2001 L AAA MA GE
Construction of River Bank Protection
along Hinatuan River (Maglambing Br.
Section), Construction/ Maintenance of
Flood Mitigation Structures and
Drainage System Construction of River
Bank Protection along Hinatuan River
(Maglambing Br. Section),
Maglambing,
Tagbina, Surigao
del Sur
11/11/2018 1stSurigao del Sur
2nd DEOLF 36.67 228 4/16/2018 11/29/2018 0.44% OG 0.396 0.240 0.150 0.030 0.070 0.050 93.60% - AHD
465 384RDEN CONSTRUCTION &
SUPPLY33707 L B MA GE
Construction of Concrete Road - San
Mateo to Upper Mingading Leading to
UK Peak, Barangay San Mateo
Aleosan, North
Cotabato11/10/2018 2nd/Final
Cotabato 2nd
DEOLF 32.57 131 4/1/2018 8/9/2018 0.00% C 0.480 0.135 0.300 - - - 91.50%
91.02%
Very SatisfactoryONS
466 385REDSON CONSTRUCTION
AND SUPPLIES35128 L C SB GE
Cosnstruction f Flood Control Control
Structure along Matigay Creek
(Upstream)
Brgy. Rizal, Silay
City, Negros
Occidental
10/8/2018 2nd/Final
Negros
Occidental 1st
DEO
LF 43.81 180 12/04/2018 10/8/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%91.00%
Very SatisfactoryONS
467 386 REGG'S BUILDERS 33262 L B SB GB
Construction of Two (2) Storey, Four (4)
Classrooms, Two (2) Science Lab.
Building, Pangal Sur High School
Echague, Isabela 11/11/2018 1stIsabela 4th
DEO LF 9.39 148 16/07/2018 12/10/2018 0.05% OG 0.385 0.245 0.150 0.018 0.041 0.050 88.90% - AHD
468 387
RELY CONSTRUCTION
AND SUPPLY / ALFREGO
BUILDERS & SUPPLY JOINT
VENTURE
JV-17-1147 L AA MA GE
Construction of Concrete Revetment of
Steel Sheet Pile along Talomo River,
Riverside-Tugbok Section
3rd
Congressional
District, Davao
City
11/11/2018 1st/FinalDavao City 2nd
DEOLF 47.51 210 3/7/2018 10/2/2018 0.00% C 0.466 0.151 0.300 - - - 91.70%
91.70%
Very SatisfactoryONS
469 388REX E. MORALES
CONSTRUCTION17427 L AA MA GE
Construction of Flood Control Structure
along Moog River Protecting Moog
Bridge and Biliran Circumferential Road,
Leftside (11.4878, 124.4494), Rightside
(11.4881, 124.4493)
Biliran, Province
of Biliran11/6/2018 1st/Final Biliran DEO LF 28.05 180 2/18/2018 8/16/2018 0.00% C 0.469 0.140 0.300 - - - 90.90%
90.90%
Very SatisfactoryONS
470 389
REYROSE CONSTRUCTION
& SUPPLY DEV'T
CORPORATION
22934 L B MA GE
Construction and Maintenance of
Bridges along National Roads-Widening
of Permanent Bridges to more than 2
Lanes, Widening of Bridge-Baleguian Br.
(B00830MN) along Daang Maharlika
(Surigao-Agusan Section)
Jabonga, Agusan
del Norte 2nd
L.D.
11/14/2018 1st/FinalAgusan del
Norte DEOLF 23.3 382 3/30/2017 4/15/2018 0.00% C 0.499 0.134 0.300 - - - 93.30%
93.30%
Very SatisfactoryONS
471 390 RJIR ENTERPRISES 34843 L B MA GE
Construction/Improvement of Access
Roads Leading to Seaports-Access Road
Leading to Silad Port
Villaba, Leyte 11/8/2018 1st/Final Leyte 3rd DEO LF 31.01 179 2/6/2018 8/3/2018 24.58% C 0.467 0.134 0.300 - - - 90.10%90.10%
Very SatisfactoryAHD
472 391
ROAD EDGE TRADING &
DEVELOPMENT SERVICES
/ JAYKRIS ENTERPRISES &
CONSTRUCTION JOINT
VENTURE
JV-17-454 L A MA GE
Construction of Flood Control Structure
(Revetment Wall) along Sibuguey River,
Sta. 00+002 t Sta. 00+251.60, Upstream
Barangay Pilar,
Diplahan,
Zamboanga
Sibugay
11/13/2018 1st
Zamboanga
Sibugay 1st
DEO
LF 29.37 220 02/04/2018 11/7/2018 -2.50% OG 0.392 0.221 0.125 0.020 0.047 0.033 83.80% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 54 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
473 392ROBIG BUILDERS AND
DEVELOPMENT CORP.35327 L A MA GE
Asset Preservation Program, Preventiive
Maintenance, Primary Roads, Calamba -
Sta. Cruz - Famy Junction Road,
K0057+207 To K0057+531,K0058+050 -
K0058+420
Los Banos,
Laguna11/7/2018 1st/Final
Laguna 2nd
DEOLF 19.60 105 09/07/2018 10/21/2018 18.10% C 0.473 0.200 0.300 - - - 97.30%
97.30%
OutstandingAHD
474 393ROCK 101 CONSTRUCTION
AND SUPPLY38070 L B SB GE
Concreting of Brgy. Gines- Inagdangan
Sur- Inagdangan Norte FMR Brgy. Gines
Inagdangan Sur
and Inagdangan
Norte, Zarraga,
Iloilo
11/12/2018 1st Iloilo 4th DEO LF 9.95 145 04/07/2018 11/25/2018 3.17% OG 0.362 0.246 0.150 0.030 0.051 0.050 88.90% - AHD
475 394
RODEKOM GENERAL
CONSTRUCTION AND
INTERPRISE
38656 L B SB GEConstruction of Flood Control at Atad-
AsinTuba Benguet 11/5/2018 1st/Final
Benguet 1st
DEOLF 18.69 157 15/03/2018 8/18/2018 5.70% C 0.386 0.200 0.300 - - - 88.60%
88.60%
SatisfactoryAHD
476
RODEKOM GENERAL
CONSTRUCTION AND
INTERPRISE
38656 L A MA GE
Construction of By-Passes/Diversion
Roads including ROW Baguio La-Trinidad-
Itogon-Sablan-Tuba-Tublay-(BLISTT)
Outer Ring Circumferential Road
including ROW and Slope
Protection,Phase 3 (Labey-Lacamen
Section ,Bokod, Benguet),
Tublay Benguet 11/8/2018 2nd/FinalBenguet 2nd
DEOLF 89.41 228 01/03/2018 10/14/2018 8.00% C 0.432 0.201 0.300 - - - 93.30%
88.32%
SatisfactoryAHD
477 395ROIM BUILDERS &
CONSTRUCTION SUPPLY20226 L AA LA GE
Off Carriageway Improvement along NRJ
San Francisco-Bahi-Barobo Road
(S00463MN) K1309+793- K1310+889
San Francisco,
Agusan del Sur11/12/2018 2nd/Final
Agusan del Sur
2nd DEOLF 11.81 167 18/04/2018 10/1/2018 0.60% C 0.500 0.141 0.300 - - - 94.10%
90.98%
Very SatisfactoryAHD
478 396
ROLCO CONSTRUCTION &
DEVELOPMENT
CORPORATION / ALJON
CONSTRUCTION & SUPPLY
JOINT VENTURE
JV-17- 1793 L B MA GE
Preventive Maintenance - Secondary
Roads, Catanduanes Circumferential
Road, K0006+083 - K0007+900,
K0015+000 - K0016+000, K0020+000 -
K0020+682, K0030+000 - K0031+000,
K0031+000 - K0032+000, K0038+223 -
K0038+370, K0043+300 - K0043+600,
K0045+000 - K0046+000, K0046+000 -
K0046+304, K0046+376 - K00656,
K00047+000 - K0047+065, K0049+276 -
K0050+000
Viga,
Catanduanes11/14/2018 1st
Catanduanes
DEOLF 45.88 270 23/02/2018 11/19/2018 -2.00% OG 0.384 0.292 0.130 0.020 0.035 0.033 86.10% - DEL
479 397
ROMA CONSTRUCTION &
DEVELOPMENT
CORPORATION/ ZEDIK
BUILDERS JOINT VENTURE
JV-15-631 L AA LA GE
Replacement of Permanent Weak
Bridges, Malamin Bridge (B02410LZ)
along Ilocos Norte- Abra
Malamin, Ilocos
Norte12/21/2018 1st/Final
Regional Office
No. ILF 60.79 779 01/02/2016 3/20/2018 -2.00% C 0.497 0.200 0.240 - - - 93.70%
93.70%
Very SatisfactoryDEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 55 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
480 398
ROMA CONSTRUCTION
AND DEVELOPMENT
CORPORATION
6514 L AAA LB GE
Road Widening - Secondary Roads -
Olongapo - Bugalion Road, Including
ROW - K0201+429 - K0203+000,
K0206+000 - K0206+897.60
Iba, Zambales 11/5/2018 1st Zambales 1st
DEOLF 76.42710815 334 30/04/2018 3/29/2019 0.35% OG 0.384 0.244 0.150 0.030 0.056 0.033 89.70% - AHD
481 399RONWOOD
CORPORATION25311 L AA MB GE
Construction of Alegria Bagahak-
Canlipos-Garcia Road, (Sta. 0+000 to Sta.
1+740)
Brgy. Alegria,
Sta. Monica,
Surigao Del
Norte
11/7/2018 1st/FinalSurigao del
Norte 2nd DEOLF 47.7 163 4/12/2018 9/21/2018 0.00% C 0.481 0.133 0.300 - - - 91.40%
91.40%
Very SatisfactoryONS
482 400 ROPRIM CONSTRUCTION 8546 L A MB GEConstruction of Tigbao River Control
System, San Antonio
Nueva Valencia,
Guimaras11/5/2018 1st Guimaras DEO LF 3.72 326 09/06/2018 4/30/2019 0.61% OG 0.384 0.243 0.150 0.030 0.055 0.033 89.50% - AHD
483 401 RRC CONSTRUCTION 24369 L A MA GE
Construction/Rehabilitation of Flood
Mitigation Facilities within Major River
Basins and Principal Rivers -
Construction of Pinacanauan River Flood
Control Project (Del Pilar Section)
San Mariano,
Isabela11/7/2018 1st/Final
Isabela 2nd
DEOLF 46.50099303 170 12/03/2018 8/28/2018 0.01% C 0.440 0.200 0.300 - - - 94.00%
94.00%
Very SatisfactoryAHD
484 402 RRN CONSTRUCTION 20228 L B MA GE
Road Widening along Jct. Sayre
Highway, Impasug-ong-Patulangan By-
Pass Road, K1478+(-911) - K1478+000
Impasug-ong ,
Bukidnon11/12/2018 1st/Final
Bukidnon 1st
DEO LF 27.3 180 08/03/2018 9/3/2018 0.00% C 0.489 0.134 0.300 - - - 92.30%
92.30%
Very SatisfactoryONS
485 RRN CONSTRUCTION 20228 L B MA GE
Rehabilitation/ Reconstruction /
upgrading of Damaged Paved Road
along Sayre Highway, K1553+270 -
K1554+414 and K1555+041 - K1555+272
Maramag,
Bukidnon11/12/2018 2nd/Final
Bukidnon 2nd
DEOLF 43.15 172 01/05/2018 10/19/2018 0.00% C 0.479 0.145 0.300 - - - 92.40%
92.40%
Very SatisfactoryONS
486 403 RSKC CONSTRUCTION 38292 L B MA GE
Construction of Three-Storey (9
Classroom) School Building Manaring
Integrated School, City of Ilagan
City of Ilagan,
Isabela11/8/2018 1st
Isabela 1st
DEOLF 24.67627314 180 09/07/2018 1/4/2019 0.39% OG 0.367 0.240 0.150 0.030 0.042 0.033 86.20% - AHD
487 404
RUCKS KONSULT 7
CONSTRUCTION SERVICES
/ J.D. LEGASPI
CONSTRUCTION (JOINT
VENTURE)
JV-17-1730 L AAA LB GE
Construction of Concrete Dike Flood
Control Structure along Boac River at
Brgy. Tanza
Boac,
Marinduque11/14/2018 1st/Final
Marinduque
DEOLF 23.75 262 27/02/2018 11/15/2018 0.38% C 0.414 0.187 0.300 - - - 90.10%
90.10%
Very SatisfactoryAHD
488 405 RUDHIL CONSTRUCTION 22901 L A MB GE
Road Concreting of Barangay San Jose
Leading to San Jose Multi-Purpose
Cooperative, in support of Agribusiness:
Rice and Rubber
Kalawit,
Zamboanga del
Norte
11/6/2018 1st/FinalZamboanga del
Norte 2nd DEOLF 71.86 285 19/02/2018 11/30/2018 3.00% C 0.460 0.132 0.300 - - - 89.20%
89.20%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 56 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
489
RUDHIL CONSTRUCTION &
ENTERPRISES, INC.
(FORMERLY: RUDHIL
CONSTRUCTION)
22901 L A MA GE
Construction / Rehabilitation of
Revetment along Iligan River (Upstream
of Tubod Bridge, Left and Right Bank),
Including ROW
Tubod, Iligan
City11/6/2018 1st/Final
Lanao del
Norte 2nd DEOLF 60.09 277 20/02/2018 11/23/2018 6.61% C 0.494 0.159 0.300 - - - 95.30%
95.30%
Very SatisfactoryAHD
490 406S&RV CONSTRUCTION &
SUPPLY19203 L D SB GB
Constructionof Multi-Purpose Building
(Municipal Building) Phase 2
Poblacion,
Batuan, Masbate11/12/2018 1st/Final
Masbate 3rd
DEOLF 4.91 150 20/03/2018 8/16/2018 0.00% C 0.496 0.136 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
491 407 SAKI Construction 42952 L D SB GEConcreting od Sitio Nabanngan,
Barangay Payawan Farm to Market RoadLamut, Ifugao 11/7/2018 1st/Final Ifugao 1st DEO LF 4.84 78 22/05/2018 8/7/2018 41.76% C 0.473 0.133 0.300 - - - 90.60%
90.60%
Very SatisfactoryAHD
492 408
SANLAHI GROUP OF
BUILDERS, INC. / B5
BUILDERS & SUPPLIES
(JOINT VENTURE)
11874 L A MA GEConstruction of Mag-Asawang Tubig RC
Structure, Pinagsabangan Section
Naujan, Oriental
Mindoro11/9/2018 1st/Final
Mindoro
Oriental DEOLF 18.81 180 15/03/2018 9/10/2018 16.00% C 0.016 0.200 0.300 - - - 51.60%
51.60%
PoorAHD
493 409
SANRHO BUILDERS, INC.
(FORMERLY: SANRHO
CONSTRUCTION AND
SUPPLIES)
24213 L A MA GE
Construction/Improvement of Access
Roads Leading To Aiports, Seaports and
Declared Tourism Destinations:Access
Roads Leading to Bacacay Seaport and
Leading to San Roque Port
Bacacay and
Tabaco City,
Albay
12/8/2018 1st/Final Albay 1st DEO LF 96.04 302 30/03/2017 1/28/2018 13.23% C 0.475 0.157 0.300 - - - 93.20%93.20%
Very SatisfactoryAHD
494 410
SANRHO BUILDERS, INC.
(FORMERLY: SANRHO
CONSTRUCTION AND
SUPPLIES)
24213 L A MA GE
Rehabilitation/Restoration/Reconstructi
on of Flood Control Projects Damaged By
Typhoon "Nina" and Super Typhoon
"Lawin"
Tabaco City ,
Albay12/7/2018 1st/Final Albay 1st DEO LF 74.73 211 13/09/2017 4/11/2018 0.00% C 0.444 0.200 0.300 - - - 94.40%
94.40%
Very SatisfactoryONS
495 411
SARGASSO
CONSTRUCTION &
DEVELOPMENT CORP. /
GREAT ZONE ENTERPRISE
JOINT VENTURE
JV-17-877 L AAA LB GE
Bridge Program: Widening of Permanent
Bridge-Kennon Br.2 along Kennon
Rd.Incl.ROW
Baguio City 11/12/2018 1stBaguio City
DEOLF 44.99 240 05/03/2018 10/30/2018 3.00% OG 0.328 0.300 0.150 0.030 0.050 0.033 89.10% - AHD
496 412SBK CONSTRUCTION
SUPPLIES AND SERVICES34150 D SB GE
Concreting of Sitio Tagbuan-Sitio
Kalibunan
Brgy. Himaya,
Hinigaran,
Negros
Occidental
11/14/2018 1st/Final
Negros
Occidental 2nd
DEO
LF 4.97 49 02/08/2018 9/19/2018 0.00% C 0.429 0.136 0.300 - - - 86.50%86.50%
SatisfactoryONS
497 413
SCP CONSTRUCTION / RED
CONSTRUCTION TECHNIK
(JOINT VENTURE)
JV-17-1458 L A MB GE
Construction of Flood Mitigation
Facilities along Major River Basins and
Principal Rivers, Mandulog River,
Lambaguhon Section (Along Emerald
Homes) Including ROW
Brgy. San Roque,
Iligan City11/6/2018 1st/Final
Lanao del
Norte 2nd DEOLF 43.65 274 20/02/2018 11/20/2018 3.39% C 0.495 0.134 0.300 - - - 92.90%
92.90%
Very SatisfactoryAHD
498 414
SEVEN DIGIT
CONSTRUCTION &
SUPPLIES
25471 L B MA GE
Construction/ Improvement of Access
Road Leading to Malampaya Sound
Dolphin Watching Tour, Brgy. Old
Guinlo, Sta. 204+500 - Sta. 205+700
Taytay, Palawan 11/10/2018 1st/FinalPalawan 1st
DEOLF 28.32 140 14/03/2018 7/31/2018 -4.00% C 0.455 0.200 0.180 - - - 83.50%
83.50%
SatisfactoryDEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 57 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
499 415
SILVERGRACES
CONSTRUCTION AND
CONSTRUCTION SUPPLY
3658 L A MA GE Construction of Overfloow Bridge
Brgy. Cansilayan,
Murcia, Negros
Occidental
11/13/2018 2nd/Final
Negros
Occidental 1st
DEOLF 6.11 141 26/04/2018 9/13/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%
92.24%
Very SatisfactoryONS
500 416SIXTEEN ENTERPRISES-
CALAPAN BRANCH18187 L B MA GE
Construction of Flood Mitigation
Structures and Drainage System,
Construction of Malayong River Control
Structure
Gloria, Oriental
Mindoro11/12/2018 1st/Final
Southern
Mindoro DEOLF 19.16 163 10/05/2018 10/19/2018 0.00% C 0.443 0.200 0.300 - - - 94.30%
94.30%
Very SatisfactoryONS
501 417SOLFIO P. JACINTO
CONSTRUCTION17799 L B MA GE
Rehabilitation of
Rehabilitation/Improvement of
Pampanga River Flood Control, Sta.
98+748.6 to Sta. 99+293
Brgy.
Pinagbayanan,
Laur, Nueva Ecija
11/8/2018 1st/FinalNueva Ecija
2nd DEOLF 58.75 171 7/15/2018 1/1/2019 1.15% OG 0.398 0.212 0.150 0.030 0.045 0.050 88.50% - AHD
502 418SOPHIA CONSTRUCTION
AND SUPPLY33484 L B SB GB
Construction of Multi-Purpose Building
(New Gym) in Barangay Talisay
Lake Sebu, South
Cotabato11/6/2018 1st/Final
South
Cotabato 1st
DEO
LF 2.47 105 4/26/2018 8/8/2018 0.70% C 0.500 0.134 0.300 - - - 93.40%93.40%
Very SatisfactoryAHD
503 419SOUTHERN DAWN
DEVELOPMENT CO.12294 L D SB GB
Construction of Two (2) Storey Four (4)
Classrooms Academic School Building at
Claro M. Recto Memorial Central School
Tiaong, Quezon 11/13/2018 1st/FinalQuezon 2nd
DEOLF 10.65 180 11/24/2017 5/22/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
504 420
SOUTHLAND
CONSTRUCTION AND
SUPPLIES
39555 L C SB GEConcreting of Dinapugan-Duit Farm to
Market Road, Barangay Tuplac & DuitKiangan, Ifugao 11/7/2018 1st/Final Ifugao 1st DEO LF 6.83 108 22/05/2018 9/6/2018 0.00% C 0.482 0.132 0.300 - - - 91.40%
91.40%
Very SatisfactoryONS
505 421
SPECO BUILDERS INC.
(FORMERLY:VRF
CONSTRUCTION)
15301 L AA MB GE
Construction of Concrete Slope
Protection with Steel Sheet Pile along
Pampanga River
Brgy. San
Gregorio, Rizal,
Nueva Ecija
11/12/2018 1st/FinalNueva Ecija 1st
DEOLF 65.09 270 07/02/2018 11/3/2018 30.00% C 0.487 0.200 0.300 - - - 98.70%
98.70%
OutstandingAHD
506 422
SPRING STAR
CONSTRUCTION AND
SUPPLY
20240 L B MA GE
Asset Preservation Program,
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse and Landslide,
Secondary Roads, Junction Milagros -
Baleno - Lagta Road, K0079+902 -
K0080+608, 668.00
Aroroy Masbate 11/9/2018 1stMasbate 1st
DEOLF 36.63 235 02/05/2018 12/23/2018 10.68% OG 0.357 0.246 0.150 0.022 0.037 0.033 84.53% - AHD
507 423
ST GERRARD
CONSTRUCTION GEN.
CONTRACTOR &
DEVELOPMENT CORP.
31762 L AA LA GE
Rehabilitation/Reconstruction of Roads
with Slips and Slope Collapse and
Landslide, Marikina - Infanta Road,
K0122+685 to K0123+045
Infanta, Quezon 11/9/2018 1st Quezon 1st
DEO LF 96.50 300 15/02/2018 12/11/2018 10.60% OG 0.325 0.284 0.150 0.024 0.019 0.050 85.20% - AHD
508 424
ST. GERRARD
CONSTRUCTION / DMLC
BUILDERS (JOINT
VENTURE)
JV-16-664 L AA LA GE
Flood Control and River Improvements
Projects along Laguna Lake Based on
Metro Maila Master Plan - Construction
of Slope Protection for Tanay River
Tanay, Rizal 11/22/2018 1st/FinalRegional Office
No. IV-ALF 92.117006 270 24/01/2017 10/20/2017 0.00% C 0.440 0.200 0.300 - - - 94.00%
94.00%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 58 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
509 425
ST. GERRARD
CONSTRUCTION GEN.
CONTRACTOR &
DEVELOPMENT CORP. /
TWIN DRAGON
CONSTRUCTION (JOINT
VENTURE
JV-16-1704 L AA LA GE
Construction / Upgrading /
Rehabilitation of Drainage along
National Roads-Tertiary-Odiongan-East-
West Road, K0004+000 - K0004+220,
K0004+480 - K0004+597.79, K0006+674 -
K0007+508.5, K0007+931 K0008+186.91
(S00007TL)
Tablas Island,
Romblon11/15/2018 2nd/Final Romblon DEO LF 42.88 240 27/06/2017 2/21/2018 0.00% C 0.491 0.200 0.178 - - - 86.90%
89.96%
Very SatisfactoryONS
510 426
ST. GERRARD
CONSTRUCTION GEN.
CONTRACTOR &
DEVELOPMENT CORP./
RUDHIL CONSTTRUCTION
& ENTERPRISES, INC.
(FORMERLY: RUDHIL
CONSTRUCTION)
JV-14-625 L A MB GE
Widening of Permanent Bridge Pulauan
RCDG Bridges (BOQ588MN) along
Dipolog-Oroquieta National Road,
Zamboanga del Norte, Sta. 1826+260.00
to Sta. 1826+800.00
Dapitan,
Zamboanga del
Norte
11/8/2018 1st/FinalRegional Office
No. IXLF 58.15 303 4/14/2015 11/6/2018 0.00% C 0.417 0.200 0.300 - - - 91.80%
91.80%
Very SatisfactoryONS
511
ST. GERRARD
CONSTRUCTION GEN.
CONTRACTORS &
DEVELOPMENT CORP.
31762 L AA MA GE
Const./Maintenance of Flood Mitigating
Structures & Drainage System Const. of
Calao East Slope Protection
Santiago City,
Isabela11/11/2018 1st/Final
Isabela 4th
DEOLF 45.74 205 05/02/2018 8/28/2018 1.29% C 0.460 0.133 0.300 - - - 89.30%
89.30%
Very SatisfactoryAHD
512 427
ST. GERRARD
CONSTRUCTION/
REBTRADE
INTERNATIONAL
CORPORATION JOINT
VENTURE
JV-16-013 L AA LA GE
Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Lanslide- Primary Road Dumaguete
North Road (Jct. Bais- Kabankalan-Nocc
Boundary, K0062+030- K0062+696 L/S
and K0063+365-K0063+413 L/S
Negros Oriental
Province10/11/2018 1st/Final
Negros
Oriental 1st
DEO
LF 192.83 441 19/09/2016 12/3/2017 5.47 C 0.453 0.200 0.300 - - - 95.30%95.30%
Very SatisfactoryAHD
513
ST. GERRERD
CONSTRUCTION GEN.
CONTRACTOR &
DEVELOPMENT CORP.
31762 L AA LA GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System -
Asset Preservation Program -
Rehabilitation/ Reconstruction of Road
with Slips, Slope Collapse and Landslide -
Secondary Roads - Manila East Road -
K0039 + (-669) - K0039+000
Cardona, Rizal 11/11/2018 1st Rizal 2nd DEO LF 92.6431399 330 26/02/2018 1/21/2019 1.19% OG 0.400 0.240 0.150 0.030 0.060 0.050 93.00% - AHD
514 428
ST. JOSEPH
CONSTRUCTION AND
TRADING
36890 L C SB GB
Construction of One (1) Storey- Two (2)
Classroom School Building at Don Jose
ES
Dinas,
Zamboanga del
Sur
11/12/2018 1st/FinalZamboanga del
Sur 2nd DEOLF 2.79 115 12/29/2017 4/22/2018 2.35% C 0.481 0.133 0.300 - - - 91.40%
91.40%
Very SatisfactoryAHD
515 429
ST. MATTHEW GEN.
CONTRACTOR &
DEVELOPMENT CORP.
40908 L B SB GEConcreting of Purok 4, Brgy. Bagong
Barrio FMR, Brgy. Bagong Barrio
San Ildefonso,
Bulacan11/7/2018 1st/Final
Bulacan 2nd
DEOLF 6.69 100 18/07/2018 10/25/2018 0.00% C 0.473 0.134 0.300 - - - 90.70%
90.70%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 59 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
516 430ST. PIUS CONSTRUCTION
AND SUPPLY41263 L B SB GB
Construction of DPWH Building (Officials
and Employees Quartes), Romblon DEO
Brgy. Batian,
Odiongan,
Tablas Island,
Romblon
11/15/2018 1st Romblon DEO LF 14.86 240 27/02/2018 10/24/2018 -4.84% OG 0.395 0.300 0.102 0.030 0.045 0.033 90.50% - DEL
517 431
ST. RAYMUND
CONSTRUCTION INC. /CFC
FIBER CONSTRUCTION
CORPORATION (JOINT
VENTURE)
JV-17-806 L B MB GE
Retroffiting/Strengthening of Permanent
Bridges, Biglang Awa (B0000MQ) along
Marinduque Circumferential Road
Boac,
Marinduque11/15/2018 1st/Final
Marinduque
DEOLF 10.88 90 16/02/2018 5/16/2018 1.11% C 0.472 0.133 0.300 - - - 90.50%
90.50%
Very SatisfactoryAHD
518 432
ST. TIMOTHY
CONSTRUCTION
CORPORATION
39196 L A MA GE
Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, Ladslides
Claveria-Calanasan-Kabugao Road
KO652+137-KO652+262
calanasan,
apayao11/16/2018 1st/Final
Apayao 2nd
DEOLF 51.49 196 19/02/2018 9/2/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%
91.30%
Very SatisfactoryONS
519
ST. TIMOTHY
CONSTRUCTION
CORPORATION
39196 L A MA GE
Construction/ Maintenance of Flood
Mitigation Facilities along Major River
Basins and Principal Rivers, Construction
of Flood Control Tignoan River
Real, Quezon 11/9/2018 1st/FinalQuezon 1st
DEO LF 49.00 173 13/02/2018 8/4/2018 0.00% C 0.417 0.200 0.300 - - - 91.70%
91.70%
Very SatisfactoryONS
520
ST. TIMOTHY
CONSTRUCTION
CORPORATION
39196 L A MA GE
Construction of Flood Mitigation
Structures and Drainage System,
Construction of Mara gooc Seawall
Gloria, Oriental
Mindoro11/12/2018 1st
Southern
Mindoro DEOLF 96.50 286 28/05/2018 3/9/2019 1.26% OG 0.333 0.300 0.150 0.030 0.050 0.050 91.30% - AHD
521
ST. TIMOTHY
CONSTRUCTION
CORPORATION
39196 L A MB GE
Construction of Agnipa Flood Control
Structure along Romblon - Cogon -
Sablayan Circumferential Road
Agnipa, Romblon 11/16/2018 1st Romblon DEO LF 46.44 330 07/05/2018 4/1/2019 5.01% OG 0.391 0.300 0.150 0.030 0.040 0.033 94.40% - AHD
522
ST. TIMOTHY
CONSTRUCTION
CORPORATION
39196 L A MA GE Construction of Concrete RevetmentMalalag, Davao
del Sur11/14/2018 1st/Final
Davao del Sur
1st DEOLF 96.5 297 3/14/2018 1/4/2019 22.40% C 0.482 0.134 0.300 - - - 91.60%
91.60%
Very SatisfactoryAHD
523
ST. TIMOTHY
CONSTRUCTION
CORPORATION
39196 L A MA GE
Road Widening-Dulawan-Marbel Road,
K1762+305-K1763+320, K1764+320,
K17864+(-494)-K1764+506
Tacurong City,
Sultan Kudarat11/7/2018 1st
Sultan Kudarat
1st DEOLF 70.2 203 5/17/2018 12/5/2018 -2.70% OG 0.389 0.239 0.123 0.024 0.047 0.033 85.50% - DEL
524 433STALL CONSTRUCTION
SUPPLIES & SERVICES29930 L B GE
Local Program, Local Infrastructure
Program, Local Roads and Bridges, Local
Roads, Concreting of Road
Brgy. Dalipit,
Cuenca,
Batangas
11/10/2018 1st/FinalBatangas 3rd
DEOLF 0.96943377 120 19/02/2018 6/18/2018 0.00% C 0.490 0.133 0.300 - - - 92.30%
92.30%
Very SatisfactoryONS
525 434STAR WILLIAM
CONSTRUCTION35938 L B SB GE
Construction of Concrete Slope
Protection along Angat River Dampol
Section
Plaridel, Bulacan 11/5/2018 1st/FinalBulacan 1st
DEOLF 28.90 180 01/03/2018 8/27/2018 47.41% C 0.477 0.201 0.300 - - - 97.80%
97.80%
OutstandingAHD
526 435STEVEN CONSTRUCTION
& SUPPLY21987 L B MA GB Rehabilitation of Municipal Hall
Magarao,Camari
nes Sur11/9/2018 1st/Final
Camarines Sur
2nd DEOLF 2.82 90 14/02/2018 5/14/2018 0.00% C 0.451 0.113 0.300 - - - 86.40%
86.40%
SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 60 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
527STEVEN CONSTRUCTION
AND SUPPLY21987 L B MA GE
Construction of Flood Mitigation
Structures (Concrete Revement) along
Buenos Aires River Barangay Buenos
Aries
San Fernando,
Masbate11/12/2018 2nd/Final
Masbate 3rd
DEOLF 47.55 280 08/02/2018 11/14/2018 0.00% C 0.455 0.135 0.300 - - - 89.00%
88.52%
SatisfactoryONS
528 436
STEVEN CONSTRUCTION
AND SUPPLY JOINT
VENTURE/ S.R. BALDON
CONSTRUCTION AND
SUPPLY
JV-17-1594 L B MA GE
Construction/ Improvement of Access
Road Leading to Declared Tourism
Destination - Donsol - Pillar - Castilla -
Sorsogon City (Don Picaso) Tourism
Highway (sorsogon city section)
Sorsogon City 11/7/2018 1stSorsogon 1st
DEOLF 47.38 270 01/03/2018 11/25/2018 1.77% OG 0.388 0.239 0.150 0.022 0.037 0.033 86.93% - AHD
529 437
STO. CRISTO
CONSTRUCTION &
TRADING
26096 L B MA GE
Rehabilitation/Improvement of Existing
Dike along Parua River (San Vicente
Section), Sta. 11+900 to Sta. 12+210.40,
Concepcion
Concepcion,
Tarlac11/13/2018 1st/Final Tarlac 2nd DEO LF 23.33 136 27/03/2018 8/9/2018 0.00% C 0.466 0.133 0.300 - - - 89.90%
89.90%
Very SatisfactoryONS
530
STO. CRISTO
CONSTRUCTION AND
TRADING
26096 L B MA GE
Rehabilitation/Construction of Slope
Protection at Cabatuhan River Phase I,
Sta. 0+520.80 to Sta. 0+760
Palangianan, Iba,
Zambales11/6/2018 1st/Final
Zambales 1st
DEOLF 37.6437831 210 02/05/2018 11/27/2018 49.52% C 0.489 0.133 0.300 - - - 92.20%
92.20%
Very SatisfactoryAHD
531
STO. CRISTO
CONSTRUCTION AND
TRADING
26096 L B MA GEConstruction of Sumangga Flood Control
Structure
Mogpog,
Marinduque11/15/2018 2nd/Final
Marinduque
DEOLF 17.69 242 16/02/2018 10/15/2018 0.00% C 0.464 0.174 0.300 - - - 93.80%
89.96%
Very SatisfactoryONS
532 438
STRONGLANE
CONSTRUCTION &
TRADING
32333 L B MA GEConstruction of Flood Control Structure
Along River, Barangay Poblacion Passi City, Iloilo 10/19/2018 1st/Final Iloilo 2nd DEO LF 29.40 195 14/02/2018 8/27/2018 0.00% C 0.410 0.199 0.300 - - - 90.90%
90.90%
Very SatisfactoryONS
533 439STRUKTURA TEKNIKA
SERVICES COMPANY16646 L A MA GE
Local Infrastructure Program -
Construction of Hugom - Malabrigo
(Hugom Section) Road, Hugom, San
Juan, Batangas
Hugom, San
Juan, Batangas11/6/2018 2nd/Final
Batangas 4th
DEOLF 29.7 300 7/10/2017 5/5/2018 0.00% C 0.500 0.200 0.000 - - - 70.00%
75.34%
UnsatisfactoryONS
534 440 STX ENTERPRISES 21547 L AAA LB GE
Rehabilitation/ Reconstruction /
Upgrading of Damaged Paved Roads
Calapan South Road K004+150 -
K005+415
Calapan City,
Oriental
Mindoro
11/10/2018 1st/FinalMindoro
Oriental DEOLF 28.29 210 18/04/2018 11/13/2018 3.35% C 0.393 0.200 0.300 - - - 89.30%
89.30%
Very SatisfactoryAHD
535 STX ENTERPRISES 21547 L AAA LB GE
Network Development - Off -
Carriageway Improvement - Secondary
Roads, Mindoro Oriental / Occidental
East Coastal Rd. - K0214+900 -
K0218+390 (S00094MR)
Magsaysay,
Occidental
Mindoro
11/6/2018 1st
Mindoro
Occidental
DEO
LF 74.02 288 05/03/2018 12/17/2018 -1.46% OG 0.353 0.238 0.135 0.030 0.045 0.033 83.40% - DEL
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 61 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
536 441SUNSTONE
CONSTRUCTION11122 L B MA GE
Construction/Improvement of Access
Roads Leading to Trades, Industries and
Economic Zones Along Aleosan Barangay
Road from Upper Katalicanan
Connecting to Sitio Citrus New Leon in
Support of Rubber and Palm Oil
Industries
Aleosan, North
Cotabato11/10/2018 2nd/Final
Cotabato 2nd
DEOLF 38.95 162 3/15/2018 8/23/2018 3.00% C 0.488 0.134 0.300 - - - 92.20%
89.62%
Very SatisfactoryAHD
537 442
SUNSTONE
CONSTRUCTION/ J-ONE
BUILDERS (JOINT
VENTURE)
JV-17-1062 L B MA GE
Construction/Improvement of Access
Roads Leading to Trades, Industries and
Economic Zone along Aleosan Brgy.
Road From San Mateo - Sitio Taguan
Connecting to Pupoyon, Dualing, In
Support of Rubber, Palm Oil and Coconut
Inductries
Aleosan, North
Cotabato11/10/2018 2nd/Final
Cotabato 2nd
DEOLF 27.93 123 3/15/2018 7/15/2018 0.81% C 0.492 0.133 0.300 - - - 92.50%
90.46%
Very SatisfactoryAHD
538 443
SUNWEST
CONSTRUCTION AND
DEVELOPMENT
CORPORATION
15906 L AAA LB GE
Asphalt Overlay of Ligao - Tabaco
Junction San Antonio - Estancia -Malinao
Poblacion Road
Malinao, Albay 11/15/2018 1st/Final Albay 1st DEO LF 28.23 56 07/06/2018 8/1/2018 0.00% C 0.475 0.139 0.300 - - - 91.40%91.40%
Very SatisfactoryONS
539
SUNWEST
CONSTRUCTION AND
DEVELOPMENT
CORPORATION
15906 L AAA LB GE Construction of Maninila Flood ControlGuinobatan,
Albay11/5/2018 1st Albay 3rd DEO LF 92.56 180 20/06/2018 12/16/2018 2.00% OG 0.320 0.293 0.150 0.020 0.030 0.033 84.60% - AHD
540
SUNWEST
CONSTRUCTION AND
DEVELOPMENT
CORPORATION
15906 L AAA LB GE
Asset Preservation Program - Preventive
Maintenance - Secondary Roads -
Junction Putiao - Pillar - Donsol Road
K0556+700 - K0559+028
Pillar, Sorsogon 11/7/2018 1stSorsogon 1st
DEOLF 94.43 210 06/08/2018 3/3/2019 5.47% OG 0.392 0.237 0.150 0.020 0.037 0.033 86.90% - AHD
541 444
SUPREME ABF CONST. &
CONST. SUPPLY
COMPANY INC.
25226 L AAA LB GE
Rehabilitation of Concrete Road Jaime
Cardinal Sin Avenue- (S00335PN)
K0285+129-K0285+466, K0285+944-
K0285+950, K0286+027-K0286+040,
(S00481PN) K0288+210-K0288+636
Kalibo-New
Washington,
Aklan
11/7/2018 2nd Aklan DEO LF 18.62 166 28/03/2018 9/9/2018 -7.61% OG 0.350 0.294 0.074 0.030 0.055 0.033 83.60% - DEL
542
SUPREME ABF CONST. &
CONST. SUPPLY
COMPANY INC.
25226 L AAA MA GEConstruction of Flood Control Structure
Along Tabigue River (Upstream)
EB. Magalona,
Negros
Occidental
9/8/2018 2nd/Final
Negros
Occidental 1st
DEO
LF 18.62 150 12/04/2018 9/8/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%89.50%
Very SatisfactoryONS
543
SUPREME ABF CONST. &
CONST. SUPPLY
COMPANY INC.
25226 L AAA LB GEConstruction/Improvement of Access
Road Leading to Kabankalan Airport
Kabankalan City,
Negros
Occidental
11/14/2018 1st
Negros
Occidental 3rd
DEO
LF 46.54 315 08/02/2018 12/19/2018 0.10% OG 0.356 0.238 0.150 0.030 0.050 0.033 85.70% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 62 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
544
SUPREME ABF
CONSTRUCTION &
CONSTRUCTION SUPPLY
COMPANY INC.
25226 L AAA MA GE
Organization Outcome 2: Protect Lives
and Properties Againts Major Floods,
Flood Management Program,
Construction/Maintenance of Flood
Mitigation Structures and Drainage
Systems Reconstruction/Rehabilitation
of Bais River Control
Bais City, Negros
Oriental11/10/2018 1st
Negros
Oriental 2nd
DEO
LF 32.58 210 29/05/2018 12/24/2018 -26.18% OG 0.360 0.300 0.000 0.030 0.061 0.000 75.10% - DEL
545 445SYNDTITE CONSTRUCTION
CORPORATION11597 L AAA MA GE
Construction of Flood Control along
Tibyawan River (Upstream) at Brgy.
Poblacion
Tayasan, Negros
Negros Oriental11/9/2018 2nd/Final
Negros
Oriental 1st
DEO
LF 27.92 205 3/11/2018 10/1/2018 0.00% C 0.429 0.200 0.300 - - - 92.90%92.96%
Very SatisfactoryONS
546
SYNDTITE CONSTRUCTION
CORPORATION
(FORMERLY: R.C TAGALA
CONSTRUCTION)
11597 L AAA LA GE
Network Development - Road Widening -
Secondary Roads, Mindoro West Coastal
Rd. - K0244+022 - K0245+805,
K0249+106 - K0250+152 (S00095MR)
San Jose
Occidental
Mindoro
11/7/2018 1st
Mindoro
Occidental
DEO
LF 78.57 309 09/02/2018 12/14/2018 -4.48% OG 0.317 0.300 0.105 0.030 0.045 0.033 83.00% - DEL
547
SYNDTITE CONSTRUCTION
CORPORATION
(FORMERLY: R.C TAGALA
CONSTRUCTION)
11597 L AAA MB GE
Road Upgrading (Unpaved to Paved) of
Aramaywan -Berong-Puerto Princesa
Road, K0202+521 - K0205+825
Quezon, Palawa 11/9/2018 1stPalawan 2nd
DEOLF 93.57 303 09/05/2018 3/7/2019 19.50% OG 0.391 0.240 0.150 0.030 0.037 0.050 89.80% - AHD
548 446
TARLAC 3-G
CONSTRUCTION &
DEVELOPMENT/ BIG
BERTHA CONSTRUCTION
& DEV
JV-17-2694 L AA MA GE
Construction/Improvement of Access
Roads Leading to Declared Tourism
Destinations - Clark Green City to Mac
Arthur Acees Road Leading to Clark
Green City
Tarlac 11/13/2018 1st Tarlac 2nd DEO LF 93.06 229 04/06/2018 1/18/2019 2.65% OG 0.373 0.225 0.150 0.030 0.051 0.050 87.90% - AHD
549 447TEDDIE CONSTRUCTION
DEVELOPMENT, INC.6313 L A MB GE
Rehabilitation/Reconstruction/
Upgrading of Damaged Paved National
Road including Drainage A. K1959+597
to K1959+853 B. K1962+000 to
K1963+000 C. K1963+000 to K1963+271
D. K1963+297 to K1963+398 E.
K1964+135 to K1965+000 F. K1966+000
to K1967+000
Zamboanga City 11/15/2018 1st/FinalZamboanga
City DEOLF 46.42 392 8/1/2017 8/27/2018 0.51% C 0.315 0.200 0.200 - - - 81.50%
81.50%
UnsatisfactoryAHD
550 448TEDDIE CONSTRUCTION
DEVELOPMENT, INC.6313 L A MA GE
Completion of Reinforced Concrete
Pier/Wharf, DPWH Regional Office
Equipment Service
Panacan, Davao
City11/16/2018 2nd/Final
Regional Office
No. XILF 72.37 517 25/04/2017 9/23/2018 0.00% C 0.483 0.175 0.300 - - - 95.80%
90.22%
Very SatisfactoryONS
551 449 THREE G BUILDERS 43055 L B SB GBConstruction of Multi-Purpose Building
(Gym) Purok Dos Urban, Brgy. Sto. Nino
Koronadal City,
South Cotabato11/5/2018 2nd/Final
South
Cotabato 1st
DEO
LF 2.37 105 7/4/2018 10/16/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%89.64%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 63 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
552 450 THREE W BUILDERS, INC 10722 L AAA MB GEConstruction/ Deeping of Bulaw River,
Brgy. Muntindilaw
Antipolo City,
Rizal11/6/2018 1st Rizal 1st DEO LF 49.00 390 01/03/2018 3/25/2019 0.06% OG 0.380 0.240 0.150 0.022 0.047 0.033 87.20% - AHD
553 451
THREE W BUILDERS, INC. /
MGBJ RISING
CONSTRUCTION & LAND
DEVELOPER (JOINT
VENTURE)
JV-17-663 L AAA LB GE
Preventive Maintenance-Secondary
Roads, Makar-Kiamba Rd.- K1658+(-235)-
K1658+480, K1658+525-K1658+648,
K1658+678-K1660+259
General Santos
City, South
Cotabato
11/14/2018 1st/Final
South
Cotabato 2nd
DEO
LF 81.4 180 12/03/2018 9/7/2018 0.00% C 0.489 0.134 0.300 - - - 92.30%92.30%
Very SatisfactoryONS
554 452
THREE W BUILDERS, INC. /
SOLRAC SETPH BUILDERS
JOINT VENTURE
10722 L AAA LB GE
Road Concreting of Calinan-Baguio
National Road, (Baguio Proper Portion)
to Wines-Tamugan-Tambobong Road to
Magpet (North Cotabato)
3rd
Congressional
District, Davao
City
11/12/2018 1stDavao City 2nd
DEOLF 72.08 277 5/2/2018 2/2/2019 0.17% OG 0.358 0.250 0.150 0.030 0.061 0.050 89.90% - AHD
555 453
THREE W BUILDERS, INC./
AMPLEX BUILDERS &
CONSTRUCTION SUPPLY
(JOINT VENTURE)
JV-17-575 L AAA LB GE
Retrofitting/Strengthening of Permanent
Bridges Polanco Bridge (B00418MN)
along Dipolog-Polanco-Piñan-Jct.
Oroquieta Road
Zamboanga del
Norte11/8/2018 3rd/Final
Zamboanga del
Norte 3rd DEOLF 41.88 225 19/03/2018 10/29/2018 -40.07 C 0.493 0.134 0.300 - - - 92.70%
91.50%
Very SatisfactoryDEL
556 454
THREE-IN- ONE
CONSTRUCTION &
TRADING
14695 L B SB GBConstruction / Rehabilitation of Multi-
Purpose Building
Pandaras, City of
San Fernando,
Pampanga
11/12/2018 1st/FinalPampanga 1st
DEOLF 1.87505 60 25/06/2018 8/23/2018 0.00% C 0.498 0.134 0.300 - - - 93.20%
93.20%
Very SatisfactoryONS
557 455THUNDERBLAST
VENTURES33377 L B MA GE
Construction of Taboc Seawall and
Baywalk Pavement
Taboc, San Juan,
La Union11/5/2018 1st/Final
La Union 1st
DEOLF 9.74 175 26/02/2018 8/19/2018 0.00% C 0.496 0.133 0.300 - - - 92.90%
92.90%
Very SatisfactoryONS
558 456
TKS BUILDERS AND
SUPPLIES/ DIGOS
TESSTON CONSTRUCTION
& SUPPLIES JOINT
VENTURE
JV-17-1042 L B MA GEConstruction of Concrete Revetment
along Cebulan River
Sta. Cruz, Davao
del Sur12/16/2018 1st/Final
Davao del Sur
DEOLF 47.53 214 3/5/2018 10/4/2018 0.00% C 0.452 0.200 0.300 - - - 95.20%
95.20%
Very SatisfactoryONS
559 457TOKWING
CONSTRUCTION, CORP.9650 L AAA LB GE
Flood Management Program;
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
System; Construction of Reinforced
Concrete Slope Protection with Steel
Sheet Piles Foundation alond Abacan
River, Barangay Sapalibutad
Angeles City,
Pampanga11/13/2018 1st/Final
Pampanga 3rd
DEOLF 48.29720383 210 09/03/2018 10/4/2018 0.00% C 0.447 0.200 0.300 - - - 94.70%
94.70%
Very SatisfactoryONS
560 458 TONKA CONSTRUCTION 4064 L B MA GE
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
Systems - Rehabilitation/Improvement
of Dike with Slope Protection along
Porac River, Hacienda Dolores
Porac,
Pampanga 11/15/2018 1st/Final
Pampanga 2nd
DEOLF 27.63515122 150 22/05/2018 10/18/2018 0.00% C 0.467 0.133 0.300 - - - 90.00%
90.00%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 64 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
561 459
TOREJA'S CONSTRUCTION
SUPPLY CORP. / E.M
CUERPO INC. JOINT
VENTURE
JV-16-1132 L AAA MA GE
MFO - 2 Flood Management Services,
Construction/ Maintenance of Flood
Mitigation Structures and Drainage
System, Construction/ Improvement of
Flood Control Structure along Lobo
Rivebanks , Tayuman
Lobo, Batangas
2nd LD11/8/2018 1st/Final
Batangas 2nd
DEOLF 77.2 390 30/03/2017 4/23/2018 0.00% C 0.467 0.133 0.300 - - - 90.00%
90.00%
Very SatisfactoryONS
562 460
TOREJA'S CONSTRUCTION
SUPPLY CORPORATION /
J.D. LEGASPI
CONSTRUCTION (JOINT
VENTURE)
JV-17-1241 L AAA LA GE
Rehabilitation / Major Repair of
Permanent Bridges Lobo Br. (Malabrigo
Br.) (B03073LZ) along Lobo - Malabrigo -
Sn Juan Rd.
Batangas
Province12/14/2018 1st/Final
Regional Office
No. IV-ALF 175.8462586 390 26/02/2018 3/22/2019 4.20% C 0.499 0.132 0.300 - - - 93.10%
93.10%
Very SatisfactoryAHD
563 461TRANS-AURORA
CONSTRUCTION11388 L A MA GE
Construction of Road Brgy. Dinadiawan,
Dipaculao, Aurora
Brgy.
Dinadiawan,
Dipaculao,
Aurora
11/10/2018 1st/Final Aurora DEO LF 19.80 169 4/11/2018 9/26/2018 0.00% C 0.472 0.134 0.300 - - - 90.60%90.60%
Very SatisfactoryONS
564 462TRIBU DESIGN &
CONSTRUCTION12756 L A MA GE
Retrofitting/Strengthening of Permanent
Bridges, Ini-In Bridge along Abbut-
Conner Road
conner, apayao 11/15/2018 1st/FinalApayao 1st
DEOLF 21.49 271 2/11/2018 11/8/2018 37.43% C 0.494 0.134 0.300 - - - 92.80%
92.80%
Very SatisfactoryAHD
565TRIBU DESIGN &
CONSTRUCTION12756 L A MA GE
Construction/Maintenance of Flood
Mitigation Structures and Drainage
System-Construction of Nabuangan
Flood Control
Barangay
Nabuangan,
Conner, Apayao
11/15/2018 1stApayao 1st
DEOLF 35.93 417 2/11/2018 4/3/2019 1.14% OG 0.378 0.229 0.150 0.030 0.070 0.033 89.00% - AHD
566 463TRI-EX TOWER COMPANY,
INC.33326 L AAA SB GB
Construction (Completion) of Multi
Purpose Building, Barangay Poblacion
Norte
Paracale,
Camarines Norte11/6/2018 1st/Final
Camarines
Norte DEOLF 0.97 60 27/03/2018 5/25/2018 0.00% C 0.474 0.134 0.300 - - - 90.80%
90.80%
Very SatisfactoryONS
567 464TRIPARCO DEVELOPMENT
CORPORATION23327 L A MA GE
Construction/Upgrading/Rehabilitation
of Drainage along Butuan City/Pianing-
Tandag Road – K1232+(-1016) – K1232+(-
716)
Butuan City 11/15/2018 2nd/FinalButuan City
DEOLF 9.8 206 3/21/2018 10/12/2018 1.16% C 0.492 0.133 0.300 - - - 92.50%
93.64%
Very SatisfactoryAHD
568 465T-SQUARE
CONSTRUCTION CORP.14268 L A MA GE
Construction/Upgrading/Rehabilitation
of Drainage along National Roads:
Marbel - Makar Rd. K1700+525 -
K1701+185, K1700+800 - K1701+237.24,
K1701+243.24 - K1701+264.35
South Cotabato 11/6/2018 2nd/Final
South
Cotabato 1st
DEO
LF 18.2 135 4/28/2018 9/9/2018 -1.46% C 0.496 0.133 0.256 - - - 88.50%89.67%
Very SatisfactoryDEL
569 466 UKC BUILDERS, INC. 10759 L AAA LB GE
Widening of Permanent Bridge, Initao
Bridge along Butuan City - Cagayan de
Oro City - Iligan City Road (Phase III)
Initao, Misamis
Oriental11/9/2018 2nd/Final
Misamis
Oriental 2nd
DEO
LF 21.46 196 12/02/2018 8/26/2018 0.00% C 0.450 0.166 0.300 - - - 91.60%91.60%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 65 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
570 467
UNIMASTERS
CONGLOMERATION,
INCORPORATED
3390 L AAA LB GE
Network Development Program Road
Widening Tertiary Roads Bagahupi-
Babatngon-Sta. Cruz-Barugo-Carigara
Rd.-K0941+000-K0942+293, K0942+353-
K0942+614
Barugo and
Carigara, Leyte11/5/2018 1st/Final Leyte 2nd DEO LF 46.20 180 3/7/2018 9/2/2018 1.11% C 0.474 0.134 0.300 - - - 90.80%
90.80%
Very SatisfactoryAHD
571
UNIMASTERS
CONGLOMERATION,
INCORPORATED
3390 L AAA LB GE
Construction of By-Pass and Diversion
Roads, San Francisco (NRJ Hubang - Sta.
Ana - San Isidro) By-pass Road, Daang
Maharlika Alternate Route), Including
ROW and Bridge
San Francisco,
Agusan del Sur11/12/2018 1st
Regional Office
No. XIIILF 108.9 300 5/24/2018 3/19/2019 20.95% OG 0.394 0.241 0.150 0.030 0.060 0.050 92.50% - AHD
572 468UY CONDEV
CORPORATION12336 L AA LA GE
ORGANIZATIONAL OUTCOME 1: Ensure
Safe and Reliable National Road System,
Asset Preservation Program
Rehabilitation/ Reconstruction/
Upgrading of Damaged Paved Roads,
Sta. Catalina-Pamplona-Tanjay City,
K0034+000-K0035+000; K0038+172-
K0039+000, K0044+411-K-K0044+508,
K0047+271-K0047+360, K0052+000-
K0052+066, K0055+255-K0055+490,
K0059+637-K0060+137
Pamplona,
Negros Oriental11/10/2018 1st
Negros
Oriental 2nd
DEO
LF 68.12 268 10/05/2018 2/1/2019 9.74% OG 0.374 0.225 0.150 0.030 0.060 0.050 88.90% - AHD
573UY CONDEV
CORPORATION 12336 AA LA GE
Construction of Concrete Road-
Himamaylan City- Negros Oriental
Boundary- Tayasan Road
Negros
Occidental11/14/2018 1st
Regional Office
No. VILF 172.34 297 08/05/2018 2/28/2019 -1.84% OG 0.385 0.238 0.132 0.030 0.051 0.033 86.90% - DEL
574 469
V. BERNARDO
CONSTRUCTION AND
TRADING
34490 L D SB GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System -
Asset Preservation Program -
Construction / Upgrading /
Rehabilitation of Drainage Along
National Roads - Secondary Roads -
Manila East Road - K0039+700 -
K0040+162
Cardona, Rizal 11/11/2018 1st/Final Rizal 2nd DEO LF 9.35899196 158 13/02/2018 7/20/2018 0.00% C 0.488 0.134 0.300 - - - 92.20%92.20%
Very SatisfactoryONS
575 470V.R. PATRON BUILDERS &
DEVELOPERS CORP.13487 L AAA LA GE
Asset Preservation Program -Program -
Preventive Maintenance - Secondary
Roads along Ternate-Nasugbu Rd. -
K0084+500 - K0084+831, K0085+000 -
K0086+060, K0086+120 - K0086+390,
K0086+405 - K0088+100, K0088+554 -
K0090+000, K0091+683 - K0091+880,
K0092+685 - K0094+000, K0096+1152 -
K0096+1229
Nasugbu,
Batangas10/12/2018 1st/Final
Batangas 1st
DEO LF 95.66624 180 12/02/2018 8/10/2018 50.00% C 0.469 0.134 0.300 - - - 90.30%
90.30%
Very SatisfactoryAHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 66 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
576V.R. PATRON BUILDERS &
DEVELOPERS CORP.13487 L AAA LA GE
MFO-3 Maintenance and Construction
Services of Other Infrastructures,
Construction/ Improvement of Access
Roads Leading to Declared Tourism
Destinations, Taal Lake Circumferential
Road along Municipalities of San Nicolas -
Sta. Teresita - Alitagtag, Batangas
San Nicolas and
Sta. Teresita,
Batangas
10/12/2018 1st/FinalBatangas 3rd
DEOLF 96.49818864 360 03/03/2017 2/25/2018 0.00% C 0.477 0.134 0.300 - - - 91.10%
91.10%
Very SatisfactoryONS
577 471VCH CONSTRUCTION AND
TRADING32050 L A MA GE
Widening of Permanent Bridges Bato
Bridge (B00238PW) along Puerto
Princesa North Road
Taytay, Palawan 11/10/2018 1stPalawan 1st
DEOLF 10.39 335 14/03/2018 2/11/2019 3.23% OG 0.370 0.300 0.150 0.020 0.056 0.033 92.90% - AHD
578 472VEN RAY CONSTRUCTION
CORPORATION18310 L AAA LB GE
Road Widening along Jct. Manolo Fortich-
Libona-Indahag Road, K1454+070 to
K1457+508
Manolo fortich,
Bukidnon11/10/2018 1st/Final
Bukidnon 3rd
DEOLF 91.57 228 28/02/2018 10/13/2018 0.88% C 0.484 0.139 0.300 - - - 92.30%
92.30%
Very SatisfactoryAHD
579VEN RAY CONSTRUCTION
CORPORATION18310 L AAA LA GE
Cluster "52" Rehabilitation /
Reconstruction / Upgrading of Damaged
Road in Misamis Oriental: 1) Butuan City -
Cagayan de Oro City- Iligan City Road,
K1305+535-K1399+318.65;2) Butuan City-
Cagayan de Oro City- Iligan City Road,
K1342+000- K1378+300, both at
intermittent sections.
Misamis Oriental 11/14/2018 1stRegional Office
No. XLF 230.19 388 12/07/2018 8/3/2019 25.05% OG 0.390 0.240 0.150 0.030 0.060 0.050 92.00% - AHD
580VENRAY CONSTRUCTION
CORPORATION18310 L AAA LA GE
Construction/Improvement of Access
Roads Leading to Trades, Industries and
Economic Zome - Tinago-Biking Road in
Support of the Agribusiness Industry
Dauis, Bohol 11/6/2018 1st Bohol 1st DEO LF 43.53 263 4/2/2018 12/20/2018 8.57% OG 0.380 0.228 0.150 0.030 0.061 0.050 89.90% - AHD
581 473VERZONTAL BUILDERS,
INC. 31579 L AAA MA GE
Construction of Flood Control Structures
along Sta. Teresita River, River
Downstream of Sorsogon Bridge
Brgy. Sta.
Teresita, Bulan
Sorsogon (Sta.
0+10 - Sta.
0+750, both
sides)
11/8/2018 1stSorsogon 2nd
DEOLF 23.64 227 02/08/2018 3/16/2019 49.94% OG 0.385 0.241 0.150 0.020 0.030 0.033 85.90% - AHD
582
VERZONTAL BUILDERS,
INC. (FORMERLY:
VERZONTAL BUILD)
31579 L AAA MA GE
Rehabilittation/ Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Tertiary Roads, San
Fernando - Talisay Road
San Fernando,
Masbate11/12/2018 2nd/Final
Masbate 3rd
DEOLF 46.50 270 01/03/2018 11/25/2018 32.96% C 0.478 0.144 0.300 - - - 92.20%
88.40%
SatisfactoryAHD
583 474VICENTE T. LAO
CONSTRUCTION7040 L AAA LB GE
Construction of Concrete Road- NRJ
Leading to Morias Falls
Barangay
Miatan,
Katipunan,
Zamboanga del
Norte
11/7/2018 1stZamboanga del
Norte 1st DEOLF 82.47 295 4/23/2018 2/11/2019 1.26% OG 0.363 0.300 0.150 0.024 0.042 0.050 92.90% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 67 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
584 475 VICMAR CONSTRUCTION 28997 L AAA MB GE
Network Development Program - Road
Widening - Secondary Roads along
Balayan - Balibago Road - K0106+ -166 -
K0107+008.4, K0107+081 - K0107+683 -
K0108+740, K0109+000, K0111+037 -
K0111+401.3
Batangas
Province11/7/2018 1st
Batangas 1st
DEOLF 96.5 300 25/02/2018 12/21/2018 0.48% OG 0.391 0.240 0.150 0.030 0.061 0.033 90.50% - AHD
585VICMAR CONSTRUCTION,
INC.28997 L AAA MB GE
Organizational Outcome 1: Ensure Safe
and Reliable National Road System,
Asset Preservation Rehabilitation /
Reconstruction of Roads w/ Slips, Slope
Collapse and Landslide, Secondary
Roads, Batangas - Tabangao - Lobo Rd.
K0128+252 - K0128+384, K0137+400 -
K0137+510
Pagkilatan and
Dela Paz,
Batangas
11/8/2018 1st/FinalBatangas 2nd
DEOLF 52.10991464 312 10/04/2018 2/15/2019 46.96% C 0.500 0.133 0.300 - - - 93.30%
93.30%
Very SatisfactoryAHD
586 476
VICTORIA DEVELOPMENT
AND CONSTRUCTION
SUPPLY CORP.
32638 L A MB GE
Construction/Improvement of Access
Roads Leading to Declared Tourism
Destinations/Ma. Clara-Cagnituan Road
Leading to Maasin Tourism Loop (Monte
Cueva, Danao Camp Tree Park, St.
Francis Javier Shrine, Maasin City Zoo
Theme) Brgy. Rizal, (Const. of Concrete
Road)
Maasin City,
Southern Leyte11/12/2018 1st
Southern Leyte
DEOLF 27.44 315 2/1/2018 12/12/2018 0.00% OG 0.395 0.240 0.150 0.030 0.056 0.033 90.40% - ONS
587 477
VICTORIA DEVELOPMENT
AND CONSTRUCTION
SUPPLY CORP./ EC
SOLICON BUILDERS &
SUPPLY, INC. JOINT
VENTURE
JV-17-1049 L A MB GE
Construction/Improvement of NRJ
Rancho Centro Nagpan - Sitio
Kalonbarak Road Leading to Kalonbarak
Skyline
Barangay
Poblacion,
Malungon,
Sarangani
Province
11/13/2018 1st Sarangani DEO LF 34.27 268 2/25/2018 11/19/2018 -1.90% OG 0.395 0.300 0.131 0.024 0.048 0.033 93.10% - DEL
588 478VIEWPOINT
CONSTRUCTION & SUPPLY31546 L D SB GE
Concreting of National Highway Junction
Brgy. Tibuloy FMR, Brgy. Tibuloy
Toril District,
Davao City11/12/2018 1st/Final
Davao City 2nd
DEOLF 9.63 104 7/12/2018 10/23/2018 0.00% C 0.470 0.179 0.300 - - - 94.90%
94.90%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 68 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
589 479VIGUZ CONSTRUCTION
CORPORATION8178 L A MA GE
Asset Preservation Program Preventive
Maintenance Tertiary Roads, Jaro-
Dagami-Burauen-La Paz Road,
K0942+110.00-K0942+462.00,
K0946+650.00-K0947+192.00,
K0947+192.00-K0947+640.20,
K0955+579.10-K0955+652.60,
K0956+020.00-K0957+000.00,
K0957+150.00-K957+500, K0958+841.00-
K0959+050, K0969+800-K0969+900,
K0971+000.00-K0972+481.00,
K0974+819.00-K0975+363.00
Jaro-Dagami-
Burauen-La Paz,
Leyte
11/5/2018 1st/Final Leyte 2nd DEO LF 43.98 116 4/19/2018 8/12/2018 1.72% C 0.469 0.133 0.300 - - - 90.20%90.20%
Very SatisfactoryAHD
590 480 VIRGO CONSTRUCTION 31068 L D SB GB
Construction of Three (3) Storey Regular
Workshop, ICT and Science Laboratory
School Building,Tambo National High
School
Tambo,Buhi
Camarines Sur11/12/2018 1st
Camarines Sur
4th DEOLF 14.43 150 14/08/2018 1/10/2019 0.63% OG 0.348 0.239 0.150 0.030 0.059 0.033 85.90% - AHD
591 481VULCAN DEVELOPMENT
CONSTRUCTION19080 L B MB GE
Reabilitation/ Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads, San
Fernando North Road
San Fernando,
Masbate11/12/2018 1st/Final
Masbate 3rd
DEOLF 18.82 100 05/06/2018 9/12/2018 9.00% C 0.484 0.133 0.300 - - - 91.70%
91.70%
Very SatisfactoryAHD
592 482VYNE CONSTRUCTION
AND SUPPLY37601 L C SA GE
Local Roads and Bridges- Local Roads-
Local Infrastructure Program: Road
Concreting including Drainage Facilities
Barangay
Baluno,
Zamboanga City
11/16/2018 1st/FinalZamboanga
City DEOLF 4.23 97 04/04/2018 7/9/2018 7.22% C 0.483 0.133 0.300 - - - 91.60%
91.60%
Very SatisfactoryAHD
593 483W.J.P. CONSTRUCTION
AND SUPPLY23192 L B MA GE
Construction/Upgrading of Cabalaongan-
Zone I Road
Rosales,
Pangasinan11/13/2018 1st
Pangasinan 3rd
DEOLF 27.93 312 03/04/2018 2/8/2019 19.64% OG 0.400 0.240 0.150 0.030 0.061 0.033 91.40% - AHD
594 484WAYCON BUILDERS &
CONSTRUCTION SUPPLY34778 L A MA GE
Construction of Seawall and Breakwater
along Perimeter of BPAHS, Barangay Sta.
Rosa
Mulanay,
Quezon 11/12/2018 1st/Final
Quezon 3rd
DEOLF 39.63 270 09/02/2018 11/5/2018 9.82% C 0.458 0.200 0.300 - - - 95.80%
95.80%
Very SatisfactoryAHD
595 485 WBX CONSTRUCTION, INC 28370 L A SB GE
Construction/Rehabilitation of Flood
Control Structure along Bakagtas River
at Dalig Section
Balagtas,
Bulacan11/6/2018 1st/Final
Bulacan 1st
DEOLF 18.61 147 14/03/2018 8/7/2018 0.00% C 0.472 0.133 0.300 - - - 90.50%
90.50%
Very SatisfactoryONS
596 486WELEX CONSTRUCTION
INCORPORATED9323 L AAA LB GE
Rehabilitation/ Construction of Tabunan
Protection Wall
Matnog,
Sorsogon11/8/2018 1st
Sorsogon 2nd
DEOLF 26.59 411 30/07/2018 9/13/2019 25.87% OG 0.398 0.232 0.150 0.020 0.033 0.033 86.60% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 69 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
597 487
WIZARD CONCRETE
SOLUTIONS AND
CONSTRUCTION
CORPORATION
21921 L A MA GE
Asset Preservation - Preventive
Maintenance Secondary Road, San Jose
City - Rizal Road, via Pinili - Purais Villa
Joson (Palarilla Rd) K0160+(-141) to
K0160+100 to K0176+606 to K0176+841
(Intermittent Sections)
Nueva Ecija 11/12/2018 2nd/FinalNueva Ecija 1st
DEOLF 40.82 140 10/05/2018 9/26/2018 0.00% C 0.486 0.134 0.300 - - - 92.00%
92.30%
Very SatisfactoryONS
598 488
WRC CONSTRUCTION
AND GENERAL
MERCHANDISE
42440 L C GB
Local Infrastructure Program -
Construction of Rainwater Collection
System (RWCS) Alfonso, Magallanes,
Naic, Tagaytay City and Ternate
Province of
Cavite11/15/2018 1st/Final
Cavite 2nd
DEOLF 2.79591605 120 28/05/2018 9/24/2018 0.00% C 0.485 0.134 0.300 - - - 91.90%
91.90%
Very SatisfactoryONS
599 489
WTG CONSTRUCTION
AND DEVELOPMENT
CORPORATION
7494 L AAA LB GE
Convergence and Special Support
Program, Construction/Improvement of
Access Roads Leading to Seaports,
Siquijor-San Antonio-Campalanas Road
Leading to Roro Port
Siquijor, Siquijor 11/7/2018 1st Siquijor DEO LF 50.57 224 13/04/2018 11/22/2018 -2.63% OG 0.383 0.300 0.124 0.030 0.061 0.033 93.10% - DEL
600 490
WTG CONSTRUCTION
AND DEVELOPMENT
CORPORATION / ROVILLA
CONSTRUCTION (JOINT
VENTURE)
JV-17-2218 L AAA LB GE
Off-Carriageway Improvement-Bogo-
Curva-Medellin-Daanbantayan-Maya Rd-
K0109+000-K0112+400
Medellin, Cebu 11/14/2018 1st Cebu 1st DEO LF 76.05 239 4/13/2018 12/7/2018 0.00% OG 0.390 0.220 0.150 0.030 0.061 0.050 90.10% - ONS
601 491
WTG CONSTRUCTION
AND DEVELOPMENT
CORPORATION
7494 L AAA LA GE
Rehabilitation/Improvement of Flood
Control Wall along Bangon River, Palo
Section, Sta. 04+032 - Sta 04+571
Palo, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 40.96 165 2/2/2018 7/16/2018 0.00% C 0.470 0.134 0.300 - - - 90.40%90.40%
Very SatisfactoryONS
602 492 XY BUILDERS 37726 L D SB GB
Construction of Multi-Perpose Building
(Municipal Gymnasium) at Barangay
Poblacion
Kadingilan,
Bukidnon11/12/2018 1st
Bukidnon 2nd
DEOLF 4.7 201 05/07/2018 1/21/2019 5.01% OG 0.385 0.255 0.150 0.030 0.047 0.050 91.70% - AHD
603 493 Y S CONSTRUCTION 11928 L A MB GE
Rehabilitation/Reconstruction/Upgradin
g of Damaged Paved Roads-Jct. (TNR)
Cortes-Balilihan-Catigbian-Macaas Road,
K0034+200-K0035+000, K0039+493-
K0041+679
Catigbian, Bohol 11/6/2018 1st Bohol 1st DEO LF 78.78 303 4/27/2018 2/23/2019 11.46% OG 0.388 0.221 0.150 0.030 0.060 0.050 89.90% - AHD
604 Y S CONSTRUCTION 11928 L A MA GBConstruction of DPWH Bohol 2nd DEO
Building
Bood, Ubay,
Bohol11/7/2018 1st Bohol 2nd DEO LF 34.93 270 2/19/2018 11/15/2018 0.00% OG 0.384 0.299 0.150 0.030 0.050 0.050 96.30% - ONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 70 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
605 494Y S CONSTRUCTION / SLP
CONSTRUCTIONJV-17-2203 L A MB GE
Construction/Improvement of Access
Roads leading to Declared Tourism
Destinations - Catigbian-Canmano Road
(Catigbian Section) leading to Sagbayan
Peak, Chocolate Hills and Danao
Adventure Park
Catigbian, Bohol 11/6/2018 1st Bohol 1st DEO LF 46.96 230 5/25/2018 1/9/2019 1.31% OG 0.376 0.240 0.150 0.030 0.061 0.050 90.70% - AHD
606 495 YAKAL CONSTRUCTION 9685 L AAA LA GE
Construction/Improvement of Access
Road Leading to Trades, Industries
Zones, NRJ Villa Consuelo Connecting to
Libtong Road in Support of the Food and
Resources-Based Processing
Naval, Province
of Biliran11/7/2018 1st/Final Biliran DEO LF 27.80 180 2/15/2018 8/13/2018 0.00% C 0.435 0.146 0.300 - - - 88.10%
88.10%
SatisfactoryONS
607 496
YAP MABUHAY
ENTERPRISES
INCORPORATED
15540 L B SB GE
Construction/Rehabilitation of Flood
Control Mitigation Facilities along
Principal River (Buayan River)
Alabel,
Sarangani
Province
11/13/2018 1st/Final Sarangani DEO LF 9.76 240 2/25/2018 10/22/2018 0.41% C 0.458 0.133 0.300 - - - 89.10%89.10%
Very SatisfactoryAHD
608 497 YOYEN ENTERPRISES 15541 L A MA GE
Construction/Extension of Flood Control
Structure along Anas River (Phase 3)
Protecting Anas Bridge and Biliran
Circumferential Road, Naval, Upstream
Rightside (11.5733, 124.4034), Upstream
Leftside (11.5572, 124,4027)
Naval, Province
of Biliran11/6/2018 1st/Final Biliran DEO LF 27.73 150 2/18/2018 7/17/2018 1.57% C 0.465 0.142 0.300 - - - 90.70%
90.70%
Very SatisfactoryAHD
609 YOYEN ENTERPRISES 15541 L A MA GE
Construction/Extension of Flood
Constrol Structures along Amambahag
River (Phase 3) Protecting Amambahag
Bridge and Biliran Circumferential Road,
Upstream (11.6656, 124.5243);
Downstream (11.6645, 124.5199)
Culaba, Province
of Biliran11/7/2018 1st/Final Biliran DEO LF 2.78 180 18/02/2018 8/16/2018 0.00% C 0.455 0.141 0.300 - - - 89.60%
89.60%
Very SatisfactoryONS
610 498YURICH BUILDERS AND
CONSTRUCTION SUPPLY37064 L B MA GE
Construction of Concrete Road - Little
Caramay - TDC - Pagdanan leading to
Proposed Port, Sta. 00+000 - Sta. 1+210
San Vicente,
Palawan11/11/2018 2nd
Palawan 1st
DEOLF 74.65 195 6/11/2018 12/22/2018 -2.61% OG 0.363 0.300 0.124 0.022 0.051 0.033 89.30% - DEL
611 499 ZEDIK BUILDERS 33330 L A MA GE
Widening of Permanent Bridges,
Tamucalao Bridge 2 (B00525LZ), along
Manila North Road
Bacarra, Ilocos
Norte11/7/2018 1st
Ilocos Norte
1st DEOLF 30.82 295 02/05/2018 2/20/2019 45.79% OG 0.360 0.239 0.150 0.030 0.035 0.033 84.70% - AHD
612 500 ZMS CONST. & DEV CORP. 10471 L AA LA GERoad Widening Tukuran Jct. Karomatan
Jct. Road, K1651+456 to K1653+207
Tukuran,
Zamboanga del
Sur
11/10/2018 2nd/FinalZamboanga del
Sur 1st DEOLF 46.7 120 19/06/2018 10/16/2018 0.00% C 0.478 0.133 0.300 - - - 91.10%
89.60%
Very SatisfactoryONS
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 71 of 72
PCAB ARC TYPE NAME LOCATIONAMOUNT
(Php, M)
DUR
(C.D)STARTED COMP
REMARKSTIME ESH RDRCPES VISIT
RATING
FINAL RATING/
QUALITATIVE
DESCRIPTION
DATESLIPPAG
E (%)STATUS WMS MTL
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)
4th Quarter CY 2018
No. of
Project
No. of
Contract
or
NAME OF
CONSTRUCTOR
LICENSE
NO.L/F
CATEGORY PROJECT
FAC DATE OF
EVALUATION
NO. OF
VISIT
*IMPL.
AGENCY
FUNDING
SOURCE
CONTRACT
613ZMS CONSTRUCTION &
DEVELOPMENT CORP.10471 L AA MA GE
Network Development: Road Widening,
Primary Roads: Dumaguete South Road
including ROW-K0040+934-K0043+000
(K0041+775-K0043+000), K0044+655-
K0045+960
Siaton, Negros
Oriental11/10/2018 1st
Negros
Oriental 3rd
DEO
LF 96.28 328 04/03/2018 1/25/2019 0.63% OG 0.383 0.241 0.150 0.030 0.045 0.033 88.20% - AHD
Consolidated in CY 2019
CPES Reports in 4th Quarter 2018 Page 72 of 72