Ohio Department of Transportation – District 9
hio’s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people
and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible for maintaining one of
the largest transportation networks in the nation. Guided by ethical principles and accountability, ODOT works to
improve safety, enhance travel and advance economic development. As a $2.8 billion enterprise, the department
wisely invests in its core services of snow and ice removal, annual construction program and highway maintenance operations.
The following summary outlines those projects which are programmed for the 2014 construction season. With an estimated
cost of $64 million, ODOT District 9’s 2014 Construction Program will consist of 78 projects to be sold and/or constructed
through FY2014 and the first quarter of FY2015. Included in these projects are:
44 Preservation
15 Maintenance
11 Safety
4 Enhancement
4 Facility
Of these projects, the district will engage in nine projects with county engineers, as well as one project under the department’s
County Bridge Program and six LPA projects.
Due to production variables, not all projects may be sold as proposed. Any cost estimates or sale dates cited in this document are subject to
change. Additional information about these and other construction or maintenance projects will be released as they are scheduled or awarded.
For more information, please contact the District 9 Offices at 740-774-8834 or email [email protected].
O
Ohio Department of Transportation – District 9
$1,000,000
$3,500,000
$6,000,000
$8,500,000
$11,000,000
$13,500,000
$16,000,000
Adams Brown Highland Jackson Lawrence Pike Ross Scioto
Ohio Department of Transportation – District 9
Districtwide
Scioto County
Ross County
Pike County
Lawrence County
Jackson County
Highland County
Brown County
Adams County
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Adams County Planned Projects PID County-Route-
Section Project Type Project Location Letting Date Estimated Cost
95271 ADA-32-9.92 Culvert Replacement Between C.R. 39 (Burnt Cabin Road) and T.R. 88 (Tater Ridge Road), approximately three miles east of Seaman.
05/22/14 $1,000,000
87206 ADA-41-0.96 Bridge Repair Approximately one mile north of the Adams-Brown County line.
06/05/14 $246,000
84632 ADA-41-25.21 Resurfacing From the junction with S.R. 32 to the Adams-Highland County line.
03/13/14 $1,345,755
84432 ADA-125-19.68 Bridge Repair Between T.R. 312 (Riley Hollow Road) and C.R. 125B (Hazelbaker Road).
01/09/14 $1,082,071
89401 ADA-770-2.07 Slide Repair Between C.R. 14 (Tranquility Pike) and T.R. 411 (McCreight Road).
10/16/14 $663,750
Estimated total construction cost $4,337,576
Ohio Department of Transportation – District 9
Ad
am
s Co
un
ty
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Brown County Planned Projects PID County-Route-Section Project Type Project Location Letting Date Estimated Cost
90881 BRO-Augusta Ferry Resurfacing/Enhancement Augusta Ferry boat dock off U.S. 52. 10/07/13 $254,751
88277 BRO-Aberdeen Bikeway Between Huntington Avenue and Elm Street, off U.S. 52 at Aberdeen.
05/22/14 $206,856
92238 BRO-White Oak Outpost Facility Upgrade ODOT outpost at T.R. 582 (Canyon Road) near Mt. Orab.
06/05/14 $285,000
94633 BRO-32-4.15 Turn Lane Addition Intersection of T.R. 126 (Brooks-Malott Road). 03/13/14 $369,000
91626 BRO-221-6.50 Slide Repair Approximately 1.5 miles south of S.R. 125 at Georgetown.
01/09/14 $559,290
84440 BRO-286-4.60 Bridge Replacement Between C.R. 87 (Bodman Road) and U.S. 68. 08/29/13 $334,996
89399 BRO-505-0.16 Slide Repair Immediately north of the junction with U.S. 52 at Higginsport.
11/07/13 $334,964
13631 BRO-763-11.50 Bridge Replacement (2) Between T.R. 221 (West Fork Road) and S.R. 353, one mile south of S.R. 125.
10/10/13 $468,785
91160 BRO-52-3.58 Slide Repair Between the Brown- Clermont County line and Higginsport.
12/12/13 $328,522
87253 BRO-52/68-4.31/41.01 Resurfacing On U.S. 52, from Higginsport to T.R. 255 (Pisgah Hill Road), and on U.S. 68, from Fayetteville to the Brown-Clinton County line.
09/18/14 $2,039,416
93801 BRO-68-30.72 Turn Lane Addition At the S.R. 32 interchange in Mt. Orab. 10/24/13 $1,822,406
Estimated total construction cost $7,003,986
Ohio Department of Transportation – District 9
Bro
wn
C
ou
nty
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Highland County Planned Projects PID County-Route-Section Project Type Project Location Sale Date Estimated Cost
97109 HIG-TR144 Bridge Replacement On Fenwick Road, between S.R. 321 at Mowrystown and the Highland-Brown County line.
08/21/14 $330,000
83933 HIG-CR11-16.78/17.43 Bridge Replacement Approximately one mile west of C.R. 11A (Bridges Road), west of Samantha.
05/08/14 $1,872,800
85678 HIG-CR5H-17.66 Intersection Improvement Intersection of C.R. 5 (Prospect Road), C.R. 74B (Pleasant Road) and T.R. 192A (Main Road), approximately one mile east of S.R. 124.
01/09/14 $950,903
94280 HIG-Highland County Facility Upgrade ODOT facility at S.R. 124 in Hillsboro. 01/07/14 $7,445,980
87254 HIG-124-0.00 Resurfacing Between the Highland-Clinton County line and Hillsboro.
02/18/14 $1,420,007
84438 HIG-134-6.01 Bridge Repair Between C.R. 39 (Greenbush Road) and T.R. 406 (Rosselott Road), south of S.R. 286.
05/08/14 $1,220,000
84449 HIG-134-10.58 Bridge Repair Between C.R. 59 (Barker Road) and T.R. 104A (Brown Road), north of S.R. 131.
11/21/13 $449,799
87214 HIG-753-16.75 Bridge Replacement Between T.R. 357 (Rupple Road) and T.R. 306B (Titus Road), south of Greenfield.
09/18/14 $330,000
Estimated total construction cost $12,319,489
Ohio Department of Transportation – District 9
Highland County
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Jackson County Planned Projects PID CRS Project Type Project Location Sale Date Estimated Cost
93989 JAC-TR291 Bridge Rehabilitation On Johnson Road, approximately one mile north of the Jackson-Scioto County line.
04/21/14 $169,200
95413 JAC-CR-Various Pavement Marking Various locations on county routes. 04/01/14 $149,557
85602 JAC-CR9-0.12 Grade Separation At the intersection of C.R. 9 (Keystone Furnace Lane) and C.R. 39 (McCarty Lane) at Jackson.
03/13/14 $4,719,290
83063 JAC-32-12.47 Resurfacing Between the route’s junction with U.S. 35 and the western corporation limit of Wellston.
05/22/14 $3,640,096
84619 JAC-93-17.46 Resurfacing From the northern corporation limit of Jackson, continuing through Wellston, and to the Jackson-Vinton County line.
03/13/13 $1,727,660
83872 JAC-139-0.00 Resurfacing Between the Jackson-Scioto County line and the city of Jackson.
10/24/13 $1,932,000
83653 JAC-35-7.83 Excavation/Slide Repair Just east of C.R. 71 (Lloyds Bridge Road). 02/18/14 $1,847,077
Estimated total construction cost $14,184,880
Ohio Department of Transportation – District 9
Jack
son
Co
un
ty
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Lawrence County Planned Projects
PID CRS Project Type Project Location Sale Date Estimated Cost
88281 LAW-South Point Sidewalk At Park, High, Seventh and Washington Streets in South Point.
05/08/14 $153,000
92791 LAW-CR1/4 Resurfacing Various locations on C.R. 1 and C.R. 4. 10/01/13 $2,336,400
92921 LAW-Wilgus Outpost Facility Upgrade Adjacent to S.R. 141 in Mason Township. 05/22/14 $230,000
95633 LAW-Chesapeake Bypass Building Demolition Various locations. 06/05/14 $105,000
91164 LAW-7-3.04 Slide Repair Just east (north) of the junction with S.R. 527 at Chesapeake and west of C.R. 32 (Eaton Road).
09/26/13 $984,496
84455 LAW-7-5.50 Bridge Replacement At the Indian Guyan Creek bridge, just west of Proctorville.
02/06/14 $2,906,643
96100 LAW-7-6.90 Bridge Repair At the bridge situated at the intersection with C.R. 403 (Irene Road).
05/08/14 $140,000
87258 LAW-217-0.00 Resurfacing Between S.R. 141 and C.R. 2 (Greasy Ridge Road).
01/23/14 $1,219,347
91927 LAW-243-17.83 Culvert Replacement/ Reconstruction
Approximately 0.25 miles west (north) of S.R. 7 at Bradrick.
05/22/14 $850,000
87393 LAW-775-13.04 Slide Repair Approximately four miles south of S.R. 141, between the intersecting points of C.R. 2 (Greasy Ridge Road).
10/30/14 $700,000
96104 LAW-52-11.12 Lighting At the Ashland, Ky. twin bridges at Coal Grove. 06/05/14 $750,000
97320 LAW-52-12.32 Rock Removal Between T.R. 268 (Crabtree Hollow Road) and C.R. 1 (Old U.S. 52).
02/18/14 $200,000
81595 LAW-93-0.00 Bridge Replacement New Ohio River crossing from Ironton to Russell 01/12/12 $81,266,742
Estimated total construction cost $10,574,886
Estimated total construction cost* $91,841,628
*Estimated cost including PID: 81595
Ohio Department of Transportation – District 9
Law
ren
ce C
ou
nty
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Pike County Planned Projects PID CRS Project Type Project Location Sale Date Estimated Cost
89137 PIK-TR524-0.01 Bridge Replacement On Swift Creek Road, immediately south of S.R. 335.
05/08/14 $519,616
89138 PIK-CR47-0.28 Bridge Replacement On Denver Road, at the junction with C.R. 46 (Prussia Road), approximately one mile west of S.R. 104
01/09/14 $1,034,500
89136 PIK-CR47-3.00 Bridge Replacement On Denver Road, just south of the Pike-Ross County line.
01/09/14 $313,231
91366 PIK-CR50-1.95 Slide Repair On Watson Road, between C.R. 55 (Hay Hollow Road) and the Pike-Ross County line.
07/24/14 $874,207
95402 PIK-CR85-0.91 Bridge Repair On Tennyson Road, At the junction with C.R. 21 (Sunfish Creek Road), approximately one mile east of S.R. 772
01/09/14 $1,004,922
94075 PIK-32-20.24 Slide Repair Between the CSX Railroad underpass (east of C.R. 116) and the T.R. 612/C.R. 57 (Darst Road/Beaver Pike) intersection
06/06/13 $900,000
91272 PIK-104-4.60 Slide Repair Just north of C.R. 21 (Sunfish Creek Road). 10/10/13 $731,409
89403 PIK-220-6.10 Slide Repair Approximately 0.4 miles west of C.R. 36 (Pleasant Hill Road).
04/24/14 $412,602
91273 PIK-335-16.95 Slide Repair Just south of C.R. 56 (Carrs Run Road), approximately four miles north of T.R. 522 (Overly Road).
08/15/13 $196,211
79975 PIK-23-0.00 Preventive Maintenance From the Pike-Scioto County line to the USEC exit ramps.
05/22/14 $2,022,225
Estimated total construction cost $8,008,923
Ohio Department of Transportation – District 9
Pike County
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Ross County Planned Projects
PID CRS Project Type Project Location Sale Date Estimated Cost
90254 ROS-CR-Various Pavement Marking Various locations. 09/04/14 $136,400
85681 ROS-CR205 Guardrail Repair Various locations on C.R. 205 (Three Locks Road). 05/22/14 $300,000
93325 ROS-159-4.33 Intersection Improvement At the intersections with Kenworth Drive and Claybourne Heights.
02/18/14 $1,502,640
95442 ROS-180-0.00 Resurfacing Between S.R. 159 and the village of Adelphi. 09/04/14 $1,635,514
84624 ROS-772-0.00 Resurfacing Between the Ross-Pike County line and C.R. 167 (Blain Highway).
03/13/14 $840,979
83182 ROS-23-9.26 Bridge Repair At the Paint Creek bridges, approximately one-half mile north of the S.R. 104/Three Locks Road underpass.
04/01/14 $1,112,739
87260 ROS-50-24.13 Resurfacing From the intersection of S.R. 159 (Bridge Street) to U.S. 35, following Bridge Street and Eastern Avenue.
04/24/14 $861,559
Estimated total construction cost $6,389,831
Ohio Department of Transportation – District 9
Ross County
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Scioto County Planned Projects PID CRS Project Type Project Location Sale Date Estimated Cost
93991 SCI-TR487 Bridge Rehabilitation Covered Bridge Lane/Curtis Smith Road, immediately north of S.R. 348.
09/05/13 $279,028
87329 SCI-73-10.37 Bridge Repair Between C.R. 44 (Henley-Comstock Road) and T.R. 115 (Euton Road), just south of Otway.
10/10/13 $177,415
81541 SCI-140-4.94 Realignment Between C.R. 3 (Hartley Road) and C.R. 5 (Turkey Foot Road).
04/10/14 $1,042,241
84965 SCI-140-9.22/9.48 Bridge Replacement Between C.R. 17 (Frederick Road) and T.R. 294 (Railroad Hollow), just west of South Webster.
08/12/14 $738,000
83062 SCI-335-1.89 Resurfacing From just north of C.R. 31 (Swauger Valley Road) to C.R. 12 (Bennett Schoolhouse Road).
02/18/14 $2,173,514
91352 SCI-348-17.51 Bridge Rehabilitation Between the intersections of S.R. 104 and U.S. 23.
11/07/13 $2,022,225
89386 SCI-Portsmouth Bypass Building Demolition Various locations. 03/13/14 $265,000
87394 SCI-23-2.60 Slide Repair Approximately 2.6 miles north of the Portsmouth corporation limit.
09/26/13 $759,205
80094 SCI-52-16.75 Resurfacing/Rehabilitation From S.R. 239 to the Scioto River bridges at Portsmouth.
09/20/12 $12,082,952
Estimated total construction cost $7,456,628
Estimated total construction cost* $19,539,580
*Estimated cost including PID: 80094
Ohio Department of Transportation – District 9
Scioto County
Ohio Department of Transportation – District 9
2014 District 9 Construction Program
Districtwide Planned Projects PID CRS Project Type Sale Date Estimated Cost
84646 Various Routes Preventive Maintenance 05/22/14 $951,000
91928 Various Routes Guardrail Repair 05/08/14 $1,400,000
93897 Various Routes Raised Pavement Marker 01/23/14 $188,836
93898 Various Routes Pavement Marking 10/10/13 $98,428
93899 Various Routes Pavement Marking 09/26/13 $1,569,347
94119 Various Routes Bridge Maintenance 03/13/14 $600,000
95128 Various Routes Herbicidal Spraying 10/24/13 $115,599
96638 Various Routes Mowing 01/23/14 $1,000,127
Estimated total to be awarded $4,972,337