8
doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRI Slide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Date: 2013-07-18 Authors: N am e C om pany A ddress Phone em ail H yunduk K ang ETRI 138 G ajeong-Ro, Y useong-G u, D aejeon, 305-700, South K orea +82-42-860-1074 henry@ etri.re.kr

Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

Embed Size (px)

Citation preview

Page 1: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

July 2013

Hyunduk Kang, ETRISlide 1

TG1 Closing Report for July 2013

Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.

Date: 2013-07-18

Authors:Name Company Address Phone email Hyunduk Kang ETRI 138 Gajeong-Ro,

Yuseong-Gu, Daejeon, 305-700, South Korea

+82-42-860-1074 [email protected]

Page 2: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

July 2013

Hyunduk Kang, ETRISlide 2

Abstract

This is TG1 closing report from July 2013 plenary meeting in Geneva, Switzerland

Page 3: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

Agenda and Results (1/2)

• The TG focused on comment resolutions with remaining 18 technical comments

• The TG heard several contributions related to the comments and were accepted as comment resolutions– All technical comments were closed

• Approved comment resolutions available in 19-13/0057r9

July 2013

Hyunduk Kang, ETRISlide 3

Page 4: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

Agenda and Results (2/2)

• TG1 updated 802.19.1 project status (19-13/0080r1)

• TG1 responded comments from 802.11 WG on 802.19.1 PAR extension

• Agenda available in 19-13/0082r4

• Draft meeting minutes available in 19-13/0094r0

July 2013

Hyunduk Kang, ETRISlide 4

Page 5: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

What’s Next?

1. The TG requested the TG editor to prepare by July 18, 2013, a new 802.19.1 draft which builds upon the DF3.04 and incorporates the changes approved by the TG1 during the July 2013 plenary meeting

2. The TG Kindly ask the 802.19 WG chair to start 15-days WG 2nd Recirculation Letter Ballot on the new 802.19.1 draft

July 2013

Hyunduk Kang, ETRISlide 5

Page 6: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

TeleconferencesDay Date Start Time End Time Call Host

Wednesday August 211:00 AM Eastern Standard Time

2:30 AM Eastern Daylight Time

S.Filin

Wednesday August 281:00 AM Eastern Standard Time

2:30 AM Eastern Daylight Time

S.Filin

Wednesday September 41:00 AM Eastern Standard Time

2:30 AM Eastern Daylight Time

S.Filin

Wednesday September 111:00 AM Eastern Standard Time

2:30 AM Eastern Daylight Time

S.Filin

July 2013

Hyunduk Kang, ETRISlide 6

Page 7: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

September 2013 Interim Objectives

• Resolve all comments from the third Working Group 2nd Recirculation Letter Ballot

• Decide on whether the 802.19.1 draft is ready for the sponsor ballot

July 2013

Hyunduk Kang, ETRISlide 7

Page 8: Doc.: IEEE 802.19-13/0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to

doc.: IEEE 802.19-13/0095r0

Submission

Targeted TG1 Timeline

• Second Working Group Letter Ballot: October 2012• 1st Recirculation Letter Ballot: April 2013• 2nd Recirculation Letter Ballot: August 2013• Form Sponsor Ballot Pool: August 2013• 3rd Recirculation Letter Ballot: October 2013• Initial Sponsor Ballot: November 2013• Recirculation Sponsor Ballot: March 2014• Final WG/EC Approval: July 2014• RevCom/Standards Board Approval: September 2014

July 2013

Hyunduk Kang, ETRISlide 8