. O ~ OPERATING DATA REPORT DOCKET NO. 50-287 DATE 08-15-76 COMPLETED BY J. A. Reavis TELEPHONE ( 70l. ) 373-8552 * OPERATING STATUS Oconee Unit 3 Notes 1. Unit Name: Year-to-date and cumulative i .. Reporting Penod: July, 1978 , capacity factors are calcu- 3. Licensed Thermal Power (MWr): 2568 lated using a weighted aver- 4. Nameplate Rating (Gross Mwe): 934 age for maximum dependable 887 5. Design Electrical Rating (Net MWe): capacity. 6. Maximum Dependable Capacity (Gross MWe): 899 860 7. Maximum Dependable Capacity (Net MWe): , S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: None None 9. Power Level To Which Restricted. If Any (Net MWe): 10. Reasons For Restrictions.If Any: This Month Yr..to-Date Cumulative 74!.0 5,087.0 31,775.0 11. Hours in Reporting Period 443.6 4,090.2 24,254.7 12. Number Of Hours Reactor Was Critical 13. Reactor Reserve Shutdown Hours - - - 14. Hours Generator On.Line 379.5 3,978.9 23,552.6 15. Unit Reserve Shutdown Hours - - - 16. Gross Thermal Energy Generated (MWH) 797,919 9,615,442 55,848,762 . 17. Gross Electrical Energy Generated (MWH) 268,670 3,354,960 19,306,804 _ _ , 18. Net Electrical Energy Generated (MWH) 248,942 3,197,508 18,370,115 19. Unit Service Factor 51.0 78.2 74.1 20. Unit Availability Factor 51.0 78.2 74.1 21. Unit Capacity Factor (Using MDC Net) 38.9 73.1 66.7 | 37.7 70.9 65.2 22. Unit Capacity Factor (Using DER Net) 0.0 3.9 12.6 ] 23. Unit Forced Outane Rate ; 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht: ) None I | 1 25. If Shut Down At End Of Report Period. Estimated Date of Startup- 26. Units in Tut Status aPrior to Commercial Operation): Forecast Achieved i I . INITIAL CRITICALITY | INITIAL ELECTRICITY 1 COMMERCIAL OPERATION . 7912180 [[] (c!77) - _ _ . - . .- _. - .. - ---

DOCKET NO. 50-287design or nes operating procedures). None. 7. Number of fuel assemblies (a) in the core: 177. (b) in the spent fuel pool: 326. 8. Present licensed fuel pool capacity:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DOCKET NO. 50-287design or nes operating procedures). None. 7. Number of fuel assemblies (a) in the core: 177. (b) in the spent fuel pool: 326. 8. Present licensed fuel pool capacity:

.

O~

OPERATING DATA REPORT

DOCKET NO. 50-287DATE 08-15-76

COMPLETED BY J. A. Reavis

TELEPHONE ( 70l. ) 373-8552 *

OPERATING STATUS

Oconee Unit 3 Notes1. Unit Name: Year-to-date and cumulative i

.. Reporting Penod: July, 1978,

capacity factors are calcu-3. Licensed Thermal Power (MWr): 2568 lated using a weighted aver-4. Nameplate Rating (Gross Mwe): 934 age for maximum dependable

8875. Design Electrical Rating (Net MWe): capacity.

6. Maximum Dependable Capacity (Gross MWe): 8998607. Maximum Dependable Capacity (Net MWe):

,

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

None9. Power Level To Which Restricted. If Any (Net MWe):10. Reasons For Restrictions.If Any:

This Month Yr..to-Date Cumulative

74!.0 5,087.0 31,775.011. Hours in Reporting Period443.6 4,090.2 24,254.712. Number Of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours- - -

14. Hours Generator On.Line 379.5 3,978.9 23,552.6

15. Unit Reserve Shutdown Hours - - -

16. Gross Thermal Energy Generated (MWH) 797,919 9,615,442 55,848,762 .

17. Gross Electrical Energy Generated (MWH) 268,670 3,354,960 19,306,804_ _ ,

18. Net Electrical Energy Generated (MWH) 248,942 3,197,508 18,370,115

19. Unit Service Factor 51.0 78.2 74.120. Unit Availability Factor 51.0 78.2 74.1

21. Unit Capacity Factor (Using MDC Net) 38.9 73.1 66.7 |

37.7 70.9 65.222. Unit Capacity Factor (Using DER Net)0.0 3.9 12.6 ]23. Unit Forced Outane Rate

; 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht: )None

I|1

25. If Shut Down At End Of Report Period. Estimated Date of Startup-26. Units in Tut Status aPrior to Commercial Operation): Forecast Achieved i

I,.

INITIAL CRITICALITY |

INITIAL ELECTRICITY 1

COMMERCIAL OPERATION

. 7912180 [[](c!77)

- _ _ . - . .- _. - .. - ---

Page 2: DOCKET NO. 50-287design or nes operating procedures). None. 7. Number of fuel assemblies (a) in the core: 177. (b) in the spent fuel pool: 326. 8. Present licensed fuel pool capacity:

- -

t

.

IINil SiltllDOWNS AND POWI.H HI:DiffilONS I)DCKl:I NO. 50-287*

UNilNAMI: Oconee Unit 3'

n3 3,.: UBZl F 78 - -

HI.PUH I MIINiil JULY, 1978 COMPI l'Il'H llY J. A. Heavis,,,jyj 9 .; 37g47373:8552

~

-

":. _

-, 3E h [d 1.it rince ( 8, 'l fanse .5 Cosari.five*

N" . DHe ~ 5g 4 js@ I vent av 9? Attion to7$E $ ~ 5, g iteport n ifM E' Pervent Itriurrem e

He U

o,

18 78-07-01 S 360.53 C 1 RC FUELXX Scheduled refueling cont'd

19 78-07-16 S B -- ZZ ZZZZZZ Power escalation testing-

20 78-07-20 F D -- RC FUELXX Xenon hold-

21 78-07-21 F - B -- Cll PUMPXX "A" FWP drain valve repair

22 78-07-21 F D -- RC FUELXX Xenon hold-

23 78-07-22 F H -- ZZ ZZZZZZ Investigation of noise picked up by-

the loose parts monitor

I24 78-07-23 F D -- RC FUELXX Xenon hold-

-

25 78-07-29 S 3.99 B 1 IIA TURBIN Scheduled turbine trip test

26 78-07-30 F B -- RC FUELXX Xenon hold-

. - . - - . -

'I 2 1 .I

1: l'insed ite.non: Method: l~xhiliit G Instim lii .es,

| S- Stheilnied A l'ignipment I ailme (I xplain) 1.M.m nal fin Picparation of D.na; il Maintenance of l'est 2 M.mnal Steam. 1:ntsy Sheces t n 1 iicnu c'

C-Refueling 1- Automatic Stram. livent Repml (1.110 l'de (Niliti G-! D-Reputatory Restein lion l Olher (1 xplain) 11161)

I?Opciator l'eaining.t Iit ense I:saminationl' Aihninistialisc 5G Opciational 1 nos (I:xplain) 1.shibit I - S nne Sinnce,~

C8/Tl) || Olhes (l'.xplain )

'

.

Page 3: DOCKET NO. 50-287design or nes operating procedures). None. 7. Number of fuel assemblies (a) in the core: 177. (b) in the spent fuel pool: 326. 8. Present licensed fuel pool capacity:

._ _ - _ - _ __ ___ __

- -

AVERAGE DAILY L' NIT POWER LEVEL

50-287DOCKET NO.

Oconee Unit 3WIT

DATE 08-15-78.

J. A. ReavisCOMPLETED BY

p . (704) 373-8552

MONTH JULY, 1978

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL(Mhe-Net) i yw,,3,,3

3041-

17

,- 457

1E-

6123 -g9

4 - 20 627

5- 671

73

7546

-

,,

-- 701

23'

- 8043 24

8439-

25

10- 842

3846

11-

7

85012 -

2S

9013-

29

14-

30709~

15 31

26116i

INSTRUCTIONS

On this format, list the average datly unit power level in MWe Net for each day in the reporting month. Compute tothe nearest whole megawatt.

toi77)

I

~- . _ _ _ . _ _ . . . _ , _ _ _ . _

Page 4: DOCKET NO. 50-287design or nes operating procedures). None. 7. Number of fuel assemblies (a) in the core: 177. (b) in the spent fuel pool: 326. 8. Present licensed fuel pool capacity:

*- MOaTHLY Pa u..1.ING INFORMAT!ON RL.,JST

1. Facility na=e: Oconee Unit 3,

2. Scheduled next refueling shutdown: July 29, 1979 .

3. Scheduled restart following refuaidng: September 16, 1979 ,

4. Will refueling or resu=ption of operation thereafter require a technicalspeed #1 cation change or other license amend =ent? .

If yes, what vd11 these be? Amendment to incorporate technical

specifications for Cycle 5.

.

.

If so, has reload design and core configuration been reviewed by SafetyReview Co=mittee regarding unreviewed safety questions? .

If nc, when is review scheduled? .

5. Scheduled date(s) for submit-d g proposed licensing action and suppor ingda#crsation: June 16, 1979

,

6. I=portant li'.ansing considerations (new or d4*ferent design or supplier,unreviewed d sign or performance analysis methods, significant changes indesign or nes operating procedures). None

.

7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 326 .

4658. Present licensed fuel pool capacity: ,

Size of requested or planned increase: No increases planned .

9. Projected date of last refueling which can be accommodated by presentlicensed capacity: 3/3/80 assuming no transfers ,

DUEI POWER COMPANY Date: August 15, 1978 ,

Name of Contact: Jerel A. Reavis,

i _

*

Page 5: DOCKET NO. 50-287design or nes operating procedures). None. 7. Number of fuel assemblies (a) in the core: 177. (b) in the spent fuel pool: 326. 8. Present licensed fuel pool capacity:

.*

DOCKET NO: 50-287

UNIT: Oconee Unit 3

DATE: 08-15-78

NARRATIVE SUMMAPJ

MONTH: grits t , 1978

The month began with the unit in refueling shutdown. On July 12 at 1900,Zero Power Physics Testing started. Testing was complete on July 16 at0032 and the unit was returned to service. Power reached 40% and was heldfor power escalation testing. Power level reached 75% on July 18 and againheld for testing. Reactor power reached power level cut off on July 20 at1756.

On July 21, power level was decreased to 65% to secure 3A FWPT to resetrelay control. The 3A FWPT was returned to service and started increasingpower at 2024 on July 21.

Power level was held at 94% on July 22 due to powdex resin trap D.P. high.On the same day started decreasing power 3 MW/ minute uue to noise on LPM.Reactor power was increased to 100% on July 24 at 1226.

On July 29 at 2100, commenced reducing reactor power to 15% to perform tur-bine trip test. Generator went off line at 2357. Unit was returned to ser-vice at 0356 on July 30. Reactor reached power level cut off at 1900. On

July 31, reactor reached near rated full power and retained power level forremainder of the month.

_

Page 6: DOCKET NO. 50-287design or nes operating procedures). None. 7. Number of fuel assemblies (a) in the core: 177. (b) in the spent fuel pool: 326. 8. Present licensed fuel pool capacity:

_ .._ ._. ._ _ _ _ _

'.

OCOEEE NUCLEAR STATION*

MONTHLY OPERATING REPORTAugust, 1978,

i. Personnel Exposure

For the month of June, no individuais exceeded 10 percent of theirallowable annual radiation dose limit.

2. Radioactive Waste Releases

The total station liquid release for June has been compared withthe Technical Specifications annual value of 15 curies; the totairelease for June was less than 10 percent of this limit.

The total station gaseous release for June has been compared tothe derived Technical Specifications annual value of 51,000 curies;the total release for June was less than 10 percent of this limit.

.