    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES

    General

    Finishes are measured as the net area in contact with support.

    No deduction are made for voids of less than 0.25 m2.

    Rates shall include (but not be limited to) the following:

    Surface preparation of and application to any surface of finishes,

    backings, raking and angle cutting, work in any width or area,

    any location and any height, fair joints of every description,

    fair edges, rounded edges, chamfered edges, quirks arises

    and the like, beaded edges, molded edges, ends, angles,

    intersections and the like, all as required to execute

    the works complete.

    Total carried to Collection

    Division 9 - Finishes Page 1 / 15

  • 7/25/2019 Div 09 Finishes

    2/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 092400 - Plastering

    General

    Works are measured net, as per the layout and units of the

    Bills of Quantities, no other consideration shall be considered

    with regard to any practice or local measurement custom.

    Rates shall include (but not be limited to) the following:

    Preparation of substrates, embedded items (corner beads, metal lath,

    reference spots, stop beads and the like), admixtures and additives

    where required, application to any surface indicated as per

    required number of coats and tolerances,making good around inserts,

    recesses and the like, curing, cutting and patching.

    (Mix ratio as per specifications)

    Self Levelling Cement Screed

    A 10cm Self Levelling Cement Screed to Floors of MDB's, Transformer, 680 m2

    Generator, H.V Room & Services Area.

    Internal Plaster Type 1

    Dash coat, base coat and finish coat,

    Tolerance: 1 mm under a 3 m straight edge, Perfect angles and corners.

    B To Walls in all floors (Full walls height) 48,037 m2

    C To Staircases Walls as shown on drawings. 5,620 m2

    D To Walls in Basements as shown on drawings. 7,135 m2

    Total carried to Collection

    Division 9 - Finishes Page 2 / 15

  • 7/25/2019 Div 09 Finishes

    3/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 092400 - Plastering

    Internal Plaster Type 2

    Dash coat, base coat

    Tolerance: 1 mm under a 3 m straight edge,

    Perfect angles and corners.

    A To Walls in all floors where Antiseptic, Antifungus Semi Gloss 5,334 m2

    Finishes are applicable.

    B To O.T.S Walls as shown on drawings. 7,058 m2

    Ready Mix Surfacing Compound Plaster:

    C To ceilings of Elect, Tel., Store, Pump, Generator, Transformer, H.V, MDB, 8,251 m2

    L.V, Generator, Service, Living, Bedroom, Lift room, MCC,

    Chilled Water Pump Room, Filter Room & Boiler Room at Roof Floor.

    D To Ceiling in Basements as shown on drawings. 8,334 m2

    E To Staircases Ceilngs as shown on drawings 1,398 m2

    Accessories

    F Galvanized metal lath, 200 mm wide bands, to walls, Item

    at intersection of concrete structure and masonry walls.

    G Galvanized angle beads, vertical and horizontal Item

    (Angle beads to be of aluminum in wet areas)

    Total carried to Collection

    Division 9 - Finishes Page 3 / 15

  • 7/25/2019 Div 09 Finishes

    4/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 092900 - Gypsum Board Ceilings

    Gypsum board ceiling, made of 12 mm thick gypsum boards

    mounted on suspended galvanized steel frame fixed to

    ceiling by means of adjustable threaded rods, including joints

    and connexions treatment with special filler on mesh band,

    and all necessary details, such as edging, connexions,

    openings and inserts for fixing electrical and A/C fixtures

    and the like,as shown on drawings and instructed by Consultant.

    A 12mm thick Decorative Suspended Decorative Gypsum Board with 60 m2

    Emulsion Paint as per Detailed Drawings in Building's Main Entrance

    including Ready made Access Panels as per specifications.

    B 12mm thick Decorative Suspended Gypsum Board with Emulsion Paint in 1,676 m2

    Lift Lobby & Lobby.

    Ready made Access Panels as per specifications.

    C 12mm thick Gypsum Board Bulk Head with Emulsion Paint as per 3,230 m2

    specifications in Living/Dining Room.

    D 12mm thick Gypsum Board with Emulsion Paint as per specification in 1,792 m2

    Flat Entance, Corridor & Dress rooms.

    Total carried to Collection

    Division 9 - Finishes Page 4 / 15

  • 7/25/2019 Div 09 Finishes

    5/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES

    Section 093013 - Ceramic Tiles

    General

    Rates include adhesives, backing and bedding compounds

    as indicated, application to any surface, coordination with

    adjacent works, detailing, jointing, grouting and cleaning. Including

    bedding compound, grouting, and all fixing materials and accessories.

    CERAMIC TILES TO FLOOR

    60x60/40x40 cm Ceramic Tiles-Floor for Retail Area in Ground Floor

    PC Rate = AED 60/-

    A.1 Ceramic Tiles to floors as shown on drawings, 99 m2

    A.2 Allow for overhead and profit 99 m2

    20x20/30x30 cm Ceramic Tiles-Floor for Bathrooms & Toilets:

    PC Rate = AED 45/-

    B.1 Ceramic Tiles to floors as shown on drawings, 1,104 m2

    B.2 Allow for overhead and profit 1,104 m2

    20x20/30x30 cm Ceramic Tiles-Floor for Kitchens & Pantries:

    PC Rate = AED 50/-

    C.1 Ceramic Tiles to floors as shown on drawings, 1,398 m2

    C.2 Allow for overhead and profit 1,398 m2

    20x20/30x30 cm Ceramic Tiles-Floor for WC's, Elect, Tel,

    Room Service, Storage Area, Laundry, Store, Pump,Maidroom, Maidbathroom, Garbage Room, Lift room, MCC,

    Chilled Water Pump & Filter Room:PC Rate = AED 35/-

    D.1 Ceramic Tiles to floors as shown on drawings, 1,808 m2

    D.2 Allow for overhead and profit 1,808 m2

    Total carried to Collection

    Division 9 - Finishes Page 5 / 15

  • 7/25/2019 Div 09 Finishes

    6/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES

    Section 093013 - Ceramic Tiles

    5x5/10x10/15x15/20x20 cm Porcelain Tiles to Floor of Health Club:

    PC Rate = AED 100/-

    A.1 Porcelain Tiles to Floors of Lockers, Showers, etc 131 m2

    A.2 Allow for overhead and profit 131 m2

    60x60, 40x40 cm Graniti Porcelain Tiles-to Floors of

    Lift-Lobby and Offices:PC Rate = AED 80/-

    B.1 Graniti Porcelain Tiles to floors as shown on drawings, 1,955 m2

    B.2 Allow for overhead and profit 1,955 m2

    60x60, 40x40 cm Graniti Porcelain Tiles-to Floors of Flat Entrance,

    Bedrooms, Corridors, Living/Dining, Dress Rooms, Balconies,

    Massage & Reception Area:

    PC Rate = AED 70/-

    C.1 Graniti Porcelain Tiles to floors as shown on drawings, 12,071 m2

    C.2 Allow for overhead and profit 12,071 m2

    Total carried to Collection

    Division 9 - Finishes Page 6 / 15

  • 7/25/2019 Div 09 Finishes

    7/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES

    Section 093013 - Ceramic Tiles

    2 x 2 cm Pure Clear Glass Mosaic Tiles to Swimming Pool Floor:

    PC Rate = AED 120/-

    A.1 Pure Clear Glass Mosaic Tiles to floors as shown on drawings, 67 m2

    A.2 Allow for overhead and profit 67 m2

    CERAMIC TILES TO WALLS

    20x20/20x25/20x30/30x30cm Ceramic Glazed Tiles for

    Bathrooms & Toilets Walls: PC Rate = AED 45/-

    C.1 Ceramic Glazed Tiles as shown on drawings, 7,417 m2

    C.2 Allow for overhead and profit 7,417 m2

    20x20/20x25/20x30/30x30cm Ceramic Glazed Tiles for

    Kitchens & Pantries Walls: PC Rate = AED 50/-

    D.1 Ceramic Glazed Tiles as shown on drawings, 5,920 m2

    D.2 Allow for overhead and profit 5,920 m2

    Total carried to Collection

    Division 9 - Finishes Page 7 / 15

  • 7/25/2019 Div 09 Finishes

    8/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 093013 - Ceramic Tiles

    20x20/20x25/20x30/30x30cm Ceramic Glazed Tiles for

    Garbage Room, Laundry & Maid Bathroom: PC Rate = AED 30/-

    A.1 Ceramic Glazed Tiles as shown on drawings, 3,989 m2

    A.2 Allow for overhead and profit 3,989 m2

    5x5/10x10/15x15 cm Porcelain Tiles to Walls of Health Club:

    PC Rate = AED 60/-

    B.1 Porcelain Tiles to Walls of Lockers, Showers, etc 559 m2

    B.2 Allow for overhead and profit 559 m2

    60x60, 40x40 cm Graniti Porcelain Tiles-Walls to Lift-Lobby:

    PC Rate = AED 80/-

    C.1 Graniti Porcelain Tiles to Walls as shown on drawings, 6,148 m2

    C.2 Allow for overhead and profit 6,148 m2

    2 x 2 cm Pure Clear Glass Mosaic Tiles to Swimming Pool Walls:

    PC Rate = AED 120/-

    D.1 Pure Clear Glass Mosaic Tiles to Walls as shown on drawings, 108 m2

    D.2 Allow for overhead and profit 108 m2

    Total carried to Collection

    Division 9 - Finishes Page 8 / 15

  • 7/25/2019 Div 09 Finishes

    9/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Skirting

    A 80mm high Procelain base to match Flooring 14,175 LM

    B 80mm high Ceramic base to match Flooring 1,828 LM

    C Wood Skirting 39 LM

    D Epoxy Paint Skirting 2,171 LM

    Section 095130 - Metal Ceilings

    Suspension System

    Aluminium False Ceilings, stove enamelled with polyester paint including

    supporting all necessary details, such as inserts for fixing

    Electrical and A/C fixtures and the like,

    as shown on drawings and instructed by Consultant.

    E 600x600mm Concealed Suspension Aluminium Plain Tiles False 3,077 m2

    Ceiling in Showers, Laundry, Kitchend, Lockers,

    Plunge Pool, Steam, WC's & Corridor.

    F 600x600mm Concealed Suspension Aluminium Perforated 108 m2

    Tiles False Ceiling in Reception, Gymnasium & Massage.

    G Combination of 300mm wide Aluminium Strip False Ceiling 279 m

    2

    and 12mm Water Resistant Gypsum Board with Emulsion Paint

    in Offices at Mezzanine Floor.

    Total carried to Collection

    Division 9 - Finishes Page 9 / 15

  • 7/25/2019 Div 09 Finishes

    10/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 096340 - Stone Flooring

    Rates include adhesives, backing and bedding compounds as indicated,

    cement mortar (white or ordinary cement as required), application to any

    surface, finishing as required, coordination with adjacent works, detailing,

    grouting, cleaning. Provide Marble, cut to size as per detailed drawings.

    The contractor must submit a sample of each type of marble

    and shop drawings for approval.

    Natural Marble to Floor, as per detailed drawings:

    A Flamed Granite Brown Nejran 233 m2

    B Polished Granite Brown Nejran 25 m2

    C 3cm Thick Marble Tread & 2cm thick Marble Riser, 60x30x2cm 58 m2

    Thick Marble for Landing of Staircase-1

    on Ground Floor, Mezz. Floor & First Floor.

    Natural Marble to Walls, as per detailed drawings:

    D Selected Marble-Walls of Main Entrance, Lounge/Reception & Lift Lobby. 159 m2

    Total carried to Collection

    Division 9 - Finishes Page 10 / 15

  • 7/25/2019 Div 09 Finishes

    11/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 096340 - Stone Flooring

    Marble Counter (30 mm Thick)

    Top Counter of Baths and Toilets are Granite/Marble

    (PC Rate: 600/ Dhs./LM)

    A Counter 95 x 50cm at Ground Floor in WC 1 No.

    B Counter 125 x 50cm at Mezzanine Floor in WC 2 Nos.

    C Counter 136 x 50cm at Typical Floor in Bath 01 34 Nos.

    D Counter 185 x 50cm at Typical Floor in Bath 02 34 Nos.

    E Counter 146 x 50cm at Typical Floor in Bath 03 34 Nos.

    F Counter 146 x 50cm at Typical Floor in Bath 04 34 Nos.

    G Counter 146 x 50cm at Typical Floor in Bath 05 34 Nos.

    H Counter 150 x 50cm at Typical Floor in Bath 06 34 Nos.

    I Counter 116 x 50cm at Typical Floor in WC 01 34 Nos.

    J Counter 116 x 50cm at Typical Floor in WC 02 34 Nos.

    Threshold (20 mm Thick)

    To thresholds, Carrara/Crema Marfil marble, polished finish in baths,

    toilets, kitchens, flats entrances, service rooms, ...etc.

    K 10 cm wide, 23 LM

    L 20 cm wide, 714 LM

    Total carried to Collection

    Division 9 - Finishes Page 11 / 15

  • 7/25/2019 Div 09 Finishes

    12/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 099100 - Painting

    General

    Rates include surface preparation as specified. Contractor shall

    verify compliance of finishing products in surfaces.

    Surface preparation shall be as follows:Rubbing and dusting of

    cementitious and wood surfaces, where natural wood is to be

    painted knots shall be burned. Shop primed metal surfaces.

    Cementitious surfaces to be epoxy painted shall be acid etched

    with a 5% muriatic acid solution then washed thoroughly with water.

    Apply primer on prepared surfaces, clean and dry, apply putty

    fillers to surfaces at a rate to ensure smoothness, uniformity

    and complete coverage with pores filled.

    Apply paints with brush, roller, spray, or other applicators

    according to manufacturer's instructions and to Consultant's indications

    Do not paint over dirt , rust , scale , grease, moisture,

    and scuffed surfaces. Allow sufficient time between successive

    coats to permit proper drying. Paint behind movable equipment same

    as adjacent exposed surfaces.

    Antiseptic & Antifungus Semi Gloss Paint

    A One coat of Antiseptic, Antifungus semi gloss finish to walls 5,334 m2

    above False Ceiling as per specifications

    B One coat of Antiseptic, Antifungus semi gloss finish to ceiling 7,025 m2

    above False Ceiling as per specifications

    Total carried to Collection

    Division 9 - Finishes Page 12 / 15

  • 7/25/2019 Div 09 Finishes

    13/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 099100 - Painting

    Use only one primer behind permanent equipment to be fixed.

    Paint backsides of access panels and removable or hinged

    covers to match exposed surfaces. Finish doors on tops,

    bottoms,and side edges the same as exposed faces.

    Apply as many finishing coats needed to obtain a final

    homogeneous finished aspect, regardless the number

    of coats specified hereunder.

    Paint to comply with manufacturer's recommendations to

    provide top quality application of commercial quality product.

    Emulsion paint on cementitious surfaces

    A Emulsion paint over cement plaster surface to Walls 48,037 m2

    B Emulsion paint over compound plaster surface to Ceiling 8,251 m2

    Total carried to Collection

    Division 9 - Finishes Page 13 / 15

  • 7/25/2019 Div 09 Finishes

    14/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Section 099100 - Painting

    Full Epoxy Paint

    A Epoxy Paint on 10cm Self Levelling Cement Screed to Floors of 680 m2

    Generator Room, Transformer Room, H.V Room & Services Area

    Epoxy Flooring Paint System

    B Epoxy Flooring Paint System for Staircases as per Specifications 1,399 m2

    C Epoxy Flooring Paint System for Car Parkings as per Specifications 8,334 m2

    DEpoxy Flooring Paint System on Screed in Basements . (Color as per

    Archtect's choice)785 m

    2

    Elastomeric Silk Finish , as per Specifications.

    E To Walls of Car Parking in all Besements 7,135 m2

    F To Ceilings of Car Parking in all Besements 8,334 m2

    Acrylic Shield Fine Textured, as per Specification

    G 100% pure Acrylic Shield Fine Textured System to Walls of 12,678 m2

    Staircases and OTS's

    H 100% pure Acrylic Shield Fine Textured System to Ceilings of Staircases 1,398 m2

    Total carried to Collection

    Division 9 - Finishes Page 14 / 15

  • 7/25/2019 Div 09 Finishes

    15/15

    Syrconsult- Consulting Engineers

    Residential Building for

    H.H. Sh. Seif Bin Mohammad Al Nahyan

    Sector W-1 Plot No.C-10 Abu Dhabi U.A.E.

    Contract Documents

    Volume 2 - Bills of Quantities

    ITEM DESCRIPTION QTY UNITRATE

    AED

    AMOUNT

    AED

    DIVISION 9 - FINISHES (ctd)

    Collection

    Page 1 / 15

    Page 2 / 15

    Page 3 / 15

    Page 4 / 15

    Page 5 / 15

    Page 6 / 15

    Page 7 / 15

    Page 8 / 15

    Page 9 / 15

    Page 10 / 15

    Page 11 / 15

    Page 12 / 15

    Page 13 / 15

    Page 14 / 15

    Total carried to Summary