15
SAFER, SMARTER, GREENER DNV GL © 2017 Closing the gap and Preparing for EU MRV and IMO DCS Naufal Ashraff DNV GL MARITIME London, March 2017 1

DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

Embed Size (px)

Citation preview

Page 1: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

SAFER, SMARTER, GREENERDNV GL © 2017

Closing the gap and Preparing forEU MRV and IMO DCS

Naufal Ashraff

DNV GL MARITIME

London, March 2017

1

Page 2: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

Coming EU and IMO Monitoring, Reporting & Verification schemes will require to deliver proper, verifiable voyage data

For each ship >5.000 GT and for each voyage to, within and from EU (and EFTA) ports

1. Port of departure / arrival

2. Amount and emission factor for each type of fuel consumed in total […]

3. CO2 emitted

4. Distance travelled

5. Time spent at sea

6. Cargo carried

7. Transport work

8. Separate CO2 emissions report for berthing and voyage

Separate monitoring plan

Monitoring

Reporting

Verification

Reporting needs EU-MRV: Reporting needs IMO-DCS:

MRV: Monitoring, Reporting & Verification DCS: Data Collection System

For each ship >5.000 GT and for the year

1. amount and emission factor for each type of fuel consumed in total […]

2. distance travelled

3. hours underway

4. DWT (as cargo proxy)

Monitoring plan part of SEEMP2018

2019

2

Page 3: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

Which voyages are covered under the EU MRV?

EU MRV relevant voyage, port of departure or port of arrival

Non EU MRV relevant voyage, port of departure or port of arrival

3

Page 4: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

Roughly 12,000 vessels affected annually

4

Page 5: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

EU MRV & IMO DCS regulation and your required actions

30th April ’19

Send emission report

30th June ’19

Data publication

31st Aug ’17

EU MRV Monitoring plan

Your to do’s:

Prepare MRV plan

Verify data input & quality

Decide & implement/adapt system

Prepare &

send report

Monitor & report Monitor & report

1st Jan – 31st Dec ’18

EU MRV 1st reporting period

M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J

2017 2018 2019 2020

1st Jan – 31st Dec ’19

IMO DCS 1st reporting period

31st Dec ’18

SEEMP Part II Monitoring plan

1st June ‘20

Send emission report IMO

Prepare SEEMP

part II

Prepare &

send report

Prepare &

send report

5

Page 6: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

Start by considering important question on your reporting system

Do I want to use my own system for reporting or monitoring?

Yes, I have my

own system

No, I have or will get

3rd party system

Ensure that current system is

gathering necessary data

Ensure that data quality is adequate

Make sure you have resources

available to follow-up on system

adaption

Ask supplier if system will be MRV

compliant and:

Gather necessary data

Provide adequate data quality

Provide necessary reports in correct

format to be sent to verifiers and

European Commission

6

Page 7: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

MRV readiness app helps for a first assessment whether a shipping company is EU MRV ready

Free to access: my.dnvgl.com -> “add service” then “MRV readiness app”.

MRV Ready quick check

7

Page 8: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

Our MRV plan app lets you easily create a plan with pre-filled technical data

MRV plan generator

8

Page 9: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

“Building blocks” can be selected to fill the procedure template

MRV plan generator

9

Page 10: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

DNV GL can provide a compliant and effective reporting solution which is user friendly and support all shore to ship reporting

Reporting solution:

Navigator Insight as proven onboard data

recording software to integrate all traditional

ship-to-shore reporting into one solution

Extensive technical and ship specific

plausibility checks deliver high quality data

with no “MRV non-conformities”

Data will be automatically compiled in EU

and IMO formats to be uploaded to resp.

servers

Data are also basis for comprehensive fleet

performance management with ECO Insight

that save operational costs

Navigator Insight will serve as “electronic

logbook” once replacing paper logbooks

becomes more widely accepted

DNV GL Navigator Insight

10

Page 11: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

Engine room

arrangement

drawings

EU MRV Monitoring Plan verification

One-off: Monitoring plan verification Scope

Document verification: Is the company

ready to submit plausible CO2

information

Potentially: office audit

Documentation to be submitted

verify that the company used the appropriate

monitoring plan template and provided all

mandatory items

verify that all installed emission sources and

measurement equipment are described

verify that the systems and procedures are in

place to monitor and report relevant

information

In case the ship is seeking to benefit from the

derogation of ‘per voyage’ monitoring, ensure

that adequate monitoring arrangements are

provided

Procedure 1

Procedure 2

Monitoring Plan

Tools

NPS

Sea-web

EU MRV plan verification

11

Page 12: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

EU MRV Emission Report

Annual: Emission report verification

Digital data verification: are the CO2

Figures submitted in emission report

plausible

Checking emission report with voyage log

abstract of each vessel

Scope

checking completeness

performing reconciliations

checking thresholds

tracing them back to the primary data source

cross-checking them with external data

sources

checking the reliability and accuracy of the

data

checking the consistency between reported

aggregated data and data from relevant

documentation or primary sources

checking the consistency between aggregated

fuel consumption and data on fuel purchased

The verification will be designed as digital as possible to avoid additional work for you!

Emission Report

Log Abstract

External Data

EU MRV emission report verification

12

Page 13: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

EU MRV and IMO DCS to be implemented – What now?

Duplicate schemes going forward?

Emission taxation schemes?

IT systems for monitoring and

reporting?

More transparency and increased

focus on energy efficiency and CO2?

What is the effect of public data?

How to reduce additional load?

13

Page 14: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

DNV GL © 2017

Additional MRV information

Further information on the EU MRV regulation;

https://www.dnvgl.com/maritime/eu-mrv-

regulation/index.html

MRV brochure on the DNV GL website under

Maritime Studies and Papers;

https://www.dnvgl.com/publications/eu-mrv-

regulation-39205

TECHNICAL AND REGULATORY NEWS No. 19, 2015;

https://www.dnvgl.com/news/preparing-for-the-

mrv-regulation-44357

MRV webinar stream;

https://www.dnvgl.com/maritime/mrv-regulation-

webinar.html

14

Page 15: DNV GL MARITIME Closing the gap and Preparing for EU … · Closing the gap and Preparing for ... DNV GL © 2017 Coming EU and IMO Monitoring, Reporting & Verification schemes

SAFER, SMARTER, GREENER

www.dnvgl.com

Closing the gap and be ready for EU MRV and IMO DCS

For further questions please contact:

Business Development LeaderMaritime Advisory Region Germany & Western EuropeJarle Coll Blomhoff

[email protected]

+49 175 727 8992

Business Development ManagerUK & IrelandNaufal Ashraff

[email protected]

+44 7860179612

15