Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

Embed Size (px)

Citation preview

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    1/28

     

    Internship Report on

    Manpower Demand Simulator 

    at

    APL Logistics (India) Pvt. Ltd. 

    June-July 2012, Mumbai

    Submitted by-

    Shashi Ranjan

    IME-M.TechIIT KanpurJuly 26, 2012

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    2/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 2 -

     ACKNOWLEDGEMENT

    I express my sincerest gratitude to Mr. Bennet Nelson Panikacherry (GM- Global Solutions Centre),

    Mr. Deepak Tiwari (Head, Contract Logistics), Mr. Amit Gourwar (Sr. Manager, Global Logistics

    Centre), Ms. Poorvi Kumar (Logistics Engineer), Mr. Michael Pangaraj (Logistics Engineer) and Mr.

    Desh Deepak Shakya (Logistics Engineer) for their valuable guidance throughout the summer

    internship. The quality of this work owes a great deal to the help rendered by them and their critical

    reviews through various stages of this project.

    Special Thanks to Mr. V.V.N. Prasad(  Manager-Admin & Procurement) and Mr. Sagar Hulyalkar( Sr.

    Manager-HR) for their kind co-operation and making me comfortable during the entire duration of

    this project.

    Finally, Thanks to APL Logistics (India) Pvt. Ltd. for giving me such a nice opportunity to work with

    the solution team which helped me in learning the implementation of knowledge and skill on real

    world problems.

    http://www.linkedin.com/search?search=&title=MANAGER-ADMN%2E+%26+PROCUREMENT+-INDIA&sortCriteria=R&keepFacets=true&currentTitle=C&goback=%2Efps_PBCK_v+v+n+prasad_*1_*1_*1_*1_*1_*1_*2_*1_Y_*1_*1_*1_false_1_R_*1_*51_*1_*51_true_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2http://www.linkedin.com/search?search=&title=MANAGER-ADMN%2E+%26+PROCUREMENT+-INDIA&sortCriteria=R&keepFacets=true&currentTitle=C&goback=%2Efps_PBCK_v+v+n+prasad_*1_*1_*1_*1_*1_*1_*2_*1_Y_*1_*1_*1_false_1_R_*1_*51_*1_*51_true_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2_*2

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    3/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 3 -

    CONTENTS

    1. About APL Logistics 04

    2. Introduction 05

    3. Objective 06

    4. Approach 06

    5. News-Vendor Model 07

    6. Implementation of Manpower Demand Simulator using VBA Excel 09

    7.

    8.

    9.

    10.

    11.

    12.

    13.

    Master Data

    Productivity Sheet

    Manpower Details

    Inbound/Outbound

    Simulation Input

    Result Analysis

    VBA Code

    12

    14

    16

    17

    21

    22

    24

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    4/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 4 -

    About APL Logistics

    APL Logistics provides international, integrated supply chain services in 50 countries, including both

    origin and destination service such as freight consolidation, warehousing and distribution

    management. With 4,500 professionals in 260 locations globally, APL Logistics offers consulting

    solutions and uses IT for maximum supply chain visibility and control. APL Logistics is a unit of

    Singapore-based Neptune Orient Lines (NOL).

    Services

      International Logistics Services: Multi-modal transportation services include:

    o  Air-Sea Services

    o  Global Freight Solutions

    o  Origin/Destination Consolidation

    Purchase Order, Vendor and Invoice Management

    o  Shipment Planning/Key Performance Indicator (KPI) Reporting/Analytics

    o  Time Definite Services –Ocean Guaranteed LCL Service

      Land Transport Services: Optimizes customers' domestic transportation network through:

    o  Intermodal Services

    o  Highway Services

    o  Managed Transportation Services

    o  Information Technology Solutions

    o  Engineering Solutions

     

    Contract Logistics: Operates a global network of facilities that provide:

    o  Warehousing and Order Fulfilment

    o  Inbound Logistics

    o  Value-added Services

    o  Manufacturing Support

    o  Vendor Managed Inventory

    o  Distribution Management

      Automotive Logistics: Supports lean manufacturing and distribution activities via:

    o  Inbound Parts Logistics

    o  Finished Vehicle Logistics

    Service Parts Distribution

    o  North American Free Trade Agreement

    o  Intermodal Services

    o  Emerging Markets Logistics

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    5/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 5 -

    Introduction

    Many times it is observed that the manpower working in warehouses are free and many times they

    are doing overtime, In both the cases company is not able to utilize the manpower resource at it’s

    best. The APL Solution team wanted me to develop a tool in excel to calculate the optimum level of

    manpower required to finish all the work within a permissible time while minimizing the loss caused

    due to overtime and unused monthly salary.

    In warehouse the time required to finish any activity depends upon the volume of reference and the

    ability of manpower. The volume of reference varies time to time and activity to activity. I

    segmented the working hours in one hour slots and took the assumption that the activities are

    reiterating every hour and finished within that one hour slot. As the volume of reference changes

    every hour, the manpower required to meet our assumption will be different as well.

    The arrival of volume of reference follows poissons distribution which is just as the arrival of bus at a

    bus stop. So, I calculate the average volume of references every hour and then generating the data

    with the help of simulation many times to consider the randomness and minimize the effect caused

    due to the random nature.

    After that I need the information about the ability of manpower which can be gathered with the

    previous observation. Having generated volume of reference and gathered the ability of manpower

    it’s easy to calculate the manpower required every hour to finish the activities. Now our problem is

    quite similar to News-Vendor model which is discussed later.

    This tool is designed in vba excel which can be run on any computer and is much user-friendly. I run

    the F&N data on this tool, it took 1hr 25min to calculate the various permanent manpower required

    for one year.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    6/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 6 -

    Objective

    This tool is designed to to calculate the optimum level of permanent employee required in

    warehouse to perform all the activities in providing the logistics facilities to the client at the

    minimum cost.

    Approach

    The 1st

     question raised in my mind – why do I need to calculate the optimum level.

    Well, let’s understand this with an example-

    I’ve hired 22 people to finish any work in a hour while I receive a work which can be finished by 20

    people only in a hour. That means I am incurring fixed cost on 2 employee who are unused. If I’ve

    hired 18 people my work would remain due next hour. After all I’ve to fulfill the client’s requirement,

    that work must be completed. So I need to pay overtime to get that work done. That overtime per

    manpower is always greater that the fixed cost incurred on a manpower. So I need to calculate the

    permanent manpower for a year for which the total fixed cost + overtime cost will be minimum for

    the year.

    In warehouse the time required to finish any activity depends upon the volume of reference and

    the ability of manpower. The volume of reference varies time to time and activity to activity. I

    segmented the working hours in one hour slots and took the assumption that the activities are

    reiterating every hour and finished within that one hour slot. As the volume of reference changesevery hour, the manpower required to meet our assumption will be different as well.

    Once I’ve calculated the manpower required every hour I need to calculate the optimum level for a

    year. I used New-Vendor model on this problem to meet my objective.

    To apply New-vendor model we must have the information to calculate the manpower required

    every hour. In the previous section I’ve mentioned that the required manpower depends upon the

    arrival of volume of reference per hour and the productivity of manpower to finish the activity.

    From the previous observation the APL team has seen that the volume of reference follows certain

    trend which varies monthly, weekly, daily and hourly. The team also expects 15% growth next year.

    With the help of trend and growth rate i generate arrival of demand/order every hour. Now I require

    a productivity sheet which will give me the productivity of manpower with different activities which

    would help me in calculating the manpower required per hour.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    7/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 7 -

    News-Vendor Model

    This model helps the vendor in deciding how many newspaper he should supply to the market in

    order to maximize his profit as the demand of market varies everyday.

    Let’s understand this with an example-

    The news-vendor collected the previous 100 days demand of market – 

    Procurement cost = 1.5

    Selling price = 3

    Scrap price =0.25

    Profit per newspaper =1.5

    Loss per newspaper = 1.25

    Expected loss(x) – expected loss if he supplies x newspaper

    Expected loss(20) = 1.5 *{P(21)*(21-20) + P(22)*(22-20) + P(23)*(23-20)} = 2.025

    Expected loss(21) = 1.25*P(20)*(21-20) + 1.5*{P(22)*(22-21) + P(23)*(23-21)} = 1.075

    Expected loss(22)= 1.25*{P(20)*(22-20) + P(21)*(22-12)} + 1.5*p(23)*(23-22) = 1.225

    Expected loss(23) = 1.25 * {P(20)*(23-20) + P(21) * (23-21) + P(22)*(23-22)} = 2.0625

    Demand of

    newspaper

    Frequency Probability

    20 newspaper 20 0.2

    21 newspaper 40 0.4

    22 newspaper 25 0.25

    23 newspaper 15 0.15

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    8/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 8 -

    IF I solved this problem using classical approach 21 newspaper supply would cost him the least loss.

    The same problem can be solved using News-Vendor model in few steps only. According to this

    model-

    Underage cost – The loss caused per unit if the demand exceeds supply

    Overage cost - the loss caused per unit if the supply exceeds demand

    Here, underage cost = 1.5, overage cost = 1.25

    Critical ratio = underage cost/(underage cost + overage cost) = 1.5/2.75 = 0.545

    a/c to this model – the vendor should supply the quantity whose cumulative probability is just

    greater than critical ratio .

    so, for 21, cumulative probability = 0.6

    and hence this is the quantity which would cost him least loss.

    Our problem is no more different than this new-vendor problem. If I replace newspaper by

    manpower required this would meet my objective.

    Here,

    Underage cost = overtime cost

    Overage cost = fixed cost unused

    Critical ratio = overtime / (overtime +fixed) cost

    suppose, overtime cost = 100

    fixed cost/hr = 60

    critical ratio = 100/160 = 0.625

    and from the newsvendor table , 21 manpower is the optimum level for this critical ratio.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    9/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 9 -

    Implementation of Manpower Demand Simulator using VBA Excel

    Before going in details of this project I want to mention the color codes used in the project which

    would help you in differentiating various data types.

    Input

    Drop down InputFormula

    Output

    Heading Bold

    Subheading Bold

    Minor heading Bold

    Page heading Bold

    Input/Output Button

    Macro Button

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    10/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 10 -

    This is the master column of Manpower

    Demand Simulator which contains 10 buttons

    comprised of 5 input buttons, 2

    commanding buttons and 3 output buttons.

     All these buttons guide the user to move to the

    corresponding tables. These buttons are

    arranged in a sequential manner in order torun this software properly.

    These are the steps listed below to operate it

    easily-

    Step 1 : Click the "Master Data Input" and fill

    the Master Data column which contains

    "Manpower Type", "Resources", "Activities",

    "UOM", "Activity type" and "Volume

    reference".

    Step 2 : Click "the Productivity Sheet Input"

    button which takes you to the Productivity

    Sheet table and fill the required fields.

    Step 3:  Click the Manpower Details Input

    button which takes you to the Manpower

    Details table where you require to fill the

    monthly salary , overtime cost and working

    hours of manpower type.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    11/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 11 -

    Step 4:  Click the Inbound/Outbound button

    which takes you to Inbound /Outbound sheet

    where you've to fill the available volume of

    reference, the expected growth, it's yearly,

    Monthly, weekly, daily and hourly distribution.

    Then there is a conversion table with the help

    of which you can generate the other volume of

    reference.

    Step 5: Click the "Simulation Input" button

    which takes you the table which asks the user

    to fill the no. of times you want to run the

    code for simulation, the day simulation start

    and the day it terminates.

    Step 6: Click the "Run" button but just wait my

     friend, before doing that click the "Reset"

    button to make sure that the previous output

    got evaporated.

    Step 7: Click the "Result " button to see the

    result which contains the recommended

    quantity of manpower type generated from the

    code. If you are more interested to know the

    Intermediate and News-Vendor output please

    click the corresponding buttons.

    These are the brief summary of steps one

    should follow in order to run this tool properly.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    12/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 12 -

    Step 1:

    Manpower Type

    Unskilled labor

    Data Entry Operator

    Resources

    HPT

    BOPT

    Stacker

    Reach truck

    ForkliftPick trolley

    Table 1: Manpower Type

     As the User follows the steps described in the

     previous page the 1st  table he encounters is

    “Manpower Type”. There are 20 Input fields whereuser can enter the types of manpower involved in the

    various activities of warehousing.

    So even if he enters more than 20 manpower types

    this will take the 1st  20 entries as the input and

     perform operation on them only.

    It’s not mandatory to fill all the 20 entries. So, enter

    only the types of manpower who matter to your

     purpose as it will help the software to process faster.

    For the sample data I’ve kept 4 manpower types.

    Table 2: Resources

    This table also accepts maximum 20entries as it’s input. So the user has to

    list down here the resources used by

    various manpower while performing

    the activities.

    For the sample data 6 resources has

    been used.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    13/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 13 -

    Activities

    Receive Inbound ASN

    Receive inbound docs

    Scan cartons at pallet level

    Unloading Pallets

    Visual Check of Cartons

    Visual Check of Pallet

    Stretch wrapping and palletizing of loose cartons

    from imports

    Putaway pallets to rack storage locations

    Putaway pallets to block storage locations

    UOM

    Truck

    Shipment

    Carton

    Piece

    Bag

    Crate

    Wooden box

    Table 3: Activities

    User requires to list down the various

    activities performed in warehouse as

    the input to this table.

    Maximum entries – 40

    For the sample data total 9 activities

    has been used.

    Table 4: UOM

    UOM- Unit of measurement

    User requires to list down the unit of

    measurements used for different

    activities in warehouse as the input to

    this table.

    Maximum entries – 20

    For the sample data total 7 UOM has

    been used.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    14/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 14 -

    Table 5

    So, the Master Data input contains total 5 tables for 5 different kinds of inputs. Once the user is

    finished with this he is supposed to follow step 2 which will take him to the “Productivity Sheet” 

    Step 2:- Productivity Sheet Input

    The 1st

     column of this table is “Activity” and cells of this column are drop-down input which prompts

    the user to select the activity from the activity table belonging to Master data.

    The 2nd

     column is Manpower whose cells are linked to the Manpower Type table of Master data with

    the drop down menu. So, the user can select the manpower involved in the activity listed in the

    corresponding cell of column1.

    The 3rd

     column is Team size and the cells of this column are direct user input.

    The 4th column is UOM whose cells are linked to UOM table of Master Data through drop down

    menu.

    The 5th

     column is Minutes/Unit and the cells of this column are direct user input. The user requires

    to fill the time consumes in performing the corresponding activity per UOM.

    The 6th

     column is Unit/Hr whose cell values are calculated from the formula 60/(min/unit) i.e the no.

    of units processed per Hr for the corresponding activity.

    volume reference

    Total inbound shipments

    Total inbound pallets

    Inbound cartons

    Outbound shipments

    Outbound pallets

    outbound cartons

    Table 5: Volume of reference

    User requires to enter the volume of

    reference for different activities in

    warehouse as the input to this table.

    Maximum entries – 20

    For the sample data total 7 UOM has

    been used.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    15/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 15 -

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    16/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 16 -

    The 7th column is Resource used while performing the corresponding activity of column 1. This is also

    a drop down input linked to Resource table of Master Data.

    The 8th

     column is Volume reference which is linked to Volume reference table of Master Data

    through drop down menu.

    Step 3:- Manpower Details Input

    Manpower Monthly Cost overtime cost/hr opening time closing time Total working day

    Unskilled labor 12000 100 4 12 25

    Data Entry Operator 15000 120 4 12 25

    The 1st

     column is Manpower and the cells of this column directly fetches the list of manpower

    entered by the user in “Manpower Type” table of Master Data. 

    The 2nd (Monthly cost), 3rd (Overtime Cost/hr), 4th (Opening Time),5th (closing time)& 6th (Total

    working day in a month) columns are user input . Opening &closing time gives the working hour

    information of manpower. This facility is given to deal with many cases when different manpower

    types have different working hours in warehouse.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    17/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 17 -

    Step 4: Inbound/Outbound Input

    This step consists of many sub-steps as many tables are there which must be filled in a proper

    sequence.

    The 1st

     input is-

    The 2nd

     cell colored sky blue is a drop-down input which is linked to the volume of reference table of

    Master data. This is the reference volume whose information is available to the user and with the

    help of this and the “conversion table” (discussed later), user can extract the information of other

    volume references.

    Reference yr Demand/Order Growth rate Year 1

    Total inbound

    shipments

    2010 20000 15.00% 2013 30417.5

    This is the 2nd

     table of Inbound/Outbound Input which takes 4 inputs-

    1. 

    Reference yr – User is supposed to enter the year of which volume reference selected as the

    1st

     input is available to him.

    2. 

    Deman/Order - This input field is supposed to get the quantity of selected VOR i.e the

    available information

    3. 

    Growth rate- This is the expected growth rate of VOR per year .

    4. 

    Year1- This is year of which demand/order is calculated for our calculation purpose.

    5. 

    5th

     Column is the quantity of selected VOR expected in year 1.This is not a user input- this is

    calculated with the compound interest formula-

    (Demand/order)year1 = (Demand/Order)reference yr *(1+growth rate/100)year1 – reference yr

     

    After feeding these inputs user has to fill the observed yearly, monthly, weekely, daily and

    hourly demand/order distribution.

    Tables for these distribution are described on the next page.

    Select VoRTotal inbound

    shipments

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    18/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 18 -

    Monthly demand

    distribution

    Week %age demand

    1 23.00%

    2 23.00%

    3 24.00%

    4&5 30.00%

    Yearly demand distribution

    Month %age demand

    Jan 9.67%

    Feb 8.03%

    Mar 7.87%

    Apr 8.06%

    May 8.30%

    June 8.52%

    July 9.00%Aug 9.00%

    Sep 8.17%

    Oct 7.80%

    Nov 7.60%

    Dec 7.98%

    Table: Yearly Demand distribution

    This table requires the user to fill the yearly

    demand/Order distribution observed in

    warehouse.

    9.67% means 9.67% of total VOR selected as the

    1st  input comes or delivers in January.

    This yearly distribution is taken from sample

    data.

    One can change this as per his distribution.

    Table : Monthly Demand distribution

    This table requires the user to fill the

    monthly demand/Order distribution

    observed in warehouse.

    The 1st  3 week is considered to be of 7

    days each while the 4&5 contains theremaining days of month.

    So, this is the demand distribution of

    monthly demands/orders.

    Eg- For the sample data 1st  week of any

    month observes the 23% of

    demand/orders of that month

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    19/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 19 -

    Weekly demand

    distribution

    Day %age demand

    Sunday 0.00%

    Monday 9.00%

    Tuesday 9.00%

    Wednesday 30.00%

    Thursday 31.00%

    Friday 15.00%

    Saturday 6.00%

    Daily demand/order distribution

    Hr %age demand

    0 4.50%

    1 4.00%

    2 3.50%

    3 3.00%

    4 3.00%

    5 3.50%

    6 3.60%

    7 4.00%

    8 4.00%

    9 4.20%

    10 5.00%

    11 5.00%

    12 5.00%

    13 5.00%

    Table : Monthly Demand distribution

    This table requires the user to fill the

    weekly demand/Order distribution

    observed in warehouse.

    So, the total input user has too enter is 7.

    Eg- For the sample data demand on

    Sunday is kept 0 as this is the holiday but

    it’s not mandatory to be 0 always.

    In most of the warehouses most of the

    demand/order are noticed on

    Wednesday and Thursday. For the

    sample data it’s 30% on Wednesday and

    31% on Thursday.

    Table: Daily Demand Distribution

    This table asks the user to feed the daily

    demand distribution observed in the

    warehouse.

    0 hr means demand observed between

    12 am to 1 am

    1hr means demand observed between

    1am to 2am

    So on….. 

    For the sample data warehouse operates

    round the clock.

    User can input 0% for the hrs warehouse

    is closed.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    20/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 20 -

    Available VoR Required VoR %age equiv Total dispatch NO. Of UoM1/UOM2Total no.of UOM2

    Total inbound shipments Total inbound pallets 100.00% 30417.5 0.066666667 456263

    Total inbound pallets Inbound cartons 100.00% 456263 0.166666667 2737578

    Total inbound shipments outbound cartons 100.00% 30417.5 0.066666667 456263

    82.90% 0 0

    90.00% 0 0

    0.00% 0 0

    0.00% 0 0

    0.00% 0 0

    0.00% 0 0

    0.00% 0 0

    This table helps the user in calculating the other volume of references from the available VOR.

    The 1st

     column of this table is a drop down input linked to the VOR table of Master data. The 1st

     cell

    always contains the VOR entered by the user in the 1st table of Inbound/Outbound.

    The 2nd

     column is also the drop down input linked to the VOR table of Master Data. The cells of this

    table contains the VOR which is required and calculated from the cells of 1st

     column.

    The 3rd

     column is “%age equivalence “ which asks the user to feed the %age of 1st column VOR

    equivalent to the required VOR .

    The 4th

     column coverts the %age equivalence into quantity using the formula

    “%age equiv * available VOR”. 

    The 4th

     column is “No. of UOM1/UOM2”-

    Each volume of reference are measured in some units.

    UOM1- Unit of Measurement of 1st

     column cell

    UOM2- Unit of Measurement of 2nd column cell

    UOM1/UOM2- average no. of UOM1 per UOM2

    5th

     column- Total no. of UOM2 = 3rd

     column cell/ 4th

     column cell

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    21/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 21 -

    Step 6: Simulation Input

    Step 7: Reset & Run

    After filling all the input tables User is supposed to click the Reset macro and then the Run macro to

    process the data.

    As the process finishes you will get such messege demonstrating the total run time in processing the

    data.It took 6 min 36 sec to process 1 month data for 5 times. Now the user can go to result table to see

    the result.

    How many times to run 5

    simulation starts at day 1

    simulation stops at day 31

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    22/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 22 -

    Result Analysis:

    The recommended quantity evolved from simulation is 15 for Unskilled labor and 4 for data entry

    operator.

    Let’s analyse the result : 

    The critical ratio for unskilled labor = 100/160 = 0.63

    Critical ratio for data entry operator = 120/195 = 0.62

    Now the user needs to refer the news-vendor output for further details-

    Manpower

    Monthly

    Cost

    overtime

    cost/hr

    opening

    time

    closing

    time

    Total

    working

    day

    Fixed

    cost/hr

    critical

    ratio

    Recommended

    quantity

    Unskilled labor 12000 100 4 12 25 60 0.63 15

    Data Entry

    Operator 15000 120 4 12 25 75 0.62 4

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    23/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 23 -

    Unskilled labor Data Entry Operator 0

    Quantity Frequency

    Cumulative

    distribution Frequency

    Cumulative

    distribution Frequency

    Cumulative

    distribution

    0 0 0 54 0.0500

    1 0 143 0.1824

    2 2 0.001851852 332 0.4898

    3 17 0.017592593 107 0.5889

    4 44 0.058333333 138 0.7167

    5 130 0.178703704 73

    6 108 0.278703704 107

    7 114 0.384259259 40

    8 56 0.436111111 52

    9 62 0.493518519 11

    10 50 0.539814815 14

    11 25 0.562962963 3

    12 21 0.582407407 6

    13 21 0.601851852

    14 22 0.622222222

    15 13 0.634259259

    16 48

    17 67

    18 81

    The 1st

     column of table contains the quantity of manpower.

    The 2nd

     column is the frequency of quantity of Unskilled labor required per hour .

    The 3rd

     column gives the cumulative distribution of the Unskilled labor required per hour.

    As the cumulative distribution of unskilled labor exceeded the critical ratio i.e 0.63 it stopped

    calculating this for next quantities and the corresponding quantity i.e 15 is the optimum level which

    would cost the least loss of company.

    The same concept is applicable for data entry operator, and hence the answer is 4.

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    24/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 24 -

    Module 1: Labor calculator

    Sub laborcalc()

    On Error Resume Next

    Application.ScreenUpdating = False

    Dim manpower As String

    Dim resource As String

    Dim volume_ref As String

    Dim total As Double

    Dim ratio As Double

    Dim hr As Integer

    Dim m As Integer

    Dim start_time, end_time

    Dim start_day, end_dayDim total_manpower

    Dim total_act

    Dim total_vol

    start_time = Now()

    start_day = Cells(154, 7)

    end_day = Cells(155, 7)

    total_manpower = Cells(133, 7)

    total_act = Cells(136, 7)

    total_vol = Cells(135, 7)

    For simulate = 1 To Cells(153, 7)

    ActiveSheet.EnableCalculation = False

    ActiveSheet.EnableCalculation = True

    For h = 7 + 24 * (start_day - 1) To 6 + 24 * end_day

    hr = Cells(h, 66).Value

    For i = 90 To (89 + total_manpower)

    manpower = Cells(6, i)

    total = 0

    For j = 11 To (10 + total_act)

    If manpower = Sheets("Master Data").Cells(j, 7).Value Then

    If Cells(i - 11, 11).Value < Cells(i - 11, 12).Value Then

    If WorksheetFunction.And(hr >= Cells(i - 11, 11), hr < Cells(i - 11, 12)) Then

    volume_ref = Cells(j, 13)

    For k = 67 To 66 + total_vol

    If volume_ref = Sheets("Master Data").Cells(6, k).Value Then

    If Cells(h, k).Value = "" Then

    Cells(h, k).Value = 0

    End If

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    25/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 25 -

    total = total + (Sheets("Master Data").Cells(h, k).Value / Sheets("Master

    Data").Cells(j, 11).Value) * Sheets("Master Data").Cells(j, 8).Value

    End If

    Next k

    Sheets("Master Data").Cells(h, i).Value = WorksheetFunction.RoundUp(total, 0)

    End If

    ElseIf Cells(i - 11, 11).Value > Cells(i - 11, 12).Value Then

    If WorksheetFunction.Or(hr >= Cells(i - 11, 11), hr < Cells(i - 11, 12)) Then

    volume_ref = Sheets("Master Data").Cells(j, 13).Value

    For k = 67 To 66 + total_vol

    If volume_ref = Sheets("Master Data").Cells(6, k).Value Then

    If Cells(h, k).Value = "" Then

    Cells(h, k).Value = 0

    End Iftotal = total + (Sheets("Master Data").Cells(h, k).Value / Sheets("Master

    Data").Cells(j, 11).Value) * Sheets("Master Data").Cells(j, 8).Value

    End If

    Next k

    Sheets("Master Data").Cells(h, i).Value = WorksheetFunction.RoundUp(total, 0)

    End If

    End If

    End IfNext j

    If Cells(h, i) = "" Then

    Cells(h, i) = ""

    Else

    Cells(Cells(h, i) + 7, 2 * (i - 90) + 115) = 1 + Cells(Cells(h, i) + 7, 2 * (i - 90) + 115)

    End If

    Next i

    Next h

    For i = 0 To (total_manpower - 1)

    shift_length = Cells(79 + i, 12) - Cells(79 + i, 11)

    If shift_length > 0 Then

    Cells(7, 115 + 2 * i) = Cells(7, 115 + 2 * i) - Int((Cells(155, 7) - Cells(154, 7) + 1) / 7) * shift_length

    Else

    Cells(7, 115 + 2 * i) = Cells(7, 115 + 2 * i) - Int((Cells(155, 7) - Cells(154, 7) + 1) / 7) * (24 +

    shift_length)

    End If

    Next i

    For i = 0 To (total_manpower - 1)

    total = 0

    ratio = 0

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    26/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 26 -

    myrange = Range(Cells(7, 115 + 2 * i), Cells(507, 115 + 2 * i))

    total = WorksheetFunction.Sum(myrange)

    Cells(508, 115 + 2 * i) = total

    For j = 0 To 500

    ratio = ratio + Cells(7 + j, 115 + 2 * i) / total

    Cells(7 + j, 116 + 2 * i) = ratioIf ratio >= Cells(7 + i, 167) Then

    Cells(7 + i, 168) = j

     j = 500

    End If

    Next j

    Next i

    Next simulate

    end_time = Now()

    Cells(26, 168) = DateDiff("s", start_time, end_time)MsgBox "Total Run Time = " & Int(Cells(26, 168).Value / 60) & " min " & Cells(26, 168).Value Mod 60

    & " sec"

    End Sub

  • 8/18/2019 Docslide.us Internship Report on Manpower Demand Simulator at Apl Logistics

    27/28

    Internship Report on Manpower Demand Simulator

    At APL Logistics (India) Pvt. Ltd 

    Shashi Ranjan

    Intern, APL Logistics (India) Pvt. Ltd.

    - 27 -

    Module 2: Public function to generate Poisson no.

    Function RandPois(lambda As Single, _

    Optional bVolatile As Boolean = False) As Long

    Dim L As Single

    Dim k As Long

    Dim p As Single

    If bVolatile Then Application.Volatile

    L = Exp(-lambda)

    p = 1

    Do

    k = k + 1

    p = p * RndLoop Until p