3

Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract demand inclusive of existing demand withoui any upper limit will be dealt at Reaional

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract demand inclusive of existing demand withoui any upper limit will be dealt at Reaional
Page 2: Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract demand inclusive of existing demand withoui any upper limit will be dealt at Reaional
Page 3: Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract demand inclusive of existing demand withoui any upper limit will be dealt at Reaional