OVERVIEW OF DPRFOR THERMAL POWER PLANTS
PRESENTED BY:SIBASISH PATTANAYAK
Page 2
1.EXECUTIVE SUMMARY
BACKGROUND
2.PROJECT HIGHLIGHTSLocationLand Requirement Plant Capacity Mode of OperationFuel Coal Availability and LinkageCoal TransportationCoal Quality Cooling Water Source, Requirement and CommitmentSteam Generator TechnologyPower Evacuation SystemBeneficiary StatesENVIRONMENTAL ASPECTSCOMMISSIONING SCHEDULE
Page 3
TABLE OF CONTENT
1. INTRODUCTION2. DEMAND ANALYSIS AND JUSTIFICATION3. LAYOUT SYSTEMS4. CIVIL SYSTEMS5. MECHANICAL SYSTEM6. ELECTRICAL SYSTEM7. CONTROL & INSTRUMENTATION SYSTEMS8. ENVIRONMENTAL ASPECTS9. MAIN PLANT SYSTEMS FOR ENVIRONMENT CLEARANCE10. PROJECT IMPLEMENTATION11. CAPITAL COST12. OPERATION AND MAINTENANCE13. CLEAN DEVELOPMENT MECHANISM (CDM)
Page 4
MAIN LAYOUTS OF REPORT1. INTRODUCTIONBACKGROUND2. DEMAND ANALYSIS AND JUSTIFICATIONDEMAND ESTIMATION (11TH AND 12TH PLAN)Supply Estimation (11th Plan) Actual supply position Capacity Addition during 11th PlanDemand & Supply Scenario at the End of 11th Plan Supply Estimation- 12th PlanDemand & Supply Scenario at the End of 12th Plan 3. LAYOUT SYSTEMSGENERAL LAYOUT PLAN MAIN PLANT LAYOUTIntroductionReference Drawings for Main Plant LayoutDESCRIPTION OF LAYOUTMechanical AreaAB BayTurbine Hall EOT Cranes
Page 5
DESCRIPTION OF LAYOUTMechanical AreaAB BayTurbine Hall EOT CranesBoiler AreaAir Compressor and CPU
Electrical Areas A-B-C BayTransformer Yard
Control and Instrumentation
Page 6
4. CIVIL SYSTEMSLAND DEVELOPMENT GEOTECHNICAL INVESTIGATIONS
MAIN PLANT BUILDINGFoundation SystemStructural System1. Main Power House2. Mill / Bunker Building3. Conveyor Galleries and Transfer Points4. Cable and Pipe Racks5. Other Buildings
Civil ConceptsArchitectural ConceptsCHIMNEY
Page 7
DM PLANT AND WTP CIVIL WORKSDM Plant Civil WorksPT Plant Civil WorksCW & MAKE UP WATER SYSTEM
COAL HANDLING SYSTEM Track Hopper Crusher HouseTransfer PointsConveyor Tunnel Conveyor GalleriesStacker/ Reclaimer FoundationsPent House, CHP Control Room, Track Hopper Control Room, WT control room, Pump house & MCC Rooms
FUEL OIL HANDLING SYSTEMASH HANDLING SYSTEM & ASH WATER RECIRCULATION SYSTEMASH DISPOSAL SYSTEM
Page 8
ROADS, DRAINS & SEWERAGESWITCHYARD CIVIL/STRUCTURAL WORKS PERMANENT TOWNSHIPNon-Residential Buildings
5. MECHANICAL SYSTEMSTEAM GENERATOR AND AUXILIARIESGeneral FurnaceSteam Generator Circulation System Air and Flue Gas SystemFuel Oil Burning SystemCoal Burning SystemSoot Blowing SystemAuxiliary Steam SystemElevatorsElectrostatic PrecipitatorTURBINE AND ITS AUXILIARIES
Page 9
WATER SYSTEM AND PLANT UTILITIESSource of WaterType of Circulating Water System Auxiliary Cooling Water System Equipment Cooling Water (ECW) System FIRE PROTECTION SYSTEMPLANT & INSTRUMENT AIR SYSTEMAIR CONDITIONING SYSTEMVENTILATION SYSTEMHYDROGEN GENERATION PLANT
6. ELECTRICAL SYSTEM ELECTRICAL SCHEME Power EvacuationStart-up Power RequirementGENERATORBUSDUCT AUXILIARY POWER SUPPLY SCHEMEL.T. TRANSFORMERS NEUTRAL GROUNDING ARRANGEMENT PROTECTIVE RELAYING STATION GROUNDING LIGHTING SYSTEM
Page 10
CONTROL PHILOSOPHY FOR SWITCHYARDCONSTRUCTION POWER BLACK START FACILITY ELECTRICAL LAB EQUIPMENT
7. CONTROL & INSTRUMENTATION SYSTEMS•GENERAL•CONTROL ROOM CONFIGURATION & LAYOUT•UNIT CONTROL & MONITORING PHILOSOPHY•MEASURING INSTRUMENTS (PRIMARY & SECONDARY)•DIGITAL CONTROL SYSTEM (DCS)•CONTROL AND INSTRUMENTATION FOR PLANT AUXILIARY PACKAGES LIKE FIRE PROTECTION, HYDROGEN PLANT ETC•STEAM & WATER ANALYSIS SYSTEM (SWAS)•CONTROL VALVES, ACTUATORS & ACCESSORIES•PROCESS CONNECTION & PIPING
Page 11
8. ENVIRONMENTAL ASPECTS•INTRODUCTION•POLLUTION CONTROL MEASURES•AIR POLLUTION CONTROL SYSTEMWATER POLLUTION CONTROL SYSTEM•NOISE POLLUTION•SOLID WASTE MANAGEMENT
9. MAIN PLANT SYSTEMS FOR ENVIRONMENT CLEARANCE•GENERAL LAYOUT PLAN •LAND DEVELOPMENT •ASH DISPOSAL SYSTEM
10. PROJECT IMPLEMENTATION•PROJECT SCHEDULE•PROJECT MANAGEMENT•TENDERING, AWARD OF CONTRACTS & ENGINEERING PHASE•MANUFACTURING, INSPECTION AND EXPEDITING PHASE•CONSTRUCTION PHASE AND COMMISSIONING PHASE
Page 12
11. CAPITAL COST
12. OPERATION AND MAINTENANCE Plant commissioningOperationTestingPlant MonitoringMaintenance
13. CLEAN DEVELOPMENT MECHANISM (CDM)