2007.05

Beijing

Dong Guan Power & Chemical Industry CO., Ltd.Dong Guan Power & Chemical Industry CO., Ltd.The Demonstration & Promotion of IGCC in Dong GuanThe Demonstration & Promotion of IGCC in Dong Guan

ContentContent

Background and ProcessBackground and ProcessObjective Objective Strategies of Realization Strategies of Realization Mean and Plan of DevelopmentMean and Plan of Development

Background and ProcessBackground and ProcessIntroduction of the DGPCIntroduction of the DGPCBackgroundBackgroundProcessProcess

Introduction of DGPCIntroduction of DGPC

DGPC is a company mainly invested in power generation, which has four power plants, with a total capacity of 880MWe. In recent years, in the cooperation with the top technique associations in China, DGPC has the capacity of building and operation the large combined cycle power plants.

Headquarter of DGPCHeadquarter of DGPC

TianTian Ming Power PlantMing Power Plant

Owned Power PlantsOwned Power Plants

Dong Dong HuaHua Power PlantPower Plant

HumenHumen Power PlantPower PlantTong Ming Power PlantTong Ming Power Plant

BackgroundBackground

Difficult PositionDifficult Position

Combined Cycle Power Plants faces serious problems:•Oil price climbed continuously, COE is higher than price on the grid•Emissions

LNG Supply insufficient and uncertain

120 MWe Combined Cycle Power Plants:

•2004:oil price1800 RMB/ton,profit 0.13 RMB/kwh•2006:oil price 3500RMB/ton,deficit 0.1 RMB/kwh

IGCCIGCC is is the the only only optionoption

PowerRequirement

Problems

Environment

Supplement of LNG

COE

Superiority of IGCC

Coal

Environmental Advantage

Policy Encouragement

Economic

Start Investigation

Lurgi

Ende Gasifier

Shell

Texaco

New Type Slurry

Two-Stage Gasifier

TypeType CompanyCompany

Transport Gasifier

Lunan

Tampa

Guotai

Tianji

Jingdezhen

TPRI

Shuanghuan

IET

Southern Company

Texaco

Fuel-Flexible

2006-03

2006-05

2006-08

2002-11

2006-03

2006-04

2006-11

2006-11

2006-09

ProcessProcess——GasifierGasifier SelectionSelection

ASU

Gasifier

Gas Turbine

HANGYANG

KFAS

SASPG

FUSHUN

DALIAN

SICHUAN

NTC

2006-03

2006-03

2006-06

2006-07

2006-04

2006-04

2006-03

ProcessProcess——Main UtilitiesMain Utilities

Slurry Gasificaton Process2006-06

Designer: Tianchen2006-06

Feasibility Study2006-08Narrow Coal Type Oxygen Consumption Heavy Investment

Fuel-Flexible Gasifier

Agreement

Wide Coal Type Low Investment

Not Suitiable, Give Up

2006-09

2006-09

ProcessProcess——Main TechnologyMain Technology

ObjectivesObjectives

Total ObjectivesTotal ObjectivesMainly IndexesMainly IndexesR&D ContentsR&D Contents

Total ObjectiveTotal ObjectiveEstablish a 120MWe IGCC and at least one Establish a 120MWe IGCC and at least one 200MWe IGCC power plant200MWe IGCC power plant

Demonstrate the key technologies of IGCC, Demonstrate the key technologies of IGCC, such as system design, large gasification such as system design, large gasification technology and operation and controllingtechnology and operation and controlling

provide a typical form for China and promote provide a typical form for China and promote the IGCC development in Chinathe IGCC development in China

IndexesIndexesIGCC of 120MWeIGCC of 120MWe

Power Generated>120MWePower Generated>120MWeGross Efficiency>39%Gross Efficiency>39%Net Net Efficiency37Efficiency37%%SOSO22<45mg/Nm<45mg/Nm33((@16%O@16%O22))NOxNOx<80mg/Nm<80mg/Nm33((@16%O@16%O22))

IGCC of 200MWeIGCC of 200MWePower Generated>200MWePower Generated>200MWeGross Efficiency>45%Gross Efficiency>45%Net Net Efficiency41Efficiency41%%SOSO22<45mg/Nm<45mg/Nm33((@16%O@16%O22))NOxNOx<80mg/Nm<80mg/Nm33((@16%O@16%O22))

R&D ContentsR&D ContentsSystem design, integration, engineering System design, integration, engineering assort, debug and demonstration of the assort, debug and demonstration of the 120MWe and 200MWe IGCC120MWe and 200MWe IGCC

Demonstrate the key technologies of the Demonstrate the key technologies of the IGCC IGCC

Data Collection and verification the element Data Collection and verification the element and system model, IGCC system estimation and system model, IGCC system estimation and promote the direction of improvement. and promote the direction of improvement.

Strategies of RealizationStrategies of Realization

Definition of R&D Definition of R&D Management Management Route Line of R&DRoute Line of R&DProgress Plan Progress Plan AchievementsAchievements

Definition of R&DDefinition of R&DSystem Design and

Integration

Gasification Island

Power Island

DCS

Construction and Operation

IETManufactories Related

IETManufactories Related

ECEC IET SEU

DGPCIET

IGCC

OF

DGPC

IET

Management of projectManagement of project初步可行性研究

初步设计

系统方案研发

动力岛方案

气化岛设备定型

燃机岛设备定型

控制技术定型

工程建设与设备安装

调试技术验证验收

气化岛方案

控制运行方案

主设备招标

可行性研究

详细设计

辅助设备招标

Organization of the projectOrganization of the project

东莞电化IGCC筹建处(示范工程的建设与运行)

工程设计建设

中国科学院工程热物理研究所(技术组织协调)

调试、考核与运行

系统优化集成与设计

气化岛技术

动力岛技术

整体运行

科研管理

工程建设管理

工程设计与自动化

东莞电化IGCC管理委员会

System Design& Optimization

Engineering Design

Construction

Demonstration

Evaluation

Route LineRoute Line

Progress PlanProgress Plan

AchievementsAchievements————Feasibility StudyFeasibility Study

AchievementsAchievements————Site of the ProjectSite of the Project

TianmingTianming22××6B6B

DonghuaDonghuaPower PlantPower PlantGasification IslandGasification Island

AchievementsAchievements————Site of 120MWe IGCCSite of 120MWe IGCC

拟建

5000

吨码头

200MWe×4 IGCC

AchievementsAchievements————Site of 200MWe IGCCSite of 200MWe IGCC

Mean and Plan of DevelopmentMean and Plan of Development

Plan of 11Plan of 11thth fivefive--year Planyear PlanPlan in a Long TimePlan in a Long TimeMeans of IGCC of DGPCMeans of IGCC of DGPC

Plan of 11Plan of 11thth fivefive--year Planyear Plan

Establish 120MWe and 200MWe IGCC Establish 120MWe and 200MWe IGCC Power PlantPower PlantDemonstrate the key technologies of Demonstrate the key technologies of IGCCIGCC

Long Time PlanLong Time PlanScale up by conformity the small diesel Scale up by conformity the small diesel power plantspower plantsDevelop the powerDevelop the power--chemistry Cochemistry Co--productionproductionEngaged in the FUTUREGEN Alliance and Engaged in the FUTUREGEN Alliance and develop the zero emission energy systemdevelop the zero emission energy systemBecome the typical IGCC of ChinaBecome the typical IGCC of China

MeaningsMeanings

Demonstration and verify the key Demonstration and verify the key technologies of IGCCtechnologies of IGCC

Demonstrate the key technologies of IGCC Demonstrate the key technologies of IGCC supported in domainsupported in domain

Provide a typical form of IGCC development Provide a typical form of IGCC development for China and promote the IGCC for China and promote the IGCC development in Chinadevelopment in China

Thank you for attention