44
Copyright by Doka The Formwork Experts. January 2013 Doka. The Formwork Experts.

Doka. The Formwork Experts

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Doka. The Formwork Experts

Copyright by Doka

Copyright by Doka

The Formwork Experts.

January 2013

Doka. The Formwork Experts.

Page 2: Doka. The Formwork Experts

Copyright by Doka

Contents

2 Doka presentation, January 2013

Umdasch Group

Executive Board

Facts and figures

Production

Products

References

Page 3: Doka. The Formwork Experts

Copyright by Doka

Doka headquarters, Amstetten

3 Doka presentation, January 2013

Total area: 350.000 m²

Page 4: Doka. The Formwork Experts

Copyright by Doka

Doka is part of the Umdasch Group

4 Doka presentation, January 2013

Doka Group Shopfitting Group

Page 5: Doka. The Formwork Experts

Copyright by Doka

Executive Board of Umdasch Group

5 Doka presentation, January 2013

Josef Kurzmann Doka Group

Dr. Andreas Ludwig Chairman

Helmut Neher Shopfitting Group

Page 6: Doka. The Formwork Experts

Copyright by Doka

Management of Doka Group

6 Doka presentation, January 2013

v.l.: Rainer Spitzer, Johann Strunz, Dir. Josef Kurzmann, Ludwig Pekarek, Jürgen Obiegli f. l.: Ludwig Pekarek, Rainer Spitzer, Josef Kurzmann,

Gregor Gaisböck, Jürgen Obiegli, Johann Strunz

Page 7: Doka. The Formwork Experts

Copyright by Doka

Umdasch Group

7 Doka presentation, January 2013

Consolidated revenues 2011

Umdasch Shopfitting Group

209 m. euros (22 %)

Doka Group

759 m. euros (78 %)

Total 968 m. euros

Page 8: Doka. The Formwork Experts

Copyright by Doka

Doka Group

8 Doka presentation, January 2013

Consolidated revenues 2006 – 2011 (million euros)

[+ 7 %] 759

[+ 24 %] 690

838

923

[+ 21 %]

[+ 10 %]

762 [- 17 %]

2006 2007 2008 2009 2010 2011

712 [- 7 %]

Page 9: Doka. The Formwork Experts

Copyright by Doka

Umdasch Group

9 Doka presentation, January 2013

Employee numbers 2011 (annual average)

Umdasch Shopfitting Group

1.460 (20 %)

Doka Group

5.437 (77 %)

Total: 7.114

Central support functions

217 (3 %)

Page 10: Doka. The Formwork Experts

Copyright by Doka

[+ 19 %]

4.397

5.227

5.874

[+ 19 %]

[+ 11 %]

2006 2007 2008 2009 2010 2011

5.478 [- 7 %] 5.238

[- 4 %]

Doka Group

10 Doka presentation, January 2013

Employee numbers 2006 – 2011 (annual average)

[+ 4 %]

5.437

Page 11: Doka. The Formwork Experts

Copyright by Doka

Doka organisation world-wide

11 Doka presentation, January 2013

Doka services customers’ needs with more than 160 sales centres in 70 countries.

Page 12: Doka. The Formwork Experts

Copyright by Doka

Vision

12 Doka presentation, January 2013

By providing economical formwork

systems and services for all sectors of

the industry, we aim at offering

construction companies the best

customer benefit so as to inspire

them and grow success jointly with

them.

Page 13: Doka. The Formwork Experts

Copyright by Doka

Mission

13 Doka presentation, January 2013

Partnership in business We want to be your best partner. Capability and dependability are

what we use to build long-lasting business relationships. These are

invariably solutions-oriented, and build on openness, reliability and

“good-as-our-word” hands-on quality.

Value-addition with capable specialists We keep pace with ever-more demanding customer requirements by

constantly evolving our core competences and thus optimizing

value-addition for our customers. Doka employees are capable and

motivated specialists, partners the construction companies can

consult at any time.

Customer benefit The basis of our long-term, sustained corporate success is our ability

to offer the highest possible customer benefit. With our innovative

and quality-assured products and service offerings, we support

construction companies worldwide in their endeavours to build

faster, better, more cost-effectively and safely.

Page 14: Doka. The Formwork Experts

Copyright by Doka

Doka production

14 Doka presentation, January 2013

Doka Metalworking (DMB)

Doka Woodworking (DHV)

Page 15: Doka. The Formwork Experts

Copyright by Doka

Doka production output

15 Doka presentation, January 2013

annual

Own production facilities

(Austria, Slovakia)

Formwork beams

10 million linear metres

Formwork sheets

4 million m²

Metal products

100,000 t

Plastic components

3000 t

Page 16: Doka. The Formwork Experts

Copyright by Doka

Formwork-beam production

16 Doka presentation, January 2013

Doka’s production facilities have several moulding

stations for the patented polyurethane end-

reinforcement. This significantly prolongs the

useful life of the beams.

Page 17: Doka. The Formwork Experts

Copyright by Doka

Formwork-sheet production

17 Doka presentation, January 2013

Doka produces an extensive range of formwork

sheets for many different areas of application. The

use of choice timbers, and careful glue-bonding,

together ensure the very highest quality.

Page 18: Doka. The Formwork Experts

Copyright by Doka

Framed-formwork production

18 Doka presentation, January 2013

The durability, dimensional accuracy and

stability of the frames are key quality criteria that

distinguish Doka framed formwork. Together with

their high-quality form facing, they allow superb

concrete results to be achieved.

Page 19: Doka. The Formwork Experts

Copyright by Doka

Floor prop production

19 Doka presentation, January 2013

The high load-bearing capacity of Doka floor props

is ensured by using only top-quality materials in

their manufacture. Doka’s state-of-the-art

production lines ensure superlative workmanship

and consistently high quality.

Page 20: Doka. The Formwork Experts

Copyright by Doka

The Doka range

20 Doka presentation, January 2013

Page 21: Doka. The Formwork Experts

Copyright by Doka

Product overview

21 Doka presentation, January 2013

Wall System

Climbing System

Floor System

Load-bearing Towers

System Components

Services

Safety Systems

Page 22: Doka. The Formwork Experts

Copyright by Doka

Wall Systems

22 Doka presentation, January 2013

Framed formwork Timber-beam formwork

Page 23: Doka. The Formwork Experts

Copyright by Doka

Wall Systems

23 Doka presentation, January 2013

Column formwork Single-sided formwork

Page 24: Doka. The Formwork Experts

Copyright by Doka

Floor Systems

24 Doka presentation, January 2013

Tableforms Timber-beam floor formwork

Page 25: Doka. The Formwork Experts

Copyright by Doka

Climbing Systems

25 Doka presentation, January 2013

Automatic climbing formwork Crane-lifted

climbing formwork

Page 26: Doka. The Formwork Experts

Copyright by Doka

Load-bearing Systems

26 Doka presentation, January 2013

Shoring towers Tunnel formwork Bridge formwork

Page 27: Doka. The Formwork Experts

Copyright by Doka

Working & protection

platforms

Guardrail systems

Safety Systems

27 Doka presentation, January 2013

Page 28: Doka. The Formwork Experts

Copyright by Doka

Protection screens Access systems

Safety Systems

28 Doka presentation, January 2013

Page 29: Doka. The Formwork Experts

Copyright by Doka

System Components

29 Doka presentation, January 2013

Formwork beams Formwork sheets

Page 30: Doka. The Formwork Experts

Copyright by Doka

System Components

30 Doka presentation, January 2013

Floor props Form-ties &

suspension cones

Page 31: Doka. The Formwork Experts

Copyright by Doka

Services

31 Doka presentation, January 2013

Engineering Rental service Formwork instructor

Page 32: Doka. The Formwork Experts

Copyright by Doka

Services

32 Doka presentation, January 2013

“Ready-to-Use” service Reconditioning service Doka-Training

Page 33: Doka. The Formwork Experts

Copyright by Doka

Doka Forum

33 Doka presentation, January 2013

The Doka Forum's 2,500 m² of

exhibition floor space showcases all

Doka’s formwork systems and

houses comprehensive training

facilities for Doka customers.

Page 34: Doka. The Formwork Experts

Copyright by Doka

bauma 2010

34 Doka presentation, January 2013

Doka made an impressive showing

at bauma 2010, where from April

19th to 25th, 100,000-plus trade

visitors took time to study the

exhibits in the 3000 m² hall built

specially for the exhibition.

Page 35: Doka. The Formwork Experts

Copyright by Doka

References

35 Doka presentation, January 2013

Construction companies worldwide

rely on the expertise, reliability

and “good-as-our-word” integrity

of Doka.

Page 36: Doka. The Formwork Experts

Copyright by Doka

Weiterstadt's "Medienschiff" centre, Germany

36 Doka presentation, January 2013

The formwork for the challenging

geometry of the "Medienschiff"

multifunction centre in the city of

Weiterstadt used a high proportion of

standard systems combined with

made-to-measure special formwork.

Page 37: Doka. The Formwork Experts

Copyright by Doka

Planet Planai, Austria

37 Doka presentation, January 2013

The swooping signature loop of the

Planet Planai valley station building

was propped with the new Staxo 40

load-bearing towers. Excellent

ergonomics and speedy progress

were characteristic of this build.

Page 38: Doka. The Formwork Experts

Copyright by Doka

Gotthard Base Tunnel, Switzerland

38 Doka presentation, January 2013

Quickly and easily, the forming

carriage adapts to the extreme taper

in tunnel cross-section, so cycle times

are kept extremely short. Forming up,

stripping out, lifting, lowering and

advancing are all fully hydraulic,

pushbutton-control operations.

Page 39: Doka. The Formwork Experts

Copyright by Doka

Tisza bridge, Hungary

39 Doka presentation, January 2013

Quickly the extra-wide superstructure

of the Tisza bridge in Hungary was

built in record time with the help of

two specially sized Doka free

cantilever travellers.

Page 40: Doka. The Formwork Experts

Copyright by Doka

Padre Adelino viaduct, Brazil

40 Doka presentation, January 2013

The MF240 crane-lift climbing

formwork kept cycle times short on

construction of the spectacular Padre

Adelino viaduct in Sao Paulo, so

progress of this build was

convincingly rapid.

Page 41: Doka. The Formwork Experts

Copyright by Doka

Rosewood Hotel, Abu Dhabi

41 Doka presentation, January 2013

Staxo 100 and Staxo 40 load-

bearing towers provided the

secure, economical propping for the

floor slabs of the Rosewood Hotel in

Abu Dhabi.

Page 42: Doka. The Formwork Experts

Copyright by Doka

Viaduct crossing the Wadi Adai, Oman

42 Doka presentation, January 2013

Doka developed its high-performance

special solution for these solid

hammerheads to utilise the

advantages of supporting

construction frames and Top 50

beam formwork.

Page 43: Doka. The Formwork Experts

Copyright by Doka

5th Avenue, USA

43 Doka presentation, January 2013

An automatic climbing Doka Xclimb

60 protection shield ensures

optimum safety for construction of a

52-floor residential tower in the heart

of New York.

Page 44: Doka. The Formwork Experts

Copyright by Doka

Thank you for your attention!

For more information please visit our

website:

http://www.doka.com/

https://www.facebook.com/dokacom

http://twitter.com/doka_com

http://www.youtube.com/user/doka

44 Doka presentation, January 2013