DISTRIBUTION PLANNING IRP CONTEMPORARY ISSUES IURC TECHNICAL CONFERENCE – APRIL 15, 2019 MIKE HOLTSCLAW, PE Director, T&D Operations Indianapolis Power & Light Company 1

DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

DISTRIBUTION PLANNINGIRP CONTEMPORARY ISSUES

IURC TECHNICAL CONFERENCE – APRIL 15, 2019

MIKE HOLTSCLAW, PE

Director, T&D Operations

Indianapolis Power & Light Company1

Page 2: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

TOPICS

• Distribution System Design – Current

State

• Distribution System Design – Future

State

• Distribution System Changes

• Future Planning Considerations

Distribution Planning will become one

of the most challenging jobs in the

utility industry

2

Page 3: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

• Radial from the substation to the last

end use customer, one way power flow

Lowest Voltage

Substation is

sole sourceHighest Voltage

3

DISTRIBUTION SYSTEM DESIGN

CURRENT STATE TODAY

Page 4: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

• Voltage profile designed to be higher at

the sub and drop as you get further out

on the circuit

• Ampacity across the circuit will vary,

usually higher towards the sub

4

DISTRIBUTION SYSTEM DESIGN

CURRENT STATE TODAY

Page 5: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

DISTRIBUTION SYSTEM DESIGN

FUTURE STATE

• Many New Challenges

• Will Need to be Designed for Two Way Power Flow

Voltage too high

Large Solar Site

Fault and load current goes both ways

False tripping, over duty, excess inrush

Will an island occur if this opens?

What about interrupting capacity?

Difficult to set one bus

voltage for both feeders

(solar vs non-solar)

5

Page 6: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

DISTRIBUTION SYSTEM DESIGN

FUTURE STATE

• Flatter voltage profile across the circuit

from the substation out

• Distributed Energy Resources (DERs)

located throughout the circuit

• Risk of creating islands, how to reconnect

• Circuit ampacity at least the same across

the circuit

6

Page 7: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

SYSTEM DESIGN CHANGES

• Smart Volt-VAR Control

(IVVC)

– Smart ULTC1 controls

– Smart Line Capacitor

Controls

• Smart Feeder relays

• Smart Switches/Reclosers

• Smart Meters

7

1 ULTC – Under Load Tap Changer

Page 8: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

SYSTEM DESIGN CHANGES

• FLISR – Fault Location, Isolation, System

Restoration (automatic)

• ADMS – Advanced Distribution Management

System to make it all work.

– Monitor/Control Devices

– Needs Detailed Circuit Model

8

Page 9: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

SYSTEM DESIGN CHANGES

• DERs at the distribution level

– Solar (Utility Scale & Rooftop)

– Wind

– Energy Storage

– Combined Heat & Power (CHP)

• Electric Vehicles

– Charging Requirements, type slow/fast

– Energy Source

– Time of Day

• Future things we haven’t thought of yet

9

Page 10: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

FUTURE DISTRIBUTION PLANNING

CONSIDERATIONS

• Will be more complicated going forward

• Will likely look more like transmission

planning does today

• Will require more detailed circuit level

models

• Will require considering not only load

profiles but DER dispatch patterns, not just

peak load

10

Page 11: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

FUTURE DISTRIBUTION PLANNING

CONSIDERATIONS

• How to treat DERs

– As Load off set

– As Capacity Resource

• Monitoring and control of DERs through

Utility’s ADMS

• Utility’s obligation to serve, how to

calculate capacity requirements if DERs

off line or unavailable

11

Page 12: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

FUTURE DISTRIBUTION PLANNING

CONSIDERATIONS

• EV Charging

– Transformer Sizing

– URD cable sizing

• System Protection &

Coordination of DERs

• Impact to Bulk Electric System

12

Page 13: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

None of the issues mentioned

are road blocks or “show

stoppers”, but things the

industry is and will work

through as we move forward

together

13

Page 14: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look

QUESTIONS/PANEL