CT Route 15 Interchange 59Deficiencies and Needs Study
Public Information Meeting
May 22, 2014
8/12/2019 DOT Public Info Meeting NH May 22 2014
2/32
Agenda
n Study Overviewn Development of Improvement
Concepts
n Recommended Improvement Plann Next Steps
8/12/2019 DOT Public Info Meeting NH May 22 2014
3/32
Study Overview
8/12/2019 DOT Public Info Meeting NH May 22 2014
4/32
Study Area Map
8/12/2019 DOT Public Info Meeting NH May 22 2014
5/32
n Study initiated due to high accident rates andtraffic congestion in the area.
n Focus is the roadway network around Route 15Interchange 59, Route 63, and Route 69 in the
City of New Haven and the Town ofWoodbridge.
n Study will result in a recommendation plan forthe interchange and surrounding roadway
network.
Study Background
8/12/2019 DOT Public Info Meeting NH May 22 2014
6/32
n Improve Safety
n Reduce Congestion
n Improve Pedestrian Accommodations
n Improve Connectivity to/from Route 15
n Involve the Public Throughout The Study
Study Goals
8/12/2019 DOT Public Info Meeting NH May 22 2014
7/32
Development of ImprovementConcepts
8/12/2019 DOT Public Info Meeting NH May 22 2014
8/32
Project Context
n Heavily developed
commercial corridorwith residential areas
n 5,000+ jobs
8/12/2019 DOT Public Info Meeting NH May 22 2014
9/32
Project Contextn Stream and pond
network along eastern
edge of Route 69
8/12/2019 DOT Public Info Meeting NH May 22 2014
10/32
Competing Considerations
Affecting Concept Development
Right-of-Way/ Socio-economic Implications
Concept
8/12/2019 DOT Public Info Meeting NH May 22 2014
11/32
Recommended Improvement Plan
8/12/2019 DOT Public Info Meeting NH May 22 2014
12/32
n Near-Term
n Medium-Term -- Alternative 1
n Long-Term -- Alternative 2
Actions Included in Plan
8/12/2019 DOT Public Info Meeting NH May 22 2014
13/32
Near-Term Actions
8/12/2019 DOT Public Info Meeting NH May 22 2014
14/32
Channelized Intersection ofRoute 63 (Amity Road) / Route 69 / Wright Avenue
(either CTDOT Option 2 or Option 3)
EXPANDED
PEDESTRIAN
REFUGE AREA
OPTION 2 OPTION 3
CHANNELIZED
SOUTHBOUND
RIGHT TURN
n Define travel paths through intersection
n Provide refuge islands for pedestrians
8/12/2019 DOT Public Info Meeting NH May 22 2014
15/32
Alternative 1
8/12/2019 DOT Public Info Meeting NH May 22 2014
16/32
n Construct a north connector road (Concept 2b)between Route 69 and Route 63
n Reconfigure the southbound Route 15 ramps
Alternative 1
Route 15 (Wilbur Cross Parkway
8/12/2019 DOT Public Info Meeting NH May 22 2014
17/32
n Second southbound lane on Route 69south of Lucy Street
n
Second approach lane on southboundRoute 69 approach to Lucy Street
n Right-turn lane on northbound Route 63 atnorth connector road
n Left-turn lane on southbound Route 63 atnorth connector road
Alternative 1
Intersection Improvements
8/12/2019 DOT Public Info Meeting NH May 22 2014
18/32
8/12/2019 DOT Public Info Meeting NH May 22 2014
19/32
Alternative 2
8/12/2019 DOT Public Info Meeting NH May 22 2014
20/32
n Construct the loop ramp from southbound Route 69 tonorthbound Route 15 (Concept 1i)
n Reconfigure the merge on northbound Route 15 fromPond Lily Avenue to incorporate the loop ramp
n Upgrade the northbound Route 15 off-ramp
Alternative 2
Route 15 (Wilbur Cross Parkway
8/12/2019 DOT Public Info Meeting NH May 22 2014
21/32
Traffic Volume Shifts Related to
Alternative 2 Loop Ramp
8/12/2019 DOT Public Info Meeting NH May 22 2014
22/32
N
Highlights of Traffic Analysis ResultsAlternative 2
SIGNIFICANT IMPROVEMENT ATROUTE 69 AND POND LILY AVESIGNIFICANT IMPROVEMENT ATROUTE 69 AND POND LILY AVE
8/12/2019 DOT Public Info Meeting NH May 22 2014
23/32
n
Right-turn lane on northbound Route 69approach to Pond Lily Avenue (OptionalImprovement)
Alternative 2
Intersection Improvements
8/12/2019 DOT Public Info Meeting NH May 22 2014
24/32
n Channelize the intersection of Route 63(Amity Road) / Route 69 / Wright Avenue
n Alternative 1 (north connector road) -- first
phase of overall plann Alternative 2 (loop ramp) -- added to
Alternative 1 as second phase of overall plan
n Spot improvements were identified for
inclusion in each alternative
Improvement Packages
8/12/2019 DOT Public Info Meeting NH May 22 2014
25/32
Design Issuesn Need for signalizing
northbound Route 15
off-ramp at Route 69n Feasibility of adding
northbound Route 69right-turn lane at Pond
Lily Avenue(environmental issues)
8/12/2019 DOT Public Info Meeting NH May 22 2014
26/32
n There are still intersections projected to operatepoorly in 2030 after improvements
n Location of western end of north connector road
on Route 63 relative to Amity Plaza and otherbusinesses
Design Issues
8/12/2019 DOT Public Info Meeting NH May 22 2014
27/32
Design Issuesn Improvements will
need to address
pedestrian needs
n Question of how toreflect bicyclist
needs along studycorridors
8/12/2019 DOT Public Info Meeting NH May 22 2014
28/32
n Should driveway access be allowedto/from the north connector road?
Design Issues
8/12/2019 DOT Public Info Meeting NH May 22 2014
29/32
n Incorporate public comments fromtodays meeting
n Finalize Deficiencies and Needs Study
Report
Next Steps
8/12/2019 DOT Public Info Meeting NH May 22 2014
30/32
Study Website
http://www.exit59study.com/
8/12/2019 DOT Public Info Meeting NH May 22 2014
31/32
8/12/2019 DOT Public Info Meeting NH May 22 2014
32/32
Discussion