TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”
0963
_071
119
ELLIS COUNTY DESIGN PROJECTS2019 HIGHWAY PROJECTS:
SUMMER • Q2 2019
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
CONTACT INFORMATIONDanielle BoydInformation Specialist(214) 320-4480 • [email protected]
TxDOT graphicSOURCE: Texas Department of Transportation.
ELLIS COUNTY DESIGN PROJECTS (SUMMER Q2 2019)# CSJ Hwy Project Limits Description Est. Let Est. Cost
1 0442-03-044 I-35E Reese Dr. to Dallas C/L Construct interchange at Loop 9 and I-35 Sep-2022 $14.72 M
2 0048-04-094 I-35E At FM 387 (Butcher Rd.) Reconstr. IC inc. 4/6-lane frtg rd & ramp mods Aug-2022 $35.6 M
3 0092-03-053 I-45 At FM 664 Construct interchange Mar-2022 $42.4 M
4 0092-05-053 I-45 SH 34 to FM 85 Ramp reversal; reconstru. frtg rd; constru. bridge at FM 1181 Sep-2029 $18 M
5 0442-03-042 I-35E At FM 664 Reconstruct interchange Mar-2022 $39 M
6 0596-02-040 FM 66 At Coffee Branch Replace bridge and approaches Dec-2020 $1.2 M
7 0596-02-046 FM 66 At Mesquite Branch Replace bridge and approaches Dec-2020 $1.4 M
8 0712-03-013 FM 916 Johnson C/L to FM 66 Reconstruct existing pavement and add shoulders Jan-2024 $11.2 M
9 1048-03-011 FM 780 FM 660 to end of maintenance Reconstruct existing pavement and add shoulders Feb-2021 $8.7 M
10 1051-01-051 FM 664 I-35E to I-45 Widen 2/4 lane rural roadway to 6 lane urban Sep-2023 $99 M
11 1159-02-035 FM 879 0.3 miles west of FM 1722 to FM 813 Reconstruct existing pavement and add shoulders Nov-2021 $14.1 M
12 1212-01-016 FM 985 FM 984 to SH 34 Reconstruct existing pavement and add shoulders Jun-2024 $11.3 M
13 1318-01-017 FM 1181 Allard Rd. to Oil Field Rd. Reconstruct existing pavement and add shoulders Dec-2024 $4.8 M
14 1393-01-015 FM 308 At Draw (0.3 Mi NW of I-35E) Replace bridge and approaches Oct-2020 $0.9 M
15 1451-02-018 FM 55 Navarro C/L to SH 34 Reconstruct existing pavement and add shoulders Apr-2025 $10.8 M
16 1599-05-963 FM 2258 Johnson C/L to FM 157 Reconstruct existing pavement and add shoulders Jun-2023 $4.1 M
17 1974-01-012 FM 1181 Oil Field Rd. to SH 34 Reconstruct existing pavement and add shoulders Jul-2025 $11.1 M
18 2964-12-001 SL 9 I-35E to Dallas C/L Construct 0 to 2 lane frontage roads (ultimate 6) Sep-2022 $9.2 M
19 2964-12-002 SL 9 Dallas/Ellis C/L to Ellis/Dallas C/L Construct 0 to 2 lane frontage roads (ultimate 6) Sep-2022 $19 M
20 1051-03-001 FM 664 West of Ferris Road to I-45 Construct 0 to 6 Lane Roadway May-2023 $35.6 M
ESTIMATED TOTAL $392.12 M
TxDOT graphicSOURCE: Texas Department of Transportation.
1
2
4
5
67
8
16
9310
11
15 12
13
17
14
18
19 20
CORSICANA
MIDLOTHIAN
ENNIS
WAXAHACHIE
CORSICANA
ENNIS
WAXAHACHIE
45
45
45
77
77
77
77
67
67
287
67
45
45
45
35E
35E
35E
35E
35E
FerrisOvilla
Pecan Hill
Red Oak
Trumbull
Milford
Palmer
Maypearl
Garrett
Rosser
Rice
Emhouse
Barry
Frost
BloomingGrove
AlmaBardwell
Italy
Forreston
ELLIS CO.
NAVARRO CO.
ELLIS CO.
NAVARRO CO.
HILL CO.ELLIS CO.
ELLIS
CO.
JOHN
SON
CO.
ELLIS
CO.
KAUFMAN CO.
ELLIS CO.
DALLAS CO.
ELLIS CO.DALLAS CO.TARRANT CO.
ELLIS CO.
BardwellLake
Mid-WayRegionalAirport
660
983
813
878 879
876
308
934
308
667
877
984
984985
744
660
1390
1182
1603
1126
1722
916
157
875
663
34
34
34
34
34
22
22
31
287
287
287
287
66
66
66
55
55
55
CombineLancasterAirport
Cedar Hill
LancasterDeSoto WilmerJoe PoolLake
1382
35
N
2 miles
1387
664
1446879
85
MIDLOTHIAN
Wes
tmor
elan
d Rd
. Combine
Projects In Design
664
LakeWaxahachie