Page 1: DNV Codes Main Changes 2013

DNV SERVICE SPECIFICATIONS, STANDARDS AND

RECOMMENDED PRACTICES

DET NORSKE VERITAS AS

Summary of Changes and Current Document Status

OCTOBER 2013

Page 2: DNV Codes Main Changes 2013

© Det Norske Veritas AS October 2013

Any comments may be sent by e-mail to [email protected]

This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document, and is believed to reflect the best ofcontemporary technology. The use of this document by others than DNV is at the user's sole risk. DNV does not accept any liability or responsibility for loss or damages resulting fromany use of this document.

FOREWORD

DNV is a global provider of knowledge for managing risk. Today, safe and responsible business conduct is both a licenseto operate and a competitive advantage. Our core competence is to identify, assess, and advise on risk management. Fromour leading position in certification, classification, verification, and training, we develop and apply standards and bestpractices. This helps our customers safely and responsibly improve their business performance. DNV is an independentorganisation with dedicated risk professionals in more than 100 countries, with the purpose of safeguarding life, propertyand the environment.

DNV service documents consist of among others the following types of documents:

— Service Specifications. Procedural requirements.

— Standards. Technical requirements.

— Recommended Practices. Guidance.

The Standards and Recommended Practices are offered within the following areas:

A) Qualification, Quality and Safety Methodology

B) Materials Technology

C) Structures

D) Systems

E) Special Facilities

F) Pipelines and Risers

G) Asset Operation

H) Marine Operations

J) Cleaner Energy

O) Subsea Systems

U) Unconventional Oil & Gas

Page 3: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

Summary of Changes and Current Document Status, October 2013

Contents – Page 3

CONTENTS

Sec. 1 General ................................................................................................................................................ 4

Sec. 2 Current Service Specifications, Standards and Recommended Practices .................................... 5

Sec. 3 Summary of Changes ......................................................................................................................... 9

1 Changes to DNV Service Specifications ........................................................................................................ 9

2 Changes to DNV Standards .......................................................................................................................... 13

3 Changes to DNV Recommended Practices .................................................................................................. 27

Page 4: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

Summary of Changes and Current Document Status, October 2013

Sec.1 General – Page 4

SECTION 1 GENERAL

As of October 2010 all DNV service documents are primarily published electronically and they are madeavailable for free as pdf files through http://www.dnv.com. The electronic pdf versions of the documents foundthrough the same site are the officially binding versions.

Readers of documents are encouraged to regularly check for updates in order to ensure that they hold thecurrent updated versions.

Updating Scheme

These documents are published throughout the year except DNV Offshore Service Specifications and OffshoreStandards which are normally published twice yearly, in April and in October.

If a document has been updated, the document will normally be given a new edition date.

The corresponding Adobe PDF file will be made available through http://www.dnv.com and the date of the column“A” of Table 2-1 in Sec.2 will be updated.

If there is a need for amendments to the document; i.e. editorial and clarification corrections only, the electronic filewill be updated, but the edition date will be retained. However, a new Adobe PDF file will be generated and madeavailable through http://www.dnv.com. The date of the PDF file will appear in column “B” of Table 2-1 in Sec.2.

The changes will be described on page 3 of each document. Historic changes are to be found at the end of eachdocument as from July 2013.

Page 5: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

Summary of Changes and Current Document Status, October 2013

Sec.2 Current Service Specifications, Standards and Recommended Practices – Page 5

SECTION 2 CURRENT SERVICE SPECIFICATIONS, STANDARDS AND RECOMMENDED PRACTICES

Table 2-1 Current Documents

Documents

ACurrent Edition

BAmendments; i.e. editorial

corrections and clarifications

only

Service Specifications

DNV-DSS-105 Rules for Classification of Diving Systems 2012-07 –

DNV-DSS-314 Verification of Hydrocarbon Refining and Petrochemical Facilities 2010-10 2012-04

DNV-DSS-315 Verification of Onshore LNG and Gas Facilities 2010-10 2012-04

DNV-DSS-401 Technology Qualification Management 2012-12 –

DNV-DSS-402 Qualification Management for Geological Storage of CO2 2012-06 2013-07

DNV-DSS-904 Type Certification of Wind Turbines 2012-01 2013-02

Offshore Service Specifications

DNV-OSS-101 Rules for Classification of Offshore Drilling and Support Units 2013-10 –

DNV-OSS-102 Rules for Classification of Floating Production, Storage and Loading Units

2012-04 –

DNV-OSS-103 Rules for Classification of Floating LNG/LPG Production, Storage and Loading Units

2012-04 –

DNV-OSS-104 Rules for Classification of Self-Elevating Units 2012-04 –

DNV-OSS-121 Classification Based on Performance Criteria Determined from Risk Assessment Methodology

2008-10 2011-10

DNV-OSS-201 Verification for Compliance with Norwegian Shelf Regulations 2013-10 –

DNV-OSS-202 Verification for Compliance with UK Shelf Regulations 2011-04 2011-10

DNV-OSS-300 Risk Based Verification 2004-04 2012-04

DNV-OSS-301 Certification and Verification of Pipelines 2000-10 2012-04

DNV-OSS-302 Offshore Riser Systems 2010-10 2012-04

DNV-OSS-304 Risk Based Verification of Offshore Structures 2006-10 2012-04

DNV-OSS-305 Rules for Certification and Verification of Diving Systems 2010-10 2011-10

DNV-OSS-306 Verification of Subsea Facilities 2004-06 2012-04

DNV-OSS-307 Verification of Process Facilities 2004-06 2012-04

DNV-OSS-308 Verification of Lifting Appliances for the Oil and Gas Industry 2010-10 2012-04

DNV-OSS-312 Certification of Tidal and Wave Energy Converters 2008-10 2012-04

DNV-OSS-313 Pipe Mill and Coating Yard - Qualification 2009-04 2011-10

DNV-OSS-901 Project Certification of Offshore Wind Farms 2012-06

Standards

DNV-DS-E403 Standard for Surface Diving Systems 2012-07 –

DNV-DS-J102 Design and Manufacture of Wind Turbine Blades, Offshore and Onshore Wind Turbines

2010-10 2010-11

Offshore Standards

DNV-OS-A101 Safety Principles and Arrangements 2013-10 –

DNV-OS-A201 Winterization for Cold Climate Operations (Tentative) 2013-10 –

DNV-OS-B101 Metallic Materials 2012-10 –

DNV-OS-C101 Design of Offshore Steel Structures, General (LRFD Method) 2011-04 –

DNV-OS-C102 Structural Design of Offshore Ships 2012-10 –

DNV-OS-C103 Structural Design of Column Stabilised Units (LRFD Method) 2012-10 –

DNV-OS-C104 Structural Design of Self-Elevating Units (LRFD Method) 2012-04 –

DNV-OS-C105 Structural Design of TLPs (LRFD Method) 2011-04 –

DNV-OS-C106 Structural Design of Deep Draught Floating Units/Spars (LRFD and WSD Method)

2012-04 –

DNV-OS-C201 Structural Design of Offshore Units (WSD Method) 2012-10 –

DNV-OS-C301 Stability and Watertight Integrity 2013-10 –

Page 6: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

Summary of Changes and Current Document Status, October 2013

Sec.2 Current Service Specifications, Standards and Recommended Practices – Page 6

DNV-OS-C401 Fabrication and Testing of Offshore Structures 2013-04 –

DNV-OS-C501 Composite Components 2010-10 –

DNV-OS-C502 Offshore Concrete Structures 2012-09 –

DNV-OS-C503 Concrete LNG Terminal Structures and Containment Systems 2010-10 –

DNV-OS-D101 Marine and Machinery Systems and Equipment 2013-10 –

DNV-OS-D201 Electrical Installations 2013-10 –

DNV-OS-D202 Automation, Safety and Telecommunication Systems 2013-10 –

DNV-OS-D203 Integrated Software Dependent System (ISDS) 2012-12

DNV-OS-D301 Fire Protection 2013-10 –

DNV-OS-E101 Drilling Plant 2013-10 –

DNV-OS-E201 Oil and Gas Processing Systems 2013-04 –

DNV-OS-E301 Position Mooring 2013-10 –

DNV-OS-E302 Offshore Mooring Chain 2013-10 –

DNV-OS-E303 Offshore Fibre Ropes 2013-02 –

DNV-OS-E304 Offshore Mooring Steel Wire Ropes 2013-10 –

DNV-OS-E401 Helicopter Decks 2012-04 –

DNV-OS-E402 Offshore Standard for Diving Systems 2010-10 –

DNV-OS-E403 Offshore Loading Buoys 2008-10 –

DNV-OS-E406 Design of Free Fall Lifeboats 2010-04 –

DNV-OS-E407 Underwater Deployment & Recovery Systems 2012-10 –

DNV-OS-F101 Submarine Pipeline Systems 2013-10 –

DNV-OS-F201 Dynamic Risers 2010-10 –

DNV-OS-H101 Marine Operations, General 2011-10 –

DNV-OS-H102 Marine Operations, Design and Fabrication 2012-01 –

DNV-OS-H201 Load Transfer Operations 2012-04 –

DNV-OS-H203 Transit and Positioning of Offshore Units 2012-02 –

DNV-OS-J101 Design of Offshore Wind Turbine Structures 2013-01 2013-02

DNV-OS-J103 Design of Floating Wind Turbine Structures 2013-06 –

DNV-OS-J201 Offshore Substations for Wind Farms 2009-10 –

DNV-OS-J301 Wind Turbine Installation Units 2013-04 2013-07

Recommended Practices

DNV-RP-A201 Plan Approval Documentation Types – Definitions 2012-04 –

DNV-RP-A203 Technology Qualification 2013-07 –

DNV-RP-A204 Quality Survey Plan (QSP) for Offshore Class New-building Surveys 2011-09 –

DNV-RP-A205 Offshore Classification Projects - Testing and Commissioning 2013-10 –

DNV-RP-B101 Corrosion Protection of Floating Production and Storage Units 2007-04 –

DNV-RP-B401 Cathodic Protection Design 2010-10 2011-04

DNV-RP-C101 Allowable Thickness Diminution for Hull Structure of Offshore Ships 2007-04 –

DNV-RP-C102 Structural Design of Offshore Ships 2002-02 –

DNV-RP-C103 Column-Stabilised Units 2012-04 –

DNV-RP-C104 Self-elevating Units 2012-11 –

DNV-RP-C201 Buckling Strength of Plated Structures 2010-10 –

DNV-RP-C202 Buckling Strength of Shells 2013-01 –

DNV-RP-C203 Fatigue Design of Offshore Steel Structures 2012-10 –

DNV-RP-C204 Design against Accidental Loads 2010-10 –

DNV-RP-C205 Environmental Conditions and Environmental Loads 2010-10 –

DNV-RP-C206 Fatigue Methodology of Offshore Ships 2012-10 –

DNV-RP-C207 Statistical Representation of Soil Data 2012-01 –

DNV-RP-C208 Determination of Structural Capacity by Non-linear FE Analysis Methods

2013-07 –

Table 2-1 Current Documents (Continued)

Documents

ACurrent Edition

BAmendments; i.e. editorial

corrections and clarifications

only

Page 7: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

Summary of Changes and Current Document Status, October 2013

Sec.2 Current Service Specifications, Standards and Recommended Practices – Page 7

DNV-RP-C301 Design, Fabrication, Operation and Qualification of Bonded Repair of Steel Structures

2012-04 –

DNV-RP-C302 Risk Based Corrosion Management 2012-04 –

DNV-RP-D101 Structural Analysis of Piping Systems 2008-10 –

DNV-RP-D102 Failure Mode and Effect Analysis (FMEA) of Redundant Systems 2012-01 –

DNV-RP-D201 Integrated Software Dependent Systems 2009-10 –

DNV-RP-D202 Witnessing of Low Sulphur Fuel Changeover and Operations 2013-10 –

DNV-RP-E101 Recertification of Well Control Equipment for the Norwegian Continental Shelf

2012-01 –

DNV-RP-E102 Recertification of Blowout Preventers and Well Control Equipment for the US Outer Continental Shelf

2012-01 –

DNV-RP-E301 Design and Installation of Fluke Anchors in Clay 2012-05 –

DNV-RP-E302 Design and Installation of Plate Anchors in Clay 2002-12 –

DNV-RP-E303 Geotechnical Design and Installation of Suction Anchors in Clay 2005-10 –

DNV-RP-E304 Damage Assessment of Fibre Ropes for Offshore Mooring 2005-04 –

DNV-RP-E306 Dynamic Positioning Vessel Design Philosophy Guidelines 2012-09 –

DNV-RP-E307 Dynamic Positioning Systems - Operation Guidance 2011-01 –

DNV-RP-E401 Survey of Diving Systems 2007-04 –

DNV-RP-E402 Naval Rescue Submersibles 2010-10 –

DNV-RP-E403 Hyperbaric Evacuation Systems 2010-10 –

DNV-RP-F101 Corroded Pipelines 2010-10 –

DNV-RP-F102 Pipeline Field Joint Coating and Field Repair of Linepipe Coating 2011-05 –

DNV-RP-F103 Cathodic Protection of Submarine Pipelines by Galvanic Anodes 2010-10 –

DNV-RP-F105 Free Spanning Pipelines 2006-02 –

DNV-RP-F106 Factory Applied External Pipeline Coatings for Corrosion Control 2011-05 –

DNV-RP-F107 Risk Assessment of Pipeline Protection 2010-10 –

DNV-RP-F108 Fracture Control for Pipeline Installation Methods Introducing Cyclic Plastic Strain

2006-01 –

DNV-RP-F109 On-Bottom Stability Design of Submarine Pipelines 2010-10 2011-11

DNV-RP-F110 Global Buckling of Submarine Pipelines Structural Design due to High Temperature/High Pressure

2007-10 –

DNV-RP-F111 Interference Between Trawl Gear and Pipelines 2010-10 –

DNV-RP-F112 Design of Duplex Stainless Steel Subsea Equipment Exposed to Cathodic Protection

2008-10 –

DNV-RP-F113 Pipeline Subsea Repair 2007-10 –

DNV-RP-F116 Integrity Management of Submarine Pipeline Systems 2009-10 –

DNV-RP-F118 Pipe Girth Weld AUT System Qualification and Project Specific Procedure Validation

2010-10 –

DNV-RP-F201 Design of Titanium Risers 2002-10 –

DNV-RP-F202 Composite Risers 2010-10 –

DNV-RP-F203 Riser Interference 2009-04 –

DNV-RP-F204 Riser Fatigue 2010-10 –

DNV-RP-F205 Global Performance Analysis of Deepwater Floating Structures 2010-10 –

DNV-RP-F206 Riser Integrity Management 2008-04 –

DNV-RP-F301 Subsea Separator Structural Design 2007-04 –

DNV-RP-F302 Selection and Use of Subsea Leak Detection Systems 2010-04 –

DNV-RP-F401 Electrical Power Cables in Subsea Applications 2012-02 –

DNV-RP-G101 Risk Based Inspection of Offshore Topsides Static Mechanical Equipment

2010-10 –

DNV-RP-G103 Non-intrusive Inspection 2011-01 –

DNV-RP-H101 Risk Management in Marine - and Subsea Operations 2003-01 –

Table 2-1 Current Documents (Continued)

Documents

ACurrent Edition

BAmendments; i.e. editorial

corrections and clarifications

only

Page 8: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

Summary of Changes and Current Document Status, October 2013

Sec.2 Current Service Specifications, Standards and Recommended Practices – Page 8

DNV-RP-H102 Marine operations during Removal of Offshore Installations 2004-04 –

DNV-RP-H103 Modelling and Analysis of Marine Operations 2011-04 2012-12

DNV-RP-H104 Ballast, Stability, and Watertight Integrity -Planning and Operating Guidance

2011-09 –

DNV-RP-J101 Use of Remote Sensing for Wind Energy Assessments 2011-04 2011-11

DNV-RP-J201 Qualification Procedures for CO2 Capture Technology 2010-04 –

DNV-RP-J202 Design and Operation of CO2 Pipelines 2010-04 –

DNV-RP-J203 Geological Storage of Carbon Dioxide 2012-04 2013-07

DNV-RP-O401 Safety and Reliability of Subsea Systems 1985-04 –

DNV-RP-O501 Erosive Wear in Piping Systems 2007-11 2011-01

DNV-RP-U301 Risk Management of Shale Gas Developments and Operations 2013-01

Table 2-1 Current Documents (Continued)

Documents

ACurrent Edition

BAmendments; i.e. editorial

corrections and clarifications

only

Page 9: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 9

SECTION 3 SUMMARY OF CHANGES

1 Changes to DNV Service Specifications

Table 3-1 DNV Service Specifications

Document number

Document title Changes

DNV-OSS-101

October 2013

Rules for Classification of Offshore Drilling and Support Units

General

Specific for this editionSignificant changes have been highlighted throughout the document. For clarity, the following changes have not been highlighted:

— content based on existing requirements from reference documents

— interpretations based on old rule requirements— editorial restructuring and moves.

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101 Ch.2 Sec.3 D506” is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6]”.

— The content has been balanced by describing survey requirements applicable for all units, followed by vessel type specific requirements for all periodical surveys and applicable areas (typically with regard to hull and equipment).

— Periodical survey requirements have been aligned with the Rules for Classification of Ships (Rules for Ships).

— Gas turbine inspection requirements have been covered.— The position/ use of DNV-OSS-101 with regard to DNV-OSS-

104 has been clarified.— Service unit survey requirements have been clarified and

focused, among others by including specific sub-section on scope.

— A new App.B on mooring equipment acceptance standard guidance, originally placed inside the main text, has been included.

— More extensive descriptions with regard to our follow up on ageing units have been included.

— Descriptions for alternative survey arrangements have been updated.

Ch.1 General

— Definition of EU Mutual Recognition Type Approval Certificate has been included.

Ch.1 Sec.3 Classification scope and notations

— The overview of class notations in [2] has been updated.

Ch.2 General

— Scope of classification with regard to structural design has been clarified in Sec.2 [3] and Sec.1 [4].

Ch.3 General

— The text has been restructured by:

1) Restructuring content of Sec.2 and previous Sec.4 A.

2) Deleting previous Sec.3 on alternative survey arrangements and service suppliers and moving the content to respectively Sec.7 and Sec.8.

3) Separating Miscellaneous main class surveys from Sec.3.

Ch.3 Sec.1 General provisions

— Updated overview table of periodical surveys.

Page 10: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 10

DNV-OSS-101(continued)

October 2013

Rules for Classification of Offshore Drilling and Support Units (continued)

Ch.3 Sec.2 General requirements for structure and machinery surveys

— Aligned with relevant description of Rules for Ships.— Reference to RP for bonded patch repairs.

Ch.3 Sec.3 (previous Sec.4) Periodical survey extent for main class

— [1] General:

— Updated IIP scope table.

— [2] Annual survey – main class:

— Content has been rewritten based on applicable Rules for Ships and IACS.

— The text has been restructured as described above.

— [3] Intermediate survey:

— Content has been rewritten based on applicable Rules for Ships and IACS.

— The text has been restructured as described above.— Specific requirements for units > 10 years have been added.

— [4] Renewal survey, structure and equipment:

— Content has been rewritten based on applicable Rules for Ships and IACS.

— The text has been restructured as described above.— Thickness measurement tables for different vessel types

have been included.— Special, primary and secondary areas for inspection for

different vessel types have been listed.— Tail shaft sealing inspection for non-self-propelled units has

been included.

— [5] Renewal survey, machinery and safety systems:

— Content has been rewritten based on applicable Rules for Ships and IACS.

— The text has been restructured as described above.

Ch.3 Sec.4 Miscellaneous main class surveys

— The text has been cleaned up by to a larger degree referring to relevant Rules for Ships.

Ch.3 Sec.5 Periodical survey extent for additional service notations

— Specific survey requirements for the different service notations have been updated.

— Scope for each service notation has been clarified.— Wind Turbine Installation units and Offshore Support units have

been included.

Ch.3 Sec.6 Optional class notation surveys

— Several requirements related to the DRILL notation have been updated.

— DEICE has been removed.— WINTERIZATION and ISDS requirements have been included.— BWM references have been completed— Several notations have been updated by in a large degree

referring to the Rules for Ships.

Ch.3 Sec.7 Alternative survey arrangements

— Alternative survey requirements for drilling equipment have been described.

Ch.3 Sec.8 Surveys performed by approved companies

— This new section contains existing requirements on service suppliers previously found in Sec.3.

Page 11: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 11

DNV-OSS-201

October 2013

Verification for Compliance with Norwegian Shelf Regulations

General

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101” Ch.2 Sec.3 D506 is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6].”

— General updating of contents to correctly reflect governing legislation of PSA, NMA and NOROG/NSA guidelines.

— Implementation letter from letters from the Petroleum Safety Authority Norway (PSA) to Class Societies 2012-06-26 about additional text to the N-notation.

Ch.1 Sec.1 Introduction

— Updated definition of AoC in [2.2].— Updated reference and abbreviation tables in [3.1] and [4.1].

Ch.1 Sec.2 Verification Principles and Class Notations

— Updated regulation references in [1.2].

Ch.2 Sec.2 Drilling Unit (N)

— Class notation ES (Enhanced Systems) is added as a prerequisite for Drilling Unit (N) in [1.1.1].

— Verification basis for Drilling Unit (N) has been updated in Table 2-1.

— Additional technical requirements stipulated by PSA in letter to Class Societies 2012-06-26 have been added in [2.2].

Ch.2. Sec.3 Production and/or Storage Unit (N)

— Verification basis for Production Unit (N) in Table 3-1 has been significantly updated to reflect latest PSA Facility regulations guidance on limitations on use of maritime regulations for mobile facilities that are production facilities

— Additional technical requirements stipulated by PSA in letter to Class Societies 2012-06-26 have been added in [2.2].

Ch.2 Sec.4 Storage Unit (N)

— New section introduced to specifically cover Storage Unit (N). This was previously combined with Production Unit (N).

Ch.2 Sec.5 Well Intervention Unit (N)

— Class notation ES (Enhanced Systems) is added as a prerequisite for Well Intervention Unit (N) in [1.1.1]

— Verification basis for Well Intervention Unit (N) has been updated in Table 5-1.

— Additional technical requirements stipulated by PSA in letter to Class Societies 2012-06-26 have been added in [2.2].

Ch.2 Sec.6 Accommodation Unit (N)

— Verification basis for Well Intervention Unit (N) has been updated in Table 6-1.

— Additional technical requirements stipulated by PSA in letter to Class Societies 2012-06-26 have been added in [2.2].

Ch.2 Sec.7 DRILL(N)

— Verification basis for DRILL (N) has been updated in Table 7-1.

Ch.2 Sec.8 PROD(N)

— Verification basis for PROD (N) has been updated in Table 8-1.

Ch.2 Sec.9 WELL(N)

— Verification basis for WELL (N) has been updated in Table 9-1.

Page 12: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 12

DNV-OSS-201(continued)

October 2013

Verification for Compliance with Norwegian Shelf Regulations(continued)

Ch.2 Sec.11 CRANE(N)

— NORSOK R-002 has been added in [2.2.1] as verification basis for CRANE(N) in line with latest amendment of PSA Regulations.

Ch.3 Sec.1 General Provisions for Periodical Surveys

— New guidance note on evaluation of rule changes introduced in [2.1.1].

App.A Special Considerations for Ageing Offshore Units (Informative)

— New informative annex added to inform about PSA's requirements to documentation of ageing units (defined as 19 calendar years).

Page 13: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 13

2 Changes to DNV Standards

Table 3-2 DNV Standards

Document number

Document title Changes

DNV-OS-A101

October 2013

Safety Principles and Arrangements

General

The document has been updated to be in accordance with the new principles for DNV Offshore Standards for Classification, including:

— This document has been split into three chapters of which Ch.2 contains technical requirements. In addition the structure has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101 Ch.2 Sec.3 D506” is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6]”.

— Interpretations have been added.— The voluntary ES notation has been defined.— Alignment with IACS, MODU code and other relevant

international standards.— Changed sequence of service unit sections to drilling units -

FPSO - FLNG.

Ch.1 Sec.1 (old Sec.1)

— [1.4]: Included definition of “interpretations”.— [1.5]: A new sub-section on structure has been added.— [4]: Revised and simplified definitions.

Ch.2 Sec.1 (old Sec.2)

— Completely rewritten— [3]: Added requirement to establish acceptance criteria.— [4]: Adjusted radiation level at lifeboats to require heat

protection from 12.5 to 4.7 kW/m2 to align with radiation requirements generally given.

Ch.2 Sec.2 (old Sec.3)

— [3]:

— Added separation requirements of hazardous and non-hazardous areas including drain

— Added requirements of toe board for deck, gangways, and stairways.

— Added requirements of the non-use of asbestos.

Ch.2 Sec.3 (old Sec.4)

— [1]: Restructured scope and objective definitions.— [4]:

— Included IACS/ MODU code definitions for hazardous areas.

— Added battery installations requirements.

Ch.2 Sec.4 (old Sec.5)

— Major changes in that Sec.4 will only include general requirements applicable to all offshore units whereas specific requirements related to Drilling Units or FPSOs are now included in Sec.6 and Sec.7 respectively.

— [1]:

— Objective rewritten to make clear the complementary role of ESD to hazardous areas wrt. ignition control.

— Scope description has been included.— Completion application description to make clear the difference

of our follow up between basis class and ES.

— [2]: Containing basis provisions based on MODU code (with our interpretations.

Page 14: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 14

DNV-OS-A101(continued)

October 2013

Safety Principles and Arrangements (continued)

Ch.2 Sec.5 (old Sec.6)

— [2] and [4]:

— Escape routes are now related to regularly manned areas.— Ref. is made to DNV-OS-D201 related to escape/access for

switchboards and capacity requirements for batteries for emergency lighting.

— [5]: Revised MODU Code/SOLAS references for marking of units in transit.

— [6]: Clarified principles for alarm and alert signals and added reference to DNV-OS-D202 on alarm philosophy.

Ch.2 Sec.6 (Old Sec.8)

— Clarified that the section is also applicable for well intervention units with return of hydrocarbons.

— [3]: Aligned and restructured area hazard classification with IACS.

— [4]: As for Sec.7 [4] the same has been done for this section.— Restructured between basis provisions and enhanced ESD

system requirements.

Ch.2 Sec.7 (Old Sec.7)

— [1] and [5]: Clarified principles for units where simultaneous production and tank inspection will apply (in [1]) and added such requirements (in [5]).

— [4]: As for Sec.5 this is subjected to a major revision in that all specific requirements for FPSOs are given in this part as opposed to the previous version where too many specific FPSO requirements were given as general requirements.

— New figures for ESD overall shutdown hierarchy have been given for both anchored and dynamically units have been included.

Ch.2 Sec.8 (Old Sec.9)

— [7]: As for Sec.7 [5] a new part has been added for units where simultaneous production and tank inspection will take place.

Ch.3 Certification and classification

— This chapter is new.

Appendices

— A new App.C has been added on methodology that can be used for ignition source control.

DNV-OS-A201

October 2013

Winterization for Cold Climate Operations (Tentative)

General

This is a new document.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 15: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 15

DNV-OS-C301

October 2013

Stability and Watertight Integrity

General

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101 Ch.2 Sec.3 D506” is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6]”.

Ch.1 Sec.1 Introduction

— [4.2.4] has been amended by adding “or weathertight”.

Ch.2 Sec.1 Stability

— In [1.1.5] the convention for IMO MODU Code references has been modified.

— A note has been added to [4.2.2].— A note has been added to [5.2.2].

Ch.2 Sec.2 Watertight Integrity, Freeboard and Weathertight Closing Appliances

— [10.1.1] has been amended regarding description of waterlines (beach lines).

DNV-OS-D101

October 2013

Marine and Machinery Systems and Equipment

General

The document has been updated to be in accordance with the new principles for DNV Offshore Standards for Classification, including:

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101 Ch.2 Sec.3 D506” is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6]”.

— Interpretations have been added.— The voluntary ES notation has been defined.— Alignment with IACS, MODU code and other relevant

international standards.

Ch.1 General

— The chapter has been restructured to clarify objective and scope of the standard.

— Definition of Interpretations has been included in Sec.1 [1.3].

Ch.2 Technical Provisions

— Restructured detailed rules to make clear their relation to principal requirements.

— Updated existing guidance notes to make clear that a follow up is expected.

— Requirements for refrigeration system of Sec.1 [1.11] defined under the scope of ES.

— Removed previous Sec.5 F Windlasses, Winches and Chain Stoppers for Temporary and Limited Use. Now covered by updated DNV-OS-E301.

Ch.3 General

— A more extensive description of classification in Sec.1 [1] and an overview of the requirements covered by ES included.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 16: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 16

DNV-OS-D201

October 2013

Electrical Installations General

The document has been updated to be in accordance with the new principles for DNV Offshore Standards for Classification, including:

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101 Ch.2 Sec.3 D506” is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6]”.

— Alignment with IACS, MODU code and other relevant international standards.

— Interpretations have been introduced.

Ch.1 Introduction

— Sec.1 [1.3.1]: Definition of interpretations has been included.— Sec.1 [1.4]: Description of the documents structure as been

included.— Sec.1 [4.10.1]: Definitions of switchboards, assemblies,

switchgear and controlgear given.

Ch.2 Technical provisions

— General

— Detailed rules have been restructured in order to clarify their relation to principal requirements.

— Existing guidance notes have been updated to specify that a follow up is expected.

— Sec.1 General

— [4.4.2]: The list of Important services has been amended. Among changes: auxiliary boilers in vessels with HFO as the main fuel is regarded as important equipment.

— [4.4.3]: The list of Emergency services has been amended. Among changes: navigation and communication system listed as emergency systems.

— [4.6.2]: EMC zones have been defined.

— Sec.2 System design

— Several detailed requirements have been deleted:

— in previous D102 on battery charger— in previous H303 Generator instrumentation a) on

busbar frequency read-out— in previous I205 on lighting circuits for cargo spaces.

— [1.2.2]: Sockets can be accepted for any voltage level.— [2.2.5]: Requirements related to regeneration of power by e.g

water milling of propellers are made applicable to all offshore units.

— [3.1.1]: Requirements for ventilation of emergency generator room and cooling of emergency generator prime mover have been added.

— Table 2-1: Requirement for emergency power for fire fighting system and alarm sounder system has been added.

— [6.4]: Limitation for rating of socket outlets for shore connection has been deleted.

— [7.1.1]: Requirement for load shedding shall take into account both active and reactive overload.

— [7.2.4]: Common short circuit protection is acceptable for non-important consumers and for consumer constituting a functional service group.

— [7.2.6]: Requirement to short circuit protection of secondary side of control power transformer has been modified.

— [7.4.2]: New requirement for protection of high voltage control transformers.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 17: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 17

DNV-OS-D201(continued)

October 2013

Electrical Installations(continued)

— [8.1.1]: If one pole or phase of the control voltage source is earthed, the control wiring and interlocks (if any) shall be installed on the non-earthed side of any relay coils.

— [8.2.2]: All generator prime movers and generator circuit breakers shall have means for manual operation.

— [8.2.4]: A shut down or stop signal to the prime mover shall cause disconnection signal to the generator circuit breaker.

— [8.2.5]: Each generator cubicle shall have a separate circuit from the control voltage distribution, with separate short circuit protection.

— [8.4.2]: Requirement for local control of motors and motor starters has been added.

— Table 2-6: Requirements for minimum cross-section of earth conductor have been updated.

— [10.5.4]: Requirements for de-rating of bunched cables have been updated.

— [10.8.1]: Tables for Current rating of cables with temperature class 60, 85 and 95 deg. C have been deleted.

— Sec.3 Equipment in general

— [2.3]: Maximum operational temperature limits have been updated.

— [3.1.4]:The possibility for defining EMC zones as given in IEC 60533 has been included.

— [4.3.2]: Requirement to cable entrance clarified.— [4.6.1]: Requirement for clearance and creepage distances

have been updated.— [7.1]: General type test requirement for equipment has been

introduced.

— Sec.4 Switchgear and controlgear assemblies

— [1.1.8]: Requirements for clearance and creepage distances for low voltage equipment have been modified.

— [1.1.9]: Requirements for clearance and creepage distances for high voltage equipment have been moved from Sec.3.

— [4.1.3]: Verification requirements for short circuit protection of control power transformers have been introduced, ref changes in Sec.2 [7.2.6].

— [4.1.4]: Requirements for power frequency tests for low voltage switchgears and controlgears given.

— Sec.5: Rotating machines

— [1.3.1]: Requirements for temperature detectors for propulsion motors have been moved from Sec.12.

— [3.1.1]: Test requirements for electrical machines have been updated.

— Sec.8: Miscellaneous equipment

— [1.3.3]: Requirement to top plate inclination of space heaters has been removed. Installation requirements have been moved to Sec.10.

— Sec.9: Cables

— [2.3.2]: Minimum conductor cross section of cables rated above 6/10kV has been increased.

— [2.6.2]: Requirement for minimum 85 degrees temperature class of protective sheet has been introduced and acceptable insulation materials has been updated.

— [6.1.1]: New requirements for data communication cables have been introduced.

— [7.1.1]: New requirements for flexible cables have been introduced.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 18: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 18

DNV-OS-D201(continued)

October 2013

Electrical Installations(continued)

— Sec.10: Installation

— Table 10-1: The required IP rating of control desks in dry control rooms may be relaxed.

— Table 10-1: IP grade required for instrumentation components in dry control rooms and switchboard rooms is changed from IP 22 to IP20.

— [2.7.1]: New requirements to installation of lighting fixture regarding UV resistant cables.

— [3.2.2] b): Requirement to 300 mm separation between high voltage cables and low voltage cables is deleted. New requirement in line with IACS UR E11: “High voltage cables are not to be installed on the same cable tray for the cables operating at the nominal system voltage of 1 kV and less”.

— [3.3]: Requirements to cable penetrations have been updated.— [3.5.2]: Aluminium cable trays may be accepted.— [3.5.4]: Bending radiuses have been adjusted.— [3.9.4]: Earthing requirements to cable metal covering have

been modified.— [4.3.2]: Requirements for electrical tests of high voltage

cable after installation have been modified.— [4.4.7]: Mandatory test requirement for harmonic distortion

has been introduced.

— Sec.11: Hazardous areas installations

— Table 11-1: The requirements for documentation of Is-circuit limits and values are clarified.

— [3.2.4]: Ex requirement in rooms for refrigerating systems has been introduced.

— [3.3.6]: Requirement for earth fault protection in hazardous area for TN-S has been introduced.

— Sec.12: Electric propulsion

— [1.1.1]: An offshore unit with shaft generator(s) which can be operated in a “power take in” (PTI) mode shall be regarded as having electrical propulsion.

— [1.2.1]: The option with only one electrical propulsion motor with to sets of windings has been removed and some other system design requirements for electrical propulsion have been modified.

— [1.6.2]: New requirement for fail safe functionality of power plant control system.

— [1.6.3]: Monitoring requirements have been updated.— [2.1.1]: Requirements for onboard testing has been changed.

Ch.3 Certification and classification

— Table 1-2 has been amended. Among the changes: operation modes shall be included in the System philosophy.Calculation of single phase fault against earth shall be included for systems with earthed neutral.

— Table 1-3 has been amended. Among the changes: for permanent magnet motors, relevant drawings for assessment of mechanical strength shall be submitted for approval.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 19: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 19

DNV-OS-D202

October 2013

Automation, Safety and Telecommunication Systems

General

The document has been updated to be in accordance with the new principles for DNV Offshore Standards for Classification, including:

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101 Ch.2 Sec.3 D506” is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6]”.

— Interpretations have been added.— The standard has been aligned with IACS, MODU code and other

relevant international standards.— The standard has been aligned with DNV Rules for Classification

of Ships, Pt.4 Ch.9 and the latest insights and experiences.

Ch.1 General

— The chapter has been restructured to clarify objective and scope of the standard.

Ch.1 Sec.1 General

— Definition of Interpretations has been included in [1.3].— Previous A400 has been amended and moved to Ch.2 Sec.3.

Ch.2 Sec.1 Design Principles

— Previous D (Back up Functions and Emergency Operation) has been removed.

— Test descriptions have been updated.

Ch.2 Sec.2 System Design

— Detailed descriptions on mutual independence in [1.1.3].— Power distribution requirements of [2] have been updated.

Ch.2 Sec.3 System Software

— Previous C on serial communication has been deleted.

Ch.2 Sec.4 Component Design and Installation

— Previous D200 has been deleted since it is covered by DNV-OS-D101.

Ch.3 General

— An overview of the requirements covered by the voluntary ES notation has been included.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 20: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 20

DNV-OS-D301

October 2013

Fire Protection General

Restructured in accordance with the new principles for DNV Offshore Standards for Classification, including:

— alignment with IACS, MODU code and other relevant international standards

— interpretations— definition of the voluntary ES notation.

Updated to reflect changes in regulatory background (i.e. MODU and FSS code) and latest experiences and insightsThe structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101” Ch.2 Sec.3 D506 is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6].”

Ch.1 Sec.1 General

— Completed introduction with scope and structure of document.— Include definition of Interpretations in [1.3].— Restructured to make more clear objective and scope of standard.— Revised definitions and added some, e.g. active fire protection,

fire detection area.

Ch.2 Technical Provisions

Moved unit specific requirements to relevant sections.

Ch.2 Sec.2 Active fire protection of specific areas

— Revised Table 1-1.

Ch.2 Sec.4 Fire and/OR Gas Detection and alarm Systems

— Completed restructured section in line with FSS code Ch. 9 for both fire and gas detection systems.

— Subsection [3] and [4]: Clarified the intention of R0.— Clarified unconfirmed and confirmed gas detection.

Ch.2 Sec.5 Miscellaneous Items

— Removed subsection on operational readiness and maintenance

Ch.2 Sec.6 Supplementary Requirements for Drilling and Well Intervention Units

— Subsection [3]: Added requirements for drill ships.

Ch.2 Sec.7 Supplementary Requirements for Oil and Gas Production and/or Storage Units

— Subsection [3]: Added requirement for remote stop of fire pumps for units where stability problems may arise to avoid capsizing.

Ch.3 Sec.1 Classification

— Include a more extensive description of classification in the new sub-section [1] and an overview of requirements covered by ES.

Ch.3 Sec.2 Certification of Equipment

— Revised general requirements and equipment categorisation to align with practice.

Previous Appendix A - “Fixed Fire Fighting Systems” has been deleted.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 21: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 21

DNV-OS-E101

October 2013

Drilling Plant General

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101” Ch.2 Sec.3 D506 is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6].”

Ch.1 Sec.1 Introduction

— API Standard 53 included as normative reference.— Clarification regarding temporary installed equipment.— Including qualification requirements for novel technology/

designs.

Ch.2 Sec.1 Design Principles

— Changed definitions, use and arrangement of Safety Systems and Drilling Systems (Essential/Important/Non-important).

— New sub-section [2.2] regarding well barriers. Previous B200 has been renumbered to [2.3].

Ch.2 Sec.3 Piping

— Clarifications regarding flexible hoses.

Ch.2 Sec.4 Electrical and Automation/Safety Systems

— Clarifications regarding electrical systems.

Ch.2 Sec.5 Drilling Systems and Equipment

— [3]: New requirements, definitions and clarifications for well control equipment.

— [5]: Clarified requirements to drawworks.— [6]: Clarified that this sub-section is also applicable to riser

handling.— [8]: New sub-section regarding Managed Pressure Drilling

(MPD) systems. Previous H, I and J has been renumbered [9], [10] and [11].

— [10]: Clarified requirements for man-riding equipment.

Ch.2 Sec.6 Manufacture, Workmanship and Testing

— Previous Sec.7 has been renumbered due to moving of Sec.6 to Appendix A.

— Clarified requirements for welding.

Ch.3 Sec.3 System and Equipment Certification

— Including certification requirements for MPD systems, in addition to some other changes (e.g. Choke and Kill valves are now Category I).

App.A Workover and Well Intervention Systems and Equipment

— Requirements to workover and well intervention are moved to Appendix A from previous Ch.2 Sec.6.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 22: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 22

DNV-OS-E301

October 2013

Position Mooring General

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101” Ch.2 Sec.3 D506 is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6].”

Ch.1 Sec.1 General

— Minor updates of references.— Included new terms.

Ch.2 Sec.1 Environmental Conditions and Loads

— Old B202 has been deleted.— [2.2.4] (previous B205): Clarification regarding extreme

environmental conditions.— [2.3.4]: Squalls wind speeds are 1 min average. — [2.3.6]: Clarification regarding how to consider squalls in design.— New [2.3.8]: Included that an analysis length of 1 hour is

recommended since the duration of squalls is approximately 1 hour.— Old B502, B504, B505, B508 and B509 have been deleted.— Minor changes in [3.1.1], [3.2.1], [3.2.5] and [3.2.8].— Previous C500 Wave frequency motions moved to Sec.2 [2.3].— Previous C600 Low frequency motions moved to Sec.2 [2.4].

Ch.2 Sec.2 Mooring System Analysis

— [2.1.2] has been rewritten due to new definitions of fibre rope performance. Guidance Note has been deleted.

— Old B103 and B104 have been deleted.— Previous B111 now [2.1.9] has been rewritten due to new

definitions of fibre rope performance.— Previous B112 now [2.1.10] Amended text: “The change-in-

length behaviour of synthetic fibre ropes or tethers has to be verified by testing”.

— [2.2.1]: Clarification regarding requirements to document that the

chosen calculation program is applicable for the particular anchoring

system and on the particular location. New Guidance Note.

— New [2.2.2], [2.2.3] and [2.2.4].— Old B202 now [2.2.5] amended - formula removed.— Old B204 now [2.2.7] extended regarding extreme value

distribution.— Old B205 regarding simulation length has been relocated to [2.2.9]— Old B208 now [2.2.11] has been amended. Guidance Note has

been deleted.— Old B209, B210 and B211 have been deleted.— New [2.3] and [2.4]. They are previously C500 and C600 in

Sec.1.— B300 Floating platform response analysis is now [2.5].— Old B303 has been amended and is now [2.5.3]. Guidance Note

is deleted.— Old B304 and B305 have been deleted.— B400 Mooring line response analysis is now [2.6].— Old B405 has been deleted.— B500 Characteristic line tension for the ULS is now [2.7].— B600 Characteristic line tension for the ALS is now [2.8].— [3.2.3]: Added description for steel wire rope going over

fairleads.— Table 2-3: added requirements for tropical waters.— E203: Moved to Ch.2 Sec.4 [9].— Minor amendment in [6.4.5] and a reference to [6.2.6] have been

included.— The expression “tension compression” is changed to “low-

tension” in [6.6.2] and [6.6.3].— Figure 10 in [6.6.4] is deleted.— [8]: Reference /9/ is deleted.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 23: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 23

DNV-OS-E301(continued)

October 2013

Position Mooring (continued) Ch.2 Sec.3 Thruster Assisted Mooring

— New class notations have been added: TAR and ATAR.— The section has been harmonised with Rules for Classification of

Ships Pt.6 Ch.7 Dynamic Positioning Systems with respect to power and control systems. Redundancy requirements has been amended.

— In [4.2.1] the power systems with and without redundancy have been directly attached to the DYNPOS notation requirements.

— Previous D202 to D206 have been deleted.— [4.3.1] and [4.3.2] regarding control systems have been

amended.— Previous D400 Manual thruster control has been deleted.— Previous D500 Remote thrust control, joystick system has been

deleted.— Previous D600 will now be [4.4].— Previous D602 now [4.4.2] with new wording: “A mode selector

shall be arranged in the thruster control position to enable switching between manual and automatic thruster control”.

— Previous D603 now [4.4.3] which specify that if redundancy is required the control system shall comply with DYNPOS-AUTR, else DYNPOS-AUT.

— Previous D800 is now [4.5] and have been amended by removing previous D805, D808, D809, D809, D810, D811 and D812.

— Previous D900 is now [4.6].— Previous D1000 Simulation is now [4.7].— Previous D1100 Logging is now [4.8].— Previous D1200 Self-monitoring is now [4.9].— Previous F101 has been amended by [5.1.1] new wording:

“Thrusters shall be certified as thrusters for dynamic positioning if not used for propulsion of the vessel”.

Ch.2 Sec.4 Mooring Equipment

— [2]: Removed “For anchors” in heading. — [2.1.3]: Clarification regarding loads to apply on turret

structures.— Previous B200: Moved to new section [3.3].— [9]: New section 9.2 (moved from previous Ch.2 Sec.4 N).— [10.1.1] changed to: “Technical requirements for offshore

mooring fibre ropes and tethers are given in DNV-OS-E303”.— [10.1.2] the word “rotation” changed to “twisting”. Updated

Guidance Note.— New [10.2] Operation.— New [10.2.1]: “Requirements to operation of offshore mooring

fibre ropes and tethers are found in DNV-OS-E303.”— Old J200 is now [10.3].— [10.3.1] changed to: “Documentation requirements for offshore

mooring fibre ropes and tethers are given in DNV-OS-E303”.— Old J202, J203, J204, J205 and J206 are deleted.— [11.5]: Title changed.— [11.5.2]: Specified wire layer to be used for dimensioning winch

brake.— [11.5.9]: Added requirement to max speed during emergency

release.— [11.5.12]: New paragraph with requirement to deluge.— [11.9]: New section (moved from previous Ch.2 Sec.4 L).— [12]: New section regarding winches for pull-in of mooring and

riser systems.— [13.3.4]: Added requirement to DFF to be used in long term

(permanent) mooring.— [14.1.1]: Changed requirement for line tension recording from 24

h to 30 days.— [18]: New section regarding bearings.

Ch.2 Sec.5 Tests

— Table 5-1: The table has been amended by:

- adding a note regarding stalling- additional test requirements on control system.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 24: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 24

DNV-OS-E301(continued)

October 2013

Position Mooring (continued) Ch.3 Sec.1 Certification and Classification

— Previous D300: Deleted as requirement belongs in OSS. — The wording in first paragraph of [4.5.2] is changed.

Ch.3 Sec.2 Equipment Selection and Certification

— [7.1.2] has been extended.— [7.2] heading changed to Condition Management— [7.2.1], the wording fibre rope assemblies are changed to

offshore mooring fibre lines. Reference to Ch.2 Sec.2 has been deleted.

— [7.2.2], the wording in service condition assessment scheme is changed to condition management program.

— Previous G203 has been deleted.

App.A Required Documentation

— The wording in [A.1.3.6] has been changed.

DNV-OS-E302

October 2013

Offshore Mooring Chain General

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101” Ch.2 Sec.3 D506 is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6].”

— Reference to Purchaser where Purchaser agreement is referred to has been deleted.

Ch.1 Sec.1 Introduction

— Table 1-1: New references.— [3.1.4]: DNV referenced in definition.

Ch.2 Sec.1 Materials

— [1.6.1]: Level II requirement to NDT operators.— [3.4.2] and [4.4.2]: Option to use oil has been included.— [3.7.1]: Allowable grinding depth on machined surfaces has been

specified.

Ch.2 Sec.2 Mooring Chain Cables and Accessories

— [2.5.3]: Deleted requirement to check furnace temperature uniformity when change of chain size.

— [2.9.1]: Requirement to accuracy of measurements has been introduced.

— [2.9.4]: Change of areas to be measured and acceptance criteria.— [2.10.3]: Requirement to use of fluorescent MT has been added.— [2.10.4]: Open up for use of Phased Array added in the Guidance

note.— [2.11.3]: Allowable temperature has been changed.— [3.7.3]: Clarification in extent of NDT.— [3.7.4]: A new Note has been added clarifying UT requirements.— [3.8.1]: Allowable grinding depth on machined surfaces has been

specified.— Table 2-3: A new Note 4 has been added.

Ch.3 Sec.1 Certification and Classification - Requirements

— [2.4]: List of procedures for approval has been added.— [2.6]: Content of material certificates has been clarified.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 25: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 25

DNV-OS-E304

October 2013

Offshore Mooring Steel Wire Ropes

General

— The structure of this document has been converted to decimal numbering. Older references to this document may normally be interpreted by analogy to this example:

— “DNV-OSS-101” Ch.2 Sec.3 D506 is now “DNV-OSS-101 Ch.2 Sec.3 [4.5.6].”

Ch.1 Introduction

— Sec.1 Table 1-1: Some international standards that are listed as applicable references have been replaced or withdrawn.

Ch.2 Technical Provisions

— Sec.2 [2.2.1], [2.4.3], [3.5.1]-[3.5.2], Sec.4 [2.1.4]: Some international standards that are listed as applicable references have been replaced or withdrawn.

— Sec.5 Figure 5-1: The figure showing the material samples location in the socket have been improved.

— Sec.5 [2.4.2] and [3.2.3]: Text have been added.— Sec.7: “and towing” has been deleted from section title and Sec.7

[1.1.1].— Sec.7 [1.2.3]: The term lay has been replaced by the term

spinning.

Ch.3 Certification and Classification

— Sec.1 [2.5.2]: Added requirement that min 5% of the wires shall be individually tested with DNV Surveyor.

— Sec.1 B702 “Materials for wires shall be delivered with the manufacturer’s certificates or test reports” has been deleted.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 26: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 26

DNV-OS-F101

October 2013

Submarine Pipeline Systems General

— Excessive conservatism related to fracture assessment of girth welds has been removed in Appendix A leading to:

— relaxation of weld repair requirements — increased installation speed.

— Other changes:

— reference list updated.— general update based upon feed-back from industry.

Sec.4 Design - Loads

— G407: Clarify effect of selecting larger positive tolerances.

Sec.5 Design – Limit State Criteria

— C402: Minimum wall thickness requirement re-worded to avoid misinterpretations.

— E1100: Pipe-in-pipe and bundles moved from G200.— Equation 5.6 corrected— F107: Clarifications on code break.

Sec.7 Construction – Linepipe

— E104: Implications of reduction in mill test pressure clarified.— I400: Table 7-26: Amended by adding t = 15 mm step for HFW

pipes.

Sec.10 Construction – Offshore

— J307: Pressure test accuracy requirement modified.

Appendix A Fracture Limit State of Girth Welds

— General clarifications based on comments from industry.— The terms 'defect', 'flaw' and 'notch' have been defined.— The Lr cut-off formula for strain based loading has been

amended by adding limit. The Lr cut-off value shall not exceed 1.5.

— Table A-7 for assessment of surface breaking flaws has been amended.

Appendix D Non-Destructive Testing (NDT)

— B212: Digital Radiography reference updated to ISO 17636-2.

Table 3-2 DNV Standards (Continued)

Document number

Document title Changes

Page 27: DNV Codes Main Changes 2013

DET NORSKE VERITAS AS

DNV Service Documents , October 2013

Sec.3 Summary of Changes – Page 27

3 Changes to DNV Recommended Practices

Table 3-3 DNV Recommended Practices

Document number

Document title Changes

DNV-RP-A205

October 2013

Offshore Classification Projects - Testing and Commissioning

General

— Spelling, grammar and punctuation have been amended. — The use of abbreviations has been standardized and [1.8]

Abbreviations has been expanded.— References to renumbered documents have been updated.

Sec.6 Safety, health and environment

— A new Sec.6 on SHE has been added.

Appendices

— Previous App.A.6 has been deleted.— There have been minor updates to App.A, App.B and App.C.— In App.D and App.E survey categorisation has been developed

for FPSO and FSO (previously marked “Pending”).— Survey scope for the Class Notation PROD has been developed

in App.G.2.

DNV-RP-D202

October 2013

Witnessing of Low Sulphur Fuel Changeover and Operations

This is a new document.