38
www.edmonton.ca/LRTProjects Downtown LRT Connector Concept Plan Transportation & Public Works Committee May 25, 2011

Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Downtown LRT Connector Concept Plan

Transportation & Public Works CommitteeMay 25, 2011

Page 2: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Edmonton LRT NetworkBrian Latte

Branch ManagerTransportation Planning

Downtown LRT Connector Concept Plan

Page 3: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Public Transportation - Strategic Objective 5.1

“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development of compact, urban communities.”

- Transportation Master Plan

Page 4: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

LRT Planning

StrategicPlanning

Alignment Definition

PreliminaryEngineering

DetailedEngineering Construction

2 3 4

LEVEL OFDETAIL

We are here

SystemOperations

Path for the Downtown LRT

Comparative analysis General

impacts and benefits

Path for the Downtown LRT

Comparative analysisGeneral

impacts and benefits

Detailed layout Track location (center or side)

Station locations Roadway

configurations Property

requirements

Detailed layout Track location (center or side)

Station locationsRoadway

configurationsProperty

requirements

Preliminary engineering

Final engineering

Preliminary engineering

Final engineering

ConstructionConstruction

Corridor Definition

Concept Planning

1

Page 5: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Concept PlanningPreliminary Engineering

Detailed Engineering

Construction Complete &Opened

Corridor Definition

AlignmentDefinition

South LRT(Health Sciences to Century Park)

North LRT(Downtown to NAIT) End 2010 End 2014

South LRT(Century Park to Ellerslie Road)

Northeast LRT(Clarview to Gorman)

Southeast LRT(Downtown to Mill Woods) Fall 2012

West LRT(Downtown to Lewis Estates) Fall 2012

Downtown LRT Spring 2011 Fall 2012

Northwest LRT(NAIT to Northwest Edmonton) 2012

Central Area Circulator TBD TBD

East LRT(Downtown to Sherwood Park)

TBD TBD

Page 6: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Evaluation & Concept Details

6

• Critical components - three components impacted decisions about the Downtown LRT Connection– The overall LRT Network

Plan – Technical Analysis– Public Input

Page 7: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Concept Plan

• Next step after Corridor approval• Defines major infrastructure requirements,

including:– LRT Alignment within corridor (center or side running)– Station Locations– Neighbourhood, business and pedestrian access– Further refinement of cost estimates

Page 8: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

8

West LRT Downtown Connection

Southeast LRT

Page 9: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Capital City Downtown Plan

• Integrates new and emerging City policy

• Guides development of the downtown

– Vibrant– Attractive– Higher-density– Mixed-use – Walkable

• Supports the integration of at-grade LRT as a catalyst for mixed-used

Page 10: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Urban-Style Low-Floor LRT• Operates on the surface• Electrically powered from

overhead lines.• Low-floor vehicles• Low-level platforms • Integrated LRT stops in the

Downtown streetscape• Integrated facilities for

pedestrians & bikes • Urban design,

redevelopment opportunities• Encourage higher density &

mixed use

Page 11: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Urban-Style Low-Floor LRT

Page 12: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Urban-Style Low-Floor LRT

Page 13: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Adam LaughlinDirector Facility PlanningTransportation Planning

Downtown LRT Connector Concept Plan

Page 14: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Downtown LRT Connector Concept Plan

Public Involvement

Page 15: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Public Outreach to Date

DOWNTOWN LRT

CORRIDOR APPROVED

Jun. 21, 2010

CONCEPT OPTIONS

REVIEWED

Sept.-Oct. 2010

FEEDBACK ON DRAFT

CONCEPT PLAN

Nov. 2, 2010

NON- STATUTORY

PUBLIC HEARING

Dec.8, 2010

DOWNTOWN LRT CONCEPT PLAN

REFINEMENT OF

CONCEPT PLAN

Jan.-Apr. 2011

INFO SESSION

TPWCITY

COUNCIL REVIEW

May-Jun. 2011

OPEN HOUSE COUNCIL

Page 16: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Public Involvement Process

• 40 Events with over 500 participants

• Focused stakeholder discussions to get input on alignment options, station locations, and access management

• 2 Public Info Sessions• Additional meetings held with:

– community leagues– major institutions– property owners– business owners

Page 17: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Feedback• LRT is a benefit - Downtown should be a focal

point• Competing theme:

– Desire for transit and pedestrian/cyclist focused environment vs. preserving vehicle access

• Safety and security – enhance at LRT stops and in adjacent areas

• Chinese/Boyle/Riverdale community concerned with approved corridor and portal location

• Access & circulation concerns• Architectural features

Address public concerns with design process...

Page 18: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Downtown LRT Connector Concept Plan

Concept Plan

Page 19: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

19

West LRT Downtown Connection

Southeast LRT

Page 20: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Benefits & Trade Offs• Benefits and impacts exist• Potential positive transportation

and land use effects:– Creating improved mobility options – Encouraging density and

redevelopment– Creating active streets – Supporting pedestrian/bike

connections and network– Implementing the vision of Capital

City Downtown Plan

Page 21: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Changes Since Nov. 2010• Campus Stop has been moved to 107 Street (between 104

& 103 Avenue)• LRT vehicle parking lane provided on 107 Street (between

102 & Jasper Avenue)• Dedicated two way cycle lane provided on 102 Avenue

(between 107 & 99 Street)• Continuous eastbound traffic lane provided on 102 Avenue

(between 107 & 95 Street)• On street parking provided on 102 Avenue• Parking loading provided between 96 & 95 Street• Pedestrian crossing provided west of 95 Street on 102

Avenue

Page 22: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

107 Street Stop

109

Stre

et10

9 St

reet

108

Stre

et10

8 St

reet

107

Stre

et10

7 St

reet

106

Stre

et10

6 St

reet

104 Avenue104 Avenue

103 Avenue103 Avenue

Page 23: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Looking south on 107 Street, from 104 Avenue

Potential

107 Street Stop

Page 24: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

102 Avenue102 Avenue

107/106 Street

109

Stre

et10

9 St

reet

108

Stre

et10

8 St

reet

107

Stre

et10

7 St

reet

106

Stre

et10

6 St

reet

Page 25: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

103

Stre

et10

3 St

reet

106

Stre

et10

6 St

reet

105

Stre

et10

5 St

reet

104

Stre

et10

4 St

reet

102 Avenue102 Avenue

105/106 Street Stop

Page 26: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Looking west on 102 Avenue between 105 Street & 106 Street

Potential

105/106 Street Stop

Page 27: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

100A

Str

eet

100A

Str

eet

103

Stre

et10

3 St

reet

101

Stre

et10

1 St

reet

102 Avenue102 Avenue

102

Stre

et10

2 St

reet

Centre West Stop

Page 28: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Looking West on 102 Avenue between 101 Street & 102 Street

Potential

Centre West Stop

Page 29: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

100

Stre

et10

0 St

reet

97 S

treet

97 S

treet

102 Avenue102 Avenue

99 S

tree

t99

Str

eet

Churchill Square Stop

Page 30: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Looking West on 102 Avenue between 99 Street & 100 Street

Churchill Square Stop

Potential

Page 31: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Looking West on 102 Avenue between 99 Street & 100 Street

Potential

Churchill Square Stop

Potential

Page 32: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

97 S

tree

t97

Str

eet

96 S

tree

t96

Str

eet

Jasper Avenue

Jasper Avenue

102A Avenue102A Avenue

102 Avenue102 Avenue

101A Avenue101A Avenue

Quarters Stop

Page 33: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

China Gate

3.2 Metre

Approximately 5.5 to 6.0 Metre

Page 34: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Looking east on 102 Avenue from 96 Street

Potential

Quarters Stop

Page 35: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

96 S

treet

96 S

treet

Jasper Avenue

Jasper Avenue

102A Avenue102A Avenue

102 Avenue102 Avenue

Connection to Southeast LRT

Page 36: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Sample Portal Pictures

Page 37: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

102 / 102 A Route Option• 102 Avenue is the most direct

corridor connection• 102 Avenue is preferred by

Quarters area development team• 102 A route would be 200 metres

longer• Journey times would increase by

1.5 minutes• Increase in journey time impacts

ridership• Cost for 102A route increase by

approximately $20 million• Route would move portal from

102 to 102 A, not mitigate or remove the impact

Page 38: Downtown LRT Concept Plan...“The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development

www.edmonton.ca/LRTProjects

Downtown LRT Concept Plan

THANK YOU