Upload
annis-reeves
View
212
Download
0
Embed Size (px)
Citation preview
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 1
802.11 Revision extension under IEEE-SA Operations Manual subclause 8.1.2
Date: 2010-07-11
Authors:
Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Ln
Santa Clara, CA 95054
+1-321-427-4098
doc.: IEEE 802.11-10/0705r1
Submission
Motion
• Request RevCom extend P802.11REVmb by two years, as described in the IEEE-SA Operations Manual subclause 8.1.2, and as supported by the schedule described in document IEEE 802.11-10/0705r1.
July 2010
Bruce Kraemer (Marvell)Slide 2
doc.: IEEE 802.11-10/0705r1
Submission
Introduction
• This document presents the schedule and background information for P802.11REVmb and seeks approval of the IEEE 802 EC to request IEEE RevCom to allow the 2-year extension.
July 2010
Bruce Kraemer (Marvell)Slide 3
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 4
P802.11REVmb Rationale for Extension
• IEEE STD 802.11-2007 was published in June 2007
• Amendments 802.11k, 802.11r, 802.11y, 802.11w, 802.11n and 802.11p have been approved since then.
• Revision project P802.11REVmb has rolled in k,r,y,w & n. 802.11p was approved in September and will be rolled in once published.
• Amendments 802.11z, 802.11v, 802.11u are expected to be completed before the completion of the P802.11REVmb, and to be rolled into the published revision.
• According to the IEEE-SA Operations Manual (subclause 8.1.2), it is necessary to get approval of a 2-year extension to allow these amendments to be considered by RevCom, as their approval will be sought after the initial 3-year period.
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 5Slide 5
P802.11REVmb Schedule May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc startFuture Items (see 11-10-0706-01-000m-planning.doc for detailed plan)• July 2010 – Conditional Sponsor Ballot Approval from EC• July 2010 – Form Sponsor Pool (45 days)• Sept 2010 – Standards Board approval of .11z, .11v, .11u• October 2010 – Sponsor Ballot start• Nov 2010 – Roll in .11p, .11z, .11v, .11u• Feb 2011 – Sponsor Recirc. start• July 2011 – WG/EC Final Approval• Sept 2011 – RevCom/SASB Approval
doc.: IEEE 802.11-10/0705r1
Submission
BACKGROUND INFORMATION
July 2010
Bruce Kraemer (Marvell)Slide 6
doc.: IEEE 802.11-10/0705r1
Submission
IEEE-SA Operations Manual• Subclause 8.1.2 – Amendments & Corrigenda• Up to three amendments can be approved before the standard shall be revised,
unless the base standard has been approved or reaffirmed within the past three years. In the latter case, multiple amendments may be added until the base standard is three years old or three years have elapsed since the most recent reaffirmation of the standard. After the three-year period, RevCom shall defer consideration of additional amendments or corrigenda until a revision or a two-year extension request is approved by the IEEE-SA Standards Board. The standard shall not be reaffirmed if three or more amendments to the base standard exist.
• If, for any extenuating circumstances, an exception to these rules is required, the Sponsor shall take its request for a two-year extension to RevCom. A project plan outlining the rationale for the request, as well as a schedule for the revision, also shall be submitted. RevCom will review the request and make a recommendation to the IEEE-SA Standards Board.
July 2010
Bruce Kraemer (Marvell)Slide 7
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 8
802.11 Revision Project – MB
TG
/WG
Ba
llo
tID
Ba
llo
t C
lose
Da
te
Title
Ba
llo
tTyp
e
Po
ol
Ap
pro
ve
Dis
ap
pro
ve
Ab
sta
in
Re
turn
%R
etu
rn
%A
bsta
in
%A
pp
rove
# C
om
me
nts
TGmb 149 Saturday, June 27, 2009
D1.0 1st Ballot
Technical 246 155 23 29 207 84 14 87 730
TGmb 160 Friday, January 08, 2010
D2.0 1st Recirc
Recirculation 246 166 20 25 211 86 12 89 246
TGmb 162 Sunday, April 25, 2010
D3.0 2nd Recirc
Recirculation 246 167 20 25 212 86 12 89 149
TGmb 163 Friday, June 25, 2010
D4.0 3rd Recirc
Recirculation 246 164 20 28 212 86 13 89 98
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 9
IEEE 802.11 Amendments Pipeline
PHY
SponsorBallot
MAC
Study groups
802.11kRRM
802.11rFast Roam
802.11VNetwork
Management
802.11sMesh
802.11uWIEN
802.11yContention
BasedProtocol
WG Letter Ballot
802.11mbMaintenance
r+k+y+n+w
802.11acVHT 5GHz
802.11adVHT 60GHz
TG without draftDiscussion Topics
PublishedAmendment
802.11aeQoS Mgmt Frm
802.11nHigh
Throughput(>100 Mbps)
802.11WManagement
Frame Security
802.11zTDLS
802.11pWAVE
802.11afTVWS
Smart Grid
FIA
S1G
802.11aaVideo Transport
802.11b (’99)11 Mbps2.4GHz
PublishedStandard
a 54 Mbps5GHz
g 54 Mbps2.4GHz
eQoS
iSecurity
f Inter AP
hDFS & TPC
802.11 -2007
j 4.9 GHz
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 10
IEEE 802.11 MA Revision Plan
PHY
802.11hDFS & TPC
802.11eQoS
802.11 (’97)2 Mbps
DS+IR+FH
PublishedStandard
802.11iSecurity
802.11 -1999802.11maMaintenance
e+h+i+j+f+a+g
PublishedAmendment
802.11a5 GHz
802.11g54 Mbps2.4 GHz
802.11fInter AP
MAC
bQoS
ddomains
corrigenda
802.11j4.9 GHz
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 11
IEEE 802.11 MB Revision Plan
PHY
802.11kRRM
802.11rFast Roam
802.11b (’99)11 Mbps2.4GHz
PublishedStandard
a 54 Mbps5GHz
g 54 Mbps2.4GHz
eQoS
iSecurity
f Inter AP
hDFS & TPC
802.11yContention
BasedProtocol
802.11 -2007
802.11mbRevision
Rolled in: r, k, y, n, w
To be rolled in: p, z, v, u
PublishedAmendment
802.11nHigh
Throughput(>100 Mbps)
802.11WManagement
Frame Security
802.11pWAVE
j 4.9 GHz
802.11VNetwork
Management
802.11uWIEN
802.11zTDLS
Amendments not yet published,
but expected
to be included in
REVmb
doc.: IEEE 802.11-10/0705r1
Submission
July 2010
Bruce Kraemer (Marvell)Slide 12
802.11 Revision Process
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
MA
PAR
PAR
MB
MC
B0 S0 SF
S0 SF
BF
B0 BF
802.11-1999 (528p)
802.11-2011 (2250p est)
802.11-2007 (1232p)
PAR – Nescom approvalB0 – Initial WG ballotBF – Final WG ballot
S0 – Initial Sponsor ballotSF – Final Sponsor ballot - Publication date
KEY
History Forecast
PAR