Upload
dustin-ford
View
213
Download
0
Embed Size (px)
DESCRIPTION
Flood Control District or Flood Control Zone District Chehalis River Basin Draft Comprehensive Flood Hazard Management Plan analyzed 7 organizational & funding structures Chehalis River Basin Draft Comprehensive Flood Hazard Management Plan analyzed 7 organizational & funding structures Recommended either a FCD or a FCZD be selected by the Flood Authority Recommended either a FCD or a FCZD be selected by the Flood Authority Final decision will be made in the fall of 2011 by BCCs Final decision will be made in the fall of 2011 by BCCs Chehalis River Basin Flood District Formation
Citation preview
District Type and District Type and Issues Issues
Identification Identification Chehalis River Basin Flood Chehalis River Basin Flood Authority Entity FormationAuthority Entity Formation
July 15, 2010July 15, 2010
Chehalis River Basin Flood District Formation
Meeting GoalsMeeting Goals
Select the approach for the Select the approach for the initial formation of a flood entityinitial formation of a flood entity
Present entity formation Present entity formation scheduleschedule
Define and refine key issuesDefine and refine key issues Discuss next stepsDiscuss next steps
Flood Control District orFlood Control District orFlood Control Zone Flood Control Zone
DistrictDistrict Chehalis River Basin Draft Chehalis River Basin Draft
Comprehensive Flood Hazard Comprehensive Flood Hazard Management Plan analyzed 7 Management Plan analyzed 7 organizational & funding structuresorganizational & funding structures
Recommended either a FCD or a FCZD Recommended either a FCD or a FCZD be selected by the Flood Authoritybe selected by the Flood Authority
Final decision will be made in the fall of Final decision will be made in the fall of 2011 by BCCs2011 by BCCs
Chehalis River Basin Flood District Formation
Flood Entity FormationFlood Entity Formation6/24/2010 Workshop 6/24/2010 Workshop
SummarySummary Flood Authority heard & discussed the Flood Authority heard & discussed the
pros & cons of FCDs and FCZDspros & cons of FCDs and FCZDs Flood Authority heard overview of breadth Flood Authority heard overview of breadth
of policy choices available for eitherof policy choices available for either Flood Authority provided feedback on the Flood Authority provided feedback on the
desirability of phasing the governance desirability of phasing the governance structure and financingstructure and financing
Consultant agreed to provide a phasing Consultant agreed to provide a phasing recommendation at the 7/15 meetingrecommendation at the 7/15 meeting
Chehalis River Basin Flood District Formation
Flood Entity Flood Entity RecommendationRecommendation
Recommend a basin-wide FCZD as Recommend a basin-wide FCZD as ultimate mechanismultimate mechanism
Recommend interim use of FCZD’s Recommend interim use of FCZD’s or Drainage Utilities within each or Drainage Utilities within each county as component members of a county as component members of a basin-wide interlocal entity basin-wide interlocal entity
Chehalis River Basin Flood District Formation
Flood Entity Flood Entity RecommendationRecommendation
Can form interim entity through Can form interim entity through Interlocal Agreement without need Interlocal Agreement without need for state legislationfor state legislation
Much more flexibilityMuch more flexibility Can meet the state deadline in 2011Can meet the state deadline in 2011 Can do in phasesCan do in phases Can improve relevant statutes Can improve relevant statutes
through state legislationthrough state legislation
Chehalis River Basin Flood District Formation
Flood Entity Flood Entity Recommendation: Recommendation:
GovernanceGovernance Create initial Entity as a Watershed Create initial Entity as a Watershed
Management Partnership (WMP) through Management Partnership (WMP) through Interlocal Interlocal
Parties include existing Lewis FCZD; new Parties include existing Lewis FCZD; new Grays Harbor FCZD; Thurston Drainage Grays Harbor FCZD; Thurston Drainage Utility or new Thurston FCZDUtility or new Thurston FCZD
Interlocal determines governance structureInterlocal determines governance structure Additional Parties could include the Additional Parties could include the
Chehalis Tribe and the StateChehalis Tribe and the State
Chehalis River Basin Flood District Formation
Flood Entity Flood Entity Recommendation: Recommendation:
Budget, Financing & Budget, Financing & BoundariesBoundaries Initial Regional Program Budget to include Initial Regional Program Budget to include
shared costs per ESA Adolfson Memo (date)shared costs per ESA Adolfson Memo (date) Interlocal to determine allocation of costsInterlocal to determine allocation of costs Revenues raised & contributed by each Revenues raised & contributed by each
PartyParty No bonding until major capital program No bonding until major capital program
approvedapproved Initial boundary: Thurston, Lewis and Grays Initial boundary: Thurston, Lewis and Grays
Harbor Counties within the Chehalis BasinHarbor Counties within the Chehalis Basin
Chehalis River Basin Flood District Formation
Flood Entity Flood Entity Recommendation: Recommendation: Options RetainedOptions Retained
Can request adjustments to state law for Can request adjustments to state law for multi-county FCZD governance structure to multi-county FCZD governance structure to replace Interlocal Agreementreplace Interlocal Agreement
Retains future public vote options: (1) Retains future public vote options: (1) future separately elected board, (2) future separately elected board, (2) bonding the capital programbonding the capital program
Retains capacity for future subzones within Retains capacity for future subzones within boundaryboundary
Retains ability to impose Retains ability to impose tax/assessments/rates tax/assessments/rates
Chehalis River Basin Flood District Formation
Flood Authority Flood Authority Provisional DecisionProvisional Decision
Should an interim entity be formed by Should an interim entity be formed by interlocal agreement to meet the June interlocal agreement to meet the June 2011 deadline?2011 deadline?
Should a Watershed Management Should a Watershed Management Partnership be the focus as the interim Partnership be the focus as the interim entity?entity?
Should options be retained for a multi-Should options be retained for a multi-county Flood District in future? county Flood District in future?
Chehalis River Basin Flood District Formation
Chehalis Entity Formation Chehalis Entity Formation ScheduleSchedule
Chehalis River Basin Flood District Formation
Chehalis River BasinChehalis River BasinEntity FormationEntity Formation
Issues?Issues?
Concerns?Concerns?
Questions?Questions?
Chehalis River Basin Flood District Formation
Chehalis River BasinChehalis River BasinEntity FormationEntity Formation
Next StepsNext Steps Date, Time & Location of Next Date, Time & Location of Next
MeetingMeeting Topics/AgendaTopics/Agenda AdjournmentAdjournment
Chehalis River Basin Flood District Formation