    Littoral Combat Ship (LCS) Surface Warfare (SUW) Testing in the News

    DOT& !esponse

    On Satur"a#$ %anuar# '$ '*$ +r, S#"ne# %, -ree"berg$ %r,$ publishe" an article in

    .rea/ingDefense,Com title"0 1LCS Test 2s, -ast 3ttac/ .oats 4Unfair50 +issile +issing$ Na6#

    Sa#s,7 8n that article$ he references an unname" Na6# official who conten"e" the testing of LCS8ncrement 88 SUW +ission 9ac/age was unfair because it "i"n5t ta/e into account the planne"

    surface:to:surface missiles that will be a""e" to the +ission 9ac/age in 8ncrement 888,

    !egretfull#$ the Na6# spo/esman was apparentl# not familiar with the basis for the test an" man#of his statements are incorrect or not relate" to what was being teste",

    .ecause the mission capabilit# of LCS is being intro"uce" in an incremental manner$ the-ebruar# ;$ ''$ Capabilit# De6elopment Document (CDD) (

  • 7/25/2019 DOT&E - Point Paper on LCS SUW Unfair Article Final

    2/2

    "escribe" in the %anuar# ;$ ';$ LCS SUW +ission 9ac/age Test 9lan title"0 1Bui"e" Test

    2ehicle E Test for the Surface:to:Surface +issile +o"ule (SUW:I:9LN:*)$7 1to pro6e the

    +CS J+issile Fhaust Containment StructureK concept an" collect "ata to support the missilesoftware "e6elopment for the LCS SS++ JSurface:to:Surface +ission +o"uleK b# engaging

    surface targets from the "ec/ of a surrogate platform,7 The test plan i"entifies that

    1mo"ifications are being ma"e to the missile algorithms b# the 3rm# to optimie the see/er an"transfer alignment performance for the LCS en6ironment,7 Aence$ this testing was focuse" on

    pro6i"ing the "e6eloper much nee"e" "ata to un"erstan" the missiles5 flight en6elop an"

    gui"ance logic to allow them to write the nee"e" software change, The missiles fire" were notrepresentati6e of the final software configuration that will e6entuall# be emplo#e" in tactical

    roun"s, The "e6elopmental test was actuall# a series of siF separate e6ents, ach e6ent was

    prescribe" an" tightl# controlle" to pro6i"e the "e6elopers the nee"e" information on specific

    points in the flight en6elope, 6er# firing e6ent use" perfect targeting information which willnot be a6ailable when emplo#e" on LCSH furthermore$ the targets were controlle" in such a

    manner that the# offere" a specific profile to obtain the nee"e" technical information an" were

    not representati6e of the realistic "#namic scenarios that will e6entuall# be presente" "uring final

    "e6elopmental testing an" the subseuent operational tests, -inall#$ the largest 1rai"7 presente"to the ship in an# one scenario was three boats$ not eight as suggeste" in the article, The LCS5s

    abilit# to "efeat a larger rai" of small boats will be eFamine" in a future test$ which will becon"ucte" in an operationall# realistic manner, .ecause of the limite" number of tests an" the

    artificialit# with which the# ha" to be con"ucte" to pro6i"e the "e6eloper the information

    nee"e"$ these tests cannot be use" to pre"ict an e6entual operational capabilit#$ nor woul" it beappropriate to suggest that an LCS was 1? for =7 when no single test with eight targets was

    con"ucte", The operational testing currentl# planne" for -G '? will pro6i"e the "ata to

    "etermine the ship5s full capabilit# in a wartime scenario,