25
8 Division 8 Chatham Hoke Lee Montgomery Moore Randolph Richmond Scotland STATE TRANSPORTATION IMPROVEMENT PROGRAM

Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

8

Division 8ChathamHokeLeeMontgomeryMooreRandolphRichmondScotland

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Page 2: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

CHATHAM

MOORE

HOKE

SCOTLAND

RICHMOND

MONTGOMERY

LEE

RANDOLPH

1

220

64

220

15220

401

1

1

74

501

15

64

15

421

73

751

690

144

902

177

87

705

4922

42

24

381

731

73

134Sanford

Asheboro

Laurinburg

SouthernPines

Pinehurst

HighPoint

AV-5761

AV-5736

AV-5762

B-5738

B-5127

B-4967

B-4550B-5755

B-4780

B-5743

B-5543

B-4795

B-5740

B-5128

B-5763

B-5739

B-5742

B-5753

U-5727

EB-5741

U-5707

U-5743

U-5711

EB-5760

EB-5740

U-5709

EB-5744

I-5738

EB-5734

U-5814

EB-5742

R-5724

U-5753

R-2536D

U-5737

EB-5739

U-5308

I-5764

U-5813A

I-5737

U-5864

R-2536AB

U-5815

U-3400

U-5858

R-3830

U-5857

R-2536B

U-5722

R-3421C

U-5756

U-5706

R-5726

R-2536C

R-0623

I-5763

R-5709

U-5305

U-5758

U-5770

U-5759

EB-5738

R-2536AA

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 8

0 9.5 194.75Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

Page 3: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

Page 4: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5724 6419LAUNIS STREET TO POWELL PLACE LANE IN PITTSBORO. WIDEN TO MULTILANES.

1.4

DIV

T R 235 T U 28 T C 6156

CHATHAM US 15 / US 501

URBAN PROJECTSU-5737 10053SR 1317 (GREENSBORO AVENUE) TO US 421

IN SILER CITY. UPGRADE ROADWAY TO INCLUDE MEDIAN FOR ACCESS CONTROL, SIDEWALKS, CROSSWALKS, BICYCLE LANES AND / OR MULTI-USE SIDEPATH.

1.9

REG

NHP R 244 NHP U 29 NHP C 9780

CHATHAM US 64(EAST 11TH STREET)

IN PROGRESS

U-4727 14716 12377DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.

DIV

STPDA 1871PE L 468PE

CHATHAMDURHAMORANGE

VARIOUS

U-5023 21748DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.

DIV

STPDA 4365C4365C4288C C 4365 C 4365CHATHAMDURHAMORANGE

VARIOUS

FEDERAL BRIDGE PROJECTS

PLANNING / DESIGN IN PROGRESS

B-4729 1700 100REPLACE BRIDGE NO. 306 OVER PRONG OF ROCKY RIVER.

HF

HFB R 150 HFB C 1450

CHATHAM SR 1303(BEN SMITH ROAD)

UNDER CONSTRUCTION

B-4730 1076 1076REPLACE BRIDGE NO. 108 OVER TERRELL CREEK.

DIV

CHATHAM SR 1549(CASTLE ROCKFARM ROAD)

RIGHT OF WAY IN PROGRESS

B-4461 2015 465REPLACE BRIDGE NO. 10 OVER SHADDOX CREEK.

HF

HFB C 1550 CHATHAM SR 1916(CORINTH ROAD)

B-5738 2134REPLACE BRIDGE NO. 147 OVER ROCKY RIVER.

DIV

STPOFF R 102 STPOFF 2032C

CHATHAM SR 1953 (CHATHAMCHURCH ROAD)

B-5747 1320REPLACE BRIDGE NO. 157 OVER CEDAR CREEK.

HF

HFB 120R HFB 1200C

CHATHAM SR 2145 (R JORDANROAD)

UNDER CONSTRUCTION

B-4731 1369 1369REPLACE BRIDGE NO. 129 OVER BRANCH OF ROCKY RIVER.

DIV

CHATHAM SR 2159(ALSTON CHAPELROAD)

8-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 5: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

CONGESTION MITIGATION PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF PITTSBORO - UNDER CONSTRUCTION

C-5551 151 151CHATHAM BUSINESS PARK DRIVE TO WHITE'S MOBILE HOME PARK DRIVE IN PITTSBORO. CONSTRUCT SIDEWALK ON SOUTH SIDE.EX

CHATHAM US 64 BUSINESS(EAST STREET)

C-5565 4422TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.

EX

CMAQ 482I A I 572 A I 620 A I 640 A L 430I A I 496 A I 579 A I 603 A

A DEVELOP FLEXIBLE WORK SCHEDULES IN CAMPO AREA.EXB DEVELOP FLEXIBLE WORK SCHEDULES IN DCHC AREA.

CHATHAMDURHAMFRANKLINGRANVILLEJOHNSTONORANGEWAKE

VARIOUS

C-5605 5030PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE DURHAM / CHAPEL HILL / CARRBORO MPO.

EX

CMAQ C 2515 C 2515 CHATHAMDURHAMORANGE

VARIOUS

C-5618 450PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE TRIANGLE AREA RPO.

EX

CMAQ C 225 C 225 CHATHAMORANGE

VARIOUS

8-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 6: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS

UNDER CONSTRUCTION BY TOWN OF CARY

C-5176 1192 1192AMERICAN TOBACCO TRAIL IN CHATHAM COUNTY, NEW HOPE CHURCH ROAD TRAILHEAD PARK AND RIDE LOT.EX

CHATHAM AMERICAN TOBACCOTRAIL (ATT)

RURAL PROJECTSR-5709 141719US 15 / US 501 IN ABERDEEN TO SR 1244

(WEST PALMER STREET) / SR 1311 (MOCKINGBIRD HILL ROAD) IN RAEFORD. WIDEN TO MULTILANES.

15.4

REG

T R 21178 21178R T U 2542 2541U T 70710C C 23570

HOKEMOORE

NC 211

URBAN PROJECTS

COORDINATE WITH U-5707

U-5798 20486US 401 (RAEFORD ROAD) TO SR 1418 (LINDSAY ROAD). WIDEN TO MULTI-LANES.

2.4

DIV

T 1598R T 192U T 9348C C 9348

CUMBERLANDHOKE

SR 1102(GILLIS HILLROAD)

U-5753 14637PLANK ROAD TO US 401. WIDEN TO MULTILANES.

1.6

DIV

T R 2178 T U 261 T C 12198

HOKE SR 1305(WAYSIDE ROAD)

U-5857 29832SR 1418 (LINDSAY ROAD) TO SR 1003 (CAMDEN ROAD) NEAR FAYETTEVILLE. WIDEN TO MULTILANES.

3.2

DIV

T R 5159 T U 619 T 24054C

HOKE SR 1406(ROCKFISH ROAD)

U-5858 23846SR 1406 (ROCKFISH ROAD) TO US 401 NEAR FAYETTEVILLE. WIDEN TO MULTILANES.

2.9

DIV

T R 1850 T U 222 T 21774C

HOKE SR 1418(LINDSAY ROAD)

COORDINATE WITH U-5798

U-5707 5844GILLIS HILL ROAD EXTENSION, SR 1406 (ROCKFISH ROAD) TO SR 1418 (LINDSAY ROAD) NEAR FAYETTEVILLE. CONSTRUCT MULTILANE FACILITY ON NEW LOCATION TO TIE IN AT THE INTERSECTION OF SR 1406 ROCKFISH ROAD AND SR 1421 SCHOOL DRIVE.

0.4

DIV

T 867R T 4977C

HOKE SR 1420(GILLIS HILL ROAD)

IN PROGRESS

U-5207 7000 1500FAYETTEVILLE URBAN AREA PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.

DIV

STPDA 400PE PE 400 PE 400 PE 400 PE 400 PE 400 400PE400PE400PE PE 400 PE 400L 100PE PE 100 PE 100 PE 100 PE 100 PE 100 100PE100PE100PE PE 100 PE 100

CUMBERLANDHARNETTHOKE

VARIOUS

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1508B SOUTH CAROLINA STATE LINE TO US 401 BUSINESS NORTHEAST OF RAEFORD. WIDEN TO MULTILANES.

HOKESCOTLAND

US 401

FEDERAL BRIDGE PROJECTS

RIGHT OF WAY IN PROGRESS

B-5127 1220 320REPLACE BRIDGE NO. 4 OVER RAFT SWAMP.REG

STPON 900C HOKE NC 211

PLANNING / DESIGN IN PROGRESS

B-4967 2249 200REPLACE BRIDGE NO. 8 OVER LUMBER RIVER.

DIV

STPOFF 153U STPOFF 300R STPOFF 46M STPOFF C 1550

HOKE SR 1203(TURNPIKE ROAD)

8-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 7: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5755 938REPLACE BRIDGE NO. 57 OVER PUPPY CREEK.

DIV

STPOFF 45R STPOFF 893C

HOKE SR 1406(ROCKFISH ROAD)

PLANNING / DESIGN IN PROGRESS

B-4550 2413 113REPLACE BRIDGE NO. 41 AND BRIDGE NO. 42 OVER ROCKFISH CREEK.

DIV

STPOFF R 200 STPOFF C 2100

HOKE SR 1432(GOLF COURSEROAD)

UNDER CONSTRUCTION

B-5132 1203 1203REPLACE BRIDGE NO. 37 OVER RAFT SWAMP.

DIV

HOKE SR 1436(BALFOUR ROAD)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

RURAL PROJECTSR-2417* 207201 207201SANFORD BYPASS, WEST OF SR 1400

(CUMNOCK ROAD) TO NC 87 WEST OF SR 1138 (HARVEY FAULK ROAD). MULTI-LANE FREEWAY ON NEW LOCATION.

11

AA WEST OF SR 1400 (CUMNOCK ROAD) TO EAST OF US 1-15-501 - UNDER CONSTRUCTIONAB WEST OF US 1-15-501 TO EAST OF US 1-15-501 - COMPLETEBA US 421 / NC 87, EAST OF US 1-15-501 TO EAST OF SR 1521 (KELLY DRIVE) - COMPLETEBB US 421 / NC 87, EAST OF SR 1521 (KELLY DRIVE) TO EAST OF NC 42 - COMPLETEC US 421/ NC 87, EAST OF NC 42 TO NC 87 NEAR SR 1138 (HARVEY FAULK ROAD) - COMPLETE

LEE US 421 /NC 87

8-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 8: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PLANNING / DESIGN IN PROGRESS

R-3830 63559 920NC 42, US 421 (HORNER BOULEVARD) IN SANFORD TO SR 1579 (BROADWAY ROAD) AND SR 1579 (BROADWAY ROAD / NORTH MAIN STREET), NC 42 (AVENTS FERRY ROAD) TO SR 1538 (EAST HARRINGTON AVENUE) IN BROADWAY. WIDEN TO MULTILANES.

5.4

DIV

T 13256R R 13256T 1590U U 1591T 32946C

LEE NC 42;SR 1579(BROADWAY ROAD / NORTH MAIN STREET)

URBAN PROJECTSU-5727 30048SOUTH OF NC 78 (TRAMWAY ROAD) / SR

1303 (CENTER CHURCH ROAD) TO PENDERGRASS ROAD IN SANFORD. CONVERT AT-GRADE INTERSECTION TO GRADE SEPARATION AND RELOCATE NC 78 TO TIE INTO INTERCHANGE.

2

REG

NHP R 3600 NHP C 26448

LEE US 1 / US 15 / US 501

U-5722 36156US 1 / US 15 / US 501 TO NORTH OF SR 1514 (BRAGG STREET) IN SANFORD. RECONSTRUCT AS A "COMPLETE STREET" WITH IMPROVEMENTS SUCH AS MEDIANS, SIDEWALKS, BICYCLE FACILITIES, AND STREETSCAPING.

3.2

DIV

T 10704R T 1284U T 24168C

LEE US 421 BUSINESS /NC 87

U-5709 12113SR 1152 (FIRE TOWER ROAD) TO NC 42 (WICKER STREET) IN SANFORD. WIDEN ROADWAY.

0.8

DIV

T R 2674 T U 321 T 9118C

LEE SR 1237(CARTHAGE STREET)

FEDERAL BRIDGE PROJECTSB-4968 6870REPLACE BRIDGE NO. 10 OVER DEEP RIVER.

HF

HFB R 570 HFB C 6300

LEE US 15 / US 501 / NC 87

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5513 2225 2225US 1 / US 15-501 INTERCHANGE. CONSTRUCT ROUNDABOUTS AT RAMP TERMINALS. US 1 BUSINESS / SR 1420 (AMOS BRIDGES ROAD) INTERSECTION. CONSTRUCT LEFTOVER. US 15-501 / SR 1444 (BEECHTREE ROAD) INTERSECTION. CONSTRUCT LEFT TURN

0.4

TRN

LEE US 1;US 1 BUSINESS;US 15 / US 501 /NC 87

8-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 9: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

INTERSTATE PROJECTS

UNDER CONSTRUCTION

I-5329 1595 1595SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.

70GUILFORDMONTGOMERYRANDOLPHRICHMOND

US 220 / I-73 / I-74

RURAL PROJECTS

RIGHT OF WAY IN PROGRESS

R-0623* 56531 7431TROY BYPASS, WEST OF SR 1138 (DAIRY ROAD) TO EAST OF LITTLE RIVER. FOUR LANES, PART ON NEW LOCATION.

5

TRN

T 16367C C 16367 C 16366 MONTGOMERY NC 24 /NC 27

FEDERAL BRIDGE PROJECTS

PLANNING / DESIGN IN PROGRESS

B-5362 2080 100REPLACE BRIDGE NO. 53 OVER DROWNING CREEK.

HF

HFB R 180 HFB C 1800

MONTGOMERY NC 73

RIGHT OF WAY IN PROGRESS

B-4780 810 285REPLACE BRIDGE NO. 22 OVER RICHLAND CREEK.

DIV

STPOFF 525C MONTGOMERY SR 1111(LILLYS BRIDGEROAD)

B-5757 1027REPLACE BRIDGE NO. 149 OVER BARNES CREEK.

HF

HFB 95R HFB C 932

MONTGOMERY SR 1134 (TOWER ROAD)

B-5743 358REPLACE BRIDGE NO. 58 OVER THICKETY CREEK.

DIV

STPOFF 17R STPOFF 341C

MONTGOMERY SR 1541 (BREWERFARM ROAD)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

8-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 10: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

CONGESTION MITIGATION PROJECTS

IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.

EX

CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM

VARIOUS

RURAL PROJECTS

SCHEDULED FOR FEASIBILITY STUDY REEVALUATION

R-2807 3000NC 211 TO PROPOSED NC 211 BYPASS OF WEST END. RELOCATE PORTION OF NC 73 TO ELIMINATE OFFSET INTERSECTIONS IN WEST END.

0.5

DIV

T U 100 T R 800 T C 2100

MOORE NC 73

R-5726 40254SR 1241 (HOLLY GROVE SCHOOL ROAD) TO NC 73 IN WEST END. WIDEN TO MULTILANES.

7.1

REG

T R 12708 T U 1525 T 26021C

MOORE NC 211

R-5709 141719US 15 / US 501 IN ABERDEEN TO SR 1244 (WEST PALMER STREET) / SR 1311 (MOCKINGBIRD HILL ROAD) IN RAEFORD. WIDEN TO MULTILANES.

15.4

REG

T R 21178 21178R T U 2542 2541U T 70710C C 23570

HOKEMOORE

NC 211

UNDER CONSTRUCTION

R-2812 46482 46482NC 73 IN WEST END TO THE TRAFFIC CIRCLE IN PINEHURST. WIDEN TO MULTI-LANES.

7.2MOORE NC 211

URBAN PROJECTS

COORDINATE WITH U-5814

U-5815 19133OLD US 1 TO SR 1112 (ROSELAND ROAD) IN ABERDEEN. ACCESS MANAGEMENT IMPROVEMENTS.

2.8

REG

NHP R 902 NHP U 7515 NHP C 10716

MOORE US 1(SANDHILLS BOULEVARD)

8-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 11: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

COORDINATE WITH U-5815

U-5814 6254US 1 (SANDHILLS BOULEVARD) TO BRUCEWOOD ROAD IN ABERDEEN AND SOUTHERN PINES. ACCESS MANAGEMENT IMPROVEMENTS.

1.3

REG

T R 195 T U 23 T C 6036

MOORE US 15 / US 501 / NC 211

U-5756 27948US 1 IN ABERDEEN TO SOUTH CITY LIMITS OF PINEHURST. WIDEN TO MULTILANES.

3.9

REG

T 1136R T 136U T C 26676

MOORE NC 5

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-3680 10715 10715REPLACE BRIDGE NO. 2 OVER CSX TRANSPORTATION IN ABERDEEN.REG

MOORE US 15-501

B-5758 575REPLACE BRIDGE NO. 13 OVER ABERDEEN CREEK.

HF

HFB 50R HFB C 525

MOORE SR 1102 (ADDORROAD)

B-5754 1210REPLACE BRIDGE NO. 118 OVER LITTLE RIVER.

HF

HFB 110R HFB 1100C

MOORE SR 1209 (MURDOCKSVILLEROAD)

UNDER CONSTRUCTION

B-5164 1077 1077REPLACE BRIDGE NO. 178 OVER BUFFALO CREEK.

DIV

MOORE SR 1484(RITTER ROAD)

COORDINATE WITH B-5745

B-5759 1375REPLACE BRIDGE NO. 46 OVER MCINTOSH CREEK.

HF

HFB 125R HFB 1250C

MOORE SR 1658(WADSWORTH ROAD)

COORDINATE WITH B-5759

B-5745 1210REPLACE BRIDGE NO. 47 OVER GOVERNORS CREEK.

HF

HFB R 110 HFB 1100C

MOORE SR 1658(WADSWORTH ROAD)

B-5764 795REPLACE BRIDGE NO. 6 OVER BEAVER CREEK.

HF

HFB 75R HFB C 720

MOORE SR 1947 (CYPRESSCHURCH ROAD)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

MUNICIPAL BRIDGE PROJECTS

RIGHT OF WAY IN PROGRESS BY VILLAGE OF WHISPERING PINES - MUNICIPAL BRIDGE

B-5543 809 165REPLACE BRIDGE NO. 87 OVER THAGGARDS LAKE IN WHISPERING PINES.

DIV

STPOFF 644C MOORE SOUTH LAKESHOREDRIVE

8-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 12: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

INTERSTATE PROJECTSI-5737 1501.3 MILES NORTH OF SR 1504 (SPERO ROAD)

TO US 311. PAVEMENT REHABILITATION.2.2

SW

NHPIM C 150 RANDOLPH I-73

I-5763 8987US 311 TO 0.6 MILE NORTH OF SR 1938 (HOCKETT DAIRY ROAD). PAVEMENT REHABILITATION.

7.7SW

NHPIM C 8987 RANDOLPH I-73

UNDER CONSTRUCTION

I-5314 4816 4816DAVIDSON COUNTY LINE TO EAST OF SR 1009 (MAIN STREET). REPLACE FUNNEL DRAINS, CONSTRUCT EXPRESSWAY GUTTER, REPAIR / REPLACE GUARDRAIL, AND RESURFACE.

6RANDOLPH I-85

I-5738 7000SOUTH OF SR 1009 TO NORTH OF SR 1912 (LUNAR DRIVE) IN ARCHDALE. PAVEMENT REHABILITATION.

1SW

NHPIM C 7000 RANDOLPH I-85

I-5792 553SR 1564 (MEADOWBROOK DRIVE) TO SR 1009 (SOUTH MAIN STREET) IN ARCHDALE. PAVEMENT REHABILITATION.

2.3SW

NHPIM C 553 RANDOLPH I-85

I-5764 7681.1 MILES NORTH OF SR 1547 (FINCH FARM ROAD) TO SR 1564 (RABBIT TOWN ROAD) IN TRINITY. PAVEMENT REHABILITATION.

2SW

NHPIM C 768 RANDOLPH I-85

UNDER CONSTRUCTION

I-5329 1595 1595SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.

70GUILFORDMONTGOMERYRANDOLPHRICHMOND

US 220 / I-73 / I-74

RURAL PROJECTS

PLANNING / DESIGN IN PROGRESS

R-2536 348597 8194ASHEBORO SOUTHERN BYPASS, US 64 WEST TO US 64 EAST. FOUR-LANE FREEWAY ON NEW LOCATION WITH INTERCHANGES AT US 220, NC 49 AND ZOO ACCESS AT NC 159.

14

TRN

T 60935R T 960U T 508M T 69500C C 69500 C 69500 C 69500

RANDOLPH US 64

8-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 13: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PART B - GARVEE BOND FUNDING $9.4 MILLION FOR RIGHT OF WAY; PAYBACK FY 2008 - FY 2019 AND GARVEE BOND FUNDING $80.0 MILLION FOR CONSTRUCTION; PAYBACK FY 2008 - FY 2019

R-2606 207268 158268SOUTH OF SR 1920 (TUTTLE ROAD) TO US 220 NORTH OF ASHEBORO. FREEWAY ON NEW LOCATION.

11.5

TRN

NHP 1031RG B RG 1031 B RG 1031 B RG 1031 B RG 1031 B NHP 8769CG B CG 8769 B CG 8769 B CG 8769 B CG 8769 B

A SOUTH OF SR 1920 (TUTTLE ROAD) TO NORTH OF SR 1929 (SPENCER ROAD) - COMPLETEB NORTH OF SR 1929 (SPENCER ROAD) TO US 220/FUTURE I-73 - DESIGN-BUILD PROJECT - COMPLETETRN

RANDOLPH US 311 /FUTURE I-74

URBAN PROJECTS

FEASIBILITY STUDY (FS-1008A) IN PROGRESS

U-5770 2175SR 1993 (SOUTH MAIN STREET) IN ARCHDALE. INTERCHANGE IMPROVEMENTS.

REG

NHP R 300 NHP C 1875

RANDOLPH I-85

U-5813 29300ASHEBORO BYPASS TO NC 49 IN ASHEBORO. WIDEN TO MULTILANES AND RECONSTRUCT INTERCHANGE AT NC 49.

2.2 T R 6300 A T U 1100 A T C 14500 A T C 7400 B

A ASHEBORO BYPASS TO NC 49 IN ASHEBORO. WIDEN FROM 2 LANE TO 4-LANE DIVIDED FACILITYREGB NC 49 IN ASHEBORO. RECONSTRUCT INTERCHANGE - COORDINATE WITH B-5363REG

RANDOLPH US 64

U-5758 465INTERSECTION OF US 220 BUSINESS (FAYETTEVILLE STREET) AND PRESNELL STREET IN ASHEBORO. INTERSECTION IMPROVEMENTS.REG

T R 90 T C 375

RANDOLPH US 220 BUSINESS(FAYETTEVILLE STREET)

U-5743 7457DUBLIN ROAD TO US 64 / NC 49 (DIXIE DRIVE) IN ASHEBORO. WIDEN TO MULTILANES.

0.5

REG

T R 1251 T U 150 T C 6056

RANDOLPH NC 42

RIGHT OF WAY IN PROGRESS

U-5305 3115 815SR 1144 (MACK ROAD) INTERSECTION AND APPROACHES IN ASHEBORO. OPERATIONAL / GEOMETRIC IMPROVEMENTS AND ROADWAY RELOCATION / REALIGNMENT.

TRN

STP 2300C RANDOLPH NC 49SR 1144 (MACK ROAD)

U-5759 233US 64 (DIXIE DRIVE) / ATLANTIC AVENUE IN ASHEBORO. INTERSECTION IMPROVEMENTS.

REG

T R 45 T C 188

RANDOLPH NC 159 (ZOO PARKWAY)

U-5308 18570SR 3106 (KENNEDY ROAD) TO I-85 IN TRINITY. WIDEN TO MULTILANES.

2.3

DIV

T R 2839 T U 341 T C 15390

RANDOLPH SR 1547(FINCH FARM ROAD)

U-3400 24207SR 1567 (ROBBINS COUNTRY ROAD) TO US 311 (MAIN STREET) IN ARCHDALE. WIDEN TO MULTI-LANES.

3.1

DIV

T R 8989 A T U 1691 A T M 7 T 10858C A T 1111R B T 209U B T 1342C B

A SR 1567 (ROBBINS COUNTRY ROAD) TO GUILFORD COUNTY LINE.DIVB RANDOLPH COUNTY LINE TO SR 1993 (MAIN STREET).

GUILFORDRANDOLPH

SR 1577 / SR 1004(ARCHDALE ROAD)

U-5864 34739I-85 TO EDEN TERRACE IN . WIDEN TO MULTILANES.

2.9

DIV

T R 2517 T U 302 T 31920C

RANDOLPH SR 1595(SURRETT DRIVE)

U-5711 3112WEST OF SYLVAN STREET TO US 220 BUSINESS IN ASHEBORO. WIDEN TO MULTILANES.

0.6

DIV

T R 1101 T U 132 T C 1879

RANDOLPH SR 1712(PINEVIEW STREET)

8-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 14: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1008A SR 1009 INTERCHANGE IN ARCHDALE. RECONSTRUCT EXISTING INTERCHANGE TO BETTER ACCOMMODATE TRAFFIC.

RANDOLPH I-85

FEDERAL BRIDGE PROJECTSB-5748 485REPLACE BRIDGE NO. 384 OVER AN

UNNAMED BRANCH.

HF

HFB 45R HFB C 440

RANDOLPH SR 1002 (FORT CREEKMILL ROAD)

UNDER CONSTRUCTION

B-4608 1681 1681REPLACE BRIDGE NO. 208 OVER FORK CREEK.

DIV

RANDOLPH SR 1003(ERECT ROAD)

PLANNING / DESIGN IN PROGRESS

B-4794 1385 150REPLACE BRIDGE NO. 18 OVER BETTIE MCGEES CREEK.

HF

HFB R 110 HFB C 1125

RANDOLPH SR 1107(LASSITER MILLROAD)

PLANNING / DESIGN IN PROGRESS

B-4795 1042 100REPLACE BRIDGE NO. 25 OVER AN UNNAMED CREEK.

DIV

STPOFF R 85 STPOFF M 7 STPOFF C 850

RANDOLPH SR 1112(ABNER ROAD)

B-5753 762REPLACE BRIDGE NO. 373 OVER AN UNNAMED CREEK.

DIV

STPOFF R 36 STPOFF C 726

RANDOLPH SR 1115 (COX MILLROAD)

UNDER CONSTRUCTION

B-4609 1037 1037REPLACE BRIDGE NO. 16 OVER TAYLOR CREEK.

DIV

RANDOLPH SR 1163(UNION CHURCHROAD)

B-5742 583REPLACE BRIDGE NO. 324 OVER UWHARRIE RIVER.

DIV

STPOFF 28R STPOFF 555C

RANDOLPH SR 1174 (WAYNICKMEADOW ROAD)

UNDER CONSTRUCTION

B-4799 1425 1425REPLACE BRIDGE NO. 37 OVER JACKSON'S CREEK.

DIV

RANDOLPH SR 1311(BESCHER CHAPELROAD)

B-4800 1980REPLACE BRIDGE NO. 43 OVER JACKSON CREEK.

HF

HFB R 180 HFB C 1800

RANDOLPH SR 1312(GALLIMORE DAIRYROAD)

PLANNING / DESIGN IN PROGRESS

B-5128 708 200REPLACE BRIDGE NO. 58 OVER AN UNNAMED TRIBUTARY OF THE LITTLE UWHARRIE RIVER.

DIV

STPOFF 50R STPOFF 8U STPOFF C 450

RANDOLPH SR 1404(FULLER MILL ROAD)

RIGHT OF WAY IN PROGRESS

B-5114 6824 1124REPLACE BRIDGE NO. 136 OVER US 29 / US 70 / BUSINESS 85.

REG

NHPB 5700C RANDOLPH SR 1619(PROSPECT STREET)

8-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 15: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

COORDINATE WITH U-5813B

B-5363 3575REPLACE BRIDGE NO. 171 OVER US 64 AND NC 49 IN ASHEBORO.

HF

HFB R 325 HFB 3250C

RANDOLPH SR 1713(ALBEMARLE ROAD)

B-5756 1210REPLACE BRIDGE NO. 106 OVER AN UNNAMED CREEK.

HF

HFB 110R HFB 1100C

RANDOLPH SR 2103 (WHITT HUNTROAD)

B-5763 448REPLACE BRIDGE NO. 129 OVER BRANCH OF SANDY CREEK.

DIV

STPOFF R 21 STPOFF C 427

RANDOLPH SR 2407 (STARMOUNTROAD)

PLANNING / DESIGN IN PROGRESS

B-4969 650 100REPLACE BRIDGE NO. 154 OVER SANDY CREEK BRANCH.

HF

HFB R 50 HFB C 500

RANDOLPH SR 2440(BROWER MEADOWROAD)

COORDINATE WITH B-5752

B-5761 385REPLACE BRIDGE NO. 152 OVER SANDY CREEK.

HF

HFB 35R HFB C 350

RANDOLPH SR 2448(ROUTH ROAD)

COORDINATE WITH B-5761

B-5752 1760REPLACE BRIDGE NO. 151 OVER SANDY CREEK.

HF

HFB 160R HFB 1600C

RANDOLPH SR 2453 (KIDDS MILLROAD)

PLANNING / DESIGN IN PROGRESS - TO BE LET WITH B-5360

B-5546 800 100REPLACE BRIDGE NO. 307 OVER MOUNT PLEASANT CREEK.

HF

HFB R 50 HFB C 650

RANDOLPH SR 2481(LOW BRIDGE ROAD)

LET WITH B-5546 - PLANNING / DESIGN IN PROGRESS

B-5360 1910 100REPLACE BRIDGE NO. 374 OVER SANDY CREEK.

HF

HFB R 110 HFB C 1700

RANDOLPH SR 2481(LOW BRIDGE ROAD)

B-5928 800REPLACE BRIDGE NO. 175 OVER MILL CREEK.

HF

HFB 50U HFB 25R HFB 725C

RANDOLPH SR 2614(GRANTVILLE LANE)

B-5739 784REPLACE BRIDGE NO. 170 OVER REED CREEK.

DIV

STPOFF 37R STPOFF 747C

RANDOLPH SR 2621 (FOUSHEEROAD)

B-5762 415REPLACE BRIDGE NO. 164 OVER MILLSTONE CREEK.

HF

HFB 40R HFB C 375

RANDOLPH SR 2642 (OLD SILERCITY ROAD)

B-5740 316REPLACE BRIDGE NO. 38 OVER CEDAR CREEK IN ASHEBORO.

DIV

STPOFF R 15 STPOFF 301C

RANDOLPH SR 3255 (FARMER ROAD)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

8-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 16: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

CONGESTION MITIGATION PROJECTS

IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.

EX

CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM

VARIOUS

INTERSTATE PROJECTS

UNDER CONSTRUCTION

I-5329 1595 1595SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.

70GUILFORDMONTGOMERYRANDOLPHRICHMOND

US 220 / I-73 / I-74

RURAL PROJECTSR-2501* 296215 17033SOUTH CAROLINA STATE LINE TO SR 1001

(MARSTON ROAD). WIDEN TO FOUR LANES WITH VARIABLE WIDTH MEDIAN WITH BYPASS OF ROCKINGHAM ON NEW LOCATION.

24.1 T 4500R A T 25700C A T 5519R BA T 908U BA T 40500C BA T 67700C BB T 13300R BB T 2523U BB T 121M BC T 14280R BC T 3731U BC T 83600C BC T 16800C C

A US 1, SOUTH CAROLINA STATE LINE TO SR 1104 (OSBORNE ROAD)BA SR 1104 (OSBORNE ROAD) TO US 74 BYPASSBB US 74 BYPASS TO US 74 BUSINESSBC US 74 BUSINESS TO NORTH OF SR 1606 (FOX ROAD)C NORTH OF SR 1606 (FOX ROAD) TO SOUTH OF SR 1001 (MARSTON ROAD) - RIGHT OF WAY IN PROGRESS

RICHMOND US 1

8-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 17: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-3421 178358 2800ROCKINGHAM BYPASS. FOUR LANES DIVIDED ON NEW LOCATION.

10.5 NHP 50M A NHP 65500C A NHP 933M B NHP 62800C B NHP 15425C C C 15425 C C 15425 C

A ROCKINGHAM BYPASS, US 74 BYPASS WEST OF ROCKINGHAM AT SR 1109 (ZION CHURCH ROAD) INTERCHANGE TO SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY) - RIGHT OF WAY IN PROGRESS

B ROCKINGHAM BYPASS, SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY) TO SOUTHWEST OF SR 1304 (HARRINGTON ROAD) - RIGHT OF WAY IN PROGRESSC ROCKINGHAM BYPASS, 0.2 MILES SOUTHWEST OF SR 1304 (HARRINGTON ROAD) TO I-73 / I-74 INTERCHANGE SOUTH OF ELLERBE - UNDER CONSTRUCTIONTRN

RICHMOND US 220 /FUTURE I-73 /FUTURE I-74

URBAN PROJECTSU-5706 6009SR 1903 (MILL ROAD) TO SR 1426

(ABERDEEN ROAD). CONSTRUCT TWO LANE FACILITY UTILIZING SECTIONS OF SR 1923 (BROAD STREET), SR 1641 (CLEMMER ROAD) AND SR 1645 (MT. OLIVE CHURCH ROAD), REMAINDER ON NEW LOCATION.

4

DIV

T R 1294 T U 155 T 4560C

RICHMOND VARIOUS

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1508A US 74 ROCKINGHAM-HAMLET BYPASS IN RICHMOND COUNTY TO EXISTING I-74 IN ROBESON COUNTY. UPGRADE CORRIDOR TO INTERSTATE STANDARDS.

23.4RICHMONDROBESONSCOTLAND

US 74/FUTURE I-74

FEDERAL BRIDGE PROJECTSB-5750 469REPLACE BRIDGE NO. 91 OVER COLEMAN'S

CREEK.

HF

HFB 42R HFB C 427

RICHMOND SR 1148 (GRASSYISLAND ROAD)

B-5751 1210REPLACE BRIDGE NO. 164 OVER LITTLE HOMER CREEK.

HF

HFB 110R HFB 1100C

RICHMOND SR 1162 (ALVINHARRIS ROAD)

B-5760 440REPLACE BRIDGE NO. 79 OVER NAKED CREEK.

HF

HFB 40R HFB C 400

RICHMOND SR 1424 (JONESSPRING CHURCH ROAD)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

8-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 18: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1508A US 74 ROCKINGHAM-HAMLET BYPASS IN RICHMOND COUNTY TO EXISTING I-74 IN ROBESON COUNTY. UPGRADE CORRIDOR TO INTERSTATE STANDARDS.

23.4RICHMONDROBESONSCOTLAND

US 74/FUTURE I-74

SCHEDULED FOR FEASIBILITY STUDY

FS-1508B SOUTH CAROLINA STATE LINE TO US 401 BUSINESS NORTHEAST OF RAEFORD. WIDEN TO MULTILANES.

HOKESCOTLAND

US 401

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4816 2834 2834REPLACE BRIDGE NO. 65 OVER JUNIPER CREEK.REG

SCOTLAND US 15 / US 501

UNDER CONSTRUCTION

B-4639 2837 2837REPLACE BRIDGE NO. 17 OVER GUM SWAMP IN LAURINBURG.REG

SCOTLAND US 15 / US 401

UNDER CONSTRUCTION

B-4817 2271 2271REPLACE BRIDGE NO. 23 OVER GUM SWAMP CREEK.SW

SCOTLAND US 74

UNDER CONSTRUCTION

B-4273 3415 3415REPLACE BRIDGE NO. 47 OVER LUMBER RIVER.SW

SCOTLAND US 401

UNDER CONSTRUCTION

B-5551 2552 2552REPLACE BRIDGE NO. 18 OVER LEITH'S CREEK.REG

SCOTLAND US 501

UNDER CONSTRUCTION

B-5131 914 914REPLACE BRIDGE NO. 63 OVER JOES CREEK.

DIV

SCOTLAND SR 1128(OLD STAGE ROAD)

B-5749 1430REPLACE BRIDGE NO. 36 OVER BIG SHOE HEEL CREEK.

HF

HFB 130R HFB 1300C

SCOTLAND SR 1421 (MCINTOSHROAD)

B-5741 648REPLACE BRIDGE NO. 30 OVER JUNIPER CREEK.

HF

HFB 60R HFB C 588

SCOTLAND SR 1425 (LEE'S MILLROAD)

B-5744 1595REPLACE BRIDGE NO. 50 OVER BRIDGE CREEK.

HF

HFB R 145 HFB 1450C

SCOTLAND SR 1615(HASTY ROAD)

B-5746 635REPLACE BRIDGE NO. 43 OVER LEITHS CREEK.

HF

HFB 60R HFB C 575

SCOTLAND SR 1645(DIXIE GUANO ROAD)

8-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 19: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5108 23645 21645DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

MUNICIPAL BRIDGE PROJECTS

RIGHT OF WAY IN PROGRESS BY CITY OF LAURINBURG - MUNICIPAL BRIDGE

B-5003 432 132REPLACE BRIDGE NO. 81 OVER LEITH CREEK WITH CULVERT IN LAURINBURG.

TRN

STPOFF 240C L 60C

SCOTLAND COMMONWEALTHAVENUE

MITIGATION PROJECTS

IN PROGRESS

EE-4908 25842 25842ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

HAZARD ELIMINATION PROJECTS

PLANNING / DESIGN IN PROGRESS

W-5145 850 75SR 1614 (BARNES BRIDGE ROAD) INTERSECTION. CONSTRUCT TURN LANES ON US 501.TRN

HSIP 100R HSIP C 675

SCOTLAND US 501

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5208 3951 3951DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND

VARIOUS

8-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 20: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

Page 21: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

NON HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS

AV-5736 365ACQUIRE NAVIGATION EASEMENTS IN RUNWAY 4 AND RUNWAY 22 APPROACHES, AND REMOVE OBSTRUCTIONS IN EASEMENTS.DIV

T R 328 L R 37

CHATHAM SILER CITY MUNICIPALAIRPORT (5WB)

BICYCLE AND PEDESTRIAN PROJECTSEB-5738 435SR 1008 (OLD FARRINGTON POINT ROAD) TO

ORANGE COUNTY LINE. CONSTRUCT BICYCLE LANES.

1.9

DIV

TAP PE 20 L PE 5 TAP C 328 L C 82

CHATHAM SR 1008(MT. CARMELCHURCH ROAD)

EB-5739 705SR 1534 (POYTHRESS ROAD) TO US 15 / US 501. CONSTRUCT BICYCLE LANES.

3.9

DIV

TAP PE 32 L PE 8 TAP C 532 L C 133

CHATHAM SR 1532(MANNS CHAPEL ROAD)

EB-5734 235SOUTH 6TH AVENUE TO US 64 (EAST 11TH STREET) IN SILER CITY. CONSTRUCT SIDEWALK ON SOUTH SIDE FROM SOUTH 6TH AVENUE TO SOUTH 10TH AVENUE, AND CONSTRUCT MULTI-USE PATH ON SOUTH SIDE FROM SOUTH 10TH AVENUE TO US 64 (EAST 11TH STREET).

1.1

DIV

TAP 31PE L 8PE TAP C 157 L C 39

CHATHAM SR 2013(EAST RALEIGH STREET)

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAP FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL

U-4726 12233 6047DURHAM-CHAPEL HILL-CARRBORO (DCHC) MPO. BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP) – ELIGIBLE PROJECTS.

DIV

STPDA 304PE L 76PE STPDA 2076C C 353 L 519C C 88 TAP C 277 C 277 C 277 C 277 C 277 277C277C277C C 277 C 277

CHATHAMDURHAMORANGE

VARIOUS

UNDER CONSTRUCTION BY TOWN OF SILER CITY

EB-5004 1010 1010SR 2208 (SOUTH 2ND AVENUE) TO PONY FARM ROAD IN SILER CITY. CONSTRUCT MULTI-USE PATH.

1.5

TRN

CHATHAM LOVE'S CREEKGREENWAY

PUBLIC TRANSPORTATION PROJECTSTM-6131 300OPERATING ASSISTANCE

HF

JARC 150O L 150O

CHATHAMLEE

CENTRAL CAROLINACOMMUNITY COLLEGEFOUNDATION

TQ-9007 312CAPITAL - PURCHASE OF SERVICE

HF

FEPD 250CP L 31CP S 31CP

CHATHAM CHATHAM COUNTY COUNCIL ON AGING

TA-6177 596 165CAPITALHF

FNU 431CP CHATHAM CHATHAM TRANSIT NETWOR

pass thru from Chapel Hill Transit

TG-6109A 150 150ROUTINE CAPITAL - SPARE ENGINESEX

CMAQ CHATHAM CHATHAM TRANSIT NETWOR

TK-6117 3300 944ADMINISTRATION

HF

FNU 468O O 236 O 236 O 236 O 236 O 236 236O236O236O FNU

CHATHAM CHATHAM TRANSIT NETWOR

TQ-6167 212MOBILITY MANAGEMENT

HF

FEPD 170CP L 21CP S 21CP

CHATHAM CHATHAM TRANSIT NETWOR

8-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 22: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

NON HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TQ-6166 200OPERATING ASSISTANCE

HF

FEPD 100O L 100O

CHATHAM CHATHAM TRANSIT NETWOR

BICYCLE AND PEDESTRIAN PROJECTSU-5528 5122 788FAYETTEVILLE URBAN AREA MPO

TRANSPORTATION ALTERNATIVES PROGRAM.

DIV

TAP 25R R 25 R 25 R 25 R 25 R 25 25R25R25R R 25 R 25L 6R R 6 R 6 R 6 R 6 R 6 6R6R6R R 6 R 6TAP 290C C 290 C 290 C 290 C 290 C 290 290C290C290C C 290 C 290L 73C C 73 C 73 C 73 C 73 C 73 73C73C73C C 73 C 73

CUMBERLANDHARNETTHOKEROBESON

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTI-6102 10518 2579INTERCITY BUS - CHARLOTTE TO

WILMINGTON

HF

FNU 2771O O 646 O 646 O 646 O 646 O 646 646O646O646O ANSONCUMBERLANDHOKEMOORERICHMONDUNION

COACH AMERICA

TA-6106 683 73CAPITALHF

FNU 610CP HOKE HOKE COUNTY

TK-6134 1474 984ADMINISTRATIONHF

FNU 490AD HOKE HOKE COUNTY

AVIATION PROJECTSAV-5762 2185CONSTRUCT APRON EXPANSION AND

WIDEN TAXIWAY FROM 35 TO 60 FEET.

DIV

T C 1966 L C 219

LEE RALEIGH EXECUTIVESANFORD - LEE COUNTYAIRPORT (TTA)

BICYCLE AND PEDESTRIAN PROJECTSEB-5742 464WEST LEE MIDDLE SCHOOL ENTRANCE TO

KIWANIS FAMILY PARK GREENWAY IN SANFORD. CONSTRUCT MULTI-USE PATH.

1.3

DIV

TAP PE 62 L PE 15 TAP C 310 L C 77

LEE NC 42(WICKER STREET)

PUBLIC TRANSPORTATION PROJECTSTM-6131 300OPERATING ASSISTANCE

HF

JARC 150O L 150O

CHATHAMLEE

CENTRAL CAROLINACOMMUNITY COLLEGEFOUNDATION

TK-6140 2214 634ADMINISTRATION

HF

FNU 316O O 158 O 158 O 158 O 158 O 158 158O158O158O FNU

LEE LEE COUNTY

TQ-6786 72OPERATING

HF

FEPD 36O L 36O

LEE LEE COUNTY

TN-6120 28OPERATING

HF

FNF 14O L 14O

LEE STEVENS CENTER

8-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 23: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

NON HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF TROY - IN PROGRESS

EB-5521 745 120SR 1323 (OKEEWEMEE ROAD) TO BARNHILL STREET IN TROY. CONSTRUCT SIDEWALKS.

2.5

TRN

STPEB 625C MONTGOMERY NC 134(NORTH MAINSTREET);SR 1005(SOUTH MAINSTREET)

EB-5760 937MONTGOMERY MIDDLE AND HIGH SCHOOLS TO ARTHUR DRIVE IN BISCOE. CONSTRUCT SIDEPATH ALONG US 220 BUSINESS.

0.8

DIV

TAP PE 38 L PE 12 TAP C 710 L C 177

MONTGOMERY EASTERN MONTGOMERYMIDDLE SCHOOLGREENWAY

PUBLIC TRANSPORTATION PROJECTSTK-6156 4834 1370ADMINISTRATION

HF

FNU 680O O 348 O 348 O 348 O 348 O 348 348O348O348O FNU

MONTGOMERYRANDOLPH

REGIONAL COORDINATEDAREA TRANSPORTATION

BICYCLE AND PEDESTRIAN PROJECTSEB-5741 120MAPLE AVENUE IN ABERDEEN. CONSTRUCT

MID-BLOCK CROSSWALK, MEDIAN REFUGE ISLAND, AND INSTALL PEDESTRIAN SIGNAL.

0.3

DIV

TAP PE 16 L PE 4 TAP C 80 L C 20

MOORE US 1 / US 15 / US 501(SANDHILLS BOULEVARD)

PUBLIC TRANSPORTATION PROJECTSTI-6102 10518 2579INTERCITY BUS - CHARLOTTE TO

WILMINGTON

HF

FNU 2771O O 646 O 646 O 646 O 646 O 646 646O646O646O ANSONCUMBERLANDHOKEMOORERICHMONDUNION

COACH AMERICA

TA-6131 227 38CAPITALHF

FNU 189CP MOORE MOORE COUNTY

TK-6147 3372 964ADMINISTRATION

HF

FNU 480O O 241 O 241 O 241 O 241 O 241 241O241O241O FNU

MOORE MOORE COUNTY

BICYCLE AND PEDESTRIAN PROJECTSEB-5740 950NORTH ELM STREET TO DUBLIN ROAD IN

ASHEBORO. CONSTRUCT SIDEWALK ON BOTH SIDES.

0.8

DIV

TAP C 760 L C 190

RANDOLPH NC 42(SALISBURY STREET)

EB-5744 461SR 1952 (HIGH POINT STREET) TO HILLARY STREET IN RANDLEMAN. CONSTRUCT SIDEWALK ON NORTH SIDE.

1

DIV

TAP PE 38 L PE 12 TAP C 329 L C 82

RANDOLPH SR 1950(WEST ACADEMY STREET)

PUBLIC TRANSPORTATION PROJECTSTA-6110 512 113CAPITAL

HF

FNU 399CP RANDOLPH RANDOLPH COUNTY SENIOR ADULTS ASSOCIATION, INC

TK-6156 4834 1370ADMINISTRATION

HF

FNU 680O O 348 O 348 O 348 O 348 O 348 348O348O348O FNU

MONTGOMERYRANDOLPH

REGIONAL COORDINATEDAREA TRANSPORTATION

8-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 24: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

NON HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TO-4790 47708 12938OPERATING ASSISTANCE

HF

FUZ 7250O O 3640 O 3650 O 3660 O 2404 O 2404 2404O2404O2404O SMAP 870O O 435 O 435 O 435 O 475 O 475 475O475O475O

DAVIDSONGUILFORDRANDOLPH

HIGH POINT TRANSITSYSTEM

TS-5113 220 60SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 32CP CP 16 CP 16 CP 16 CP 16 CP 16 16CP16CP16CP DAVIDSONGUILFORDRANDOLPH

HIGH POINT TRANSITSYSTEM / HI-TRAN

TQ-6168 124OPERATING ASSISTANCE

HF

FEPD 62O L 62O

RANDOLPH REGIONAL COORDINATEDAREA TRANSPORTATION

TD-4920D 1551 776VAN POOL REPLACEMENT TO SUPPORT NEW ROUTES

EX

CMAQ 775CP DAVIERANDOLPH

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TG-4814 3206 916ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC ($40K CAPITAL COST OF CONTRACTING)HF

FUZ 458CP CP 229 CP 229 CP 229 CP 229 CP 229 229CP229CP229CP DAVIDSONGUILFORDRANDOLPH

HIGH POINT TRANSITSYSTEM / HI TRAN

PASSENGER RAIL PROJECTS

ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS

P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.

EX

CMAQ 3750O O 3750

A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS

ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE

PIEDMONT CORRIDOR

AVIATION PROJECTSAV-5761 550CLEAR OBSTRUCTIONS IN RUNWAY 14

APPROACH.

DIV

T 495C L 55C

RICHMOND RICHMOND COUNTYAIRPORT (RCZ)

AV-5763 5627EXTEND RUNWAY 14-32 TO 5500 FEET.

DIV

T C 5065L C 562

RICHMOND RICHMOND COUNTYAIRPORT (RCZ)

PUBLIC TRANSPORTATION PROJECTSTI-6102 10518 2579INTERCITY BUS - CHARLOTTE TO

WILMINGTON

HF

FNU 2771O O 646 O 646 O 646 O 646 O 646 646O646O646O ANSONCUMBERLANDHOKEMOORERICHMONDUNION

COACH AMERICA

8-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 25: Division 8 - Home | Connect NCDOT 08.pdfU-5305 U-5758 U-5770 U-5759 EB-5738 R-2536AA DRAFT STIP FY 2015-2025 STI Projects DIVISION 8 0 4.75 9.5 19 ... HP - Federal-Aid High Priority

NON HIGHWAY PROGRAMDIVISION 8

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6211 229 225CAPITAL

HF

FNU 4CP RICHMOND RICHMOND INTERAGENCYTRANSPORTATION, INC.

TK-6157 901 426ADMINISTRATION

HF

FNU 475AD RICHMOND RICHMOND INTERAGENCYTRANSPORTATION, INC.

PUBLIC TRANSPORTATION PROJECTSTA-6156 433 240CAPITALHF

FNU 193CP SCOTLAND SCOTLAND COUNTY

TK-6163 1611 466ADMINISTRATION

HF

FNU 225O O 115 O 115 O 115 O 115 O 115 115O115O115O FNU

SCOTLAND SCOTLAND COUNTY

8-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project