23
Februar y 2012 Jon R osdah l, CS Slide 1 doc.: IEEE 802 EC-12/0004r1 Agenda IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 N am e A ffiliations A ddress Phone em ail Jon Rosdahl CSR 10871 N 5750 W Highland, UT 84003 801-492-4023 [email protected] Authors:

Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

Embed Size (px)

Citation preview

Page 1: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 1

doc.: IEEE 802 EC-12/0004r1

Agenda

IEEE 802 EC Interim Telecon – Feb 7 2012Date: 2012-02-07

Name Affiliations Address Phone email Jon Rosdahl CSR 10871 N 5750 W

Highland, UT 84003 801-492-4023 [email protected]

Authors:

Page 2: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 2

doc.: IEEE 802 EC-12/0004r1

Agenda

Abstract

Agenda and meeting slides for the Feb 7, 2012 EC interim telecon.

Page 3: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 3

doc.: IEEE 802 EC-12/0004r1

Agenda

Agenda – Feb 7, 2012; 1-3pm1. Welcome/Intro/Approve Agenda – Nikolich 4 min2. Report: Single Sales Channel Update – Nikolich 3 min3. Report: Pending Appeal – 802.15.6 – Nikolich 3 min4. Report: Network RFP – Rosdahl 3 min5. Report: March 2012 Waikoloa Meeting Plans – Rosdahl 3 min6. Report: July 2013 Geneva Meeting Plans – Rosdahl 4 min7. Report: 802.21 – Sponsor Ballot Completions – Das 5 min8. Motion: 802.16 – Sponsor Ballot Request – Marks 5 min

Motion: To forward IEEE P802.16.1b/D2 for IEEE-SA Sponsor Ballot.

9. Motion: 802.11 – Sponsor Ballot Completions – Kraemer 10 minMotion: To forward IEEE 802.11ae to RevComMotion: To forward IEEE 802.11aa to RevCom

10. Update: November Workshop Action items – Kraemer 60 min11. AOB 15 min

Page 4: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 4

doc.: IEEE 802 EC-12/0004r1

Agenda

1. Welcome/Intro/Approve Agenda

Nikolich 4 min

Page 5: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 5

doc.: IEEE 802 EC-12/0004r1

Agenda

2. Report: Single Sales Channel Update –

Nikolich 3 min

Announced 2-2-2012 -- 802 Standards available for $5.

http://www.standardsinsight.com/ieee_news/802sale2012

Page 6: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 6

doc.: IEEE 802 EC-12/0004r1

Agenda

3. Report: Pending Appeal – 802.15.6

Nikolich 3 min

Page 7: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 7

doc.: IEEE 802 EC-12/0004r1

Agenda

4. Report: Network RFP

Rosdahl 3 min

Page 8: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 8

doc.: IEEE 802 EC-12/0004r1

Agenda

5. Report: March 2012 Waikoloa Meeting Plans

Rosdahl 3 min

Page 9: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 9

doc.: IEEE 802 EC-12/0004r1

Agenda

6. Report: July 2013 Geneva Meeting Plans

Rosdahl 4 min

Page 10: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 10

doc.: IEEE 802 EC-12/0004r1

Agenda

7. Report: 802.21 on two Sponsor Ballot Completions

Das 5 min

Page 11: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 11

doc.: IEEE 802 EC-12/0004r1

Agenda

IEEE 802 EC Interim Teleconference

Report from 802.21 on two Sponsor Ballot Completions  

Subir Das

Subir at appcomsci dot com

Subir Das, Chair 802.21 WG

Page 12: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 12

doc.: IEEE 802 EC-12/0004r1

Agenda

Background

• During the November 2011 closing plenary the IEEE 802 EC granted conditional approval for the IEEE802.21a and  IEEE802.21b drafts  to proceed to RevCom

• Full details of EC presentation are available at: https://mentor.ieee.org/802.21/dcn/11/21-11-0193-00-0000-sb-details-and-motions-802-21a.pptx,  and https://mentor.ieee.org/802.21/dcn/11/21-11-0194-00-0000-sb-results-and-motions-802-21b.pptx

Subir Das, Chair 802.21 WG

Page 13: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 13

doc.: IEEE 802 EC-12/0004r1

Agenda

Sponsor Ballot Update

  

• The Ballot closed on December 08, 2011 

• The recirculation  comments (editorial)  are available at: https://mentor.ieee.org/802.21/dcn/11/21-11-0196-00-0000-sb-recirc-2-802-21a-comments.xls, and        https://mentor.ieee.org/802.21/dcn/11/21-11-0197-00-0000-sb-recirc-2-802-21b-comments.xls

• The comments associated with remaining disapproves and the WG responses are available at: 

– https://mentor.ieee.org/802.21/dcn/11/21-11-0148-07-0sec-802-21a-sb-comments.xls and       https://mentor.ieee.org/802.21/dcn/11/21-11-0149-03-bcst-802-21b-sb-comments.xls

Subir Das, Chair 802.21 WG

Page 14: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 14

doc.: IEEE 802 EC-12/0004r1

Agenda

Conditional Terms and Results

• As per LMSC OM Clause 14:

- The Ballot occurred, in accordance with the tentative schedule presented to the EC.The recirculation running at the time conditional approval was granted completed on schedule.  The additional recirculation shown on the plan is not required– The approval percentage is 98% for IEEE 802.21a   (63 Approve, 1

Disapprove).– The approval percentage is 96% for IEEE 802.21b   (60 Approve, 2

Disapprove).    - There are no new DISAPPROVE votes

• No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters     - During the last recirculation of IEEE 802.21a, we received  an APPROVE vote from one DISAPPROVE voter      - No new DISAPPROVE comments were received for IEEE802.21a and IEEE802.21b

Subir Das, Chair 802.21 WG

Page 15: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 15

doc.: IEEE 802 EC-12/0004r1

Agenda

Conclusion

• Based upon the results of the WG 802.21 recirculation ballots on P802.21a/D6.0  and P802.21b/D6.0, the terms of the conditional approval have been met

• An email was sent to EC reflector on December 09, 2011

• IEEE802.21a and IEEE802.21b drafts are in RevCom’s March meeting agenda

Subir Das, Chair 802.21 WG

Page 16: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 16

doc.: IEEE 802 EC-12/0004r1

Agenda

8. Motion: 802.16 – Sponsor Ballot RequestMarks 5 min

The Working Group Letter Ballot on this draft currently stands at 100% approval. A recirc will close two days prior to the EC telecon, so Roger

expects the approval request to be unconditional

https://mentor.ieee.org/802.16/dcn/12/16-12-0141.pdf

Motion: To forward IEEE P802.16.1b/D2 for IEEE-SA Sponsor Ballot.

Page 17: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 17

doc.: IEEE 802 EC-12/0004r1

Agenda

Motion 802.16.1bForward to Sponsor Ballot

• To forward IEEE P802.16.1b/D2 for IEEE-SA Sponsor Ballot.

• Moved: Roger Marks

• Seconded: Jon Rosdahl

• Approve:

• Disapprove:

• Abstain:

Roger Marks, Consensii LLC

Page 18: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 18

doc.: IEEE 802 EC-12/0004r1

Agenda

9. Motion: 802.11 – Sponsor Ballot Completions

Kraemer 10 min

802.11ae – Completed Sponsor Letter Ballot 100%

802.11aa – Completed Sponsor Letter Ballot 100%

Motion: To forward IEEE 802.11ae to RevCom

Motion: To forward IEEE 802.11aa to RevCom

Page 19: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 19

doc.: IEEE 802 EC-12/0004r1

Agenda

Motion – 802.11aa (Robust Audio Video Transport Streams)

UnConditional Approval to RevCom• Grant Unconditional approval to forward P802.11aa to

RevCom.

• Moved: Bruce Kraemer

• Seconded: Jon Rosdahl

• This project completed Sponsor Ballot on D9.0 on Jan 27, 2012 with zero comments and 100% approval.

• Document 11-12-0179r3 is the report the requirements for unconditional approval to forward P802.11aa to RevCom.

• URL: https://mentor.ieee.org/802.11/dcn/12/11-12-0179-03-00aa-status-report-to-revcom-for-11aa.pptxSlide 19

Bruce Kraemer, Marvell

Page 20: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 20

doc.: IEEE 802 EC-12/0004r1

Agenda

Motion – 802.11ae(Prioritization of Management Frames)

UnConditional Approval to RevCom• Grant Unconditional approval to forward P802.11ae to RevCom.

• Moved: Bruce Kraemer

• Seconded: Jon Rosdahl

• This project completed Sponsor ballot on Jan 04, 2012 with zero comments and 100% approval

• Document 11-12-0030r1 is the report the requirements for unconditional approval to forward P802.11ae to RevCom was approved in the WG: 61/0/0

• URL: https://mentor.ieee.org/802.11/dcn/12/11-12-0030-01-00ae-excom-request-to-proceed-to-revcom.ppt

Slide 20

Bruce Kraemer, Marvell

Page 21: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 21

doc.: IEEE 802 EC-12/0004r1

Agenda

10: Update: November Workshop Action items

Kraemer 60 min

Workshop Action items doc::EC-12/03r1https://mentor.ieee.org/802-ec/dcn/12/ec-12-0003-01-00EC-november-2011-ec-workshop-action-items.xls

Page 22: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 22

doc.: IEEE 802 EC-12/0004r1

Agenda

11. AOB

About 15 min

Page 23: Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

February 2012

Jon Rosdahl, CSR

Slide 23

doc.: IEEE 802 EC-12/0004r1

Agenda

References

• https://mentor.ieee.org/802-ec/dcn/12/ec-12-0003-00-00EC-november-2011-ec-workshop-action-items.xls

• https://mentor.ieee.org/802.11/dcn/12/11-12-0030-01-00ae-excom-request-to-proceed-to-revcom.ppt

• https://mentor.ieee.org/802.11/dcn/12/11-12-0179-01-00aa-status-report-to-revcom-for-11aa.pptx

• https://mentor.ieee.org/802.16/dcn/12/16-12-0141.pdf

• https://mentor.ieee.org/802.21/dcn/12/21-12-0014-00-0000-report-to-802-ec-interim-teleconference.pptx