Dos and Don’ts of a SAP Transportation Management

Implementation

Tom VervustCGI [email protected]+46702382249

1

Page 2: Dos and Donts of SAP TM Impl

Agenda

• Personal Introduction

• What is SAP TM?

• Why SAP TM?

• 4 things to consider

• Q&A

2

Page 3: Dos and Donts of SAP TM Impl

Personal Introduction

Tom Vervust

• Belgium (Flanders)

• Master Civil Engineer-Architect & Master in General Management

• Passion for supply chain management

• 6 years of international experience as a SAP consultant

• Certified SAP TM consultant

• References:

3

Page 4: Dos and Donts of SAP TM Impl

What is SAP Transportation Management?

• History

• Basic process

• Different perspectives– Shipper

– Logistics Service Provider

4

1987 1993 2000 2001 2004 2006 2007 2008 2010 2011 2012 2013

Transportation

Solution in SAP R/2

Transportation

Solution in SAP R/3

Transportation Planning

in SAP APO-TP/VS

Event

Management

Track and

Trace

RFID

handling

Extended

Planning

and Ocean

Booking

SAP TM 6.0

for Shippers,

3PL and LSP

SAP TM 7.0

Integration /

Specialization

SAP

TM 8.0

TM 8.1

SAP

TM 9.0

TM 9.1

Page 5: Dos and Donts of SAP TM Impl

Why implement SAP Transportation Management?

Transportation cost puts profit margins under pressure

Shippers & LSPs seek similar benefits

• Transparent end-to-end process

• Traceability during execution

• Visibility on the spend

• Standardized process, automation

• Efficient integration

• Wide range of functionalities

• New technology (mobile, NWBC,...)

5

Page 6: Dos and Donts of SAP TM Impl

4 things to consider when implementing SAP TM

• Business Case & Strategy

• System & Process Integration

• Master Data, Master Data, Master Data!

• It is a journey

6

Page 7: Dos and Donts of SAP TM Impl

4 things to consider when implementing SAP TMBusiness Case & Strategy• SAP TM does not dictate you one general ‘best practice’, but it provides a

robust, yet higly flexible framework to organize your company’s shipping activities according to its strategy.

• What is your company’s supporting strategy? – In-house or external transport planning, execution, optimization?

– Do you want to consolidate shipments at all cost to increase the fill rates of trucks?

– How does this impact order confirmation and delivery accuracy?

– Do you by definition use slower, cheaper modes of transport for long distance?

– Do we have enough transportation capacity to deal with high volume peaks?

– Is a quick response time during transport execution the cutting edge you seek?

– Who has which responsibilities within your transportation organization?

– How to avoid empty returns? What does the transportation network look like?

– How do you want to integrate and communicate with different stakeholders?

– Which are the essential KPI’s you want to monitor?

• A lot of these fundamental questions need to be answered during a SAP TM implementation project, never to forget that a good transportation strategy should be an integral part of a rock-solid overall supply chain strategy.

7

Page 8: Dos and Donts of SAP TM Impl

4 things to consider when implementing SAP TMSystem & Process Integration

• Distribution / Logistics is a central point in the organization

• Typical stakeholders: Sales, Warehouse, Sourcing, Finance

• Define handovers & timeline!

8

SAP ERP

Global Trade System

Global

Capacity

Planning

Event Management

Carrier Web Portal

Logistics

Service

Provider

(LSP)

Freight Orders

& Confirmations

Web

Solution

Access

Customs Info

Master Data

(via CIF)

Master Data

Transport

Planning

Transport

Request

Overview

Advanced

Transport

Optimization

TM8 Master Data

Events

SAP TM8

Transport

Costing

Transport Cost

(via PI)

Transport

Request

(via PI)Project Transport

to site (Prod. PO)

Spare Parts

Prod. Inbound

Prod.

Intercompany

Project Transport

to site

Spare Parts

Prod. Inbound

Prod.

Intercompany

Prod. Plans

Demand

Business Intelligence

Analytics

Data

Transport Reports

Price List

Manual Transport

Request

Environment, Health

and Safety

Dangerous Goods

Man.Upd. of TM8

Auto.Upd. of TM8

Event

Collection

Device

Events

Manual

Event input

Direct EDI

Integration

1st Project

2nd set of Projects

Legend

Later Projects

Prices from RFQ

Primavera

(Construction)

Transport

Orders

Acual Cost

Visual Business

Map

Functionality

Events

Supplier

Relationship

Management

Performance

& RFQ

Document

ManagementLink to Documents

PBU

Read Access to

Project Transport

• SAP TM is not ‘another module’

• SAP TM is ‘another system’

• Standard, but complexintegration (ECC-TM, ECC-PI-TM, EM-TM, TM-LSP, dangerousgoods, global trade services, …)

Page 9: Dos and Donts of SAP TM Impl

4 things to consider when implementing SAP TMMaster Data, Master Data, Master Data

9

Locations

Means of Transport

Lanes

Agreement

ProductsWeight

DimensionsDangerous Goods

Address

ResourcesCalendars

Loading Docks

CapacityVehicles

LSP

Leadtimes

Distance

Calculation Sheet Rate Tales Scales

Network

Schedules

• TM (optimisation) drives on MD

• Planning profiles

• Communication & Outputs

Business Partners

Organization

Page 10: Dos and Donts of SAP TM Impl

4 things to consider when implementing SAP TMIt is a journey• Do you know already what you want to gain from TM?

• Do you have a plan for maturing your organization? – Is this included in the timeline of your project plan and the budget?

– Do you have a strategy to make your business and IT organization self relient (train the trainer, set up key user organization, IT support organization, …)

• Do you have the right resources?

• Is your organization ready to absorb the new process and the new technology? (Change Management, Netweaver Business Client, PI integration, mobile, …)

Allow your organization the time to mature

Apply a ‘learn as you go’ approach Proof of concept, sandbox to play around and learn

Distinct phases with a limited scope

Manage expectations from management during the first phases of the project

Adjust the goal and setup as you go ("lagen om progressiva insikt")