16
19036 SWTC Platteville Outreach Center 00 90 00 -1 DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. [1] Date: January 30, 2020 RE: SOUTHWEST WISCONSIN TECHNICAL COLLEGE PLATTEVILLE OUTREACH CENTER 75 SOUTH OAK ST PLATTEVILLE, WI BID NUMBER: 1920-07 FROM: HSR Associates, Inc 100 Milwaukee Street La Crosse, WI 54603 (608) 784-1830 To: Prospective Bidders This addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated January 2020. Acknowledge receipt of this Addendum in the space provided on the bid form. Failure to do so may subject the Bidder to disqualification. This Addendum consists of [2] pages, Pre-bid attendance, Revised Bid Form, [1] specification sections, and [4] 30 x 42 drawings. CHANGES TO BIDDING REQUIREMENTS AND CONDITIONS OF THE CONTRACT: 1. Section 00 11 13 ADVERTISEMENT FOR BIDS a. Page 1: Change Bid Opening location to Room 354 in Building 300. 2. Pre-bid attendance attached hereto. 3. Section 00 41 00 BID FORM a. Revised bid Form attached hereto. GENERAL REQUIREMENTS: 4. Section 01 10 00 SUMMARY a. 1.09, A: Change commence date to “February 23, 2020”. b. 1.09, B: Change completion date to “May 8, 2020”. 5. Section 01 22 00 UNIT PRICES a. 1.07: Delete Item A. Shot blasting no longer applicable. 6. Section 01 23 00 ALTERNATES a. Section attached hereto as part of Contract Documents. CHANGES TO SPECIFICATIONS: 7. Section 03 01 00 MAINTENANCE OF CONCRETE a. 2.02: Delete Item B. See directions under 09 05 61 this addendum. b. 3.02, A: Add the following; “Grind entire existing concrete floor area.” c. 3.03: Delete Paragraph C. No shot blasting. See grinding requirement above.

DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

19036 SWTC Platteville Outreach Center 00 90 00 -1

DOCUMENT 00 90 00

ADDENDUM

ADDENDUM NO. [1] Date: January 30, 2020

RE: SOUTHWEST WISCONSIN TECHNICAL COLLEGE PLATTEVILLE OUTREACH CENTER 75 SOUTH OAK ST PLATTEVILLE, WI BID NUMBER: 1920-07

FROM: HSR Associates, Inc

100 Milwaukee Street

La Crosse, WI 54603

(608) 784-1830

To: Prospective Bidders

This addendum forms a part of the Contract Documents and modifies the original Bidding Documents

dated January 2020. Acknowledge receipt of this Addendum in the space provided on the bid form.

Failure to do so may subject the Bidder to disqualification.

This Addendum consists of [2] pages, Pre-bid attendance, Revised Bid Form, [1] specification sections,

and [4] 30 x 42 drawings.

CHANGES TO BIDDING REQUIREMENTS AND CONDITIONS OF THE CONTRACT:

1. Section 00 11 13 ADVERTISEMENT FOR BIDS

a. Page 1: Change Bid Opening location to Room 354 in Building 300.

2. Pre-bid attendance attached hereto.

3. Section 00 41 00 BID FORM

a. Revised bid Form attached hereto.

GENERAL REQUIREMENTS:

4. Section 01 10 00 SUMMARY

a. 1.09, A: Change commence date to “February 23, 2020”.

b. 1.09, B: Change completion date to “May 8, 2020”.

5. Section 01 22 00 UNIT PRICES

a. 1.07: Delete Item A. Shot blasting no longer applicable.

6. Section 01 23 00 ALTERNATES

a. Section attached hereto as part of Contract Documents.

CHANGES TO SPECIFICATIONS:

7. Section 03 01 00 MAINTENANCE OF CONCRETE

a. 2.02: Delete Item B. See directions under 09 05 61 this addendum.

b. 3.02, A: Add the following; “Grind entire existing concrete floor area.”

c. 3.03: Delete Paragraph C. No shot blasting. See grinding requirement above.

Page 2: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

19036 SWTC Platteville Outreach Center 00 90 00 -2

8. Section 09 05 61 COMMON WORK RESULT FOR FLOORING PREPARATION

a. 3.03 and 3.05: After floor is ground and cleaned under Section 03 01 00, install floor

topping, leveler and patching compound as specified under Article 2.01 in this section,

over entire floor.

b. Delete Article 3.04.

9. Section 10 22 39 FOLDING PANEL PARTITION

a. 1.06, C: Change “one” to “two”.

b. 2.02, B, 3: Steel sheet shall be minimum 18 ga.

c. 2.02, F, 1: Delete paragraph a.

d. 2.02, F, 1, b: Change “47” to “51”.

CHANGES TO DRAWINGS

10. Sheet A100 FIRST FLOOR REMODEL PLAN 30 x 42 attached hereto

a. Revisions clouded on Drawing.

11. Sheet A110 RCP, SECTIONS AND CASEWORK ELEVATIONS 30 x 42 attached hereto

a. Revisions clouded on Drawing.

12. Sheet A500 STEEL BEAM PLAN AND DETAILS 30 x 42 attached hereto

a. Revisions clouded on Drawing.

13. Sheet ID101 FINISH FLOOR PLAN

a. The upper landing of the west stair is identified to receive walk-off carpet.

b. Note 1 at upper landing indicates paint for the stair area walls.

14. Sheet E200 POWER PLAN 30 x 42 attached hereto

a. Revisions clouded on Drawing

END OF DOCUMENT 00 90 00

Page 3: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9
Page 4: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

Page Intentionally Left Blank

Page 5: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

19036 SWTC Platteville

Outreach Center 00 41 00-1

DOCUMENT 00 41 00

BID FORM (Revised) BIDDER:______________________________________________________________________ BID FOR SINGLE PRIME CONTRACT PROJECT: SOUTHWEST WISCONSIN TECHNICAL COLLEGE

PLATTEVILLE OUTREACH CENTER

75 SOUTH OAK ST

PLATTEVILLE, WI

BID NUMBER: 1920-07

TO: SOUTHWEST WISCONSIN TECHNICAL COLLEGE

1800 BRONSON BLVD

FENNIMORE, WI 53809

ATT: DAN IMHOFF – DIRECTOR OF FACILITIES BASE BID The undersigned, having examined the site where the Work is to be executed and become familiar with local conditions affecting the cost of the Work and carefully examined the Project Manual, the Project Drawings, all other Bidding Documents and Addenda thereto prepared by the AE, HSR Associates, Inc., hereby agrees to provide all labor, materials, equipment and services necessary for the complete and satisfactory execution of the ENTIRE WORK, in the time frame stipulated in these contract documents, for the Base Bid stipulated sum of: ______________________________________________________________________________ Dollars ($ .00) The Base Bid stipulated sum, stated above, includes work by the following major subcontractors intended for Work on this Project: ALTERNATE BIDS The undersigned further agrees to perform the alternative portions of the Work as described in the Project Manual, Section 01 23 00 Alternates, for the following additions to or deductions from the Base Bid sum stipulated above: Alternate No. 1 Wall Insulation Add Dollars ($ .00)

Page 6: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

Page Intentionally Left Blank

Page 7: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

19036 SWTC Platteville

Outreach Center 00 41 00-2

UNIT PRICES The undersigned agrees to add or deduct portions of the Work from the Contract as described in the Project Manual, Section 01 22 00 Unit Prices, for the following Unit Price amounts: A. Unit Price UP-1: NOT USED B. Unit Price UP-2: (Fluid Applied Flooring) Per square foot Dollars ($ .00)

BIDDER'S CHOICE SUBSTITUTIONS The following Bidder's Choice Substitution is proposed for your consideration subject to the requirements set forth in Document 00 22 13 Supplementary Instructions to Bidders, Subparagraph 3.3.4: Substitution No. S1: For substituting______________________________________________________________ ____________________________________________________________________________ Type, Brand, Catalog No._____________________________________________________ Manufacturer________________________________________________________________ Deduct from BASE BID Dollars ($ .00) In submitting this Bid, the undersigned agrees to: 1. Hold this Bid open for 60 days. 2. Accept the provisions of Instructions to Bidders regarding disposition of Bid Security. 3. Enter into and execute an Agreement, if awarded on the basis of this Bid, and to furnish

Performance and Labor and Material Payment Bonds according to the Supplementary Conditions.

4. Accomplish work according to the Contract Documents. 5. Complete the work by the time stated in Section 01 10 00 Summary of the Work. Receipt of the following Addenda and inclusion of their provisions in this Bid is hereby acknowledged: Addendum No. Dated____________ Addendum No. Dated____________ Addendum No. Dated____________ Addendum No. Dated____________ Attached hereto are the required:

a. ( ) Bid Security

Page 8: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

Page Intentionally Left Blank

Page 9: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

19036 SWTC Platteville

Outreach Center 00 41 00-3

FIRM NAME: ________________________________________________

(Affix seal if By: _______________________________________________________ Corporation)

Title: _______________________________________________________

By: _________________________________________________________

Title: _______________________________________________________

Date: _______________________________________________________

Official Address: ______________________________________________

____________________________________________________________

Telephone: __________________________________________________

END OF DOCUMENT 00 41 00

Page 10: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

Page Intentionally Left Blank

Page 11: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

19036 SWTC Platteville Outreach Center

01 23 00 - 1 ALTERNATES

SECTION 01 23 00

ALTERNATES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Description of Alternates.

1.02 RELATED REQUIREMENTS

A. Document 00 21 13 - Instructions to Bidders: Instructions for preparation of pricing for Alternates.

1.03 DESCRIPTION

A. Conditions of the Contract and pertinent portions of Sections in Division One of this Project Manual, apply to the Work of this Section as fully as though repeated herein.

B. This Section describes the alternates to the project. Refer to the Product/Execution Articles of the Contract Documents for information pertaining to the work of each alternate.

C. Each proposal under an alternate shall include all incidental work and all adjustments necessary to accommodate the changes. All work shall meet the requirements of the Contract Documents.

D. Each alternate proposal shall be submitted as an individual cost for the particular alternate and shall be proposed under the premise that no other alternates have been accepted. Should the work of an alternate called for by the Bid Form not affect the cost of the work, "No Change" shall be stated.

E. Owner may, at his option, vary the scope of the work by authorizing alternates which will add to the work, deduct from the work or substitute materials, equipment or methods.

F. Immediately following Award of Contract, awarded Contractor shall prepare and distribute to each party involved, notification of the status of each alternate. Indicate whether alternates have been accepted, rejected, or deferred for consideration at a later date. Include a complete description of negotiated modifications to alternates, if any.

1.04 ACCEPTANCE OF ALTERNATES

A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option. Accepted Alternates will be identified in the Owner-Contractor Agreement.

1.05 SCHEDULE OF ALTERNATES

A. Alternate No. 1: Wall Insulation

1. The following work shall be priced under Alternate No. 1: State the amount to be added to the base bid to add rigid insulation to exterior wall as shown on Sheet A100.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

Page 12: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

Page Intentionally Left Blank

Page 13: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

UP

RE

F.

GENERAL NOTES:

A

A

SYMBOL INDICATES WALL TYPE - SEESHEET A600 FOR WALL TYPE DETAILS.

SYMBOL INDICATES WINDOW TYPE. SEE SHEET A600 FORWINDOW FRAME ELEVATIONS.

SEE ID SHEETS FOR FLOOR AND WALL FINISH LAYOUTS.

VERIFY EXACT SIZE AND LOCATION OF ALL MECHANICAL / PLUMB AND ELEC.OPENINGS - GENERAL CONTRACTOR SHALL BE RESPONSIBLEFOR FINISH AT ALL VISIBLE AREAS. ALL OPENING SHALL BE SEALED AFTER UTILITY INSTALLATION.

LOOSE FURNISHINGS EXCEPT AS NOTED SHALL BE PROVIDED AND INSTALLED BY THE OWNER.

A

B

C

D

E

F

EXTEND ALL WALLS TO DECK UNLESS NOTED OTHERWISE. SEE A500FOR TOP OF WALL DETAILS.

SYMBOL INDICATES CONSTRUCTION NOTE THIS SHEET

REFER TO CODE PLAN FOR FIRE RATING LOCATIONS AND ACCESSIBILITY ROUTES.

LEGEND:

FIRE EXTINGUISHER CABINET - REINSTALL SALVAGEDFEC

INSTALL EDGE STEAL BEADS WHERE DRYWALL ABUTTS DOOR/ WDW FRAMES OR DISSIMILAR MATERIAL.

1 HOUR WALL CONSTRUCTION

GYP. BD CONTROL JOINTGCJ

6'-6

"5"

6'-6

"

7

A110

7'-6

"5"

12'-9

"

FIELD VERIFY

11'-3"

5" 6'-10"

5"

FIELD VERIFY

11'-3"

4'-7

"5"

33'-7

"5"

7'-0

"

7'-6" 5" 6'-8" 5" 6'-8" 5" 4'-8" 5" 12'-3"

8'-0

"5"

32'-3

"

18'-5

"5"

13'-0

"5"

3'-1 1/2" 5" 10'-3"4'-8 1/2"16'-5"

22'-4" 17'-1" 5" 18'-10"

FIELD VERIFY

58'-8"

FIE

L D V

ER

I FY

20'

-8"

FIE

L D V

ER

I FY

46'

-0"

VESTIBULE

100

WAITING

101

OFFICE

102

TOILET

104

TOILET

105

DATA

109TEST

110

TEST

111

STORAGE

112

COPY

113

MECH./ STORAGE

114

CLASSROOM

108

CLASSROOM

107

HALLWAY

106

KITCHENETTE

103

A110 4

13'

-0"

5"1

'-7"

2'-4

"

113

107A

100B

100A

112

114

111

110

109

107B

108B

108A

102

1'-10"

5'-4

"9"

6'-4

"

D7

D7

D7

D7

D4D1

D4

D4

D1

D4

D7

D7D7

D7

D7

D7

D7

D7

D7

D1

D1

D1

1'-7

"8

'-11

1/2

"

1'-5 1/2"

7'-7" 14'-2" 4'-8" 5"

11'

-11

1/2

"3

'-2"

11'

-11

1/2

"2

'-5 1

/2"

17'-8 1/4" 2'-4"

1'-11 3/4"

5" 15'-0"

D4

D4

D4D4

D6

D1

2

A110

EXISTING SPACE

EXISTING SPACE

3'-5

"

5"

4'-7

"

TPH

SNDPTD

M1M2 LSD

CH (2)

CH (2)

PTDM2 M1LSD

SND

TPH

3

A110

1

1

3

2

2

2

18'-7"

29'

-11"

4'-3

"2

'-10"

135.00°

135.00°

1'-0" 4'-4" 11'-9"

D7

D7

D1

105

104

D4

D4

4

FEC

5

5

106'-0"

A110

5

8 1

/2"

9'-9 1/2"

D1

D1

D1 6 6

6

7

7

7 7 88

8

8

9

10

10

11

11

12

12

12

10

GCJ

EXISTING EXTERIOR RAILING

D7

D7

13

13

13

13

ALTERNATE WALL TYPEALTERNATE WALL TYPE

ALT

ER

NA

TE

WA

LL T

YP

E

ALT

ER

NA

TE

WA

LL T

YP

E

A5005

EXTERIOR PATIO

ID101

2

3

14 A01

10

ACCESSORY SCHEDULE

ABBREVIATION ITEM STD. MOUNTING HEIGHT

CH COAT HOOK (DOUBLE) BOT. @ 4'-6" A.F.F.

PAPER TOWEL DISPENSER PTD BOT. @ 3'-6" A.F.F.

ACCESSORY SCHEDULE GENERAL NOTES:

1. CONFIRM EXACT LOCATION OF EACH ACCESSORY WITH OWNER PRIOR TO INSTALLATION.2. SURFACE MOUNTED ACCESSORIES SHALL BE INSTALLED OVER WALL TILE.3. PROVIDE INSULATION WRAP AT EXPOSED PIPING AT SINKS WHERE NO OTHER PROTECTION IS PROVIDED4. SEE ELEVATIONS - A110 FOR ADDITIONAL ACCESSORIES

LSD LIQUID SOAP DISP. BOT. @ 3'-6" A.F.F.

OW

NE

R

FU

RN

ISH

ED

CO

NT

RA

C.

FU

RN

ISH

ED

OW

NE

R

INS

TA

LLE

DC

ON

TR

AC

. IN

ST

ALL

ED

X

X X

DOUBLE TOILET PAPER HOLDER - CENTER @ 36" FROM CORNERTPH CENTER @ 2'-0" A.F.F

SANITARY NAPKIN DISPOSALSND TOP @ 2'-6" A.F.F.

MIRROR 18"W x 60"H W/ METAL EDGESM2 TOP @ 6'-0" A.F.F.

MIRROR 18"W x 36"H W/ METAL EDGES & SHELFM1 BOT. @ 3'-4" A.F.F. X X

X X

X X

X

X X

X X

7

A110D6

D6

200REMOVE EXISTING HANDRAILS - STAIRS TO REMAIN IN PLACE

STORAGE200

FIE

LD V

ER

I FY

3'-8

"

4'-2"

EXISTING EXTERIOR WALL

2" RIGID INSULATION

3 5/8" MTL. STUD @ 24" O.C.

5/8" GYP. BD

5/8" 3 5/8" 2"

6 1/4"

She

et T

itle:

Pro

ject

Loc

atio

n:

Pro

ject

Titl

e:

SWTC Bid Number:

Project Date:

Drawn By:

Last Update:

HSR ASSOCIATES INC.100 MILWAUKEE STREETLA CROSSE, WISCONSIN

PHONE: 608.784.1830FAX: 608.782.5844

WEB SITE: www.hsrassociates.com

Graphic Scale:

VARIES

HSR Project Number:

1/30/2020 12:05:31 PM

A100

FIR

ST

FL

OO

R R

EM

OD

EL

PL

AN

M.MALAND

PL

AT

TE

VIL

LE

OU

TR

EA

CH

CN

TR

.

75 S

OU

TH

OA

K S

TR

EE

TP

LA

TT

EV

ILL

E, W

I 538

18

1920-07

JANUARY 2020

SO

UT

HW

ES

T W

ISC

ON

SIN

TE

CH

NIC

AL

CO

LL

EG

E

19036

KEY NOTES PLAN1 8'-0"W x 4'-0"H MARKERBOARD BOTTOM @ 3'-0" A.F.F.2 TV MONITOR - NIC3 SINGLE PANEL FOLDING PARTITION WALL - SEE SECTION 3A1104 REMOVE EXISTING FIRE EXTINGUISHER CABINET AND INSTALL IN NEW

LOCATION

5 REMOVE EXISTING METAL HANDRAIL AND INSTALL NEW STAINLESSSTEEL HANDRAIL - SEE SECTION 7A110

6 HSS 3x3x1/4" STEEL COLUMN7 SOLID SURFACE WINDOW STOOLS - SET IN SEALANT8 WINDOW SHADES9 SHOT BLAST PAINT FROM STAIR TREADS/ RISERS. PATCH BROKEN

AREAS OF CONCRETE W/ CEMENTIOUS PATCH PER 03 01 00

10 REFER TO 03 01 00 FOR SEQUENCE OF CLEANING/ GRINDING/ RINSINGFLOOR. GRIND ENTIRE AREA IDENTIFIED ON PLAN W/ KEYNOTE.CLEANING APPLIES TO ENTIRE FLOOR AREA. REFER TO 09 05 61 FORFLOOR LEVELER.

11 REMOVE FLOOR DRAIN APPROX. 16" x 16" AND PATCH CONCRETE. REFERTO PLUMBING FOR CLEAN OUT TO REPLACE DRAIN

12 CLEAN SEALANT & DEBRIS FROM FLOOR JOINT. AFTER FLOORPREPARATION & INSTALLATION OF FLOOR LEVELER INSTALL BACKERROD & SEALANT IN JOINT

13 GYP. BD SOFFIT OVERHEAD - SEE RCP ON A11014 REMOVE EXISTING CLEAN OUT AND INSTALL NEW ADJUSTABLE CLEAN

OUT WITH ROUND TENZ ALLOY OR NICKEL BRONZE METAL RING ANDSCORIATED COVER AT TOP OF FINISH FLOOR. FIELD VERIFY IF WATERLINE IS ABONDOND AND IF SO FILL HOLE WITH CONCRETE FLUSH WITHADJ. FLOOR

1/4" = 1'-0"1 FIRST FLOOR REMODEL PLAN

1/4" = 1'-0"2 STAIR PLAN

1 1/2" = 1'-0"3 ALTERNATE WALL TYPE

No. Description DateA01 ADDENDUM #1 1/30/2020

A01

A01

A01

Page 14: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

D

LEGEND:

GENERAL NOTES:

ALL INTERIOR PARTITIONS TO EXTEND TO BOTTOM OF DECK UNLESS OTHERWISE NOTED. CLOSE DECK FLUTES AT TOP OF WALL WITH NEOPRENE FILLER OR FIRESTOPPING SYSTEM. IN GYP/STUD PARTITIONS SEE SPECIFICATION FOR LEVEL OF FINISH ABOVE FINISHED CEILING.

REFER TO INTERIOR DESIGN SHEETS FOR OTHER FINISHES

SEE MECHANICAL FOR CEILING GRILLE INFORMATION

SEE ELECTRICAL FOR LIGHTING TYPES

LIGHT FIXTURE - SEE ELECTRICAL

SUPPLY - SEE MECHANICAL

RETURN - SEE MECHANICAL

SPEAKER - SEE ELECTRICAL

LIGHT FIXTURE - SEE ELECTRICAL

WHERE NO CEILING/EXPOSED STRUCTURE UNLESS NOTED OTHERWISE, CONTRACTOR SHALL KEEP ALL MEP ABOVE OR EVEN WITH THE LEVEL OF THE LIGHTS. MEP SHALL RUN IN NEAT ORDERLY APPEARANCE GENERALLY PARALLEL OR PERPENDICULAR TO FINISHED STRUCTURE. WALLS IN THESE ROOMS TO RUN TO DECK AND ALL STRUCTURE / MEP COMPONENTS ARE TO BE PAINTED.

LIGHT FIXTURE - SEE ELECTRICAL

LIGHT FIXTURE - SEE ELECTRICAL

LIGHT FIXTURE - SEE ELECTRICAL

A

C

D

E

F

G

B

ALL REMAINING ANNULAR SPACE AROUND ITEMS PENETRATING WALLS SHALL BE NEATLY SEALED. PENETRATIONS OF FIRE RATED WALLS SHALL BE FIRESTOPPED WITH THE SAME AS THE WALL.

EXHAUST - SEE MECHANICAL

CEILING TYPES INSTALLED AS NOTED ON PLANS. SEE SPECIFICATIONS FOR ADDITIONAL SYSTEM INFORMATION. ACT-2=TEGULAR EDGE, ACT-3=VINYL FACED GYP

7

A110

COPY

113

MECH./ STORAGE

114

TOILET

105

TOILET

104

OFFICE

102

HALLWAY

106

CLASSROOM

107

CLASSROOM

108

TEST

111

TEST

110

WAITING

101

VESTIBULE

100

KITCHENETTE

103

DATA

109

STORAGE

112

EXISTING SPACE

EXISTING SPACE

2

A110

1'-8

"5"

1'-8" 5"

7'-1

"8"

7'-1

"

3'-6 1/2"

9"

10'-8 1/2"

R 25'-5"

R 25'-5"

R 24'

-8"

ACT-29'-6"

ACT-29'-6"

ACT-29'-0"

ACT-29'-0"

ACT-39'-0"

ACT-39'-0"

ACT-29'-0"

ACT-210'-8"

ACT-210'-8"

GYP. BD10'-0"

GYP. BD9'-4"

GYP. BD7'-0"

GYP. BD10'-4"

GYP. BD9'-4"

GYP. BD10'-4" GYP. BD

9'-4"

GYP. BD9'-4"

3

A110

ACT-210'-8"

1

2

2

22

1

1

3

4

8"

ACT-29'-0"

15'-0"

5 1/2"

1

5 1/2"

GYP. BD9'-0"

1'-6

"

3'-6"

3'-10 3/4"

ID101

2

3

A01

FIRST FLOOR100'-0"

1'-8" 4 7/8"

1'-0

"

CLASSROOM

108

SOLID SURFACE WINDOW STOOL

D4

FIRST FLOOR100'-0"

3'-0" 2'-6" 2'-6" 1'-9" 2"

3'-1" 9'-11"

2'-6

"1'

-8"

2'-1

0"

7'-0

"

1'-6

"

3'-0" 2'-6" 2'-6" 1'-9" 2"

9'-11"

FRIDG.(NIC)

PTD LSD

SOFFIT - PAINT PNT-2

FILLERUPPER CABINETS W/ ADJ. SHELF

SINK - SEE PLBG.25"D COUNTERTOP W/ BACK SPLASH

FILLER24"D BASE CABINET W/ ADJ. SHELVES

VWB

REMOVABLE PROTECTION PANEL

EXTEND DOOR TO COVER UNDER CABINET LIGHT

FIRST FLOOR100'-0"

SECOND FLOOR113'-7"

EXISTING CONCRETE BEAM

EXISTING CONCRETE FLOOR SLAB

OPERABLE SINGLE PANEL PARTITION WALL

1'-3

"9'

-0"

CLASSROOM

108

CLASSROOM

107

10'-3

"

12'-2

"

WF6 D5 D5

A5003

UNDER CABINETLIGHT - SEE ELEC

PULL- SEE SPEC

CABINETDOOR PULL

2'-0"

ADJ. SHELF

VWB

25" D PLAM COUNTER TOP W/ BACKSPLASH

2'-1

0"1'

-8"

FIRST FLOOR100'-0"

2"3'-0"3'-0"

2'-6

"1'

-8"

2'-1

0"

7'-0

"

2"3'-0"3'-0"

6'-2"

6'-2"

15"D UPPER CABINETS W/ ADJ. SHELVES

FILLER

19"D COUNTERTOP W/ BACKSPLASH

18"D BASE CABINET W/ ADJ. SHELVES

FILLER

VWB

FIRST FLOOR100'-0"

SECOND FLOOR113'-7"

7'-8

" +

/-

1'-0"

2'-1

0"

EXISTING CONCRETE STEPS

NEW GYP. BD WALL INSTALLED OVER EXISTING STAIR TREADS - PAINT

CLEAN & PAINT EXISTING CONRETE WALL

STAINLESS STEEL HANDRAIL

7 1/4"

STAINLESS STEEL POST TO SUPPORT HANDRAIL PAST WALL

D4

A01

A01

ALIGN

A01

She

et T

itle:

Pro

ject

Loc

atio

n:

Pro

ject

Titl

e:

SWTC Bid Number:

Project Date:

Drawn By:

Last Update:

HSR ASSOCIATES INC.100 MILWAUKEE STREETLA CROSSE, WISCONSIN

PHONE: 608.784.1830FAX: 608.782.5844

WEB SITE: www.hsrassociates.com

Graphic Scale:

VARIES

HSR Project Number:

1/30/2020 12:05:40 PM

A110

RC

P, S

EC

TIO

N A

ND

CA

SE

WO

RK

EL

EV

.

M.MALAND

PL

AT

TE

VIL

LE

OU

TR

EA

CH

CN

TR

.

75 S

OU

TH

OA

K S

TR

EE

TP

LA

TT

EV

ILL

E, W

I 538

18

1920-07

JANUARY 2020

SO

UT

HW

ES

T W

ISC

ON

SIN

TE

CH

NIC

AL

CO

LL

EG

E

19036

KEY NOTES RCP1 GYP. BD SOFFIT - PAINT2 ACT CLOUDS W/ 6"H PROFILE EDGE3 PAIRED PANEL FOLDING PARTITION4 EXPOSED STRUCTURE - PAINT STRUCTURE AND MEP

1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN1/2" = 1'-0"2 WALL SECTION

1/4" = 1'-0"4 CW RM 103

1/2" = 1'-0"3 WALL SECTION

1 1/2" = 1'-0"6 CASEWORK SECTION

1/4" = 1'-0"5 CW RM 113

1/4" = 1'-0"7 STAIR SECTION

No. Description DateA01 ADDENDUM #1 1/30/2020

Page 15: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

5 1/2"

3 1/2"

WF6

WT6

RODS PER PANEL DOOR MANUFACTURER

D5

D5

3"

(VIF)

1'-4" 3"

WT 6x20x8 1/2" + PL 1/2"x6"x8" -BOTH SIDES

(2) 1/2" DIA. BOLTS

(2) 1/2" DIA. BOLTS

(2) 1/2" DIA. KWIK BOLT + TZ (2 1/2" EMBED)

WF6

LENGTHWISE SLOTTED HOLES IN WF

EXISTING CONCRETE BEAMS

EXISTING CONCRETE SLAB

1 1

/2"

6"

A01

3

A110 CLASSROOM

107

CLASSROOM

108

W6x

20

W6x

20

HSS 3x3x1/4

HSS 3x3x1/4

EXISTING CONCRETE BEAMS

EXISTING CONCRETE BEAMS

DESIGNATES HANGERS

4A500

VESTIBULE

100

TEST

111

TEST

110

DATA

109

33'-3

"

2'-9"

2A500

A01

FIRST FLOOR100'-0"

3/8" STIFFNER

3/8" CAP PLATE

(2) 1/2" DIA. HS BOLTS

W6

HSS 3x3x1/4

1/2"x9x9 PLATE W/ (4) 1/2" DIA KWIK BOLTS - 2 1/2" EMBED

GYP. BD ADHERED TO CONCRETE COLUMN

ALUM STORE FRONT SYSTEM -DOOR AS SCHEDULED - SEAL PERIMETER BOTH SIDES

SHIM

4 1/2"

EXISTING CONCRETE BEAM

GYP. BD SOFFIT ON 2 1/2" STUD FRAMING

ALUM STORE FRONT SYSTEM - SEAL PERIMETER BOTH SIDES

D4

She

et T

itle:

Pro

ject

Loc

atio

n:

Pro

ject

Titl

e:

SWTC Bid Number:

Project Date:

Drawn By:

Last Update:

HSR ASSOCIATES INC.100 MILWAUKEE STREETLA CROSSE, WISCONSIN

PHONE: 608.784.1830FAX: 608.782.5844

WEB SITE: www.hsrassociates.com

Graphic Scale:

VARIES

HSR Project Number:

1/30/2020 12:06:38 PM

A500

ST

EE

L B

EA

M P

LA

N &

DE

TA

ILS

M.MALAND

PL

AT

TE

VIL

LE

OU

TR

EA

CH

CN

TR

.

75 S

OU

TH

OA

K S

TR

EE

TP

LA

TT

EV

ILL

E, W

I 538

18

1920-07

JANUARY 2020

SO

UT

HW

ES

T W

ISC

ON

SIN

TE

CH

NIC

AL

CO

LL

EG

E

19036

1 1/2" = 1'-0"3 BEAM DETAIL1 1/2" = 1'-0"2 BEAM DETAIL

1/4" = 1'-0"1 FIRST FLOOR STRUCTURAL PLAN

3/4" = 1'-0"4 COLUMN SECTION

1 1/2" = 1'-0"5 JAMB DETAIL

1 1/2" = 1'-0"6 HEAD DETAIL

No. Description DateA01 ADDENDUM #1 1/30/2020

Page 16: DOCUMENT 00 90 00 ADDENDUM ADDENDUM NO. …...topping, leveler and patching compound as specified under Article 2.01 in this section, over entire floor. b. Delete Article 3.04. 9

RE

F.

J

J

J

J

J

J

J

WAP

WAP

WAP

WAP

WAPT T

T

T

J J

S

S

S

S

S

SS

S S

J

GENERAL NOTES :PROVIDE GROUND CONDUCTOR IN ALL RACEWAYS.

THE WORD "PROVIDE" MEANS TO FURNISH AND INSTALL

PROVIDE SEPARATE NEUTRAL CONDUCTORS FOR EACH BRANCH CIRCUIT.

A

B

C

SEE MOTOR, EQUIPMENT, HEAT PUMP SCHEDULES SHEET E600 FOR ALL PANEL DESIGNATIONS, AND CIRCUIT NUMBERS, AND BREAKER SIZES.

D

E CIRCUIT NUMBERS INDICATED ON DRAWINGS ARE FOR REFERENCE. ELECTRICAL CONTRACTOR TO ARRANGE BRANCH CIRCUITS AS REQUIRED FOR WIRING AND LOAD BALANCING. INDICATE ACTUAL PANELBOARD CIRCUIT NUMBERS ON AS-BUILT DRAWINGS.SEE ARCHITECTURAL SHEETS FOR RELEVANT INTERIOR ELEVATIONS, SECTIONS AND MISCELLANEOUS BUILDING INFORMATION REQUIRED TO COMPLETE THE ELECTRICAL INSTALLATION.

COORDINATE ALL HVAC WITH MECHANICAL CONTRACTOR REFERENCE HVAC DRAWINGS.

ALL 20 AMP, 125 AND 250 VOLT NONLOCKING TYPE RECEPTACLE SHALL BE LISTED TAMPER-RESISTANT RECEPTACLE.

F

G

H

ALL DATA OUTLETS CAT6 RAN TO DATA RACK IN DATA RM. UNLESS OTHERWISE NOTED WITH "PP" .

I

ALL SECURITY TO BE CONTRACTED/ CORRIDATED BY OWNER.

J

ALL DATA DROPS AT WALLS - ORTRONICS CLARITY 6 SERIES II TWO PORT WITH OR40300011 FACE PLATES. UNLESS OTHERWISE NOTED.

K

POWER KEY NOTES :1. FIELD VERIFY LOCATION AND PLACEMENT WITH OWNER.2. STANDARD OWNER SUPPLIED AND INSTALLED BATTERY

OPERATED.3. UPS FOR SERVE RACK OWNER SUPPLIED/ MODEL

NUMBER. CORRIDIATE WITH OWNER.4. AUDIO SYSTEM SUPPIED BY OWNER. INSTALLED BY

CONTRACTOR.5. SIGN POWER SWITCH AND DATA PORT.6. PROVIDE LOCAL 40AMP FUSED DISCONNECT AND GFI

RECEPT.7. SINGLE PORT CAT6 DATA FOR WAP LOCATIONS.8. OWNER PROVIDE WALL MOUNT CABNET/RACK FOR

NETWORK TERMINATION.

#

18"

FLOOR

OUTLETS. (OR DATA ONLY

TELEVISION OUTLET

CEILING

COMBINATION DATA/ VOICE

PROVIDE 1" CONDUIT CONCEALED IN WALL.

IF NOTED BY SYMBOL).

CORRIDOR WALL

BUSHING

PROVIDE CONDUIT RACEWAY FROM EACH ROOM WITH DATA/TELEPHONE/TELEVISIONOUTLET TO CORRIDOR.

84"

BUSHING

HANDDRYERS

VENT FANS1-6

VENT FANS1-6

HANDDRYERS

GFIS1-6

GFIS1-6

GFIS1-9

GFIS1-9

GFIS1-5

GFIS1-7

GFIS1-8

S1-9 S1-9

S1-9

AUDIOSYSTEM

S1-18

S1-18

S1-18

S1-8

S1-8

S1-8

S1-8

S1-11

S1-11S1-11

S1-10 S1-10

S1-10S1-10

S1-13

S1-13S1-13

S1-13

S1-13

S1-13

S1-10

S1-15

S1-12

GFIS1-12

GFIS1-12

S1-12

S1-16

S1-16

S1-11

S1-11

S1

GFIS1-12

CLASSROOM

108

CLASSROOM

107

WAITING

101

VESTIBULE

100

OFFICE

102KITCHENETTE

103

HALLWAY

106

TOILET

104

TOILET

105

HALLWAY

106

TEST

110

TEST

111

DATA

109

HALLWAY

106

STORAGE

112

COPY

113

MECH./ STORAGE

114

96"S1-14

60"S1-14

F2S1-3

F1S1-1

SIGNS1-17

S1-12

60"S1-11

60"

60"

96"

96"96"S1-10

UPSS1-19

2

2

2

2

2

3

4

1

5

RTU-1S1-20,22

RTU-2S1-23,25

EX FANS1-27

6 6

2

2

2 2

2 2

2 2

2

2

2

7

7

7

7

7

8

Sheet T

itle

:

Pro

ject Location:

Pro

ject T

itle

:

SWTC Project Number:

Project Date:

Drawn By:

Last Update:

HSR ASSOCIATES INC.100 MILWAUKEE STREET

LA CROSSE, WISCONSIN

PHONE: 608.784.1830

FAX: 608.782.5844

WEB SITE:

www.hsrassociates.com

Graphic Scale:

VARIES

HSR Project Number:

1/30/2020 2:01:27 PM

E200

PO

WE

R P

LA

N

C. CRANDALL

PL

AT

TE

VIL

LE

OU

TR

EA

CH

CE

NT

ER

75

SO

UT

H O

AK

ST

RE

ET

PL

AT

TE

VIL

LE

, W

I 5

381

8

1920-07

JANUARY 2020

SO

UT

HW

ES

T W

ISC

ON

SIN

TE

CH

NIC

AL

CO

LL

EG

E

19036

NORTH

NTS2RACEWAY DETAIL

1/4" = 1'-0"1FIRST FLOOR POWER PLAN

No. Description Date

AD01 Addendum 1 AD01

AD01

AD01

AD01