PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITY SUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT SCOPE OF ACCOMPLISHMENT ARCHITECTURAL PHASE (OCTOBER 2015 – CURRENT) 1.) CONCRETING OF STAIRS 2.) INSTALLATION OF, DOORS, GLASS, WATERPROOFING 3.) TILE SETTING, ROOFING WORKS, METAL FURRINGS, HAND RAILS, PIPE FITTINGS. TOTAL ACCOMPLISHMENT PERCENTAGE AS OF NOVEMBER 6 2015: (75.63% )

Doc House Report November Progress

Embed Size (px)

DESCRIPTION

civil engineering

Citation preview

Page 1: Doc House Report November Progress

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

SCOPE OF ACCOMPLISHMENT ARCHITECTURAL PHASE (OCTOBER 2015 – CURRENT)

1.) CONCRETING OF STAIRS2.) INSTALLATION OF, DOORS, GLASS, WATERPROOFING3.) TILE SETTING, ROOFING WORKS, METAL FURRINGS, HAND RAILS, PIPE FITTINGS.

TOTAL ACCOMPLISHMENT PERCENTAGE AS OF NOVEMBER 6 2015: (75.63% )

Page 2: Doc House Report November Progress

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

PIPE FITTINGS AND CONCRETING OF STAIRS

Page 3: Doc House Report November Progress

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

RAILINGS AND METAL FURRING INSTALLATION

Page 4: Doc House Report November Progress

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

ROOFING AND CEILING CLOSURE

Page 5: Doc House Report November Progress

PROJECT: PROPOSED TWO STOREY RESIDENTIAL BUILDING LOCATION: PATAG CAGAYAN DE ORO CITYSUBJECT: PROGRESS REPORT FOR OCTOBER 2015 – CURRENT

PAINTING WORKS (SKIMCOAT)

Page 6: Doc House Report November Progress