www.dot.state.pa.us District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson Bureau of Project Delivery (BOPD) Innovation & Support Services Division (ISSD) Construction Quality Assurance Section (CQAS)

District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

Embed Size (px)

DESCRIPTION

District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson Bureau of Project Delivery (BOPD) Innovation & Support Services Division (ISSD) Construction Quality Assurance Section (CQAS). PTM 611. - PowerPoint PPT Presentation

Citation preview

Page 1: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

District 8-0 Winter Construction SchoolFebruary 23rd, 2012

PTM 611

Linda A. AtkinsonBureau of Project Delivery (BOPD)

Innovation & Support Services Division (ISSD)Construction Quality Assurance Section (CQAS)

Page 2: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• PTM 611 Making and Curing Concrete Compression and Flexural Test Specimens in the Field

• Revised December 2011

• Change 5 to the 2003 edition of Publication 19

Page 3: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Materials Quality Assurance Stewardship Review

– Recommendation

• “Security of field cured cylinders should be improved.”

Page 4: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Questionnaire to all 50 States• Best Practices• Dissimilar Acceptance and Quality Control

Processes

– Nothing or Not Applicable (20)– Locks on Cure Boxes (2)– Metal Tags (1)

Page 5: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

Page 6: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Metal Tags

>5mm

Saw orGrind into Tolerance

Page 7: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Destructible Stickers

• Controlled Environment

• Worked Good

Page 8: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Statewide Pilot Project

– 3 Projects per District– Pre-fab facilities

Page 9: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

00001

00251 00002

00252

00253

00003

00254

00004

00256

00006

00255

00005

00001

0025100002

00252

00003

00253

00004

00254

00005

0025500006

00256

Page 10: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

Page 11: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Results…………………….

Some Good

Page 12: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

• Some NOT SO GOOD….

Page 13: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Back to Basics

Page 14: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Making and Curing Concrete Compression and Flexural Test Specimens in the Field

– Added Section 12

• Identification and Security of Compression Test Specimen Molds and Compression Test Specimens Molded on Construction Projects

Page 15: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• 12.1 Identification of Specimen Molds

– A PENNDOT Representative shall identify each specimen mold with the following info

• Date Molded• Construction Area• Specimen Type• Series Number• Class of Concrete• AND Most Importantly…….

Page 16: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Each Specimen Mold Must Contain the Signature of a

– PennDOT Representative– Contractor’s Certified Technician

• Technician’s Certification Number

Page 17: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• 12.2 Identification of Specimens

– The PennDOT Representative will transfer the EXACT SAME Info on the Specimens

• Date Molded• Construction Area• Specimen Type• Series Number• Class of Concrete• AND Most Importantly……….

Page 18: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Each Specimen Must Contain the Signature of a

– PennDOT Representative– Contractor’s Certified Technician

• Certification Number

Page 19: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Date Molded• Construction Area• Series Number• Class of Concrete• Specimen Type• PennDOT Rep Signature• Concrete Technician• Technician’s Certification #

Page 20: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• TABLE B Section 704

Lot Sizes for Concrete AcceptanceConstruction Areas

Structural Concrete (S)Pavement Concrete (P)Pavement Patching Concrete (PP)Incidental Concrete (M) Pavement Concrete RPS (RPS)

Page 21: District 8-0 Winter Construction School February 23rd, 2012 PTM 611 Linda A. Atkinson

www.dot.state.pa.us

PTM 611

• Specimen Types

– Acceptance Testing (AT)– Quality Control Testing (QC)– Verification Testing (VT)– Independent Assurance Testing (IA)– Quality Assurance Testing (QA)