Do you need your electricity supply disconnected?If so, please read our guide for the costing, processes and how to apply
ukpowernetworks.co.uk
I need my electricity supply disconnected
2 Excavating in the highway We always have to dig in the footpath or road to disconnect an underground supply. The council may charge us to close the footpath or road which can delay work.
Price on average £500 but in rare circumstances could be as high as £10,000
Time: up to three months to obtain permits (dependent on local authority)
3 Parking. Do you have a parking space we can use to get close to the power cable? If not there may be an extra charge from the local council to enable us to park.
Price from £30 to £300 per parking bay (dependent on local authority)
1 You will need to have your electricity meter removed, UK Power Networks will contact your supplier to arrange this.
4 Once the disconnection is complete, we will issue you with a Disconnection Certificate and update the national database.
15 working days
This is an approximate time that the work could take, from quote acceptance and receipt of payment. Please be aware that during periods of high workload the times indicated may vary.
This is the approximate price to disconnect your electricity supply
What next?
Please proceed to next page and fill in the application form
990
UK Power Networks standard disconnection
cost (approximately)
Probable total cost
Costs from 1 to 4 on the diagram
Price average £990 including VAT
+
=
If you are not sure about what your job might involve, please give us a call on 0800 085 5290
Who’s responsible?
Key You Us – UK Power Networks
2
There may be some additional costs. Please follow the four steps below to find out which additional costs might affect you...
Please be aware that not all these costs are payable to UK Power Networks. For example you would pay your electricity supplier (step 1) and electrician separately.
Any questions: 0800 085 5290
1. Customer details If you would like a disconnection and have gone through the stages outlined on the previous page, please complete your application here.
Name: Company name:
Address:
Postcode: Email:
Telephone: Mobile:
2. Contact details (if different from customer details) Please note: this is who we will contact with regards to your site, ie electrician.
Name: Company name:
Address:
Postcode: Email:
Telephone: Mobile:
3. Site information (where the works are to be carried out)
Name:
Address:
Postcode: Local Authority:
4. Disconnections detailsNumber of electricity meters to be disconnected:
Meter point administration number (MPAN) (found on your electricity bill):
If there are multiple MPAN’s to be disconnected , please enter details below: (continue on another page if necessary)
MPAN number Address Vacant (YES / NO) Postcode
Is your electricity supply fed by: (please tick) Undergound cables Overhead cables Don’t know
Application to disconnect an electricity supply
Remember, if you just want your meter removed then please speak with your supplier – there is no need to contact UK Power Networks.
3
Any questions: 0800 085 5290
MPAN(s) Location Meter serial number Supplier
Application to disconnect an electricity supply
continued
5. Additional information
Is the property on a private road? Yes No
How wide is the footpath outside the property?
Are there any parking bays outside the property? Yes No
If yes, please specify the type of bay, eg residents, pay and display, doctor, loading etc.
Outside the property are there?
Single yellow lines Yes No
Double yellow lines Yes No
A red route Yes No
A bus stop Yes No
If yes, please specify the shelter or stop number
Is there scaffolding works affecting the footpath outside of the property? Yes No
Are there any other works currently going on outside the property? Yes No
Is this a Construction Design and Management (CDM) F10 notifiable site? Yes No
If yes:
- Is a site induction required to gain entry?
- How long does the induction take?
- What information do UK Power Networks need to supply?
Is the site contaminated? Yes No
If yes:
- Where is the contamination?
- What type of contamination is it?
- If Asbestos is present, is it air-born?
6. Tell us about your project
4
continues overleaf
Any questions: 0800 085 5290
5
Application to disconnect an electricity supply
continued
Draw a plan of your property: This can be a print from an online map or hand drawn.
Example plan of a propertyDraw a plan of your property:
Draw where your property is:
Belmont Road
Holla
nd W
ay
Shire Crescent
New Site
7. Drawing and mapsPlease send or draw (right) a plan of your property. To enable us to accurately quote your work we need a clear plan showing where your meter is located.
It would also help us if you could identify your site boundary and let us know of any hazards or obstructions at site.
Please send us a map or draw (right) where your property is. Please show your site boundary, two road names which surround the property and let us know of any hazards or obstructions at site.
Any questions: 0800 085 5290
What next?
Explaining the process
Standard disconnection
5 daysComplex
disconnection 25-35 days
Within 90 days of receiving your quote
5 days
5 days
6
ukpowernetworks.co.uk
Sending your applicationPrint and scan this form then email it to: [email protected]
Print the form and post it to: Disconnections Department, UK Power Networks, Metropolitan House, Darkes Lane, Potters Bar, Hertfordshire EN6 1AG
Any questions: 0800 085 5290
7
6
5
4
3
2
Starting the processContact UK Power Networks either by calling us on 0800 085 5290 to request a disconnection of supply or visit our website www.ukpowernetworks.co.uk to download an application form.Please note that meter removals only are still dealt with by your supplier.
Complete the application form and send it to us at [email protected] or post it toDisconnectionsUK Power Networks Offices2nd Floor Metropolitan House, Darkes Lane, Potters Bar, Herts, EN6 1AG
QuotationAfter we have received your application, your dedicated coordinator will provide you with a formal quotation* that will be valid for 90 days, after which time your quote will expire.
*subject to site survey.
PaymentOnce you have received the quote and are happy to proceed with the disconnection, you can agree to the works by making payment in full to UK Power Networks. Details of how to make payment can be found on your quotation.
Notifying your supplierWe will notify your supplier on your behalf and give statutory notice to allow removal of their equipment.
Scheduling worksYour co-ordinator will try and schedule the works to meet your desired dates. This is not always possible as the local authority has to agree to our requested dates, co-ordinating any potential conflicts with other planned utility works.
Works on siteIt is your responsibility to ensure that there are no obstacles that may delay works from being carried out on the agreed date. For example, your supplier should have removed the meter prior to works starting, the disconnection area should be clear from stored items or scaffolding.Either you or a nominated site contact must be available on the day to ensure we have access to our equipment inside the property.
1
I need the electricity
supply cable
and head completely re
moved fro
m
my property
3 Excavating in the Highway
We always have to dig in the
footpath or road to connect a
new
underground supply. The council m
ay
charge us to clo
se the footpath or
road which can delay work.
Price
on average £500 but in rare
circumsta
nces could be as high
as £10,000
Tim
e: up to 3 months to obtain
permits (dependent on council)
4 Parking. Do you have a parking
space we can use to get close
to the power cable? If
not there
may be an extra charge from the
local council t
o enable us to park.
Price
from £30 - £
300 per parking
bay (dependent on council)
1 You will need to have your
electricity
meter removed. Th
is
can be organised by contacting your
energy supplier, who will a
lso send us
a D0132 disconnectio
n request.
Price
£0
2 Complete and submit t
he
Disconnectio
ns application
form and send to UK Power
Networks, address b
elow.
Price
£0
5 Once the disconnectio
n is complete,
we will issue you with a Disco
nnection
Certificate and update the national
database.
Price
£0
15 working days
Is our ta
rget time to complete the
disconnectio
n once payment has
been received. (This a
pplies to
straight-fo
rward disconnectio
ns.)
Price
start fr
om
around £1,000*
This cost is
an approximate price.
Follow the steps below to find out
any requirements and additio
nal
charges that m
ay affect you.
What next?
Once you have made yourself
aware of the potential co
sts
involved, please proceed by
applying for a disconnectio
n on
the next page.
1,000
1,000
0
UK Power Networks standard cost f
rom
Costs from 1 to 5 on the diagram
Probable total cost
+
Disconnectio
ns Application Form
If you would like
a disconnectio
n and have gone through the stages outlin
ed on the previous page please complete your
application here. Please fill o
ut one application per property.
Continued on next page
Application to install a new electri
city supply
continued
Is your su
pply fed by: (
please tick)
Undergound cables
Overground cables
Don’t know
Is your su
pply fed by:
1 Phase
3 Phase
Street W
ork Information (additional in
formation)
How wide is the footpath
outside the property?
Are there any parkin
g bays outsid
e the property?
Yes
No
If YES,
please specify the type of bay,
e.g. Residents, Pay &
Display, Doctor, Lo
ading etc.
Are there any single yellow lines outsid
e the property?
Yes
No
Are there any double yellow lines outsid
e the property?
Yes
No
Is the property
on a red route?
Yes
No
Is there a
bus stop outsid
e the property?
Yes
No
If YES,
please specify the shelter or st
op number
Is there sca
ffolding works affe
cting the footpath
outside of th
e property?
Yes
No
Are there any other works
currently going on outsid
e the property?
Yes
No
Further Comments
(please provide any additional in
formation that may be relevant to
your application and the works re
quired)
Print and scan this f
orm then email it to:
smallservices@
ukpowernetworks.co.uk
Print the form and post i
t to:
Small Services D
epartment,
UK Power Networks, Metropolita
n House,
Darkes La
ne, Potters Bar, H
ertfordshire EN
6 1AG
or Fax it t
o:
08701 964133
If you are not su
re about what
your job might entail
please give
our Disconnectio
ns Team a c
all on
TBC XXXXXXX XXXXXXX and we’ll
be happy to help you.
Customer Details If you would lik
e a disconnectio
n and have gone through the stages outlin
ed on the previous page please
complete your application here. Please fill o
ut one application per property.
Name:
Company name:
Address:
Postcode:
Email:
Telephone:
Mobile:
Site Contact D
etails (if d
ifferent fro
m Customer Details)
Name:
Company name:
Address:
Postcode:
Email:
Telephone:
Mobile:
Site Information (where the works are to be carrie
d out)
Name:
Address:
Postcode:
Local Authority:
Disconnectio
ns Details
Number of properties to
be disconnected:
MPAN number: (found on yo
ur electricity
bill):
If there are multip
le MPAN numbers to be disco
nnected , please enter details b
elow: (continue on another page if n
ecessary)
Please be aware that not all the above costs are payable to UK Power Networks.
For example you would pay your electricity supplier and electric
ian separately.
Please proceed to next page to make an application.
*Please note all our prices are exclu
sive of VAT.
Submitting your applica
tion
MPAN number
Address
Vacant (YES / NO)
Postcode
Responsibility
Anticipated total time: 4 – 6 weeks (for simple works)
You and
us
You
Us
You
Us
Us
You and
us
Please be aware that during periods of high workload the times indicated may vary.
Anticipated time to complete
UK Power Networks (Operations) Limited Registered office: Newington House, 237 Southwark Bridge Road, London SE1 6NP Registered number: 3870728 registered in England and Wales
V3Apr2014