AIM MET AL F ABRI CATION 078 A. MABINI ST. CAINTA RIZAL NOV. 24, 2015 A TTN: SIS. S ALL Y VERAS MPC – HEAD DM2 CHAPEL CAINTA RIZAL RE: PROPOSED LABOR COST FOR STEEL WORKS ITEM NO. PARTICULARS QTY UNIT U/C AMT  A STEEL !INDO! A !NIN"  1 1.2 MTS # 2.0 MTS 12 SETS 2000 24,000  2 1.2 MTS # 1.5 MTS 4 SETS 1750 7,000  B S!IN" DOOR !ITH FI#ED 4 SETS 4250 17,000  C SLIDIN" DOOR !ITH FI#ED 1 SET 7000  7,000 TOTAL 55,000 INCLUSION HEREIN ARE A FOLLOWS 1. ELECTRIC TOOLS AND MA CHI NERIES. 2. INST ALLA TION OF FI NISH PROD$CTS. EXCLUDED ARE AS FOLLOWS 1. MA TERIAL S AND CONS$MABLES 2. "LAZIN" AND MASONRY. NOTE: VAT EXCLUSIVE  DESIGN: AS PER PLAN DURATION: %0%5 DAYS COMPLETION TERMS :  !EE&L Y BILLIN" APPLICATION OF PRIMER PAINT ONLY ALL !OR&S "$ARANTY VERY TR$LY YO$RS, DENNIS C. "$ARDA

DM 2

Embed Size (px)

Citation preview

7/21/2019 DM 2

http://slidepdf.com/reader/full/dm-25695d26a1a28ab9b029a5808 1/2

AIM METAL FABRICATION078 A. MABINI ST. CAINTA RIZAL

NOV. 24, 2015

ATTN: SIS. SALLY VERAS

MPC – HEAD

DM2 CHAPEL

CAINTA RIZAL

RE: PROPOSED LABOR COST FOR STEEL WORKS

ITEM NO. PARTICULARS QTY UNIT U/C

AMT

  A STEEL !INDO! A!NIN"  1 1.2 MTS # 2.0 MTS 12 SETS 2000

24,000

  2 1.2 MTS # 1.5 MTS 4 SETS 1750

7,000

  B S!IN" DOOR !ITH FI#ED 4 SETS

4250 17,000

  C SLIDIN" DOOR !ITH FI#ED 1 SET 7000

  7,000

TOTAL

55,000

INCLUSION HEREIN ARE A FOLLOWS

1. ELECTRIC TOOLS AND MACHINERIES.

2. INSTALLATION OF FINISH PROD$CTS.

EXCLUDED ARE AS FOLLOWS

1. MATERIALS AND CONS$MABLES

2. "LAZIN" AND MASONRY.

NOTE: VAT EXCLUSIVE

 

DESIGN: AS PER PLAN

DURATION: %0%5 DAYS COMPLETION

TERMS :

  !EE&LY BILLIN"

APPLICATION OF PRIMER PAINT ONLY

ALL !OR&S "$ARANTY

VERY TR$LY YO$RS,

DENNIS C. "$ARDA

7/21/2019 DM 2

http://slidepdf.com/reader/full/dm-25695d26a1a28ab9b029a5808 2/2

CONTRACTOR

7%481%4'0(((5775241