53
DC WATER ADDENDUM NO. 01 IFB # 150150 PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 1 JULY 6, 2018 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION NO. 150150 DATE: JULY 6, 2018 TO: PROSPECTIVE BIDDERS SUBJECT: ADDENDUM NO. 01 REFERENCE: PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS Bidders shall acknowledge receipt of this Addendum on the Bid Form. Failure to do so may result in the rejection of the bid. This Addendum is hereby included in and made a part of the Contract Documents. This Addendum is being provided to all registered plan holders. All requirements of the original Project Specifications, Drawings and any previous Addenda shall remain in force except as amended by this addendum. Addendum No. 01 consists of a Total of fifty-three (53) pages; the breakdown is as follows: Seven (7) pages of Revisions, Clarifications and Modifications Forty-seven (46) pages of Addendum No. 01 ======================================================================== The following corrections, changes, additions, deletions, revisions, and/or clarifications are hereby made a part of the Contract Documents for the above referenced project. In case of conflicts between this Addendum and previous issued Documents, this Addendum shall have precedence. Bidders shall make the following change to all pertinent sheets, pages, and paragraphs of the bid proposal, plans, specifications and other Contract Documents and take same into full consideration in arriving at the prices bid. BID DATE: 1. This Addendum does alter the previously published bid date of 7/11/2018 at 2:00 p.m. 2. The new published bid date and time shall be corrected to 7/18/2018 on the Project Manual Covers (Specification and Bid Forms) specified in related sections elsewhere may include but are not limited to the following: A. 00 10 00: “Invitation to Bid – Page 1 B. 00 20 00: “Instruction to Bidders” - Page 9; Article 6.3.2 C. 00 40 00: “Bid Form” – Page 1 D. 00 40 20: “Bid Bond” – Page 1

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER ADDENDUM NO. 01

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 1

JULY 6, 2018

DISTRICT OF COLUMBIA

WATER AND SEWER AUTHORITY

INVITATION NO. 150150

DATE: JULY 6, 2018

TO: PROSPECTIVE BIDDERS

SUBJECT: ADDENDUM NO. 01

REFERENCE: PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS

Bidders shall acknowledge receipt of this Addendum on the Bid Form. Failure to do so may result in the rejection of the

bid.

This Addendum is hereby included in and made a part of the Contract Documents.

This Addendum is being provided to all registered plan holders.

All requirements of the original Project Specifications, Drawings and any previous Addenda shall remain in force except

as amended by this addendum.

Addendum No. 01 consists of a Total of fifty-three (53) pages; the breakdown is as follows:

Seven (7) pages of Revisions, Clarifications and Modifications

Forty-seven (46) pages of Addendum No. 01

======================================================================== The following corrections, changes, additions, deletions, revisions, and/or clarifications are hereby made a part of the

Contract Documents for the above referenced project. In case of conflicts between this Addendum and previous issued

Documents, this Addendum shall have precedence.

Bidders shall make the following change to all pertinent sheets, pages, and paragraphs of the bid proposal, plans,

specifications and other Contract Documents and take same into full consideration in arriving at the prices bid.

BID DATE:

1. This Addendum does alter the previously published bid date of 7/11/2018 at 2:00 p.m.

2. The new published bid date and time shall be corrected to 7/18/2018 on the Project Manual Covers (Specification

and Bid Forms) specified in related sections elsewhere may include but are not limited to the following:

A. 00 10 00: “Invitation to Bid – Page 1

B. 00 20 00: “Instruction to Bidders” - Page 9; Article 6.3.2

C. 00 40 00: “Bid Form” – Page 1

D. 00 40 20: “Bid Bond” – Page 1

Page 2: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER ADDENDUM NO. 01

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 2

JULY 6, 2018

E. 00 61 10: “Performance Bond”-(Regular) Page 1

F. 00 61 20: “Payment Bond” - Page 1

.

SPECIFICATIONS AND BID FORMS COVER PAGE

REPLACE: By removing the existing Specifications and Bid Forms Cover Page and inserting the new

attached Specifications and Bid Forms Cover Page.

CHANGES TO CONTRACT DOCUMENTS

3. SECTION: 00 01 10 TABLE OF CONTENTS

[Page(s) 1 thru 6]

● ADD: Immediately following “00 90 00 Revisions, Clarifications, and Modifications” insert the following

information “Addendum No. 01”; No of Pages “58”, Date “07/06/18”.

ADD: Immediately following “Appendix C” insert the following:

APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date

Emerson Process Management Power &

Water Solutions, Inc

6 7/6/18

REVISE: The date under Section 00 01 10 from 10/01/14 to 07/06/18

REVISE: The footer date from October 1, 2014 to July 6, 2018.

REVISE: Under the title “Invitation to Bid” by changing the date from 05/01/14 to 07/06/18.

REVISE: Under the title “Instructions to Bidders” by changing the date from 04/13/17 to 07/06/18.

REVISE: Under the title “Schedule of Prices” by changing the date from 05/01/14 to 07/06/18.

REVISE: Under the title “Bid Document Checklist” by changing the date from 06/15/17 to 07/06/18.

REVISE: Under the title “Labor Provisions” by changing the date from 05/01/14 to 07/06/18.

REVISE: Under the title “Project Permits and Approvals” by changing the date from 05/15/15 to 07/06/18.

REVISE: Under the title “Revision, Clarification and Modifications” by changing the date from 05/01/14 to

07/06/18.

ADD: Immediately following the Section “00 90 00” titled “Revisions, Clarifications and Modifications”

insert the following information: Section number “00 90 01”; “Addendum No. 1”; Number of Pages “53”;

Date “07/06/18”.

REVISE: Under the title “General Requirements” by changing the date from 11/04/16 to 07/06/18.

REVISE: Under the title “Allowances” by changing the date from 04/01/14 to 07/06/18.

REVISE: Under the title “Measurement and Payment” by changing the date from 05/01/14 to 07/06/18.

REVISE: Under the title “Trench Excavation and Backfill” by changing the date from 05/01/14 to 07/06/18.

REVISE: Under the title “Pavement Markings” by changing the date from 08/17 to 07/06/18.

REVISE: Under the title “Ductile Iron Pipe” by changing the date from 05/01/14 to 07/06/18.

REVISE: Under the title “Process Control System General Provisions” by changing the date from 08/17 to

07/06/18.

REVISE: Under the title “Control System Panel Panels and Racks” by changing the date from 08/17 to

07/06/18.

REVISE: Under the title “Process Control System Input/Output Modules” by changing the date from 04/18

to 07/06/18.

Page 3: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER ADDENDUM NO. 01

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 3

JULY 6, 2018

4. SECTION 00 10 00: INVITATION TO BID

REPLACE: By removing the existing section in its entirety and inserting the new attached Section 00 10 00

titled, “Invitation to Bid” to the Project Manual.

5. SECTION 00 20 00: INSTRUCTIONS TO BIDDERS

00 20 00-22

REMOVE: Delete 20.1.7 in its entirety.

[Pages 1 thru 30]

REVISE: Revise date in footer to July 6, 2018.

6. SECTION 00 40 10: SCHEDULE OF PRICES

[Pages 1 thru 2]

REPLACE: By removing the existing section in its entirety and insert the new attached Section 00 40 10

titled, “Schedule of Prices” to the Project Manual.

7. SECTION 00 40 25: BID DOCUMENT CHECKLIST

[Pages 1 thru 2]

REPLACE: By removing the existing section in its entirety and inserting the new attached Section 00 40

25 titled, “Bid Document Checklist” to the Project Manual.

8. SECTION 00 76 00 LABOR PROVISIONS

[Pages 1 thru 14]

REPLACE: By removing the existing section in its entirety and inserting the new attached Section 00 76

00 titled, “Labor Provisions” to the Project Manual.

9. SECTION 00 89 00 PROJECT PERMITS AND APPROVALS

00 89 00-1

REVISE: Section 3.1 A. to read as follows: “DC Water has applied, paid for and obtained the District of

Columbia Department of Consumer and Regulatory Affairs (DCRA) Building Department Permit. The

Building Permit is included as an Appendix to this Specification.”

REVISE: Section 3.1 B to read as follows: “DC Water has applied, paid for and obtained the District of

Columbia Department of Energy and Environment (DOEE) Erosion and Sediment Control Permit.”

00 89 00-2

REVISE: Section 3.2 B. 1. to read as follows: “Contractor is responsible for obtaining required trade

permits pertaining to the approved plans of the building permit.”

REVISE: Section 3.2. B. 3. to read as follows: “Contractor is responsible for obtaining District of Columbia

Department of the Environment Erosion and Sediment Control Permits if modifications are made to the

approved plans.”

ADD: At the end of Specification 00 89 00, add the Building Permit.

10. SECTION: 00 90 00 REVISION, CLARIFICATION AND MODIFICATIONS

Page 4: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER ADDENDUM NO. 01

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 4

JULY 6, 2018

00 90 00-1

● ADD: “00 90 01 No. 1 58 07/06/18”

11. SECTION: 00 90 01 ADDENDUM NO. 01

[Pages 1 thru 58]

● ADD: Insert the new Section 00 90 01 titled, “Addendum No. 01” to the Project Manual (see attached).

● REVISE: Revise date in footer to July 6, 2018.

CLARIFICATIONS

12. SECTION: 01 00 00 GENERAL REQUIREMENTS

01 00 00-4

REVISE: Section1.10. C. to read as follows “Contractor shall be responsible for all minor complications

and/or delays within their control for Bid Items 1 thru 4 shown on the Schedule of Prices; are

characteristic of the work that will be required for this Contract. Such delays could be caused by

insufficient labor, supervision, manufacturers and suppliers of materials, delivery, tools and equipment.”

[Pages 1 thru 20]

REVISE: Revise date in footer to July 6, 2018.

13. SECTION: 01 21 00 ALLOWANCES

01 21 00-3

REVISE: Section 4.2 A. to read “Allowance No. One (Bid Item #3): $58,180.00”

ADD: By inserting “B. Allowance No. Two (Bid Item #4): $130,000.00” directly after Section 4.2 A.

[Pages 1 thru 4]

REVISE: Revise date in footer to July 6, 2018.

14. SECTION: 01 22 25 MEASUREMENT AND PAYMENT

01 22 25-5

ADD: By inserting the following directly after Section 4.1 B:

“C. Bid Item No. 3 – Bid Allowance:

1. Emerson Process Management (EPM or Emerson) for work required to be completed by

Emerson per:

01 21 00 – Allowances

40 95 23 – Remote Input-Output Cabinet”

REVISE: Section 4.1 D to read “Bid Item No. 4 – Bid Allowance:”

ADD: By inserting “C. Bid Item No. 3: Allowance.” directly after Section 4.2 B.

REVISE: Section 4.2 D to read “Bid Item No. 4 – Bid Allowance.”

ADD: By inserting “H. Payment for Bid Item No. 4 is included in the SOP as an allowance.” directly

after Section 4.2 G.

[Pages 1 thru 5]

REVISE: Revise date in footer to July 6, 2018.

Page 5: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER ADDENDUM NO. 01

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 5

JULY 6, 2018

15. SECTION 31 23 10 TRENCH EXCAVATION AND BACKFILL

31 23 10-2

REVISE: 1.6. A. to read as follows: “The Contractor’s attention is directed to the possible existence of

pipe and other underground improvements which may or may not be shown on the Drawings. Preserve

and protect any such existing utilities whether shown on the Drawings or not. Expose such improvements

in advance of the pipeline construction to allow for changes in the alignment as necessary. Where it is

necessary to remove and replace or to relocate such improvements in order to prosecute the work, they

shall be removed, maintained, and permanently replaced by the Contractor as directed by DC Water in

writing, and shall be paid for under Bid Allowance (Item #4) as listed in the Schedule of Prices in Section

00 40 10 and as specified in Section 01 21 00.”

31 23 10-14

ADD: By inserting the following Section 4.02. B, “B. Where contingent items are needed, these will be

paid for by the Bid Allowance (Item #4) as listed in the Schedule of Prices in Section 0 40 10 and as

specified in Section 01 21 00.”

[Pages 1 thru 14]

REVISE: Revise date in footer to July 6, 2018.

16. SECTION 32 17 23 PAVEMENT MARKINGS

32 17 23-1

REVISE: Section 1.1. A. to read as follows: “This Work shall consist of establishing the location of

pavement markings and the application of pavement marking paint and reflectorized material on specified

pavements and the eradication of existing pavement marking, as shown on the Drawings and as necessary

to provide for the safe direction of the traveling public, in accordance with these specifications and as

directed by the Authority. Where shown on the Drawings, a double line consisting of two normal width

lines (2 inches to 4 inches wide) separated by a discernable space shall be applied longitudinally to the

centerline of the roadway to delineate the separation between travel paths in opposite directions. These

lines shall be of No. 45 solid yellow traffic zone paint, reflectorized fast drying, in accordance with

Subsection 2.1 D. Glass beads shall be applied.”

17. SECTION: 33 05 02 DUCTILE IRON PIPE

33 05 02-3

REVISE: Section 2.1. A. 1. to read as follows: “Pipe shall be ductile-iron meeting the requirements of

AWWA C151 with mechanical, push-on, or flanged joints. Buried pipe shall be asphaltic coated outside

and cement lined with double thickness and seal coated in accordance with AWWA C104. Exposed

interior pipe shall be prime coated at the factory and finish coated in the field in accordance with Section

09 91 13. Pipe shall be furnished in lengths of 18 to 20 feet and shall include all joining materials.”

33 05 02-4

REVISE: Section 2.1. B. 1. to read as follows: “Mechanical, push-on, and flanged joints for ductile iron

pipe and fittings shall be per AWWA C111.”

REVISE: Section 2.1. B. 2. to read as follows:

“2. Coatings for Fittings:

a. For buried fittings, provide exterior asphaltic coating per AWWA C110 and interior

cement mortar lining with seal coating per AWWA C104.

Page 6: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER ADDENDUM NO. 01

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 6

JULY 6, 2018

b. For exposed interior fittings, provide interior cement mortar lining with seal coating per

AWWA C104, factory prime coat, and finish coating in the field in accordance with

Section 09 91 13.”

REVISE: Section 2.1. B. 3. to read as follows: “All fittings shall be complete with all joint accessories,

rubber gaskets, bolts, and nuts. Flange bolts and nuts shall be heavy hex 316 stainless steel per ASTM

A193, Grade B8M, Class 2. Flange gaskets shall be 1/8-inch thick synthetic rubber specifically designed

for use with ductile iron pipe and fittings.”

[Pages 1 thru 16]

REVISE: Revise date in footer to July 6, 2018.

18. SECTION: 40 61 13 PROCESS CONTROL SYSTEM GENERAL PROVISIONS

[Pages 1 thru 8]

REPLACE: By removing the existing section in its entirety and inserting the new attached Section 40 61 13

titled, “Process Control System General Provisions” to the Project Manual.

19. SECTION: 40 67 00 CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

[Pages 1 thru 6]

REPLACE: By removing the existing section in its entirety and inserting the new attached Section 40 67 00

titled, “Control System Equipment Panels and Racks” to the Project Manual.

20. SECTION: 40 95 23 REMOTE INPUT-OUTPUT CABINET

[Pages 1 thru 8]

REPLACE: By removing the existing section titled, “Process Control Input/Output Modules” in its entirety

and inserting the new attached Section 40 95 23 titled, “Remote Input-Output Cabinet” to the Project

Manual.

21. APPENDIX D ALLOWANCES

ADD: By inserting Appendix D - Emerson Process Management Power & Water Solutions, Inc after

Appendix C.

22. GENERAL DRAWING G11 STANDARD CIVIL DETAILS III

REVISE: Note 3 on 2G-11 to read as follows: “If excavation to a depth greater than 4.5 feet is

required, excavation support sheeting may be ordered or trench shields utilized at contractors

option. Costs under this option shall be part of the price for excavation.”

23. PART 1 DRAWING C-2 SITE RUNOFF PUMP STATIONS 10 & 11 LEGEND-GENERAL NOTES

REVISE: Note 8 under General Notes to read as follows: “Jet wash all drainage structures and

piping within the limits of work after completion of all work.”

Page 7: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER ADDENDUM NO. 01

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 90 01 - 7

JULY 6, 2018

24. PART 1 DRAWING C-5 AERATION ROAD ENLARAGED PLAN AND PIPING PROFILE

ADD: By inserting the following Coded Note 11: “Connection to Secondary Reactor shall be made

during conditions where the water surface elevation in the Secondary Reactor is at or below EL

9.0.”

25. PART 2 DRAWING C-5 SOLIDS ROAD PARTIAL PLAN I – MODIFIED

ADD: By inserting the following Coded Note 15: “Damaged Concrete/Exposed Rebar area shown

on this Drawing requires a concrete patch of approximately 5 ft x 5 ft on the concrete surface.”

26. PART 2 DRAWING C-8 SOLIDS ROAD PARTIAL PLANS, SECTIONS AND DETAILS

ADD: By inserting the following Note 4: “Stainless steel pipe shall be Type 304L stainless steel, minimum Schedule 10 wall thickness, as manufactured by Felker Brothers, Douglas Brothers or equal.”

~ END OF ADDENDUM NO. 01 ~

Page 8: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

SCHEDULE OF PRICES

INVITATION NO. 150150

PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS

DC WATER SCHEDULE OF PRICES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 40 10 -1

JULY 6, 2018 ADDENDUM #1

Item

No. ITEM DESCRIPTION

Estimated

Quantity Unit

Unit Price Extension Amount

Dollars Cents Dollars Cents

1. Mobilization and Demobilization 1 LS 100,000 00 100,000 00

2.

Completion of all work required by the plans and

specifications while complying with all

requirements, except as otherwise itemized in this

Schedule of Prices

1 LS

3.

LUMP PRICE ALLOWANCE

Emerson Process Management Power and Water

Solutions (EPM or Emerson) for work required to

be completed by Emerson per:

01 21 00 – Allowances

40 95 23 – Remote Input-Output Cabinet

1 AL ALLOWANCE 58,180 00

4.

BID ALLOWANCE

Additional work that is deemed “Necessary and

Prudent” as defined and approved by the Chief

Engineer (Per Section 01 21 00).

(Contingent Item)

1 AL ALLOWANCE 130,000 00

TOTAL AMOUNT BID ( ITEMS NO. 1 THROUGH 4 )

Numeral Format:

$ ___________________________________________

Written Format:

________________________________________________________________________________ Dollars

_____________________________________ Cents

Page 9: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER SCHEDULE OF PRICES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 40 10 -2

MAY 1, 2014 ADDENDUM #1

THIS PAGE IS INTENTIONALLY LEFT BLANK

Page 10: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER BID DOCUMENT CHECKLIST IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 40 25 - 1 JULY 6, 2018 ADDENDUM # 1

SECTION 00 40 25

BID DOCUMENT CHECKLIST

NOTE: SUBMIT BID DOCUMENT CHECKLIST WITH BIDDING DOCUMENTS.

SUBMISSION REQUIREMENT ITEMS

SUBMITTED

(BIDDER’S

INITIALS)

SECTION

NUMBER DOCUMENT TITLE

00 40 00 BID FORM

00 40 10 SCHEDULES OF PRICES

00 40 20 BID BOND

00 40 21 DBE OUTREACH CERTIFICATION

00 40 22 DC WATER GOOD FAITH EFFORTS CHECKLIST

00 40 25 BID DOCUMENT CHECKLIST

00 40 30 CONTRACTOR’S QUALIFICATION STATEMENT, notarized, separate package

00 45 01 CONTRACTOR IDENTIFICATION NUMBER

00 45 02 WELLS FARGO FORM 1W

00 45 03 NON-COLLUSION AFFIDAVIT

00 45 04 DC WATER CERTIFICATION REGARDING A DRUG FREE WORKPLACE

00 45 08 DC WATER CONTRACTOR’S INTENT TO SUBCONTRACT

MBE OR WBE

00 45 09 DC WATER WBE – MBE INTENT TO SUBCONTRACT

00 45 13 PAYMENT TO SUBCONTRACTORS AND SUPPLIERS CERTIFICATE

0045 15 CERTIFICATION REGARDING DEBARMENT SUSPENSION INELIGIBILITY &

VOLUNTARY EXCLUSION LOWER TIER COVERED TRANSACTION

00 45 16 EPA CERT. REGARDING DEBARMENT, SUSPENSION

& RESPONSIBILITY MATTERS

00 45 17 ASSURANCE OF COMPLIANCE W/EEO GOALS

00 45 18 EEO & NON-SEGREGATED FACILITIES CERTIFICATE

00 45 19 DISCLOSURE OF LOBBYING ACTIVITIES

00 45 20 DC WATER WORKS EMPLOYMENT PROGRAM DISCLOSURE

STATEMENT

00 45 23 *****SUBCONTRACTING APPROVAL REQUEST (Dept. of Engineering)

00 45 25 D.C. TAX CERTIFICATION AFFIDAVIT

00 45 26 EPA CERTIFICATION REGARDING LOBBYING

00 45 30 DBE SUBCONTRACTOR PERFORMANCE FORM

00 45 31 DBE SUBCONTRACTOR UTILIZATION FORM

Page 11: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER BID DOCUMENT CHECKLIST IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 40 25 - 2 JULY 6, 2018 ADDENDUM # 1

SUBMISSION REQUIREMENT ITEMS

SUBMITTED

(BIDDER’S

INITIALS)

SECTION

NUMBER DOCUMENT TITLE

*CLASS “A” BUSINESS LICENSE

**BIDDER’S QUALIFICATION AND FINANCING INFORMATION

***CERTIFIED FINANCIAL STATEMENT (separate package)

**** MBE & WBE OUTREACH PLAN

APPENDICES

FR-W-9 REQUEST FOR TAXPAYER ID. NUMBER & CERTIFICATION

FR-500 COMBINED BUSINESS TAX REGISTRATION APPLICATION

MBE/WBE OUTREACH

GOOD FAITH EFFORT BID SUBMITTAL CHECKLIST

RESPONSES FROM CORRESPONDENCE OUTREACH

CALL LOG

ADS IN WASHINGTON POST, MINORITY NEWSPAPERS

WEBSITE POSTINGS, I.E., SMALL BUSINESS ADMINISTRATION (SBA)

AND THE MINORITY BUSINESS DEVELOPMENT AGENCY OF THE

DEPARTMENT OF COMMERCE

BLUEBOOK PROJECT REPORT

MBE/WBE SUMMARY TO INCLUDE PERCENTAGES

CURRENT MBE/WBE CERTIFICATIONS OF SELECTIONS

* Class “A” Business License: See Section 00 20 00 Instruction to Bidders, Article 18 “Class “A” Business

License”.

*** Certified Financial Statement: See Section 00 20 00 Instruction to Bidders, Article 13 “Bidder’s

Qualification and Financing Documentation”, Paragraph 13.3

**** MBE & WBE Outreach Plan: See Section 00 20 00 Instruction to Bidders, Article 31 “Subcontracting

Goals (MBE & WBE)” (Water & Sewer Projects), Paragraph 31.3

***** Subcontracting Approval Request Subcontractor information is required to be submitted with the bid for

MBE/WBE firms only. The balance of subcontractor approval requests can be submitted after the bid

submission in accordance with typical DC Water procedures and specifications.

THE UNDERSIGNED BIDDER HEREWITH SUBMITS THE ABOVE REQUIRED DOCUMENTS.

THIS CHECKLIST SHALL BE INITIALED AND SIGNED WHERE INDICATED AND RETURNED

WITH THE BID PROPOSAL

~ END OF SECTION 00 40 25 ~

PRINT

NAME OF

BIDDER:

______________________________________________________________

SIGNED BY:

______________________________________________________________

PRINT

NAME AND

TITLE:

______________________________________________________________

DATE:

______________________________________________________________

Page 12: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 1

JULY 6, 2018 ADDENDUM #1

SECTION 00 76 00

LABOR PROVISIONS

Attached is the Davis Bacon General Wage Decision Number DC180001 dated 07/06/2018 consisting of

13 pages.

Page 13: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 2

JULY 6, 2018 ADDENDUM #1

General Decision Number: DC180001 07/06/2018 DC1

Superseded General Decision Number: DC20170001

State: District of Columbia

Construction Types: Heavy (Heavy and Sewer and Water Line)

and Highway

County: District of Columbia Statewide.

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines);

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage

of $10.35 for calendar year 2018 applies to all contracts

subject to the Davis-Bacon Act for which the contract is

awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor

must pay all workers in any classification listed on this wage

determination at least $10.35 per hour (or the applicable wage

rate listed on this wage determination, if it is higher) for

all hours spent performing on the contract in calendar year

2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types

of contracts entered into by the federal government that are

subject to the Davis-Bacon Act itself, but it does not apply to

contracts subject only to the Davis-Bacon Related Acts,

including those set forth at 29 CFR 5.1(a)(2)-(60). Additional

information on contractor requirements and worker protections

under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2018

1 02/09/2018

2 03/23/2018

3 04/20/2018

4 05/04/2018

5 05/11/2018

6 06/29/2018

7 07/06/2018

ASBE0024-001 10/01/2017

Rates Fringes

Asbestos Worker/Heat and

Frost Insulator

Includes the application

of all insulating

materials, protective

coverings, coatings and

finishes to all types of

mechanical systems..........$ 35.13 16.22

----------------------------------------------------------------

Page 14: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 3

JULY 6, 2018 ADDENDUM #1

ASBE0024-002 10/01/2017

Rates Fringes

HAZARDOUS MATERIAL HANDLER

Includes preparation,

wetting, stripping,

removal, scrapping,

vacuuming, bagging and

disposing of all

insulation materials,

whether they contain

asbestos or not, from

mechanical systems..........$ 22.81 7.34

----------------------------------------------------------------

ASBE0024-005 10/01/2017

Rates Fringes

Fire Stop Technician.............$ 28.01 7.78

Includes the application of materials or devices within or

around penetrations and openings in all rated wall or floor

assemblies, in order to prevent the pasage of fire, smoke

of other gases. The application includes all components

involved in creating the rated barrier at perimeter slab

edges and exterior cavities, the head of gypsum board or

concrete walls, joints between rated wall or floor

components, sealing of penetrating items and blank openings.

----------------------------------------------------------------

BOIL0193-001 01/01/2017

Rates Fringes

Boilermakers:....................$ 40.47 22.97

----------------------------------------------------------------

BRDC0001-001 04/29/2018

Rates Fringes

Bricklayer......................$ 31.36 10.78

----------------------------------------------------------------

BRMD0001-004 04/29/2018

Rates Fringes

BRICKLAYER

Refractory (Firebrick)......$ 38.82 11.35

----------------------------------------------------------------

CARP0177-001 05/01/2017

Rates Fringes

Carpenter/Lather.................$ 28.36 11.53

----------------------------------------------------------------

CARP0179-004 05/01/2018

Page 15: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 4

JULY 6, 2018 ADDENDUM #1

Rates Fringes

DIVER TENDER.....................$ 32.41 10.95

DIVER............................$ 42.59 10.95

----------------------------------------------------------------

CARP0219-001 05/01/2018

Rates Fringes

MILLWRIGHT.......................$ 34.24 11.23

----------------------------------------------------------------

* CARP0441-001 05/01/2018

Rates Fringes

PILEDRIVERMAN....................$ 30.94 11.45

----------------------------------------------------------------

ELEC0026-001 11/06/2017

Rates Fringes

Electricians.....................$ 45.15 17.15

----------------------------------------------------------------

* ELEC0070-001 05/07/2018

Rates Fringes

Line Construction:

Cable Splicers..............$ 38.63 19%+5.75

Equipment Operators.........$ 38.63 19%+5.75

Groundmen...................$ 17.97 19%+5.75

Linemen.....................$ 38.63 19%+5.75

Truck Driver................$ 20.43 19%+5.75

----------------------------------------------------------------

ENGI0077-001 05/01/2017

Rates Fringes

Power equipment operators:

(HEAVY AND HIGHWAY

CONSTRUCTION)

GROUP 1.....................$ 38.09 8.95+a

GROUP 2.....................$ 36.24 8.95+a

GROUP 3.....................$ 34.07 8.95+a

GROUP 4.....................$ 30.56 8.95+a

GROUP 5.....................$ 26.39 8.95+a

GROUP 6.....................$ 24.24 8.95+a

GROUP 7.....................$ 39.21 8.95+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Tower Cranes and Cranes 100 ton and over.

GROUP 2: 35 ton cranes & above, derricks, concrete boom pump,

drill rigs (+50,000 lbs torque), mole.

GROUP 3: Cranes, hoists, drill rigs (under 50,000 lbs

torque), tie back machines, paving mixers, tunnel shovels,

Page 16: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 5

JULY 6, 2018 ADDENDUM #1

batch plants, shields, tunnel mining machines, draglines,

mucking machines, graders in tunnels, pile driving engines,

welder, horizontal directional drill operator, Tug boats.

GROUP 4: Front end loaders, boom trucks, backhoes,

excavators, gradalls, power driven wheel scoops & scrapers,

blade graders, motor graders, bulldozers, trenching

machines, ballast regulator,hoe ram, locomotive (standard,

narrow gauge, tuggers).

GROUP 5: Boilers (skelton), asphalt spreaders, bullfloat

finishing machines, concrete finishing machines, concrete

spreaders,concrete mixer, concrete pump, well points,

hydraulic pumps, elevators, freeze uniits, tunnel motorman

or dinky operator, conveyors, grout pump, fireman, ultra

high pressure water jet cutting tool system

operator/mechanic, horizontal directional drill locator,

skid steers (fine grading), High lifts (lull type lifts).

GROUP 6: Fork lifts, ditch witch, bobcat, skid steer, space

heaters, sweepers, assistant engineers, oilers, service

unit equipment, roller.

GROUP 7: Master mechanic.

a. PAID HOLIDAYS: New Years Day, Inaugural Day, Decoration

Day, Independence Day, Labor Day, Martin Luther King's

Birthday, Veterans' Day, Thanksgiving Day, Friday after

Thanksgiving and Christmas Day.

----------------------------------------------------------------

ENGI0077-002 06/01/2016

Rates Fringes

Power equipment operators:

(PAVING AND INCIDENTAL

GRADING)

GROUP 1.....................$ 29.79 7.55

GROUP 2.....................$ 26.55 7.55

GROUP 3.....................$ 22.84 7.55

GROUP 4.....................$ 20.55 7.55

GROUP 5.....................$ 30.50 7.35

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Gradall operator, Crane.

GROUP 2: Boom Truck, Milling Machine, Excavator, Rubber Tire

Backhoe, Asphalt Paver, Asphalt Plant Engineer, Motor

Grader, Track Loader, Rubber Tire Loader, Track Dozer,

Concrete Paver.

GROUP 3: Broom Truck, Asphalt Roller.

GROUP 4: Air Compressor, Grade Rollers.

GROUP 5: Mechanic.

----------------------------------------------------------------

* ENGI0077-003 07/01/2018

Page 17: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 6

JULY 6, 2018 ADDENDUM #1

Rates Fringes

Power equipment operators:

(SEWER, GAS AND WATER LINE

CONSTRUCTION)

GROUP 1.....................$ 33.67 7.85+a

GROUP 2.....................$ 27.72 7.85+a

GROUP 3.....................$ 27.29 7.85+a

GROUP 4.....................$ 25.65 7.85+a

GROUP 5.....................$ 21.51 7.85+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1:Cranes 50 ton and above.

GROUP 2:Gradall, Lead Mechanic, Crane under 50 ton

capacity.

GROUP 3:Boom Trucks, Excavators, Backhoes, Front-End Loaders,

Fork Lift/Lull, Bulldozers, Motor Graders, Mechanic 1,

Hydraulic Tamper and Hoe Pack, Paving Mixers, Pile Driving

Engines, Batch Plant, Concrete Pumps, Low-Boy Driver, Lube

Truck.

GROUP 4.Knuckle Boom, Trenching Machine, Well Drilling

Machines, Concrete Mixers, Assistant Mechanic, Mini

Excavator under 10,000 lbs. gross weight.

GROUP 5:Oiler, Dump Truck, Skid Steer/Bobcat, Rollers.

a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Washington's

Birthday, Memorial Day, Independence Day, Labor Day,

Thanksgiving Day, day after Thanksgiving Day and Christmas

Day

----------------------------------------------------------------

IRON0005-011 06/01/2017

Rates Fringes

IRONWORKER.......................$ 31.15 20.63

----------------------------------------------------------------

LABO0011-003 06/01/2017

Rates Fringes

Laborers: (HEAVY AND HIGHWAY

AND SEWER & WATER LINES

CONSTRUCTION)

GROUP 1.....................$ 24.51 8.04

GROUP 2.....................$ 25.14 8.04

GROUP 3.....................$ 25.14 8.04

GROUP 4.....................$ 25.34 8.04

GROUP 5.....................$ 25.89 8.04

GROUP 6.....................$ 26.60 8.04

GROUP 7.....................$ 27.28 8.04

GROUP 8.....................$ 28.19 8.04

LABORERS CLASSIFICATIONS:

Page 18: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 7

JULY 6, 2018 ADDENDUM #1

GROUP 1: Carloaders, choker setter, concrete crewman, crushed

feeder, demolition laborers, including salvaging all material,

loading, cleaning up, wrecking, dumpmen, flagmen, fence

erector and installer (other than chain link), including

installation and erection of fence, guard rails, medial rails,

reference posts, guide posts and right-of-way markers, form

strippers, general laborers, railroad track laborers, riprap

man, scale man, stake jumper, structure mover, includes

foundation, separation, preparation, cribbing, shoring,

jacking and unloading of structures, water nozzleman, timber

bucker and faller, truck loader, water boys, tool room men.

GROUP 2: Combined air and water nozzleman, cement handler,

dope pot fireman (nonmechanical), form cleaning machine,

mechanical railroad equipment (includes spiker, puller, tile

cleaner, tamper, pipe wrapper, power driven wheelbarrows,

operators of hand derricks, towmasters, scootcretes,

buggymobiles and similar equipment), tamper or rammer

operator, trestle scaffold builders over one tier high, power

tool operator (gas, electric or pneumatic), sandblast or

gunnite tailhose man, scaffold erector, (steel or wood),

vibrator operator (up to 4 feet), asphalt cutter, mortar men,

shorer and lagger, creosote material handler, corrosive enamel

or equl, paver breaker and jackhammer operators.

GROUP 3: Multi-section pipe layer, non-metallic clay and

concrete pipe layer (including caulker, collarman, jointer,

rigger and jacker, thermal welder and corrugated metal culvert

pipe layer.

GROUP 4: Asphalt block pneumatic cutter, asphalt roller,

walker, chainsaw operator with attachment, concrete saw

(walking), high scalers, jackhammer operator (using over 6

feet of steel), vibrator operator (4 feet and over), well

point installer, air trac operator.

GROUP 5: Asphalt screeder, big drills, cut of the hole drills

(1 1/2 " piston or larger), down the hole drills (3 1/2"

piston or larger) gunnite or sandblaster nozzleman, asphalt

raker, asphalt tamper, form setter, demolition torch operator,

shotcrete nozzlemen and potman.

GROUP 6: Powderman, master form setters.

GROUP 7: Brick paver (asphalt block paver, asphalt block

sawman, asphalt block grinder, hastings block or similar type)

GROUP 8: Licensed powdermen.

----------------------------------------------------------------

LABO0011-004 06/01/2017

Rates Fringes

Laborers: (HAZARDOUS WASTE

REMOVAL, EXCEPT ON MECHANICAL

SYSTEMS:

Preparation for, removing and

Page 19: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 8

JULY 6, 2018 ADDENDUM #1

encapsulation of hazardous

materials from non-mechanical

systems)

Skilled Asbestos Abatement

Laborers....................$ 20.92 8.04

Skilled Toxic and

Hazardous Waste Removal

Laborers....................$ 23.73 8.04

----------------------------------------------------------------

LABO0011-005 06/01/2017

Rates Fringes

Laborers: (TUNNEL, RAISE &

SHAFT (FREE AIR)

FOR HEAVY AND SEWER & WATER

LINES CONSTRUCTION)

GROUP 1.....................$ 25.42 8.04

GROUP 2.....................$ 26.25 8.04

GROUP 3.....................$ 28.33 8.04

GROUP 4.....................$ 29.22 8.04

LABORERS CLASSIFICATIONS:

GROUP 1: Brakeman, Bull Gang, Dumper, Trackmen, Concrete Man.

GROUP 2: Chuck Tender, Powdermen in Prime House, Form Setters

and Movers, Nippers, Cableman, Houseman, Groutman, Bell or

Signalman, Top or Bottom Vibrator Operator.

GROUP 3: Miners, Re-Bar Underground, Concrete or Gunnite

Nozzlemen, Powdermen, Timbermen and Re-Timbermen, Wood Steel

Including Liner plate or Other Support, Material Motorman,

Caulkers, Diamond Drill Operators, Riggers, Cement Finishers-

Underground, Welders and Burners, Shield Driver, Air Trac

Operator, Shotcrete Nozzlemen and Potman.

GROUP 4: Mucking Machine Operator (Air).

----------------------------------------------------------------

LABO0011-006 06/01/2017

Rates Fringes

Laborers: (TUNNEL, RAISE AND

SHAFT (COMPRESSED AIR) FOR

HEAVY CONSTRUCTION ONLY

Gauge Pressure Work Period

(Pounds) (Hours)

1-14 7...........$ 34.10 8.04

14-18 6...........$ 40.12 8.04

FOOTNOTE: On any requirement for air pressure in excess of 18

PSI, work periods and rates should be negotiated at a

pre-bid conference.

----------------------------------------------------------------

LABO0011-007 09/01/2017

Page 20: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 9

JULY 6, 2018 ADDENDUM #1

Rates Fringes

Laborers: (PAVING AND

INCIDENTAL GRADING)

Asphalt Raker & Concrete

Saw Operator................$ 20.05 7.01

Asphalt Shoveler............$ 19.20 7.01

Asphalt Tamper & Concrete

Shoveler....................$ 19.68 7.01

Jack Hammer.................$ 19.71 7.01

Laborer.....................$ 19.03 7.01

Sand Setter & Form Setter...$ 20.75 7.01

----------------------------------------------------------------

LABO0011-008 06/01/2017

Rates Fringes

LABORERS (BRICK MASONRY WORK)

Mason Tenders...............$ 17.00 8.04

Scaffold Builders,

Mortarmen...................$ 18.04 8.04

----------------------------------------------------------------

MARB0002-003 04/29/2018

Rates Fringes

Marble & Stone Mason

Includes Pointing,

Caulking and Cleaning of

All Types of Masonry,

Brick, Stone and Cement

Structures..................$ 37.91 17.08

----------------------------------------------------------------

MARB0003-001 04/29/2018

Rates Fringes

Mosaic & Terrazzo Worker,

Tile Layer.......................$ 28.20 11.67

----------------------------------------------------------------

MARB0003-004 04/29/2018

Rates Fringes

Marble, Tile & Terrazzo

Finisher.........................$ 23.28 10.72

----------------------------------------------------------------

PAIN0051-001 06/01/2017

Rates Fringes

Painters:

All Industrial Work.........$ 30.90 10.49

Bridges, Heavy Highway,

Lead Abatement and

Flame/Thermal Spray.........$ 36.13 11.29

Commercial and Mold

Remediation, Painters,

Page 21: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 10

JULY 6, 2018 ADDENDUM #1

Wallcovers and Drywall

Finishers...................$ 25.06 9.66

Metal Polishing and

Refinishing.................$ 26.06 9.66

----------------------------------------------------------------

PLAS0891-001 02/01/2018

Rates Fringes

Cement Masons:

HEAVY CONSTRUCTION ONLY.....$ 28.15 10.58

----------------------------------------------------------------

PLAS0891-002 06/01/2017

Rates Fringes

Cement Masons: (PAVING &

INCIDENTAL GRADING)

Cement Masons...............$ 20.10 7.38

Concrete Saw Operators......$ 20.10 7.38

Form Setters................$ 20.10 7.38

----------------------------------------------------------------

PLUM0005-001 02/01/2018

Rates Fringes

Plumbers.........................$ 41.67 17.60+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving

Day and the day after Thanksgiving, Christmas Day, New

Year's Day, Martin Luther King's Birthday, Memorial Day and

the Fourth of July.

----------------------------------------------------------------

PLUM0602-005 08/01/2017

Rates Fringes

Steamfitter, Refrigeration &

Air Conditioning Mechanic........$ 40.69 21.07+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's

Birthday, Memorial Day, Independence Day, Labor Day,

Veterans Day, Thanksgiving Day and the day after

Thanksgiving and Christmas Day.

----------------------------------------------------------------

SHEE0100-001 03/01/2018

Rates Fringes

Sheet Metal Worker...............$ 40.27 18.87+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's

Birthday, Memorial Day, Independence Day, Labor Day,

Veterans Day, Thanksgiving Day and Christmas Day

----------------------------------------------------------------

Page 22: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 11

JULY 6, 2018 ADDENDUM #1

TEAM0639-001 06/01/2017

Rates Fringes

Truck drivers: (HEAVY &

HIGHWAY CONSTRUCTION)

Tractor trailer, Low Boy....$ 24.25 2.52+a

Truck Drivers...............$ 22.25 2.52+a

a. VACATION: Employees will receive one (1) week's paid

vacation after one (1) year of service.

----------------------------------------------------------------

TEAM0639-005 06/01/2017

Rates Fringes

Truck drivers: (PAVING &

INCIDENTAL GRADING)

All paving projects where

the grading is incidental

to the paving...............$ 22.25 2.52+a

a. VACATION: Employees will receive one (1) week's paid

vacation after one (1) year of service.

----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing

operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave

for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any

solicitation was issued) on or after January 1, 2017. If this

contract is covered by the EO, the contractor must provide

employees with 1 hour of paid sick leave for every 30 hours

they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their

own illness, injury or other health-related needs, including

preventive care; to assist a family member (or person who is

like family to the employee) who is ill, injured, or has other

health-related needs, including preventive care; or for reasons

resulting from, or to assist a family member (or person who is

like family to the employee) who is a victim of, domestic

violence, sexual assault, or stalking. Additional information

on contractor requirements and worker protections under the EO

is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within

the scope of the classifications listed may be added after

award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

----------------------------------------------------------------

Page 23: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 12

JULY 6, 2018 ADDENDUM #1

The body of each wage determination lists the classification

and wage rates that have been found to be prevailing for the

cited type(s) of construction in the area covered by the wage

determination. The classifications are listed in alphabetical

order of "identifiers" that indicate whether the particular

rate is a union rate (current union negotiated rate for local),

a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed

in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were

prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of

the union which prevailed in the survey for this

classification, which in this example would be Plumbers. 0198

indicates the local union number or district council number

where applicable, i.e., Plumbers Local 0198. The next number,

005 in the example, is an internal number used in processing

the wage determination. 07/01/2014 is the effective date of the

most current negotiated rate, which in this example is July 1,

2014.

Union prevailing wage rates are updated to reflect all rate

changes in the collective bargaining agreement (CBA) governing

this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that

no one rate prevailed for this classification in the survey and

the published rate is derived by computing a weighted average

rate based on all the rates reported in the survey for that

classification. As this weighted average rate includes all

rates reported in the survey, it may include both union and

non-union rates. Example: SULA2012-007 5/13/2014. SU indicates

the rates are survey rates based on a weighted average

calculation of rates and are not majority rates. LA indicates

the State of Louisiana. 2012 is the year of survey on which

these classifications and rates are based. The next number, 007

in the example, is an internal number used in producing the

wage determination. 5/13/2014 indicates the survey completion

date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a

new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate

that no single majority rate prevailed for those

classifications; however, 100% of the data reported for the

classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union

Page 24: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 13

JULY 6, 2018 ADDENDUM #1

average rate. OH indicates the state. The next number, 0010 in

the example, is an internal number used in producing the wage

determination. 08/29/2014 indicates the survey completion date

for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of

each year, to reflect a weighted average of the current

negotiated/CBA rate of the union locals from which the rate is

based.

----------------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can

be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests

for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted

because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal

process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an

interested party (those affected by the action) can request

review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the

interested party's position and by any information (wage

payment data, project description, area practice material,

etc.) that the requestor considers relevant to the issue.

Page 25: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER WAGE RATES

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 00 76 00 - 14

JULY 6, 2018 ADDENDUM #1

3.) If the decision of the Administrator is not favorable, an

interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

================================================================

END OF GENERAL DECISION

Page 26: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,
Page 27: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-1

JULY 6, 2018 ADDENDUM #1

SECTION 40 61 13

PROCESS CONTROL SYSTEM GENERAL PROVISIONS

PART 1 GENERAL

1.1 SUMMARY

A. Work specified in this Section includes but is not limited to the following:

1. Two Storm Runoff Pump Stations are being provided under this contract, SRPS-10

located on Aeration Road and SRPS-11 located on Perimeter Road. This Section

contains equipment, submittal, testing and quality requirements in addition to those

listed in Section 43 26 13 - Submersible Non-Clog Pumps.

2. The Contractor shall provide, through the pump supplier as specified in Section 43

26 13 and, through Emerson Process Management (EPM) as specified in Section 40

95 23, a complete, integrated monitoring and control system consisting of control

panels, instrumentation, as well as all required ancillary services specified in Division

40 and as shown on the contract drawings.

3. The Emerson Scope of Work has been pre-selected and negotiated with the

Authority, and is included in the allowances in the Schedule of Prices.

4. The General Contractor shall furnish and provide all other equipment, appurtenances,

services and all other expenses associated with Work described in this Section but

not included in the Emerson Scope of Work and Price.

5. Include all materials, labor, tools, fees, charges and documentation required to

furnish, install, test and place in operation a complete and operable instrumentation

and control system as shown and/or specified.

This Specification Section includes the provision of various equipment and services to be provided by Emerson

Process Management Power and Water Solutions (EPM or Emerson). Such equipment and services, as detailed in

Section 40 95 23, shall be provided as a part of the Plant-wide Stormwater Drainage Improvements (PWDI) work

scope under a subcontract agreement with the PWDI Contractor. Emerson’s fixed price amounts of this

subcontract agreement are indicated in the PWDI Bidder’s Schedule of Prices as a line-item “Lump Price

Allowance”. The Emerson Scope of Work to be provided is included as Appendix D. (The Emerson Scope of

Work and Price reflects all changes and additions made by this addendum.)

The Emerson Scope also may include specific terms and conditions which may differ from those applied to the

PWDI Contract. Such terms and conditions have been accepted by the Authority and are not subject to further

negotiation or adjustment by the PWDI Contractor.

The Emerson Work Scope is selective. This Specification Section also includes the provision of certain related

equipment and services which are to be provided by the PWDI Contractor. Thus, PWDI bidders shall include in

their bidding, all of those installation services, materials, equipment appurtenances, bonds, insurance and any

required equipment or services not included in the Emerson Work Scope and price. In the case where there is a

difference between the Emerson Scope of Work in Appendix D and the requirements in the Specifications

Section, the Contractor is required to supply and install.

Page 28: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-2

JULY 6, 2018 ADDENDUM #1

6. Include all measuring elements, signal converters, transmitters, local control panels,

interconnecting wiring and such accessories as shown, specified, and/or required to

provide the functions indicated.

7. Coordinate with the pump supplier and DC Water to perform loop testing on all new

signals.

8. The DC Water Blue Plains Advanced Wastewater Treatment Plant is an existing

facility and has an existing operational Process Control System (PCS), comprised

of an Emerson Process Management Ovation Distributed Control System (DCS).

Provide a hardwired interface to the PCS to allow DC Water to monitor these

pump stations at the PCS. Coordinate all work with DC Water to minimize

interruptions in its daily operations.

9. Provide wiring from the proposed new pump control panels to existing and new

interface terminal cabinets (ITCs) and new and existing remote I/O panels near the

new pump stations as indicated on the Drawings. For SRPS-10, this project will use

existing spare I/O to accommodate the new inputs in the corresponding existing

DCU. For SRPS-11, EPM shall provide a new remote I/O cabinet and associated

hardware required to accommodate these inputs in the corresponding existing DCU.

10. Surge protection devices shall be furnished for all signals included under this

contract. Surge protection devices shall be furnished under Division 26 and installed

in the new and existing ITCs under Division 26.

11. DC Water will incorporate the two new pump stations into the plant’s existing

PCS, including modification to existing database and graphic display screens.

12. For SRPS 11, Contractor shall install the remote I/O cabinet provided by EPM

including concrete pad to match level of adjacent cabinet.

13. Provide and coordinate all equipment necessary to monitor all equipment provided

under this contract. Auxiliary devices such as transducers, relays, necessary to

interface with equipment provided under other sections shall be included.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specifications Sections, apply to this Section.

B. Specifications throughout all Divisions of the Project Manual are directly applicable to

this Section, and this Section is directly applicable to them.

1.3 RELATED SECTIONS

A. Section 01 33 00: Submittals

B. Section 01 75 00: Operational Demonstration

C. Section 01 75 20: Service Manual

D. Section 01 78 40 Record Drawings

Page 29: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-3

JULY 6, 2018 ADDENDUM #1

E. Section 01 78 42 As-built Drawings

F. Section 01 79 00: Operation & Maintenance Training

G. Section 01 91 00: Equipment System Commissioning

H. Section 40 06 70: Schedules of Instrumentation for Process Systems

I. Section 40 61 93: Process Control System Input-Output List

J. Section 40 67 00: Control System Equipment Panels and Racks

K. Section 40 70 00: Instrumentation for Process Systems

L. Section 40 95 23: Remote Input-Output Cabinet

M. Section 43 26 13: Submersible Non-Clog Pumps

1.4 REFERENCES

A. Regulations, Standards and Publications:

ISA International Society of Automation

UL Underwriters' Laboratories, Inc.

1.5 SUBMITTALS

A. General Requirements:

1. Submit for review complete Shop Drawings for all equipment in accordance with

the General Conditions and Division 1 of the Specifications. All submittal

material shall be complete, legible, and reproducible, and shall apply specifically

to this project.

B. Shop Drawings:

1. Submit the required number of detailed shop drawings for all equipment being

provided for the PCS. Submit shop drawings within 60 days of the date of Notice to

Proceed.

2. Shop drawings shall be submitted in electronic format and in 3-ring loose-leaf

binders and shall be complete, neat, orderly, and indexed. Separate shop drawing

submittals shall be made for each of the following:

a. Control panels

b. Instrumentation

3. Refer to specification sections for specific shop drawing requirements.

4. Submit a complete set of engineered drawings for the control panels. These

engineered drawings shall be created using AUTOCAD, or an equivalent CADD

System. The drawing size shall be 11"x17". These drawings shall include, but not be

limited to, the following:

Page 30: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-4

JULY 6, 2018 ADDENDUM #1

a. Control panel drawings to scale, including elevation, details, front and back

panel layout, and wiring diagrams showing terminal numbers and

interconnecting wiring. The control panel layout drawings shall include

dimensions for the location of all panel-mounted devices.

b. Loop drawings conforming to ISA-S5.4. Loop drawings shall be complete

from the pump local control panels and EPM remote I/O cabinets to field

devices.

c. Information for all exterior and interior panel mounted equipment including:

1) Bill of materials with equipment names, manufacturers complete

model numbers and locations.

2) Catalog cuts sheets, including complete part number breakdown

information.

3) Complete technical, material and environmental specifications.

4) Assembly drawings.

5) Mounting Requirements.

6) Nameplates.

7) Environmental requirements during storage and operation.

d. Submit panel wiring diagrams showing power, signal, and control wiring,

including surge protection, relays, courtesy receptacles, lighting, wire size

and color coding, etc.

C. Service Manuals

1. Submit Service Manuals for installation, operation, and maintenance of

equipment, and parts list for Division 40 equipment listed in Section 01 75 20 –

Service Manuals.

1.6 QUALITY ASSURANCE

A. All components shall be new and of the most current and proven design. All components shall

be suitable for the intended application and shall be installed and wired in strict accordance

with the manufacturer's requirements. Provide all necessary transformers, power supplies,

fusing, and grounding required to meet the manufacturer's requirements.

B. The complete system shall comply with all Federal, State, Municipal, or other authority's

laws, rules, or regulations.

C. All control panels, and their components and materials, shall bear the label of the

Underwriters’ Laboratory. All control panels shall be UL listed as a complete assembly.

D. The Contractor’s bid shall be based on providing the manufacturers specified under Division

40 for all equipment furnished.

PART 2 PRODUCTS

Page 31: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-5

JULY 6, 2018 ADDENDUM #1

Not Applicable

PART 3 EXECUTION

3.1 COORDINATION

A. The Contractor shall schedule an initial coordination meeting with DC Water to review the

scope of the project and the project schedule.

B. The Contractor shall coordinate schedule and installation/startup requirements with DC

Water, EPM and with the pump supplier to ensure that all work is completed in a timely

and efficient manner, with minimal disruption to DC Water operations.

C. The Contractor shall include in the Construction Schedule all project milestones as well as

delivery and installation dates for submittals and equipment provided by EPM under

Section 40 95 23.

D. The Contractor shall provide as a minimum two (2) one-day field trips for assistance in

checkout and startup of the SRPS local control panels using the pump supplier’s field

personnel for the purpose of testing the interface to the PCS. Each day shall consist of an 8-

hour day. Contractor shall coordinate said field trips with DC Water during construction.

3.2 TESTING

A. The Contractor shall perform factory acceptance testing, field testing and acceptance testing

of the system and demonstrate compliance with the contract documents.

B. The Contractor shall conduct a factory acceptance test for the pump control panels prior to

shipment of the equipment. The factory test shall be conducted at the supplier's facility and

shall demonstrate the control system was designed and performs in accordance with the

specifications and drawings.

C. Provide all necessary equipment and hardware required to conduct the factory test.

D. The factory acceptance test shall demonstrate the proper operation of all control logic

described in the contract documents. The factory test shall be witnessed by DC Water.

E. Field testing shall include system start-up to ensure that the system is safely placed into

operation. Primary elements shall be calibrated and tested. This shall include running tests to

prove that the system is capable of continuously, safely and reliably monitored as required by

the Contract.

F. The Contractor shall ensure that all mechanical equipment, equipment control panels, field

instrumentation, and related equipment are checked and tested for proper installation and

operation.

Page 32: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-6

JULY 6, 2018 ADDENDUM #1

G. The Contractor shall ensure that the electrical subcontractor conforms to the start-up, test and

sign-off procedures.

H. Prior to control system startup and testing, test each monitoring and control loop on an

individual basis from the primary element to the final element, including the PCS, for

continuity and for proper operation and calibration.

3.3 RECORD DRAWINGS

A. Submit the required number of record or as-built drawings for the pump control panels prior

to the delivery of any equipment to the site. Provide an as-built drawing in the control panel.

B. Following start-up and commissioning of the system, make all necessary changes to the as-

built drawings and re-submit required number of final as-built drawings. A final as-built

drawing shall also be provided in the control panel.

3.4 SYSTEM INSTALLATION, START-UP AND COMMISSIONING

A. System Installation:

1. Ensure the system is installed, tested and started up in accordance with the

specifications and the manufacturer's requirements.

2. Perform field wiring to the equipment furnished under this division under the

electrical portion of the contract unless noted otherwise on the drawings.

B. Loop Check-out:

1. Perform a loop check-out of each loop to verify that the wiring and programming

for the I/O point is correct up to the PCS-DCU/RIO cabinet. Provide loop check-

out sheets to be used for the record sign-off for each loop. DC Water will witness

loop testing. Coordinate loop check with DC Water, provide two weeks’ notice

for scheduling loop checkouts.

C. System Start-Up:

1. Start-up the control system by energizing the system equipment and testing the

operation of all hardware, software, process control logic, and all customized

software programs.

2. All start-up and testing shall be scheduled, performed in an orderly sequence, and

conducted in the presence of and to the satisfaction of DC Water.

D. System Commissioning:

1. Calibrate all instrumentation and place the complete pump station control system into

operation. The commissioning of the system shall include the overall calibration and

tuning of all control loops and sequences to provide stable control of the process.

The validity of all inputs and outputs for the system shall be checked and verified

during the system commissioning.

Page 33: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-7

JULY 6, 2018 ADDENDUM #1

3.5 FINAL ACCEPTANCE TEST

A. Following the commissioning of the pump station controls, and the issuance of the Certificate

of Substantial Completion to the Contractor by DC Water, a final acceptance test shall be

conducted in accordance with Section 01 75 00 – Operational Demonstration. This test shall

be scheduled with DC Water and shall not be started until the Contractor receives written

approval to start. During that time period, the system shall operate satisfactorily and in

compliance with the specifications. The Contractor shall promptly correct any problems that

occur during the acceptance test, within a time period of 8 hours.

3.6 TRAINING

A. During the final acceptance test, train DC Water personnel in the operational procedures of

the system. At the end of this period, the personnel shall have sufficient knowledge to operate

the system.

B. This training shall consist of four two-hour training sessions, with each session being

performed for each shift. This training shall be in addition to the training specified in other

Division 40 sections.

C. Refer to Section 01 79 00 for additional requirements.

PART 4 MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. The Process Control System General Provisions will not be measured separately for payment.

4.2 PAYMENT

A. Payment for Process Control System General Provisions shall be considered incidental and

included in the lump sum price bid for items of which it is a part.

~ END OF SECTION 40 61 13 ~

Page 34: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER PROCESS CONTROL SYSTEM GENERAL PROVISIONS

IFB # 150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 61 13-8

JULY 6, 2018 ADDENDUM #1

THIS PAGE IS INTENTIONALLY LEFT BLANK

Page 35: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 67 00 - 1

JULY 6, 2018 ADDENDUM #1

SECTION 40 67 00

CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

PART 1 GENERAL

1.1 SUMMARY

A. Furnish, test, install and place in satisfactory operation the control enclosures, with all spare

parts, accessories, and appurtenances as specified herein and as shown on the Drawings.

B. Control enclosures shall be assembled, wired, and tested. All components and all necessary

accessories such as power supplies, conditioning equipment, mounting hardware, signal input

and output terminal blocks, and plug strips that may be required to complete the system shall

be provided.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specifications Sections, apply to this Section.

B. Specifications throughout all Divisions of the Project Manual are directly applicable to

this Section, and this Section is directly applicable to them.

1.3 RELATED SECTIONS

A. Section 01 33 00: Submittals

B. Section 01 75 20: Service Manual

C. Section 01 79 00: Operation Maintenance Training

D. Section 01 91 00: Equipment System Commissioning

E. Section 40 61 13 Process Control System General Provisions

F. Section 40 61 93: Process Control System Input-Output List

G. Section 40 70 00: Instrumentation for Process Systems

H. Section 43 26 13: Submersible Non-Clog Pumps

1.4 REFERENCES

A. Regulations and Standards:

NEMA National Electrical Manufacturers Association

UL Underwriters' Laboratories

Page 36: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 67 00 - 2

JULY 6, 2018 ADDENDUM #1

1.5 SUBMITTALS

A. Shop Drawings:

1. Submit shop drawings on the panel in accordance with the requirements of the

Specifications. Shop drawings shall be complete in all respects and shall include a

complete bill of material, catalog information, descriptive literature of all

components, wiring diagrams, and panel layout drawings showing dimensions for all

devices.

2. Submit loop drawings in DC Water standard format for all signals from the

manufacturer supplied pump control panels and the Emerson PCS for use by DC

Water in configuring the PCS.

B. Service Manuals

1. Submit Service Manuals for installation, operation, and maintenance of

equipment, and parts list for Division 40 equipment listed in Section 01 75 20 –

Service Manuals.

1.6 QUALITY ASSURANCE

A. The panel components shall be of the most current and proven design. Specifications and

Drawings call attention to certain features but do not purport to cover all details entering into

the design of the panel. The components provided by the Contractor shall be compatible with

the functions required and shall form a complete working system.

B. Panels shall be UL listed as a complete assembly in accordance with UL-508.

PART 2 PRODUCTS

2.1 PANEL ENCLOSURE AND COMPONENTS

A. Pump Control Panel Enclosure:

1. The enclosure for the pump control panel shall be designed and sized in accordance

with the requirements of the Drawings and as specified herein.

2. The panel shall be Stainless Steel NEMA 4X, as manufactured by Hoffman or equal.

3. The panel components shall be properly identified with an engraved nameplate

mounted on the inside of the panel. All components not mounted on the front of the

panel shall be mounted to a subpanel. All wiring shall be installed in a neat,

workmanlike manner and shall be grouped, bundled, supported and routed

horizontally and vertically to provide a neat appearance. Provide Panduit inside the

enclosure for wire management. All wires leaving the panel shall be terminated at

the terminal strips inside the enclosure. Terminals and wires shall be identified in

accordance with the Supplier's panel wiring diagrams.

4. Provide a copper grounding plate inside the panel for terminating all ground wires.

5. Provide a plastic data pocket in the panel.

6. Provide thermostatically controlled heater suitable for maintaining the temperature

inside the enclosure at a minimum of 50 degrees F.

Page 37: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 67 00 - 3

JULY 6, 2018 ADDENDUM #1

7. Panel shall be UL listed.

8. Quick disconnects shall be provided for all power and control cables connecting to

the pump control panel from the pumps. Quick disconnect manufacturer shall be

Meltric or approved equal. Coordinate quick disconnect plug and receptacles with

Section 43 26 13 - Submersible Non Clog Pumps.

9. Construction

a. The base shall be formed of steel channels, with flanges extending

upwards. The base shall be provided with 1/2 inch diameter holes at 12

inch centers so that the base can be bolted to the concrete equipment base.

Welds, seams, and edges on all exposed surfaces shall be ground smooth.

Suitable lifting facilities shall be provided for handling and shipment.

10. Structure

a. Panel structure shall be suitably braced and of sufficient strength to

support all equipment mounted on or within, to withstand handling and

shipment, to remain in proper alignment, and to be rigid and freestanding.

Top, sides, and back shall be fabricated from USS 10 gage or heavier

stainless steel sheets, with stationary back suitable for back to wall

installation.

11. Panel Front

a. The front shall be a hinged door, or doors, with mounted instruments and

control devices, fabricated from USS 10 gage stainless steel sheet and

suitably braced and supported to maintain alignment. Panels with hinged

fronts shall be of sufficient width to permit door opening without

interference with rear projection of flush mounted instruments.

12. Doors

a. Doors shall be essentially full height, having turned back edges and

additional bracing to ensure rigidity and prevent sagging. Doors shall be

mounted with strong, continuous, piano type hinges. Positive latches,

acting from a common door handle, shall hold doors securely compressed

at top, side, and bottom against rubber gaskets.

13. Mounted Instruments

a. Panel doors shall be suitably reinforced between mounting cutouts and

drilling to support instruments and devices without deformation and shall

be free from waves and other imperfections.

b. Panel instruments and control devices shall be arranged in a logical

configuration for the plant operators. Control switches shall be within 6

feet and 2'-6" above the base of the panel. Indicators may be located

within 2'-6" and 6'-6" above the base of the panels.

14. Conduit Entrance

a. The panel shall be drilled to accommodate external wiring and conduit to

be installed from below.

15. Interior Lighting

a. Illumination of panel interiors shall be provided by ceiling mounted lamp

fixtures near the door. Fixtures shall be nominal 40-watt fluorescent tube

type, with an "On-Off" switch near the door. Duplex-grounded

receptacles shall be provided for service and maintenance tools. The

Page 38: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 67 00 - 4

JULY 6, 2018 ADDENDUM #1

lighting and receptacle circuit shall be fused separately from the

instrumentation systems.

B. Control Circuit Breakers:

1. Control circuit breakers shall be quick-make, quick-break thermal magnetic molded

case type, individually mounted and identified. Circuit breakers shall be Allen-

Bradley Bulletin 1492-CB.

C. Transient Voltage Surge Suppressor:

1. Provide a 120 volt, 1 phase transient voltage surge suppressor in the panel to protect

the panel components from damage which may occur from transient overvoltages

caused by lightning or surges on the incoming power line.

2. The surge suppressor shall use high speed silicon avalanche diodes as the

suppression devices and shall have an indication light and alarm contact to indicate if

the unit has failed.

3. Surge suppressor shall be Transtector Model ACP 100BW3R, or equal by Phoenix

Contact.

D. 24 Volt DC Power Supplies: (if required)

1. 24 volt DC power supplies shall be mounted in panel, to supply 24 volt DC power

for the 24 volt DC programmable controller inputs and for the 2-wire

instrumentation. The power supplies shall be sized as required plus 50% spare

capacity.

2. 24 volt DC power supplies shall be Allen-Bradley Bulletin 1606, or equal by Sola.

E. Selector Switches:

1. Selector switches shall be 30.5mm, heavy-duty, non-illuminated. Switches shall have

double-break silver contacts. Switches shall be maintained contact type unless

otherwise indicated on the Drawings. Provide auxiliary contact blocks on switches

where indicated on the Drawings or in the Description of Operation. Provide a gray

legend plate for each switch with white engraving as indicated on the Drawings.

Selector switches shall be Allen-Bradley Bulletin 800H, NEMA Type 4X.

F. Push Buttons:

1. Push buttons shall be 30.5mm, heavy-duty, non-illuminated. Push buttons shall have

double-break silver contacts. Push buttons shall be momentary contact type and shall

be color-coded as indicated on the Drawings. Stop push buttons shall have extended

heads. All other push buttons shall have flush heads. Provide a gray legend plate for

each push button with white engraving as indicated on the Drawings. Push buttons

shall be Allen-Bradley Bulletin 800H, NEMA Type 4X.

G. Pilot Lights:

1. Pilot lights shall be 30.5mm, heavy-duty, push to test, transformer type with LED

lamps. Voltage rating shall be 120 volts. Lens color shall be as indicated on the

Drawings. Provide a gray legend plate for each pilot light with white engraving as

indicated on the Drawings. Pilot lights shall be Allen-Bradley Bulletin 800H, NEMA

Type 4X.

Page 39: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 67 00 - 5

JULY 6, 2018 ADDENDUM #1

H. Relays:

1. Relays shall be heavy-duty general-purpose type with 10 amp contacts. Relays shall

have terminals, which plug-in to a socket, mounted to the inside of the panel

enclosure. Terminals for relays having AC coils shall be pin type, and terminals for

relays having DC coils shall be blade type. Contact configuration shall be 3PDT.

2. Relay coils shall operate on 120 volts AC, unless indicated otherwise on the

Drawings. Relays shall have an indicator light to indicate the relay coil is energized.

Relays shall be Idec RR Series.

3. Intrinsically Safe Relays and Barriers – Intrinsically safe relays and barriers shall

be provided where required to interface with equipment such as level devices that

are located in NFPA-classified hazardous areas. Intrinsically safe relays and

barriers shall be FM approved and shall be manufactured by Pepperl and Fuchs,

Crouse Hinds, Square D, or equal.

I. Fuses:

1. All fuses shall be sized as required for the circuit they are protecting. Fuses shall be

Bussmann, touch-safe type, or equal.

J. Terminal Blocks:

1. Terminal blocks shall be provided in each control panel for terminating field wiring.

All terminal blocks shall be rated for 600 volts AC, and shall be identified with a

permanent machine printed marking in accordance with the terminal numbers shown

on the panel wiring diagrams.

2. A maximum of two wires shall be provided per terminal block.

3. Terminal blocks for 24vdc inputs shall be blue.

4. Provide 20% spare terminal blocks in the control panel.

5. Terminal blocks shall be Allen-Bradley Bulletin 1492-W4, or equal.

K. Wiring:

1. All wiring shall be stranded copper. Control wiring shall be 14 gauge, 600 volt, Type

MTW. Power wiring shall be 600 volt, Type MTW, sized as required.

2. All analog signal wiring shall be 16 gauge twisted pairs with foil shield and drain

wire, with 300 volt, 90°C insulation. Drain wires shall be grounded at one end only.

3. All wiring and terminal strips shall be isolated by voltage levels to the greatest extent

possible.

4. Wiring shall be continuous with no splices.

5. All wiring shall conform to the following color code:

6. 120 volt, 1 phase: Black, White

7. 24 vdc: Blue

8. 120 VAC Control Wires: Red

9. Ground Wires: Green

10. 120 VAC control wires energized from a source external to the panel power source

shall be yellow.

11. All control wiring shall be tagged at each end with a legible permanent coded wire-

marking sleeve. Sleeves shall be white PVC tubing with machine printed black

marking. Markings shall be in accordance with the wire numbers shown on the

control wiring diagrams, and shall match terminal strip numbers.

Page 40: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 67 00 - 6

JULY 6, 2018 ADDENDUM #1

L. Nameplates:

1. Provide laminated phenolic nameplate on the front of the panel. Nameplate shall be

black with white engraved letters. Engraving shall be as indicated on the Drawings.

Minimum size of engraving shall be 1/4".

2.2 SPARE PARTS

A. Provide the following spare parts for the control panel:

1. Two (2) 24 volt DC power supplies for each size utilized

2. Two (2) general purpose relays for each type utilized

3. Six (6) fuses for each size and type utilized

B. Spare parts shall be packaged individually in boxes that are clearly labeled with part name and

manufacturer's part/stock number.

PART 3 EXECUTION

3.1 FIELD SERVICES

A. Start-up and Testing:

1. Test the operation of the control panel and all controls. All start-up and testing shall

be performed in the presence of DC Water.

B. Training:

1. Provide on-site training for DC Water personnel on the operation of the control panel

as specified in Sections 01 79 00 and 43 26 13.

PART 4 MEASUREMENT AND PAYMENT

4.1 MEASUREMENT:

A. Work for Control System Equipment Panels and Racks will not be measured separately

for payment.

4.2 PAYMENT:

A. Payment for Control System Equipment Panels and Racks shall be considered incidental and

included in the lump sum price bid for items of which it is a part.

~ END OF SECTION 40 67 00 ~

Page 41: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 67 00 - 7

JULY 6, 2018 ADDENDUM #1

THIS PAGE INTENTIONALLY LEFT BLANK

Page 42: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 1

JULY 6, 2018 ADDENDUM #1

SECTION 40 95 23

REMOTE INPUT-OUTPUT CABINET

PART 1 GENERAL

1.1 SUMMARY

A. Furnish, test, and deliver to the Contractor for installation and wiring the remote input-output

(RIO) cabinet, with all accessories and appurtenances as specified herein and as shown on the

Drawings.

B. The RIO cabinet shall be assembled, wired, and tested. All remote I/O hardware components

and all necessary accessories such as power supplies, conditioning equipment, mounting

hardware, signal input and output terminal blocks, and plug strips that may be required to

complete the system shall be provided.

C. All work specified under this Section shall be furnished by Emerson Process Management

(EPM). No substitutions shall be accepted.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specifications Sections, apply to this Section.

B. Specifications throughout all Divisions of the Project Manual are directly applicable to

this Section, and this Section is directly applicable to them.

1.3 RELATED SECTIONS

A. Section 01 33 00: Submittals

B. Section 01 75 20: Service Manual

C. Section 01 79 00: Operation Maintenance Training

This Specification Section includes the provision of various equipment and services to be provided by Emerson

Process Management Power and Water Solutions (EPM or Emerson). Such equipment and services, as detailed

in this Section, shall be provided as a part of the Plant-wide Stormwater Drainage Improvements (PWDI) work

scope under a subcontract agreement with the PWDI Contractor. Emerson’s fixed price amounts of this

subcontract agreement are indicated in the PWDI Bidder’s Schedule of Prices as a line-item “Lump Price

Allowance”. The Emerson Scope of Work to be provided is included as Appendix D. (The Emerson Scope of

Work and Price reflects all changes and additions made by this addendum.)

The Emerson Scope also may include specific terms and conditions which may differ from those applied to the

PWDI Contract. Such terms and conditions have been accepted by the Authority and are not subject to further

negotiation or adjustment by the PWDI Contractor. In the case where there is a difference between the Emerson

Scope of Work in Appendix D and the requirements in the Specifications Section, the Contractor is required to

supply and install.

Page 43: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 2

JULY 6, 2018 ADDENDUM #1

D. Section 01 91 00: Equipment System Commissioning

E. Section 26 00 00: Basic Electrical Materials & Methods

F. Section 40 61 13: Process Control System General Provisions

G. Section 40 61 93: Process Control System Input-Output List

1.4 REFERENCES

A. Regulations and Standards:

NEMA National Electrical Manufacturers Association

UL Underwriters' Laboratories

1.5 SUBMITTALS

A. Shop Drawings:

1. Shop drawings shall be in accordance with Section 01 33 00 - Submittals. Shop

drawings shall be complete in all respects and shall include a complete bill of

material, catalog information, descriptive literature of all components, wiring

diagrams, and panel layout drawings showing dimensions for all devices.

B. Service Manuals

1. Submit Service Manuals for installation, operation, and maintenance of

equipment, and parts list for Division 40 equipment listed in Section 01 75 20 –

Service Manuals.

1.6 QUALITY ASSURANCE

A. The panel components shall be of the most current and proven design. Specifications and

Drawings call attention to certain features but do not purport to cover all details entering into

the design of the panel. The components provided by the Contractor shall be compatible with

the functions required and shall form a complete working system.

B. Panels shall be UL listed as a complete assembly in accordance with UL-508.

PART 2 PRODUCTS

2.1 PANEL ENCLOSURE AND COMPONENTS

A. Remote I/O Cabinet

1. Construction

a. Panel construction shall be an indoor, dust-tight, completely enclosed

cubicle formed from steel structural members and steel plates. The base

shall be formed of steel channels, with flanges extending upwards. The

base shall be provided with 1/2 inch diameter holes at 12 inch centers so

that the base can be bolted to the concrete equipment base. Welds, seams,

Page 44: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 3

JULY 6, 2018 ADDENDUM #1

and edges on all exposed surfaces shall be ground smooth. Suitable

lifting facilities shall be provided for handling and shipment.

2. Structure

a. Panel structure shall be suitably braced and of sufficient strength to

support all equipment mounted on or within, to withstand handling and

shipment, to remain in proper alignment, and to be rigid and freestanding.

Top, sides, and back shall be fabricated from USS 10 gage or heavier

carbon steel sheets, with stationary back suitable for back to wall

installation, or designed for rear access with hinged back doors. Doors

shall not be greater than 24 inches wide or spaced not greater than 36

inches center to center. Rear access doors shall be fabricated from USS

14 gage or heavier carbon steel.

3. Panel Front

a. The front shall be a hinged door, or doors, with mounted instruments and

control devices, fabricated from USS 10 gage carbon steel sheet and

suitably braced and supported to maintain alignment. Panels with hinged

fronts shall be of sufficient width to permit door opening without

interference with rear projection of flush mounted instruments.

4. Doors

a. Doors shall be essentially full height, having turned back edges and

additional bracing to ensure rigidity and prevent sagging. Doors shall be

mounted with strong, continuous, piano type hinges. Positive latches,

acting from a common door handle, shall hold doors securely compressed

at top, side, and bottom against rubber gaskets.

5. Conduit Entrance

a. The top shall be provided with nominal 1 square foot removable access

plates, which may be drilled to accommodate external wiring and conduit

to be installed from above.

6. Size and Arrangement

a. Panel dimensions and general instrument arrangement shall be as

indicated on the Drawings or in the equipment schedules attached to this

section.

7. Interior Lighting

a. Illumination of panel interiors shall be provided by ceiling mounted lamp

fixtures spaced at approximately 2'-6" and near the door. Fixtures shall

be nominal 40-watt fluorescent tube type, with a common "On-Off"

switch near each end door. Duplex-grounded receptacles shall be

provided for service and maintenance tools at spacing not greater than 5

feet throughout the length of a panel. The lighting and receptacle circuit

shall be fused separately from the instrumentation systems.

8. Remote I/O Hardware

a. Refer to Section 40 95 23 – Process Control Input-Output Modules for

requirements for remote I/O hardware.

9. Manufacturer

a. RIO cabinet shall match in all applicable respects the existing RIO

cabinets currently installed on site, which were supplied/installed by

Page 45: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 4

JULY 6, 2018 ADDENDUM #1

Emerson Process Management (EPM). RIO panels shall be the same size

and color of the existing RIO cabinets, and shall be provided with fittings

and other appurtenances to match existing.

b. Remote I/O cabinet shall be procured from EPM. No substitutions will

be permitted.

B. Remote I/O Hardware

1. Digital Input Modules

a. Digital input modules shall be 16-point modules, shall sense voltages

between 100 and 130 volts ac and shall have LED indicators for each

point to display the status of the field contact. Each input module shall be

suitable for being connected to a separate voltage source and return.

Digital input modules shall provide complete electrical isolation between

individual inputs. Standard Ovation digital input modules shall be

provided consistent with currently installed hardware provided under

previous DC Water projects.

b. Eight (8) digital input modules shall be provided in the new remote I/O

cabinet.

2. Digital Output Modules

a. Digital output modules shall be 16-point modules, shall control voltages

from 100 and 130volts ac and shall be rated at least 1 ampere. Digital

output modules shall provide complete electrical isolation between

individual output circuits. Digital outputs shall be provided by an

interposing relay as an integral component of the digital output module.

Standard Ovation digital output modules shall be provided consistent with

currently installed hardware provided under previous DC Water projects.

b. Three (3) digital output modules shall be provided in the new remote I/O

cabinet.

3. Analog Input Modules

a. Analog input modules shall accept linear 4-20 mA dc signals from field

transmitters, configurable for loop or field power. Analog to digital

conversion accuracy shall be at least 12-bit (04095 count) resolution.

Analog input modules shall have eight inputs. Each input shall be fully

isolated from the other inputs. Standard Ovation analog input modules

shall be provided consistent with currently installed hardware provided

under previous DC Water projects. Ovation analog inputs shall be HART

compatible.

b. Three (3) analog input modules shall be provided in the new remote I/O

cabinet.

4. Analog Output Modules

a. Analog output modules shall transmit linear 4-20 mA dc signals to field

devices. Loop power for all analog outputs shall be provided by regulated

power supplies in each input/output enclosure and shall be capable of

driving a 0 to 600 ohm load. Digital to analog conversion accuracy shall

be at least 12-bit (0-4095 count) resolution. Analog output modules shall

have eight isolated outputs. Standard Ovation analog output modules shall

be provided consistent with currently installed hardware provided under

previous DC Water projects.

Page 46: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 5

JULY 6, 2018 ADDENDUM #1

b. Three (3) analog output modules shall be provided in the new remote I/O

cabinet.

C. Control Circuit Breakers:

1. Control circuit breakers shall be quick-make, quick-break thermal magnetic molded

case type, individually mounted and identified. Circuit breakers shall be Allen-

Bradley Bulletin 1492-CB.

D. Power Surge Suppressor:

1. Provide a 120 volt, 1 phase transient voltage surge suppressor in the panel to protect

the panel components from damage which may occur from transient overvoltages

caused by lightning or surges on the incoming power line.

2. The surge suppressor shall use high speed silicon avalanche diodes as the

suppression devices and shall have an indication light and alarm contact to indicate if

the unit has failed.

3. Surge suppressor shall be Transtector Model ACP 100BW3R, or equal by Phoenix

Contact.

E. 24 Volt DC Power Supplies: (if required)

1. 24 volt DC power supplies shall be mounted in panel, to supply 24 volt DC power

for the 24 volt DC programmable controller inputs and for the 2-wire

instrumentation. The power supplies shall be sized as required plus 50% spare

capacity.

2. 24 volt DC power supplies shall be Allen-Bradley Bulletin 1606, or equal by Sola.

F. Relays:

1. Relays shall be heavy-duty general-purpose type with 10 amp contacts. Relays shall

have terminals, which plug-in to a socket, mounted to the inside of the panel

enclosure. Terminals for relays having AC coils shall be pin type, and terminals for

relays having DC coils shall be blade type. Contact configuration shall be 3PDT.

2. Relay coils shall operate on 120 volts AC, unless indicated otherwise on the

Drawings. Relays shall have an indicator light to indicate the relay coil is energized.

Relays shall be Idec RR Series.

3. Intrinsically Safe Relays and Barriers – Intrinsically safe relays and barriers shall

be provided where required to interface with equipment such as level devices that

are located in NFPA-classified hazardous areas. Intrinsically safe relays and

barriers shall be FM approved and shall be manufactured by Pepperl and Fuchs,

Crouse Hinds, Square D, or equal.

G. Fuses:

1. All fuses shall be sized as required for the circuit they are protecting. Fuses shall be

Bussmann, touch-safe type, or equal.

H. Terminal Blocks:

1. Terminal blocks shall be provided in each control panel for terminating field wiring.

All terminal blocks shall be rated for 600 volts AC, and shall be identified with a

permanent machine printed marking in accordance with the terminal numbers shown

on the panel wiring diagrams.

Page 47: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 6

JULY 6, 2018 ADDENDUM #1

2. A maximum of two wires shall be provided per terminal block.

3. Terminal blocks for 24vdc inputs shall be blue.

4. Provide 20% spare terminal blocks in the control panel.

5. Terminal blocks shall be Allen-Bradley Bulletin 1492-W4, or equal.

I. Wiring:

1. All wiring shall be stranded copper. Control wiring shall be 14 gauge, 600 volt, Type

MTW. Power wiring shall be 600 volt, Type MTW, sized as required.

2. All analog signal wiring shall be 16 gauge twisted pairs with foil shield and drain

wire, with 300 volt, 90°C insulation. Drain wires shall be grounded at one end only.

3. All wiring and terminal strips shall be isolated by voltage levels to the greatest extent

possible.

4. Wiring shall be continuous with no splices.

5. All wiring shall conform to the following color code:

6. 120 volt, 1 phase: Black, White

7. 24 vdc: Blue

8. 120 VAC Control Wires: Red

9. Ground Wires: Green

10. 120 VAC control wires energized from a source external to the panel power source

shall be yellow.

11. All control wiring shall be tagged at each end with a legible permanent coded wire-

marking sleeve. Sleeves shall be white PVC tubing with machine printed black

marking. Markings shall be in accordance with the wire numbers shown on the

control wiring diagrams, and shall match terminal strip numbers.

J. Nameplates:

1. Provide laminated phenolic nameplate on the front of the panel. Nameplate shall be

black with white engraved letters. Engraving shall be as indicated on the Drawings.

Minimum size of engraving shall be 1/4".

PART 3 EXECUTION

3.1 FACTORY TESTING

A. Conduct a factory acceptance test for the Remote I/O Cabinet prior to shipment of the

equipment. The factory test shall be conducted at the supplier's facility and shall

demonstrate the cabinet was designed and performs in accordance with the specifications

and drawings.

B. Provide all necessary equipment and hardware required to conduct the factory test.

C. The factory acceptance test shall demonstrate the proper operation of all hardware specified in

the contract documents. The factory test shall be witnessed by DC Water.

3.2 FIELD SERVICES

A. Start-up and Testing:

Page 48: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 7

JULY 6, 2018 ADDENDUM #1

1. Assist DC Water in the startup and testing of the Remote I/O Cabinet. All start-up

and testing shall be performed in the presence of DC Water.

PART 4 MEASUREMENT AND PAYMENT

4.1 MEASUREMENT:

A. Work for Remote Input-Output Cabinets will not be measured separately for payment.

4.2 PAYMENT:

A. The RIO Cabinet Supplier’s lump sum price for furnishing RIO equipment, submittals, and

testing specified herein is included in the Schedule of Prices as an Allowance.

~ END OF SECTION 40 95 23 ~

Page 49: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

DC WATER REMOTE INPUT-OUTPUT CABINET

IFB #150150 – PLANT-WIDE STORMWATER DRAINAGE IMPROVEMENTS 40 95 23 - 8

JULY 6, 2018 ADDENDUM #1

THIS PAGE INTENTIONALLY LEFT BLANK

Page 50: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

appendix D

ALLOWAnCES

Page 51: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

June 26, 2018 Subject: DC Water Plant-wide Stormwater Pump Stations Emerson Process Management Power & Water Solutions, Inc. Offer No. WAM18060092 Rev.2 Dear Contractor: Emerson Process Management Power & Water Solutions, Inc. (Emerson) is pleased to submit this offer for the subject project. This offer is based upon an email from DC Water on June 12, and any clarifications or exceptions submitted with this offer. Overview DC Water is building two new storm runoff pump stations and would like to include the monitoring of those pumps in the existing Ovation distributed control system (DCS). This offer includes the hardware and hardware-related submittals for interfacing the new pumps with the existing Ovation DCS. Hardware Emerson’s offer includes the following hardware.

Item Description Quantity

1 NEMA 12 Ventilated I/O Expansion Cabinet (78x24x24) 1

2 I/O Bus Terminators 2

3 I/O Bus Terminators 2

4 I/O Termination Bases - 2 slot 10

5 4 - 20mA High Performance HART Analog Input Module 3

6 4 - 20mA High Performance HART Analog Output Module 3

7 125 VAC/VDC Differential Compact Digital Input Module 8

8 Relay Output Panel with 16 G2R Form C Relays 3

9 Miscellaneous Cabinet Hardware (15’ set of cables, lighting, etc.) 1

Engineering Services Emerson’s offer includes the following engineering services:

• Project management o Project schedule o Project oversight o Components sourcing

Emerson Power & Water Solutions 200 Beta Drive Pittsburgh, PA 15238 Tel 1 (412) 963-4000

Page 52: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

Page 2

• Submittals o Shop drawings o Update existing system layout o Update existing O&M manuals

• Cabinet assembly and signature test General Exclusions

1. Except for the materials specifically defined in Emerson’s bill of material, all materials are excluded

from Emerson’s scope of supply.

2. This offer does not include any programming, startup, factory acceptance testing, field testing, or training.

3. Database, graphics, and controls submittals are not included. 4. Receipt, storage, setting in place, installation and/or termination of any equipment or instrumentation. 5. Development of loop drawings. 6. Taxes, fees, permits and licenses. 7. Factory acceptance testing. 8. Emerson assumes that the expansion cabinet will be placed at a maximum of 30 feet in cable distance

(Max allowed) of existing RIO cabinet in the electrical building.

Thank you for the opportunity to submit this offer. Should you have any questions or require additional information, please feel free to contact your local representative, Greg Lippert, at 412-551-0847 or me at 412-963-3871. Regards,

Daniel Kippelen

Daniel Kippelen Senior Proposal Engineer Emerson Process Management Power & Water Solutions, Inc. Attachments: Commercial Description

Page 53: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY INVITATION … · 7/6/2018  · APPENDIX APPENDIX D - ALLOWANCES No. of Pages Date Emerson Process Management Power & Water Solutions,

Page 3

Commercial Description This document defines the commercial basis under which Emerson makes this offer.

Terms and Conditions

This offer expressly limits acceptance to the terms of this offer including the terms and conditions set forth in the Framework Agreement 15-PR-DETS-1 between Emerson and DC Water.

Legal Name and Address for Doing Business

Emerson Process Management Power & Water Solutions, Inc.

200 Beta Drive

Pittsburgh, PA 15238

Pricing The price for this scope is: $58,180.

Freight and handling charges are included. Taxes are excluded.

Emerson would like to work with you in developing a mutually agreeable milestone payment schedule. A typical payment schedule is shown below.

Invoices will be issued for each of the following deliverable line items with payment due net 30 days from the date of the invoice. The amount of each invoice shall be calculated by applying the percentages (%) shown below against the total Purchase Order price including any changes.

20% Upon submittal of Hardware Drawings

60% Upon System Shipment

20% Upon System Acceptance

Delivery Emerson will deliver the offered system based upon a mutually agreed upon delivery schedule.

Bid Validity This offer shall remain valid for ninety (90) days from the date of this letter, unless otherwise extended, modified, or withdrawn in writing by Emerson.

Proprietary Information

This offer and any subsequent communications relative to this offer are considered to be proprietary information of Emerson. Accordingly, please do not publish, use, reproduce, transmit, or disclose to others outside your organization any information contained in this offer without prior written consent by Emerson.