FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIAL LOGISTICS
09.19.16Parts & Ad Hoc Shipments to China
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIAL LOGISTICS
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIALLOGISTICS
Contents
Lead Times
China Customs Certifications
Process
Information Required
Purpose
Purpose
+ Provide clear process for shipments to Mainland China
— Marketing and Project Moves
— Prototypes
— Tools, equipment, paint, and parts
+ Standardize logistics to China
— Capture logistics and customs compliance requirements.
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIALLOGISTICS
Information Required
+ All Ad Hoc shipping requests require portal input ( FF # assigned) – refer to pg.
7.
+ All shipments imported into China must be declared to China customs,
regardless of if they are samples or commercial goods, and regardless
of whether they are shipped via freight forwarder, parcel, or courier.
— All shipments imported into China must reflect the actual price paid by
the buyer to seller (known as the “transaction value”).
+ Detailed information for the consignee (recipient) including name, telephone
number, address, and email address, is required on shipping documents to
ensure correct and timely delivery.
+ NOTE: Failure to declare goods and/or an accurate customs value may
subject Faraday Future to fines, penalties, and loss of import privileges. This
would devastate our ability to sell vehicles and parts in China, and perhaps
cause trouble for LeEco as well.FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIALLOGISTICS
Information Required
Upon Export from USA Upon Import into China
+ Faraday Export Detail (next slide - Excel) + AWB or BOL
+ FF# (generated by Shipping Portal) + Purchase Order
+ Commercial Invoice + Customs Power of Attorney (Logistics), or
+ Packing List + Consignee’s Customs Broker Contact
+ AWB or BOL Information (Requestor)
+ IPPC Stamp (wooden packaging) + CIQ Power of Attorney (Logistics)
+ Export licensing confirmation (Legal ) + Import License (CCC, exemption, O-cert, etc.)
+ D.P.S. (Denied Party Screening) check
(Logistics)
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIAL LOGISTICS
+ Dangerous Goods screening (Logistics)
Information Required
+ Faraday Export Detail
- Description (in layman’s terms)
- HS Code (if known, otherwise Trade Compliance will determine)
- Country of Origin
- Quantity
- Price
- Weight
- Unit
- Essential Elements (brand, material made of, use, etc. – Excel)
+ China Customs requires detailed, product-specific information for customs
clearance.
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIAL LOGISTICS
Photo
MSDS
Current/Voltage/Power
Internet link reference (if applicable)
Qty
Unit Weight
Unit Value
Primary Function (how is it used?)
Material (made of?)
Country of Manufacture
Model Number
Manufacturer
HTS Code
Item Description
Return completed form with FF # (shipper request) to: [email protected]
FF#:
Process
1. Submit shipping request in Logistics Portal:
- http://b2b.chrobinson.com/sites/faraday/SitePages/Home.aspx - Include
team member contacts in request.
- Email auto-generated shipment confirmation to [email protected] for
visibility.
2. Complete FF Export Detail (Excel) for each item in the shipment.
- Reference FF#
- Send to [email protected]
- Shipment cannot leave the U.S. until all data in this form is complete and a
Commercial Invoice is generated.
3. Crate and band the shipment.
4. If wood packing material, submit IPPC/heat treat certificate to
[email protected] and attach a copy to the crate.
5. Submit to HQ warehouse for handling.
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIAL LOGISTICS
China Customs Certifications
+ Generally, any automotive item imported into China will require some type
of exam or certification:
- CCC
- Anti-Dumping
- Paint Registration
- O-Certification
- Energy Catalog Certification
- Wheel Test
+ Lead times vary from 3 working days to 3 months.
China Customs Certifications
Lead Times
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIAL LOGISTICS
+ These can adversely affect lead times:
- Public holidays in China (no Customs work)
- Lack of customs classification data
- Lack of import license (FF and LeSee)
- Physical inspection by Customs or CIQ
- Shipment delay (overbooked or cancelled flights)
- Discrepancy between physical shipment and documents
- Lack of proper delivery address
- Damage during transit
+ These lead times assume CCC or O-registration. Wheel and paint registration
take substantially longer (see matrix).
FARADAY FUTURE COPYRIGHT 2016 PROPRIETARY AND CONFIDENTIAL LOGISTICS
China Customs CertificatesChina
RequirementCCC Confirmation Letter Certification Anti-Dumping Tariffs Paint Registration O - Certification Energy Catalog Certification Wheel Test
Definition China Compulsory Certification
Parts ordinarily requiring CCC, but are: 1. Products that are used for scientific purposes and product testing;2. Products that are displayed at trade fairs3. Products that are to be re-exported again4. Products that are processed in China and, as part of a larger product to be exported 5. Products that are imported in low volumes
Protectionist trade barriers require 100% inspection and elevated duty payments. Ideally
sourced in China. If must ship, due to 100% inspection, should ship separately from other goods to
prevent delays.
Paint is internationally considered a Dangerous Good
to ship, and China CIQ requires product data to be submitted
before import. Lead time is 2 months. Should ship separately.
Import license for electrical and mechanical products.
Certify to Customs that electrical appliances are automotive in nature and
do not qualify for the China Energy Certification Catalog (household electrical
items).
CIQ request all the import vehicle wheels for aftermarket need do the test locally or provide the third party test report when import,Suzhou CIQ insist to do local test even have foreign test report
Category of Parts
1. Vehicle tires 2. Reflective logo 3. Vehicle travelling data recorder 4. Seats and seat headrest 5. Fuel tank 6. Door lock & hinge 7. Interior Trim 8. Rear view mirror 9. Lighting10. Brake Hoses11. Reflector 12. Horns 13. Safety Belts 14. Glazing
No directory available from China Customs. Determined by CIQ office at time of importation.
Parts with HTS codes such as:1. 7318120001 2. 7318140001 3. 7318151001 4. 7318159001 5. 73182100086. 7318220001
All parts with HTS code 3208 or3209 (paints and varnishes)
Including, but not limited to:1. Engine, HTS 8407342090/84082010902. Remote control key, HTS 85269200003. Vehicle chassis, HTS 87060090004. Vehicle body, HTS 87071000005. Vehicle transmission, HTS 8708409910 6. Vehicle drive axle, HTS 8708507910
All electrical tools, motors, and appliances.
All the wheels which HS code under"8708709100",means vehicle use aluminum alloywheels
Data Required (non-exhaustive)
All data requested in FF Export Detail form. Depending on item,
additional information may be required by China Customs.
All data requested in FF Export Detail form. Depending on item, additional information may be
required by China Customs.
All data requested in FF Export Detail form. Depending on item,
additional information may be required by China Customs.
1. Application form2. Business license of the applicant with chop3. Statement about harmful substances in conformity with the provisions stated4. Detail Component content list provide by paint producers5. Other documents required by CIQ
All data requested in FF Export Detail form. Depending on item, additional information
may be required by China Customs.
All data requested in FF Export Detail form. Depending on item, additional
information may be required by China Customs.
Test item1.Rotating bending fatigue 2.Radial load fatigue3.The radial impactTechnical data requirements1.Wheel Size2.Offset3.PCD4.Hub hole Ø5.Design Load (kg)6.Tightening screw torque7.Designated tire8.Minimum tire size9.Maximum tire size
Informational Linkhttp://www.chinacertification.com/en/list-of-cccmandatory-products
http://www.china-certification.com/en/ciqcertificate-an-alternative-china-market-entry
https://en.wikipedia.org/wiki/D umping_(pricing_policy)
Lead Times
usually 2 months,importer can not apply this,it should be applied by
makerat least 3~5 working days NA
3 Month before import,the testing need 15 working days
3 working days at least 3~4 working days at least 5 working days