23
Head office: Dong Xuyen Industrial Zone, Rach Dua Ward, Vung Tau City, S.R. Vietnam Tel: +84 254 3596 970 Fax:+ 84 254 3596 566 Website:h ttp://www.dkengineering.com.vn E-mail:d [email protected] Tax Code:3 500816144 DK ENGINEERING DK ENGINEERING CONSULTANCY JOINT STOCK COMPANY

DK ENGINEERING CONSULTANCY JOINT STOCK COMPANY

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Head office: �Dong Xuyen Industrial Zone, Rach Dua Ward, Vung Tau City, S.R. VietnamTel: �+84 254 3596 970Fax:+� 84 254 3596 566Website:h� ttp://www.dkengineering.com.vnE-mail:d� [email protected] Code:3� 500816144

DK ENGINEERING

DK ENGINEERING CONSULTANCY JOINT STOCK COMPANY

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

ABOUT US HUMAN RESOURCE

Delivering solution, Expanding customer value

3

With experienced Technical & Managing Staff whom have being taken part into many onshore & offshore projects in the field of Oil and Gas which include: Civil, Structure, Process, Mechanical and E&I for over 10 years, We assure that we will bring to you the best services with high quality, reliability, effective cost-benefit target, and best progress.

2

ORGANIZATION CHART- GENERAL

COMPANY PROFILE

DK Engineering J.S.C was established in the year 2007 in Vietnam. With many years of experience in engineering for onshore/ offshore and Process equipment provider such as separation equipment, heat transfer equipment, measuring equipment, electrical and control cabinet. Our headquarter is located in Vung Tau City, Vietnam.

Our Vision

Becoming a favored company for onshore/offshore engineering consultancy and process equipment providing in the oil and gas industry.

Our Mission

Providing engineering consulting services and process equipment with innovative solutions, high quality, competitive prices and on time delivery for the customers.

Statement of Operation Policy

DK Engineering commits to deliver excellent services, equipment to the oil and gas customer. By providing the best engineering solutions, high quality fabrication for our customer, we always try our best to increase the customer value.

All DK Engineering employees commit to try our best and continuously improve on each task, products and services to ensure delivering high quality services and secure a sustainable growth since our establishment.

ORGANIZATIONCH

ART-

GENERAL

COMMERCIALDept.

BUSINESS

DEVELOPMENT Dept.

ENGIEERING Dept.

HSE/QA/QC Dept.

WORKSHOP

Process & R&D Dept.

Mech. Dept.

Piping Dept.

Structure Dpt.

E&I Dept.

DEPUTY DIRECTOR ENGINEERING/QC/ WS

DEPUTY DIRECTOR COMERCIAL/BUSINESS

PROJECT Dept.

H.R Dept. ACCOUNTANT

Dept.

MANAGING DIRECTOR

WORKSHOP, EQUIPMENT, MACHINES

COMPUTER SOFTWARE CAPABILITIES

4

We have specialized software to use for specific engineeringdisciplines as follows:

Process Engineering Aspen HYSYS: Process Simulation Aspen Exchanger Design & Rating (EDR): Heat Exchanger OLGA: The industry-standard tool for dynamic multiphase

flow simulation NEC Acostix: All sound calculations for sound insulation

of the enclosure walls, sound attenuators and louvers.

Mechanical Engineering PVElite: Pressure vessel and tank design analysis software MATHCAD: Programming software Microsoft Excel: In-house developed spreadsheets Solidworks Compress: Engineering for pressure vessel, ASME VIII-1

design capabilities

Electrical Engineering CAPTOR: Electrical system design

Structural/Civil Design Analysis Software Staad Pro Staad Offshore SACS: Offshore structural analysis SAP, Version 14: Structural analysis GRLWEAP: Pile driving simulation GEO SLOPE/W: Soil slope stability analysis

Pipeline Analysis Software CAESAR II: Piping stress analysis and design OFFPIPE: Pipeline installation analysis SAGE Profile: Pipeline stability and stress analysis Auto pipe: Pipeline stability and stress analysis

Project Management Microsoft Project Primavera

Drafting AutoCAD 3D Model/Drafting software PDMS: 3D computer aid design software Cadworx Smart plan 3D

5

Delivering solution, Expanding customer value

CORE SERVICES

Work shop has been a fully equipped with equipment and machinery for simulation, testing and to serve the site fabrication and installation activities.

Engineering Service

OnshoreProvide complete engineering solutions for onshore included process, mechanical, civil, structure, piping, electrical

and control for oil and gas industry, such as gas distribution, compressor station, metering station, pipeline, cathodic

protection system, oily water treatment system…

Offshore

Provide complete engineering for offshore included topside, jacket, subsea pipeline modification of existing system

included process, mechanical, piping, electrical and control system.

Separation Equipment: 2 Phase Separator,3 Phase Separator,Filter Separator,Degasser,...

Heat Transfer Equipment: Shell and Tube Heat Exchanger

Air Cooled Heat ExchangerWater Bath Heater,Fired Heater,

Electrical Heater, Cooling Tower,...

Measuring Equipment: all type of Gas Metering System

Liquid Metering System Multiphase Metering System Metering Control System Sampling and Analysis Brownfield Metering Upgrades,...

Oily Water Treatment for Onshore and Offshore Gas Processing API/CPI Tank Produced Water Treatment System (IGF/CFU),...

Process/Compression Skid: Compressor Station,Gas Dehydration System,Generator/Compressor Enclosure,...

Utility Skid: Fuel Gas Treatment System,

Chemical Injection Skid,Pump Skid,CO2/N2 Snuffing System,Pig Launcher, Pig Receiver, ...

Electrical & Instrument System: Electrical Cabinet,

PLC Control Cabinet,...

Cathodic Protection System.

Equipment engineering/ fabrication

We provide engineering, procurement, fabrication and testing, installation of equipment as below:

Construction supervision consultant/Project Management

State of the art techniques in project management which requires broad range of knowledge are being applied in DK

Engineering to enable us to meet or exceed our customer's needs and expectations. Our project management

professionals combined detailed technical knowledge of management disciplines such as tendering, contracting, work

break down, cost estimating and control, scheduling and monitoring, project risk and change management, quality

management, stakeholder management with an extensive awareness of industry and customer drivers.

Procurement

“Exactly, quickly & competitive price” is our slogan. Let us to be your partner for an optimized & renovated products.

Familiar with materials and equipment in oil and gas industries compliance with International standards: ASME, ASTM,

BS, API,…

Qualified, experienced personnel in oil and gas projects.

Out source from all over the world as per Client's vendor list inspection companies: ABS, DNV, LR, ASME…

To Protect Onshore/Offshore Pipeline/Equipment

ITEM LIST OF TOOL AND EQUIPMENT SPEC. UNIT Q'TY

BOUGTH

REND

I WELDING EQUIPMENT Ea 15

II LIFTING EQUIPMENT Set 27

III CUTTING AND DRILLING

EQUIPMENT

Ea/Set 48

IV QA/QC EQUIPMENT Ea 11

V HAND TOOL Ea/Set 105

VI OTHER EQUIPMENT

1 Water jet CNC machine Ea 1

2 High pressure pump 37kg/cm3 Ea 1

3 Air compressor machine; 5HP 5 HP 10kg Ea 1

4 Water tanks Ea 1

5 Bolt �ghtening machine Set 2

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

7

Delivering solution, Expanding customer value

SOW: Engineering, fabrication Three-phase Separator Skid (No. 01) Project: Hornet Gas Field DevelopmentClient: Rhine Ruhr Pty Ltd - Year Built: 2014Design Pressure: 102 barg - Design Temperature: -10/100 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, fabrication Three-phase Separator Skid (No. 02) Project: Hornet Gas Field DevelopmentClient: Rhine Ruhr Pty Ltd - Year Built: 2015Design Pressure: 102 barg - Design Temperature: -10/100 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design, Internal part procurement HP Separator Skid Project: Diamond Field Development ProjectClient: PVCL - Year Built: 2013Design Pressure: 133 barg - Design Temperature: 0/103 C0

Construction material: SA516 Gr.70N - ASME U stampInternal part: Rhine Ruhr/Australia

SOW: Engineering, fabrication LP Separator VesselProject: Thai Binh-Ham Rong Gas Distribution And Gathering System ProjectClient: PVGAS SERVICE - Year Built: 2015Design Pressure: 46 barg - Design Temperature: -46/70 C0

ASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, procurement, fabrication CO2 Compress Interstage SeparatorProject: Camau Fertilizer PlantClient: PVCFC - Year built: 2016

0Design Pressure: 90 barg - Design Temperature: -10/80 CConstruction material: SS 304 - ASME U stampInternal part: Rhine Ruhr/Australia

SOW: Provision of mobile 2 Phase Test Separator Skid Project: Bundled Phase 2 EPCI of Wellhead PlatformsClient: TNS/PTT Exploration - Year built: 2017Design Pressure: 35.5-56.3 barg Design Temperature: -29/135 C/ (-12) - 120 C0 0

Construction material: NACE CS +6MM CA+ANODES

SOW: Engineering, Internal part procurement Test Separator MBD-2920 Project: Su Tu Trang Field Development ProjectClient: Cuu Long JOC - Year Built: 2010Design Pressure: 50 barg - Design Temperature: -18.4/150 C0

Construction material: SA516 Gr.70N - ASME U-StampInternal part: FMC Technology

SOW: Engineering, fabrication for HHP SeperatorProject: Dai Hung Phase II DevelopmentClient: PVEP - Year of Completion: 2010Design Pressure: 38 barg - Design Temperature: -29/100 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design, Internal part procurement PW Degasser SkidProject: Saraswati Oil Field Development Project - Phase 2Client: PETRO6-INDIA - Year Built: 2013

0Design Pressure: 10.34 barg - Design Temperature: 0/120 CConstruction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design, Internal part procurement for Slug Catcher SkidProject: Dragon & Tortoise Field Development ProjectClient: VSP – PTSC M&C - Year built: 2010

0Design Pressure: 46 barg - Design Temperature: 0/120 CConstruction material: SA516 Gr.70N - ASME U-StampInternal part: Rhine Ruhr/Australia

SOW: Calculation, Detail Design Flare Scrubber SkidProject: Dragon & Tortoise Field Development ProjectClient: VSP – PTSC M&C - Year built: 2010Design Pressure: 50 barg - Design Temperature: -18.4/1500CConstruction material: SA516 Gr.70N - ASME U-StampInternal part: Rhine Ruhr/Australia

6

SEPARATION EQUIPMENT

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

SOW: Calculation, Detail Design Allocation SeparatorProject: Su Tu Nau Field Development ProjectClient: Cuu Long JOC - Year Built: 2013Design Pressure: 31 barg - Design Temperature: 0/140 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

9

Delivering solution, Expanding customer value

8

SOW: Engineering, procurement & fabrication supporting Utility Gas SkidProject: Pear Field DevelopmentClient: PVCL - Year built: 2008Design Pressure: 0-46 barg

0Design Temperature: AMB-65 C

SOW: Engineering, procurement, fabrication for Filter Separator (F-401A)Project: Phu My GDC Client: PVGAS - Year Built: 2015

0Design Pressure: 60 barg - Design Temperature: -10/65 CASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, procurement, fabrication for Filter Separator (F1440)Project: GPP Ca Mau Factory Client: PVGAS - Year Built: 2019

0Design Pressure: 82.74 barg - Design Temperature: -28.9/65.6 CASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia, Jonell/USA

SOW: Engineering, procurement, fabrication for Filters Package (F5702 & 5703)Project: Q04 Gallaf ProjectClient: NOC/PTSC M&C - Year Built: 2020

0Design Pressure: 60 barg - Design Temperature: -10/65 CASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Engineering, fabrication FilterProject: Ba Ria GDS Client: - Year Built: 2012PVGAS GPMBDesign Pressure: 40 barg - Design Temperature: -10/80 C0

Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia

SOW: Calculation, detail design Gas Filter Skid Project: Dai Hung Platform, Phase 2Client: PVEP POC - Year Built: 2010Design Pressure: 40 barg - Design Temperature: -10/80 C0

Construction material: SA516 Gr.70N

SOW: Calculating and engineering for Diesel Filter SkidProject name: BK3 - Bk10 Client: Vietsovpetro Joint VentureYear of Completion: 2012

FILTER/ FILTER SEPARATOR

SOW: Engineering, fabrication & installation FilterProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGAS

Design Pressure: 4600 kPag Design Temperature: -29 C to 65 C 0 0

Construction material: CS +3mm CA + Internal Epoxy Coating

Design Pressure: 20 Pag/Fv Design Temperature: 60/20 C 0

Construction material: CS +3mm CA + Internal Coating + CPInternal: Super Duplex SS

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

SOW: Engineering, fabrication & installation Sea Water FilterProject: Sao Vang and Dai Nguyet Development ProjectClient: - Year built: 2019PTSCMC

11

SOW: Engineering, procurement and fabrication of Air CoolerProject: CCP PlatformClient: VIETSOVPETRO J.V - Delivery time: 2017Fin-Tube material: Copper Tube/Copper finsFans: 04 Blades, Aluminum, Moore/Motor: 10.5kW, Siemens

SOW: Engineering, procurement and fabrication of Air CoolerProject: Extension of gas compression capacity at Block 09-1Client: VIETSOVPETRO J.V - Delivery time: 2017Fin-Tube material: Carbon Tube/Aluminum finsFans: 06 Blades, Aluminum, Moore - Motor: 35kW, SiemensDesign pressure: 130barg

SOW: Engineering, procurement and fabrication of Air CoolerProject: MKC PlatformClient: Bách Việt - Delivery time: 2016Fin-Tube material: Carbon Tube/Aluminum finsFans: 06 Blades, Aluminum, Moore - Motor: 15kW, SiemensDesign pressure: 78barg

SOW: Engineering, procurement and fabrication of Tube Bundle for Air CoolerProject: GPP Dinh CoClient: Petrovietnam Gas Corporation - Delivery time: 2017Design pressure: 139 barg (Class 1500#)Fin tube material: SA 213/Aluminum fins - Fin Tube length: 10600mm

SOW: Engineering, procurement and fabrication Tube Bundle for Air coolerProject: Fabrication of Tube bundle for Air Cooler for PVCFCClient: PVCFC - Delivery time: 2017Fin tube material: SS 304/SS 304 finsFin Tube length: 9800mm

SOW: Engineering, procurement, fabrication Air Cooler Project: Diamond Development Project Client: PVCL - Delivery time: 2013Fin-Tube material: SA 179/AluminumFans: 06 Blades, Aluminum, Moore - Motor: 5kW, ABB

SOW: Engineering, procurement, fabrication Air CoolerProject: Dai Hung Gas Gathering ProjectClient: Dai Hung - Delivery time: 2014 Fin-Tube material: SA 269 316L/Aluminum Fans: 06 Blades, Aluminum, Moore - Motor: 15kW, ABB/Siemens

HEAT TRANSFER EQUIPMENT

Delivering solution, Expanding customer value

10

HEAT TRANSFER EQUIPMENT

SOW: Engineering, procurement and fabrication Air Cooled Heat Exchanger (ACHE) Project: Gas Coolers train E on CPPClient: VSP- Delivery time: 2021Fin-Tube material: Carbon Tube/Aluminum finsFans: 06 Blades, Aluminum, Moore - Motor: 15kW/30kW - SiemensDesign pressure: 140barg

SOW: Engineering, procurement and fabrication Lube Oil Cooler 103114-A/BProject: Armada FPSO Lube Oil CoolerClient: ARMADA TGT LDT - Delivery time: 2018Fin-Tube material: Carbon Tube/Aluminum finsFans: 06 Blades, Aluminum, Moore - Motor: 35kW, SiemensDesign pressure: 130barg

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

SOW: Engineering, procurement and fabrication Air Fin Cooler K-1011D Project: Extension of gas compression capacity at Block 09-1Client: PVGas-DVK- Delivery time: 2019Fin-Tube material: Carbon Tube/Aluminum finsFans: 06 Blades, Aluminum, Moore - Motor: 15kW, SiemensDesign pressure: 130barg

TYPICAL COMPLETED PROJECTS

12

Delivering solution, Expanding customer value

SOW: Engineering, fabrication & installation of Suction Heater (HE-101) Project: Bitumen Storage And Distribution Terminal Project Client: Puma - Year built: 2016

0Design Pressure: 136/8 barg - Design Temperature: 0-300 CConstruction material: SA 179, U-Tube type

SOW: Provision of Shell & Tube Heater Exchanger (E-04316 & 29102) Project: Ca Mau Fertilizer ProjectClient: PVCFC - Year built: 2020

0Design Pressure: 44/6 barg - Design Temperature: 235-420 CConstruction material: SA 179, Straight Tube type

SOW: Provision of Shell & Tube Heater Exchanger (E-041011) Project: Ca Mau Fertilizer ProjectClient: PVCFC - Year built: 2019

0Design Pressure: 45/15 barg - Design Temperature:-10-100 CConstruction material: SA 213 TP304L, U-Tube type

SOW: Engineering, fabrication & installation of Heat ExchangerProject: LPG Thi Vai StorageClient: Petrovietnam Gas Corporation - Year built: 2014

0Design Pressure: 0-17.6 barg - Design Temperature: -45-95 CConstruction material: SS 316, Straight Tube type

SOW: Engineering, fabrication & installation of Heating coilProject: Phu-My Gas Distribution CenterClient: Petrovietnam Gas Corporation - Year built: 2014Design Pressure: 71 barg - Design Temperature: -10-1 000 CConstruction material: SA 106 Gr.B, Pipe

SOW: Engineering, fabrication & installation Heat Exchanger T-402 Project: MKC PlatformClient: - Year built: 2015VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type

SOW: Engineering, fabrication & installation Heat Exchanger T-302 Project: MKC PlatformClient: - Year built: 2017VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type

SOW: Closed Drain Tank Electrical heater and HP Flare KO drum heaterProject: Thien Ung Wellhead PlatformClient: VSP - Year built: 2015Design Pressure: 47 barg - Design Temperature: 60-190 C0

Construction material: SS 316L - Heat Duty: 55kW & 75kW

SOW: Heat ExchangerEngineering, fabrication & installation of Project: TB-HR Gas distribution & gathering systemClient: PTSC PPS/PVGAS Corporation - Year built: 2015Design Pressure: 46 barg - Design Temperature: -29-90 0CConstruction material: SA 179, U-Tube type

SOW: Detail Engineering, fabrication supporting of Heat exchangerProject: Su Tu Vang CPP Client: CUU LONG JOC - Year built: 2013Design Pressure: 20.7/FV barg - Design Temperature: 19-232 0CConstruction material: SA 179M, Straight Tube type 13

SOW: Engineering, fabrication & installation Heat Exchanger T-102 Project: MKC PlatformClient: - Year built: 2017VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type

SOW: Engineering & Fabrication Heating Medium Heaters (SV-41-FE-003AB) Project: Sao Vang Dai Nguyet ProjectClient: - Year built: 2019PTSCDesign Pressure: 20 barg- Design Temperature: 017-300 CConstruction material: SA 516 Gr 70, Heating Rate: 800kWHeating element: INCOLOY 800

HEAT TRANSFER EQUIPMENT

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

1514

Delivering solution, Expanding customer value

SOW: Engineering, procurement, fabrication Ammonia Metering Package Project: Ammonia Plant Revamp Client: PVFCCo/PTSC - Year built: 2017Design Pressure: 0-27 barg / Design Temperature: 0-65 C0

Service: NH3 metering - Flow meter type: Coriolis Flow MeterMetering capacity: 10000000 m3/h - Accuracy: ±0.1 %

SOW: Engineering, procurement, fabrication for Gas Metering skid Project: Provision of Gas Metering Skid Client: PVEP POC/PTSC PPS - Year built: 2015Design Pressure: 0-27 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Orifice Flow MeterMetering capacity: 10000000 m3/h - Accuracy: ±0.055 %

SOW: Engineering, procurement, fabrication for Gas Metering skid Project: Provision of Gas Metering Skid for Tan Phuoc Khanh Client: Tan Phuoc Khanh - Year built: 2011Design Pressure: 0-27 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2200 SCMH - Accuracy: 0.5%

SOW: Engineering, procurement, fabrication for Gas Metering skidProject: Provision of Gas Metering Skid for PominaClient: Pominal Steel Corporation - Year built: 2010Design Pressure: 0-27 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2200 SCMH - Accuracy: 0.5%

SOW: Engineering, procurement, fabrication for Gas Metering skidProject: Provision of Gas Metering Skid for Ton Phuong NamClient: Ton Phuong Nam Cor. - Year built: 2014Design Pressure: 0-17 barg - Design Temperature: 0-65 C0

Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2500 SCMH - Accuracy: 0.5%

MEASURING EQUIPMENT/METERING SKID

SOW: Engineering, fabrication for CPI SystemProject: Ca Mau Gas Processing Plant ProjectClient: - Year built: 2016POSCODesign Pressure: 0-6 barg - Design Temperature: 0/70 C0

Construction material: SA 36/SS 304Internal part: K-pack

SOW: Engineering, fabrication for CPI SystemProject: PM3 Ca Mau Booster Compressor StationClient: PVGAS/CAMAU GPMB - Year built: 2013Design Pressure: 0-6 barg - Design Temperature: 0/70 C0

Construction material: SA 36/SS 304Internal part: K-pack

PIG LAUNCHER & PIG RECEIVER

OILY WATER TREATMENT FOR ONSHORE AND OFFSHORE GAS PROCESSING

SOW: Engineering, fabrication Pig Launcher and Receiver Project: Q01 - Gallaf Client: PTSC/NOC - Year built: 2020Design Pressure: 139.5 barg / Design Temperature: 0-82 C0

ASME U stamp - Construction material: SA516 Gr.70N

SOW: Engineering, fabrication for Pig Launcher & Receiver Project: Sao Vang Dai NguyetClient: PTSC - Year built: 2018-2019Design Pressure: 184 barg / Design Temperature: -20-70 C0

ASME U stamp - Construction material: SA516 Gr.70N

SOW: Engineering, fabrication for ME01/Pig Launcher & Receiver Project: Hai Phong TerminalClient: PTSC Thanh Hoa - Year built: 2018Design Pressure: 38 barg / Design Temperature: 0-60 C0

ASME U stamp - Construction material: SA516 Gr.70N

SOW: Engineering, fabrication Pig Launcher and Receiver Project: Q10 - Gallaf Client: PTSC/NOC - Year built: 2020Design Pressure: 139.7 barg / Design Temperature: 5-93 C0

ASME U stamp - Construction material: SA516 Gr.70N, MTC EN10204 Type 3.2

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

16 17

Delivering solution, Expanding customer value

SOW: Engineering, fabrication & installation Degassing Pump H1Project: Te Giac Trang Field DevelopmentClient: Hoang Long Hoan Vu J.O.C - Year built: 2020Design Pressure: 33 barg - Design Temperature: 100°C Service: Degassing PumpPump: Pump 5m3/h

SOW: Engineering, fabrication & installation Phosphate Pump Injection SkidProject: Ammonia Plant Revamp ProjectClient: FVFCCo - Year built: 2017Design Pressure: 0-28 barg / Design Temperature: AMB-65 C0

Service: Phosphate InjectionPump: Phosphate Injection Pump 4 L/hr

SOW: Engineering, procurement, fabrication for Coagulant & Flocculent Injection Skid Project: Ammonia Plant Revamp ProjectClient: - Year built: 2017FVFCCoDesign Pressure: 0-4 barg / Design Temperature: AMB-65 C0

Service: Coagulant & Flocculent InjectionPump: Coagulant Injection Pump 4.63 L/hr, Flocculent Injection Pump: 2.55 L/hr

SOW: Engineering, fabrication for Odorant Injection PackageProject: Ca Mau Gas Processing Plant Project (PACKAGE-1)Client: - Year built: 2016POSCODesign Pressure:99.2/11.46 barg / Design Temperature: 0-70 C0

Service: OdorantDesign flowrate (l/hr): Max 10.8 - Min 0.72

UTILITY SKID

SOW: Engineering, fabrication & installation Chemical Injection SkidProject: Sao Vang and Dai Nguyet Development ProjectClient: - Year built: 2020PTSCMC

Design Pressure: +0.6/-0.002 barg - Design Temperature: 60/-22 C0

Service: Chemical Injection SkidMaterial: SS316L / Trim No.: AS00A

SOW: Engineering, fabrication & installation Fuel Gas SkidProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 0-46 barg - Design Temperature: 0-90 C0

Service: Fuel GasHeater Bundle: 0.5kW

SOW: Engineering, procurement, fabrication Hot Water SkidProject: BK.TNG Wellhead PlatformClient: - Year built: 2015Vietsovpetro Joint VentureDesign Pressure: 0-14 barg - Design Temperature: 0-80 C0

Service: Hot WaterHeater Bundle: 58kW

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

SOW: Engineering, fabrication & installation Chemical Injection SkidProject: BK.TNG Wellhead PlatformClient: - Year built: 2015VSPDesign Pressure: 0-42.2 barg / Design Temperature: AMB-65 C0

Service: Corrosion Inhibitor/Wax Inhibitor/ Reserve Demulsifier injectionPump: Chemical Injection Pump 0.1 L/hr, 0.2 L/hr & 31 L/hr

SOW: Engineering, fabrication & installation Fuel Gas SkidProject: Sao Vang and Dai Nguyet Development ProjectClient: - Year built: 2019PTSCMC

SOW: Engineering, fabrication & installation Instrumented HIPPS System Project: Sao Vang and Dai Nguyet Development Project Client: PTSCMC - Year built: 2020Design Pressure: 690 barg - Design Temperature: 155/-50°C Material: Duplex SSService: High Integrity Pressure Protection System HIPPConnection: Hub connected.

Design Pressure: 45 barg - Design Temperature: 70/-20 C0

Service: Fuel GasElectrical Heater: 231 kW

SOW: Engineering, fabrication & installation Chemical Injection SkidProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 0-46 barg / Design Temperature: AMB-65 C0

Service: Corrosion Inhibitor injectionPump: Chemical Injection Pump 2.0 l/hr

Delivering solution, Expanding customer value

UTILITY SKID

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

SOW: Engineering, procurement, fabrication Chemical Injection SkidProject: Diamond Field DevelopmentClient: PVCL - Year built: 2013Design Pressure: 0-205 barg / Design Temperature: AMB-65 C0

Service: Corrosion Inhibitor/Wax Inhibitor/ Pour Point Depressant injectionPump: Chemical Injection Pump 50 L/hr, 110 L/hr & 70 L/hr

SOW: Engineering, procurement, fabrication supporting Chemical Injection Pump skidProject: BKT Wellhead PlatformClient: VSP - Year built: 2010

0Design Pressure: 0-250 barg / Design Temperature: 0-65 CPump type: Dosing Pump, 25L/hr, API 675

SOW: Engineering Hypochlorite Injection Skid PK 5002 A/BProject: LPG Refrigerated Storage Thi VaiClient: PVGAS - Year built: 2011

18 19

SOW: Engineering, procurement, fabrication Chemical Injection SkidProject: Su Tu Trang Field DevelopmentClient: JVPC - Year built: 2011Design Pressure: 0-15 barg / Design Temperature: AMB-65 C0

Service: Pour Point Depressant injectionPump: Chemical Injection Pump 40L/hr

SOW: Engineering for Separator & PW Degasser SkidProject: Saraswati Oil Field Development Project - Phase 2Client: Cairn Enegy India Pty Ltd(CEIL) - Year built: 2012Design Pressure: 1034 Kbarg / Design Temperature: 120 C0

Service: Separator & PW Degasser SkidPressure Switch: 80PS-1003 / Pressure Gauge: 80PG-1001/1002/1003Service: Foam Storage Tank

Delivering solution, Expanding customer value

PRESSURE &TANKS

20 21

SOW: Engineering, fabrication for Fresh water storage tank Project: Sao Vang Dai Nguyet Project Client: PTSC - Year built: 2018

0Design Pressure: 125 barg - Design Temperature: -29/140 CConstruction material: SA 516 Gr.60

SOW: Engineering, fabrication for Open Drain TankProject: Gallaf Project - Client: PTSC - Year built: 2020Design Pressure: 125 barg, Water full + 0.05 /-0.0025 Barg Design Temperature: -29/140 C, 17/60 C0 0

Construction material: SA 516 Gr.60, SA 516 Gr.70

SOW: Engineering, Pressure & TankProject: Su Tu Trang Project Client: Cuu Long JOC - Year built: 2010

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

SOW: Engineering, fabrication for Diesel Day Tank 16M3 (TK-6901 A/B/C/D)Project: Package G Central Utility Plant Client: STD&T/Long Son Petrochemical Company LimitedYear built: 2020 Construction material: SA36

SOW: Engineering, fabrication & testing for RecondenserProject: LNG Receiving Terminal and Re-GasificationClient: - Year built: 2020Hai Linh Company Vung Tau

0Design Pressure: 90 barg - Design Temperature: -10/80 CConstruction material: SS 304 - ASME U stampInternal part: Rhine Ruhr/Australia - - Dimension: ID.3000 x 10800 T/T

SOW: Provision of engineering design for closed drain vessel.Project: Pearl & Topaz field developmentClient: - Year built: 2007PCVL

SOW: Provision of engineering Methanol Storage Tank Project: Su Tu Trang Project Client: Cuu Long JOC - Year built: 2010

SOW: Engineering for the BOG Propane CondenserProject: LPG Refrigerated Storage Thi Vai Client: PVGas - Year built: 2011

SOW: Engineering for the Chemical Storage TankProject: Hai Su Trang - Hai Su DenClient: Thang Long JOC - Year built: 2012

SOW: Engineering for the Storage TankProject: Bk3 - BK10Client: VSP - Year built: 2010

SOW: Engineering, fabrication for Liquid Seal PotProject: Sao Vang Dai Nguyet Project Client: PTSC - Year built: 2018-2019

0Design Pressure: 125 barg - Design Temperature: -29/140 CConstruction material: SA 516 Gr.60, SA 516 Gr.70

SOW: Engineering, fabrication for Fire Water Break TankProject: Sao Vang Dai Nguyet Project Client: PTSC - Year built: 2018-2019

0Design Pressure: 125 barg - Design Temperature: -29/140 CConstruction material: SA 516 Gr.60, SA 516 Gr.70

Delivering solution, Expanding customer value

6

Pm3 CA MAU BOOSTER COMPRESSOR STATION

22 23

PROCESS/COMPRESSION SKID

SOW: Engineering & Provide Equipment and Packages: - Modified Cold Vent - Closed Drain Vessel - Fast stop Valve for gas turbine compressor - Seal gas system for gas turbine compressor - Nitrogen system - Open Drain Tank - Instrument Air Receiver Vessel - Utility Air ReceiveProject: PM3 Ca Mau Booster Compressor StationClient: PVGAS/CAMAU GPMB - Year built: 2013

SOW: Engineering, procurement, fabrication for Nh3 Refrigeration package Project: Ammonia Plant Revamp Project Client: Johnson Control/ PVFCCo - Year built: 2017Design Pressure: 125 barg

Design Temperature: -29/140 C0

Construction material: SA 516 Gr.60 ASME U stampCompressor: Johnson Control/Singapore

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

Delivering solution, Expanding customer value

24 25

MODIFICATION PIPING SYSTEM - RISER - BACH HO

RANG DONG FIELD DEVELOPMENT - JVPC

SOW: Engineering New WHP-NE structural feasibility studySOW: Engineering for Additional POB To NULQ Living Quarters Module

SOW: Engineering, procurement, installation for CNV Gaslisf Client: Hoang Long Hoan Vu J.O.C - Year: 2020

OFFSHORE PROJECT

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

CA NGU VANG FIELD DEVELOPMENT

EMERGENCY GENERATOR ENCLOSURE

SOW: Engineering, procurement, fabrication for Emergency Generator Enclosure Project: BK-TNG wellhead PlatformClient: Vietsovpetro Joint VentureYear built: 2015Size: max. Length: 12m, max. Wide: 5m, max. High: 4.65m; max. Weight: 63.500 ton.

CATHODIC PROTECTION SYSTEM

26

Delivering solution, Expanding customer value

27

ELECTRICAL AND INSTRUMENTATION SYSTEM

SOW: Engineering and installation Control Cabinet and Control System; The Purpose of cabinet is used to control the F&G system for rig BK16Project: BK-16 Platform Client: Vietsovpetro Joint Venture - Year: 2015

SOW: Modify HVAC system for FBSO Replace the soft starter 3RW4047 to control the Micro turbine system Replace and modify the logic controller of HVACProject: H01&H04 Well Head Platform, Te Giac Trang Field Development Client: Hoang Long JOC - Year: 2014

SOW: Engineering, fabrication, installation for Cathodic Protection System Project: Phu My Gas DistributionPlace of End user: Phu My, Ba Ria-Vung TauClient: Petrovietnam Gas Corp. - Year: 2014

SOW: Engineering, fabrication, installation for Cathodic Protection System Project: Thai Binh - Ham Rong Gas Distribution And Gathering SystemPlace of End user: Thai Binh, VietnamClient: Petrovietnam Gas Corp. - Year: 2015

SOW: Engineering and assembly Heater Control PanelProject: Thai Binh-Ham Rong Gas SystemPlace of End user: Onshore, Vietnam Client: Petrovietnam Gas Corp. - Year: 2014

SOW: Engineering, installation of UPS systemProject: Gas Distribution Center Project Place of End user: Onshore, Vietnam Client: Petrovietnam Gas Corp. - Year: 2016

SOW: Engineering, procurement & offshore installation Synchronizationn Cabinet.Project: TGT H01 Wellhead PlatformPlace of End user: Onshore, Vietnam Client: Hoang Long JOC - Year: 2015

SOW: Engineering Heater Control Panel; installation Power Control Panel Project: BK.TNG Well Head Platform Place of End user: Onshore, Vietnam Client: Vietsovpetro Joint Venture - Year: 2015

SOW: Engineering, fabrication,installation for Cathodic Protection SystemProject: Provision of ICCP for Nhon Trach 1 and Nhon Trach 2 planPlace of End user: Nhon Trach, Dong Nai Client: Petrovietnam Gas Corp. - Year: 2017

SOW: Provision of control cabinet for PCS, SSD and fire & gas systemProject: Ammonia Plant Revamp Place of End user: Onshore, Vietnam Client: Petrovietnam Fertilizer Chemical Corporation - Year: 2017

SOW: Engineering, fabrication, installation for Power Distribution Cabinet System Project: Power Distribution Cabinet System Of PVC-MSPlace of End user: Onshore, Vietnam Client: PVC-MS - Year: 2016

SOW: Explosion Proof Control Panel for Ammoniac Metering SystemProject: Ammoniac Metering ProjectPlace of End user: Onshore, Vietnam Client: - Year: 2017PVFCCo

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

28 29

Delivering solution, Expanding customer value

Rhine Ruhr - Australia

OUR MAJOR CUSTOMERSCERTIFICATE

DK ENGINEERING

DK ENGINEERING CONSULTANCY J.S.C

3130

LIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

1

Engineering Chemical Injection Skids for Su Tu Trang Project: 1, ZZZ-4200 2, ZZZ-4815 3, ZZZ-4215

Su Tu Trang Field Development

2010

2

Engineering Pressure Vessels for Su Tu Trang Project: 1. Instrument Air Receiver-MBL-6470 2. Fuel Gas Scrubber-MBF-5730 3. Flare Scrubber -MBF-4324 4. Test Separator- MBD-2920 5. Hazardous Opened Drain Tank -ABJ-6201 6. Methanol Storage Tank - MBJ-4810 7. Pipeline Pig Launcher -KAH-3010 8. Pipeline Pig Receiver -KAQ-2020

Su Tu Trang Field Development

2010

3 Provision of Calculation, engineering for Heat Exchanger

Su Tu Vang Field 2012

4

Engineering for Su Tu Nau Field Development Project: A. Su Tu Nau South Platform 1. Allocation Separation 2. Production Pipeline Pig Launcher 3. Production Pipeline Pig Receiver 4. Fuel Gas Scrubber 5. Flare Scrubber 6. Instrument Air Receiver 7. Hazardous Open Drain Tank B. Su Tu Nau North Platform 1. Production Pipeline Pig Launcher 2. Fuel Gas Scrubber 3. Flare Scrubber 4. Instrument Air Receiver 5. Hazardous Open Drain Tank C. WHP - B Platform 1. Production Pipeline Pig Launcher

Su Tu Nau Field Development

2013

5 Calculation & Engineering for Anode - STN-N & STN-S Caisson Project

Su Tu Nau Field Development

2013

6 Chemical Injection Skid – CIS - Pearl Platform Pearl field

Development

2007

7 Engineering for Close Drain Vessel - Pearl Platform Pearl Platform 2007

8 Engineering for Utility Gas Conditioning Skid (UGS) – Pearl Platform

Pearl Platform 2008

9 Stress analysis piping - Ruby B Ruby B 2008

10 Engineering for Pour Point Depressant (PPD) Tank - PCVL

Ruby B 2008

11 Engineering for Nitrogen Skid - Pearl Project Pearl project 2008

12 Engineering for Chemical Injection Skid - TOPAZ TOPAZ Platform 2008

13 Engineering for LP Test Separator Ruby B 2011

14 Engineering for Utility Gas Scrubber – Ruby B Ruby B 2011

15 Provision, installation of 200A Active Harmonic Filter – Topaz Platform

TOPAZ Platform 2011

16

Diamond Project: Calculation, engineering for: 1. Chemical Injection Skid 2. Fuel Gas Skid 3. Launcher 4. CO2 Vent Snuffing 5. LP-HP Separator Skid 6. Nitrogen 7. Open Drain Pump 8. Sample Connection 9. Tote Tank

Diamond Development

Project 2013

17

Provision of Designing Materials, Onshore Fabrication and Offshore Installation Off the VRC Pneumatic Starting System At RBDP-B Platform, Block 01&02, Offshore Vietnam

RBDP-B Platform, Block 01&02

2014

No. PROJEC T/W ORK DESCRIPTION PROJEC T N AM E CLIEN T YEAR

18 Calculation of Life R aft

Rang Dong Field Developm ent

2008

19 Engineering for Chem ical Injection Skid - JVPC 2008

20 Provision of P ipe Stress Analysis for Fuel Gas line to FSO

2009

21

P ipe stress analysis for R ang Dong Field Developm ent Project: 1. W HP-S1, S1-8P Production Flow Line 2. W HP-N1, N1-5I Flow Line & Extension of N 1w1 Manifold 3. W HP-N1, N1-6I Flow Line & Line No. 6"-W i-F-993 4. CPC-CLPP, C LPP C losed Drain D ischarge Line ( ECR-270)

2010

22

Engineering for Rang Dong Field Developm ent Project: 1. Pum p Skid RD F-SK-4900 & RD F-SK-4901 2. B iocide Injection RD F-Skid SK-4915

Rang Dong Field Developm ent

2011

23 Engineering for CLPP Flare Boom 2011 24 Structure Calculation for Basket 2011

25 Engineering for CLPP Barge Bum per – Rang Dong Field Developm ent

Rang Dong Field Developm ent

2012

26 Calculation and engineering for Com pression & W ater Injection Structure P latform

2012

27 Calculation and Engineering for Boat Landing - JVPC

2012

28 Engineering for C1 Tem porary Ladder 2012

29 Provision of P ipe Stress Analysis, P iping Isom etric, P iping A rrangem ent Drawing

2012

30 P ipe Stress Analysis for C 1-8P 2012

31 Calculation, engineering for P ipe S tress Analysis for Flow line & Gas lift - W HP-E1A-16P

Rang Dong Field Developm ent

2013

32 Engineering for Injection C om pression Suction Scrubber Package

2013

33 Rang Dong Field D evelopm ent Design, engineering Flare Boom for E1, CLPP

2013

34 Rang Dong Field D evelopm ent: S tructure in-place reanalysis for W HP-S1, N1, CLPP

2014

35 Reviewing the fatigue lives for existing pipelines-JVPC

2014

36 Rang Dong Field D evelopm ent: Engineering Living Quarters Extension In NU LQ

Rang Dong Field Developm ent

2015

37 P ipe stress analysis of E1 -22P ?own line & Gas lift line in W HP-E1 & W HP-S1

Rang Dong Field Developm ent

2015

38 New W HP-NE Structural Feasibility S tudy - Rang Dong Field D evelopm ent

2015

39 The Feasibility S tudy for S lot Extension of W HP -S1 2015

40 S ite survey for S1 -8P and 2I-LTPT Gas lift line and m odify EOR ?ow line

2015

41 Modify of P1/P2 P ig Launcher & P ig Receiver Rang Dong Field

Developm ent

2016 42 Provision of Engineering W ork Service for P5 & P3 2016

43 Provision of Engineering W ork Service For E-07I W AG Flow line

2016

44 Design and Installation of P5 Dewatering & Degassing Line

Rang Dong Field Developm ent

2017

45 Provision of design & engineering service for E-23P flowlines Rang Dong Field

Developm ent

2018

46 Provision of engineering service for installation of pig launcher and pig receiver for P5 P ipeline

2018

47 Provision of design & engineering service of H igh Pressure Gas lift Lines For E1&E1A Producers

Rang Dong Field Developm ent

2019

48 Provision of design & engineering service of H igh Pressure Gas lift Lines For C1 Producers

2019

49 Calculation and Engineering for Package: K illing & B leeding Lines For N1

2019

50 Calculation and Engineering for Package: Installation O f H igh Pressure G aslift Lines For E1&E1A Producers

2019

51 Calculation and Engineering for Flowline & G aslift for E-29P (ECR-0481)

Rang Dong Field Developm ent

2020

52 Survey, C alculation and Engineering For N 1_E1_S1 & CPC Network (ECR -0480)

2020

53 Provision of installing rem ote drain for S1 GL Liquid Trapped (ECR -0483) (PR 20-10845)

2020

3332

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

54 Engineering for modification of process equipment - Dinh Co GPP

Dinh Co GPP project

2008

55 Calculation & Engineering for Chemical Tank 2008

56

Engineering for Dragon Tortoise Gas Utilization Project: 1.Close Drain Drum2.Open Drain Tank3.Slug Catcher4.Flare Scrubber

Dragon tortoise gas utilization

project 2009

57 Design, engineering, cost estimate for construction of bypass pipe for heaters E-401A/B/C at Phu My GDS

Phu My GDS 2010

58 Design, engineering, cost estimate for modification of isolated valves for PSVs - Phu My GDS

Phu My GDS 2010

59 Design, engineering, cost estimate for modification of instrument air system - Phu My GDC

Phu My GDC 2010

60 Examining and verifying of engineering documents for Rang Dong – Bach Ho pipeline improvement to 4 mill cubic meter of Gas/day

Rang Dong – Bach Ho pipeline

2010

61 EPC of instrument air for PVGAS Service workshop PVGAS Service

workshop 2011

62 Design, engineering, cost estimate for mattress covering Phu My – HCM city pipeline

Phu My – HCM city pipeline

2011

63 Installation supervision consultancy of Rang Dong – Bach Ho pipeline improvement to 4 mill cubic meter of Gas/day

Rang Dong – Bach Ho pipeline

2011

64 Design, engineering, cost estimate for mattress covering Bach Ho – Long Hai pipeline

Bach Ho – Long Hai pipeline

2011

65 Engineering for Thi Vai LPG refrigerated storage Thi Vai LPG refrigerated

storage 2011

66 Engineering for Corrosion Inhibitor System 2011

67 Installation of E & I system, civil work - low pressure gas distribution system for Pomina steel project

Pomina steel project

2012

68 Engineering for maintenance of Phu My - HCM pipeline Phu My - HCM

pipeline 2012

69 Examining and verifying of engineering documents for GPP Ca Mau – PM3 Gas Booster Compression Package

GPP Ca Mau – PM3 Gas Booster

Compression 2012

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

70 Engineering for pig trap skid – Ba Ria GDS Ba Ria GDS 2012

71 Engineering for gas filter separator skid – Ba Ria GDS Ba Ria GDS 2012

72 Calculation, engineering for LPG Hai Phong storage widening

LPG Hai Phong storage

2012

73 Calculation, engineering for Heat Exchanger 2013

74 Modification for H6, H7, H9 & H11 - Dinh Co - Thi Vai piping

Dinh Co - Thi Vai piping

2013

75

PM3 Ca Mau Booster Compressor Project: 1. Gas turbine Compressor station detail designincluded:

- Civil engineering - Structural engineering - Mechanical engineering - Piping engineering - Process engineering - E & I engineering - Gas turbine fuel gas system - Fire & Gas and firefighting engineering

2. Provide Equipment and Packages: - Modified Cold Vent - Closed Drain Vessel - Fast Stop Valve for Gas Turbine Compressor - Seal Gas System for Gas Turbine Compressor - Nitrogen System - Open Drain Tank - Instrument Air Receiver Vessel - Utility Air Receiver Vessel - Control System

PM3 Ca Mau Booster

Compressor Project

2013

76

Thai Binh - Ham Rong Gas Distribution and Gathering System Project, Block 102&106, Phase 01. Engineering and fabrication for: 1. TBHR-PAC01-Corrosion Inhibitor Skid2. TBHRPAC10-LP Separator/ Filter Separator3. TBHRPAC11-Condensate Preheater-Heater4. TBHRPAC18 Cathodic Protection System

Thai Binh - Ham Rong Gas

Distribution And Gathering System

Project, Block 102&106, Phase

01.

2014

77 Engineering & assembly Heater Control Panel For TB-HR Project

2014

78 Reanalysis for LPG Go Dau storage LPG Compressor

Go Dau 2014

79 Engineering, Provision of Inlet Gas Metering System at Dinh Co Gas Processing Plant (16” class 900; 3” class 600)

Dinh Co GPP Plant 2014

80 Engineering, Provision of Heat Exchangers Thi Vai Thi Vai 2014

3534

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

81 Engineering and fabrication For Gas Pump Injection Skid (Gas Pump Skid ZZZ-4278) STV-RD

STV-RD 2014

82 Engineering, Provision of Gas Chromatograph GC-1601-DVK

GC-1601-DVK 2014

83 Engineering & installation for HVAC-04 system 2014

84 Engineering for SSIV Skid, 16" pipeline Rang Dong-Bach Ho/Riser Block

Rang Dong-Bach Ho/Riser Block

2015

85 Engineering & Procurement & Construction Module ER Probe

Construction Module ER Probe

2015

86 Report on technical evaluation & cost estimation for H1.H2.H4.H8.H13. L1-H3-L4-H5-H12-H14/2015

- 2015

87 Provision of Gas Filter F-401A Phu My Gas

Distribution Project 2015

88 Provision of Heating Coil Water Bath Phu My Gas

Distribution Project 2015

89 Engineering Subsea check valve with spool in Rang Dong Field

Rang Dong Field 2015

90 Report on technical evaluation & cost estimation for PM2.1& PM 4 Pipeline

Rang Dong Field 2015

91 Engineering, fabrication, installation Phu My - Ho Chi Minh Pipeline - Install Pig Station at Nhon Trach GDS

Phu My Gas Distribution Project

2015

92 Modification Of CPP-STV Chemical Injection Package Su Tu Vang

Platform 2015

93 Provision, fabrication, of Filter Separator - GDC Phu My Phu My Gas

Distribution Project 2015

94 Provision of UPS Dinh Co Gas Distribution

2016

95 Provision of Pig Launcher CCP BACH HO

PLATFORM 2016

96 Survey, report on technical evaluation & cost estimation for H1.3.5.8.9.14-2016

-

2016

97 Repairing the damaged points of fiber optic cable lines No. 03 - Liquid product route of PV Gas South East

-

2016

98 Repairing the arisen defects at underground pipe line PM2.1, PM2.2 and PM4 through the line No. 16.

Phu My Gas Distribution Project

2016

99 Surveying, calculating, assessing and suggesting the solutions to solve the shake of device system at GDC - Phu My.

Phu My Gas Distribution Project

2016

100 Surveying, carrying out the Economic and technical report for replacing the technological pipelines on Riser - Bach Ho 5 platform

Bach Ho 5 platform.

2016

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

101 Basic Design Package of Improving LPG Recovery Efficiency of Dinh Co Gas Processing Plant

GPP Dinh Co 2016

102 Fabrication for SSIV Skid in Bach Ho Field Bach Ho Field 2016

103

Engineering the Cuu Long compensative gas distribution pipeline for PV Gas D - Nhon Trach Hiep Phuoc zone at GDC-PM in the NCS gas stop progress on September, 2016.

Phu My Gas Distribution Project

2016

104 Surveying, calculating and engineering the gas distribution pipeline for PV Gas D - Nhon Trach Hiep Phuoc zone at GDC-PM.

Phu My Gas Distribution Project

2016

105 Additional installation for valves at C-01 & C-05 tower in GPP Dinh Co

GPP Dinh Co 2016

106 Surveying, calculating, provide equipment, fabrication, installation for the Loading Arm at LPG Dinh Vu

LPG Dinh Vu 2016

107 Surveying, calculating safety assessment for the Go Dau LPG and LPG Dinh Vu

LPG Dinh Vu 2016

108 Design the process and instrument diagram for the air system Cuu Long basin.

Cuu Long basin. 2016

109 Surveying, calculating, assessing and suggesting the cable routes 3 at Tan Thanh, Ba Ria-Vung Tau

-

2016

110 Research project for improving LPG recovery efficiency of LPG Thi Vai

Thi Vai LPG 2017

111 Upgrade the Critical LSHH in GPP To Improve the Reliability

GPP Dinh Co 2017

112 Surveying, engineering upgrade processing piping system and Teflon of the support system on Riser Block - Bach Ho platform and DGCP platform.

Riser Block - Bach Ho Platform

DGCP platform

2017

Engineering, replacing of Air Cooler Tube Bundles at Dinh Co GPP

Dinh Co GPP 2017

Provision of 02 flange protection cover Flange protection cover

- 2017

Provision of ICCP for Nhon Trach 1 and Nhon Trach 2 plan at Nhon Trach GDS

Nhon Trach GDS 2017

Engineering, additional installing truck scale and loading arm at Thi Vai LPG station

Thi Vai LPG 2017

Engineering consultation, installation management for the gas supply system for SOP Phu My at My Xuan A industrial zone

SOP Phu My at My Xuan A industrial

zone

2017

Engineering consultation, installation management for the gas supply system for Thep Song Than at My Xuan A industrial zone

Thep Song Than at My Xuan A industrial

zone

2017

Repair Lower Column for LPG Go Dau Storage (KU-T101)

LPG Go Dau 2017

Engineering consulting for relocation the pipeline system of oil-contaminated at GDC Tien Hai

GDC Tien Hai 2017

121 Provision of 01 Suction Strainer - 2017

122 Additional functions Line monitoring for important signals on CPP platform

CPP Platform 2017

123 Engineering and Fabrication for Tube Bundle K1011A/C

Tube Bundle K1011A/C

2018

124 Modification V1401 at Th? Vai LPG station Thi Vai LPG 2018

125 Engineering and Fabrication for Strainer -E-14A at GPP Dinh Co

GPP Dinh Co 2018

126 Upgrading the metering system for Bach Ho Crossover D?m Phu My line at PM GDC

PM GDC 2018

127 Survey, report on technical evaluation & cost estimation for Condensate piping system from JETTY 1 to JETTY 2 at Thi Vai LPG station

Thi Vai LPG 2018

113

114

115

116

117

118

119

120

3736

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

128 Survey, report on technical evaluation & cost estimation for the repairing defects of gas pipeline coating at NT GDC

Nhon Trach GDC 2018

129 Survey, report on technical evaluation & cost estimation for the checking, replacing the broken fiber cables along DC-BR-KCVT/PM route

- 2018

130 Upgrading, extending the truck scale no.01 at Thi Vai LPG station

Thi Vai LPG 2018

131 Calculating, upgrading AE-1601 to analyze Neo Pentane - 2018

132 Purchasing parts for repairing & maintaining, periodically replacing F1001 vessel of low pressure gas compressor Vom Bac LP4, LP9

Vom Bac LP4, LP9

2018

133 Survey, report on technical evaluation & cost estimation for the repairing, replacing the fire hose after DELUGE VALVE at GDC-PM & GDS-PM

GDC-PM & GDS-PM

2018

134 Replace the Tube Bundle for After Cooler CMP-1101 A/B & CMP-1201 A/B

CMP-1101 A/B & CMP-1201 A/B

2019

135 Survey, report on technical evaluation & cost estimation: “Modification of E-10 to standby operating for E-03”

GPP Dinh Co 2019

136Survey, report on technical evaluation & cost estimation: “Modification of suction and discharge line at PSV-1111 to suitable with new capacity”

GPP Dinh Co 2019

137 Survey, report on technical evaluation & cost estimation “Upgrading, extending the truck scale for GPP Ca Mau”

GPP Ca Mau 2019

138 Provisions of filter F-1440 for input system - Ca Mau Gas Processing Plant Project

GPP Ca Mau 2019

139 Engineering and Replacing the input piping of the Slug Catcher” at GPP Dinh Co

GPP Dinh Co 2019

140 Provision of EJW/AUX Tube Bundle For K1011 A/C/D Compressor

GPP Dinh Co 2019

141 Provision of Tube Bundles K1011-D For Dinh Co GPP GPP Dinh Co 2019

142 Repairing of 03 Filters at Nhon Trach GDC GDC Nhon Trach 2019

143 Provision of Tube Bundle for After Cooler CMP-1101 A/B Thi Vai LPG 2019

144 Survey, Engineering, Modification for Pressure Reducing Pipeline to PSV-1111 and Installation E-10 standby for E-03

Nhon Trach 2 Power Plant

2019

145 Provision of Bundle for After Cooler CMP-1201 A/B Thi Vai LPG 2019

146 Provision of Bundle of Air Fin Cooler for Engine Jacket Water Section and Engine Auxiliary Water Section

- 2019

147 Provision of Tube Bundle for Air Fin Cooler K-1011D Thi Vai LPG 2019

148 Survey, engineering, procurement, fabrication and installation for Pipeline 16” from TEE V-101 to input SC-01/02 at Dinh Co GPP

Dinh Co GPP 2019

149 Survey, engineering and cost estimation for Pig Receiver at Nhon Trach of Pipeline 22”

GDC Nhon Trach 2019

150 Survey, engineering and cost estimation for Package: Check and replace broken or damaged for the cable routing along PH-KCTV

- 2019

151 Modification the Welds of Slug Catcher SC-01 at GPP Dinh Co

Dinh Co GPP 2020

152 Survey, engineering and cost estimation for the “Modify Thi Vai LPG Terminal To Increase The Productivity Of Truck Loading Project”

Thi Vai LPG 2020

153 Replace the line output of Condensate from V-100 to V-03 Dinh Co GPP 2020

154 Modification the Welds of Slug Catcher SC-02 at GPP Dinh Co

Dinh Co GPP 2020

155 Survey, Engineering Oil & Gas Pipe line for Petec Storage Thi Vai LPG 2020

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

156 Calculation, engineering for BK3/BK10 process equipment

BK3/BK10 2010

157 Calculation engineering for sprinkler vessel RC1-RC3 Production platform complex

RC1-RC3 2010

158 Calculation and consultancy of DK14-15M installation method statement

DK14 2011

159 Engineering for Offshore Store Containers - 2013

160 Noise survey and remediation In Armada TGT1 FPSO TGT1 FPSO 2014

161 EPC of Diesel generator enclosure BK.TNG Wellhead

Platform Project 2014

162 BK14/BT7 - Engineering & assembly PCS & DCI system/Marshalling cabinet GA/IA

BK14/BT7 2014

163 Engineering & Fabrication Portable Water Filter - BK.TNG Wellhead Platform project

BK.TNG Wellhead Platform Project

2014

164

Engineering & Fabrication for BK.TNG Wellhead Platform Project: 1. Foam skid2. Hot Water Skid

BK.TNG Wellhead Platform Project

2015

165 Provision of Chemical Injection Skid (68AQ-01) BK.TNG Wellhead

Platform Project 2015

166 Provision of Closed Drain Vessel l& HP Flake K.O Drum

BK.TNG Wellhead Platform Project

2015

167 Provision internal part for Thien Ung project BK.TNG Wellhead

Platform Project 2015

168 Provision, fabrication, installation for Electrical Cabinets for Hai Su Den rig

Hai Su Den rig 2015

169 Provision of Electrical and Instrument Material RC9/RC5 Wellhead

Platform Project

2015

170 Provision of Piping & Fittings 2015

171 Provision of service design and supply of internal of three phase oil and gas separator - RP1 platform

Block 09-1 2016

172 Modification Works During FPSO Annual Maintenance Campaign In 2016

FPSO 2016

173 Provision of Internal parts - Due to increased production capacity separator

Tho Trang Project 2016

174 Provision of KO Drum Vessel with U-Stamp, third party certificate

CCP Platform 2016

175 Provision of Sea Water/Gas Heat Exchanger T-102 & T-302)

MKC Platform 2017

176 Provision of equipment and material for Metering Unit of Gas-Saturated Crude Oil Production on BK-5 and BK-8/17 Platform (Block 09-1)

BK-5 and BK-8/17 Platform

(Block 09-1) 2017

177 Provision of Spare parts of automation system in compressor center platform for maintenance 4K-8K

- 2017

178 Purchasing Materials for modification pressure vessel from two-phase to three-phase on RP1 platform (Block 09.1)

RP1 platform (Block 09.1)

2017

179 Modification for the control systems and SSD1 & SSD2 emergency stop on the compressor platform center

- 2017

3938

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

180 Replace Internal Parts for Glycol Contactor T-311A/B in CCP Platform

T-311A/B in CCP Platform

2017

181 Engineering, procurement and fabrication Air Cooler

Extension of gas compression

capacity at Block 09-1

2017

182 Detail Design, Fabrication of Corrosion Inhibitor Skid For MKC.

Thien Ung Field, Dai Hung Field

2018

183 Engineering, Procurement, Construction And Installation, Commissioning (EPCIC) Ph Control Injection Package.

CCP PLATFORM 2018

184 Provision of Internal part for CTC1 CCP PLATFORM 2018

185 Provision of Star up filter-Oil Field Development Ca Tam Oil Field

Development 2018

186 Provision material and equipment for fabrication the Pig Launcher & Pig Receiver VT-563/17-XL

- 2018

187 Modification the HVAC TOPSIDE & SLM system on DGCP platform

DGCP platform 2018

188 Provision of Internal part for Extension of gas compression capacity at Block 09-1. Install train a on MKS

MKS 2018

189 Survey, engineering and cost estimation for Package: Replace Process Pipeline System and Add for Teflon for the Support System at DGCP Platform

DGCP Platform

2019

190 Provision of material and equipment of Chemical Injection Pump

DGCP Platform 2019

191 Provision Of Mitigation Of Risks For CNV Gaslift Supplying

CNV platform

2019

192 Engineering of Gaslift system for CNV platform CNV platform 2020

193 Provision of Internal part for Test Separator (V-1202) BK 21 WHP

2020

194 Provision Of Onshore Pipelines & Facilities Pre/Commissioning Gas-In And Performance Run Test Services

Nam Con Son 2 Project

2020

195 Calculation and detail engineering for Filter Separator Nam Con Son 2

Project

2020

196 Provision of Quick Opening Closure 30”, 34”, 56” Nam Con Son 2

Project

2020

197

Provision of main material for Pig Receiver, Filter Separator. Provision of Internal Part for Filter Separator, Test Separator (V-1202)

Nam Con Son 2 Project

2020

198 Engineering, Installation of Gaslift system for CNV platform

CNV platform

2021

199 Engineering, procurement and fabrication Air Cooled Heat Exchanger (ACHE) on CPP platform

CCP platform

2021

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

200

Engineering for HST-HSD Project 1. Closed Drain Vessels2. Pig Launcher & Pig Receiver3. Chemical Storage Tanks & Open Drain Tanks

HST-HSD Project 2011

201 Engineering for HST Full Field Development & HSD Early Production System Development: Potable W ater Tank, Flush W ater Tank

HST-HSD Full Field Development

2012

202

Engineering for HST Full Field Development & HSD Early Production System Development: 1.HST - Diesel Loading Filter (01F-4410)2.HSD - Diesel Loading Filter (02F-4410)3.HST - Diesel Transfer Filter (01F-4420)4.HSD - Diesel Transfer Filter (02F-4420)

HST-HSD Full Field Development

2012

203

Engineering for HST Full Field Development & HSD Early Production System Development: 1.HST - close drain transfer pumps 01P-6010A/B2.HSD - open drain transfer pumps 02P-6110A/B3.HSD - close drain transfer pumps 02P-6010A/B

HST-HSD Full Field Development

2012

204 Calculation, engineering for sand jetting – HST-HSD Project

HST-HSD Full Field Development

2012

205 Engineering for Gas Filter, Gas Scrubber, Flare Scrubber, Test Separator, HHP Separator

Dai Hung 2 2008

206 Engineering for chemical injection skid – Dai Hung 2 (COR & PPD)

Dai Hung 2 2008

207 Provision for open drain tank – Dai Hung 2 Project Dai Hung 2 2010

208 Provision of Pressure Vessel & Provision of Internal Part for Dai Hung 1

Dai Hung 1 2014

209 Engineering and fabrication for Metering Skid (Dai Hung GGP)

Dai Hung 2 2014

210 Provision of Crude Oil Booster Pump Package on WHP DH2 at Dai Hung Field, Block 05-1(a), Offshore Vietnam

Dai Hung 2 2020

211 Engineering for Te Giac Trang H01 project 1.Open & Close Drain Package2.Fuel Gas Conditioning Skid

Te Giac Trang H01 project

2010

212

Engineering for Te Giac Trang - H04 Project 1, Open & Closed Drain Package 2, Fuel Gas Conditioning Skid 3, Diesel Conditioning

Te Giac Trang - H04 Project

2011

213 Provision of H4 EDG-MT Synchronization and Closed Drain Motor Start Circuit Modification

Te Giac Trang - H04 Project

2015

214 Provision of closed Drain Motor A & B and start Circuit Modification

- 2016

215 Modification works during FPSO annual maintenance campaign in 2016

FPSO 2016

216 Provision of H5 Closed Drain Motors A/B & HVAC Start Circuit Modification

Te Giac Trang 2017

217 Provision of Installation of Degassing Pump for H1 Water Handling Unit

Te Giac Trang 2019

218 Engineering, fabrication, installation NH3 Metering Station

Ammonia Plant Revamp Project

2016

219 Provision of Phosphate Dosing Pump Skid & Anti-Scale Dosing Pumps

2016

220 Engineering, fabrication, installation New Ammonia Refrigeration Package

2016

221 Engineering, fabrication, Installation Coagulant – Flocculent Dosing Package

2017

4140

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

222 Design, engineering, cost estimate for construction of PVPIPE sample work shop

PVPIPE sample work shop

2012

223 Supply of Spreader Bar 40T & Plate Clamp for PV PIPE

- 2014

224 Design, engineering, cost estimate for construction of new PVPIPE sample work shop

PVPIPE sample work shop

2018

225 Engineering & Procurement Manual valve & Instrument for 2 phases Mobile Separator skid Bundled Phases 2

EPCI Of W ellhead Platforms, Pipelines

and Tie-Ins

2016

226 Engineering & Procurement Manual valve & Instrument for next 3 MTS packages - 2 phases Mobile Separator skid

2017

227 Provision of vibration processing services for PT04301 piping

PT04301 2015

228 Manufacturing, installation, commissioning of CO2 compress Interstage separator

Camau Fertilizer Plant 2016

229 Provision of E07604 Tube Bundles for PVCFC E07604 2017

230 Engineering, procurement, fabrication and installation of Filter F-1440

GPP Ca Mau 2019

231 Consultancy, engineering for Ca Mau Fertilizer Plant CO2 recovery system form the Permeate Gas and Flash Gas

GPP Ca Mau 2019

232 Provision of Engineering service (Upgrading CO2 removal)

GPP Ca Mau 2019

233 Engineering, Procurement, Fabrication and Installation of Shell Tube Heat Exchanger

GPP Ca Mau 2020

234 Engineering, fabrication, installation Suction Heater (HE-101)

(HE-101) 2016

235 Transfer UPS & CP electrical signal to ICSS system at Ham Rong Thai Binh GDC Station

Ham Rong Thai Binh GDC Station

2017

236 Upgrade and renovate Distribution Cabinet - 2017

237 Air Cooler Modification & Exhaust Insulation for Armada TGT

Armada FPSO Lube Oil Cooler

2018

238 Provisions of Air Cooler Modification Armada FPSO Lube

Oil Cooler 2018

239 Upgrade Of Gas Compressor In FPSO Supply Services Of Design, Hazid, Fabrication, Manpower

Armada FPSO Lube Oil Cooler

2019

240 Engineering for CNG Gas Station – Dua A Chau CNG Gas Station -

Dua A Chau 2017

241 Engineering for CNG Gas Station – Thuan Dao Long An Industrial zone

CNG Gas Station - Thuan Dao Long An

2017

242 Engineering Metering gas station at CNG Phu My factory

CNG Phu My factory 2017

243 Engineering for CNG Gas Station - Kolon CNG Gas Station -

Kolon 2017

244 Engineering Zirtec Metering Gas Station at Chau Duc Industrial zone

Zirtec Metering Gas Station

2018

245 Engineering Accredo Metering Gas Station at Binh Duong Province

Accredo Metering Gas Station

2018

246 Survey, report on technical evaluation & cost estimation for 04 CNG compressor/ 2000Sm3/h

CNG compressor 2018

247 consultancy, engineering design and cost estimation for gas supply & Pressure Reducing unit of Le Phan Gia – Binh Duong

Le Phan Gia – Binh Duong

2018

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

248 Calculation of Rolling Coil - 2008

249 Engineering for Booster Compressor Suction Scrubber 230-V-2501

- 2011

250 Engineering for Super Gas Heater- Booster Compressor Project

Booster compressor Project

2011

251 Engineering for Pressure Vessels - DANIELI DANIELI 2011

252 Engineering for Fuel Gas Skid - Bien Dong Phase 1 Project Bien Dong Phase 1

Project

2011

253 Engineering for Liquid Trap 2011

254 Injection W ater Filter Skid

PETRO 6 - INDIA

2012

255 Supply of Separator and PW Degasser Skid 2012

256

Engineering for Thang Long – Dong Do Project: 1. Compact manifold2. Atmospheric Rectangular Tank3. FW S Pig Launcher (Tag No. L-0921)4. FW S Pig Launcher (Tag No. L-0901)5. Open Drain Pump Skid6. CO2 Vent Snuffing System7. Nitrogen Bottle Rack Skid8. Sand Jetting

Thang Long – Dong Do Project

2012

257 Engineering and fabrication for 3 phase Separator Skid - No.01 Hornet Gas Field

Development Project

2014

258 Engineering and fabrication for 3 phase Separator Skid - No.02

2015

259 Engineering and fabrication for Gas Dryer Cylinder (CDF-823AB)

REG project 2016

260 Provision of CPI Separator

Ca Mau Gas Processing Plant

Project

2016

261 Provision of Odorant Skid 2016

262 Provision of Methanol Tank 2016

263 Provisions of Air heater & Chiller, Filter NPK, Ca Mau

Air Heater And Chiller 2018

264 Design, Calculation and Feasibility Study - Phase 2 Su Tu Trang Gas Pipeline Project

2017

265 Engineering, fabrication Chemical Injection Package Block 6.1 Phong Lan

Dai Development Project

266 Provision of Air Cooler for Air Compressor on CCP Platform

CCP Platform 2017

267 Create pipeline & instrument diagram (P&ID), production engineering flow scheme (PEFS) document for shell GD plant base on existing system

GD plant 2018

2017

4342

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

268

Consulting, report on technical evaluation & cost estimation for external storage & gas pipeline form Hon La port to Kham Muon

Hon La port 2016

269 Provision of High Pressure Vessel for Sao Vang Dai Nguyet Development Project

Sao Vang Dai Nguyet Development Project

2018

270

Engineering & Fabrication FRP Fresh W ater Tank for Sao Vang Dai Nguyet Development Project

2018

271 Engineering & Fabrication Fuel Gas Skid for Sao Vang Dai Nguyet Development Project

2018

272

Engineering & Fabrication Pig Launcher and Receiver Package for Sao Vang Dai Nguyet Development Project

2018

273

Engineering & Fabrication Fire W ater Break Tank for Sao Vang Dai Nguyet Development Project

2018

274 Engineering & Fabrication Liquid Seal Pot for Sao Vang Dai Nguyet Development Project

2018

275

Engineering, Procurement, Fabrication of Diesel filter coalesce ASFCA-FIL-5702, ASDCA-FIL-5703, ASDCA-FIL-5702 for Gallaf Project

Gallaf Project 2019

276 Engineering, Procurement, Fabrication of Open Drain Tank & Pig Receiver for Gallaf Project

Gallaf Project 2019

277 Engineering, Procurement, Fabrication of Pig Launcher and receiver for Gallaf Project

Gallaf Project 2019

278

Engineering, Procurement, Fabrication of Pressure Vessel (PIG)

Sao Vang Dai Nguyet Development Project 2019

279

Engineering, Procurement, Fabrication of Chemical Injection Package

Sao Vang Dai Nguyet Development Project 2019

280

Provision of Spare part for Pig Launcher, Heater, Fuel Gas Skid of Sao Vang Dai Nguyet Development Project

Sao Vang Dai Nguyet Development Project

2019

281

Engineering, Procurement and Fabrication of BOD Recondenser

LNG Receiving Terminal Project

2020

282 Engineering for Alpha ECC workshop ECC workshop 2008

283

Detailed engineering for Alpha ECC workshop including electrical system.

ECC workshop 2009

284

Re Analysis, engineering for transportation & replacement Inter Stage Cooler

Inter Stage Cooler 2015

285

Sao Vang Dai Nguyet Development Project: 1. Provision of High Pressure Vessel – Part 12. Provision of High Pressure Vessel – Part 23. Provision of Filter Coalescer SVDN-CPP-M-0011

Sao Vang Dai Nguyet Development Project: 2018

286

Calculation and Engineering for LAYDOW N AREA AT NCW I MEZZANINE DECK project

DECK project 2019

287

Calculation and Engineering for W P2 Flowline Modification of Yad-2G and Yad-2C

- 2019

288

Petrochemical Complex In South Of Vietnam T? H? p Hóa D?u Mi?n Nam Vi?t Nam Calculation and Engineering for Pressure Vessel

Long Son Project 2019

289

Calculation and Engineering for Killing/Bleeding lines for N1, PR 19-10643

N1, PR 19-10643 2019

290

Piping Stress Calculation & Scaffolding Calculation Node - Drop Project

Drop Project 2019

291

Petrochemical Complex In South Of Vietnam T? H? p Hóa D?u Mi?n Nam Vi?t Nam Calculation and Engineering for 17 vessel

Long Son Project 2019

292 Survey work for N1/E1/S1 and CPC Network - 2020

293

Calculation and Engineering for Slop W ater Hydro Cyclones and Slop W ater Filter Coalesce

FPSO Sepetiba 2020

b◘ PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

294

Engineering for offshore facilities - BP Offshore Facilities BP 2007

295

Engineering for offshore container - Schlumberger Container -

Schlumberger 2008

296

EPC of gas pipeline and Metering skid My Xuan Ceramics

Co., Ltd My Xuan Ceramics

Co., Ltd 2008

297

Engineering for HT Company workshop Heat treatment

company Heat treatment

company 2008

298

Design & Installation and commissioning of the LV & HV Electrical system of the factory

Vietnam Meisheng Textiles

Vietnam Meisheng Textiles

2008

299 Engineering for pressure vessel - LPG 2008

300

Engineering and Installation of 3000 kVA transformers for Meisheng Textiles factory

2009

301

Installation of electrical system 22kV for Meisheng Textiles factory

2009

302

EPC of electrical distribution system after transformers output - Meisheng Textiles Factory

2009

303 Supply of 01 No. MSB & 04 Nos. of SSB 2009

304 Engineering for modification of DK I/2 & I/9 Platform DK I/2 & I/9 Platform

Ministry of Defense of Vietnam

2007

305 Engineering for modification of DK Platform DK Platform 2008

306

Engineering for Modification of DK I/14 & I/15 Platform

DK I/14 & I/15 Platform

2012

307 Engineering and installation of gas pipeline SSC SSC 2009

308

Engineering of offshore pipeline – Van Phong Project

Van Phong Project VAN PHONG 2009

309

Survey, design, engineering, cost estimate for construction of 8” nitrogen pipeline and 2” hydrogen pipeline

Air Liquide Vietnam Air Liquide Vietnam 2010

310

EPC of Tan Phuoc Khanh Gas pipeline and metering skid

Tan Phuoc Khanh TPK Production and Commercial Co., Ltd

2010

311

Engineering for Air Receiver – PV Shipyard Air Receiver PV SHIPYARD 2010

4544

Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

312 Engineering for modification of product input & output system

PMPC PMPC 2010

313 Calculation engineering for life raft platform Life raft platform PVD Training 2010

314 EPC of Dong Xuyen port outdoor lighting system Dong Xuyen Port Dong Xuyen Port J.S.C

2011

315 Calculation and engineering for offshore containers

Baker Hughes Baker Hughes

2011

316 Calculation, engineering for fixing boxes 2012

317 Engineering for Jack - up Jack - up R&D Co.,Ltd 2012

318 Engineering for Mixed Bed Vessels Mixed bed vessels GE 2012

319 Survey and engineering HVAC system - EPSO - Block 12W Development Project

Block 12W Development Project

PV Tran 2012

320 Calculation, engineering for Degasser Degasser TNK 2012

321 Calculation, engineering River Water Switch Room for Nui Phao Mining Project

Nui Phao Mining Project

ABB 2012

322 Engineering for gas pipeline 10" Nghe An Gas pipeline 10 "

Nghe An HDTDCTX

Cua Lo 2013

323 Engineering the Import/Export Gas Pipeline for Processing Factory Condensate

Factory Condensate PV OIL 2013

324 Supply of Custody Gas Metering System for Ton Phuong Nam - Nhon Trach Gas Distribution Pipeline Project-Phase 2

Ton Phuong Nam - Nhon Trach Gas

Distribution Pipeline Project

Ton Phuong Nam

2014

325 Crude Oil Pipeline Underground Oil Storage – Binh Son Refinery

Underground Oil Storage Terminal PV OS 2014

326 Engineering & assembly Control Panel for Yokogawa - YOKOGAWA 2014

327 Engineering, fabrication, installation Heat Exchanger Ruby B FPSO 2015

328 Engineering & Fabrication for Central Fresh Water Cooling System - Tam Dao 05 Jack-Up Rig

Tam Dao 05 Jack-Up Rig SONDEX 2015

No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR

329 Engineering & Calculation for Duyen Hai 3 Extension Thermal Power Plant Project (1x688MW)

Duyen Hai 3 EVN TPMB3 2016

330 Nghi Son Refinery and Petrochemical Project Plem Valve replacement

Nghi Son Refinery And Petrochemical JGCS 2016

331 Engineering & Calculation for Hydro Test Pig - ASME Projects

ASME Projects ASME PROJECTS 2016

332 Engineering, fabrication, installation Heat Exchanger

Heat Exchanger E-13 SAIGON PETRO 2016

333 Engineering & Fabrication for Pig Launcher & Reeceiver

Hai Phong Terminal Project

2018

334 Survey, engineering and cost estimation for The Productivity Of Truck Loading Project

Sao Việt 2019

335 Provision Of Inline Demister V-2101B Vessel For Lan Tay Inline Demister

Lan Tay Project FMC TECHNOLOGIES SINGAPORE PTE LTD

2019

336 Provsion of Manpower Supply - TECHNIP FMC 2019

337

Provision of hardware and labour services for Project: 2-E1680 Mars Mechanical Drive Control Retrofit & Package System Upgrade

- SOLAR 2019

338 Provision of 750KW Exshaust - PREMIER OIL 2019

339 Provision of Lifting Engineering for Methanol Injection Pumps Tag No. DN-46-PX-001 A/B

SVDN Project THIEN PHU

ENGINEERING 2020

340 Survey, design construction drawings to Upgrade Gas Supply Metering System for Ca Mau 1 Power Plant in Ca Mau GDC

Ca Mau GDC IAS 2020

341 Survey, Engineering for the package "Testing of gas supply metering system for Ca Mau 2 power plant in Ca Mau GDC"

Ca Mau GDC IAS 2020

342 Engineering, Procurement and Fabrication of HIPPS Package

SVDN Project YOKOGAWA 2020

343 Engineering, Procurement and Fabrication of LNG Thi Vai Pressure Vessel Recondenser

LNG Thi Vai PTCS Quang Ngai 2020

344 Provision to fabricate strengthening clamp for boom lowering_OCS

- OCS 2020

345 Design, renovate and upgrade the canoe for Shienco

- 2020