18
Performance Architecture 2012 “The passage”

Dossier Artes digitais

Embed Size (px)

DESCRIPTION

Dossier artes digitais projecto, guimaraes

Citation preview

Page 1: Dossier Artes digitais

Performance Architecture 2012

“The passage”

Page 2: Dossier Artes digitais

“The Passage”

Contents0- Abstract0.1- Key words1- Introduction2- Conceptual description3- Description of the implementation of the project3.1- Detailed description of the installation3.2- Interaction3.3- Area of the installation3.4- Acessories3.5- Accomplishment3.6- Calendar3.7- Budget4- Technical description4.1- Technique4.2- Basic Technical requirements4.3- Lighting and electrical installation4.4- Technical requirements (equipment)4.5- Cleaning and maintenance4.6- Detailed description of the components4.7- Troubleshooting5- References

Performance Architecture 2012 1

Page 3: Dossier Artes digitais

0- Abstract Concerning the challenge Performance Architecture, wepropose a public art installation consisting on a structurethat on the inside will allow the passage of the interactors.system of capture and amplification of sound that amplifythe steps and sound made by the people inside.

0.1- Key words - Sound; - Interaction; - Privacy; - Unknown

“The Passage”

Performance Architecture 2012 2

Page 4: Dossier Artes digitais

1- Introduction

Here will be presented all the concept of the structure, all the construction process and the accomplished steps till the final piece. And also will be here presented the total budget of thestructure, his implementation (with a detailed descrip-tion), material of the installation, maintenance, technicaldrawings, electric installation and interactivity. Describes also the chosen place to the piece imple-mentation.

“The Passage”

Performance Architecture 20123

Page 5: Dossier Artes digitais

2- Conceptual description The public art project for the challenge “Guimarães 2012 – European capital of culture”, aims to explore the interest of the people with the unknown object, by it’s exterior futurist structure, without any window or tips of what’s going on in the inside, and by the inside sound installation that will confuse the spectator in the sense that she will be confused by the multiplied sounds recorded from her own steps and voice. We want to appeal to the unknown, showing that it’s like a natural instinct, the human wish to know beyound the unknown, desiring to enter into the privacy of the other and controlling the reality that surrounds him. We’ve chosen this concepts because of the busy social life that our society live and the fact thatnowadays we can’t have full privacy, everyone insociety can be known and exposed. This project is the result of a creative partner-ship between multimedia artists and architectors.

“The Passage”

Performance Architecture 20124

Page 6: Dossier Artes digitais

3- Description of the projectimplementation

The installation of the passage will be a parallelepiped with 2,5m width and height, and 10m length and the two doors will have 1m width and 2m height. It will be constructed with concrete molds, showing a contemporary architecture but a bit primitive giving at the same time a unfin-ished environment, to give more dinamic to the people movements we placed mismatched entries, the inside would be black and the floor will have a aluminum plate to make more sound and also will have two antechamber to block exterior sounds and give the structure more effect. On the inside it would have 4 columns, 2 on each side that will being reproducing the sound captured by the mi-crophone and amplifier that would amplified the sounds made by the people that enter on the inside. When they enter, they could hear their sound and the other peoples sound, reproduced in real time. By day the light will be turn off and the passage would be only illuminated by the sun light and bynight would have next to the doors movement sen-

sors that will turn on the lights during their pas-sage. For the maintenance of this project, the insidehave to be clean 3 times a week and the outside1 time a week. For the maintenance of this work of ublic art, the inside have to be clean 3 times a week and don’t have to be clean outside. The transport of the aluminum passage will be done by a company of metallurgy that makes the transportation and the installation since it’s a struc-ture of a big dimension and it have to be welded. The lights, sensors and sound system, have to be purchased on the internet or in the shop and the installation will be made by an electrician and the

sound system by a sound technical. To build the structure will be necessary to wait about one week to have all the material available.

“The Passage”

Performance Architecture 20125

Page 7: Dossier Artes digitais

“The Passage”

3.1- Detailed description of the installation

Performance Architecture 20126

Page 8: Dossier Artes digitais

“The Passage”

3.2- Interaction

Performance Architecture 20127

Page 9: Dossier Artes digitais

“The Passage”

3.3- Acessories (inside of the structure)

Performance Architecture 2012

DIAGRAL motion detectorrow DM320119,70 € IVA incProtected Area: 22 m, 10 °

- Security of electronic detection filter- Test button with indicator light-Position flat or angled (except for protection of the corridor) with or without a label- Self-protection to the opening or break (assem-blyunlabeled)- Autonomy of 2 years,batteries supplied- 5 year warranty Diagral

http://www.pixmania.com

3 lights(Pack 3 focos de encastrar) 14,95€

- 3 x 50 W.- GU10. IP23.- Trainable. ø 8 cm.- Brushed Nickel.

http://www.aki.pt

8

Page 10: Dossier Artes digitais

BLACK - Ref: 10250652

Description of the produt:A / V receiver with 7 x 7.2 Continuous 160W (6 ohms), HDMI 1.4 3D Technology WRAT (Low Negative Feedback), DTS-HD Master Audio, Dolby TrueHD, SACD and Multi-CH PCM, DTS-HD Express, Dolby Pro Logic IIz, THX Select 2 Plus 4 Audio Processing Modes for Gaming: Rock, Sports, Action, RPG, a D-sub input (15 pin) RGB Computer, 6 in-puts, 1 HDMI (v. 1.4a) with processing audio / Video (3D), “upscaling” Qdeo, OSD via HDMI, 6 analog audio inputs, 1 output, component video switching (2 inputs and 1 output), 2 coaxial digital inputs, 2 optical input, Ethernet port for “streaming “audio files (MP3, WMA, WMA Lossless, FLAC, WAV, Ogg Vorbis, AAC, and LPCM), Internet radio (Last.fm, Napster, and vTuner) Updates” Firmware “via Ethernet and USB , Audyssey 2EQ system calibration, system opti-mization for compressed audio files, Universal Gateway in one cable for connecting iPod or DAB System, “Pure Audio”, Zone 2 amplifiers and preamplifiers, programmable control, Dimensions : 435 x 174 x 328 mm (WxHxD) 11.3 kghttp://www.pixmania.com/pt

Performance Architecture 2012

ONKYO RECEIVER ON-KYO TX-NR609699 € IVA inc

M-AUDIO Colunas HiFi Studiophile AV30 de M-AUDIO89 € IVA incRef : 00079027

Description of the produt:

structureNumber of items: 2Composition 2 ColumnsAutifalantes frontPower (W): Amplifier 15 watts per channelNumber of Woofers: 1Woofers diameter (in mm): 3 “Number of Tweeters: 1Tweeters diameter (in mm) 3 / 4 “

http://www.pixmania.com/

9

“The Passage”

Page 11: Dossier Artes digitais

“The Passage”

Performance Architecture 2012

Features: • element: Fixed-charge back plate, permanently polarized condenser • polar pattern: cardioid • frequency response: 30-20000 Hz • low frequency roll-off: 80 Hz, 18 dB/octave • open circuit sensivity: -39 dB (11.2 mV) re 1V at 1 Pa • impedance: 250 ohms • maximum input sound level: 139 dB SPL, 1 kHz at 1% T.H.D. • dynamic range (typical): 115 dB, 1 kHz at Max SPL

• signal-to-noise ratio: 70 dB, 1 kHz at 1 Pa • phantom power requirements: 11-52V DC, 2 mA typical • switch: Flat, roll-off • weight (mikrophone): 0.5 oz (14 g) • weight (power module): 2.9 oz (81 g) • dimensions (microphone): 1.34” (34.0 mm) long, 0.48” (12.2 mm) diameter • dimensions (power module): 3.66” (92.9 mm) long, 0.74” (18.9 mm) diameter • output connector (power module): integral 3-pin XLRM-type • cable: 25.0’ (7.6 m) long (permanently attached to microphone), 0.13” (3.2 mm) diameter, 2 con-ductor shielded cable with TA3F-type connector

http://www.musicstore.com/pt_PT

Audio Technica U853R

299€ IVA inc

10

Page 12: Dossier Artes digitais

“The Passage”

3.4- Acomplishment

Each material have their own transport due to theirmaintenance and installation. The structure will be constructed with concrete moldsand the floor will have a aluminum plate, the inside would be black. The structure will be constructed by a company and the transport of the aluminum floor will be done by othercompany of metallurgy that makes the transportation and the installation and the lights, sensors and sound system, have to be purchased on the internet or in the shop and the installation will be made by an electrician and the sound system by a sound technical. For the maintenance of this work of public art, the inside have to be clean 3 times a week and don’t have to be clean outside.

Performance Architecture 2012 11

Page 13: Dossier Artes digitais

3.6- CalendarDay 1 – speculation about the Project studying the follow keywords:Urban Interaction, multidisciplinary, temporary structures, consciousness body, Performance, artistic Responsibility , Public art, Body and space, art, socio-cultural differences, social critical, reinvention of public space .

Day 4 – preliminary investigation

Day 10 – Formulation of the first hypothesis

Day 15 – Investigation of technical solutions

Day 20 – hypothesis text

Day 26 – Presentation of a work plan

Day 30 – Critical reflexion

Day 36 – Reflexion about the materials of visual-ization, the project and the budget

Day 40–End of the Dossier A3

Day 42- Notification of pré-selected

Day 67– Delivery of the painel A1

Day 77– Notification of the winners; conference

Day 177– Beginning of the Project construc tion

Day 184–End of the Project construction Day 188– Public presentation of the interactivity

“The Passage”

Performance Architecture 2012 12

Page 14: Dossier Artes digitais

“The Passage”

3.7- Budget

Performance Architecture 201213

Page 15: Dossier Artes digitais

“The Passage”

Performance Architecture 2012

4- Technique

Project: “Performance architecture – Guimarães2012 – Capital of culture”

Coordinative institution:Guimarães 2012 – Capital of Culture

Project Team:Multimedia and Plastic arts studentsArchitect

School of Education (Beja), Polytechnic Instituteof Beja [ESEB-IPB] Responsible technician:Digital Arts teatcher

Management of the project:

- All the members of the team work at the same time, with the same requirements and the same objective.-During the project the members collaborate and work with coordination, delivering and controlling the tasks between them.

Objective of the project:Creation of a structure of public art for the con-test “Performance architecture – Guimarães 2012 , Capital of culture”.

14

Page 16: Dossier Artes digitais

“The Passage”

Performance Architecture 2012

4.1- Lighting and electrical installation

15

Page 17: Dossier Artes digitais

“The Passage”

Performance Architecture 2012

4.2- Technical requirements(equipment)

Material required:- Concrete molds-1 aluminum plates (10m:2.50m)- 6 lights- 4 sound columns-Sound captor,-Sound amplifier- Electrical connectors- Movement sensor

4.3- Cleaning and maintenance

The cleaning of this work will be: Inside cleaning- 3 times a week

16

Page 18: Dossier Artes digitais