Douthit Hills Construction Plan James Bonney, PE Associate Director of Residential Facilities Dan Hofmann, CAPP Director of Parking & Transportation Services December 8, 2014

Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Douthit Hills Construction PlanJames Bonney, PEAssociate Director of Residential Facilities

Dan Hofmann, CAPPDirector of Parking & Transportation Services

December 8, 2014

Page 2: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Agenda• Douthit Hills Development Overview & Schedule• Construction Site Plan• Road Closures• Hwy 93 Intersection Improvements• Fire Department Access• Pedestrian Access• Communication Plan• Parking & Transportation

– Temporary Parking Spaces– Employee Parking– Employee Shuttle– Student Parking– Student Shuttle

Page 3: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Douthit Hills Development Overview

N

Project ObjectiveDouthit Hills is a pedestrian oriented mixed use development providing housing, dining , recreation, bookstore, and parking located at the east Hwy 93 entrance to Clemson University.

Tillman Hall

Page 4: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Douthit Hills Development Overview

Clemson House

UpperclassHousing

Commons Building

Bridge Student Housing

Housing• 980 Beds Upperclass Housing• 783 Beds Bridge Housing• Bridge Academic Success 

Commons Building (Hub)• 450+ Seat Dining Hall• Recreation Center• Campus Bookstore• 2 Dining Retail Locations

Parking• 1100+ On‐site Parking • 650+ Satellite Parking

N

P

PPP

Page 5: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Douthit Hills Development Overview

Undergraduate Housing

Commons Building

Bridge Student Housing N

Page 6: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Satellite Parking

76

93

Kite Hill

N

650+

Douthit Hills

Page 7: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Schedule

2015

Today

Utility & Site Work Foundation & Structure

Building

Constructio

n

2017 2018

Move In!

Site Fence

Noise

2016 2019

December 15th, 2014 Note: Site Fence Installation Starts December 15th, 2014

Page 8: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Construction Site Plan

N

Employee Spaces (173 Relocated / 108 Remaining )

Student Spaces (138 Relocated/152 Remaining through Spring Break 2015/80(+/‐) Remaining Spring Break to Dec 2015)Metered SpacesPotential Temporary Spaces (Up to 120 Added Spaces)

Construction Fence (Dec. ‘14 – Aug. ‘18)Daniel Drive Fence (Dec. ‘14 – Dec. ’15 Public Access Road)

Hwy 93

CU FoundationLittle John HouseAlumni CenterVisitor CenterClemson House

OpenOpen

Page 9: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Road Closures – December 2014

Hwy 93

CU FoundationLittle John HouseAlumni CenterVisitor CenterClemson House

Roads Closed as a Result of Douthit Hills Construction:Oak TerraceGamma Delta CircleLee StreetBarre StreetRho Sigma Circle

Bradly StreetHunter StreetNorth Palmetto Boulevard (Between SC 93 and Alumni Circle)Daniel Drive (East of Martin Street)Daniel Square Apt East Access Drive (Emergency Access Only) N

Open

Open

Page 10: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

N

Neighborhood Access

Approx.Approx.Approx.

Page 11: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Neighborhood Access

N

Approx.Approx.Approx.

Page 12: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Neighborhood Access

N

Approx.Approx.Approx.

Page 13: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Road/Intersection Improvements

N

Intersection Signalization Improvements 

Intersection Roadway Improvements 

Cherry Rd Newman Rd

Hwy 76 West

Hwy 76 East

Satellite Parking

Parkway Dr/ Calhoun Dr

Nu Kappa/ Sherman St

Hwy 133

Hwy 93

Douthit Hills

Page 14: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Fire Department Access

N

Hwy 93

CU FoundationLittle John HouseAlumni CenterVisitor CenterClemson House

Fire Department Lock on Gate at Daniel Square Apartments

Note:1. Fire Access to East Daniel Square Access Drive Will be Maintained at all times.2. Fire Access to North Neighborhood will be maintained to through either Martin Street or Bradley Street.

Open

Open

Page 15: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

ADA Accessible Route

N

CU FoundationLittle John HouseAlumni CenterVisitor CenterClemson House

ADA Accessible Route

Open

Page 16: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Communication PlanStudent Communication• Student Government Email• Clemson Student Website• CU Parent Website• Student Affairs Website/FB/Twitter• Housing & Dining Website/FB/Twitter• Parking & Transportation Website/FB/Twitter• Clemson House Student Email• December 8th Town Hall

Faculty/Staff Communication• Inside Clemson• Inside News• Faculty & Staff Senate Meetings• Facilities Disruption Calendar• Student Affairs Website/FB/Twitter• Housing & Dining Website/FB/Twitter• Parking & Transportation Website/FB/Twitter• Building Security Coordinator Email• December 8th Town Hall

Campus/Clemson Community Communication • Conversation/Email w/ the Following

• Neighborhood Representatives• City of Clemson• City of Clemson PD• Daniel Square Apartments

Page 17: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Construction Site Plan

N

Employee Spaces (173 Relocated / 108 Remaining )

Student Spaces (138 Relocated/152 Remaining through Spring Break 2015/80(+/‐) Remaining Spring Break to Dec 2015)Metered SpacesPotential Temporary Spaces (Up to 120 Added Spaces)

Construction Fence (Dec. ‘14 – Aug. ‘18)Daniel Drive Fence (Dec. ‘14 – Dec. ’15 Public Access Road)

Hwy 93

CU FoundationLittle John HouseAlumni CenterVisitor CenterClemson House

OpenOpen

Page 18: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Construction Site Plan

N

Employee Spaces (173 Relocated / 108 Remaining )

Student Spaces (138 Relocated/152 Remaining through Dec 2015)Metered SpacesPotential Temporary Spaces (Up to 70 Added Spaces)

Construction Fence (Dec. ‘14 – Aug. ‘18)Daniel Drive Fence (Dec. ‘14 – Dec. ’15 Public Access Road)

CU FoundationLittle John HouseAlumni CenterVisitor CenterClemson House

31

17

9 36

15

89

63

# Number of employee parking spaces remaining

# Number of resident student parking spaces remaining

Open

Page 19: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Temporary Parking

N

Employee Spaces (173 Relocated / 108 Remaining )

Student Spaces (138 Relocated/152 Remaining through Dec 2015)Metered SpacesPotential Temporary Spaces (Up to 120 Added Spaces)Construction Fence (Dec. ‘14 – Aug. ‘18)Daniel Drive Fence (Dec. ‘14 – Dec. ’15 Public Access Road)

Hwy 93

CU FoundationLittle John HouseAlumni CenterVisitor CenterClemson House

75

10

35

#

Up to 120 Temporary Spaces

72 Daniel Drive Spaces Remain until Spring Break

OpenOpen

Page 20: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Temporary Parking

N

75

Calhoun Courts

Clemson House

Page 21: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Employee Parking

N

65 Spaces

14 Spaces

24 Spaces

50 Spaces

Page 22: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Employee Shuttle – West Option 1

Tiger Transit West Shuttle operates Monday – Friday from 7:30 AM – 11 AM and 2:30 PM – 6 PM every 15 minutes.This route will be equipped with GPS tracking through the RideCell App & My.Clemson App

Tiger  Transit Nighttime Service operates from 6 PM – 6 AM, Daytime Service operates from 11 AM to 2:30 PM by calling 864‐656‐3333 or using the My.Clemson App

Closed forConstruction

P3 Parking Lot

NN

Mell Hall

Tillman Hall

Page 23: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Employee Shuttle – West Option 2Orange CAT Bus Route operates Monday – Friday from 7:30 AM – 5:30 PM every 8 minutes.

Closed forConstruction

P3 Parking Lot

N

Mell Hall

Tillman Hall

Page 24: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Employee Shuttle – East Option 1Closed for

Construction

E‐21  Parking Lot

Tiger Transit East Shuttle operates Monday – Friday from 7:30 – 11 AM and 2:30 – 6 PM 

every 15 minutes.

This route will be equipped with GPS tracking through the RideCell 

App & My.Clemson App

Tiger  Transit Nighttime Service operates from 6 PM – 6 AM, 

Daytime Service operates from 11 AM to 2:30 PM by calling 864‐

656‐3333 or using the My.Clemson App

N

Page 25: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Employee Shuttle – East Option 2Closed for

Construction

Tiger Transit Green Route operates Monday – Friday from 7:30 AM – 6:00 PM every 13 

minutes.

This route is equipped with GPS tracking through the RideCell App 

& My.Clemson App

Tiger  Transit Nighttime Service operates from 6 PM – 6 AM, 

Daytime Service operates from 11 AM to 2:30 PM by calling 864‐

656‐3333 or using the My.Clemson App

E‐21  Parking Lot

N

AcademicSuccessCenter

Page 26: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Student Parking

N

191 Spaces

152 Spaces

Page 27: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

Student ShuttleCAT Purple Route 

operates Monday – Friday7:30 AM – 5:30 PM 

and connects Brackett Hall to the R3 parking lot on   

Nu Street

Tiger Transit nighttime service is available from 6 PM – 6 AM through the 

My.Clemson app (under Safety), 

the RideCell App, or by calling 

864‐656‐3333         

N

Page 28: Douthit Hills Construction Plan FINAL- 12-8-14housing.clemson.edu/wp-content/uploads/Douthit_Hills_Construction_Plan_FINAL-_12-8-14[1...Dec 08, 2014  · Student Spaces (138 Relocated/152

QuestionsDan Hofmann, CAPPDirector Parking and Transportation Services Clemson [email protected](864) 656-2270

GO TIGERS!

James Bonney, PEAssociate Director of Housing & DiningClemson [email protected](864) 656-1982