doc.: IEEE psc Submission, Slide 3 Achievements Group discussed the future plan for the PSC: amendment of an existing WG standard or a new task group Group felt that it needed more time to instill ideas into a new PAR and 5C Group agreed to submit a new PAR and 5C at the end of Okinawa meeting to meet the EC schedule (first week of October) Group approved the motion that WG request to extend the activity of SG PSC from the EC.
Citation preview
doc.: IEEE 802.15-11-0542-00-0psc
Submission
<July 2011>
<Myung Lee>, <CUNY>Slide 1
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [Closing report for the PSC Study Group]Date Submitted: July 21 2011]Source: [Myung Lee] Company [CUNY]Address [Dept of ECE, CUNY, NY, NY 10031]Voice:[212-650-7260], FAX: [Add], E-Mail:[[email protected]]Re: [.]
Abstract: [San Francisco Plenary Closing Report for SG-PSC]
Purpose: []Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.
doc.: IEEE 802.15-11-0542-00-0psc
Submission
<July 2011>
<Peter Murray>, <Self Consultant>Slide 2
Achievements
•Since the withdrawal of an early core member at Singapore meeting, the Study Group effectively re-chartered with new key members. • At this session, the Study group had 4 meeting slots to hear presentations on new use cases and applications.
•15-11-0522-01, 15-10-0516-00, 15-11-0483-00
•Group discussed main features to be supported by PSC standard•Group further derived distinctive PHY and MAC features
doc.: IEEE 802.15-11-0542-00-0psc
Submission
<July 2011>
<Peter Murray>, <Self Consultant>Slide 3
Achievements
•Group discussed the future plan for the PSC: amendment of an existing WG standard or a new task group •Group felt that it needed more time to instill ideas into a new PAR and 5C• Group agreed to submit a new PAR and 5C at the end of Okinawa meeting to meet the EC schedule (first week of October)•Group approved the motion that WG request to extend the activity of SG PSC from the EC.
doc.: IEEE 802.15-11-0542-00-0psc
Submission
Study Group Motion
<July 2011>
<Peter Murray>, <Self Consultant>Slide 4
SG PSC requests that 802.15 WG approve the extension of the Study Group PSC.
Moved by: Seong-Soon JooSeconded by: Jin-kyung Kim
Yes 10 No 0 ABS 0
doc.: IEEE 802.15-11-0542-00-0psc
Submission
Study Group Motion
<July 2011>
<Peter Murray>, <Self Consultant>Slide 5
SG PSC requests that 802.15 WG request approval of the extension of SG PSC from the EC.
Moved by: Seong-Soon JooSeconded by: Jin-kyung Kim
Yes 10 No 0 ABS 0
doc.: IEEE 802.15-11-0542-00-0psc
Submission
Future Plan
• Weekly teleconfereincing– For initial draft of PAR and 5C before the
Okinawa meeting– To review existing IEEE 802 standards to help
draft solid PAR and 5C
<July 2010>
<Peter Murray>, <Self Consultant>Slide 6
doc.: IEEE 802.15-11-0542-00-0psc
Submission
<May 2011>
<Seong-Soon Joo>, <ETRI>Slide 7
Call details
•SG PSC Call on Tuesday August 9 at 6:30 PST, 9:30 EST, 15:30 CET, 23:30 Seoul, Tokyo• From August 17 PSC Call on Wednesdays• Three time zones will rotate (US, Asia, Europe)•Thanks to Samsung for providing teleconference facility.
doc.: IEEE 802.15-11-0542-00-0psc
Submission
WG Motion
<July 2011>
<Peter Murray>, <Self Consultant>Slide 8
SG PSC requests that 802.15 WG approve the extension of the Study Group PSC.
Moved by: Myung LeeSeconded by:
Yes No ABS
doc.: IEEE 802.15-11-0542-00-0psc
Submission
<July 2010>
<Peter Murray>, <Self Consultant>Slide 9