Power  Genera*on  @  Remote  Mines    

Page 4: Download Technology Choices for Remote Gold Mine

Factors Driving Power Plant Assessments

§  Independent advice avoids prejudiced advice

§  Life Cycle Cost (LCC) - fuel cost is most important

§  Reducing emissions

§  Adding renewables, when financially viable

§  Challenging the accepted norm

§  Every project is different – preliminary desk top study useful.

Page 5: Download Technology Choices for Remote Gold Mine

So what is the cost of power? §  for remote, off grid applications, it’s quite high §  Most mines take the path of least resistance, i.e., diesel generated power

because it’s readily available, low capex, requires little support infrastructure or ‘engineering’ and it’s reliable.

§  diesel generators consume ~270 litres/MWh & are ~32% efficient. §  cost of diesel in Africa currently ~$1.00/ litre, of which 68% is thrown away in

waste heat. Huge risk of oil price and/or govt. duty hike! §  a typical power plant at a small gold mine with a processing plant and ball mills

running continuously at 6MW: §  39,000 litres /day, 273,000 litres per week, §  at US$1.00/ litre = US$39,000/day, or $273,000/week = $14M/year

§  compare this to subsidized grid power in Tanzania = US$0.16/kWh. But with frequent outages, unstable voltage and limited distribution.

$0.27     $0.08   $  0.35/kWh  

Diesel  Fuel   Rental  

Page 6: Download Technology Choices for Remote Gold Mine

q  Desk Top Study: §  cost and availability of fuels &

power production technology, including diesel, HFO, coal, gas, HEP, solar pV

§  Assess rental versus purchase - Capex versus Opex

§  Economic impact §  Logistics

Shanta Mining Company Ltd, New Luika Mine, Tanzania

q  New Luika Gold Mine flagship project in production since August 2012.

q  Energy cost from diesel fuel rented power plant represented 1/3 of process plant CoP & fuel cost represented ~80% of this.

q MCD carried out a desk top study to determine options for reducing energy costs.

Page 7: Download Technology Choices for Remote Gold Mine

§  Why? § Determine opportunities § Evaluate potential savings § Eliminate non-viable

alternatives §  What?

§ Fuel source and Logistics § Appropriate technologies for

the load. § Hybrid opportunities

§  How? § Configuration § Fixed & variable costs § Rent vs. procure

Desktop Study - New Luika Mine

Page 8: Download Technology Choices for Remote Gold Mine

New  Luika  Mine    

•  In   remote   SW   area   of   Tanzania   with   4MW   intermi:ent   grid   power   within   5km.  Originally  5MW  Rented  Island  (Diesel)  Power  Plant.    ConsumpGon  24,000MWh/annum  rising  to  48,000MWh/annum.  2.5MW  demand  rising  to  5MW.  

•  Unique   situaGon:   Generalised   soluGon   impossible.   Required   unbiased   and  comprehensive  understanding  of  cost/suitability  of  alternaGve  energy  soluGons  from  the  myriad  of  opGons  punted  by  enthusiasGc  salesmen.  

•  Feasibility  study  evaluated  opGons  à  informed  decision  based  on  true  Life  Cycle  Cost  (LCC)  of  the  energy.    

•  Investment  decision  easier  if  oil  prices  stable  &  if  LCC  of  renewable  energy  was  lower.  De-­‐risked   only   from   detailed   assessment   of   mine   demand   characterisGcs,   unbiased  advice   from   independent   power   consultants,  mine   visits  &   a   study   of   the   literature  and   the   commercially   available   mature   technologies.   Understanding   of   why   each  power  plant  technology  was  chosen  helps  to  discern  appropriate  soluGons.  

•  Renewable   energy   storage   cost   usually   prohibiGve   &   power   output   varies,   hence  Island   Power   Plant   must   provide   100%   of   MD   &   renewable   energy   costs   must  compete  with  the  variable  cost  of  the  IPP  energy.  

Page 9: Download Technology Choices for Remote Gold Mine

Modified to Hybrid HFO & Diesel + Solar PV Power

q  Originally  6  x  0.9MW  diesel  genset  rented  Island  Power  Plant.  

q  Converted  to  4  x  0.75MW  HFO  gensets  +  2  x  0.9MW  diesel  gensets  

q  Solar  PV  pilot  plant  added  -­‐  50t/annum  CO2  reducGon  from  only  63kW  installaGon.  

q Solar  PV  Fully  scalable  -­‐  No  costly  energy  storage  

q The  first  Hybrid  HFO  +  Solar  PV  power  plant  at  a  mine  

q HFO  @  $0.66/L  cf  Diesel  @  $0.97/L,  i.e.,  fuel  cost  saving  of  32%  

q Reviewing  opGon  to  extend  to  5MW  Solar  PV,  saving  $1M  to  $2M  over  5  years  

 

Page 10: Download Technology Choices for Remote Gold Mine

Redavia pilot Solar PV farm on PPA

•  No  foundaGons  –  only  needs  level  cleared  area  near  to  feed-­‐in  point  

•  3  mth  trial  period  prior  to  acceptance,  or  return  

•  2  year  PPA  contract,  inclusive  of  supplier  operaGon  &  maintenance  

•  Integrated  with  Island  HFO  Power  Plant  

•  Fully  scalable  if  future  uprate  required  

Page 11: Download Technology Choices for Remote Gold Mine

Alterna*ve  Energy  

§  Base Load Technology: §  Diesel >>> HFO: Reduces LCC to $0.26/kWh ($0.20/kWh once capex

repaid) §  Waste Heat Recovery: 5% – 10% fuel saving? §  National Grid: Requires Conditioning & Ride-Through – 4MW @ $0.16/

MWh?

§  Hybrid technology §  Hydroelectric – 5MW PPA – run of river from nearby seasonal river @

$0.21/MWh §  5MW Solar PV > PPA @ $0.15/kWh

Page 12: Download Technology Choices for Remote Gold Mine

$0  

$2  

$4  

$6  

$8  

$10  

$12  

$14  

$16  

$18  

0  

5,000  

10,000  

15,000  

20,000  

25,000  

30,000  

35,000  

40,000  

45,000  

50,000  

2015   2016   2017   2018   2019   2020   2021   2022  

ENER

GY  CO

ST  PER

 ANNUM  ($

M)  

ANNUAL

   ENER

GY  CO

NSU

MPT

ION  (M

Wh)  

YEAR  

ANNUAL  ENERGY  USAGE  &  COST  BASE  CASE  50ktpm  

RENTAL  ENERGY  COST   HFO  ENERGY  COST   Energy  Consump*on  

RENTAL  ENERGY  COST  IS  HIGHER  FROM  2017  

ONWARDS  

EXCLUDING  RESIDUAL  VALUE  OF  HFO  PLANT  

Page 13: Download Technology Choices for Remote Gold Mine

2015  –  2022  LoM  

Page 14: Download Technology Choices for Remote Gold Mine

2015  –  2022  LoM  

Page 15: Download Technology Choices for Remote Gold Mine

Operating Lease - Medium Speed HFO    FOR   AGAINST  

Low  Risk  –  scalable,  proven  technology   High  fuel  cost  compared  to  coal,  hydro  and  solar  

Good  residual  value  -­‐  especially  for  containerised  plant  Gov't  fuel  duGes  could  be  increased  to  discourage  imports  &  improve  balance  of  payments.  

Lowest  capital  cost  -­‐  Opera*ng  Lease  off  Balance  Sheet   Fuel  price  subject  to  exchange  rate  fluctuaGons.  

Large  saving  cf    compared  to  rented  diesel  power  plant.   AddiGonal  site  fuel  storage  facility  required  

Coal/Steam/Turbine Genset FOR   AGAINST  

Low  Risk  -­‐  proven  technology   Limited  residual  value  

Abundant  acceptable  quality  local  coal   Very  High  capital  cost  

Largest  energy  cost  saving  cf  rented  diesel  power  plant.   Requires  100%  diesel  back-­‐up.  

PPA Coal/Gasifier/Gas Genset FOR   AGAINST  

Low  Risk  –  scalable,    proven  technology   Must  commit  to  8yr  contract  at  minimum  ojake  

Abundant  acceptable  quality  local  coal   Technology  more  suited  to  grid  supply  -­‐  Step  Load  Capability/Standby  provision      

Large  energy  cost  saving  cf  rented  diesel  power  plant.  

Page 16: Download Technology Choices for Remote Gold Mine

Thank you

Questions?  

Manuel Duggal MCD International Energy

Solutions

[email protected] Tel: +44 7795 421460

www.mcd-energy.com  