4
10.45 11.96 2.69 3.00 2.69 2.69 2.69 3.00 2.69 2.69 11.96 10.45 DRAWING TITLE CLIENT PROJECT TITLE STATUS DRAWN BY SCALE CHECKED BY DRAWING NO. REV AS SHOWN THE UNDERSIGNED HAS REVIEWED & TAKES RESPONSIBILITY FOR THIS DESIGN, HAS THE QUALIFICATIONS & MEETS THE REQUIREMENTS SET OUT IN THE ONTARIO BUILDING CODE TO BE A DESIGNER. QUALIFICATION INFORMATION REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.5.1 OF THE BUILDING CODE. Jonathan Sprawson 32490 ________________________________________________ NAME SIGNATURE BCIN REGISTRATION INFORMATION REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.4.1 OF THE BUILDING CODE. DESIGN QUORUM INC. 35234 FIRM NAME BCIN GENERAL NOTES FEATURES OF CONSTRUCTION NOT FULLY SHOWN ARE TO BE THE SAME CHARACTER AS THOSE NOTED FOR SIMILAR CONDITIONS. ALL DIMENSIONS AND INFORMATION SHOWN ON THESE DRAWINGS MUST BE CHECKED AND VERIFIED ON SITE PRIOR TO CONSTRUCTION AND FABRICATION OF ITS COMPONENTS. SHOULD EXISTING CONDITIONS OR SERVICES BE FOUND TO VARY FROM THOSE INDICATED ON THE ARCHITECTURAL DRAWINGS, THE DESIGN OFFICE MUST BE NOTIFIED IMMEDIATELY. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, NO PROVISION HAS BEEN MADE ON THE DRAWINGS FOR CONDITIONS OCCURRING DURING CONSTRUCTION. THE CONTRACTOR IS TO PROVIDE ALL NECESSARY BRACING AND SHORING REQUIRED FOR STRESS AND INSTABILITY OCCURRING FROM ANY CAUSE DURING CONSTRUCTION. THE CONTRACTOR SHALL ACCEPT RESPONSIBILITY FOR ALL SUCH MEASURES. IT SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY BRACING, SHORING, SHEET PILING OR OTHER TEMPORARY SUPPORTS TO SAFEGUARD ALL EXISTING OR ADJACENT STRUCTURES AFFECTED BY THIS WORK. DO NOT SCALE DRAWINGS. JDS BIS DATE 3 NEW SEMI - DETACHED DWELLING 79 Wilson St Oakville, Ont L6K 3G4 ELIZABETH & JIM KNOWLTON ZONING BY - LAW AMENDMENT A201 ELEVATIONS 28/03/19 1 : 100 2 EAST ELEVATION 1 : 100 1 WEST ELEVATION REV. No. DESCRIPTION DATE BY 1 PRECON. PLAN 17 APR 18 DQI 2 DRAWING ISSUED 13 DEC 18 DQI 3 ZBLA RESUBMISSION 29 MAR 19 DQI

D:My DocumentsIndigo Spaces 8 Projects 8.02 - 79 ... planning/da... · floors f1 flooring running perpendicular to floor joist to comply with section 9.30 of the ontario building

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: D:My DocumentsIndigo Spaces 8 Projects 8.02 - 79 ... planning/da... · floors f1 flooring running perpendicular to floor joist to comply with section 9.30 of the ontario building

10.4

5

11.9

6

2.69

3.00

2.69

2.69

2.69

3.00

2.69

2.69

11.9

6

10.4

5

DRAWING TITLE

CLIENT

PROJECT TITLE

STATUS

DRAWN BY

SCALE

CHECKED BY

DRAWING NO. REV

AS SHOWN

THE UNDERSIGNED HAS REVIEWED & TAKES RESPONSIBILITY FOR THIS DESIGN, HAS THE QUALIFICATIONS & MEETS THE REQUIREMENTS SET OUT IN THE ONTARIO BUILDING CODE TO BE A DESIGNER.

QUALIFICATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.5.1 OF THE BUILDING CODE.

Jonathan Sprawson 32490________________________________________________ NAME SIGNATURE BCIN

REGISTRATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.4.1 OF THE BUILDING CODE.

DESIGN QUORUM INC. 35234 FIRM NAME BCIN

GENERAL NOTESFEATURES OF CONSTRUCTION NOT FULLY SHOWN ARE TO BE THE SAME CHARACTER AS THOSE NOTED FOR SIMILAR CONDITIONS.

ALL DIMENSIONS AND INFORMATION SHOWN ON THESE DRAWINGS MUST BE CHECKED AND VERIFIED ON SITE PRIOR TO CONSTRUCTION AND FABRICATION OF ITS COMPONENTS. SHOULD EXISTING CONDITIONS OR SERVICES BE FOUND TO VARY FROM THOSE INDICATED ON THE ARCHITECTURAL DRAWINGS, THE DESIGN OFFICE MUST BE NOTIFIED IMMEDIATELY.

UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, NO PROVISION HAS BEEN MADE ON THE DRAWINGS FOR CONDITIONS OCCURRING DURING CONSTRUCTION. THE CONTRACTOR IS TO PROVIDE ALL NECESSARY BRACING AND SHORING REQUIRED FOR STRESS AND INSTABILITY OCCURRING FROM ANY CAUSE DURING CONSTRUCTION. THE CONTRACTOR SHALL ACCEPT RESPONSIBILITY FOR ALL SUCH MEASURES. IT SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY BRACING, SHORING, SHEET PILING OR OTHER TEMPORARY SUPPORTS TO SAFEGUARD ALL EXISTING OR ADJACENT STRUCTURES AFFECTED BY THIS WORK.DO NOT SCALE DRAWINGS.

JDSBIS

DATE

3

NEW SEMI-DETACHED DWELLING79 Wilson St

Oakville, Ont L6K 3G4

ELIZABETH & JIM KNOWLTON

ZONING BY-LAW AMENDMENT

A201

ELEVATIONS

28/03/19

1 : 1002 EAST ELEVATION1 : 1001 WEST ELEVATION

REV. No. DESCRIPTION DATE BY1 PRECON. PLAN 17 APR 18 DQI2 DRAWING ISSUED 13 DEC 18 DQI3 ZBLA RESUBMISSION 29 MAR 19 DQI

Page 2: D:My DocumentsIndigo Spaces 8 Projects 8.02 - 79 ... planning/da... · floors f1 flooring running perpendicular to floor joist to comply with section 9.30 of the ontario building

2.69

3.00

2.69

2.69

11.9

6

9.30

HLW

HLW

HLW

HLW HLW HLW

HLW1.

501.

90

1.90

1.90

1.52

1.23

DRAWING TITLE

CLIENT

PROJECT TITLE

STATUS

DRAWN BY

SCALE

CHECKED BY

DRAWING NO. REV

AS SHOWN

THE UNDERSIGNED HAS REVIEWED & TAKES RESPONSIBILITY FOR THIS DESIGN, HAS THE QUALIFICATIONS & MEETS THE REQUIREMENTS SET OUT IN THE ONTARIO BUILDING CODE TO BE A DESIGNER.

QUALIFICATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.5.1 OF THE BUILDING CODE.

Jonathan Sprawson 32490________________________________________________ NAME SIGNATURE BCIN

REGISTRATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.4.1 OF THE BUILDING CODE.

DESIGN QUORUM INC. 35234 FIRM NAME BCIN

GENERAL NOTESFEATURES OF CONSTRUCTION NOT FULLY SHOWN ARE TO BE THE SAME CHARACTER AS THOSE NOTED FOR SIMILAR CONDITIONS.

ALL DIMENSIONS AND INFORMATION SHOWN ON THESE DRAWINGS MUST BE CHECKED AND VERIFIED ON SITE PRIOR TO CONSTRUCTION AND FABRICATION OF ITS COMPONENTS. SHOULD EXISTING CONDITIONS OR SERVICES BE FOUND TO VARY FROM THOSE INDICATED ON THE ARCHITECTURAL DRAWINGS, THE DESIGN OFFICE MUST BE NOTIFIED IMMEDIATELY.

UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, NO PROVISION HAS BEEN MADE ON THE DRAWINGS FOR CONDITIONS OCCURRING DURING CONSTRUCTION. THE CONTRACTOR IS TO PROVIDE ALL NECESSARY BRACING AND SHORING REQUIRED FOR STRESS AND INSTABILITY OCCURRING FROM ANY CAUSE DURING CONSTRUCTION. THE CONTRACTOR SHALL ACCEPT RESPONSIBILITY FOR ALL SUCH MEASURES. IT SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY BRACING, SHORING, SHEET PILING OR OTHER TEMPORARY SUPPORTS TO SAFEGUARD ALL EXISTING OR ADJACENT STRUCTURES AFFECTED BY THIS WORK.DO NOT SCALE DRAWINGS.

JDSBIS

DATE

3

NEW SEMI-DETACHED DWELLING79 Wilson St

Oakville, Ont L6K 3G4

ELIZABETH & JIM KNOWLTON

ZONING BY-LAW AMENDMENT

A202

ELEVATIONS

28/03/19

REV. No. DESCRIPTION DATE BY1 PRECON. PLAN 17 APR 18 DQI2 DRAWING ISSUED 13 DEC 18 DQI3 ZBLA RESUBMISSION 29 MAR 19 DQI

1 : 1001 SOUTH ELEVATION

HLW = HIGH LEVEL WINDOW

Page 3: D:My DocumentsIndigo Spaces 8 Projects 8.02 - 79 ... planning/da... · floors f1 flooring running perpendicular to floor joist to comply with section 9.30 of the ontario building

2.69

2.69

3.00

2.69

11.9

6

HLW HLW

HLW

HLW

HLW HLW

HLW

1.93

1.52

1.93

1.93

1.22

1.50

DRAWING TITLE

CLIENT

PROJECT TITLE

STATUS

DRAWN BY

SCALE

CHECKED BY

DRAWING NO. REV

AS SHOWN

THE UNDERSIGNED HAS REVIEWED & TAKES RESPONSIBILITY FOR THIS DESIGN, HAS THE QUALIFICATIONS & MEETS THE REQUIREMENTS SET OUT IN THE ONTARIO BUILDING CODE TO BE A DESIGNER.

QUALIFICATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.5.1 OF THE BUILDING CODE.

Jonathan Sprawson 32490________________________________________________ NAME SIGNATURE BCIN

REGISTRATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.4.1 OF THE BUILDING CODE.

DESIGN QUORUM INC. 35234 FIRM NAME BCIN

GENERAL NOTESFEATURES OF CONSTRUCTION NOT FULLY SHOWN ARE TO BE THE SAME CHARACTER AS THOSE NOTED FOR SIMILAR CONDITIONS.

ALL DIMENSIONS AND INFORMATION SHOWN ON THESE DRAWINGS MUST BE CHECKED AND VERIFIED ON SITE PRIOR TO CONSTRUCTION AND FABRICATION OF ITS COMPONENTS. SHOULD EXISTING CONDITIONS OR SERVICES BE FOUND TO VARY FROM THOSE INDICATED ON THE ARCHITECTURAL DRAWINGS, THE DESIGN OFFICE MUST BE NOTIFIED IMMEDIATELY.

UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, NO PROVISION HAS BEEN MADE ON THE DRAWINGS FOR CONDITIONS OCCURRING DURING CONSTRUCTION. THE CONTRACTOR IS TO PROVIDE ALL NECESSARY BRACING AND SHORING REQUIRED FOR STRESS AND INSTABILITY OCCURRING FROM ANY CAUSE DURING CONSTRUCTION. THE CONTRACTOR SHALL ACCEPT RESPONSIBILITY FOR ALL SUCH MEASURES. IT SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY BRACING, SHORING, SHEET PILING OR OTHER TEMPORARY SUPPORTS TO SAFEGUARD ALL EXISTING OR ADJACENT STRUCTURES AFFECTED BY THIS WORK.DO NOT SCALE DRAWINGS.

JDSBIS

DATE

3

NEW SEMI-DETACHED DWELLING79 Wilson St

Oakville, Ont L6K 3G4

ELIZABETH & JIM KNOWLTON

ZONING BY-LAW AMENDMENT

A203

ELEVATIONS

28/03/19

REV. No. DESCRIPTION DATE BY1 PRECON. PLAN 17 APR 18 DQI2 DRAWING ISSUED 13 DEC 18 DQI3 ZBLA RESUBMISSION 29 MAR 19 DQI

1 : 1001 NORTH ELEVATION

HLW = HIGH LEVEL WINDOW

Page 4: D:My DocumentsIndigo Spaces 8 Projects 8.02 - 79 ... planning/da... · floors f1 flooring running perpendicular to floor joist to comply with section 9.30 of the ontario building

1 2 3 5 6

4 72.a

175 SF

LIVING165 SF

DINING

93 SF

BEDROOM 2

47 SF

WASHROOM86 SF

BEDROOM 373 SF

ENSUITE

327 SF

KITCHEN

219 SF

SITTING ROOM

230 SF

REC. ROOMB. WASHROOM

20 SF

ELEVATOR

20 SF

ELEVATOR

20 SF

ELEVATOR

20 SF

ELEVATOR

2.43

2.73

2.43

289 SF

GARAGE

5.a

11.9

6

NEW BASEMENT FLOOR: ONE COAT OF APPROVED SEALER, 3" CONC. SLAB CONCRETE (20mPa) (STEEL TROWEL FINISH, ALL REQ'D CONTROL AND CONSTRUCTION JOINTS (MAX. 20'-0" X 20'-0"), 6 MIL V.B. OVER 2" S.M., 4" GRANULAR 'A'

F2

FLOOR STRUCTURE, 5/8" SUBFLOOR, FELT PAPER, STRIP WOOD FLOORING RUNNING PERPENDICULAR TO FLOOR JOISTF1

FLO

ORS

TO COMPLY WITH SECTION 9.30 OF THE ONTARIO BUILDING CODE

4" REINFORCED CONCRETE SLAB ON 4" GRANULAR 'A'F3

5/4" DECK BOARD ON STRUCTUREF45/4" DECK BOARD ON 2x4 SLEEPERS ON WATERPROOF MEMBRANE ON STRUCTUREF5

INTERIOR - 1/2" GYPSUM BOARD ON 2X6 STUD WALLW2

INTERIOR - 1/2" GYPSUM BOARD ON 2X4 STUD WALL W1

WALL

S

TO COMPLY WITH SECTION 9.4, 9.10, 9.11, 9.23, 9.29 OF THE ONTARIO BUILDING CODE

EXTERIOR - WOOD SIDING ON 3/4" STRAPPING, 1" RIGID INSULATION, AIR BARRIER, 3/8" EXTERIOR SHEATHING, 2X6 SPF WOOD STUD WALL, VAPOUR BARRIER, 1/2" GYPSUM WALL BOARD

W3

PARTY WALL - TWO ROWS 38mm x 89mm (2X4) WOOD STUDS EACH SPACED AT 610mm O.C. STAGGERED ON COMMON 38mm x 140mm (2X6) WOOD PLATE W. 65mm THICK ABSORPTIVE MATERIAL ON EACH SIDE, 2 LAYERS OF 12.7mm TYPE X GYPSUM BOARD ON EACH SIDE

W9bL30" X W30" X H6" CONCRETE PADFTG2

L36" X W36" X H12" CONCRETE PADFTG1FO

OTI

NG

S

TO COMPLY WITH SECTION 9.15 OF THE ONTARIO BUILDING CODE

W18" X H8" CONTINUOUS CONCRETE FOOTINGFTG3

DRAWING TITLE

CLIENT

PROJECT TITLE

STATUS

DRAWN BY

SCALE

CHECKED BY

DRAWING NO. REV

AS SHOWN

THE UNDERSIGNED HAS REVIEWED & TAKES RESPONSIBILITY FOR THIS DESIGN, HAS THE QUALIFICATIONS & MEETS THE REQUIREMENTS SET OUT IN THE ONTARIO BUILDING CODE TO BE A DESIGNER.

QUALIFICATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.5.1 OF THE BUILDING CODE.

Jonathan Sprawson 32490________________________________________________ NAME SIGNATURE BCIN

REGISTRATION INFORMATION

REQUIRED UNLESS DESIGN IS EXEMPT UNDER 2.17.4.1 OF THE BUILDING CODE.

DESIGN QUORUM INC. 35234 FIRM NAME BCIN

GENERAL NOTESFEATURES OF CONSTRUCTION NOT FULLY SHOWN ARE TO BE THE SAME CHARACTER AS THOSE NOTED FOR SIMILAR CONDITIONS.

ALL DIMENSIONS AND INFORMATION SHOWN ON THESE DRAWINGS MUST BE CHECKED AND VERIFIED ON SITE PRIOR TO CONSTRUCTION AND FABRICATION OF ITS COMPONENTS. SHOULD EXISTING CONDITIONS OR SERVICES BE FOUND TO VARY FROM THOSE INDICATED ON THE ARCHITECTURAL DRAWINGS, THE DESIGN OFFICE MUST BE NOTIFIED IMMEDIATELY.

UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, NO PROVISION HAS BEEN MADE ON THE DRAWINGS FOR CONDITIONS OCCURRING DURING CONSTRUCTION. THE CONTRACTOR IS TO PROVIDE ALL NECESSARY BRACING AND SHORING REQUIRED FOR STRESS AND INSTABILITY OCCURRING FROM ANY CAUSE DURING CONSTRUCTION. THE CONTRACTOR SHALL ACCEPT RESPONSIBILITY FOR ALL SUCH MEASURES. IT SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY BRACING, SHORING, SHEET PILING OR OTHER TEMPORARY SUPPORTS TO SAFEGUARD ALL EXISTING OR ADJACENT STRUCTURES AFFECTED BY THIS WORK.DO NOT SCALE DRAWINGS.

JDSBIS

DATE

3

NEW SEMI-DETACHED DWELLING79 Wilson St

Oakville, Ont L6K 3G4

ELIZABETH & JIM KNOWLTON

ZONING BY-LAW AMENDMENT

A301

SECTIONS

28/03/19

1 : 1001 SECTION

REV. No. DESCRIPTION DATE BY1 PRECON. PLAN 17 APR 18 DQI2 DRAWING ISSUED 13 DEC 18 DQI3 ZBLA RESUBMISSION 29 MAR 19 DQI