1
TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT “Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.” 0963_071119 ELLIS COUNTY DESIGN PROJECTS 2019 HIGHWAY PROJECTS: SUMMER • Q2 2019 Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 CONTACT INFORMATION Danielle Boyd Information Specialist (214) 320-4480 • [email protected] TxDOT graphic SOURCE: Texas Department of Transportation. ELLIS COUNTY DESIGN PROJECTS (SUMMER Q2 2019) # CSJ Hwy Project Limits Description Est. Let Est. Cost 1 0442-03-044 I-35E Reese Dr. to Dallas C/L Construct interchange at Loop 9 and I-35 Sep-2022 $14.72 M 2 0048-04-094 I-35E At FM 387 (Butcher Rd.) Reconstr. IC inc. 4/6-lane frtg rd & ramp mods Aug-2022 $35.6 M 3 0092-03-053 I-45 At FM 664 Construct interchange Mar-2022 $42.4 M 4 0092-05-053 I-45 SH 34 to FM 85 Ramp reversal; reconstru. frtg rd; constru. bridge at FM 1181 Sep-2029 $18 M 5 0442-03-042 I-35E At FM 664 Reconstruct interchange Mar-2022 $39 M 6 0596-02-040 FM 66 At Coffee Branch Replace bridge and approaches Dec-2020 $1.2 M 7 0596-02-046 FM 66 At Mesquite Branch Replace bridge and approaches Dec-2020 $1.4 M 8 0712-03-013 FM 916 Johnson C/L to FM 66 Reconstruct existing pavement and add shoulders Jan-2024 $11.2 M 9 1048-03-011 FM 780 FM 660 to end of maintenance Reconstruct existing pavement and add shoulders Feb-2021 $8.7 M 10 1051-01-051 FM 664 I-35E to I-45 Widen 2/4 lane rural roadway to 6 lane urban Sep-2023 $99 M 11 1159-02-035 FM 879 0.3 miles west of FM 1722 to FM 813 Reconstruct existing pavement and add shoulders Nov-2021 $14.1 M 12 1212-01-016 FM 985 FM 984 to SH 34 Reconstruct existing pavement and add shoulders Jun-2024 $11.3 M 13 1318-01-017 FM 1181 Allard Rd. to Oil Field Rd. Reconstruct existing pavement and add shoulders Dec-2024 $4.8 M 14 1393-01-015 FM 308 At Draw (0.3 Mi NW of I-35E) Replace bridge and approaches Oct-2020 $0.9 M 15 1451-02-018 FM 55 Navarro C/L to SH 34 Reconstruct existing pavement and add shoulders Apr-2025 $10.8 M 16 1599-05-963 FM 2258 Johnson C/L to FM 157 Reconstruct existing pavement and add shoulders Jun-2023 $4.1 M 17 1974-01-012 FM 1181 Oil Field Rd. to SH 34 Reconstruct existing pavement and add shoulders Jul-2025 $11.1 M 18 2964-12-001 SL 9 I-35E to Dallas C/L Construct 0 to 2 lane frontage roads (ultimate 6) Sep-2022 $9.2 M 19 2964-12-002 SL 9 Dallas/Ellis C/L to Ellis/Dallas C/L Construct 0 to 2 lane frontage roads (ultimate 6) Sep-2022 $19 M 20 1051-03-001 FM 664 West of Ferris Road to I-45 Construct 0 to 6 Lane Roadway May-2023 $35.6 M ESTIMATED TOTAL $392.12 M TxDOT graphic SOURCE: Texas Department of Transportation. 1 2 4 5 6 7 8 16 9 3 10 11 15 12 13 17 14 18 19 20 CORSICANA MIDLOTHIAN ENNIS WAXAHACHIE CORSICANA ENNIS WAXAHACHIE 45 45 45 77 77 77 77 67 67 287 67 45 45 45 35E 35E 35E 35E 35E Ferris Ovilla Pecan Hill Red Oak Trumbull Milford Palmer Maypearl Garrett Rosser Rice Emhouse Barry Frost Blooming Grove Alma Bardwell Italy Forreston ELLIS CO. NAVARRO CO. ELLIS CO. NAVARRO CO. HILL CO. ELLIS CO. ELLIS CO. JOHNSON CO. ELLIS CO. K A U F M A N C O . E L L I S C O. DALLAS CO. ELLIS CO. DALLAS CO. TARRANT CO. ELLIS CO. Bardwell Lake Mid-Way Regional Airport 660 983 813 878 879 876 308 934 308 667 877 984 984 985 744 660 1390 1182 1603 1126 1722 916 157 875 663 34 34 34 34 34 22 22 31 287 287 287 287 66 66 66 55 55 55 Combine Lancaster Airport Cedar Hill Lancaster DeSoto Wilmer Joe Pool Lake 1382 35 N 2 miles 1387 664 1446 879 85 MIDLOTHIAN Westmoreland Rd. Combine Projects In Design 664 Lake Waxahachie

DISTRICT 2019 HIGHWAY PROJECTS: ELLIS COTY DESIG …ftp.dot.state.tx.us/pub/txdot-info/dal/maps-project/design/ellis-design.pdf · 12 1212-01-016 FM 985 FM 984 to SH 34 Reconstruct

  • Upload
    volien

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DISTRICT 2019 HIGHWAY PROJECTS: ELLIS COTY DESIG …ftp.dot.state.tx.us/pub/txdot-info/dal/maps-project/design/ellis-design.pdf · 12 1212-01-016 FM 985 FM 984 to SH 34 Reconstruct

TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”

0963

_071

119

ELLIS COUNTY DESIGN PROJECTS2019 HIGHWAY PROJECTS:

SUMMER • Q2 2019

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONDanielle BoydInformation Specialist(214) 320-4480 • [email protected]

TxDOT graphicSOURCE: Texas Department of Transportation.

ELLIS COUNTY DESIGN PROJECTS (SUMMER Q2 2019)# CSJ Hwy Project Limits Description Est. Let Est. Cost

1 0442-03-044 I-35E Reese Dr. to Dallas C/L Construct interchange at Loop 9 and I-35 Sep-2022 $14.72 M

2 0048-04-094 I-35E At FM 387 (Butcher Rd.) Reconstr. IC inc. 4/6-lane frtg rd & ramp mods Aug-2022 $35.6 M

3 0092-03-053 I-45 At FM 664 Construct interchange Mar-2022 $42.4 M

4 0092-05-053 I-45 SH 34 to FM 85 Ramp reversal; reconstru. frtg rd; constru. bridge at FM 1181 Sep-2029 $18 M

5 0442-03-042 I-35E At FM 664 Reconstruct interchange Mar-2022 $39 M

6 0596-02-040 FM 66 At Coffee Branch Replace bridge and approaches Dec-2020 $1.2 M

7 0596-02-046 FM 66 At Mesquite Branch Replace bridge and approaches Dec-2020 $1.4 M

8 0712-03-013 FM 916 Johnson C/L to FM 66 Reconstruct existing pavement and add shoulders Jan-2024 $11.2 M

9 1048-03-011 FM 780 FM 660 to end of maintenance Reconstruct existing pavement and add shoulders Feb-2021 $8.7 M

10 1051-01-051 FM 664 I-35E to I-45 Widen 2/4 lane rural roadway to 6 lane urban Sep-2023 $99 M

11 1159-02-035 FM 879 0.3 miles west of FM 1722 to FM 813 Reconstruct existing pavement and add shoulders Nov-2021 $14.1 M

12 1212-01-016 FM 985 FM 984 to SH 34 Reconstruct existing pavement and add shoulders Jun-2024 $11.3 M

13 1318-01-017 FM 1181 Allard Rd. to Oil Field Rd. Reconstruct existing pavement and add shoulders Dec-2024 $4.8 M

14 1393-01-015 FM 308 At Draw (0.3 Mi NW of I-35E) Replace bridge and approaches Oct-2020 $0.9 M

15 1451-02-018 FM 55 Navarro C/L to SH 34 Reconstruct existing pavement and add shoulders Apr-2025 $10.8 M

16 1599-05-963 FM 2258 Johnson C/L to FM 157 Reconstruct existing pavement and add shoulders Jun-2023 $4.1 M

17 1974-01-012 FM 1181 Oil Field Rd. to SH 34 Reconstruct existing pavement and add shoulders Jul-2025 $11.1 M

18 2964-12-001 SL 9 I-35E to Dallas C/L Construct 0 to 2 lane frontage roads (ultimate 6) Sep-2022 $9.2 M

19 2964-12-002 SL 9 Dallas/Ellis C/L to Ellis/Dallas C/L Construct 0 to 2 lane frontage roads (ultimate 6) Sep-2022 $19 M

20 1051-03-001 FM 664 West of Ferris Road to I-45 Construct 0 to 6 Lane Roadway May-2023 $35.6 M

ESTIMATED TOTAL $392.12 M

TxDOT graphicSOURCE: Texas Department of Transportation.

1

2

4

5

67

8

16

9310

11

15 12

13

17

14

18

19 20

CORSICANA

MIDLOTHIAN

ENNIS

WAXAHACHIE

CORSICANA

ENNIS

WAXAHACHIE

45

45

45

77

77

77

77

67

67

287

67

45

45

45

35E

35E

35E

35E

35E

FerrisOvilla

Pecan Hill

Red Oak

Trumbull

Milford

Palmer

Maypearl

Garrett

Rosser

Rice

Emhouse

Barry

Frost

BloomingGrove

AlmaBardwell

Italy

Forreston

ELLIS CO.

NAVARRO CO.

ELLIS CO.

NAVARRO CO.

HILL CO.ELLIS CO.

ELLIS

CO.

JOHN

SON

CO.

ELLIS

CO.

KAUFMAN CO.

ELLIS CO.

DALLAS CO.

ELLIS CO.DALLAS CO.TARRANT CO.

ELLIS CO.

BardwellLake

Mid-WayRegionalAirport

660

983

813

878 879

876

308

934

308

667

877

984

984985

744

660

1390

1182

1603

1126

1722

916

157

875

663

34

34

34

34

34

22

22

31

287

287

287

287

66

66

66

55

55

55

CombineLancasterAirport

Cedar Hill

LancasterDeSoto WilmerJoe PoolLake

1382

35

N

2 miles

1387

664

1446879

85

MIDLOTHIAN

Wes

tmor

elan

d Rd

. Combine

Projects In Design

664

LakeWaxahachie