3
APPLICATION FOR QUOTATION FOR CDM ACTIVITIES APPLICATION FOR VALIDATION OR VERIFICATION AND CERTIFICATION OF A CDM PROJECT ACTIVITY/PROGRAMME OF ACTIVITIES This form should be completed in full and returned to: AENOR INTERNACIONAL. S.A.U. Génova, 6 Tel: (+34) 915294961 E-28004 Madrid e-mail: [email protected] Spain e-mail: [email protected] Please complete AL L applicable sections of the form in CLEAR PRINT or in type. This form is available in electronic form. Please do not modify the form other than filling in cells provided for this purpose. Any form that is modified will not be recognized as a valid application. Should you have difficulties in filling the form, please contact AENOR. Please be aware that, in case the offer provided by AENOR is accepted, according to CDM Accreditation Standard AENOR shall have a legally enforceable contract with a project participant or coordinating/managing entity for the provision of validation and verifications/certification services. INFORMATION ON THE CDM PROJECT PARTICIPANT OR COORDINATING /MANAGING ENTITY Organization name, (and acronym) in English Operational language of the organization Contact person for the CDM project activity, name Position Physical address Tel Postal address: (If different from above) Mobile e-mail R-DTC-109.04 Page 1 of 3

DOC NO - aenor.es Web viewOther relevant documentation (calculation spreadsheets, financial model) ... Quality management procedures ... Word Development

Embed Size (px)

Citation preview

DOC NO :_

APPLICATION FOR QUOTATION FOR CDM ACTIVITIES

APPLICATION FOR VALIDATION OR VERIFICATION AND CERTIFICATION OF A CDM PROJECT ACTIVITY/PROGRAMME OF ACTIVITIES

This form should be completed in full and returned to:

AENOR INTERNACIONAL. S.A.U.

Gnova, 6Tel: (+34) 915294961

E-28004 Madride-mail: [email protected]

Spaine-mail: [email protected]

Please complete ALL applicable sections of the form in CLEAR PRINT or in type.

This form is available in electronic form. Please do not modify the form other than filling in cells provided for this purpose. Any form that is modified will not be recognized as a valid application. Should you have difficulties in filling the form, please contact AENOR.

Please be aware that, in case the offer provided by AENOR is accepted, according to CDM Accreditation Standard AENOR shall have a legally enforceable contract with a project participant or coordinating/managing entity for the provision of validation and verifications/certification services.

INFORMATION ON THE CDM PROJECT PARTICIPANT OR COORDINATING /MANAGING ENTITY

Organization name, (and acronym) in English

Operational language of the organization

Contact person for the CDM project activity, name

Position

Physical address

Tel

Postal address:

(If different from above)

Mobile

e-mail

REFERENCE OF TYPE OF APPLICATION

|_| New methodology

|_| CDM validation

|_| PoA and first CPA validation

|_| additional CPA validation

|_| initial verification and certification

|_| periodic verification and certification. N#.....................

|_| other...................................................................

PROJECT ACTIVITY INFORMATION

Is it a small-scale CDM project?

|_| YES |_| NO

Is it a Programme of Activities?

|_| YES |_| NO

Title of the project/PoA

Methodology

|_| Approved Methodology. Number, title and version:

|_| New Methodology. Title:

Sectoral Scope:

Host country:

Designated national authority (DNA)

Project Description

Only in case of POAs, define the scope of each one of the CPAs (region, country, province, building, etc.)

Foreseen date to start validation/ verification process

Start date of the project activity

UTM coordinates of the project activity

List of all project participants/CME

Consultancy Organization

Financing Organization

INFORMATION FOR VALIDATION

Contract period

required (if any):

Liability conditions

(if any):

Have you notified to the CDM EB the purpose of implementation of the project activity?

|_| YES. Date: .

|_| NO

Documents required to submit a quotation for validation:

PROJECT IDEA NOTE (PIN)1,2 OR PDD

Other documents required to confirm and start the validation process:

a) Project Design Document (PDD) or Simplified project design document for small-scale CDM project activities (SSC-PDD)

b) CDM-PoA-DD and CDM-CPA-DD in case of a Programme of activities (or the correspondent for Small scale)

c) Baseline study and Monitoring plan

d) CDM New Methodology (if applicable)

e) Written approval of voluntary participation from the DNA (Designated National Authority) of each Party involved (if available).

f) Confirmation by the host party that the Project activity assists it in achieving sustainable development (if available).

g) Completed Modalities of Communication Form

h) Other relevant documentation (calculation spreadsheets, financial model)

INFORMATION FOR VERIFICATION / CERTIFICATION

UNFCCC Registration number

for the project activity:

Monitoring period

From: ........to: ...........

Contract period

required (if any):

Liability conditions

(if any):

Maximum period to complete the verification process (if any):

Documents required to submit a quotation for verification:

REGISTERED PDD 1

Other documents required to confirm and start the verification process:

a) Emissions reduction calculation spreadsheet.

b) Quality management procedures (if applicable)

c) Operation licenses of local authorities (if applicable)

1Minimum information required to submit a conditioned quotation.

2If a PIN is sent as relevant project information, a PDD shall be provided to confirm the quotation submitted by AENOR.

Other relevant information:

Name and company of applicant

Date of application

R-DTC-109.04Page 1 of 3

R-DTC-109.04Page 2 of 3